Top Banner
RARS Implementation Group – Sixth meeting Exeter - 2012 RARS Implementation Group – Sixth Meeting Exeter – 2012 EARS-IASI and EARS-NPP concept Slide: 1
18

RARS Implementation Group – Sixth meeting Exeter - 2012 RARS Implementation Group – Sixth Meeting Exeter – 2012 EARS-IASI and EARS-NPP concept Slide: 1.

Mar 31, 2015

Download

Documents

Javier Eastlick
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: RARS Implementation Group – Sixth meeting Exeter - 2012 RARS Implementation Group – Sixth Meeting Exeter – 2012 EARS-IASI and EARS-NPP concept Slide: 1.

RARS Implementation Group – Sixth meetingExeter - 2012

RARS Implementation Group – Sixth MeetingExeter – 2012

EARS-IASI and EARS-NPP concept

Slide: 1

Page 2: RARS Implementation Group – Sixth meeting Exeter - 2012 RARS Implementation Group – Sixth Meeting Exeter – 2012 EARS-IASI and EARS-NPP concept Slide: 1.

RARS Implementation Group – Sixth meetingExeter - 2012

EARS-IASI

Page 3: RARS Implementation Group – Sixth meeting Exeter - 2012 RARS Implementation Group – Sixth Meeting Exeter – 2012 EARS-IASI and EARS-NPP concept Slide: 1.

RARS Implementation Group – Sixth meetingExeter - 2012

EARS-IASI

Design:• Decentralised processing. Channel selection and data

compression using Principal Component Scores to reduce data volume.

• Processor: AAPP (v7.3) and OPS-LRS (v6.0p12) as delivered by NWP SAF.

• Distribution via EUMETCast Ku-Band and GTS.• Satellites: Metop-A (Metop-B, Metop-C).• Number of stations: 4 (more planned for Metop-B).

Products, formats:• One Level 1c product per pass:

– calibrated and navigated IASI observations,– combined product containing both Principal Component

scores and 366 original IASI Channels,– cloud/scene analysis information,– BUFR format.

Timeliness:• 30 minutes (HRPT).• 60 minutes (FDES).

Page 4: RARS Implementation Group – Sixth meeting Exeter - 2012 RARS Implementation Group – Sixth Meeting Exeter – 2012 EARS-IASI and EARS-NPP concept Slide: 1.

RARS Implementation Group – Sixth meetingExeter - 2012

EARS-IASI (2/2)

Number of Users on EUMETCast:• > 100 registered Users.

Number of products per day:• ~ 25 files, corresponding to 500 MB.

System evolutions in the near future:• GTS dissemination to start in November 2012.• Metop-B.

Product quality monitoring (under development):• NWP-SAF product monitoring (comparison with global data and

local products, warning messages, etc.). Details to be agreed.• Statistics + inter-comparisons at EUMETSAT.

Page 5: RARS Implementation Group – Sixth meeting Exeter - 2012 RARS Implementation Group – Sixth Meeting Exeter – 2012 EARS-IASI and EARS-NPP concept Slide: 1.

RARS Implementation Group – Sixth meetingExeter - 2012

Product Processing

Slide: 5

OPS-LRS AAPPL1C IASI

GTS

EUMETCast

IASI L1 BUFR (PC scores and 366 channels)

L0 IASI

AAPP

L0 AVHRR

L1B AVHRR

Page 6: RARS Implementation Group – Sixth meeting Exeter - 2012 RARS Implementation Group – Sixth Meeting Exeter – 2012 EARS-IASI and EARS-NPP concept Slide: 1.

RARS Implementation Group – Sixth meetingExeter - 2012

Daily Data Volume per Service (EUMETCast Ku-Band - October 2012)

Slide: 6

Service Number of stations

Number of satellites

Total number of passes

Daily volume (MB)

EARS-ATOVS 15 6 420 625

EARS-AVHRR 7 2 28 (630 segments) 1400

EARS-ASCAT 7 1 37 76

EARS-IASI 4 1 25 500

EARS-NWC 7 2 28 (630 segments) 800

Page 7: RARS Implementation Group – Sixth meeting Exeter - 2012 RARS Implementation Group – Sixth Meeting Exeter – 2012 EARS-IASI and EARS-NPP concept Slide: 1.

RARS Implementation Group – Sixth meetingExeter - 2012

EARS-NPP

Page 8: RARS Implementation Group – Sixth meeting Exeter - 2012 RARS Implementation Group – Sixth Meeting Exeter – 2012 EARS-IASI and EARS-NPP concept Slide: 1.

RARS Implementation Group – Sixth meetingExeter - 2012

Direct Readout ReceptionSupporting NOAA POES, Metop, NPP/JPSS, FY3

Slide: 8

NOAA POES

L-Band0.6 Mb/s

Metop

L-Band3.5 Mb/s

FY-3

L-Band3.5 Mb/sX-Band18 Mb/s

L-Band

NPP/JPSS

X-Band15 Mb/s

X/L-Band

Page 9: RARS Implementation Group – Sixth meeting Exeter - 2012 RARS Implementation Group – Sixth Meeting Exeter – 2012 EARS-IASI and EARS-NPP concept Slide: 1.

RARS Implementation Group – Sixth meetingExeter - 2012

EARS – New Regional Suomi NPP Services

Satellites: NOAA POES

MetopSuomi NPP

Services

EARS-ATOVS L1A/C/D

EARS-ASCAT L2 Winds

EARS-AVHRR L0

EARS-IASI L1C + PCS

EARS-NWC L2 Clouds

EARS-ATMS SDR (L1C)

EARS-CrIS SDR (L1C)

EARS-VIIRS SDR (L1C)

Initial Suomi NPP Coverage

Page 10: RARS Implementation Group – Sixth meeting Exeter - 2012 RARS Implementation Group – Sixth Meeting Exeter – 2012 EARS-IASI and EARS-NPP concept Slide: 1.

RARS Implementation Group – Sixth meetingExeter - 2012

EARS-NPPCommon part

Slide: 10

• Geographical coverage: 6 core European stations initially. Other EARS stations to be added if and when NPP data become available.

• Product processing: CSPP/AAPP, as provided by the CIMSS/NWP-SAF,

configured and run by EUMETSAT.

Kangerlussuaq

Svalbard

Athens

Lannion

Moscow

Maspalomas

Page 11: RARS Implementation Group – Sixth meeting Exeter - 2012 RARS Implementation Group – Sixth Meeting Exeter – 2012 EARS-IASI and EARS-NPP concept Slide: 1.

RARS Implementation Group – Sixth meetingExeter - 2012

EARS-NPPEARS-ATMS

Slide: 11

• Product Segmentation: one file per station pass.

• Products via EUMETCast (Ku-Band Europe):

SDR (Level 1),

all 22 channels,

all FOV,

data on original instrument grid,

BUFR format.

• Timeliness via EUMETCast: 30 minutes.

• Products via GTS/RMDCN: As for EUMETCast.

Page 12: RARS Implementation Group – Sixth meeting Exeter - 2012 RARS Implementation Group – Sixth Meeting Exeter – 2012 EARS-IASI and EARS-NPP concept Slide: 1.

RARS Implementation Group – Sixth meetingExeter - 2012

EARS-NPPEARS-CrIS

Slide: 12

• Product Segmentation: one file per station pass.

• Products via EUMETCast (Ku-Band Europe):

SDR (Level 1),

399 channels out of 1305,

all FOV,

data on original instrument grid,

BUFR format.

• Timeliness via EUMETCast: 30 minutes.

• Products via GTS/RMDCN: As for EUMETCast.

Page 13: RARS Implementation Group – Sixth meeting Exeter - 2012 RARS Implementation Group – Sixth Meeting Exeter – 2012 EARS-IASI and EARS-NPP concept Slide: 1.

RARS Implementation Group – Sixth meetingExeter - 2012

EARS-NPPEARS-VIIRS

Slide: 13

• Product Segmentation: segmented. Duplicates

removed.

• Products via EUMETCast (Ku-Band Europe):

SDR (Level 1), geolocation on tie-points,

all 16 M-Band channels,

HDF5 format,

bzip2 compressed.

• Timeliness via EUMETCast: 15 minutes.

• Products via GTS/RMDCN: None.

Page 14: RARS Implementation Group – Sixth meeting Exeter - 2012 RARS Implementation Group – Sixth Meeting Exeter – 2012 EARS-IASI and EARS-NPP concept Slide: 1.

RARS Implementation Group – Sixth meetingExeter - 2012

Building on EARS infrastructure

Slide: 14

EUMETCast is EUMETSATs data dissemination system based on DVB over satellite

10-30 Minutes

Page 15: RARS Implementation Group – Sixth meeting Exeter - 2012 RARS Implementation Group – Sixth Meeting Exeter – 2012 EARS-IASI and EARS-NPP concept Slide: 1.

RARS Implementation Group – Sixth meetingExeter - 2012

Product Processing

Slide: 15

CSPP AAPPL1/SDRATMS & CrIS

VFP**

L1/SDRVIIRS

GTS

EUMETCast

L1 BUFRATMS & CrIS

BZIP2L1’VIIRS

L1’’ VIIRS

L0/RDR*VIIRS, ATMS & CrIS

*: using RT-STPS to produce RDR per instrument from CADU file containing all instruments.

**VFP: VIIRS Formatting Package (computes geolocation on tie-points, scale radiances and segments data)

Page 16: RARS Implementation Group – Sixth meeting Exeter - 2012 RARS Implementation Group – Sixth Meeting Exeter – 2012 EARS-IASI and EARS-NPP concept Slide: 1.

RARS Implementation Group – Sixth meetingExeter - 2012

Slide: 16

Product Quality MonitoringPlanned for EAR-NPPEARS-ATMS and EARS-CrIS:- Product quality indicator collected during the processing and

recorded (statistics, time series…).- Comparison with global data and independent local products

(offline).

EARS-VIIRS:- As for EARS-ATMS and EARS-CrIS plus:- VIIRS tie-point and interpolation: geolocation errors to be recorded.

Involvement of the SAFs (TBC):- NWP-SAF for EARS-ATMS and EARS-CrIS.- NWC-SAF for EARS-VIIRS.

Page 17: RARS Implementation Group – Sixth meeting Exeter - 2012 RARS Implementation Group – Sixth Meeting Exeter – 2012 EARS-IASI and EARS-NPP concept Slide: 1.

RARS Implementation Group – Sixth meetingExeter - 2012

Daily Data Volume per Service (October 2012)Estimates for ATMS, CrIS and VIIRS

Slide: 17

Service Number of stations

Number of satellites

Total number of passes

Daily volume

EARS-ATOVS 15 6 420 625

EARS-AVHRR 7 2 28 (630 segments) 1400

EARS-ASCAT 7 1 37 76

EARS-IASI 4 1 25 500

EARS-NWC 7 2 28 (630 segments) 800

EARS-ATMS 6 1 30 45 MB

EARS-CrIS 6 1 30 300 MB

EARS-VIIRS 6 1 14 (300 segments) > 11GB

Page 18: RARS Implementation Group – Sixth meeting Exeter - 2012 RARS Implementation Group – Sixth Meeting Exeter – 2012 EARS-IASI and EARS-NPP concept Slide: 1.

RARS Implementation Group – Sixth meetingExeter - 2012

Slide: 18

Early Access to Regional NPP Services

• Early access to the three Regional NPP Services is expected as follows:

EARS-ATMS starting in Q4 2012

EARS-CrIS starting in Q4 2012, initially without VIIRS Cloud information

EARS-VIIRS starting in Q1 2013