RARS Implementation Group – Sixth meeting Exeter - 2012 RARS Implementation Group – Sixth Meeting Exeter – 2012 EARS-IASI and EARS-NPP concept Slide: 1
Mar 31, 2015
RARS Implementation Group – Sixth meetingExeter - 2012
RARS Implementation Group – Sixth MeetingExeter – 2012
EARS-IASI and EARS-NPP concept
Slide: 1
RARS Implementation Group – Sixth meetingExeter - 2012
EARS-IASI
RARS Implementation Group – Sixth meetingExeter - 2012
EARS-IASI
Design:• Decentralised processing. Channel selection and data
compression using Principal Component Scores to reduce data volume.
• Processor: AAPP (v7.3) and OPS-LRS (v6.0p12) as delivered by NWP SAF.
• Distribution via EUMETCast Ku-Band and GTS.• Satellites: Metop-A (Metop-B, Metop-C).• Number of stations: 4 (more planned for Metop-B).
Products, formats:• One Level 1c product per pass:
– calibrated and navigated IASI observations,– combined product containing both Principal Component
scores and 366 original IASI Channels,– cloud/scene analysis information,– BUFR format.
Timeliness:• 30 minutes (HRPT).• 60 minutes (FDES).
RARS Implementation Group – Sixth meetingExeter - 2012
EARS-IASI (2/2)
Number of Users on EUMETCast:• > 100 registered Users.
Number of products per day:• ~ 25 files, corresponding to 500 MB.
System evolutions in the near future:• GTS dissemination to start in November 2012.• Metop-B.
Product quality monitoring (under development):• NWP-SAF product monitoring (comparison with global data and
local products, warning messages, etc.). Details to be agreed.• Statistics + inter-comparisons at EUMETSAT.
RARS Implementation Group – Sixth meetingExeter - 2012
Product Processing
Slide: 5
OPS-LRS AAPPL1C IASI
GTS
EUMETCast
IASI L1 BUFR (PC scores and 366 channels)
L0 IASI
AAPP
L0 AVHRR
L1B AVHRR
RARS Implementation Group – Sixth meetingExeter - 2012
Daily Data Volume per Service (EUMETCast Ku-Band - October 2012)
Slide: 6
Service Number of stations
Number of satellites
Total number of passes
Daily volume (MB)
EARS-ATOVS 15 6 420 625
EARS-AVHRR 7 2 28 (630 segments) 1400
EARS-ASCAT 7 1 37 76
EARS-IASI 4 1 25 500
EARS-NWC 7 2 28 (630 segments) 800
RARS Implementation Group – Sixth meetingExeter - 2012
EARS-NPP
RARS Implementation Group – Sixth meetingExeter - 2012
Direct Readout ReceptionSupporting NOAA POES, Metop, NPP/JPSS, FY3
Slide: 8
NOAA POES
L-Band0.6 Mb/s
Metop
L-Band3.5 Mb/s
FY-3
L-Band3.5 Mb/sX-Band18 Mb/s
L-Band
NPP/JPSS
X-Band15 Mb/s
X/L-Band
RARS Implementation Group – Sixth meetingExeter - 2012
EARS – New Regional Suomi NPP Services
Satellites: NOAA POES
MetopSuomi NPP
Services
EARS-ATOVS L1A/C/D
EARS-ASCAT L2 Winds
EARS-AVHRR L0
EARS-IASI L1C + PCS
EARS-NWC L2 Clouds
EARS-ATMS SDR (L1C)
EARS-CrIS SDR (L1C)
EARS-VIIRS SDR (L1C)
Initial Suomi NPP Coverage
RARS Implementation Group – Sixth meetingExeter - 2012
EARS-NPPCommon part
Slide: 10
• Geographical coverage: 6 core European stations initially. Other EARS stations to be added if and when NPP data become available.
• Product processing: CSPP/AAPP, as provided by the CIMSS/NWP-SAF,
configured and run by EUMETSAT.
Kangerlussuaq
Svalbard
Athens
Lannion
Moscow
Maspalomas
RARS Implementation Group – Sixth meetingExeter - 2012
EARS-NPPEARS-ATMS
Slide: 11
• Product Segmentation: one file per station pass.
• Products via EUMETCast (Ku-Band Europe):
SDR (Level 1),
all 22 channels,
all FOV,
data on original instrument grid,
BUFR format.
• Timeliness via EUMETCast: 30 minutes.
• Products via GTS/RMDCN: As for EUMETCast.
RARS Implementation Group – Sixth meetingExeter - 2012
EARS-NPPEARS-CrIS
Slide: 12
• Product Segmentation: one file per station pass.
• Products via EUMETCast (Ku-Band Europe):
SDR (Level 1),
399 channels out of 1305,
all FOV,
data on original instrument grid,
BUFR format.
• Timeliness via EUMETCast: 30 minutes.
• Products via GTS/RMDCN: As for EUMETCast.
RARS Implementation Group – Sixth meetingExeter - 2012
EARS-NPPEARS-VIIRS
Slide: 13
• Product Segmentation: segmented. Duplicates
removed.
• Products via EUMETCast (Ku-Band Europe):
SDR (Level 1), geolocation on tie-points,
all 16 M-Band channels,
HDF5 format,
bzip2 compressed.
• Timeliness via EUMETCast: 15 minutes.
• Products via GTS/RMDCN: None.
RARS Implementation Group – Sixth meetingExeter - 2012
Building on EARS infrastructure
Slide: 14
EUMETCast is EUMETSATs data dissemination system based on DVB over satellite
10-30 Minutes
RARS Implementation Group – Sixth meetingExeter - 2012
Product Processing
Slide: 15
CSPP AAPPL1/SDRATMS & CrIS
VFP**
L1/SDRVIIRS
GTS
EUMETCast
L1 BUFRATMS & CrIS
BZIP2L1’VIIRS
L1’’ VIIRS
L0/RDR*VIIRS, ATMS & CrIS
*: using RT-STPS to produce RDR per instrument from CADU file containing all instruments.
**VFP: VIIRS Formatting Package (computes geolocation on tie-points, scale radiances and segments data)
RARS Implementation Group – Sixth meetingExeter - 2012
Slide: 16
Product Quality MonitoringPlanned for EAR-NPPEARS-ATMS and EARS-CrIS:- Product quality indicator collected during the processing and
recorded (statistics, time series…).- Comparison with global data and independent local products
(offline).
EARS-VIIRS:- As for EARS-ATMS and EARS-CrIS plus:- VIIRS tie-point and interpolation: geolocation errors to be recorded.
Involvement of the SAFs (TBC):- NWP-SAF for EARS-ATMS and EARS-CrIS.- NWC-SAF for EARS-VIIRS.
RARS Implementation Group – Sixth meetingExeter - 2012
Daily Data Volume per Service (October 2012)Estimates for ATMS, CrIS and VIIRS
Slide: 17
Service Number of stations
Number of satellites
Total number of passes
Daily volume
EARS-ATOVS 15 6 420 625
EARS-AVHRR 7 2 28 (630 segments) 1400
EARS-ASCAT 7 1 37 76
EARS-IASI 4 1 25 500
EARS-NWC 7 2 28 (630 segments) 800
EARS-ATMS 6 1 30 45 MB
EARS-CrIS 6 1 30 300 MB
EARS-VIIRS 6 1 14 (300 segments) > 11GB
RARS Implementation Group – Sixth meetingExeter - 2012
Slide: 18
Early Access to Regional NPP Services
• Early access to the three Regional NPP Services is expected as follows:
EARS-ATMS starting in Q4 2012
EARS-CrIS starting in Q4 2012, initially without VIIRS Cloud information
EARS-VIIRS starting in Q1 2013