Top Banner
Quality control tools www.mbaknol.com
21

Quality control tools

Dec 31, 2015

Download

Documents

Quality control tools. Introduction. - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Quality control tools

Quality control tools

www.mbaknol.com

Page 2: Quality control tools

Introduction • Seven QC tools are fundamental instruments to improve the

quality of the product. They are used to analyze the production process, identify the major problems, control fluctuations of product quality, and provide solutions to avoid future defects. Statistical literacy is necessary to effectively use the seven QC tools. These tools use statistical techniques and knowledge to accumulate data and analyze them.

• Seven QC tools are utilized to organize the collected data in a way that is easy to understand and analyze. Moreover, from using the seven QC tools, any specific problems in a process are identified.

www.mbaknol.com

Page 3: Quality control tools

7QC tools always include :

• Check Sheet • Pareto Chart • Cause-and-Effect Diagram • Histogram • Scatter Diagram • Flow Chart • Control Chart

www.mbaknol.com

Page 4: Quality control tools

Check Sheet • A check sheet is a pre-designed format for collection of data

that encourages organized collection and groups data into categories.  

• When to use it:  To keep track of the parameters of an on

going process.  It can be used to track events by such factors as timeliness, reason for inspection failure, etc

• How to use it: Look at some preliminary data before developing the check sheet.  This will indicate what categories to use.

www.mbaknol.com

Page 5: Quality control tools

• Used for the collection of quantitative or qualitative repetitive data. Adaptable to different data gathering situations. Minimal interpretation of results required. Easy and quick to use.

www.mbaknol.com

Page 6: Quality control tools

Pareto Chart • A simple rule, pareto, 20 % issues causes 80 % results. This means, 80 % if

problems come from 20 of reasons. 80 % of results come from 20% of work. 80% of cost come from 20% of spent area...and so on.

• When to UseUse it when there are many problems or opportunities and you want to focus on the most important. Or when your analyzing data about the frequency of problems or causes in a process.

www.mbaknol.com

Page 7: Quality control tools

Constructing a Pareto chart:1.Decide the categories to compare.

2.Determine the appropriate measurement.

3.Decide the period of time for the chart.

4.In a table, collect the data for each category. 5.Arrange the categories in descending way per the total sums. 6.Construct and label bars for each category.

7.Calculate the percentage for each category.

8.Calculate and draw cumulative percentage.

• Analysis of the Pareto Chart

www.mbaknol.com

Page 8: Quality control tools

Cause-and-Effect Diagram (Fishbone Diagram)

• The Cause and Effect diagram identifies many possible causes for an effect or a problem.

• When to UseWhen your figuring out the possible factors for a problem. When your team’s thinking hits a roadblock.

www.mbaknol.com

Page 9: Quality control tools

Procedure• 1- Agree on the problem (effect).

• 2- Brainstorm the possible major categories of causes of the problem (5M and 1E).

• 3- Write the categories of causes as branches from the main arrow.

• 4- Brainstorm all the possible factors for each of the major categories.

• 5- Again ask “why does this happen?” about each branch from step 4.

• 6 After completion, have the team review the diagram

www.mbaknol.com

Page 10: Quality control tools

Example:

www.mbaknol.com

Page 11: Quality control tools

Histogram• shows a bar chart of accumulated data and provides the easiest way to

evaluate the distribution of data.

• This chart graphs data distributions. If you have numerical, variable, continuous data you can use the this chart. The chart organizes and sorts the data. It shows the data in a pictorial format.

www.mbaknol.com

Page 12: Quality control tools

Construction

• Collect at least 50 data points from a process. • Use the worksheet to set up the chart.

• After calculating width in step 2 of the worksheet, use your judgment and adjust it to a convenient round number.

• Draw x- and y-axes on graph paper. Mark and label the y-axis for counting the data values. Mark and label the x-axis with the L values from the worksheet.

• For each data point, locate it where it fits within the Ls. Mark off one count above the appropriate bar with an X or by shading that portion of the bar.

www.mbaknol.com

Page 13: Quality control tools

Scatter Diagram• is a graphical tool that plots many data points and shows a pattern of

correlation between two variables.• Scatter Diagram Is used to investigate the possible relationship between

two variables that both relate to the same "event". When to Use:• When you have paired numerical data.• When trying to identify potential root causes of problems.• After brainstorming causes and effects using a fishbone diagram, to

determine objectively whether a particular cause and effect are related.• When determining whether two effects that appear to be related both

occur with the same cause.

www.mbaknol.com

Page 14: Quality control tools

Procedure• 1. Collect pairs of data where a relationship is suspected.• 2. Draw a graph with the independent variable on the horizontal axis and the

dependent variable on the vertical axis. • 3. Look at the pattern of points to see if a relationship is obvious. • 4. Divide points on the graph into four quadrants. If there are X points on the

graph.• 5. Count X/2 points from top to bottom and draw a horizontal line.• 6. Count X/2 points from left to right and draw a vertical line.• 7. If number of points is odd, draw the line through the middle point.• 8. Count the points in each quadrant.• 9. Add the diagonally opposite quadrants. • 10. A = points in upper left + points in lower right• 11. B = points in upper right + points in lower left• 12. Q = the smaller of A and B• 13. N = A + B• 14. Look up the limit for N on the trend test table.• 15. If Q is less than the limit, the two variables are related.• 16. If Q is greater than or equal to the limit, the pattern could have occurred from

random chance.

www.mbaknol.com

Page 15: Quality control tools

Example

www.mbaknol.com

Page 16: Quality control tools

Flow Chart• shows the process step by step and can sometimes identify an

unnecessary procedure.

When to Use:

• One of the first activities of a process improvement effort is constructing a flowchart. It provides the following benefits:

1- It give you and everyone a clear understanding of the process.

2- Facilitates teamwork and communication.

3- Helps to identify non-value-added operations.

www.mbaknol.com

Page 17: Quality control tools

Method:• There are many symbols used to construct a flowchart; the more common

symbols are shown below:

• Identify the process steps and link them together with direction arrows

www.mbaknol.com

Page 18: Quality control tools

Control Chart•  provides control limits which are generally three standard

deviations above and below average, whether or not our process is in control.

• Control charts are graphs used to study how a process changes over time. 

• Data is plotted in time order. A control chart always has a central line for the average, an upper line for the upper control limit and a lower line for the lower control limit. These three lines are determined from historical data. 

www.mbaknol.com

Page 19: Quality control tools

When to Use:

• • When controlling ongoing processes by finding and correcting problems as they occur.

• • When predicting the expected range of outcomes from a process.

• • When determining whether a process is stable (in statistical control).

• • When analyzing patterns of process variation from special causes (non-routine events) or common causes (built into the process).

• • When determining whether your quality improvement project should aim to prevent specific problems or to make fundamental changes to the process.

www.mbaknol.com

Page 20: Quality control tools

Basic Procedure

• 1. Choose the appropriate control chart for your data.

• 2. Determine the appropriate time period for collecting and plotting

data.

• 3. Collect data, construct your chart and analyze the data.

• 4. Look for “out-of-control signals” on the control chart. When one is identified, mark it on the chart and investigate the cause. Document how you investigated, the root cause and how it was corrected.

www.mbaknol.com

Page 21: Quality control tools

Example

www.mbaknol.com