Top Banner
Process group Knowledge area Initiating Planning Executing Monitoring & Controlling Closing Input Business case Agreements Project charter Schedule forecast Change requests cost forecast Validated changes Accepted deliverables Process name Determines Goals of project Doing it Expert judgement, Expert judgement, Expert judgement, Expert judgement, Expert judgement, Expert judgement, Change control tools Meetings Meetings Meetings Meetings Formulaes Output Deliverables Work peformance data Change requests Change requests change log Project integration management Output from other process Project management plan Project management plan Project management plan Project management plan Approved change requests Enterprise enviornmental factors Enterprise enviornmental factors Enterprise enviornmental factors Enterprise enviornmental factors Enterprise enviornmental factors Organisational process assets Organisational process assets Organisational process assets Organisational process assets Organisational process assets Organisational process assets Project statement of work Work performance information Work performance reports Develop project charter Develop project management plan Direct & manage project work Monitor & control project work Perform integrated change control close project or phase How project will be done plan? Decision making by control board ? Final sign off and / or handover Tools & Techniques Project management information system Project management information system techniques techniques technique technique Work performance reports Approved change requests services, or result transition Project management plan updates Project management plan updates Project management plan updates process assets updates Project document update Project document update Project document update
57

Process Chart for PMP from PMbok 5 edition - 47 processes

Dec 31, 2015

Download

Documents

kanan1512

PMP Process chart from PMBOk 5th Edition
47 processes
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Process Chart for PMP from PMbok 5 edition - 47 processes

Process groupKnowledge area Initiating Planning Executing Monitoring & Controlling Closing

Input

Business case

Agreements Project charter Schedule forecast Change requestscost forecast

Validated changes

Accepted deliverables

Process nameDevelop project charter close project or phase

Determines Goals of project How project will be done Doing itExpert judgement, Expert judgement, Expert judgement, Expert judgement, Expert judgement, Expert judgement,

Change control toolsAnalytical techniques Analytical techniques

Facilitation technique Facilitation technique Meetings Meetings Meetings MeetingsFormulaes

Output

Deliverables

Work peformance dataChange requests Change requests change log

Project integration management

Output from other process

Project management plan

Project management plan

Project management plan

Project management plan

Approved change requests

Enterprise enviornmental factors

Enterprise enviornmental factors

Enterprise enviornmental factors

Enterprise enviornmental factors

Enterprise enviornmental factors

Organisational process assets

Organisational process assets

Organisational process assets

Organisational process assets

Organisational process assets

Organisational process assets

Project statement of work

Work performance information

Work performance reports

Develop project management plan

Direct & manage project work

Monitor & control project work

Perform integrated change control

Is it going as per plan? Decision making by control board ?

Final sign off and / or handover

Tools & Techniques

Project management information system

Project management information system

Work performance reports

Approved change requests

Final product, services, or result transition

Project management plan updates

Project management plan updates

Project management plan updates

Organisational process assets updates

Project document update Project document update Project document update

Page 2: Process Chart for PMP from PMbok 5 edition - 47 processes

Process groupKnowledge area Planning Monitoring & Controlling

Input

Project management plan Scope management plan Scope management plan Scope management plan Project management plan Project management planProject charter Project charter Project charter Work performance data Work performance data

Stakeholder register Verified deliverables

Process namePlan scope management Collect requirements Define scope Create WBS Validate scope Control scope

Determines Documenting HOW Is it going as per planExpert judgement Interviews Expert judgement Expert judgement Expert judgement Variance analysis

Meetings Focus groups Product analysisFacilitated workshops Facilitated workshops Analytical techniques

Decomposition Change control tools

Questionnaire & surveys Alternatives generationObservationsPrototypesBenchmarkingContext diagramsDocument analysis

Formulaes

Scope management plan Project scope statement Scope baselinechange requests change requests

Project documents update Project documents update Project documents update

Accepted deliverables Project documents update

Project scope management

Enterprise Enviiornment factors

Stakeholder management plan

Enterprise Enviiornment factors

Requirement tracebility matrix

Requirement tracebility matrix

Organisational process assets

Organisational process assets

Organisational process assets

Organisational process assets

Requirement management plan

Requirement documentation

Requirement documentation

Requirement documentation

Requirement documentation

Document stakeholder needs

What work needs to be done

Divide the work into smaller manageble units

Is it going as per plan? Decision making by control board ?

Project management information system

Group creativity techniques

Group decision making techniques

Requirement tracebility matrix

Work performance information

Work performance information

Requirement management plan

Requirements documentation

Project management plan update

Organisational process assets updates

Page 3: Process Chart for PMP from PMbok 5 edition - 47 processes

Process group

Knowledge area

Planning

Input

Project charter Scope baseline Activity list Activity list Activity list Activity list Schedule data

Project schedule

Resource calenders Resource calenders Resource calenders Project calendarsActivity attributes Activity attributes Activity attributes Activity attributesMilestone list Risk register Risk register Risk register

Process nameDefine activities Sequence activities Develop schedule Control schedule

Determines In which order Who will do this How long will it take

Expert judgement Expert judgement Expert judgement Expert judgement Performance reviews

Analytical techniques Alternative analysis Critical path method

Meetings Decomposition Leads & lags Critical chain method

Reserve analysis Leads & lags Leads & lags

Schdule compression Schdule compressionScheduling tools Scheduling tools

Formulaes

Output

Activity list Schedule baseline

Activity attributes Project schedule Schedule forcast

Milestone list Schedule data Change request

Project calendars

Monitoring &

Controlling

Project time management

Project management plan

Schedule management plan

Schedule management plan

Schedule management plan

Schedule management plan

Schedule management plan

Project management plan

Enterprise enviornment factors

Enterprise enviornment factors

Enterprise enviornment factors

Enterprise enviornment factors

Enterprise enviornment factors

Enterprise enviornment factors

Organisational process assets

Organisational process assets

Organisational process assets

Organisational process assets

Organisational process assets

Organisational process assets

Organisational process assets

Project scope statement

Activity duration estimate

Work performance data

Project scope statement

Project scope statement

Project staff assignment

Activity resource requirement

Project schedule network diagrams

Resource breakdown structure

Resource breakdown structure

Plan schedule management

Estimate activity resources

Estimate activity duration

How will you plan, develop, manage, execute & control the project schedule

What needs to be done

When will this be done

How the changes will be made

Tools & Techniques

Precedence diagram method

Schedule network analysis

Rolling wave planning

Dependanct determination Analogous estimating

Project management software

Published estimation data

Parametric estimating

Bottom up estimating

Three point estimators

Resource optimisation technique

Resource optimisation technique

Project management software

Group decision making techniues

Modelling techniques

Modelling techniques

Schedule management plan

Project schedule network diagrams

Activity resource requirements

Activity duration estimate

Organisational process updates

Project documents updates

Project document updates

Project document updates

Resource breakdown structures

Work performance information

Project management plan updates

Project management plan updates

Project documents updates

Project document updates

Page 4: Process Chart for PMP from PMbok 5 edition - 47 processes

Process group

Knowledge areaPlanning

Input

Project management plan Cost management plan Cost management planProject charer Risk register Risk register

Resource calendars Work performance data

Project schedule Project scheduleScope baseline Scope baselineHR Management plan Activity cost estimates

Basis of estimatesAgreements

Process name Plan cost management Estimate cost Determine budget Control costs

Determines

Expert judgement Expert judgement Expert judgement Forecasting

Analytical techniques Analogous estimatingMeetings Parametric estimating

Bottom up estimatingThree point estimatingReserve analysis Reserve analysis Reserve analysisCost of quality Cost aggregation

Monitoring & Controlling

Project cost management

Project management plan

Enterprise enviornment factors

Enterprise enviornment factors

Organisational process assets

Organisational process assets

Organisational process assets

Organisational process assets

Project funding requirements

How to plan, manage, expend & control project costs

How much for each activity

What is the budgeted target

How we will manage changes to costs

Tools & Techniques

Earned value management (EVM)

Project management software

Project management software

Page 5: Process Chart for PMP from PMbok 5 edition - 47 processes

Vendor bid analysis Historical relationships Performance reviews

Formulaes

Output

Change request

Cost management plan Activity cost estimates Cost baselineCost forecast

Basis of estimates

Project cost management

Tools & Techniques

Group decision making techniques

Funding limit reconciliation

To Complete performance Index (TCPI)

Work performance information

Project funding requirements

Organisational process assets

Project documents updates

Project documents updates

Project documents updates

Project management plan updates

Page 6: Process Chart for PMP from PMbok 5 edition - 47 processes

Knowledge area

5 Project quality management

Input

3 Process name

Determines

Tools & Techniques

Formulaes

Output

Page 7: Process Chart for PMP from PMbok 5 edition - 47 processes

5 Project quality management

Output

Page 8: Process Chart for PMP from PMbok 5 edition - 47 processes

Process group

Initiating Planning Executing

Risk register Quality metrics Quality metrics

Requirement documents Quality checklist

Stakeholer register Work performance data

DeliverablesProject documents Project documents

Control quality

Seven basic quality tools Quality audits Seven basic quality toolsCost benefit analysis Process analysis Statstical samplingCost of quality (COQ) Inspection

BenchmarkingDesign of experimentsStatistical sampling

Meetings

Quality metrics Validated changesQuality checklists Verified deliverables

Change requests Change requests

Monitoring & Controlling

Project management plan

Quality management plan

Project management plan

Quality control measurements

Process improvement plan

Enterprise enviornment factors

Approved change requests

Organisational process assets

Organisational process assets

Plan quality management

Perform quality Assurance

How project will demonstrate compliance

Whether appropriate quality standards and operational definitions are used

Whether performance is as per the plan

Quality management & control tools

Approved change requests review

Additional quality planning tools

Quality management plan

Quality control measurement

Process improvement plan

Work performance Information

Project management plan updates

Project management plan updates

Project document updates

Project document updates

Project document updates

Organisational process updates

Organisational process updates

Page 9: Process Chart for PMP from PMbok 5 edition - 47 processes
Page 10: Process Chart for PMP from PMbok 5 edition - 47 processes

Process group

Closing

Page 11: Process Chart for PMP from PMbok 5 edition - 47 processes
Page 12: Process Chart for PMP from PMbok 5 edition - 47 processes

Knowledge area

6 Project HRM

Input

4 Process name

Determines

Tools & Techniques

Formulaes

Output

Page 13: Process Chart for PMP from PMbok 5 edition - 47 processes

6 Project HRM

Output

Page 14: Process Chart for PMP from PMbok 5 edition - 47 processes

Process group

Initiating Planning Executing

Project staff assignments

Resource calendars

Acquire project team Develop project team

Networking Negotiation Training

Organisational theory Acquisition Team building activitiesExpert judgement Virtual teams Ground rulesMeetings Pre assignments Co-location

Recognition and rewardsInterpersonal skills

Project staff assignments

Resource calendars

Project management plan

Human resource management plan

Human resource management plan

Activity resource requirements

Enterprise enviornment factors

Enterprise enviornment factors

Organisational process assets

Organisational process assets

Plan human resource management

How resources will be staffed

Getting the team on board

Optimizing team performance

Organisational charts and positional descriptions

Multi criteria decision analysis

Personnel assessment tools

Human resource management plan

Team performance assessments

Project management plan updates

Enterprise enviornmental factors updates

Page 15: Process Chart for PMP from PMbok 5 edition - 47 processes
Page 16: Process Chart for PMP from PMbok 5 edition - 47 processes

Process group

Executing Closing

Project staff assignments

Issue log

Manage project team

Conflict managementInterpersonal skills

Change requests

Monitoring & Controlling

Human resource management plan

Team performance assessments

Organisational process assets

Work performance reports

Maintaining the team performance

Observation and conversation

Project performance appraisals

Project documents updates

Project management plan updates

Enterprise environment factors updates

Organisational process assets updates

Page 17: Process Chart for PMP from PMbok 5 edition - 47 processes
Page 18: Process Chart for PMP from PMbok 5 edition - 47 processes

Knowledge area

Input

3 Process name

Determines

Tools & Techniques

Formulaes

Output

Project communication management

Page 19: Process Chart for PMP from PMbok 5 edition - 47 processes

Output

Project communication management

Page 20: Process Chart for PMP from PMbok 5 edition - 47 processes

Process group

Initiating Planning Executing

Stakeholder register Work performance data

Project communications

Issue log

Control communications

Expert judgement

Communication models Communication models

Meetings Performance reporting Meetings

Project communications

Change requests

Monitoring & Controlling

Project management plan

Communication management plan

Project management plan

Work performance reports

Enterprise enviornment factors

Enterprise enviornment factors

Organisational process assets

Organisational process assets

Organisational process assets

Plan communication management

Manage communications

How information will flow

Creating, collecting, distributing, storing, retrieving, and the ultimate disposition of proejct information

information needs of the proejct stakeholders are met

Communications requirement analysis

Information management system

Information management system

Communications technology

Communications technology

Communications methods

Communications methods

Communication management plan

Work performance information

Project document updates

Project document updates

Project document updates

Project management plan updates

Project management plan updates

Organisational process assets updates

Organisational process assets updates

Page 21: Process Chart for PMP from PMbok 5 edition - 47 processes
Page 22: Process Chart for PMP from PMbok 5 edition - 47 processes

Process group

Closing

Page 23: Process Chart for PMP from PMbok 5 edition - 47 processes
Page 24: Process Chart for PMP from PMbok 5 edition - 47 processes

Process group

Initiating Planning

8

Input

Project charter

Stakeholder register

6 Process namePlan risk management

Determines

Tools & Techniques

Analytical techniques

Meetings

Expert judgement

Project management plan

Enterprise environmental factors

Organisational process assets

Planning uncertainities - HOW

Page 25: Process Chart for PMP from PMbok 5 edition - 47 processes

8

Tools & Techniques

Formulaes

Output

Risk management plan

Page 26: Process Chart for PMP from PMbok 5 edition - 47 processes

Process group

Planning

Risk management plan Risk management plan Risk management plan Risk management plan

Procurement documents Risk register Risk register Risk register

Cost management plan Cost management plan

Scope baseline Scope baselineActivity cost estimates

Stakeholder registerProject documents

Identify risks Plan risk responses

Identify uncertinities Prioritising risk Options and actions

Documentation reviews

Checklist analysis

Expert judgement Expert judgement Expert judgement Expert judgement

Diagramming techniques Risk categorisationSWOT analysis

Schedule management plan

Schedule management plan

Enterprise environmental factors

Enterprise environmental factors

Enterprise environmental factors

Organisational process assets

Organisational process assets

Organisational process assets

Quality management plan

Human resource management plan

Activity duration estimates

Perform qualitative risk analysis

Perform quantitive risk analysis

Further analysing numerically (optional)

Risk probability and impact assessment

Data gathering and representation techniques

Strategies for negative risks or threats

Information gathering techniques

Probability and impact matrix

Quantitative risk analysis and modelling techniques

Strategies for positive risks or opportunities

Risk data quality assessment

Contingent response strategies

Page 27: Process Chart for PMP from PMbok 5 edition - 47 processes

Assumption analysis Risk urgency assessment

Risk registerProject management plan updates

Project document updates

Project document updates

Project document updates

Page 28: Process Chart for PMP from PMbok 5 edition - 47 processes

Process group

Executing Closing

Risk register

Work performance data

Control risks

Risk assessment

Risk audits

Reserve analysisMeetings

Monitoring & ControllingProject management plan

Work performance reports

Evaluating risk process effectiveness

Variance and trend analysis

Technical performance measurement

Page 29: Process Chart for PMP from PMbok 5 edition - 47 processes

Change requests

Work performance information

Project management plan updates

Project document updates

Organisational process updates

Page 30: Process Chart for PMP from PMbok 5 edition - 47 processes

Knowledge area

9 Project procurement management

Input

4 Process name

Determines

Tools & Techniques

Formulaes

Output

Page 31: Process Chart for PMP from PMbok 5 edition - 47 processes

9 Project procurement management

Output

Page 32: Process Chart for PMP from PMbok 5 edition - 47 processes

Process group

Initiating Planning Executing

Procurement documents Procurement documentsRisk register Seller proposals Agreements

Source selection criteria

Project schedule Project documents

Activity cost estimates Make or buy decision Work performance dataStakeholder register

Conduct procurements Control procurements

Awarding contracts Managing procurements

Make or buy analysis Bidder conferences

Expert judgement Expert judgement

Market research Independent estimates Inspection and audits

Meetings Performance reportingAdvertising Payment systemsAnalytical techniques Claims administration

Procurement negotiation

Selected sellers

Agreements

Procurement documents Resource calendars

Monitoring & Controlling

Project management plan

Procurement management plan

Project management plan

Requirement documentation

Activity resource requirements

Approved change requests

Work performance reports

Enterprise enviornmental factors

Procurement statement of work

Organisational process assets

Organisational process assets

Plan procurement management

What and how to procure

Contact change control system

Procurement performance reviews

Proposal evaluation technique

Records management system

Procurement management plan

Work performance information

Procurement statement of work

Organisational process assets updates

Page 33: Process Chart for PMP from PMbok 5 edition - 47 processes

Source selection criteria Change requests Change requestsMake or buy decision

Change requestsProject management plan updates

Project management plan updates

Project documents updates

Project documents updates

Project documents updates

Page 34: Process Chart for PMP from PMbok 5 edition - 47 processes

Process group

Closing

Procurement documents

Close procurements

Procurement audits

Closed procurements

Project management plan

Completion and audit of procurement

Procurement negotiations

Records management system

Organisational process assets updates

Page 35: Process Chart for PMP from PMbok 5 edition - 47 processes
Page 36: Process Chart for PMP from PMbok 5 edition - 47 processes

Knowledge area

10 Project stakeholder management

Input

4 Process name

Determines

Tools & Techniques

Formulaes

Output

Page 37: Process Chart for PMP from PMbok 5 edition - 47 processes

10 Project stakeholder management

Output

Page 38: Process Chart for PMP from PMbok 5 edition - 47 processes

Process group

Initiating Planning Executing

Project charter

Procurement documents Stakeholder register Project documents

Change log Issue log

Work performance data

Identify stakeholders

Who all are impacted Eliminating gaps

Stakeholder analysis Analytical techniquesExpert judgement Expert judgement Interpersonal skills Expert judgementMeetings Meetings Management skills Meetings

Stakeholder register

Issue logChange requests Change requests

Monitoring & Controlling

Project management plan

Stakeholder management plan

Project management plan

Communications management plan

Enterprise enviornmental factors

Enterprise enviornmental factors

Organisational process assets

Organisational process assets

Organisational process assets

Plan stakeholder management

Manage stakeholder engagement

Control stakeholder engagement

How to effectively engage stakeholders

Monitoring overall project stakeholder relationships and adjusting strategies

Communications methods

Information management system

Stakeholder management plan

Project management plan updates

Project management plan updates

Project document updates

Project document updates

Project document updates

Organisational process assets updates

Organisational process assets updates

Work performance information

Page 39: Process Chart for PMP from PMbok 5 edition - 47 processes
Page 40: Process Chart for PMP from PMbok 5 edition - 47 processes

Process group

Closing

Page 41: Process Chart for PMP from PMbok 5 edition - 47 processes
Page 42: Process Chart for PMP from PMbok 5 edition - 47 processes

I S time, cost quality high, common people at risk, procure start ?

Process group

Knowledge areaInitiating

2

1 Project integration management 6Develop project charter

2 Project scope management 6

3 Project time management 7

4 Project cost management4

5 Project quality management 3

6 Project HRM 4

7 Project communication management 3

8 Project risk management 6

9 Project procurement management 4

Page 43: Process Chart for PMP from PMbok 5 edition - 47 processes

10 Project stakeholder management 4 Identify stakeholders

Page 44: Process Chart for PMP from PMbok 5 edition - 47 processes

I S time, cost quality high, common people at risk, procure start ?

Process group

Planning Executing

24 8 11

Direct & manage project work

Plan scope management Validate scopeCollect requirements Control scopeDefine scopeCreate WBS

Plan schedule management Control scheduleDefine activitiesSequence activitiesEstimate activity resourcesEstimate activity durationDevelop schedule

Plan cost management Control costEstimate costDetermine budget

Plan quality management Perform quality Assurance Control quality

Acquire project teamDevelop project teamManage project team

Manage communications Control communications

Plan risk management Control risksIdentify risks

Perform qualitative risk analysis

Perform quantitive risk analysisPlan risk responses

Plan procurement management Conduct procurements Control procurements

Monitoring & Controlling

Develop project management plan

Monitor & control project work

Perform integrated change control

Plan human resource management

Plan communication management

Page 45: Process Chart for PMP from PMbok 5 edition - 47 processes

Plan stakeholder managementManage stakeholder engagement

Control stakeholder engagement

Page 46: Process Chart for PMP from PMbok 5 edition - 47 processes

Process group

Closing

2

close project or phase

Close procurements

Page 47: Process Chart for PMP from PMbok 5 edition - 47 processes