Top Banner
…. RENEWABLE ENERGY, REGULATORY FRAMEWORK AND LICENSING PRESENTATION 1
23

RENEWABLE ENERGY, REGULATORY FRAMEWORK AND … ENERGY, … · Renewable energy Cont… Renewable energy comprises of alternative forms of energy other than the commonly used hydro-power

May 21, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: RENEWABLE ENERGY, REGULATORY FRAMEWORK AND … ENERGY, … · Renewable energy Cont… Renewable energy comprises of alternative forms of energy other than the commonly used hydro-power

….

RENEWABLE ENERGY,

REGULATORY FRAMEWORK AND

LICENSING PRESENTATION

1

Page 2: RENEWABLE ENERGY, REGULATORY FRAMEWORK AND … ENERGY, … · Renewable energy Cont… Renewable energy comprises of alternative forms of energy other than the commonly used hydro-power

PRESENTATION OUTLINE

1. What is Renewable Energy

2. Legislative Framework

3. Licensing process

Investment Endorsement for Project

Developers in alternative sources of energy

2

Page 3: RENEWABLE ENERGY, REGULATORY FRAMEWORK AND … ENERGY, … · Renewable energy Cont… Renewable energy comprises of alternative forms of energy other than the commonly used hydro-power

RENEWABLE ENERGY

What is “Renewable Energy”:

Renewable energy is energy which can

be obtained from natural resources that

can be constantly replenished, like wind

and sunshine.

Renewable energy is also called "clean

energy" or "green power" because it

doesn't pollute the air or the water.

3

Page 4: RENEWABLE ENERGY, REGULATORY FRAMEWORK AND … ENERGY, … · Renewable energy Cont… Renewable energy comprises of alternative forms of energy other than the commonly used hydro-power

Renewable energy Cont…

Renewable energy comprises of

alternative forms of energy other than the

commonly used hydro-power energy

(dependent on water). These include:

Solar energy,

Biomass energy/fuel,

Wind energy, and

Geothermal energy.

4

Page 5: RENEWABLE ENERGY, REGULATORY FRAMEWORK AND … ENERGY, … · Renewable energy Cont… Renewable energy comprises of alternative forms of energy other than the commonly used hydro-power

LEGISLATIVE FRAMEWORK

Enabling legislation include:

The Energy Regulation Act, Cap 436;

The Electricity Act, Cap 433;

The Petroleum Act, Cap 435; and

The Energy Regulation (Licensing Regulations), Statutory Instrument No. 2 of 1998.

5

Page 6: RENEWABLE ENERGY, REGULATORY FRAMEWORK AND … ENERGY, … · Renewable energy Cont… Renewable energy comprises of alternative forms of energy other than the commonly used hydro-power

LICENSING

Authority to licence drawn from:

The Energy Regulation Act (ERA)

particularly section 6 which

acknowledges the ERB as the sole

licensing authority in the energy sector.

The Electricity Act (EA) particularly

section 3 which requires the licensing of

Generation; Transmission; Distribution;

and Supply of electricity whether hydro-

power or renewable energy such as Solar.

6

Page 7: RENEWABLE ENERGY, REGULATORY FRAMEWORK AND … ENERGY, … · Renewable energy Cont… Renewable energy comprises of alternative forms of energy other than the commonly used hydro-power

LICENSING PROCEDURE

The Energy Regulation (Licensing ) Regulations SI No.2 of 1998 as read together with the ERA sets out procedures for licensing for energy undertakings;

A formal application to undertake a licensed activity in the energy sector such as generation (30yrs), or supply of electricity (5yrs) using any form of energy i.e. solar, must be made to the ERB, with specific documentations to be filed in support of the application;

Page 8: RENEWABLE ENERGY, REGULATORY FRAMEWORK AND … ENERGY, … · Renewable energy Cont… Renewable energy comprises of alternative forms of energy other than the commonly used hydro-power

Requirements for a Licence to Generate

Electricity using Renewable Energy

Requirements for Generation Licence using Renewable Energy: 5 Year Business Plan;

Latest Audited Accounts/Financial Statement [If company is already operational];

Proof of funds i.e. Six Months Bank Statement or

8

Page 9: RENEWABLE ENERGY, REGULATORY FRAMEWORK AND … ENERGY, … · Renewable energy Cont… Renewable energy comprises of alternative forms of energy other than the commonly used hydro-power

Requirements cont..

Letter of commitment from Sponsors accompanied with Board Resolutions of Sponsor company;

Latest Annual Returns from PACRA Latest Tax Clearance Certificate from ZRA;

Residence Permits for foreign, directors/shareholders;

Certified copies of NRCs for Zambian Directors;

9

Page 10: RENEWABLE ENERGY, REGULATORY FRAMEWORK AND … ENERGY, … · Renewable energy Cont… Renewable energy comprises of alternative forms of energy other than the commonly used hydro-power

Requirements cont..

Copy of Investment Endorsement;

Proof of residence for Directors, i.e. Utility bill or tenancy agreement; and

Technical detail of the infrastructure to be used.

10

Page 11: RENEWABLE ENERGY, REGULATORY FRAMEWORK AND … ENERGY, … · Renewable energy Cont… Renewable energy comprises of alternative forms of energy other than the commonly used hydro-power

Requirements Cont..

NB: Once assessed application fee is

paid at 0.1 % of the cost of investment.

Upon being licensed, licensee is also

required to pay monthly licence fees of

0.7% of monthly turnover of the

business.

11

Page 12: RENEWABLE ENERGY, REGULATORY FRAMEWORK AND … ENERGY, … · Renewable energy Cont… Renewable energy comprises of alternative forms of energy other than the commonly used hydro-power

Licensing Procedure Cont...

Documentation supporting application for Supply Installation and Maintenance of Solar Energy Systems:

Applicable to undertakings that may wish to engage in the supply, maintenance and installation of solar systems to their customers.

12

Page 13: RENEWABLE ENERGY, REGULATORY FRAMEWORK AND … ENERGY, … · Renewable energy Cont… Renewable energy comprises of alternative forms of energy other than the commonly used hydro-power

Documentation supporting application

for Supply Installation and Maintenance

of Solar Energy Systems cont..

Requirements include:

5 Year Business Plan;

Latest Audited Accounts/Financial Statement [If company is already operational], or Letter of commitment from Sponsors accompanied with Board Resolutions of Sponsor company;

Latest Annual Returns from PACRA;

13

Page 14: RENEWABLE ENERGY, REGULATORY FRAMEWORK AND … ENERGY, … · Renewable energy Cont… Renewable energy comprises of alternative forms of energy other than the commonly used hydro-power

.Cont.….

Certificate of Incorporation (local companies);

List & details of shareholders, directors from PACRA;

Warehouse & proof of qualified technician to demonstrate the usage & maintenance of solar systems.

14

Page 15: RENEWABLE ENERGY, REGULATORY FRAMEWORK AND … ENERGY, … · Renewable energy Cont… Renewable energy comprises of alternative forms of energy other than the commonly used hydro-power

Licensing Procedure Cont...

Latest Tax Clearance Certificate from ZRA;

Residence Permits for foreign, directors/shareholders;

Certified copies of NRCs for Zambian Directors;

Proof of residence for Directors, i.e. Utility bill or tenancy agreement; and

technical detail of the infrastructure to be used.

All applications are subjected to license processing procedure.

15

Page 16: RENEWABLE ENERGY, REGULATORY FRAMEWORK AND … ENERGY, … · Renewable energy Cont… Renewable energy comprises of alternative forms of energy other than the commonly used hydro-power

ASSESSMENT OF APPLICATION

Legal assessment to determine whether

application has been duly lodged;

Technical assessment of the application

and inspection of infrastructure to

ensure compliance with standards; and

Financial and economic assessment of

the application is conducted, examining

the financial capability of applicant. The

license application fee is set at 0.1 % of

the cost of investment.

Page 17: RENEWABLE ENERGY, REGULATORY FRAMEWORK AND … ENERGY, … · Renewable energy Cont… Renewable energy comprises of alternative forms of energy other than the commonly used hydro-power

EXEMPTION TO LICENCE FEES

Once assessed application fee is paid at

0.1 % of the cost of investment, the

applicant for Solar energy projects is

exempt from payment of monthly licence

fees set at 0.7% of monthly turnover of

the business;

Equipment imported for purpose of

supply, install and maintenance of solar

systems are tax exempt by ZRA;

The above incentives are meant to attract

investments in renewable/clean energy.

17

Page 18: RENEWABLE ENERGY, REGULATORY FRAMEWORK AND … ENERGY, … · Renewable energy Cont… Renewable energy comprises of alternative forms of energy other than the commonly used hydro-power

PUBLIC NOTIFICATION

Notice of the Application is published in

the Gazette for (30) days;

Publication allows the public to make

their objections to the application, if

any;

Where there are no objections, the

application is approved by the Board for

licensing;

Licenses are to be issued within sixty

(60) days of receipt of application.

Page 19: RENEWABLE ENERGY, REGULATORY FRAMEWORK AND … ENERGY, … · Renewable energy Cont… Renewable energy comprises of alternative forms of energy other than the commonly used hydro-power

PROVISIONAL LICENCE

To cushion the period within which it

takes to issue a standard licence, the

ERB usually issues a provisional licence

to an applicant that has fulfilled all the

licensing requirements pending

gazzetting and issuance of a standard

licence by the Board.

19

Page 20: RENEWABLE ENERGY, REGULATORY FRAMEWORK AND … ENERGY, … · Renewable energy Cont… Renewable energy comprises of alternative forms of energy other than the commonly used hydro-power

INVESTMENT ENDORSEMENT

Investment Endorsement: Is a document

that guarantees a Developer that a license

will be issued by ERB upon completion of

the Project i.e. Solar Project for generation

or transmission or supply of electricity;

It is a precursor to issuance of a license by

ERB;

It is applicable to new or additional

generation projects;

20

Page 21: RENEWABLE ENERGY, REGULATORY FRAMEWORK AND … ENERGY, … · Renewable energy Cont… Renewable energy comprises of alternative forms of energy other than the commonly used hydro-power

Investment Endorsement cont.

When applying for IE the Developer must

submit the following:

Detailed project description;

Estimated cost and economic

justification of the project;

Decision letter on EPB from ZEMA;

Draft Power Purchase Agreement (PPA)

if power is to be sold by the Developer

to ZESCO Limited (as off-taker);

21

Page 22: RENEWABLE ENERGY, REGULATORY FRAMEWORK AND … ENERGY, … · Renewable energy Cont… Renewable energy comprises of alternative forms of energy other than the commonly used hydro-power

Cont..

I.E valid for a specific period (1yr) but renewable upon Developer showing good cause.

22

Page 23: RENEWABLE ENERGY, REGULATORY FRAMEWORK AND … ENERGY, … · Renewable energy Cont… Renewable energy comprises of alternative forms of energy other than the commonly used hydro-power

THE END

THANK YOU FOR YOUR ATTENTION

23