    Estidama Community Waste Calculator v1.1

    Report a Template Bug :

    Project Details Background

    Construction and Demolition Waste Estimation

    Operational Waste Estimation

    Salvage/Reycling Capture Rates

    Credit Point Summary

    Construction and Demolition Waste Summary

    Operational Waste Summary

    Key to cell formats in the waste calculator

    Input Cells that may be changed by design teams

    Last Revised: 1st November 2010

    Home Step 1 Step 2 Step 3 Step 4 Summary 1 Summary 2 Summary 3

    [email protected]

    Step 1

    Design teams are required to proceed through the worksheets Steps 1 to 4 in order. All Input Cellsmust be completed in order to display results correctly within the Summary worksheets.The results are presented in the Summary worksheets, but please do not proceed to next step if thereare any warning messages in any of the Steps.

    Instructions:* Design teams are required to enter information in all light blue input cells not greyed out to displaythe results in the Results worksheet. Please do not proceed if there are any warning messages in anyof the Steps.* For construction rating submissions, select "Construction" as the Pearl Rating Stage and override

    default values with actual data from construction and, if applicable, demolition

    Note: This tool is for use with the Pearl Rating System only and to demonstrate compliance with thePearl Rating requirements. It is not a design tool.

    Step 2

    Step 3

    Step 4

    Summary 1

    Summary 2

    Summary 3

    Next

    mailto:[email protected]?subject=Pearl%20Community%20Waste%20Calculator%20Bug%20Reportmailto:[email protected]?subject=Pearl%20Community%20Waste%20Calculator%20Bug%20Report
  • 8/3/2019 PCRS Waste Calculator v1.1

    2/8

    Step 1 - Project Details

    Project Details Client Details

    Community/Project Name Client Name

    Location Client Contact

    Client Address

    Warning: Please fill all fields above. Warning: Please fill all fields above.

    Rating System Details

    Project ID

    Pearl Rating System Community

    Pearl Rating Stage

    Warning: Please fill all fields above. Design Team Details

    Architect

    Developer

    Pearl QP Details Mechanical Engineer

    Pearl QP Name Electrical Engineer

    Pearl QP Number Structural Engineer

    Warning: Please fill all fields above. Ecologist

    Landscape Architect

    Other

    Waste Calculator Other

    Person Responsible Other

    Company Other

    Date of Issue Other

    Warning: Please fill all fields above.

    Home Step 1 Step 2 Step 3 Step 4 Summary 1 Summary 2 Summary 3

    Total building GFA, m2

    Previous Home Next

  • 8/3/2019 PCRS Waste Calculator v1.1

    3/8

    Step 2 - Construction and Demolition Waste Estimation

    Details of existing buildings and infrastructure to be demolished

    Are there any existing building(s) within the community? No

    Is there any existing public realm infrastructure within the community? No

    Existing building(s) Override default demolition waste values? No

    Attribute Unit Value Demolition waste generated in m3 per 100 m2 of building: 50.0

    Total gross floor area sqm Please write the source reference of this figure:

    Existing public realm infrastructure

    Attribute Unit Value Demolition waste generated in tonnes per 100 m2 of public realm infrastructure:

    Total area sqm Please write the source reference of this figure:

    Proposed Community Details

    Proposed public realm/common elements in the community

    Attribute Unit Value

    Street/Roads/Highways m2 Construction waste generated in tonnes per 100 m2 of Street/Roads/Highways

    Please insert the source reference for the value used:

    Infrastructure buildings, e.g. district cooling centres m2 Construction waste generated in tonnes per 100 m2 of Infrastructure buildings, e.g. district cooling centres

    Please insert the source reference for the value used:

    Utility corridors m2 Construction waste generated in tonnes per 100 m2 of Utility corridors

    Please insert the source reference for the value used:

    Parks / landscape with vegetation m2 Construction waste generated in tonnes per 100 m2 of Parks / landscape with vegetation

    Please insert the source reference for the value used:

    Waterfront features m2 Construction waste generated in tonnes per 100 m2 of Waterfront features

    Please insert the source reference for the value used:

    Other m2 Construction waste generated in tonnes per 100 m2 of Other

    Home Step 1 Step 2 Step 3 Step 4 Summary 1 Summary 2 Summary 3

    Note: Only include public realm infrastructure or buildings that will be demolished in preparation ofpublic realm/infrastructure work. Do not include buildings that will be part of individual plots andthat will be considered by the Building or Villa rating systems

    Note: Please fill in all areas of public realm/common elements of the communitywith their respective construction waste rates as no default benchmarks areprovided.

    Note: Earthworks are not included in the construction waste calculations. Nonetheless, balancingfilling and excavation volumes within the community site is best practice.

  • 8/3/2019 PCRS Waste Calculator v1.1

    4/8

    Step 3 - Operational Waste Estimation

    Proposed Community Details

    Office Office Non-default waste composition and generation for Offices

    Attribute Unit Value Paper/Cardboard Metal Glass Plastic Organic Other non-haz.

    Office Gross Floor Area sqm 0 59.0% 1.0% 2.0% 9.0% 19.0% 10.0%

    Office Net Floor Area sqm Quantity 80.0 kg/m2/year

    Override default operational waste values for offices? No Please insert the source reference for the value used:

    Retail Retail Non-default waste composition and generation for Retail

    Attribute Unit Value Paper/Cardboard Metal Glass Plastic Organic Other non-haz.

    Retail Gross Floor Area sqm 0 62.0% 1.5% 0.0% 28.0% 3.5% 5.0%

    Retail Net Floor Area sqm Quantity 40.0 kg/m2/year

    Override default waste values for retail? No Please insert the source reference for the value used:

    School School Non-default waste composition and generation for School

    Attribute Unit Value Paper/Cardboard Metal Glass Plastic Organic Other non-haz.

    School Gross Floor Area sqm 0 55.0% 2.0% 4.0% 17.0% 18.0% 4.0%

    Number of students students Quantity 70.0 kg/student/year

    Override default waste values for schools? No Please insert the source reference for the value used:

    Residential Residential Non-default waste composition and generation for Residential

    Attribute Unit Value Paper/Cardboard Metal Glass Plastic Organic Other non-haz.

    Residential Gross Floor Area sqm 0 15.0% 5.0% 5.0% 15.0% 50.0% 10.0%

    Total number of residents person Quantity 532.9 kg/person/year

    Override default operational waste values for Residential? No Please insert the source reference for the value used:

    Other building types: Hotel Non-default waste composition and generation for Other - Hotel

    Attribute Unit Value Paper/Cardboard Metal Glass Plastic Organic Other non-haz.

    Home Step 1 Step 2 Step 3 Step 4 Summary 1 Summary 2 Summary 3

  • 8/3/2019 PCRS Waste Calculator v1.1

    5/8

    Step 4 - Salvage/Reycling Capture Rates

    Construction and Demolition waste recycling and salvage rates

    Salvage and recycling of Construction and Demolition waste

    Non-technical factorsWill a construction and demolition waste management plan be written? (Required SM-R2) No

    Will waste education be provided to construction contractors? No

    Will waste education be provided to demolition contractors? No

    Will waste be adequately segregated and temporarily stored on-site during construction? No

    Will waste be adequately segregated and temporarily stored on-site during demolition? No

    Will there be a person responsible of C&D waste management? No Construction Demolition

    Salvage rate - 0%

    Technical factors Non-technical capture rate 0% 0%

    What percentage of material from existing community elements/buildings will be reused in the new one? 0% Technical capture rate 0% 0%

    List of items reused: Overal capture rate 0% 0%

    Will construction waste be segregated in a recycling plant? No

    Which plant(s)?

    Will demolition waste be segregated in a recycling plant? No

    Which plant(s)?

    NoConstruction Demolition Please insert the source reference for these figures:

    0% 0%

    Operational waste diversion from landfill rates

    General

    Will an operational waste management plan be written? (Required SM-R3) No

    Will adequate access be provided for refuse collection vehicles? (Required SM-R3) No

    Home Step 1 Step 2 Step 3 Step 4 Summary 1 Summary 2 Summary 3

    NOTE:Capture rates represent the expected salvage/recycling rates of the project for

    construction and demolition waste at the design stage or those achieved duringthe construction stage.They are not the final salvage/recycling rates that will be achieved in theprojects. These which are shown in the Summary 2 worksheet.Capture rates are always

  • 8/3/2019 PCRS Waste Calculator v1.1

    6/8

    Summary 1 - Credit Point Summary

    0

    Building Construction and Demolition Waste SM-R2: Basic construction waste management

    Estimated demolition waste generated in tonnes 0 Pre-requisite Achieved? NoEstimated construction waste generated in tonnes 0

    Estimated total C&D waste generated in tonnes 0

    Quantity landfilled in tonnes 0 SM-R3: Basic operational waste management strategy

    Estimated construction and demolition waste salvaged/recycled in % 0.0% Pre-requisite Achieved? No

    Building Operational Waste

    Estimated operational waste generated in tonnes per annum 0 SM-5: Improved construction waste management

    Estimated operational waste landfilled in tonnes per annum 0 Credit Points Awarded 0Estimated operational waste diverted in tonnes per annum 0

    Estimated operational waste diverted in % 0.0%

    SM-6: Improved operational waste management

    Credit Points Awarded 0

    SM-7: Organic waste management

    Credit Points Awarded 0

    SM-8: Hazardous waste management

    Credit Points Awarded 0

    Home Step 1 Step 2 Step 3 Step 4 Summary 1 Summary 2 Summary 3

    Previous Home Next

  • 8/3/2019 PCRS Waste Calculator v1.1

    7/8

    Summary 2 - Construction and Demolition Waste Summary

    Generated Landfilled

    Tonnes Tonnes Tonnes %

    Demolition waste 0 0 0 0.0%

    Construction waste 0 0 0 0.0%

    Total waste 0 0 0

    Percentage of Construction and Demolition waste recycled/salvaged 0.0%

    Construction and Demolition Waste: 0 tonnes

    Home Step 1 Step 2 Step 3 Step 4 Summary 1 Summary 2 Summary 3

    EstimatedConstruction and Demolition waste

    Salvaged/Recycled

    Salvaged/Recycled

    Previous Home Next

    Demolition waste Construction waste

    0

    0

    0

    0

    0

    0

    1

    1

    1

    1

    1

    Construction and Demolition Waste: 0 tonnes

    Salvaged/Recycled

    Landfilled

    Tonnes

    Construction and Demolition Waste: 0 tonnes

    Landfil led Salvaged/Recycled

  • 8/3/2019 PCRS Waste Calculator v1.1

    8/8

    Summary 3 - Operational Waste Summary

    Estimated Operational wasteGenerated Landfilled

    tpa tpa tpa %

    Paper/Cardboard 0 0 0 0.0%

    Metal 0 0 0 0.0%

    Glass 0 0 0 0.0%

    Plastic 0 0 0 0.0%

    Organic 0 0 0 0.0%

    Other non-hazardous 0 0 0 0.0%

    Total operational waste generated in tonnes per annum 0 0 0

    Percentage of operational waste recycled/composted/treated 0.0%

    Operational Waste: 0 Tonnes per annum

    Reference

    http://www.beeah-uae.com/en/whatyoucando/industry/did-you-know-industry

    Home Step 1 Step 2 Step 3 Step 4 Summary 1 Summary 2 Summary 3

    Recycled/Composted/

    Treated

    Recycled/

    Treated

    NOTE: tpa: tonnes per annum

    Previous Home

    Paper/Cardboard Metal Glass Plastic Organic Other non-hazardous0

    0

    0

    0

    0

    0

    1

    1

    1

    1

    1

    Operational Waste: 0 Tonnes per annum

    Recycled/Composted/Treated

    Landfilled

    Tonnespera

    nnum

    Operational Waste: 0 Tonnes per annum

    Landfilled Recycled/Composted/Treated