Hessian Road and Traffic Authority Gerd Riegelhuth Hessian Road and Traffic Authority Gerd Riegelhuth Budapest, 15th April 2009 1 Exchange of experiances with ITS Hungary Budapest, 15th April 2009
36
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Riegelhuth-Congestion Free Hessia

Hessian Road and Traffic Authority

Gerd Riegelhuth

Hessian Road and Traffic Authority

Gerd Riegelhuth Budapest, 15th April 2009 1

Exchange of experiances with ITS Hungary

Budapest, 15th April 2009

Page 2: Riegelhuth-Congestion Free Hessia

Hessian Road and Traffic Authority

GermanyHessen

Federal State of Hessia

Population 6,0 MillionArea 22.335 km2

Motorways 1.000 kmSecondary Roads 14.000 km

Gerd Riegelhuth Budapest, 15th April 2009 2

Rhein-Main Area

Rhein-Main Area

62% of population (3,7 Million)33% of area (7.445 km2)

67% of jobs70% of economy power

Page 3: Riegelhuth-Congestion Free Hessia

Hessian Road and Traffic Authority

A 5

Motorways in the Rhein-Main area

150.000

accidents events

RheinMain area: one of thetraffic turntables in Europe with the overlapping of throughtraffic and commuting traffic

Gerd Riegelhuth Budapest, 15th April 2009 3

Frankfurt a.M.

A 6

61

A 3

A 6

7

A 66

A 5

[ADT]Veh/d

130.000

130.000

130.000140.000

accidents

road works capacity overload

events

Comparison:Comparison:Comparison:Comparison:

ADT MW Hessen 62.000 Veh/dADT MW Germany 49.000 Veh/d

Page 4: Riegelhuth-Congestion Free Hessia

Hessian Road and Traffic Authority

Traffic framework conditions in Traffic framework conditions in Traffic framework conditions in Traffic framework conditions in HessenHessenHessenHessen� Frankfurt Airport

� Central air traffic hub (worldwide)

� Intermodal network with other transport carriers

� Intercity Railway Station and Central Railway Station in Frankfurt� More than 330,000 passengers/day at the Frankfurt Central Railway Station� Intercity Railway Station linked with road and air

� Federal motorways and Frankfurt motorway interchange� More than 330,000 vehicles/day at the Frankfurt motorway interchange

Gerd Riegelhuth Budapest, 15th April 2009 4

� More than 330,000 vehicles/day at the Frankfurt motorway interchange� More than 130,000 vehicles/day on every motorway in the Rhine-Main-Region

� Rhine-Main-Region� More than 2/3 of the population and more than 2/3 of the economic power of Hessen� City of Frankfurt with a commuter balance of 251,000 professionals

Page 5: Riegelhuth-Congestion Free Hessia

Hessian Road and Traffic Authority

Traffic framework conditions in Traffic framework conditions in Traffic framework conditions in Traffic framework conditions in HessenHessenHessenHessen� Rhine-Main area is the most impor-

tant traffic turntable in Europe

� Regional and long distance traffic

� High part of heavy-vehicle traffic

� ADT >130.000 veh/day on motor-

ways in the Rhine-Main area

� 335.000 veh/day at junction F.-Kreuz

Gerd Riegelhuth Budapest, 15th April 2009 5

� Average Traffic on motorways� Germany: 49.400 veh/day

� Hessen: 62.300 veh/day

� Well developed traffic infrastructure with telematics applications

Page 6: Riegelhuth-Congestion Free Hessia

Hessian Road and Traffic Authority

Effects of high traffic loadEffects of high traffic loadEffects of high traffic loadEffects of high traffic load� Periodic load / Overload of the road network

� Disruption of traffic flow at construction sites

� Excessive load of road infrastructure and resulting restrictions / closures

~ 70% capacity problems� Infrastructure

� Short term construction sitesLong term construction sites

Gerd Riegelhuth Budapest, 15th April 2009 6

� Road accidents by infrastructure, vehicle and driver-related deficits

� Disruption of traffic due heavy (lorry) accidents

� Long term construction sites

~ 30% safety problems � Accidents

� Incidents

Page 7: Riegelhuth-Congestion Free Hessia

Hessian Road and Traffic Authority

Strategic goals in traffic managementStrategic goals in traffic managementStrategic goals in traffic managementStrategic goals in traffic management� Efficiency

� Enhancement of efficiency and optimized use of transport systems� Intermodal mobility by networking the modes of transport

� Safety� Improvement of passive and active safety of travelers� Protection of privacy for applications and users

� Quality� Regard of ecological and economical aspects

Gerd Riegelhuth Budapest, 15th April 2009 7

� Regard of ecological and economical aspects� Availability of the infrastructure networks for persons and goods

� Availability� Standardization and interoperability� Accessibility and barrier-freedom� Customer and user kindness

Page 8: Riegelhuth-Congestion Free Hessia

Hessian Road and Traffic Authority

The Hessian wayThe Hessian wayThe Hessian wayThe Hessian way� Congestion free Hessen 2015 with

clear goal and big support by

the Hessian government

� Concepts, strategies and realization

are in responsibility of the HRTA

� The State of Hessen takes care for

the task of sustainable mobility

Gerd Riegelhuth Budapest, 15th April 2009 8

� Goal oriented involvement of part-

ners according to their strengths

� Innovative methods of resolution

� Sustainability and transferibility of projects are guaranteed

Page 9: Riegelhuth-Congestion Free Hessia

Hessian Road and Traffic Authority

Essential steps for achievementEssential steps for achievementEssential steps for achievementEssential steps for achievement� Targeted measures (upgrading, conversion) to increase the basic capacity

� Intelligent use of available transport infrastructure with the help of

telematics systems [e.g. for traffic management and traffic information]

� Consistent use of potentials to increase road safety, particularly in heavy

vehicle traffic

� Immediately towning of neglected and accidented vehicles

� Minimise the disruption of traffic flow resulting from construction sites by

Gerd Riegelhuth Budapest, 15th April 2009 9

coordinated road works management

� Division of responsibilities between individual transport and public

transportation, particularly in regional transport

Page 10: Riegelhuth-Congestion Free Hessia

Hessian Road and Traffic Authority

Strategy of Realization of Traffic ManagementStrategy of Realization of Traffic ManagementStrategy of Realization of Traffic ManagementStrategy of Realization of Traffic Management

Organi-

sational

and technical

network

Gerd Riegelhuth Budapest, 15th April 2009 10

Realization of

basic capacity of transport infrastructure

Availibility of

transport infrastructure

Efficient use of

transport infrastructure

Page 11: Riegelhuth-Congestion Free Hessia

Hessian Road and Traffic Authority

Be

nch

ma

rk

ing

Eva

luati

on

Strategy ManagementL

ine

Co

ntr

ol

Inc

ide

nt

ma

na

ge

men

t

Ne

two

rk

-

op

tim

izati

on

Co

nstr

uc

tio

n

ma

na

ge

men

t

Tra

ffic

info

rm

ati

on

Hessen Traffic Centre

Topics Topics Topics Topics ofofofof traffictraffictraffictraffic managementmanagementmanagementmanagement in Hessenin Hessenin Hessenin Hessen

Be

nch

ma

rk

ing

Gerd Riegelhuth Budapest, 15th April 2009 11

Innovations – Mobility strategies - Concepts

Be

nch

ma

rk

ing

Traffic data management system

Eva

luati

on

Traffic situation analysis and forecast

Lin

e C

on

tro

l

Inc

ide

nt

ma

na

ge

men

t

Ne

two

rk

op

tim

izati

on

Co

nstr

uc

tio

n

sit

e

ma

na

ge

men

t

Tra

ffic

info

rm

ati

on

Be

nch

ma

rk

ing

Page 12: Riegelhuth-Congestion Free Hessia

Hessian Road and Traffic Authority

RoleRoleRoleRole ofofofof Hessen Traffic Hessen Traffic Hessen Traffic Hessen Traffic CentreCentreCentreCentre� Hessen Traffic Centre as the core:

Traffic Management Centre for traffic control and information

� Road trafffic authority for motorways

� Operation on 24 hours and 7 days

� Competence from one source:� Visions and concepts

� Planning und realisization

� Operation and co-operation

Gerd Riegelhuth Budapest, 15th April 2009 12

� Operation and co-operation

� Sustainability and transferability

� Managing the traffic of the future in an innovative and intelligent way

Page 13: Riegelhuth-Congestion Free Hessia

Hessian Road and Traffic Authority

accidents road workscapacity overload events

Realization of dynamic measuresRealization of dynamic measuresRealization of dynamic measuresRealization of dynamic measures

Gerd Riegelhuth Budapest, 15th April 2009 13

Traffic situation

analysis / forecast

(problem sample)

Realization of dynamic measures to remove/reduce traffic problems

Richtung Basel bis18 22

Vollsperrung nach Unfall

Umleitung über Offenbacher Kreuz

5

661 5 661

Frankfurt

Wiesbaden

Oberur sel

Bad Homburg

Köln

F. Kreuz

Bad Vilbel

661

Page 14: Riegelhuth-Congestion Free Hessia

Hessian Road and Traffic Authority

Level of ServiceTraffic ForecastTMC Messages

Strategy Manager

TCCTrafficControlCentre

Ober ur se l

TSCTrafficServiceCentre

Road Works Management

Content Providing

Network Control

Line Control

Strategy ManagementStrategy Management

Database

System architecture of Hessen Traffic CentreSystem architecture of Hessen Traffic CentreSystem architecture of Hessen Traffic CentreSystem architecture of Hessen Traffic Centre

Gerd Riegelhuth Budapest, 15th April 2009 14

Digital TrafficManagement Map

Basic Data

TMC MessagesRoad Works MessagesCalendar of Events

Actual Strategy SituationPattern of EventsStrategy LibraryTravel Times

Richtung Basel bis18 22

Vollsperrung nach Unfall

Umleitung über Offenbacher Kreuz

5

661

661

Bad Hom burg

Internet Service

RDS-TMC

Event Management

Junction Control

Incident Management

T. Use of Hard Shoulder

Benchmarking and Quality Management

Page 15: Riegelhuth-Congestion Free Hessia

Hessian Road and Traffic Authority

Potential Potential Potential Potential assessmentassessmentassessmentassessment ofofofof motorwaysmotorwaysmotorwaysmotorways in Hessenin Hessenin Hessenin HessenTime losses per year

100%

80

100

Tim

e l

osses v

eh

*h (

wit

ho

ut

co

nstr

ucti

on

sit

es)

%

Level 0: Current state (without construction sites) Level 1: Eliminate bottlenecks (capacity-releated)

Level 2: Eliminate bottlenecks (safety-releated) Level 3: Improved incident management

Gerd Riegelhuth Budapest, 15th April 2009 16

41% 40%

34%

0

20

40

60

Level 0 Level 1 Level 2 Level 3

Tim

e l

osses v

eh

*h (

wit

ho

ut

co

nstr

ucti

on

sit

es)

%

Page 16: Riegelhuth-Congestion Free Hessia

Hessian Road and Traffic Authority

Areas Areas Areas Areas ofofofof thethethethe initiative initiative initiative initiative CongestionCongestionCongestionCongestion Free Free Free Free HessiaHessiaHessiaHessia

� Mobility ServicesMobility ServicesMobility ServicesMobility Services

� Traffic ManagementTraffic ManagementTraffic ManagementTraffic Management

Gerd Riegelhuth Budapest, 15th April 2009 17

� Traffic ManagementTraffic ManagementTraffic ManagementTraffic Management

� Future TechnologiesFuture TechnologiesFuture TechnologiesFuture Technologies

mit Unterstützung durch:

Page 17: Riegelhuth-Congestion Free Hessia

Hessian Road and Traffic Authority

� Future Future Future Future technologiestechnologiestechnologiestechnologiesCarCarCarCar----InfrastructureInfrastructureInfrastructureInfrastructure----CommunicationCommunicationCommunicationCommunication� Project SIM-TD

� Co-operation project with partners of German industry[car manufacturers, sub-supplier, science, ...]

� 400 cars in the test field Rhein-Main to provecommunication to Hessen Traffci Centre

� DIAMANT� Co-operation project HSVV, Opel, Dambach, Continental

Gerd Riegelhuth Budapest, 15th April 2009 18

� Co-operation project HSVV, Opel, Dambach, Continental

Hessen Traffic Hessen Traffic Hessen Traffic Hessen Traffic CentreCentreCentreCentre� Experimental Centre for C2X applications� E21: Sustainability by further development

VerkehrsdatenerfassungVerkehrsdatenerfassungVerkehrsdatenerfassungVerkehrsdatenerfassung� Project DIVA

� Modelling of traffic situation [motorways, federal state roads, ...]

� Floating Car Data [DIANA] � Floating Traveller Data [in preparation]

Page 18: Riegelhuth-Congestion Free Hessia

Hessian Road and Traffic Authority

�Traffic ManagementTraffic ManagementTraffic ManagementTraffic ManagementTemporaryTemporaryTemporaryTemporary UseUseUseUse ofofofof HardHardHardHard ShoulderShoulderShoulderShoulder� Increase of capacity up to 25%� Masterplan for motorways in Hessen (~340 km)

ConstructionConstructionConstructionConstruction Site Site Site Site MMMManagementanagementanagementanagement� Evaluation of impacts on traffic caused by

short-term construction sites on motorways� Reduction of contruction time

Gerd Riegelhuth Budapest, 15th April 2009 19

� Reduction of contruction time

IncidentIncidentIncidentIncident ManagementManagementManagementManagement� Reduction congestions caused by cars which

had an accident or a break down� Quicker rescue of these vehicles

StrategyStrategyStrategyStrategy////CorridorCorridorCorridorCorridor ManagementManagementManagementManagement� Cross competence realization of traffic management

strategies concerning different modes

Page 19: Riegelhuth-Congestion Free Hessia

Hessian Road and Traffic Authority

�Mobility ServicesMobility ServicesMobility ServicesMobility ServicesParkingParkingParkingParking andandandand pick pick pick pick upupupup� Detailled information regarding P+M parking places

in order to support car pooling� Website www.pundm.hessen.de

HandyHandyHandyHandy----TicketingTicketingTicketingTicketing� Encouragement to use public transport by

simplification of acces to busses and trains

Gerd Riegelhuth Budapest, 15th April 2009 20

simplification of acces to busses and trains� Transmission of time tables to handies in real time � Buying tickets by use of handies

Traffic Information PortalTraffic Information PortalTraffic Information PortalTraffic Information Portal� Information regarding all modes� Co-operation with map24� Website www.verkehrsinfo.hessen.de

Page 20: Riegelhuth-Congestion Free Hessia

Hessian Road and Traffic Authority

Levels of strategic traffic management

AccidentsS

trate

gie

s

Interregional Traffic

Public Transport

Gerd Riegelhuth Budapest, 15th April 2009 43

Road works

Overload

Events

Str

ate

gie

s

Urban Traffic

Information Services

Driver Assistance / Navigation

Page 21: Riegelhuth-Congestion Free Hessia

Hessian Road and Traffic Authority

Technical frameTechnical frameTechnical frameTechnical frame

Various road or traffic authorities are involved

Organizational structure and tasks of involved parties are different

Different levels of development in the Control Centres of the involved

authorities, e.g. different models for re-routing in the Control Centres

Telematics

Gerd Riegelhuth Budapest, 15th April 2009 44

TelematicsCentre

TrafficCentre

ControlCentre

TelematicsComponent ?

Page 22: Riegelhuth-Congestion Free Hessia

Hessian Road and Traffic Authority

01 02 03 04 05 06 07 08 09

11 12 13 14 15 16 17 18 19

10

20

Library of StrategiesLibrary of StrategiesLibrary of StrategiesLibrary of Strategies

16

16 1616

Interregional/Intermodal Strategy ManagementInterregional/Intermodal Strategy ManagementInterregional/Intermodal Strategy ManagementInterregional/Intermodal Strategy Management

P r o b l e m S i t u a t i o nP r o b l e m S i t u a t i o nP r o b l e m S i t u a t i o nP r o b l e m S i t u a t i o n

F r a m e w o r k C o n d i t i o n sF r a m e w o r k C o n d i t i o n sF r a m e w o r k C o n d i t i o n sF r a m e w o r k C o n d i t i o n s

++++

Gerd Riegelhuth Budapest, 15th April 2009 45

11 12 13 14 15 16 17 18 19 20

16

16

04 08 02

Activation

16

Priority: 1. 2. 3. 4.

Pre-selection

F r a m e w o r k C o n d i t i o n sF r a m e w o r k C o n d i t i o n sF r a m e w o r k C o n d i t i o n sF r a m e w o r k C o n d i t i o n s

S t r a t e g i e sS t r a t e g i e sS t r a t e g i e sS t r a t e g i e s

16 Measure 1Measure 2

Measure 3Measure 4

Measure 5Measure n

[ ]

====

Problem Situation

Page 23: Riegelhuth-Congestion Free Hessia

Hessian Road and Traffic Authority

Interregional/Intermodal Strategy ManagementInterregional/Intermodal Strategy ManagementInterregional/Intermodal Strategy ManagementInterregional/Intermodal Strategy Management

Synchronization of crossSynchronization of crossSynchronization of crossSynchronization of cross----competence strategy activationcompetence strategy activationcompetence strategy activationcompetence strategy activation

---- Conceptual structure Conceptual structure Conceptual structure Conceptual structure ----

Partner 1 LOS

Partner 2 LOS

strategypre-selection

inquiry forstrategy

reali

zati

on

of

str

ate

gy r

ela

ted

measu

res

o.k.

activation ofstrategies

problem

Gerd Riegelhuth Budapest, 15th April 2009 46

Partner 3

Partner 4

Partner n LOS

LOS

LOS

strategy

inquiry forstrategy

reali

zati

on

of

str

ate

gy r

ela

ted

measu

res

o.k.

inquiry forstrategy

o.k.

Page 24: Riegelhuth-Congestion Free Hessia

Hessian Road and Traffic Authority

CoCoCoCo----operation frameworkoperation frameworkoperation frameworkoperation framework

HessenInter-

Strategy ManagerStrategy ManagerStrategy ManagerStrategy Manager

Gerd Riegelhuth Budapest, 15th April 2009 48

HessenTrafficCentre

Regionalpartners

Inter-regionalPartners

Traffic management needs co-ordination

Page 25: Riegelhuth-Congestion Free Hessia

Hessian Road and Traffic Authority

OverOverOverOver----regional Network regional Network regional Network regional Network ControlControlControlControl� Hessen is the initiator for the

development and testing of a meta-level

responsibility traffic control on German

motorways (see chart) embedded in a

European context by early involvement

of neighbouring countries such as

SustainabilitySustainabilitySustainabilitySustainability andandandand transferabilitytransferabilitytransferabilitytransferability

Gerd Riegelhuth Budapest, 15th April 2009 50

of neighbouring countries such as

Austria and Switzerland

� The technical and organisational

arrangements were designed in Hessen

� Three-cross national corridors

� First measurable results

� New quality level of network influence in

Germany

Page 26: Riegelhuth-Congestion Free Hessia

Hessian Road and Traffic Authority

50.000

60.000

70.000

80.000

90.000

100.000

- 47 % - 44 %

- 60 %- 70 %

100 %

90 %

80%

70 %

CongestionCongestionCongestionCongestion freefreefreefree HessiaHessiaHessiaHessia –––– a a a a modellmodellmodellmodell ofofofof successsuccesssuccesssuccess

- 80 %

Gerd Riegelhuth Budapest, 15th April 2009 52

0

10.000

20.000

30.000

40.000

50.000

Mittelwert 2001 - 2003 2004 2005 2006 2007

60%

50 %

40 %

30 %

20 %

10 %

0 %

Progression of congestion time on motorways in Hessen

2008

- 80 %

Page 27: Riegelhuth-Congestion Free Hessia

Hessian Road and Traffic Authority

CongestionCongestionCongestionCongestion freefreefreefree HessiaHessiaHessiaHessia –––– a a a a modellmodellmodellmodell ofofofof successsuccesssuccesssuccess

car breakdowns construcition sites accidents traffic caused

3.000

15.000

70.000

80.000

90.000

100.000 Main Main Main Main factorsfactorsfactorsfactors ofofofof successsuccesssuccesssuccess

� Temporary use of hard shoulder

� Constructional elemination of bottlenecks

� Dynamic information panels

Gerd Riegelhuth Budapest, 15th April 2009 53

54.000

60.000

50.000

40.000

30.000

20.000

10.000

0

Mittelwert 2001-2003 2004 2005 2006 20082007

22.000

12.000

12.00011.000

25.000

12.00010.000

19.000

5.000

13.000

5.000

7.000

9.000

1.000 1.000

1.000

1.000

6.0003.000

1.000

16.000

� Dynamic information panels

� Construction site management

Page 28: Riegelhuth-Congestion Free Hessia

Hessian Road and Traffic Authority

Benefit of intelligent traffic management� Reduction of heavy accidents up to 30 %

� Reduction of travel times up to 20 %

� Increase of road capacity up to 25 %

� High acceptance by dynamic measures in traffic control

� Less incidents in road operation by road works management

� Reduction of congestion up to 20 % by preventive re-routing

measures

Gerd Riegelhuth Budapest, 15th April 2009 54

More More More More traffictraffictraffictraffic safetysafetysafetysafety

lesslesslessless congestioncongestioncongestioncongestion andandandand betterbetterbetterbetter traffictraffictraffictraffic flowflowflowflow

but ...

Page 29: Riegelhuth-Congestion Free Hessia

Hessian Road and Traffic Authority

Limits of collective traffic control systemsLimits of collective traffic control systemsLimits of collective traffic control systemsLimits of collective traffic control systems

� Traffic situation analysis and forecast only on motorways

� Outside of motorways traffic data only available for the operation of local

traffic control systems, e.g. traffic lights

� Traffic control systems will not be available all over the country

� Differentiated traffic control only possible in a very limited way

� Different local and regional developments caused by distributed

Gerd Riegelhuth Budapest, 15th April 2009 55

Different local and regional developments caused by distributed

responsibilities and limited interoperability of telematics systems

� Sustainable operation not everywhere guaranteed

� Only limited financial resources on site of public authorities

� ...

No sufficient use of all potentials,

Chances of intelligent vehicles???

Page 30: Riegelhuth-Congestion Free Hessia

Hessian Road and Traffic Authority

Traffic controlTraffic controlTraffic controlTraffic control vs.vs.vs.vs. Traffic Information / NavigationTraffic Information / NavigationTraffic Information / NavigationTraffic Information / Navigation

Traffic centre

Collective influence

of road users

Automatic Condition Analysis

and control decisions

Automatic condition analysis

and information serviceExchange Guide

Navigation System

Traffic Information

Phone service

Road Atlas

Passenger ....

Gerd Riegelhuth Budapest, 15th April 2009 57

FCD

FTD

Traffic detectors

and other sources

centre

Current coverage of the transport demand

of collective transport recording systems

To influence

decisions by

(individual)

information

Servicecentre

Data delivery according to

the data transfer agreement

....

Page 31: Riegelhuth-Congestion Free Hessia

Hessian Road and Traffic Authority

Concept of C2XConcept of C2XConcept of C2XConcept of C2X----CommunicationCommunicationCommunicationCommunication

Core componentCore componentCore componentCore component

� Traffic Centre Hessen with ex-

tended functionalities / applications

ApplicationApplicationApplicationApplication

� Messages about incidents from the

vehicles to the Traffic Centre

� Distribution of warning or re-routing

Road-Side-Unit

Warnung an nachfolgendeFahrzeuge (I2C)

Gerd Riegelhuth Budapest, 15th April 2009 58

� Distribution of warning or re-routing

information from the Traffic

Centre to the vehicles

� Exchange of dangerous warnings

between the vehicles

� Transportation of informationen

by the vehicles (multi hopping)

� Optimization of re-routing measures by

including navigation informationZentrale

Unfall

Direkte Unfallwarnung(C2C)

Road-Side-Unit

Page 32: Riegelhuth-Congestion Free Hessia

Hessian Road and Traffic Authority

Levels of action seen by the traffic centreLevels of action seen by the traffic centreLevels of action seen by the traffic centreLevels of action seen by the traffic centre

Gerd Riegelhuth Budapest, 15th April 2009 59

Traffic control and

detection

Network control

and re-routing

Traffic safety

Strategies� RhineMain

� Europe

Hessen Traffic Centre

Page 33: Riegelhuth-Congestion Free Hessia

Hessian Road and Traffic Authority

C2X projects with participation of C2X projects with participation of C2X projects with participation of C2X projects with participation of HessenHessenHessenHessen� DIAMANT (DIAMANT (DIAMANT (DIAMANT (DDDDynamic ynamic ynamic ynamic IIIInformation and nformation and nformation and nformation and AAAApplications to secure pplications to secure pplications to secure pplications to secure

MMMMobility by using obility by using obility by using obility by using AAAAdaptive daptive daptive daptive NNNNetworks and etworks and etworks and etworks and TTTTelematicselematicselematicselematics

infrastruktureinfrastruktureinfrastruktureinfrastrukture))))� Regional project; co-operation Opel, Hessen and regional enterprises

� Kickoff in February 2006; End of 2007: presetation of demonstrators

� AKTIV (AKTIV (AKTIV (AKTIV (AAAAdaptive und daptive und daptive und daptive und KKKKooperativeooperativeooperativeooperative TTTTechnologienechnologienechnologienechnologien fürfürfürfür den den den den

IIIIntelligentenntelligentenntelligentenntelligenten VVVVerkehrerkehrerkehrerkehr))))� National project with test field Hessen

Gerd Riegelhuth Budapest, 15th April 2009 60

� National project with test field Hessen

� Start: September 2006

� CVIS (CVIS (CVIS (CVIS (CCCCoooo----operative operative operative operative VVVVehicleehicleehicleehicle IIIInfrastructure nfrastructure nfrastructure nfrastructure SSSSystem)ystem)ystem)ystem)� European project

� Start: February 2006

� SIMSIMSIMSIM----TD (TD (TD (TD (SSSSafe afe afe afe IIIIntelligent ntelligent ntelligent ntelligent MMMMobilityobilityobilityobility----TTTTestingestingestingesting DDDDemonstratingemonstratingemonstratingemonstrating))))� National project with field trial in Hessen (~400 equipped cars)

� Main Partners: VW, DaimlerChrysler, Opel, Ford, BMW, Audi, Bosch,

Continental, T-Com, Hessian Road and Traffic Authority, City of Franfurt

� Start: September 2008

Page 34: Riegelhuth-Congestion Free Hessia

Hessian Road and Traffic Authority

Vision of hard shoulder running using C2IVision of hard shoulder running using C2IVision of hard shoulder running using C2IVision of hard shoulder running using C2I

Breakdown!!!Breakdown!!!Breakdown!!!Breakdown!!!

Obstacle!!! Obstacle!!! Obstacle!!! Obstacle!!!

Clear hard houlder!!!Clear hard houlder!!!Clear hard houlder!!!Clear hard houlder!!!

Gerd Riegelhuth Budapest, 15th April 2009 61

Seite

nstre

ifen

befa

hre

n

Seite

nstre

ifen

räum

en

10

01

00

10

0

10

01

00

10

01

00

equipped with C2X technology

Page 35: Riegelhuth-Congestion Free Hessia

Hessian Road and Traffic Authority

C2IC2IC2IC2I----/C2C/C2C/C2C/C2C----CommunicationCommunicationCommunicationCommunication

Example „Dynamic Construction Site Warning“Example „Dynamic Construction Site Warning“Example „Dynamic Construction Site Warning“Example „Dynamic Construction Site Warning“

Gerd Riegelhuth Budapest, 15th April 2009 62

Page 36: Riegelhuth-Congestion Free Hessia

Hessian Road and Traffic Authority

ConclusionConclusionConclusionConclusion andandandand outlookoutlookoutlookoutlook� Hessen has a competitive edge in

the field of transport telematics

� This potential is strictly used for

an integrated traffic management

and will be systematically enlarged

� Innovative methods of resolution will

developed and run with high efficiency

Gerd Riegelhuth Budapest, 15th April 2009 66

� Construction site management system

� Long distance corridor network control

� Dynamic location of short term

construction sites

� ...

� On account of this framework con-

ditions Hessen is test field (biotop) in

several research projects to assess

traffic technologies of the future

(CVIS, AKTIV, DIAMANT, SIM-TD)