Top Banner
PSM Key Performance Indicators Nexen Energy ULC SEPT. 26, 2017 CCPS CALGARY REGIONAL MEETING
14

PSM Key Performance Indicators - AIChE · PSM Key Performance Indicators ... • Overall “Health” indicator for assets is trended ... compliance Tier 1 PSEs Tier 2 PSEs

May 30, 2018

Download

Documents

buiduong
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: PSM Key Performance Indicators - AIChE · PSM Key Performance Indicators ... • Overall “Health” indicator for assets is trended ... compliance Tier 1 PSEs Tier 2 PSEs

PSM Key Performance IndicatorsNexen Energy ULC

SEPT. 26, 2017 CCPS CALGARY REGIONAL MEETING

Page 2: PSM Key Performance Indicators - AIChE · PSM Key Performance Indicators ... • Overall “Health” indicator for assets is trended ... compliance Tier 1 PSEs Tier 2 PSEs

Agenda

1. Why use KPIs, What to Measure?

2. Two Approaches at Nexen

3. Oil Sands PSM Dashboard

4. Current Status and Next Steps

2

Page 3: PSM Key Performance Indicators - AIChE · PSM Key Performance Indicators ... • Overall “Health” indicator for assets is trended ... compliance Tier 1 PSEs Tier 2 PSEs

PSM Pyramid Model

3

• Aligned with Heinrich’s

classic safety pyramid

• “Defects” in plant,

processes or people can

lead to undesirable

outcomes

• Disciplined and

systematic approach to

identifying and addressing

defects reduces the

likelihood of escalating

consequence events

• A culture that proactively

seeks out defects and

maintains a sense of

chronic unease is a

prerequisite

Page 4: PSM Key Performance Indicators - AIChE · PSM Key Performance Indicators ... • Overall “Health” indicator for assets is trended ... compliance Tier 1 PSEs Tier 2 PSEs

Process Safety & Reliability

Cultural Maturity Model

4

Num

ber

of V

isib

le D

efe

cts

Fleming et al’s HSE Cultural Maturity Model

Page 5: PSM Key Performance Indicators - AIChE · PSM Key Performance Indicators ... • Overall “Health” indicator for assets is trended ... compliance Tier 1 PSEs Tier 2 PSEs

PSM Pyramid Model

5

Oil Sands PSM Dashboard is aligned with the API/ANSI RP 754 pyramid model

• Improve visibility and awareness of PSM performance, based on leading indicators (familiar model from personal safety)

• More comprehensive view of the health of the people, plant and process barriers, across silos

• Enable benchmarking of Best in Class performers given wide adoption of the API model

API/ANSI RP 754

ABB Ltd. white paper “Avoiding the 'watermelon' effect

Are we doing enough in the process industry to prevent the

next major accident?“

Page 6: PSM Key Performance Indicators - AIChE · PSM Key Performance Indicators ... • Overall “Health” indicator for assets is trended ... compliance Tier 1 PSEs Tier 2 PSEs

PSM Barrier Model

• Nexen Offshore

dashboards are

focused on Major

Accident Hazard

prevention,

mitigation and

recovery

• Safety Case

regulated

jurisdiction

• KPIs are organized

into People,

Process and Plant;

as well as asset

section and

traditional Barriers6

Page 7: PSM Key Performance Indicators - AIChE · PSM Key Performance Indicators ... • Overall “Health” indicator for assets is trended ... compliance Tier 1 PSEs Tier 2 PSEs

PSM Barrier Model

• Overall “Health” indicator for assets is trended

• Focus is on gains and losses (strengthened or weakened barriers) and

persistent underperformance7

Note – data for illustration purposes only

Page 8: PSM Key Performance Indicators - AIChE · PSM Key Performance Indicators ... • Overall “Health” indicator for assets is trended ... compliance Tier 1 PSEs Tier 2 PSEs

PSM Review Cycle

DECISIONS &

DIRECTIONDATA QUALITY

ELT Stewardship

Quarterly

Week 1 Week 2 Week 3 Week 4

Division

Stewardship

Presentation

detailing key issues

and action plan to

address

Input Data

And

PSM Analysis

KPI Owner Team

Review

With Operations

At Weekly HSE

KPI Meeting (site

PMT)

Action Plan for Continuous Improvement and

Barrier Maintenance

Action Items and

Data Integrity

Questions

Page 9: PSM Key Performance Indicators - AIChE · PSM Key Performance Indicators ... • Overall “Health” indicator for assets is trended ... compliance Tier 1 PSEs Tier 2 PSEs

PSM Dashboard

9

Tier 1 PSEs

Tier 2 PSEs

Small Losses of Containment, PS

Near Miss Reports, Challenges to

Safety Barriers

Management system procedures

compliance

Tier 1

PSEs

Tier 2 PSEs

Tier 3 Safety System

Challenges

Tier 4 Operating Discipline &

Management Systems

Used in Alberta, a Non-Safety Case Regulated

JurisdictionNote – data for illustration purposes only

Page 10: PSM Key Performance Indicators - AIChE · PSM Key Performance Indicators ... • Overall “Health” indicator for assets is trended ... compliance Tier 1 PSEs Tier 2 PSEs

PSM Dashboard Breakdown

10

Area 2 Tier 4 Management Systems

Management of Change

HIRAPSSR PSI

Asset Integrity

Conduct of Operations

ERP SWP

Tier 1

PSEs

Tier 2 PSEs

Tier 3 Safety

System Challenges

Tier 4 Operating Discipline &

Management Systems

Area 1 Tier 4 Management Systems

Management of Change

HIRAPSSR PSI

Asset Integrity

Conduct of Operations

ERP SWP

• Base Tier is organized

by PSM elements (8 of

them).

• Each PSM Element has

one or more KPIs to

indicate the health of

that management

system element

Results can be presented by Division, Plant or Area

Note – data for illustration purposes only

Page 11: PSM Key Performance Indicators - AIChE · PSM Key Performance Indicators ... • Overall “Health” indicator for assets is trended ... compliance Tier 1 PSEs Tier 2 PSEs

PSM Dashboard

KPI Results Summary

11

Tier PSM Element Sub-Element KPI Name RuleDivn.

Result

Tier

1 Tier 1 Recordable

Process Safety Events

Green if =0

Yellow if =1

Red if >1

3.00

Tier

2

Tier 2 Recordable

Process Safety Events

Green if < 3

Yellow if =3

Red if >3

3.00

Tier

3

Critical Operating Limit

Excursion

Green if <=540

Yellow if <1080

Red if >=1080

Primary Containment

Outside Integrity Limits

Green if < 3

Yellow if <=5

Red if >5

SIS & BMS Activations

Green if < 5

Yellow if <=15

Red if >15

Process Safety Near

Miss

Green if >40

Yellow if >=30

Red if <30

Small Losses of

Containment

Green if <50

Yellow if <=60

Red if >60

2.20

Tier

4

Safe Work Permit

(SWP)SWP Compliance Audit

Green if >=0.9

Yellow if >0.75

Red if <=0.75

3.00

Safety Bypass

Compliance Audit

Green if >=0.95

Yellow if >0.85

Red if <=0.85

# Safety Bypasses

Green if <15

Yellow if <=30

Red if >30

Temp MOCs Expired

Green if =0

Yellow if <=5

Red if >5

Permanent MOCs

Overdue

Green if =0

Yellow if <=10

Red if >10

2.75

PHA (incl. Re-HAZOP)

Action Items Overdue

Green if =0

Yellow if <=10

Red if >10

Revalidation Hazops on

Schedule

Green if >=1

Yellow if >0.5

Red if <=0.5

2.50

Pre-Startup

Safety Review

# Exception Actions

Overdue

Green if =0

Yellow if <=10

Red if >10

2.00

Average Alarm Rate

Green if <1

Yellow if <=1.5

Red if >1.5

Alarm Burst Count

Green if <=75

Yellow if <100

Red if >=100

Average Standing Alarms

Green if <=50

Yellow if <75

Red if >=75

Control Loop Service

Factor

Green if >0.75

Yellow if >=0.6

Red if <0.6

2.50

Average Suppressed

Alarms

Green if <15

Yellow if <=30

Red if >30

Average Age of

Bypasses (days)

Green if <60

Yellow if <=90

Red if >902.50

Operating Procedure

Audit

Green if >=0.95

Yellow if >0.85

Red if <=0.853.00

2.57

# Non-Conformance

Reports Overdue

Green if <0

Yellow if <=5

Red if >5

Non-Conformance

Report Actions Overdue

Green if =0

Yellow if <=7

Red if >7

Vessel/Tank Inspections

Overdue

Green if =0

Yellow if <=10

Red if >10

PRDs Overdue for

Servicing

Green if <0

Yellow if <=10

Red if >102.75

Safety Critical

Equipment

Integrity

SCE ITPMs Completed

on Schedule

Green if >0.9

Red if <0.7

3.00

2.75

Emergency

Response

Planning (ERP)

Completion of Scheduled

ERT Drills

Green if >0.9

Yellow if >=0.75

Red if <0.753.00

2.61

Conduct of

Operations

Asset Integrity &

Reliability (AI&R)

Management of

Change (MOC)

Challenges to

Safety Barriers

Process &

Alarm

Management

Safety Bypass

Management

Pressure

Equipment

Integrity

Hazard

Identification and

Risk Assessment

(HIRA)

Tier PSM Element Sub-Element KPI Name RuleDivn.

Result

Tier

1 Tier 1 Recordable

Process Safety Events

Green if =0

Yellow if =1

Red if >1

3.00

Tier

2

Tier 2 Recordable

Process Safety Events

Green if < 3

Yellow if =3

Red if >3

3.00

Tier

3

Critical Operating Limit

Excursion

Green if <=540

Yellow if <1080

Red if >=1080

Primary Containment

Outside Integrity Limits

Green if < 3

Yellow if <=5

Red if >5

SIS & BMS Activations

Green if < 5

Yellow if <=15

Red if >15

Process Safety Near

Miss

Green if >40

Yellow if >=30

Red if <30

Small Losses of

Containment

Green if <50

Yellow if <=60

Red if >60

2.20

Tier

4

Safe Work Permit

(SWP)SWP Compliance Audit

Green if >=0.9

Yellow if >0.75

Red if <=0.75

3.00

Safety Bypass

Compliance Audit

Green if >=0.95

Yellow if >0.85

Red if <=0.85

# Safety Bypasses

Green if <15

Yellow if <=30

Red if >30

Temp MOCs Expired

Green if =0

Yellow if <=5

Red if >5

Permanent MOCs

Overdue

Green if =0

Yellow if <=10

Red if >10

2.75

PHA (incl. Re-HAZOP)

Action Items Overdue

Green if =0

Yellow if <=10

Red if >10

Revalidation Hazops on

Schedule

Green if >=1

Yellow if >0.5

Red if <=0.5

2.50

Pre-Startup

Safety Review

# Exception Actions

Overdue

Green if =0

Yellow if <=10

Red if >10

2.00

Average Alarm Rate

Green if <1

Yellow if <=1.5

Red if >1.5

Alarm Burst Count

Green if <=75

Yellow if <100

Red if >=100

Average Standing Alarms

Green if <=50

Yellow if <75

Red if >=75

Control Loop Service

Factor

Green if >0.75

Yellow if >=0.6

Red if <0.6

2.50

Average Suppressed

Alarms

Green if <15

Yellow if <=30

Red if >30

Average Age of

Bypasses (days)

Green if <60

Yellow if <=90

Red if >902.50

Operating Procedure

Audit

Green if >=0.95

Yellow if >0.85

Red if <=0.853.00

2.57

# Non-Conformance

Reports Overdue

Green if <0

Yellow if <=5

Red if >5

Non-Conformance

Report Actions Overdue

Green if =0

Yellow if <=7

Red if >7

Vessel/Tank Inspections

Overdue

Green if =0

Yellow if <=10

Red if >10

PRDs Overdue for

Servicing

Green if <0

Yellow if <=10

Red if >102.75

Safety Critical

Equipment

Integrity

SCE ITPMs Completed

on Schedule

Green if >0.9

Red if <0.7

3.00

2.75

Emergency

Response

Planning (ERP)

Completion of Scheduled

ERT Drills

Green if >0.9

Yellow if >=0.75

Red if <0.753.00

2.61

Conduct of

Operations

Asset Integrity &

Reliability (AI&R)

Management of

Change (MOC)

Challenges to

Safety Barriers

Process &

Alarm

Management

Safety Bypass

Management

Pressure

Equipment

Integrity

Hazard

Identification and

Risk Assessment

(HIRA)

Note – data for illustration purposes only

Page 12: PSM Key Performance Indicators - AIChE · PSM Key Performance Indicators ... • Overall “Health” indicator for assets is trended ... compliance Tier 1 PSEs Tier 2 PSEs

PSM Dashboard

Overall Health Indicator

The Overall PSM Health Indicator is an average of all (28) KPIs in the

dashboard: leading and lagging12

Note – data for illustration purposes only

Page 13: PSM Key Performance Indicators - AIChE · PSM Key Performance Indicators ... • Overall “Health” indicator for assets is trended ... compliance Tier 1 PSEs Tier 2 PSEs

Current Status & Next Steps

• Benefits have been realized through improved

compliance on safety critical maintenance, action

management

• Less tangible benefits have been realized through

leadership accountability, depth of PSM knowledge,

fostering a sense of Chronic Unease

• Next steps include:

– In collaboration with the Business Units, revisit the focus

areas of the dashboard in 2018 (different PSM elements,

different KPIs - e.g. competency, SCE performance)

– Aligning PSM Dashboard with Canadian HSE Cases13

Page 14: PSM Key Performance Indicators - AIChE · PSM Key Performance Indicators ... • Overall “Health” indicator for assets is trended ... compliance Tier 1 PSEs Tier 2 PSEs

Questions

14