PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) - Version 03CDM Executive Board
1
CLEAN DEVELOPMENT MECHANISM
PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD)
Version 03 - in effect as of: 22 December 2006
CONTENTS
A. General description of the small scale project activity
B. Application of a baseline and monitoring methodology
C. Duration of the project activity / crediting period
D. Environmental impacts
E. Stakeholders comments
Annexes
Annex 1: Contact information on participants in the proposed small scale project activity
Annex 2: Information regarding public funding
Annex 3: Baseline information
Annex 4: Monitoring Information
8/2/2019 PDD Sinewave India
2/32
PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) - Version 03CDM Executive Board
2
Revision history of this document
VersionNumber
Date Description and reason of revision
01 21 January
2003
Initial adoption
02 8 July 2005 The Board agreed to revise the CDM SSC PDD to reflectguidance and clarifications provided by the Board since
version 01 of this document.
As a consequence, the guidelines for completing CDM SSCPDD have been revised accordingly to version 2. The latest
version can be found at
.
03 22 December
2006
The Board agreed to revise the CDM project designdocument for small-scale activities (CDM-SSC-PDD), takinginto account CDM-PDD and CDM-NM.
8/2/2019 PDD Sinewave India
3/32
PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) - Version 03CDM Executive Board
3
SECTION A. General description of small-scale project activity
A.1 Title of the small-scale project activity:
>>
10MW biomass power plant at Sangli by Sinewave Power
Version 01
01/12/2009
A.2. Description of the small-scale project activity:
>>
The proposed CDM project activity is undertaken by Sinewave Biomass Power Pvt Ltd and involves the
establishment of a 10 MW biomass based power plant. The plant will utilise agricultural wastes, mainly
babul wood (40%), bagasse (40%) and other agro residues (20%) available in the area surrounding the
plant. The purpose of the project activity is to generate electricity by the combustion of the agricultural
wastes and export it to the Maharashtra State Electricity Distribution Company Limited (MSEDCL)through Maharashtra State Electricity Transmission Company Limited (MSETCL).
The proposed plant comprises the installation of a boiler of 50 TPH capacity and a single extraction cum
condensing turbo generator set of 10MW. The project proponent intends to install these and ancillary
equipments to generate electricity for the grid from a renewable energy source (babul wood, bagasse and
agro product residues).
The boiler would generate steam at 66 bar pressure and 490 5oC. The power generation would be at 11
kV and would be stepped up to 33 kV for synchronizing with the grid. The plant is located about 6 kms
from the nearest MAHADISCOM sub-station. The necessary transmission lines from the power plant to
the substation would be laid by the project activity.
The project activity will reduce emissions through the generation of electricity from renewable biomass,
which is carbon neutral, and replace and supplement existing grid based generation which is pre-
dominantly fossil fuel based.
Sustainable Development
The project activity will contribute to sustainable development through socio-economic and
environmental development in the region. The proposed project activity will generate new job
opportunities for the local community and the development of basic amenities leading to an improvement
in the living standards of the local community. People from the local area will be employed during the
construction and operation of the project activity which will indirectly leads to economic benefits in the
area.
Environmental Benefits
The generation of electricity for supply to the grid from a renewable source will have a direct
environmental benefit. The generation of power from biomass has long term benefits related to climate
change given that the alternative source of generation in India is typically a fossil fuel based generation
8/2/2019 PDD Sinewave India
4/32
PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) - Version 03CDM Executive Board
4
system. Local pollution will also be reduced as these alternatives are predominantly coal based
combustion for the supply of electricity which gives rise to increased emissions of NOx, SOx and ash.
A.3. Project participants:>>
Name of Party involved
((host) indicates a host Party)
Private and/or public
entity(ies) project participants
(as applicable)
If Party wishes to be
considered as a project
participant
India (host) Private Entity: Sinewave
Biomass Power Pvt Ltd
No
United Kingdom Private Entity: Agrinergy Pte
Ltd
No
(*) In accordance with the CDM modalities and procedures, at the time of making the CDM-PDD
public at the stage of validation, a Party involved may or may not have provided its approval. At
the time of requesting registration, the approval by the Party(ies) involved is required.
A.4. Technical description of the small-scale project activity:
>>
A.4.1. Location of the small-scale project activity:
>>
A.4.1.1. Host Party (ies):
>>
India
A.4.1.2. Region/State/Province etc.:
>>Maharashtra
A.4.1.3. City/Town/Community etc:
>>
Tung village, Miraj Taluka, Sangli District.
A.4.1.4. Details of physical location, including information allowing the
unique identification of this small-scale project activity :
>>
The project activity is located at Tung Village, Taluka Miraj of Sangli district in the state of
Maharashtra. The site is located at 1655'36"N latitude and 7428'48"E longitude. The following map
shows the exact location of the project activity.
8/2/2019 PDD Sinewave India
5/32
PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) - Version 03CDM Executive Board
5
A.4.2. Type and category (ies) and technology/measure of the small-scale project activity:
>>
According to the Appendix B to the simplified modalities and procedures for small-scale CDM project
activities, the proposed project activity falls under the following type and category.
Type I Renewable Energy Projects
Category D - Grid connected renewable electricity generation1
1http://cdm.unfccc.int/methodologies/SSCmethodologies/approved.html.
Location site ofPlant, Tung
Village
8/2/2019 PDD Sinewave India
6/32
PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) - Version 03CDM Executive Board
6
The capacity of the proposed CDM project is 10 MW, which is below the qualifying capacity of 15 MW
as outlined in section ID of Appendix B of the simplified modalities for small scale CDM project
activities. The biomass power plant will be connected to the grid and the electricity produced by the plant
will replace existing and planned generation from the grid. As the maximum electricity generatingcapacity is limited by its design and construction, there is no possibility of exceeding the limits of small-
scale CDM project activities during the crediting period and the project activity will remain as a small
scale project activity.
Technology
The project is designed to generate electricity for grid system using biomass fuel such as babul wood,
bagasse and agro product residue. The basic technology is the Rankine cycle route where direct
combustion of biomass materials takes place through the AFBC boiler to generate high pressure and high
temperature steam, which drives an impulse turbine generator set.
The main plant and machinery of the project consists of one 50 TPH AFBC boiler, one single extraction
cum condensing turbo generator set, power evacuation system and fuel handling system. The turbo
generator will generate electricity at 33/11 kV level. The substation is located at MAHADISCOM
substation which is about 6 km from the project site.
The technology to be employed is domestically available in India and the main equipments, i.e. boiler
and turbine, are supplied by well-known Indian manufacturers. All equipments are designed as per
industry guidelines and meet the national environmental and safety guidelines and comply with the
criteria laid down by the Maharashtra State Pollution Control Board.
No technology transfer is envisaged for the proposed CDM project activity.
The detail description of the plant as given in following table
Boiler
Type AFBC
Boiler capacity (100 % load) / Steam Flow rate 50TPH
Steam pressure at super heater outlet 66k kg/cm2
Steam temperature at super heater outlet 490oC
Water requirement 65 m3
/ hour
Turbo Generator
Type Single extraction cum condensing
Steam pressure at the TG inlet 66 kg/cm2
Steam temperature at the TG inlet 490oC
Generator Voltage 11 kV
Power evacuationGrid Voltage 33 kV
MAHADISCOM Sub station 33/11 kV
Energy production
Gross power 10 MW
Auxiliary consumption (10%) 1.0 MW
Net power for export 9.0 MW
8/2/2019 PDD Sinewave India
7/32
PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) - Version 03CDM Executive Board
7
A.4.3 Estimated amount of emission reductions over the chosen crediting period:
>>
The chosen crediting period for the project activity is 7 years. It is estimated that the project activitywould generate 369,690 emission reductions during the crediting period of 7 years. Annual estimates of
emission reductions by the project activity during the above crediting period are furnished below.
Year Annual estimation of emission reductions in
tonnes of CO2e
June 2010-May 2011 48090
June 2011-May 2012 51095
June 2012- May 2013 54101
June 2013-May 2014 54101
June 2014-May 2015 54101
June 2015-May 2016 54101
June 2016-May 2017 54101Total estimated reductions (tonnes CO2e) 369690
Total number of crediting years 7
Annual average over the crediting period of
estimated reductions (tonnes of CO2e)
52812
A.4.4. Public funding of the small-scale project activity:
>>
The project has not received any public funding.
A.4.5. Confirmation that the small-scale project activity is not a debundled component of a
large scale project activity:>>
Appendix C, paragraph 2 of the Simplified Modalities and Procedures for Small-Scale CDM project
activities states:
A proposed small-scale project activity shall be deemed to be a debundled component of a large
project activity if there is a registered small-scale CDM project activity or an application to
register another small-scale CDM project activity:
With the same project participants;
In the same project category and technology/measure; and
Registered within the previous 2 years; and
Whose project boundary is within 1 km of the project boundary of the proposed small-
scale activity at the closest point.
The proposed project activity satisfies the criteria mentioned above and thus is not a debundled
component of a large scale project activity.
8/2/2019 PDD Sinewave India
8/32
PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) - Version 03CDM Executive Board
8
SECTION B. Application of a baseline and monitoring methodology
>>
B.1. Title and reference of the approved baseline and monitoring methodology applied to the
small-scale project activity:
>>
Type I Renewable Energy Projects
Category D - Grid connected renewable electricity generation2
Version 15, valid from 30th
October 2009
B.2 Justification of the choice of the project category:
>>
This category comprises renewable energy
generation units, such as photovoltaics, hydro,
tidal/wave, wind, geothermal and renewable
biomass, that supply electricity to and/or displace
electricity from an electricity distribution systemthat is or would have been supplied by at least one
fossil fuel fired generating unit.
The proposed project activity satisfies this
condition as it involves renewable energy
generation, i.e. using biomass, that supplies
electricity to the regional grid that would have
been generated by a mix of fossil fuel firedgenerating units supplying to the regional grid.
Hydro power plants with reservoirs that satisfy at
least one of the following conditions are
eligible to apply this methodology:
The project activity is implemented in an existing
reservoir, with no change in the volume of
reservoir;
The project activity is implemented in an existing
reservoir, where the volume of reservoir is
increased and the power density of the project
activity, as per definitions given in the Project
Emissions section, is greater than 4 W/m2;
The project activity results in new reservoirs and
the power density of the power plant, as per
definitions given in the Project Emissions section,
is greater than 4 W/m2.
The proposed project activity is biomass power
plant and not a hydro power plant.
If the unit added has both renewable and non-
renewable components (e.g. a wind/diesel unit), the
eligibility limit of 15MW for a small-scale CDM
project activity applies only to the renewable
component. If the unit added co-fires fossil fuel1,
the capacity of the entire unit shall not exceed the
limit of 15MW.
The proposed project activity does not involve any
non-renewable components.
Combined heat and power (co-generation)systems are not eligible under this category.
The project activity is not a co-generation unit.
2http://cdm.unfccc.int/methodologies/SSCmethodologies/approved.html.
8/2/2019 PDD Sinewave India
9/32
PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) - Version 03CDM Executive Board
9
In the case of project activities that involve the
addition of renewable energy generation units at
an existing renewable power generation facility,
the added capacity of the units added by the projectshould be lower than 15 MW and should be
physically distinct from the existing units.
The project activity is a new activity of 10 MW
capacity.
Project activities that seek to retrofit or modify an
existing facility for renewable energy generation
are included in this category. To qualify as a small-
scale project, the total output of the modified or
retrofitted unit shall not exceed the limit of 15
MW.
The proposed project activity does not involve the
retrofitting or modification of an existing facility
for renewable energy generation.
B.3. Description of the project boundary:>>
In line with the guidance in Appendix B of the simplified modalities and procedures for small-scale
CDM project activities the boundary encompasses the physical, geographical site of the renewable
generation source.
For
the
Biomass from
near by site
Biomass
residue
Biomass fired
boiler
(50TPH, 66
kg/cm2, 490
oC)
Turbo Generator
Electricit to GridEnd
User
Auxillary
Consumption
Project
boundary
8/2/2019 PDD Sinewave India
10/32
PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) - Version 03CDM Executive Board
10
purpose of the project activity the relevant grid is defined by the power generating units serving the same
grid as the project activity. In line with the tool to calculate the grid emission factor ,which states that If
the DNA of the host country has published a delineation of the project electricity system and connected
electricity systems, these delineations should be used, we have considered the regional grid that isdelineated by the Central Electricity Authority of India.
In the case of India there are regional grids which facilitate the transfer of electricity between states and
which are supplied by central sector power stations operating in the region. The Indian power system is
divided into two grids for the purposes of calculating the grid emission factor, namely the new integrated
Northern, Eastern, Western, and North-Eastern regional grids (NEW NE) and the Southern grid.
Maharashtra is a part of the western region as per the grid definitions outlined by the CEA and we have
therefore utilized the analysis of the NEWNE grid undertaken by the CEA in order to determine the
baseline emission factor for electricity generation.
B.4. Description of baseline and its development:
>>
The project activity comprises the installation of a 10MW turbine generator that generates electricity by
combusting biomass residues and the generated electricity is supplied to the grid. This generated
electricity would otherwise have been supplied by at least one fossil fuel fired generating unit connected
to the grid.
The project activity does not use landfill gas, waste gas or wastewater treatment nor does it exclusively
use fuel oil and/or diesel oil thus negating baseline scenarios in paragraph 7 and 8 of methodology AMS
ID.
The project activity does not involve addition of renewable energy generation units at an existing
renewable power generation facility nor does it seek to retrofit or modify an existing facility thus
negating baseline scenarios in paragraph 11 and 12 of the methodology.
The grid has been taken as the baseline as mentioned in paragraph 9 of the methodology for the project
activity and the baseline emissions therefore are calculated as the product of electrical energy baseline
EGBL, y expressed in kWh of electricity produced by the renewable generating unit multiplied by an
emission factor
The emission coefficient has been calculated as mentioned in paragraph 10 (a) in a transparent and
conservative manner as the combined margin (CM), consisting of the combination of operating margin
(OM) and build margin (BM) according to the procedures prescribed in the Tool to calculate the
emission factor for an electricity system. This has been calculated by the Central Electricity Authority
(CEA) for the regional grids in India.
The following data sources have been used in the determination of the baseline:
Variable Parameter Data sources
Energy exported EGBL,y Plant setup
Grid emission factor EFCO2 CEA
8/2/2019 PDD Sinewave India
11/32
PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) - Version 03CDM Executive Board
11
B.5. Description of how the anthropogenic emissions of GHG by sources are reduced below
those that would have occurred in the absence of the registered small-scale CDM project activity:
>>
In line with attachment A to appendix B of the simplified M&P for small scale CDM project activities,the demonstration of additionality focuses on the barriers facing the project. As a part of additionality, an
investment analysis has been performed to demonstrate that the project activity faces an investment
barrier. In showing that the project is additional we demonstrate that it is not a part of the baseline
scenario, which in the case of the project activity is the generation of electricity in fossil fuel based grid
power plants. The project activity has to overcome significant investment barriers for its successful
implementation.
The project participant proposes to use Benchmark Analysis. The indicator for comparison used as the
benchmark is chosen as the Weighted Average Cost of Capital (WACC). The expected cost of equity and
weighted average of cost of capital (WACC) for the power generating industry in India has been
calculated using the CAPM approach. The weighted average cost of capital has been calculated
considering the bank prime lending rate (PLR) at the time the investment decision was taken which is
18th
June 2009 as the cost of debt3.
The cost of equity has been determined using the Capital Asset Pricing Model Approach considering
Beta values of power generating companies in India that were listed at the time of the investment for this
project. As per the CAPM model, the expected return of equity for the project is estimated as follows:
Rf + *( Rm - Rf )
Where
Rf = Risk free rate of return
= Beta
Rm = Market returns
Rm - Rf = Market risk premium.
Risk free rate of return:
The risk free rate of return is a benchmark figure against which all the investments in an
economy should be measured. The risk free rate of return has been taken as the average ten year
yield for Government securities4
at the time of the project start date. The risk free rate of return
is 7.67%.
Market return and risk premium:
The market risk premium, as measured and applied in practice is the premium above the risk
free rate if return that investors expect to earn on a portfolio of equities. With a view of
eliminating the unsystematic risk associated with the projects totally, index containing 500
companies has been taken to represent the market return. A period starting since 1999 till the
start date has been considered in order to remove any short term volatility. Therefore the risk
premium has been calculated as the difference in compounded annual return between the BSE-
500 and the Government bond rates. The value calculated is 9.34%
3http://www.rbi.org.in/scripts/WSSView.aspx?Id=13654
4http://www.rbi.org.in/scripts/AnnualPublications.aspx?head=Macroeconomic+and+Monetary+Developments
8/2/2019 PDD Sinewave India
12/32
PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) - Version 03CDM Executive Board
12
Beta:
Equity beta measures the risk that cannot be eliminated in a systematic, well balanced and
diversified portfolio. Equity beta is calculated as the covariance between its return and thereturn of a well diversified market portfolio, divided by a variance of the return of a well
diversified market portfolio.
Equity Beta = Covariance (r,rm)/Variance (rm)
Where,
r is the return from the equity investment in a single stock
rm is the return from the equity investment in the well diversified market portfolio
The measured equity beta for a particular company relates to the unique capital structure of that
company and a change in the capital structure will change the degree of financial risk borne by
the equity holders and hence the equity beta. In order to allow the comparison of equity betas
across companies with different capital structures, the estimated equity beta is adjusted into the
equivalent asset beta (which is the equity beta that would apply if the assets were financed
wholly with equity). This is done as follows,
Asset beta = Equity Beta/[1+(1-Tax) x (debt/equity)]
Therefore, the average value of the asset betas of the listed power generating companies in
India has been considered and this is calculated to be 1.01.
For calculation a debt equity ratio of 65:35 has been considered
Therefore:
Cost of equity = 7.67% + (1.01)* 9.34% which is 17.14%
WACC = 65%* 12.50% *(1-16.89%) + 35%* 17.14%
WACC = 14.80%
The IRR without CDM is calculated to be 8.34% and is below the benchmark calculated.
The revenues from the project activity are from the sale of electricity to the grid. The operating costs
include the fuel cost, the costs to be incurred through the operation and maintenance, employee salary
and welfare, administration and insurance. These costs and revenues have been detailed in the
spreadsheet provided to the DOE.
The financial analysis has been undertaken over a period of 20 years. The basic assumptions in
performing the financial analysis are outlined in the table below.
Parameter Value Basis of assumption
Installed capacity 10 MW Purchase orders
PLF 80% for year 1; 85% for year
2 ; 90% from year 3 onwards
DPR
8/2/2019 PDD Sinewave India
13/32
PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) - Version 03CDM Executive Board
13
Total project cost INR 588.224 million DPR
Repair and maintenance cost INR 7.50 million DPR
Escalation 5% DPR
Admin costs INR 3.60 million DPREscalation 5% DPR
Salaries INR 8.40 million DPR
Escalation 5% DPR
Other manufacturing
expenses
INR 10 million DPR
Biomass residue cost Rs 1500/tonne MERC 2009 tariff order and
quotations from vendors
Escalation 2% DPR
Income tax rate 33.99% Standard values
MAT rate 11.33% Standard values
Tariff Rs 4.28 for the first year and
remaining years
MERC tariff order and DPR
CER price 11/ CER
Exchange rate INR 65
Based on the above assumptions the project IRR is calculated as 8.34% without the CDM revenues. All
the workings and assumptions are in line with recognized standards and will be made available to the
DOE during validation.
Sensitivity analysis
The sensitivity analysis has been done in accordance with EB 41, Annex 45 Guidance on the Assessment
of Investment Analysis paragraph 16 and 17. The following factors are expected to have a significant
impact on the financial internal rate of return of the project and hence sensitivity analysis has been
conducted for these:
1. Plant Load Factor2. Electricity Tariff3. Investment Costs4. Fuel Costs
The financial analysis has been carried out taking into account the value of PLF of 80% in the first year,
85% in the second year and 90% for the remaining years. Even when the PLF is increased by 10% the
IRR is 11.06% which remains below the benchmark considered.
(-10%) (-5%) PLF (+5%) (+10%)
ProjectIRR
without
CDM
5.30% 6.88% 8.34% 9.72% 11.06%
The electricity tariff has been fixed by the Maharashtra State Electricity Board for twenty years i.e.
through out the life of the project activity. This parameter is important as it determines the only revenues
8/2/2019 PDD Sinewave India
14/32
PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) - Version 03CDM Executive Board
14
of the project activity aside from carbon revenues. The table below shows the impact of an increase in
the tariff and even when the tariff is raised by 10% it is still below the benchmark.
(-10%) (-5%) Tariff (+5%) (+10%)
Project
IRR
without
CDM
0.45% 4.96% 8.34% 11.24% 13.97%
In line with the guidance on sensitivity we adjust the investment costs by +10% to -10%, the results of
this are shown in the following table and the project IRR remains below the benchmark.
(-10%) (-5%) Base Case (+5%) (+10%)
Project
IRRwithout
CDM
10.07% 9.17% 8.34% 7.58% 6.87%
Biomass residues used as a fuel in this project activity are subject to sensitivity analysis as they
constitute more than 20% of the total costs. However, even with a 10% reduction in these costs the
project IRR does not cross the benchmark.
(-10%) (-5%) Base Case (+5%) (+10%)
Project
IRR
without
CDM
11.78% 10.12% 8.34% 6.39% 4.15%
Thus all the necessary parameters have been subjected to sensitivity analysis and it has been shown that
the project remains additional, thus it can be concluded that CDM revenues are essential for the
successful implementation of the project.
B.6. Emission reductions:
B.6.1. Explanation of methodological choices:
>>
As per paragraph 9 of the methodology the baseline emissions are calculated as the product of electrical
energy baseline EGBL, y expressed in kWh of electricity produced by the renewable generating unit
multiplied by an emission factor, which is the combined margin emission factor of the grid.
Baseline Emissions
2, COyBLy EFEGBE =
Where:
8/2/2019 PDD Sinewave India
15/32
PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) - Version 03CDM Executive Board
15
BEy = Baseline emissions in year y, tCO2e
EGBL,y = EGy = Energy Baseline in the year y which is the electricity exported to the grid in year y, MWh
EFC02 = C02 emissions factor, tCO2e/MWh which is the grid emission factor
This is calculated in accordance with paragraph 10(a) of AMS I.D which states that A combined margin
(CM), consisting of the combination of operating margin (OM) and build margin (BM) according to the
procedures prescribed in the Tool to calculate the emission factor for an electricity system. The CEA
value of the grid EFCO2 that we have considered is the weighted average using 50:50 weights for the OM
and BM.
Using the fixed carbon dioxide emissions factor determined in section B4, this equation may be
simplified to the following:
84.0= yy EGBE
Project EmissionsThe emissions due to transport of the biomass to the project plant are calculated as:
2,COkmyyy EFAVDNPE =
Where:
PEy = CO2 emissions during the year y due to transport of the biomass residues to the project plant
(tCO2/yr)
Ny = Number of truck trips during year y
AVDy = Average round trip distance (from and to) between the biomass residue supply sites and the site
of the project plant during the year y (km)
2,COkmEF = Average CO2 emission factor for the trucks measured during the year y (tCO2/km)
This is calculated in accordance with ACM0006, option 1, in which project emissions are calculated
based on the number of trips and average return distance
Leakage
In line with the guidance provided in the methodology, leakage is only considered for the transfer of
equipment, as there is no transfer this may be neglected.
With reference to the general guidance on leakage in biomass project activities, we have to consider the
possibility of leakage in the case of the project activity as it utilizes biomass residues from external
sources. Leakage may occur because of the diversion of biomass from other activities outside the
boundary thus increasing the fossil fuel combustion outside the boundary. Considering that the biomassrequirement for the project is small and that there is sufficient biomass available in the region
surrounding the site of the project activity, no such leakage is anticipated. However a survey has been
undertaken ex-ante to ensure that there is surplus biomass in the region and hence the usage of biomass
in the project activity does not lead to leakage elsewhere. The biomass surplus assessment survey shall
be carried out at the start of each crediting period.
8/2/2019 PDD Sinewave India
16/32
PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) - Version 03CDM Executive Board
16
Emission Reductions
The emission reductions are therefore calculated as follows:
yyy PEBEER =
B.6.2. Data and parameters that are available at validation:
(Copy this table for each data and parameter)
Data / Parameter: EFy
Data unit: tCO2/MWh
Description: Grid emission factor
Source of data used: Central Electricity Authority
http://cea.nic.in/planning/c%20and%20e/Government%20of%20India%20web
site.htm
Value applied: 0.84
Justification of the
choice of data or
description of
measurement methods
and procedures actually
applied :
This value has been provided by the Central Electricity Authority (CEA), a
government body, for the NEWNE grid in India.
Any comment: Specified ex-ante
Data / Parameter: OMData unit: tCO2/MWh
Description: Operating Margin for grid
Source of data used: Central Electricity Authority
http://cea.nic.in/planning/c%20and%20e/Government%20of%20India%20web
site.htm
Value applied: 1.0
Justification of the
choice of data or
description of
measurement methods
and procedures actuallyapplied :
Average of values for the past 3 years. This value has been provided by the
Central Electricity Authority (CEA), a government body, for the NEWNE grid
in India.
Any comment:
Data / Parameter: BM
Data unit: tCO2/MWh
Description: Build Margin for the grid
8/2/2019 PDD Sinewave India
17/32
PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) - Version 03CDM Executive Board
17
Source of data used: Central Electricity Authority
http://cea.nic.in/planning/c%20and%20e/Government%20of%20India%20web
site.htm
Value applied: 0.68
Justification of the
choice of data or
description of
measurement methods
and procedures actually
applied :
This value has been provided by the Central Electricity Authority (CEA), a
government body, for the NEWNE grid in India.
Any comment:
Data / Parameter: SCbiomassData unit: tonnes/MWh
Description: Specific fuel consumption of biomass residuesSource of data used: Calculated based on specifications provided by the manufacturer
Value applied: 1.38
Justification of the
choice of data or
description of
measurement methods
and procedures
actually applied :
Specific fuel consumption is calculated based on specifications for boiler and
turbine. In calculating the specific fuel consumption we have taken into account
GCV values of the three fuels which is 40% bagasse, 40% babulwood and 20%
agro-residues. The GCV values for babulwood = 3600 kcal, bagasse =
2900kcal, agro residue= 2900 kcal respectively.http://www.indiasolar.com/cal-value.htm
Any comment: Specified Ex-ante
B.6.3 Ex-ante calculation of emission reductions:
>>
From section B.6.1, the emission reductions are calculated as follows:
yyyPEBEER =
Baseline emissions
The baseline emissions are calculated as:
02. CEFEGBE yy =
Where:
BEy = Baseline emissions in year y, tCO2eEGy = Electricity exported to the grid in year y, MWh
EFC02 = Grid emissions factor, tCO2e/MWh
The quantity of electricity generated is equal to the difference between gross electricity generated and the
electricity used for auxiliary consumption and is based on factors such as installed capacity, operating
days and the plant load factor (PLF). It is initially assumed that the 10 MW plant will operate for 330
8/2/2019 PDD Sinewave India
18/32
PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) - Version 03CDM Executive Board
18
days at 80% PLF for generation during the first year and 85% in the second year and 90% from the third
year onwards. The auxiliary consumption is 10%.
Hence, EGy which is given as:auxgrossy EGEGEG =
Where:
EGgross = Gross electricity generated by the project activity in the year y, MWh
EGaux = Auxiliary consumption due to the project activity in the year y, MWh
PLFHoursdaysOperatingCapacityEGgross =
For year 1
Based on the values above, EGgross is equal to 63,360 MWh and with 10% auxiliary consumption EG y =
57,024 MWh.
EFy fixed ex ante as per Section B.6.2 at 0.84 based on the CEA value for the NEWNE grid
Using the value of EFy = 0.84 tCO2/MWh gives BEy = 48,090 tCO2.
For year 2
EGgross is equal to 67,320 MWh and with 10% auxiliary consumption EG y = 60,588 MWh.
BEy = 51,095 tCO2.
From year 3 onwards
PLF is 90% and auxiliary consumption remains at 10%
EGgross = 71,280 MWh
EGy = 64,152 MWh
BEy = 54,101 tCO2.
Project emissions
The emissions due to transport of the biomass to the project plant are calculated as:
2,COkmyyy EFAVDNPE =
Where:
PEy = CO2 emissions during the year y due to transport of the biomass residue to the project plant(tCO2/yr)
Ny = Number of truck trips during year y
AVDy = Average round trip distance (from and to) between the biomass supply sites and the site of the
project plant during the year y (km)
EFkm,CO2 = Average CO2 emission factor for the trucks measured during the year y (tCO2/km)
8/2/2019 PDD Sinewave India
19/32
PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) - Version 03CDM Executive Board
19
However as per SSG WG report 22 SSG WG agreed to clarify that emissions related to transport of
biomass is only required if these are transported over a distance of more than 200 kilometres
Hence project emissions in this case can be neglected. However the distance will be monitored and if it is
greater than 200km the project emissions will be taken into account.
Emission reductions are provided by the following equation:
yyy PEBEER =
From the analysis above the emission reductions are calculated as 48,090 tCO 2 for the first year of
operation.
B.6.4 Summary of the ex-ante estimation of emission reductions:
>>
Year
Estimation of
project activity
emission(tCO2e)
Estimation of
baseline emissions
(tCO2 e)
Estimation of
Leakage
(tCO2 e)
Estimation of
overall emission
reductions(tCO2 e)
June 2010-May 2011 0 48,090 0 48,090
June 2011-May 2012 0 51,095 0 51,095
June 2012-May 2013 0 54,101 0 54,101
June 2013-May 2014 0 54,101 0 54,101
June 2014-May 20150 54,101 0 54,101
June 2015-May 2016 0 54,101 0 54,101
June 2016-May 2017 0 54,101 0 54,101
Total
( tonnes of CO2 e)0 369690 0 369690
B.7 Application of a monitoring methodology and description of the monitoring plan:
>>
B.7.1 Data and parameters monitored:
(Copy this table for each data and parameter)
Data / Parameter: EGgrossData unit: MWh
Description: Gross electricity generated by the project activity in year y
Source of data to be
used:
Energy meter readings from plant records
Value of data 63,360 for year 1; 67,320 for year 2; 71,280 from year 3 onwards
Description ofmeasurement methods
and procedures to be
applied:
Data will be continuously recorded from the turbine and the Shift Electrical in-charge will take hourly readings. This will be collated at the end of each day and
reported to the Site in-charge.
QA/QC procedures to
be applied:
The generation energy meters will be calibrated at least once every three years
by the MSEB.
Any comment: All data will be kept for a minimum of 2 years following issuance of certified
8/2/2019 PDD Sinewave India
20/32
PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) - Version 03CDM Executive Board
20
emission reductions or the end of the crediting period, whichever is later.
Data / Parameter: EGaux
Data unit: MWhDescription: Auxiliary consumption by the project activity in year y
Source of data to be
used:
Plant records
Value of data 6,336 for year 1; 6,732 for year 2; 7,128 from year 3 onwards
Description of
measurement methods
and procedures to be
applied:
Data will be continuously recorded from the turbine and the Shift Electrical in-
charge will take hourly readings. This will be collated at the end of each day
and reported to the Site in-charge.
QA/QC procedures to
be applied:
The meters will be calibrated at least once every three years.
Any comment: All data will be kept for a minimum of 2 years following issuance of certified
emission reductions or the end of the crediting period, whichever is later.
Data / Parameter: EGnetData unit: MWh
Description: Net electricity generated by the project activity in year y
Source of data to be
used:
It is a calculated value
Value of data 57,024 for year1; 60,588 for year2; 64,152 for year3
Description of
measurement methods
and procedures to be
applied:
Calculated as:
EGnet = EGgross - EGaux
QA/QC procedures to
be applied:
Any comment: All data will be kept for a minimum of 2 years following issuance of certified
emission reductions or the end of the crediting period, whichever is later.
Data / Parameter: EFkm, CO2
Data unit: tCO2/km
Description: Emission factor for transport of biomass
Source of data used: 1996 IPCC Guidelines for National Greenhouse Gas Inventories, Chapter 1
Ref4, Table 1-32
Value applied: 0.00110799
Justification of the
choice of data ordescription of
measurement methods
and procedures
actually applied :
The data from the plausible options in Table 1-32 of IPCC 1996 report has been
chosen most conservatively, i.e. we have chosen data that results in the highestemission factor which will result in the largest transport emissions.
Any comment:
8/2/2019 PDD Sinewave India
21/32
PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) - Version 03CDM Executive Board
21
Data / Parameter: Mbiomass,y
Data unit: Tonnes
Description: Amount of biomass input in the project activity
Source of data to beused:
Plant records
Value of data 87,175 for year 1; 92,623 for year 2; 98,072 from year 3 onwards
Description of
measurement methods
and procedures to be
applied:
All the biomass is brought from outside. Each truck that enters the site will be
recorded at the weighbridge installed at the factory.
QA/QC procedures to
be applied:
The weighbridge records will be tallied against transporters receipts or against
the computer generated payment invoices.
Any comment: The data will be kept for the later of, two years after the end of the crediting
period or the last issuance of CERs for the project activity.
100% of the data will be monitored.
Data / Parameter: AVDy
Data unit: Km
Description: Average return distance of trips undertaken to transport biomass to the project
site
Source of data to be
used:
Transporters receipts
Value of data 100
Description of
measurement methods
and procedures to be
applied:
The average return distance will be recorded for each truck on entry to the site.
100% of the data will be monitored.
QA/QC procedures to
be applied:
This data may be cross checked with payments for transportation of the material.
Any comment: The data will be kept for the later of, two years after the end of the crediting
period or the last issuance of CERs for the project activity. 100% of the data will
be monitored.
B.7.2 Description of the monitoring plan:
>>
This monitoring plan is developed in accordance with the modalities and procedures for small-scale
CDM project activities and is proposed for the grid-connected biomass based renewable energy project
being implemented. The monitoring plan, which will be implemented by the project proponent, describes
the monitoring organization, the parameters to be monitored, the monitoring practices, quality assurance,quality control procedures, data storage and data archiving.
Monitoring requirement
The monitoring plan includes monitoring of energy parameters such as
Type and Quantity of each type of biomass fuel consumption of the project activity, (tons)
8/2/2019 PDD Sinewave India
22/32
PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) - Version 03CDM Executive Board
22
Gross electricity Generation (MWh) Net quantity of electricity generated (exported) by the project activity (MWh)
Electricity generation
As per the small scale methodology AMS I.D, monitoring shall consist of metering the electricity
generated by the renewable technology. The generation data from the turbine will be continuously
recorded using the electricity meters in the control room. A manual hourly record will be made by the
Shift in-charge. This data will be collated at the end of each day by the Electrical in-charge and
reported on a daily basis to the Site in-charge. This data will form the basis of the ongoing calculation
which will then be tallied against the monthly recordings taken by the MSEDCL along with a
representative from the factory.
The Site Head will be responsible for collating all electrical data monthly out of the daily data (electricity
exported to the grid). He will transmit these data monthly to the Plant Manager.
The electricity meter will be calibrated atleast once in three years by MSEDCL. The Instrumentation
Engineer will be in charge of maintaining the records of the calibrations on site.
Evaluation of biomass
As per EB 47, annex 28 The project participant shall evaluate ex ante annually if there is a surplus of
the biomass in the region of the project activity, which is not utilised. If it is demonstrated (e.g., using
published literature, official reports, surveys etc.) at the beginning of each crediting period that the
quantity of available biomass in the region (e.g., 50 km radius), is at least 25% larger than the quantity of
biomass that is utilised including the project activity, then this source of leakage can be neglected
otherwise this leakage shall be estimated and deducted from the emission reductions.
We have therefore excluded the monitoring of leakage parameters as a biomass survey has been
undertaken and the results of the same have been provided to the DOE.
Fuel consumption
The consumption of the fuel will be monitored at the weighbridge installed at the site. The amount of
each type of fuel brought in by the plant will be monitored separately by the weighbridge operator.
Besides, the measurement of transport emissions is undertaken through monitoring of the number of
trucks delivering biomass and the average return distance to the site from which biomass is collected.
These data will be collected continuously by the weighbridge operator and will be collated at the end of
each day by the Plant Manager. The weighbridge records will be tallied against transporters receipts or
against the computer generated payment invoices.
The Plant Manager will collate monthly the consumption of all types of fuels, the number of trucks, the
average truck load and the average return distance out of the daily data.
The weighbridge will be calibrated annually and the Instrumentation Engineer will be in charge of thecalibrations and of maintaining the records of the calibrations on site.
General
The staff will be trained to ensure that the monitoring process is appropriate and effective. The CDM
data will be collated monthly and maintained by the Plant Manager. A detailed monitoring and
verification report will be produced by the plant on a yearly basis.
8/2/2019 PDD Sinewave India
23/32
PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) - Version 03CDM Executive Board
23
The meters used will be calibrated regularly as per requirements. In case, the meters are found outside
the acceptable limits of accuracy or if not functioning properly, necessary action will be taken and the
meters will be repaired or replaced immediately. The Instrumentation engineer will be in charge ofcalibrations and of maintaining the records of calibrations on site.
The project proponent shall keep complete and accurate records of all the data as a part of monitoring for
at least a period of 2 years after the end of the crediting period or the last issuance of CERs for the
project activity, whichever occurs later.
B.8 Date of completion of the application of the baseline and monitoring methodology and the
name of the responsible person(s)/entity(ies)
>>
10/10/2009
Mr. Gambhirmal R Shah, Sinewave Biomass Power Pvt Ltd, contact details as listed in Annex1
Ms. Roshni Kumar, Agrinergy Consultancy Private Limited, [email protected]
8/2/2019 PDD Sinewave India
24/32
PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) - Version 03CDM Executive Board
24
SECTION C. Duration of the project activity / crediting period
C.1 Duration of the project activity:
>>
C.1.1. Starting date of the project activity:
>>
26/05/2009
Letter of intent for Boiler purchase
C.1.2. Expected operational lifetime of the project activity:
>>
21y 00m
C.2 Choice of the crediting period and related information:
C.2.1. Renewable crediting period
>>
A 7 year renewable crediting period has been chosen
C.2.1.1. Starting date of the first crediting period:
>>
01/06/2010 or the date of registration, whichever is later.
C.2.1.2. Length of the first crediting period:
>>
7y 00m
C.2.2. Fixed crediting period:
C.2.2.1. Starting date:
>>
Not applicable
C.2.2.2. Length:
>>
Not Applicable
8/2/2019 PDD Sinewave India
25/32
PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) - Version 03CDM Executive Board
25
SECTION D. Environmental impacts
>>
D.1. If required by the host Party, documentation on the analysis of the environmental impacts
of the project activity:
>>
In relation to the baseline scenario no negative environmental impacts will arise as a result of the project
activity.
The positive environmental impacts arising from the project activity are:
Reduction in CO2 emissions, which would be generated under the baseline scenario, by thereplacement of fossil fuels
Reduction in the emissions of other harmful gases (NOx and SOx) that would have been emittedfrom the combustion of fossil fuels for power generation in power plants connected to the grid.
Reduced ash production because bagasse, babulwood and agro residues have lower ash contentthan that of Indian coal (30-40%)
The project will meet all national and local environmental legislation. An Environmental Impact
Assessment (EIA) will be done and the EIA approval shall be obtained. The project has received a
consent to establish from the Maharashtra Pollution Control Board and an annual consent to operate
will be obtained. The consent to operate will be made available to the DOE during verification. The
project has obtained the following clearances:
1. Approval from Maharashtra Energy Development Agency
2. Consent to establish from MPCB
3. NOC from the Gram Panchayat
4. NOC from the Zilla Parishad
D.2. If environmental impacts are considered significant by the project participants or the host
Party, please provide conclusions and all references to support documentation of an environmental
impact assessment undertaken in accordance with the procedures as required by the host Party:
>>
An Environmental Impact Assessment (EIA) will be conducted as per the requirements of the host
country (India) and the approval will be obtained from the host party.
8/2/2019 PDD Sinewave India
26/32
PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) - Version 03CDM Executive Board
26
SECTION E. Stakeholders comments
>>
E.1. Brief description how comments by local stakeholders have been invited and compiled:
>>
A newspaper advertisement has been published inviting comments from local people regardingthe project. The notice was published in Dainik Janpravas on 17th November 2009
A local stakeholder review has been undertaken through the invitation of comments from localpeople and the local municipal board
A national stakeholder review is undertaken through the approval of the project by the DNA (Ministry of
Environment and Forests).
E.2. Summary of the comments received:>>
To date no comments have been received.
E.3. Report on how due account was taken of any comments received:
>>
Since no comments have been received, no action has been taken.
8/2/2019 PDD Sinewave India
27/32
PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) - Version 03CDM Executive Board
27
Annex 1
CONTACT INFORMATION ON PARTICIPANTS IN THE PROJECT ACTIVITY
Organization: Sinewave Biomass Power Pvt Ltd
Street/P.O.Box: 94-B
Building: Maruti Krupa, Varshanagar
City: Kolhapur
State/Region: Maharashtra
Postfix/ZIP: 416012
Country: India
Telephone: +91 22 66363308
FAX: +91 22 23809797
E-Mail: [email protected]
URL:
Represented by: -Title: Director
Salutation: Mr
Last Name: Shah
Middle Name: R
First Name: Gambhirmal
Department: -
Mobile: 9821028080
Direct FAX:
Direct tel:
Personal E-Mail: [email protected]
8/2/2019 PDD Sinewave India
28/32
PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) - Version 03CDM Executive Board
28
Organization: Agrinergy Pte Ltd
Street/P.O.Box: 10 Hoe Chiang Road
Building: #08-04 Keppel TowersCity: Singapore
State/Region:
Postfix/ZIP: 089315
Country: Singapore
Telephone: +65 6592 0398
FAX: +65 6592 0401
E-Mail:
URL: www.agrinergy.com
Represented by: -
Title: Director
Salutation: Mr
Last Name: AtkinsonMiddle Name: -
First Name: Ben
Department: -
Mobile: +44 7960 970974
Direct FAX: +65 6592 0401
Direct tel: +65 6592 0398
Personal E-Mail: [email protected]
8/2/2019 PDD Sinewave India
29/32
PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) - Version 03CDM Executive Board
29
Annex 2
INFORMATION REGARDING PUBLIC FUNDING
The project has not received any public funding
8/2/2019 PDD Sinewave India
30/32
PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) - Version 03CDM Executive Board
30
Annex 3
BASELINE INFORMATION
We have adopted the approach specified in the tool to calculate the emission factor for an electricity
system to calculate the CO2 emission coefficient of the regional electricity grid.
The operating margin for the years 2006-2007, 2007-2008, 2008-2009 is 1.01, 1.01, and 1.00
respectively. The value of the operating margin of the NEWNE grid as calculated by the CEA is 1.01 and
the build margin is 0.685.
This value of the combined margin is fixed ex-ante at 0.84 tCO 2/MWh and is calculated as shown in the
table below:
tCO2/MWh
Operating Margin 1.00
Build Margin 0.68
Combined Margin (1*0.5) + (0.68*0.5) = 0.84
5http://www.cea.nic.in/planning/c%20and%20e/user_guide_ver5.pdf, Page 8
8/2/2019 PDD Sinewave India
31/32
PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) - Version 03CDM Executive Board
31
Annex 4
MONITORING INFORMATION
In addition to the measures for monitoring listed in section B.7.2 the following systems will be put in
place to monitor the project activity. Complete documentation for the operation and maintenance of the
power plant will be provided to the project owner at the time of commissioning by the Agrinergy Pte Ltd.
Additional training on CDM data monitoring will be provided to the operators of the power plant.
The monitoring of the project activity will be the responsibility of Sinewave Biomass Power Pvt Ltd. The
monitored data will be reported to Agrinergy by the Plant Manager on a quarterly basis for the
calculation and estimation of emission reductions. This data will be checked against initial estimates. If
the project is not performing as expected, a report will be sent to Sinewave Biomass Power Pvt Ltd
outlining where the project is deviating in its generation of emission reductions.
The procedure for storage of records and performance documentation is as given below:
o All data and records of data will be stored in electronic and paper format on site and will bemaintained for the crediting period and two years thereafter.
o All calibration reports will be stored in paper format on site and will be maintained for thecrediting period and two years thereafter.
The data quality will be ensured by the cross-check measures detailed below:
o Electricity exported to the grid: the electricity exported will be metered both by electricitymeters in the control room and by electricity meters located at the switchyard. Data from the
meters in the control room will be recorded continuously. Data from the meters at switchyard
will be recorded monthly by MSEB. In case there is a difference between the two records,
MSEB records will prevail.
o Average return trip distance: This will be cross checked with payments for transportation of thematerial.Measures to deal with possible monitoring data adjustment and missing data
The following are the measures that shall be taken to account for missing or adjusted data:
o Electricity export to the grid: In case both the data recorded by MSEB from the switchyardmeters and the meters in the control room is missing, then the emission reductions for the
corresponding period shall be set to zero.
o Consumption of biomass fuels: In case the data pertaining to quantity of biomass fuels ismissing, then the average GCV of the biomass fuel fired during the corresponding period for
which data is available shall be used to arrive at the weight of biomass fuels fired depending on
the power generation during the particular period.
Procedure for conducting internal audit at Sinewave Biomass Power Pvt Ltd:An internal audit shall be carried out during the project verification and monitoring phase, at every 6
months interval but one of these will coincide with the verification. The plant O&M manager and the
plant manager shall be responsible for conducting internal audits every 6 months from the start of
commercial operation of the power plant.
The following points shall be carried out as part of the internal audit procedures:
8/2/2019 PDD Sinewave India
32/32
PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) - Version 03CDM Executive Board
1. Consolidation of quarterly data: The data recorded during the operation of the plant, shall beconsolidated on a half-yearly basis by the plant manager. The number of ERs generated by the
project activity shall be calculated and cross checked against the estimated ER as per the
calculation sheet. Any difference arising in the ER generated and ER estimated shall be recordedand reasons for the increase or decrease in the actual number of ERs generated shall be identified
and documented.
2. Random checking of data: The plant manager shall cross check the recorded data randomly. Fore.g., the data for electricity generation and import recorded for a particular months may be cross
checked against the MSEB bills for that particular month.
3. Record of necessary calibration certificates / government approvals: The plant manager shallensure that the measurement meters shall be calibrated as required by the state regulatory
authority. The records of such calibrations done shall be updated and stored. The necessary
approvals from the statutory bodies shall be updated and records maintained.
4. Storage of data: The plant manager shall ensure that the data recorded on a monthly basis forenergy generation, supply of biomass fuels shall be signed off by the individuals responsible for
recording the respective data.
5. Data collection and storage procedures: The plant manager shall check that the CDM data isbeing collected and recorded as per the formats for data storage as provided during the validation
of the project.
On completion of the above steps, minutes of meeting shall be prepared and all individuals participating
in the internal audit shall sign the minutes of meeting and the record shall be maintained for future
reference.
The organization will train the staff to ensure that the monitoring process is appropriate and effective.
The CDM data will be collated monthly in an excel file maintained by the Plant Manager (a specific
template will be provided by Agrinergy). A detailed monitoring report will be produced by the plant on a
yearly basis.
---------