Project of construction work Church of the Nazarene. “C UTERVO – CAJAMARCA -PERU”. Geographic Location. Cutervo, province of the departament of Cajamarca , has a population of about 138 thousand people. CURRENT STATE OF THE TEMPLE. - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Project  of construction work  Church of the Nazarene

Project of construction work Church of the Nazarene

“CUTERVO – CAJAMARCA -PERU”

Page 2: Project  of construction work  Church of the Nazarene

Geographic Location

Cutervo, province of the departament of Cajamarca , has a

population of about 138 thousand people.

Page 3: Project  of construction work  Church of the Nazarene

CURRENT STATE OF THE TEMPLE

The temple has 3 floors of rustic material, that is, adobe and stone. It is

45 years old.DECLARED

IN EMERGENCY BY CIVILDEFENSE

Page 4: Project  of construction work  Church of the Nazarene

DESIGN OF CONSTRUCTIÓN

Construction ProjectCost S/. 800 000 40 % self- finacing nature60 % national & international help.

Page 5: Project  of construction work  Church of the Nazarene

FINAL CONSTRUCTION

TEMPLE3 floors of 15 x 30 metersFirst floor: a public funeral awake.Second floor: A mini auditorium and clasrooms for workshops.Third floor:Temple, Pastoral and administrative house.

Page 6: Project  of construction work  Church of the Nazarene

THANKS

With your help, we will get our dream

and getting souls for the

Kingdom of Christ .