Page 1: PS ehp6 enhancements

Enhancement Package 6

Customer © 2014 SAP SE or an SAP affiliate company. All rights reserved. 1

Page 2: PS ehp6 enhancements

As of SAP enhancement package 6 for SAP ERP 6.0 (EA-APPL 606 and SAP_APPL 606), the business function Project System, Extended Usability and Performance (OPS_PS_CI_2) is available. With this business function, you can use the following enhancements in Project System (PS):

SAP Project System in SAP ERP 6.0 EhP6 Extended Usability and Performance Delta Overview

SAP ERP6.0 EhP6

Performance Improvements in the Project Builder Performance Improvement Options in the Project Builder and

Network Transactions Display of non Archived and Archived Line Items Option for the Down Payment Clearing of Billing Plans and

Invoicing Plans

Customer © 2014 SAP SE or an SAP affiliate company. All rights reserved. 2

Page 3: PS ehp6 enhancements

With SAP ERP 6.0 Enhancement Package 6 you now have the option to load projects and networks without loading specific data and hence improve the data loading times. You can exclude this data on the Project Builder: User-Specific Options screen. The performance improvement options are • Exclude Material Master Data • Exclude Purchase Order History

Selected Highlight Performance Improvement Options in Project Builder

Performance Improvement Options in the User-specific

Option screen

Customer © 2014 SAP SE or an SAP affiliate company. All rights reserved. 3

Page 4: PS ehp6 enhancements

SAP Project System in SAP ERP 6.0 EhP6 New User Interface for Project Planning Delta Overview

As of SAP enhancement package 6 for SAP ERP 6.0 (SAP_APPL 606), the business function CO, Cost Center Management (FIN_CO_CCMGMT) is available.

With this business function, you can implement the New User Interface for Project Planning.

You can use the following PS related role with this function: Project Planner and Cost Estimator (SAP_CO_PROJECT_PLANNER)

SAP ERP6.0 EhP6

Ready to use role delivered for Project Planner and Estimator New User Interface for Overall Planning New User Interface for Cost Estimation New User Interface for Cost Element Planning Express Planning

Customer © 2014 SAP SE or an SAP affiliate company. All rights reserved. 100

Page 5: PS ehp6 enhancements

Selected Highlights New User Interface for Project Planning

Customer © 2014 SAP SE or an SAP affiliate company. All rights reserved. 5

Page 6: PS ehp6 enhancements

Selected Highlights New User Interface for Cost Estimation

The Easy Cost Planning user interface was reworked in Release 4.6C to use a formula-based questionnaire to determine the main cost blocks in a cost estimate.

The new application builds on this work but modernizes the user experience.

Customer © 2014 SAP SE or an SAP affiliate company. All rights reserved. 6

Page 7: PS ehp6 enhancements

Selected Highlights Overall Planning: Optional Excel UI

If you prefer to use the SAP Business Objects Analysis Client, you have the option of using all Excel functions while enjoying the benefits of integration with SAP ERP.

Customer © 2014 SAP SE or an SAP affiliate company. All rights reserved. 7

Page 8: PS ehp6 enhancements

Selected Highlights Express Planning: Overall Planning within Express Planning

Express Planning Framework guides users through planning steps.

The planning application is displayed within Express Planning as a planning service.

Customer © 2014 SAP SE or an SAP affiliate company. All rights reserved. 8

Page 9: PS ehp6 enhancements

SAP Project System in SAP ERP 6.0 EhP6 Simplified Reporting for Project System

As of SAP enhancement package 6 for SAP ERP 6.0 (SAP_APPL 606), the business function CO, Cost Center Management (FIN_CO_CCMGMT) is available. With this business function, you can use the new simplified reports (see next slide).

Customer © 2014 SAP SE or an SAP affiliate company. All rights reserved. 9

Page 10: PS ehp6 enhancements

Simplified Reporting for Project System Delivered Roles include a Report Launchpad

Role: e.g. Project Planner and Cost Estimator The WDR_CHIP_PAGE

application calls a role- based list of reports for each role (report launchpad).

Customer © 2014 SAP SE or an SAP affiliate company. All rights reserved. 10

Page 11: PS ehp6 enhancements

Simplified Reporting for Project System Plan/Actual/Variance Report

The new reports use the SAP BW front end to support drill down (here by value category), aggregation, and so on.

However, it is not necessary to replicate the data to SAP BW since it is read using „direct access” via data sources

Customer © 2014 SAP SE or an SAP affiliate company. All rights reserved. 11

Page 12: PS ehp6 enhancements

Simplified Reporting for Project System New Report: Actual/Commitments/Total/Plan

This report provides detailed cost element information showing the actual costs, the commitments and the planned costs for the WBS element.

Customer © 2014 SAP SE or an SAP affiliate company. All rights reserved. 12

Page 13: PS ehp6 enhancements

SAP Project System in SAP ERP 6.0 EhP 6 Commercial Project Inception Delta Overview

As of SAP Enhancement Package 6 for SAP ERP 6.0 (EA-APPL 606), the business function Commercial Project Inception & Lean Staffing 2 (PRS_ERP_CPILS_2) is available.

The Commercial Project Set-up application has been enhanced to include the following functions:

SAP ERP6.0 EhP6

Ability to change and hide project definition data Ability to create and delete WBS elements User Fields Ability to change the User Status Tree view

Customer © 2014 SAP SE or an SAP affiliate company. All rights reserved. 13

Page 14: PS ehp6 enhancements

Selected Highlight Commercial Project Inception

New: Toggle to Project Definition maintenance

New: Tree View

New: Add/Delete

WBS-elements

New: Change User Status

New: User Fields

Customer © 2014 SAP SE or an SAP affiliate company. All rights reserved. 14

Page 15: PS ehp6 enhancements

Side Panel Reporting

Customer © 2014 SAP SE or an SAP affiliate company. All rights reserved. 15

Page 16: PS ehp6 enhancements

Side Panel Reporting

Customer © 2014 SAP SE or an SAP affiliate company. All rights reserved. 16

Page 17: PS ehp6 enhancements

Project System: Upcoming Milestones – Details

This CHIP displays details of upcoming milestones

Customer © 2014 SAP SE or an SAP affiliate company. All rights reserved. 17

Name of object Type of object

Additional remarks Package

CL_BSSP_NEARING_MILES TONES

Feeder Class BSSPB

BSSP_MILESTONE_PS2 Configuration Component

Web dynpro Component - FPM_LIST_UIBB_AT S

BSSPB

BSSP_MILESTONE_PS2_UC W

Configuration Component

Web dynpro Component - FPM_UCW_COMPO NENT

BSSPB

BSSP_PS_UPCOMING_MILE STONE

Web dynpro CHIP

Web dynpro Component - FPM_UCW_COMPO NENT

BSSPB

NW_BT_MLST_NUM_PERIO D

RFC-Enabled Function Module

Function Group - NWBT

CN_NET _OPR

Page 18: PS ehp6 enhancements

Project System: Due and Overdue Milestone – Details

This CHIP displays number of Milestones which are Overdue and Due.

Customer © 2014 SAP SE or an SAP affiliate company. All rights reserved. 18

Name of object Type of object Additional remarks Packag e

CL_BSSP_TABLE_OF_MILE STONES_PS

Feeder Class BSSPB

BSSP_MILESTONE_TABLE Configuration Component

Web dynpro Component - FPM_LIST_UIBB_AT S

BSSPB

BSSP_COMPOSITE_MILEST ONE_UCW

Configuration Component

Web dynpro Component - FPM_UCW_COMPO NENT

BSSPB

BSSP_PS_DUE_OVD_MILES TONES_DTL

Web dynpro CHIP

Web dynpro Component - FPM_UCW_COMPO NENT

BSSPB

NW_BT_MLST_NUM_PERIO D

RFC-Enabled Function Module

Function Group - NWBT

CN_NE T_OPR

Page 19: PS ehp6 enhancements

Project System: Milestones – Due and Overdue

This CHIP displays number of Milestones which are Overdue and Due in a chart.

Customer © 2014 SAP SE or an SAP affiliate company. All rights reserved. 19

Name of object Type of object

Additional remarks

Package

CL_BSSP_COUNT_OF_MILE STONES_PS

Feeder Class BSSPB

BSSP_MILESTONE_COUNT Configuration Component

Web dynpro Component - BS_ANLY_CHART _UIBB

BSSPB

BSSP_MILESTONE_COUNT2 _UCW

Configuration Component

Web dynpro Component - FPM_UCW_COM PONENT

BSSPB

BSSP_PS_DUE_OV_MILEST ONE_CHART

Web dynpro CHIP

Web dynpro Component - FPM_UCW_COM PONENT

BSSPB

NW_BT_MLST_NUM_PERIO D

RFC-Enabled Function Module

Function Group - NWBT

CN_NET _OPR

Page 20: PS ehp6 enhancements

Project System: System Status Distribution – Activities

This CHIP displays system status distribution for activities at the project and WBS element level.

Customer © 2014 SAP SE or an SAP affiliate company. All rights reserved. 20

Name of object Type of object

Additional remarks Package

CL_BSSP_ACTIVITY_STATUS Feeder Class

BSSPB

BSSP_PS_ACTIVITY_STATUS Configur ation Compon ent

Web dynpro Component - BS_ANLY_CHART_U IBB

BSSPB

BSSP_PS_ACTIVITY_STATUS_ UCW

Configur ation Compon ent

Web dynpro Component - FPM_UCW_COMPO NENT

BSSPB

BSSP_ACTIVITY_STATUS_PS_ UCW

Web dynpro CHIP

Web dynpro Component - FPM_UCW_COMPO NENT

BSSPB

CJWB_GET_ACTIVITY_STATU S_DATA

RFC- Enabled Function Module

Function Group - CJWB

CN_PSP_O PR

Page 21: PS ehp6 enhancements

Project System: System Status Distribution - WBS Elements

This CHIP displays system status distribution for WBS elements at the project and WBS element level.

Customer © 2014 SAP SE or an SAP affiliate company. All rights reserved. 21

Name of object Type of object

Additional remarks Package

CL_BSSP_WBS_STATUS Feeder Class BSSPB

BSSP_WBS_STATUS_PS Configuration Component

Web dynpro Component - BS_ANLY_CHART_UIBB

BSSPB

BSSP_WBS_STATUS_PS _UCW

Configuration Component

Web dynpro Component - FPM_UCW_COMPONEN T

BSSPB

BSSP_WBS_STATUS_PS _UCW

Web dynpro CHIP

Web dynpro Component - FPM_UCW_COMPONEN T

BSSPB

CJWB_GET_WBS_STAT US_DATA

RFC-Enabled Function Module

Function Group - CJWB CN_PSP_O PR

CJWB_GET_WBS_HIER_ STATUS

RFC-Enabled Function Module

Function Group - CJWB CN_PSP_O PR

Page 22: PS ehp6 enhancements

Project System: Cost/Revenue

This CHIP displays the financial data (Costs/Revenue) at the Project and WBS Element level.

Customer © 2014 SAP SE or an SAP affiliate company. All rights reserved. 22

Name of object Type of object Additional remarks

Package

CL_BSSP_FIN_DATA_PS Feeder Class BSSPB

BSSP_FIN_DATA_PS Configuration Component

Web dynpro Component - BS_ANLY_CHAR T_UIBB

BSSPB

BSSP_FIN_DATA_PS Web dynpro CHIP Web dynpro Component - BS_ANLY_CHAR T_UIBB

BSSPB

CJCH_GET_FIN_DATA_PS RFC-Enabled Function Module

Function Group - CJCH

CN_PSP _OPR

CJCH_INTEGRATED_COST _REPORTING

Function Module Function Group - CJCH

CN_PSP _OPR

Page 23: PS ehp6 enhancements

Master Data Details

Apart from the above CHIPs, we have also reused existing side panel CHIPs for display of Object Master Data – Controlling Area, Business Area, Profit Center etc.

Customer © 2014 SAP SE or an SAP affiliate company. All rights reserved. 23