Process improvement  Many software companies have turned to software process improvement as a way of enhancing the quality of their software, reducing costs or accelerating their development processes.  Process improvement means understanding existing processes and changing these processes to increase product quality and/or reduce costs and development time. 3
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Process improvement 1. Topics covered  The process improvement process  Process measurement  Process analysis  Process change  The CMMI process improvement.

1

Process improvement

Page 2: Process improvement 1. Topics covered  The process improvement process  Process measurement  Process analysis  Process change  The CMMI process improvement.

2

Topics covered

The process improvement process Process measurement Process analysis Process change The CMMI process improvement framework

Page 3: Process improvement 1. Topics covered  The process improvement process  Process measurement  Process analysis  Process change  The CMMI process improvement.

3

Process improvement

Many software companies have turned to software process improvement as a way of enhancing the quality of their software, reducing costs or accelerating their development processes.

Process improvement means understanding existing processes and changing these processes to increase product quality and/or reduce costs and development time.

Page 4: Process improvement 1. Topics covered  The process improvement process  Process measurement  Process analysis  Process change  The CMMI process improvement.

4

Approaches to improvement

The process maturity approach, which focuses on improving process and project management and introducing good software engineering practice. The level of process maturity reflects the extent to which good

technical and management practice has been adopted in organizational software development processes.

The agile approach, which focuses on iterative development and the reduction of overheads in the software process. The primary characteristics of agile methods are rapid delivery of

functionality and responsiveness to changing customer requirements.

Page 5: Process improvement 1. Topics covered  The process improvement process  Process measurement  Process analysis  Process change  The CMMI process improvement.

5

Process and product quality

Process quality and product quality are closely related and process improvement benefits arise because the quality of the product depends on its development process.

A good process is usually required to produce a good product.

For manufactured goods, process is the principal quality determinant.

For design-based activities, other factors are also involved, especially the capabilities of the designers.

Page 6: Process improvement 1. Topics covered  The process improvement process  Process measurement  Process analysis  Process change  The CMMI process improvement.

6

Factors affecting software product quality

Page 7: Process improvement 1. Topics covered  The process improvement process  Process measurement  Process analysis  Process change  The CMMI process improvement.

7

Quality factors

For large projects with ‘average’ capabilities, the development process determines product quality.

For small projects, the capabilities of the developers is the main determinant.

The development technology is particularly significant for small projects.

In all cases, if an unrealistic schedule is imposed then product quality will suffer.

Page 8: Process improvement 1. Topics covered  The process improvement process  Process measurement  Process analysis  Process change  The CMMI process improvement.

8

Process improvement process

There is no such thing as an ‘ideal’ or ‘standard’ software process that is applicable in all organizations or for all software products of a particular type. You will rarely be successful in introducing process

improvements if you simply attempt to change the process to one that is used elsewhere.

You must always consider the local environment and culture and how this may be affected by process change proposals.

Each company has to develop its own process depending on its size, the background and skills of its staff, the type of software being developed, customer and market requirements, and the company culture.

Page 9: Process improvement 1. Topics covered  The process improvement process  Process measurement  Process analysis  Process change  The CMMI process improvement.

9

Improvement attributes

You also have to consider what aspects of the process that you want to improve.

Your goal might be to improve software quality and so you may wish to introduce new process activities that change the way software is developed and tested.

You may be interested in improving some attribute of the process itself (such as development time) and you have to decide which process attributes are the most important to your company.

Page 10: Process improvement 1. Topics covered  The process improvement process  Process measurement  Process analysis  Process change  The CMMI process improvement.

10

Process attributes

Process characteristic

Key issues

Understandability To what extent is the process explicitly defined and how easy is it to understand the process definition?

Standardization To what extent is the process based on a standard generic process? This may be important for some customers who require conformance with a set of defined process standards. To what extent is the same process used in all parts of a company?

Visibility Do the process activities conclude in clear results, so that the progress of the process is externally visible?

Measurability Does the process include data collection or other activities that allow process or product characteristics to be measured?

Supportability To what extent can software tools be used to support the process activities?

Page 11: Process improvement 1. Topics covered  The process improvement process  Process measurement  Process analysis  Process change  The CMMI process improvement.

11

Process attributes

Process characteristic

Key issues

Acceptability Is the defined process acceptable to and usable by the engineers responsible for producing the software product?

Reliability Is the process designed in such a way that process errors are avoided or trapped before they result in product errors?

Robustness Can the process continue in spite of unexpected problems?

Maintainability Can the process evolve to reflect changing organizational requirements or identified process improvements?

Rapidity How fast can the process of delivering a system from a given specification be completed?

Page 12: Process improvement 1. Topics covered  The process improvement process  Process measurement  Process analysis  Process change  The CMMI process improvement.

12

Process improvement stages

Process measurement Attributes of the current process are measured. These are a

baseline for assessing improvements.

Process analysis The current process is assessed and bottlenecks and

weaknesses are identified.

Process change Changes to the process that have been identified during the

analysis are introduced.

Page 13: Process improvement 1. Topics covered  The process improvement process  Process measurement  Process analysis  Process change  The CMMI process improvement.

13

The process improvement cycle

Page 14: Process improvement 1. Topics covered  The process improvement process  Process measurement  Process analysis  Process change  The CMMI process improvement.

14

Process measurement

Wherever possible, quantitative process data should be collected However, where organisations do not have clearly defined

process standards this is very difficult as you don’t know what to measure. A process may have to be defined before any measurement is possible.

Process measurements should be used to assess process improvements But this does not mean that measurements should drive the

improvements. The improvement driver should be the organizational objectives.

Page 15: Process improvement 1. Topics covered  The process improvement process  Process measurement  Process analysis  Process change  The CMMI process improvement.

15

Process metrics

Time taken for process activities to be completed E.g. Calendar time or effort to complete an activity or process.

Resources required for processes or activities E.g. Total effort in person-days.

Number of occurrences of a particular event E.g. Number of defects discovered.

Page 16: Process improvement 1. Topics covered  The process improvement process  Process measurement  Process analysis  Process change  The CMMI process improvement.

16

Goal-Question-Metric Paradigm

Goals What is the organisation trying to achieve? The objective of

process improvement is to satisfy these goals. Questions

Questions about areas of uncertainty related to the goals. You need process knowledge to derive these.

Metrics Measurements to be collected to answer the questions.

Page 17: Process improvement 1. Topics covered  The process improvement process  Process measurement  Process analysis  Process change  The CMMI process improvement.

17

GQM questions

The GQM paradigm is used in process improvement to help answer three critical questions: Why are we introducing process improvement? What information do we need to help identify and assess

improvements? What process and product measurements are required to

provide this information?

Page 18: Process improvement 1. Topics covered  The process improvement process  Process measurement  Process analysis  Process change  The CMMI process improvement.

18

The GQM paradigm

Page 19: Process improvement 1. Topics covered  The process improvement process  Process measurement  Process analysis  Process change  The CMMI process improvement.

19

Process analysis

The study of existing processes to understand the relationships between parts of the process and to compare them with other processes.

Process analysis and process measurement are intertwined.

You need to carry out some analysis to know what to measure, and, when making measurements, you inevitably develop a deeper understanding of the process being measured.

Page 20: Process improvement 1. Topics covered  The process improvement process  Process measurement  Process analysis  Process change  The CMMI process improvement.

20

Process analysis objectives

To understand the activities involved in the process and the relationships between these activities.

To understand the relationships between the process activities and the measurements that have been made.

To relate the specific process or processes that you are analyzing to comparable processes elsewhere in the organization, or to idealized processes of the same type.

Page 21: Process improvement 1. Topics covered  The process improvement process  Process measurement  Process analysis  Process change  The CMMI process improvement.

21

Process analysis techniques

Published process models and process standards It is always best to start process analysis with an existing model.

People then may extend and change this.

Questionnaires and interviews Must be carefully designed. Participants may tell you what they

think you want to hear.

Ethnographic analysis Involves assimilating process knowledge by observation. Best

for in-depth analysis of process fragments rather than for whole-process understanding.

Page 22: Process improvement 1. Topics covered  The process improvement process  Process measurement  Process analysis  Process change  The CMMI process improvement.

22

Aspects of process analysis

Process aspect

Questions

Adoption and standardization

Is the process documented and standardized across the organization? If not, does this mean that any measurements made are specific only to a single process instance? If processes are not standardized, then changes to one process may not be transferable to comparable processes elsewhere in the company.

Software engineering practice

Are there known, good software engineering practices that are not included in the process? Why are they not included? Does the lack of these practices affect product characteristics, such as the number of defects in a delivered software system?

Organizational constraints

What are the organizational constraints that affect the process design and the ways that the process is performed? For example, if the process involves dealing with classified material, there may be activities in the process to check that classified information is not included in any material due to be released to external organizations. Organizational constraints may mean that possible process changes cannot be made.

Page 23: Process improvement 1. Topics covered  The process improvement process  Process measurement  Process analysis  Process change  The CMMI process improvement.

23

Aspects of process analysis

Process aspect Questions

Communications How are communications managed in the process? How do communication issues relate to the process measurements that have been made? Communication problems are a major issue in many processes and communication bottlenecks are often the reasons for project delays.

Introspection Is the process reflective (i.e., do the actors involved in the process explicitly think about and discuss the process and how it might be improved)? Are there mechanisms through which process actors can propose process improvements?

Learning How do people joining a development team learn about the software processes used? Does the company have process manuals and process training programs?

Tool support What aspects of the process are and aren’t supported by software tools? For unsupported areas, are there tools that could be deployed cost-effectively to provide support? For supported areas, are the tools effective and efficient? Are better tools available?

Page 24: Process improvement 1. Topics covered  The process improvement process  Process measurement  Process analysis  Process change  The CMMI process improvement.

24

Process models

Process models are a good way of focusing attention on the activities in a process and the information transfer between these activities.

Process models do not have to be formal or complete – their purpose is to provoke discussion rather than document the process in detail.

Model-oriented questions can be used to help understand the process e.g. What activities take place in practice but are not shown in the

model? Are there process activities, shown in the model, that you (the

process actor) think are inefficient?

Page 25: Process improvement 1. Topics covered  The process improvement process  Process measurement  Process analysis  Process change  The CMMI process improvement.

25

Process exceptions

Software processes are complex and process models cannot effectively represent how to handle exceptions: Several key people becoming ill just before a critical review; A breach of security that means all external communications are

out of action for several days; Organisational reorganisation; A need to respond to an unanticipated request for new

proposals. Under these circumstances, the model is suspended and

managers use their initiative to deal with the exception.

Page 26: Process improvement 1. Topics covered  The process improvement process  Process measurement  Process analysis  Process change  The CMMI process improvement.

26

Key points

The goals of process improvement are higher product quality, reduced process costs and faster delivery of software.

The principal approaches to process improvement are agile approaches, geared to reducing process overheads, and maturity-based approaches based on better process management and the use of good software engineering practice.

The process improvement cycle involves process measurement, process analysis and modeling, and process change.

Measurement should be used to answer specific questions about the software process used. These questions should be based on organizational improvement goals.

Page 27: Process improvement 1. Topics covered  The process improvement process  Process measurement  Process analysis  Process change  The CMMI process improvement.

27

Process change

Involves making modifications to existing processes. This may involve:

Introducing new practices, methods or processes; Changing the ordering of process activities; Introducing or removing deliverables; Introducing new roles or responsibilities.

Change should be driven by measurable goals.

Page 28: Process improvement 1. Topics covered  The process improvement process  Process measurement  Process analysis  Process change  The CMMI process improvement.

28

The process change process

Page 29: Process improvement 1. Topics covered  The process improvement process  Process measurement  Process analysis  Process change  The CMMI process improvement.

29

Process change stages

Improvement identification This stage is concerned with using the results of the process

analysis to identify ways to tackle quality problems, schedule bottlenecks or cost inefficiencies that have been identified during process analysis.

Improvement prioritization When many possible changes have been identified, it is usually

impossible to introduce them all at once, and you must decide which are the most important.

Process change introduction Process change introduction means putting new procedures,

methods and tools into place and integrating them with other process activities.

Page 30: Process improvement 1. Topics covered  The process improvement process  Process measurement  Process analysis  Process change  The CMMI process improvement.

30

Process change stages

Process change training Without training, it is not possible to gain the full benefits of

process changes. The engineers involved need to understand the changes that have been proposed and how to perform the new and changed processes.

Change tuning Proposed process changes will never be completely effective as

soon as they are introduced. You need a tuning phase where minor problems can be discovered, and modifications to the process can be proposed and introduced.

Page 31: Process improvement 1. Topics covered  The process improvement process  Process measurement  Process analysis  Process change  The CMMI process improvement.

31

Process change problems

Resistance to change Team members or project managers may resist the introduction

of process changes and propose reasons why changes will not work, or delay the introduction of changes. They may, in some cases, deliberately obstruct process changes and interpret data to show the ineffectiveness of proposed process change.

Change persistence While it may be possible to introduce process changes initially, it

is common for process innovations to be discarded after a short time and for the processes to revert to their previous state.

Page 32: Process improvement 1. Topics covered  The process improvement process  Process measurement  Process analysis  Process change  The CMMI process improvement.

32

Resistance to change

Project managers often resist process change because any innovation has unknown risks associated with it. Project managers are judged according to whether or not their

project produces software on time and to budget. They may prefer an inefficient but predictable process to an improved process that has organizational benefits, but which has short-term risks associated with it.

Engineers may resist the introduction of new processes for similar reasons, or because they see these processes as threatening their professionalism. That is, they may feel that the new pre-defined process gives

them less discretion and does not recognize the value of their skills and experience.

Page 33: Process improvement 1. Topics covered  The process improvement process  Process measurement  Process analysis  Process change  The CMMI process improvement.

33

Change persistence

The problem of changes being introduced then subsequently discarded is a common one. Changes may be proposed by an ‘evangelist’ who believes

strongly that the changes will lead to improvement. He or she may work hard to ensure the changes are effective and the new process is accepted.

If the ‘evangelist’ leaves, then the people involved may therefore simply revert to the previous ways of doing things.

Change institutionalization is important This means that process change is not dependent on individuals

but that the changes become part of standard practice in the company, with company-wide support and training.

Page 34: Process improvement 1. Topics covered  The process improvement process  Process measurement  Process analysis  Process change  The CMMI process improvement.

Software Process A software process is a road map that helps you create a

timely, high quality result. It is the way we produce software and it provides stability and control.

Each process defines certain deliverables known as the work products.These include programs, documents, and data produced as a consequence of the software engineering activities.

Page 35: Process improvement 1. Topics covered  The process improvement process  Process measurement  Process analysis  Process change  The CMMI process improvement.

• In 1986, in response to a request from the US Department of Defence to provide a method of assessing the capability of contractors to produce software on time and within budget, the SEI began the development of a process maturity framework.

• The primary aim of the CMM was to determine an organisation's capability by measuring the degree to which processes are defined and managed. The CMM describes an evolutionary path from an immature, ad-hoc software process to an optimising, disciplined and mature process.

CMMI - History

Page 36: Process improvement 1. Topics covered  The process improvement process  Process measurement  Process analysis  Process change  The CMMI process improvement.

• CMM's success had led to the development of similar models addressing systems engineering (SE-CMM), integrated product development (IPD-CMM), software acquisition (SA-CMM), and human resources (People CMM).

• The CMM Integration project was formed to sort out the problem of using multiple CMMs. As the name suggests, the CMMI is a model that combines three source models – the Capability Maturity Model for Software, the Alliance Interim Standard (EIA/IS) 731, and the Integrated Product Development Capability Maturity Model (IPD-CMM).

CMMI - History

Page 37: Process improvement 1. Topics covered  The process improvement process  Process measurement  Process analysis  Process change  The CMMI process improvement.

• The CMM (Software CMM) was the first capability maturity model adopted by software development companies

• The CMM has been retired, and CMMI replaces it. • The SEI no longer maintains the SW-CMM model,

its associated appraisal methods, or training materials, nor does the SEI offer SW-CMM training. All SW-CMM appraisal results expired on December 31, 2007. After December 31, 2007, all SW-CMM ratings will be considered invalid and should not be advertised.

CMMI - History

Page 38: Process improvement 1. Topics covered  The process improvement process  Process measurement  Process analysis  Process change  The CMMI process improvement.

CMMI has two representations, i.e. staged and continuous

• The staged representation uses a maturity levels and is a systematic and structured way to approach process improvement one step at a time.

• The continuous representation uses capability levels to measure process improvement. The continuous representation is a flexible way to improve process performance as organisations are allowed to improve any single process areas or group of process areas.

CMMI

Page 39: Process improvement 1. Topics covered  The process improvement process  Process measurement  Process analysis  Process change  The CMMI process improvement.

• Staged representation• Maturity levels, which belong to the staged representation,

apply to an organisation’s overall maturity. There are five maturity levels, numbered 1 through 5. Each maturity level comprises a predefined set of process areas.

CMMI - Staged

Maturity Level Staged Representation

1 Initial2 Managed3 Defined4 Quantitatively Managed5 Optimizing

Page 40: Process improvement 1. Topics covered  The process improvement process  Process measurement  Process analysis  Process change  The CMMI process improvement.

• Staged representation

to Perform

Maturity Levels

Generic Practices

Generic Goals

Process Area 2

Common Features

Process Area 1 Process Area n

AbilityImplementation

Verifyingto Perform

Commitment DirectingImplementation

Specific Goals

ImplementationSpecific Practices

to Perform

Maturity Levels

Generic Practices

Generic Goals

Process Area 2

Common Features

Process Area 1 Process Area n

AbilityImplementation

Verifyingto Perform

Commitment DirectingImplementation

Specific Goals

ImplementationSpecific Practices

Staged

CMMI - Staged

Page 41: Process improvement 1. Topics covered  The process improvement process  Process measurement  Process analysis  Process change  The CMMI process improvement.

• Process Areas: A process area is a cluster of related practices in an area that, when performed collectively, satisfy a set of goals considered important for making significant improvement in that area. All CMMI process areas are common to both continuous and staged representations.

• Specific Goals: Specific goals apply to a process area and address the unique characteristics that describe what must be implemented to satisfy the process area. Specific goals are required model components and are used in appraisals to help determine whether a process area is satisfied.

• Specific Practices: A specific practice is an activity that is considered important in achieving the associated specific goal.

 

CMMI - Staged

Page 42: Process improvement 1. Topics covered  The process improvement process  Process measurement  Process analysis  Process change  The CMMI process improvement.

• Example• Process Areas – Requirements Management• Specific Goals – SG 1 Manage Requirements

Specific Practices:•SP 1.3-1 Manage requirements changes•SP1.5-1 Identify inconsistencies between requirements

 

CMMI - Staged

Page 43: Process improvement 1. Topics covered  The process improvement process  Process measurement  Process analysis  Process change  The CMMI process improvement.

• Generic Goals: In the staged representation, each process area has only one generic goal. Achievement of a generic goal in a process area signifies improved control in planning and implementing the processes associated with that process area. Generic goals are required model components and are used in appraisals to determine whether a process area is satisfied.

• Genetic Practices: Generic practices provide institutionalization to ensure that the processes associated with the process area will be effective, repeatable, and lasting. Generic practices are categorized by generic goals and common features and are expected components in CMMI models.  

SPI Model – CMMI - Staged

Page 44: Process improvement 1. Topics covered  The process improvement process  Process measurement  Process analysis  Process change  The CMMI process improvement.

• Example• Process Areas – Requirements Management• Generic Goal – SG 2 Institutionalize a Managed

Process• Generic Practices:

•GP 2.2 Plan the process•GP2.3 Provide resources•GP2.5 Train people

 

CMMI - Staged

Page 45: Process improvement 1. Topics covered  The process improvement process  Process measurement  Process analysis  Process change  The CMMI process improvement.

 

SPI Model – CMMI - Staged

Page 46: Process improvement 1. Topics covered  The process improvement process  Process measurement  Process analysis  Process change  The CMMI process improvement.

• Ad-hoc software process• System development projects follow no prescribed

process.• Each developer uses his or her own tools and

methods.• Success or failure is usually a function of the skill

and experience of the project team. • The process is unpredictable.• Documentation is not consistent from one project

to the next, thus creating problems for those who must maintain a system over its lifetime

CMMI – Level 1 Initial

Page 47: Process improvement 1. Topics covered  The process improvement process  Process measurement  Process analysis  Process change  The CMMI process improvement.

• Project management processes and practices are established to track project costs, schedules, and functionality.

• The focus is on project management, not system development.

• Results of project management are reasonably predictable.

• The necessary process discipline is in place to repeat earlier successes on projects with similar applications.

• Experience from previous projects is gathered

CMMI – Level 2 Managed

Page 48: Process improvement 1. Topics covered  The process improvement process  Process measurement  Process analysis  Process change  The CMMI process improvement.

• A standard system development process (sometimes called a “methodology”) is purchased or developed.

• The process is stable, predictable, and repeatable.• The software process for both management and

engineering activities is documented and standardized for all software projects.

• Success is achieved by the process (hero’s are expected).

• Foundation is laid for major and continuing progress.• All projects use an approved, tailored version of the

organization's standard software process for developing and maintaining software.

CMMI – Level 3 Defined

Page 49: Process improvement 1. Topics covered  The process improvement process  Process measurement  Process analysis  Process change  The CMMI process improvement.

• Creates a group within the organization responsible for software process activities, called Software Engineering Process Group (SEPG).

• Organization-wide training programs are established to ensure that staff has the necessary skills and knowledge to be able to fulfil their roles.

• Management has good insight into the progress of the projects.

CMMI – Level 3 Defined

Page 50: Process improvement 1. Topics covered  The process improvement process  Process measurement  Process analysis  Process change  The CMMI process improvement.

• The process is in statistical control, so that special causes can be distinguished from common causes and the quality of the process can be controlled.

• Detailed measures of the standard system development process and product quality are routinely collected and stored in a database.

• Both the software process and products are quantitatively understood and controlled.

• Organisation-wide software process database is established.

• Managers have quantitative metrics for making decisions.

CMMI – Level 4 Quantitatively Managed

Page 51: Process improvement 1. Topics covered  The process improvement process  Process measurement  Process analysis  Process change  The CMMI process improvement.

• The standardized system development process (methodology) is continuously monitored and improved based on measures and data analysis established in Level 4

• Focused on continuous improvement.• Organisation has means to identify the weakest

elements of the process and fix them.• Can introduce new technology and make changes

in a controlled and managed manner.

CMMI – Level 5 Optimising

Page 52: Process improvement 1. Topics covered  The process improvement process  Process measurement  Process analysis  Process change  The CMMI process improvement.

• If organisations do not want to follow the predefined order of improvement as suggested by staged representation then they follow continuous representation.

• The continuous representation allows you to select the order of improvement that best meets the organisation’s business objectives and mitigates the organisation’s areas of risk.

• Can start with process areas in CMMI Level 3.

CMMI – Continuous

Page 53: Process improvement 1. Topics covered  The process improvement process  Process measurement  Process analysis  Process change  The CMMI process improvement.

• Continuous representation

CMMI - Continuous

Generic Practices

Generic Goals

Process Area 2Process Area 1 Process Area n

Specific Goals

Specific Practices Capability LevelsGeneric Practices

Generic Goals

Process Area 2Process Area 1 Process Area n

Specific Goals

Specific Practices Capability Levels

Page 54: Process improvement 1. Topics covered  The process improvement process  Process measurement  Process analysis  Process change  The CMMI process improvement.

• Capability levels, which belong to the continuous representation, apply to an organization’s process-improvement achievement for each process area. There are six capability levels, numbered 0 through 5. Each capability level corresponds to a generic goal and a set of generic and specific practices.

• Capability level is measured separately for each process area.

Capability Level Continuous Representation Capability Levels

0 Incomplete1 Performed2 Managed3 Defined4 Quantitatively Managed5 Optimizing

 

CMMI - Continuous

Page 55: Process improvement 1. Topics covered  The process improvement process  Process measurement  Process analysis  Process change  The CMMI process improvement.

• The continuous representation has more specific practices than the staged representation because the continuous representation has two types of specific practices, base and advanced, whereas the staged representation has only one type of specific practice.

• In the continuous representation, generic practices exist for capability levels 1-5, whereas, in the staged representation, only the generic practices from capability levels 2 and 3 appear; there are no generic practices from capability levels 1, 4, and 5  

CMMI - Continuous

Page 56: Process improvement 1. Topics covered  The process improvement process  Process measurement  Process analysis  Process change  The CMMI process improvement.

Critics of CMMI

• The focus is on “what to do” instead of “how to do it”.• Complex and hard to implement.• Hard to use by Small and Medium Enterprises.• No formal theoretical basis.• Based mainly on experience of large government

contractors.• Based on Watts Humphrey's own experience in the

mainframe world.• Ignores People.

Page 57: Process improvement 1. Topics covered  The process improvement process  Process measurement  Process analysis  Process change  The CMMI process improvement.

Key Points

• The primary aim of the CMMI is to determine an organisation's capability by measuring the degree to which processes are defined and managed.

• CMMI has two representations, i.e. staged and continuous.• The continuous representation has more specific practices

than the staged representation.• Capability levels belong to a continuous representation.• Maturity levels belong to a staged representation.• A software process assessment is an appraisal or review of an

organisation’s software process.• SCAMPI is designed to provide benchmark quality ratings

relative to CMMI models.