Top Banner
PCA Forum 2008 and Members Meeting PETRONAS Carigali Information Management (PCIM) PETRONAS Perspective Yusoff Siraj, PCSB 22 nd October 2008
16

PETRONAS Carigali Information Management (PCIM) PETRONAS ... · PDF filePCA Forum 2008 and Members Meeting. PETRONAS. Carigali. Information Management (PCIM) PETRONAS Perspective.

Mar 06, 2018

Download

Documents

phamdien
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: PETRONAS Carigali Information Management (PCIM) PETRONAS ... · PDF filePCA Forum 2008 and Members Meeting. PETRONAS. Carigali. Information Management (PCIM) PETRONAS Perspective.

PCA Forum 2008 and Members Meeting

PETRONASCarigaliInformation Management (PCIM) PETRONAS Perspective

Yusoff Siraj, PCSB22nd October 2008

Page 2: PETRONAS Carigali Information Management (PCIM) PETRONAS ... · PDF filePCA Forum 2008 and Members Meeting. PETRONAS. Carigali. Information Management (PCIM) PETRONAS Perspective.

PETRONAS Carigali Information Management and Capital Facilities Information Handover Guide, Part 1

• Identify work processes that can streamlinedthrough the use of structured informationhandover

• Identify the information requirements of theselected processes

• Assess what is available in structured data formats

• Find out who is working on the development ofrelevant standards and the utility and maturity ofthese standards initiatives

• Define and execute a plan for industry-widestandards solutions for information delivery andhandover

Page 3: PETRONAS Carigali Information Management (PCIM) PETRONAS ... · PDF filePCA Forum 2008 and Members Meeting. PETRONAS. Carigali. Information Management (PCIM) PETRONAS Perspective.

Consortium and Project Lead PCIM Processes

PETRONAS Carigali Information Management (PCIM) Approach for Capital Facilities Development Projects

EPC/I/CContractors

Operation, Maintenance

EPC/I/C Processes

Production Sharing Contractors (PSC)

Engineering SoftwareVendors

ECMEnterprise Content

Management

EAMEnterprise Asset

Management

Review,Approval

Deliverables(native Format)

ProjectContract

Validated Structured Master Data

Validated Structured Content & Final Documentation

PCIM Requirements for Unstructured Data and Structured Data(Software Vendor neutral !)

Validated StructuredMaster Data ISO 15926

Structured Documentation & Content  IEC 61355‐1IEC 82045‐2

ISO 15489

Information QualityReports (Data)

PCIM MDMMaster Data Management

UnstructuredData & Docs

Information QualityReports (Docs)

PCIM ECMEnterprise Content

Management

Documents, Data

PCIM SDMStructured Data

Management

Structured DataISO 15926

ValidatedStructured DataISO 15926

Project ManagementProcesses

PCIM IQMInformation Quality

Management

AIMAsset Information

Management

Page 4: PETRONAS Carigali Information Management (PCIM) PETRONAS ... · PDF filePCA Forum 2008 and Members Meeting. PETRONAS. Carigali. Information Management (PCIM) PETRONAS Perspective.

PETRONAS Carigali Information Management (PCIM) Approach for Capital Facilities Development Projects

PCIM Requirements

Operation, Maintenance

Page 5: PETRONAS Carigali Information Management (PCIM) PETRONAS ... · PDF filePCA Forum 2008 and Members Meeting. PETRONAS. Carigali. Information Management (PCIM) PETRONAS Perspective.

Consortium and Project Lead

PETRONAS Carigali Information Management (PCIM) Approach for Capital Facilities Development Projects

EPC/I/CContractors

Eng. SoftwareVendors

PCIM Requirements

Production Sharing Contractors (PSC)

ProjectContract

Page 6: PETRONAS Carigali Information Management (PCIM) PETRONAS ... · PDF filePCA Forum 2008 and Members Meeting. PETRONAS. Carigali. Information Management (PCIM) PETRONAS Perspective.

PETRONAS Carigali Information Management (PCIM) Approach for Capital Facilities Development Projects

Deliverables(native Format)

EPC/I/C Project Management

Page 7: PETRONAS Carigali Information Management (PCIM) PETRONAS ... · PDF filePCA Forum 2008 and Members Meeting. PETRONAS. Carigali. Information Management (PCIM) PETRONAS Perspective.

PETRONAS Carigali Information Management (PCIM) Approach for Capital Facilities Development Projects

PCIM Processes

Validated StructuredMaster Data ISO 15926

Structured Documentation & Content  IEC 61355‐1IEC 82045‐2

ISO 15489

Information QualityReports (Data)

PCIM MDMMaster Data Management

UnstructuredData & Docs

Information QualityReports (Docs)

PCIM ECMEnterprise Content

Management

Documents, Data

PCIM SDMStructured Data

Management

Structured DataISO 15926

ValidatedStructured DataISO 15926

PCIM IQMInformation Quality

Management

Page 8: PETRONAS Carigali Information Management (PCIM) PETRONAS ... · PDF filePCA Forum 2008 and Members Meeting. PETRONAS. Carigali. Information Management (PCIM) PETRONAS Perspective.

Consortium and Project Lead PCIM Processes

PETRONAS Carigali Information Management (PCIM) Approach for Capital Facilities Development Projects

EPC/I/CContractors

Operation, Maintenance

EPC/I/C Processes

Production Sharing Contractors (PSC)

Engineering SoftwareVendors

ECMEnterprise Content

Management

EAMEnterprise Asset

Management

Review,Approval

Deliverables(native Format)

ProjectContract

Validated Structured Master Data

Validated Structured Content & Final Documentation

PCIM Requirements for Unstructured Data and Structured Data(Software Vendor neutral !)

Validated StructuredMaster Data ISO 15926

Structured Documentation & Content  IEC 61355‐1IEC 82045‐2

ISO 15489

Information QualityReports (Data)

PCIM MDMMaster Data Management

UnstructuredData & Docs

Information QualityReports (Docs)

PCIM ECMEnterprise Content

Management

Documents, Data

PCIM SDMStructured Data

Management

Structured DataISO 15926

ValidatedStructured DataISO 15926

Project ManagementProcesses

PCIM IQMInformation Quality

Management

AIMAsset Information

Management

Page 9: PETRONAS Carigali Information Management (PCIM) PETRONAS ... · PDF filePCA Forum 2008 and Members Meeting. PETRONAS. Carigali. Information Management (PCIM) PETRONAS Perspective.

PETRONAS Carigali Information Management Initiative

PETRONASCarigali InformationManagement

Initiative

PCIM ECMEnterprise Content Management

PCIM SDMStructured Data Management

PCIM IQM Information Quality Management

PCIM MDMMaster Data Management

• Document Management based on ISO/IEC 82045• Document Classification and Structuring based on IEC 61355• Record Management based on ISO 15489-1• Validated Structured Documentation Handover

• Structured Data Delivery and Handover based on ISO 15926

• Information Quality for Structured Data • Information Quality for Documents/Content

• Centralized Master TAG Register• Structured Master Data in ISO 15926 Data Repository• Structured Master Data Handover to EAM

PCIM

PCIM BPMBusiness Process Management

• Focus on Information Delivery and Handover Business Processes• Documenting & Analysis existing (as-is) Business Processes• Defining (to-be) Business Processes and Information Requirements• Implementing and Controlling the new Business Processes

Page 10: PETRONAS Carigali Information Management (PCIM) PETRONAS ... · PDF filePCA Forum 2008 and Members Meeting. PETRONAS. Carigali. Information Management (PCIM) PETRONAS Perspective.

24/7 Web Access to Documentsfor Project Management Teams

ALCIM Data CenterKuala Lumpur

PMT (Project Director)KLCC

PMTLocationRamunia

PMTLocationSIME

PMTLocationMMHE

PMTLocationKENCANA

Page 12: PETRONAS Carigali Information Management (PCIM) PETRONAS ... · PDF filePCA Forum 2008 and Members Meeting. PETRONAS. Carigali. Information Management (PCIM) PETRONAS Perspective.

Fabrication, Installation Phase

Design Phase

PCIM - Information Quality ManagementExample PID Data Non-Conformance

Skid, Assemblies(Vendor Data)

AFB (IFC) AFC Post‐AFC

Wrong, missing

correct

Page 13: PETRONAS Carigali Information Management (PCIM) PETRONAS ... · PDF filePCA Forum 2008 and Members Meeting. PETRONAS. Carigali. Information Management (PCIM) PETRONAS Perspective.

Master TAG Schematics

Relation between Scope, Time, Costs

Scope(TAG Register)

Plant Design

CBD

SLD

P&ID

Contract,Technical SpecificationPCIM

Documents for Procurement Fabrication

Construction Commissioning

Drawings

Tie-In Point ListsInterface Lists

BOM

Physical Plant, Facility

Time Cost

Page 14: PETRONAS Carigali Information Management (PCIM) PETRONAS ... · PDF filePCA Forum 2008 and Members Meeting. PETRONAS. Carigali. Information Management (PCIM) PETRONAS Perspective.

Tangga Barrat MLDP-AP&ID (Master Tag) Quality Improvements

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

Equipment Equipment Nozzle*

Skid Tie‐In

PipeValve

InstrumentSpecial 

Piping Item Average %

42%

0%

26%

0%

55%

0%

89%

0%

27%

42%

31% 34%

26%

55%

0%

88%

0%

35%

67% 68%

95% 99%

78%86%

84%

98%

84%

IFC ( Issued for comments)15‐Feb‐2008

AFC (Approved for Construction)14‐Mar‐2008

Post‐AFC (Approved for Construction)16‐May‐2008

PCIM IQM Information Quality Management

Page 15: PETRONAS Carigali Information Management (PCIM) PETRONAS ... · PDF filePCA Forum 2008 and Members Meeting. PETRONAS. Carigali. Information Management (PCIM) PETRONAS Perspective.

PETRONAS Carigali Information Management

PETRONAS Carigali Information Management (PCIM)

Business Process Change Initiativebased on the

PETRONAS 5 Quality Principles

to reduce COST of Poor Qualityby harmonizing, standardizing and improving

Quality Requirements und Business Processes in relation to

Information Management

Page 16: PETRONAS Carigali Information Management (PCIM) PETRONAS ... · PDF filePCA Forum 2008 and Members Meeting. PETRONAS. Carigali. Information Management (PCIM) PETRONAS Perspective.

PETRONAS welcomes PCA Member and the Malaysian Oil & Gas Industry

Thank You