Top Banner
TITLE DOCUMENT NO FORMAT REV F007-12-CAL-CS-001 A CLIENT PT. PERTAMINA EP UBEP LIRIK PROJECT TITLE PT. KLARAS PUSAKA INTERNASIONAL PT. PERTAMINA EP UBEP LIRIK PREPARED BY CHECKED/REVIEWED BY APPROV A Issued For Review 20-Mar-11 NP ERT REV DESCRIPTION REVISION DATE Prepare Check CIVIL STRUCTURE CALCULATION SHEET OF 2000 CAPACITY PEMBANGUNAN SATU UNIT TANKI 2000 BBLs, SATU UNIT BBLs, SATU UNIT TANKI 10000 BBLs DI FIELD PERTAM LIRIK CIVIL STRUCTURE CALCULATION SHEET 2000 BBLs TANK CAPACI PT. PERTAMINA EP UBEP LIRIK
23
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: PERHITUNGAN-STRUKTUR-TANGKI

TITLE

DOCUMENT NO FORMAT REV SHEETF007-12-CAL-CS-001 A 1 of 10CLIENT

PT. PERTAMINA EP UBEP LIRIKPROJECT TITLE

PT. KLARAS PUSAKA INTERNASIONAL PT. PERTAMINA EP UBEP LIRIKPREPARED BY CHECKED/REVIEWED BY APPROVED BY

A Issued For Review 20-Mar-11 NP ERT ARF

REV DESCRIPTION REVISION DATE Prepare Check Approved

CIVIL STRUCTURE CALCULATION SHEET OF 2000 BBLs TANK CAPACITY

PEMBANGUNAN SATU UNIT TANKI 2000 BBLs, SATU UNIT TANKI 5000 BBLs, SATU UNIT TANKI 10000 BBLs

DI FIELD PERTAMINA EP UBEP LIRIK

CIVIL STRUCTURE CALCULATION SHEET OF2000 BBLs TANK CAPACITY

PT. PERTAMINA EPUBEP LIRIK

Page 2: PERHITUNGAN-STRUKTUR-TANGKI

REV DESCRIPTION REVISION DATE Prepare Check Approved

Page 3: PERHITUNGAN-STRUKTUR-TANGKI

TITLE

- EP CIVIL STRUCTURE CALCULATION SHEET OF

UBEP – Sangasanga & Tarakan 2000 BBLs TANK CAPACITY

DOCUMENT NUMBER FORMAT REV SHEET

F007-12-CAL-CS-001 A4 A 1 of 10

DOCUMENT CHANGES HISTORY

PAGES REV. NO DATE REMARKS

Page 4: PERHITUNGAN-STRUKTUR-TANGKI

TITLE

- EP CIVIL STRUCTURE CALCULATION SHEET OF

UBEP – Sangasanga & Tarakan 2000 BBLs TANK CAPACITY

DOCUMENT NUMBER FORMAT REV SHEET

F007-12-CAL-CS-001 A4 A 1 of 10

DAFTAR ISI

1.0. TUJUAN .......................................................................................................................... 4

2.0. REFERENSI .......................................................................................................................... 4

3.0. KRITERIA DESIGN .............................................................................................................. 4

3.1. Material ................................................................................................................................. 43.2. Beban Rencana ......... ................................................................................................................................. 53.3. Kombinasi Pembebanan ................................................................................................................................. 5

4.0. DETAIL PERHITUNGAN ................................................................................................................................. 5

4.1. Denah dan Potongan ................................................................................................................................. 54.2. Data Pembebanan ................................................................................................................................. 64.3. Foundation Outline ................................................................................................................................. 64.4. Ringkasan Pembebanan ................................................................................................................................. 74.5. Stability of Foundation ................................................................................................................................. 74.6. Perhitungan Ring Wall ................................................................................................................................. 9

ATTACHMENT 1: TANK LOADING CALCULATION 10

Page 5: PERHITUNGAN-STRUKTUR-TANGKI

TITLE

- EP CIVIL STRUCTURE CALCULATION SHEET OF

UBEP – Sangasanga & Tarakan 2000 BBLs TANK CAPACITY

DOCUMENT NUMBER FORMAT REV SHEET

F007-12-CAL-CS-001 A4 A 1 of 10

1.0 TUJUAN

Dokumen ini bertujuan untuk memperlihatkan hasil perhitungan untuk Pondasi Tangki Air Kapasitas 5000 Bblpada proyek SPU Anggana UBEP Lirik

2.0 REFERENSI

Referensi yang digunakan antara lain:1. SNI 03 – 1734 : Petunjuk Perencanaan Beton Bertulang dan struktur Dinding

Bertulang untuk Rumah dan Gedung, 2002

2. SNI 03 – 1727 : Pedoman Perencanaan Pembebanan untuk Rumah danGedung, 2002

3. SNI-03-1726-2002 : Tata Cara Perencanaan Ketahanan Gempa untuk Bangunan Gedung

4. UBC 1997 : Uniform Buildiing Code 1997

5. ACI 318 – 02 : American Concrete Institute : Building Code Requiriments for Buildings

6. API650 : American Petroleum Institute : Welded Steel Tanks for Oil Storage

7. ASCE : American Society of Civil Engineering : Minimum Design Loads forBuilding and Other Structures

8. ASTM A615 : American Society for Testing Materials Specification for Deformed and Plain Billet Steel Bars for Concrete Reinforcement

9. ASTM A36 : Standard Specification for Structure Steel. and Heat Treated Joints

10. AISC 9 th Edition : American Institute of Steel Construction

11. Soil test report yang dilakukan oleh Laboratorium Teknik Sipil Politeknik Negeri Samarinda

3.0 KRITERIA DESAIN

3.1 Material

Spesifikasi Material :Baja : ASTM A-36 fy = 2400 kg/cm2Beton : K-300 f`c = 280 kg/cm2Tulangan Utama : BJTD40/ASTM 615 fy = 4000 kg/cm2Tulangan Sengkang : BJTD24/ASTM 615 fy = 2400 kg/cm2Anchor Bolt : ASTM 307 ft = 20 kips

Berat Jenis Beton : = 2400 kg/m3

Berat Jenis Tanah : = 1830 kg/m3

Berat Jenis Pasir (Sirtu) : = 1800 kg/m3

gbeton

gtanah

gpasir

Page 6: PERHITUNGAN-STRUKTUR-TANGKI

TITLE

- EP CIVIL STRUCTURE CALCULATION SHEET OF

UBEP – Sangasanga & Tarakan 2000 BBLs TANK CAPACITY

DOCUMENT NUMBER FORMAT REV SHEET

F007-12-CAL-CS-001 A4 A 1 of 10

3.2 Beban Rencana

Beban Rencana yang bekerja adalah:- Beban Mati : DL- Beban Operation : OL- Beban Angin : WL- Beban Gempa : EL

3.3 Kombinasi Pembebanan

Kombinasi untuk pembebanan mengacu pada LRFD- 1.4 DL- 1.2 DL + 1.6 OL- 1.2 DL + 1.6 WL + 0.5 OL- 1.2 DL ± 1.0 EL + 0.5 OL- 0.9DL ± (1.6 WL atau 1.0 EL)

4.0 DETAIL PERHITUNGAN

4.1 DENAH dan POTONGAN

DATA :H1 = 6.00 m (tinggi tanki)OD = 8.40 m (outer diameter tanki)D = 8.39 m (inner diameter tanki)d = 8.00 m (tinggi pondasi di atas

telapak)t = 0.30 m (tinggi pondasi telapak)b = 0.75 m (lebar pondasi)Sx = outer diameter pondasiSy = tinggi pondasiCx1 = inner diameter pondasiCx2 = lebar pondasi telapak

Sx = D + 2*0.5b = 9.14 mSy = t + d = 8.30 mCx1 = D - 2*0.5b = 7.64 mCx2 = 2.00 mCx3 = Cx1 - 2*0.6 = 6.44 m

Page 7: PERHITUNGAN-STRUKTUR-TANGKI

TITLE

- EP CIVIL STRUCTURE CALCULATION SHEET OF

UBEP – Sangasanga & Tarakan 2000 BBLs TANK CAPACITY

DOCUMENT NUMBER FORMAT REV SHEET

F007-12-CAL-CS-001 A4 A 1 of 10

4.2 Data Pembebanan

- Dead Load, Shell, Roof, & Ext.Structure Loads 762.43 kg/m

- Live Load 122.00 kg/m

- Uniform Load, Operating Condition 5,530.95

- Uniform Load, Hydrotest Load 6,372.16

- Base Shear due to Wind 4,571.69 kg

- Reaction due to Wind 71.17 kg/m

- Moment Due to Wind 13,715.07 kg.m

- Base Shear due to Seismic Load : V 928.40 kg

- Reaction due to Seismic Load 11.75 kg/m

- Moment Due to Seismic Load 2,785.19 kg.m

4.3 Foundation Outline- Lebar Ring Wall b = 0.75 m- Tinggi Ring Wall d+t = 8.30 m- Soil Cover d+t = 8.30 m

- Footing Outer Dia Sx = 9.14 m- Footing Inner Dia Cx1 = 7.64 m

Areas & Moment of Inertia

- Area of Ring Foundation = 19.78 m² = 197,778.97 cm²

- Area of Soil = 45.89 m² = 458,913.93 cm²

- Area Enclosed by Tank = 55.34 m² = 553,385.55 cm²

W = Section modulus of ring foundation

= = 31.21 m³ = 31,210,771.90

Loading at Bottom of Foundation

17.07%

82.93%

: DL

: LL

: WO kg/m2

: Wh kg/m2

: WL

: RW

: MW

: RS

: MS

AF = π ( Sx2-Cx12 ) / 4

AS = π Cx12 / 4

AT = π D2 / 4

1/32 * p * (Sx3 - Cx13) cm3

% Content Load transferred to Ring ( P1 ) P1 = (AT - AS) / AT (%)

% Content Load transferred to Soil ( P2 ) P2 = 100% - P1

SxO

Cx1

D

Page 8: PERHITUNGAN-STRUKTUR-TANGKI

TITLE

- EP CIVIL STRUCTURE CALCULATION SHEET OF

UBEP – Sangasanga & Tarakan 2000 BBLs TANK CAPACITY

DOCUMENT NUMBER FORMAT REV SHEET

F007-12-CAL-CS-001 A4 A 1 of 10

4.4 Ringkasan PembebananBeban yang akan menjadi input dalam analysis

Beban RemarksVertical (kg) Horisontal (kg) Moment (kg.cm)

H Mo

Equip Erecting 20,105.63 - - -

OL

52,251.82 253,823.18 - -

3,217.20 - - -

55,469.02 169,222.91 - -

WL Wind Load 1,876.72 - 4,571.69 1,371,506.96 EL Seismic Load 309.88 - 928.40 278,518.51

4.5 Stability of Foundation

Asumsi data tanah seperti dibawah iniTitik CPT Kedalaman qc qc @1.5m Satuan

Titik S-01 1.40 3.20

3.20 1.60 3.20

Titik S-02 1.40 8.52

10.65 1.60 12.78

Titik S-03 1.00 6.39

5.59 3.00 3.20

Rata-rata qc = 6.48 kg/cm²SF = 3Menurut Schmertmann (1978), untuk tanah lempung dengan pondasi persegi, daya dukung tanah yang diijinkan adalah sbb:

= (5+0.34*qc)/SF = (5+0.34*6.48)/3

= 2.40 kg/cm²

Maximum Soil Pressure Below Ring < Pallow : Allowable Soil Pressure

dan

Maximum Soil Pressure Below Soil < Pallow : Allowable Soil Pressure

Cek Soil Pressure

Kombinasi BebanM/W Allowable

1.4 DL 0.142 0.000 0.142 0.000 2.40 PASS

1.2 DL + 1.6 OL 0.545 0.000 0.545 0.88 2.40 PASS

1.2 DL + 1.6 WL + 0.5 OL 0.269 0.070 0.340 0.277 2.40 PASS

1.2 DL + 1.0 EL + 0.5 OL 0.256 0.009 0.265 0.277 2.40 PASS

1.2 DL - 1.0 EL + 0.5 OL 0.253 -0.009 0.244 0.277 2.40 PASS

0.9DL + 1.0 EL 0.093 0.009 0.102 0.000 2.40 PASS

0.9DL - 1.0 EL -0.002 -0.009 -0.010 0.000 2.40 PASS

Below Ring (NR) Below Soil (NS)

DL

WO

LL

WO + LL

kg/cm2

sall

: PR = NR / AF + M/W

: PS = NS / AS

s (kg/cm2) Hasil (PS dan PR < Allow)NR/AF PR PS

Page 9: PERHITUNGAN-STRUKTUR-TANGKI

TITLE

- EP CIVIL STRUCTURE CALCULATION SHEET OF

UBEP – Sangasanga & Tarakan 2000 BBLs TANK CAPACITY

DOCUMENT NUMBER FORMAT REV SHEET

F007-12-CAL-CS-001 A4 A 1 of 10

Cek OverturningResistant moment : Mr = N.Do / 2 (kg-cm)Safety Factor : Fo = Mr/Mo > Foallow : Minimum Safety Factor for Overturning

Kombinasi Beban Mr (kg.cm) Mo (kg.cm) Fo = Mr/Mo Foallow

1.4 DL 11,822,109.60 - 999.00 1.50 PASS

1.2 DL + 1.6 OL 47,408,419.56 - 999.00 1.50 PASS

1.2 DL + 1.6 WL + 0.5 OL 23,042,887.24 2,194,411.14 10.50 1.50 PASS

1.2 DL + 1.0 EL + 0.5 OL 21,911,880.25 278,518.51 78.67 1.50 PASS

1.2 DL - 1.0 EL + 0.5 OL 21,651,582.57 (278,518.51) 77.74 1.50 PASS

0.9DL + 1.0 EL 7,730,076.44 278,518.51 27.75 1.50 PASS

0.9DL - 1.0 EL 7,469,778.76 (278,518.51) 26.82 1.50 PASS

Cek OverturningResistant force : Hr = 0.5 N (kN)Safety Factor : Fs = Hr / H > Fsallow : Minimum Safety Factor for Sliding

Kombinasi Beban Hr (kg.cm) Ho (kg.cm) Fs = Hr/Ho Fsallow

1.4 DL 14,073.94 - 999.00 1.50 PASS

1.2 DL + 1.6 OL 56,438.59 - 999.00 1.50 PASS

1.2 DL + 1.6 WL + 0.5 OL 27,432.01 7,314.70 3.75 1.50 PASS

1.2 DL + 1.0 EL + 0.5 OL 26,085.57 928.40 28.10 1.50 PASS

1.2 DL - 1.0 EL + 0.5 OL 25,775.69 928.40 27.76 1.50 PASS

0.9DL + 1.0 EL 77,300.76 928.40 83.26 1.50 PASS

0.9DL - 1.0 EL 74,697.79 928.40 80.46 1.50 PASS

Hasil (Fo > Foallow)

Hasil (Fo > Foallow)

Page 10: PERHITUNGAN-STRUKTUR-TANGKI

TITLE

- EP CIVIL STRUCTURE CALCULATION SHEET OF

UBEP – Sangasanga & Tarakan 2000 BBLs TANK CAPACITY

DOCUMENT NUMBER FORMAT REV SHEET

F007-12-CAL-CS-001 A4 A 1 of 10

4.6 Perhitungan Ring Wall

Beban merata terfaktor yang bekerja pada Ring Wall adalah tegangan maximum yang terjadipada kombinasi beban 1.2DL + 1.6OL, sebesarqu = 0.545 kg/cm²

= 5,446.97 kg/m2Data Tanah :

= 1830 kg/m3

f = 11.2 deg

Ka =

= 0.6747131733Data Ring Wall:Lebar Ring Wall: b = 0.75 mInner Diameter: Di = Cx1 = 7.64 mTinggi Ring Wall: df = 8.30 m

Pembebanan

- Hoop Stress : F1 = = 30,503.70 kg/m

F2 = = 42,530.11 kg/m

F = F1 + F2 = 73,033.80 kg/m

- Hoop Tension T = ½*F*Di = 279,135.20 kg

- Luas Tulangan untuk Hoop TensionAt = T/fy = 6,978.38 mm2

- As min / ACI-318-05-14.3.3

= = 15,562.50 mm2

Area of Steel Required = 15562.50 mm2

Bar size (db) 12 mm2Sectional area 113 mm2Required No. of Bars 138

Menurut ACI 318 Section 14.3.4, untuk tebal dinding pondasi lebih dari 250mm, harus mempunyai reinforcement dalam 2 (dua)

Digunakan tulangan 69 - D12 Bars on each face

- As min / ACI-318-05-14.3.2

= 0.0015*b = 1,125.00 mm2/m

Bar size (db) 12 mm2Sectional area 113 mm2Required spacing of bars 101 mm

Digunakan D12 @ 200 mm c/c (D22-200)

gsoil

tan2 (45-f/2)

qu*Ka*df

½*gsoil*Ka*df2

Penulangan Keliling (Circumferencial Reinforcement)

Asmin 0.0025*b*df

AREQ

layer paralel dengan muka (face) dari dinding.

Penulangan Vertikal (Vertical Reinforcement)

Asmin

C. L

PS

df

KaPSKa gsoil df

F

T T

Di

Page 11: PERHITUNGAN-STRUKTUR-TANGKI

Page 11 of 13

TITLE

PERHITUNGAN PONDASI TANGKI AIR KAP 10.000 BBL

UBEP – Sangasanga & Tarakan ATTACHMENT 1

DOCUMENT NUMBER FORMAT REV SHEET

F007-12-CAL-CS-001 A4 A 10 of 10

TANK LOADING CALCULATION

1 REFERENCE MECHANICAL DESIGN

- Mechanical Data Sheet No. : F007-12-CAL-ME-002-Mechanical Calculation Sheet of 5000 BBLs Tank Capacity- Drawing No. : F007-12-DWG-ME-002

2 DEAD LOAD (D)

2.1 Plat Dinding Qty Weight (kg/mm m2) Total Weight (kg)- Course 1, Plat 1524 x 6096 x 6mm Thk, A-36: 6 pcs 7.85 2,625.44 - Course 2, Plat 1524 x 6096 x 6mm Thk, A-36: 6 pcs 7.85 2,625.44 - Course 3, Plat 1524 x 6096 x 6mm Thk, A-36: 6 pcs 7.85 2,625.44 - Course 4, Plat 1524 x 6096 x 6mm Thk, A-36: 6 pcs 7.85 2,625.44 - Course 5, Plat 1524 x 6096 x 6mm Thk, A-36: 6 pcs 7.85 2,625.44 - Course 6, Plat 1380 x 6096 x 8mm Thk, A-36: 6 pcs 7.85 2,377.37

Total Berat Plat Dinding 13,127.20

2.2 Plat Dasar Qty Weight (kg/mm m2) Total Weight (kg)- 7 pcs 7.85 5,918.11

Total Berat Plat Dasar 5,918.11

2.3 Plat Atap Qty Weight (kg/mm m2) Total Weight (kg)- No. 1-9, Plat 1828 x 6096 x 6mm Thk, A-36: 9 pcs 7.85 4,723.72

Total Berat Plat Atap 4,723.72

2.4 Tiang Mast dan Rangka Atap Qty Unit Weight Total Weight (kg)- Pipe 8", L=8.770m, Sch. 40, 1pcs 8.77 m 42.49 kg/m 372.64 - Pipe 6", L=8.034m, Sch. 40, 12pcs 96.408 m 28.23 kg/m 2,721.60 - Rafter1, L=7.709m, UNP 180x75x7mm, 12pcs 92.508 m 21.4 kg/m 1,979.67 - Rafter2, L=5.140m, UNP 180x75x7mm, 12pcs 61.68 m 21.4 kg/m 1,319.95 - Rafter3, L=2.569m, UNP 180x75x7mm, 12pcs 30.828 m 21.4 kg/m 659.72 - Girder1, L=3.009m, UNP 180x75x7mm, 12pcs 36.108 m 21.4 kg/m 772.71 - Girder2, L=0.849m, UNP 180x75x7mm, 24pcs 20.376 m 21.4 kg/m 436.05 - Base Plat Center Colum 850 x 850 x 8mm Thk, A 1 pcs 7.85 kg/m 45.37 - 4 pcs 7.85 kg/m 22.61 - 1 pcs 7.85 kg/m 55.89 - Neck Plate Water Drench 4350x300x8mm Thk, A 1 pcs 7.85 kg/m 81.95 - 1 pcs 7.85 kg/m 14.19 - Base Plat Middle Colum 500 x 500 x 8mm Thk, A 12 pcs 7.85 kg/m 188.40 - Bracket Plat Middle Column 8mm Thk, A-36: 48 pcs 7.85 kg/m 94.20 - Bracket & Plat Shell Middle Column 8mm Thk, A- 24 set 7.85 kg/m 565.20 - Rafter Girder Support Plate & Bracket 8mm, A-36 24 set 7.85 kg/m 565.20

Total Berat Tiang Mast dan Rangka Atap 9,895.35

No. 1-7 Plat 8.975m2 x 12mm Thk, A-36:

Stiffener Plat Center Colum 0.09m2 x 8mm Thk, A-36:Base Plate Water Drench 0.890m2 x 8mm Thk, A-36:

Stiffener Plat Center Drum 0.226m2x8mm Thk, A-36:

Page 12: PERHITUNGAN-STRUKTUR-TANGKI

Page 12 of 13

TITLE

PERHITUNGAN PONDASI TANGKI AIR KAP 10.000 BBL

UBEP – Sangasanga & Tarakan ATTACHMENT 1

DOCUMENT NUMBER FORMAT REV SHEET

F007-12-CAL-CS-001 A4 A 10 of 102.5 Nozzles Qty Unit Weight Total Weight (kg)

- N1 & N17, 3" Sch.40 Pipe: 0.4 m 11.27 kg/m 4.51 - N1 & N17, 3" Flange: 1 pcs 3.7 kg 3.70 - N3, N4, N9, N15, 4" Sch.40 Pipe: 1.6 m 16.06 kg/m 25.70 - N3, N4, N9, N15, 4" Flange: 4 pcs 5.9 kg 23.60 - N2, N5, N10, N11, N13 & N14, 6" Sch.40 Pipe: 2.4 m 28.23 kg/m 67.75 - N2, N5, N10, N11, N13 & N14, 6" Flange: 6 pcs 8.6 kg 51.60 - N7, N8, N12, N16, 8" Sch.40 Pipe: 1.6 m 42.49 kg/m 67.98 - N7, N8, N12, N16, 8" Flange: 4 pcs 13.7 kg 54.80 - N6, 10" Sch.40 Pipe: 0.4 m 60.24 kg/m 24.10 - N6, 10" Flange: 1 pcs 19.5 kg 19.50 - N18 - N21, 1" Sch.40 Pipe: 1.6 m 2.5 kg/m 4.00 - N22, 2" Sch.40 Pipe: 0.4 m 5.43 kg/m 2.17 - M1, M2, C1, 24" Sch.40 Pipe: 1.2 m 254.48 kg/m 305.38

Total Berat Nozzles 654.78

2.6 Tangga & Handrail Qty Unit Weight Total Weight (kg)- Round Bar 19 x 1700mm Length, ASTM A36: 30 ea 3.791 kg 113.73 - Bracing 60 x 60 x 6mm, ASTM A36: 0.995 m 5.42 kg/m 5.39 - Pad Plate, 100 x 150 x 6mm, ASTM A36: 1 ea 0.019625 kg 0.02 - Support, 762 x 300 x 10mm Thk, ASTM A36: 1 ea 0.179451 kg 0.18 - Pipe 1-1/2", Sch. Std, CS 11.661 m 4.05 kg/m 47.23 - Checquered Plate, 700 x 400 x 4.5mm, ASTM A3 30 ea 0.5027555556 kg 15.08 - Round Bar 19 x 1370mm Length, ASTM A36: 5 ea 3.0551 kg 15.28 - CNP. 200 x 80 x 7.5mm, 1400mm Length, ASTM 3 ea 34.44 kg 103.32 - CNP. 200 x 80 x 7.5mm, 964mm Length, ASTM 2 ea 23.7144 kg 47.43 - CNP. 200 x 80 x 7.5mm, 1200mm Length, ASTM 2 ea 29.52 kg 59.04 - CNP. 200 x 80 x 7.5mm, 762mm Length, ASTM 2 ea 18.7452 kg 37.49 - Checker Plate, 762 x 1200 x 4.5mm, ASTM A36: 1 ea 1.641856 kg 1.64 - L 60 x 60 x 6mm, 1070mm Length, ASTM A36: 35 5.7994 kg 202.98 - Pipe 1-1/2", Sch. Std, 6000mm Length, CS 9 ea 24.3 kg 218.70 - Pipe 1-1/4", Sch. Std, 6000mm Length, CS 9 ea 20.34 kg 183.06 - FB 75 x 6mm, 6000mm Length, ASTM A36 9 ea 21.18 kg 190.62

Total Berat Tangga & Handrail 1,241.19

Total WEIGHT = 31,239.88 Kg- Tolerancy 10% = 3,123.99 Kg

= 34,363.87 Kg

- Inner Diameter Tank = 8.39 m- Keliling Tank = 26.37 m

= 1,303.12 kg/m

3 LIVE LOAD (L)- Uniform Roof Load = 122 (Data Sheet)- Roof Load (Live Load) = 6,751.30 kg- Roof Load (Live Loa = 256.02 kg/m

4 UNIFORM LOAD, OPERATING CONDITION- Working Capacit: 317 (Data Sheet)- SG Fluida : 0.86 (Data Sheet)- Berat Jenis Fluid : = 860

- Berat Fluida (Produced Water) = = 272,620.00 kg

- Luas Area Tank =

= 55.34

- = Berat Fluida / Luas di bawah Tank

= 4,926.40

5 UNIFORM LOAD, HYDROSTATIC CONDITION- Nominal Capacit: 795 (Data Sheet)- Berat Fluida (Produced Water) = = 683,700.00 kg

- = 12,354.86

Dead Load (DL)

Dead Load, DL

kg/m2

m3

SG Fluida / SG Water * 1000 kg/m3 kg/m3

1010 kg/m3 * 1512 m3

1/4*π*ID2 m2

m2

Uniform Load, Operating Condition, WO

kg/m2

m3

1010 kg/m3 * 1600 m3

Uniform Load, Hydrostatic Condition, Wh kg/m2

Page 13: PERHITUNGAN-STRUKTUR-TANGKI

Page 13 of 13

TITLE

PERHITUNGAN PONDASI TANGKI AIR KAP 10.000 BBL

UBEP – Sangasanga & Tarakan ATTACHMENT 1

DOCUMENT NUMBER FORMAT REV SHEET

F007-12-CAL-CS-001 A4 A 10 of 10

6- Wind Speed = 126 km/hr (Data Sheet)- OD Shell Plate = 8.40 m- Tinggi Tanki, H = 6.00 m

- Vertical Plane = OD x H

= 50.40 Dari UBC 1997

- Design Wind Pressure, P == combined height, exposure and gust factor coefficient as given in Table 16-G (UBC 1997)= 1.23 (Exposure C)

= pressure coefficient for the structure or portion of structure under construction as given in Table 16-H (UBC 1997)= 0.8 (winward wall)

= wind stagnation pressure at standard height of 10000 mm as forth in Table 16-F (UBC 1997)

= 0.79 (16.4 psf)

= importance factor as set forth in Table 16-K (UBC 1997)= 1.15 (Essential facilities)

- P = 0.89

- = P x Av = 44.80 kN = 4,571.69 kg

-

= = 13,715.07 kg.m

-

== 1,876.72 kg= 71.17 kg/m (pembebanan di ringwall / keliling tanki)

7- Seismic Factor : SUG II (Data Sheet)- Seismic Zone Factor, Z = 0.15 (Table E-2 API-650 untuk Seismic Factor 2A)- Maximum Seismic Load (design base shear): V (UBC 1997 Section 1630.2.1)

V =

Ca = 0.18 (table 16-Q UBC 1997, untuk Sc dan Z=0.15)I = 1.25 (table 16-K UBC 1997, untuk Essential facilities)R = 4.5 (table 16-N UBC 1997, untuk Concrete shear walls)

W = 34,363.87 kg

Vmaks = 4,295.48 kg

- Minimum Design Seismic Load (design base shear): V (UBC 1997 Section 1630.2.1)V =

Vmin = 850.51 kg

- Design Seismic Load (design base shear): V (UBC 1997 Section 1630.2.1)V =

T = (UBC 1997 Section 1630.2.2 Method A)

Ct = 0.0731hn = 7.2T = 0.321

Cv = 0.25 (table 16-R UBC 1997, untuk Sc dan Z=0.15)

V = 928.40 kg (digunakan yang ini)

- Momen di dasar tangki akibat V

= V x H/2 = 2,785.19 kg.m

-Rs = V/(1.07*D) x H/2

= 309.88 kg= 11.75 kg/m (pembebanan di ringwall / keliling tanki)

WIND LOAD (WL)

Av

m2

Ce Cg qs IwCe

Cg

qs

kN/m2

Iw

kN/m2

Wind Load, WL (g = 9.8 m/s2)

Momen di dasar tangki akibat WL

MW WL x H/2

Reaction due to WL, Rw

Rw WL/(0.87*D) x H/2

SEISMIC LOAD (EL or V)

2.5*Ca*I*W/R

DL + WO

0.11*Ca*I*W

Cv*I*W/(R*T)

Ct(hn)3/4

MS

Reaction due to V, Rw