• Challenges• Lack of Customer Awareness• Land Acquisition problems• Initial Cost of Setting up Power Plant is
still high
Overview•Solar energy is generated via 2 kinds of technology: Solar Photovoltaic (PV) technology Solar thermal technology•PV are arrays of cells containing solar photovoltaic material that converts solar radiation into electricity•In India, nearly 98% of solar modules manufactured use crystalline silicon technology and merely 2% of modules are manufactured using Thin Film technology
Value Chain – SPV Market
• Solar panel production is done using two technologies –• Crystalline silicon cells – Most dominant technology with more than 87% market share• Thin-film cells – Fastest growing technology due to silicon shortage
Application Segment Phase - I Phase-II Phase- III
2010-13 2013-17 2017-22
Utility grid power 1,000-2,000 MW 4000-10,000 MW 20,000 MW
Off- grid Applications 200 MW 1,000 MW 2,000 MW
Solar Thermal Collectors Area
7 million Sqm 15 million Sqm 20 million Sqm
Manufacturing Base -- -- 4,000-5,000 MW
Solar Lighting Systems -- -- 20 million
Solar RPO 0.25% -- 3%
- In West Bengal the solar energy will solve power woes of the state, which desperately needs development. According to survey the state gets 90% power from coal and crisis is increasing daily.
- There are about 2,000 villages in west Bengal where conventional electric line cannot be extended due to prohibitive cost. 400 villages out of these 2000 villages have already been electrified by Solar PV route.
- The multi-storey buildings in the state of West Bengal can be encouraged to install solar panels on the rooftops for power generation,
- Govt. of West Bengal is in the process of making mandatory for all the public buildings to have solar devices to meet electricity requirements and other applications. All existing and upcoming commercial and business establishments having more than 1.5 MW of contract demand will be required to install solar rooftop systems to meet at least 2% of their total electrical load. Further, all the existing and upcoming schools and colleges, hospitals, large housing societies and Government establishments having a total contract demand of more than 500 KW will be required to install solar rooftop systems to meet at least 1.5% of their total electrical load
-
- Solar rooftop and small solar PV installations can provide a significant amount of energy for in-house loads, reducing peak system demands in urban establishments. Depending on the rooftop area available and building loads, these solar systems can be as large as 0.5 MW and can power a majority of the building’s loads.
-Urban local bodies like Municipal Corporations, Utilities, City, Corporations, commercial building like offices and malls may form an essential part of the installation as they posses buildings with considerable roof space..
MJB
Solar PV ArraySolar PV Array Stand Alone PCUStand Alone PCU
ACDBACDB
Battery BankBattery Bank
LOADLOAD
MJB
Solar PV ArraySolar PV Array Grid Connected PCUGrid Connected PCU
ACDBACDB
Grid/MainsGrid/Mains
LOADLOAD
Net MeterNet Meter
MJB
Solar PV ArraySolar PV Array Stand Alone PCUStand Alone PCU
ACDBACDB
Battery BankBattery Bank
LOADLOAD
MJB
Solar PV ArraySolar PV Array Grid Connected PCUGrid Connected PCU
ACDBACDB
Grid/MainsGrid/Mains
LOADLOAD
Net MeterNet Meter
And today VIKRAM SOLAR is recognized as one of the Leading Solar PV Module Manufacturing Company & Total EPC Solution provider in Eastern India and
known for its Quality, Innovation, Commitment & Experience.
And today VIKRAM SOLAR is recognized as one of the Leading Solar PV Module Manufacturing Company & Total EPC Solution provider in Eastern India and
known for its Quality, Innovation, Commitment & Experience.
THANK YOU