Vertical section Passive house detail 0.1.1 Date: 2009-07-01 Schematic view Design of plinth area with projecting facade insulation and perimeter insulation down to foundation interior plaster brickwork bonding ETICS Insulation Board ETICS Basecoat + Finishing Coat in system build-up ETICS Plinth Joint Profile ≥ 260 175 10 ETICS Window Joint Profile Fill with PUR Filler Foam without joints foundation wall protection foil ETICS Plinth and Underground Insulation Board, bonded with ETICS Multiflex ETICS Basecoat + Finishing Coat in system build-up double protection coat using ETICS Multiflex capillary-breaking, water draining layer, e.g. gravel existing water proofing* ≥ 220 300 *according to DIN 18195
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Vertical section
Passive house detail 0.1.1
Date: 2009-07-01 Schematic view
Design of plinth area with projecting facade insulation and perimeter insulation down to foundation
interior plaster
brickwork
bonding
ETICS Insulation Board
ETICS Basecoat + Finishing Coat in system build-up
ETICS Plinth Joint Profile
≥ 260 175 10
ETICS Window Joint Profile
Fill with PUR Filler Foam without joints
foundation wall protection foil
ETICS Plinth and Underground Insulation Board, bonded with ETICS Multiflex
ETICS Basecoat + Finishing Coat in system build-up
double protection coat using ETICS Multiflex
capillary-breaking, water draining layer, e.g. gravel
existing water proofing*
≥ 220
300
*according to DIN 18195
Vertical section
Passive house detail 0.1.2
Date: 2009-07-01 Schematic view
Design of plinth connected to soil
bondinginterior plaster
brickwork
screed on isolation layer/steam barrier
thermal insulation
existing water proofing*
basement ceiling
existing water proofing*
unheated basement
≥ 260 175 10
200
250
50
200
ETICS Plinth and Underground Insulation Board, bonded with ETICS Multiflex
double protection coat using ETICS Multiflex
300
ETICS Insulation Board
insulation stone
mortar bed
foundation wall protection foil
ETICS Basecoat + Finishing Coat in system build-up
*according to DIN 18195
Vertical section
Passive house detail 0.1.3
Date: 2009-07-01 Schematic view
Skirting design with connection to base plate
bondinginterior plaster
brickwork
screed on isolation layer/steam barrier
thermal insulation
insulation stonemortar bed
filletETICS Plinth and Underground Insulation Board,bonded with ETICS Multiflex
existing water proofing*existing water proofing*
base plate
compensation layer
drainage
≥ 260 175 10
200
250
50
300
double protection coat using ETICS Multiflex
foundation wall protection foil
ETICS Basecoat + Finishing Coat in system build-up
ETICS Insulation Board
*according to DIN 18195
Vertical section
Passive house detail 0.2
Date: 2009-07-01 Schematic view
Connection to balcony exit sill
ETICS Sealing Tape
ETICS Sealing Tape
airtight window connection foil
supporting console
foundation wall protection foil
balcony exit sill
ETICS Basecoat + Finishing Coat in system build-up
double protection coat using ETICS Multiflex
ETICS Plinth and Underground Insulation Board, bonded with ETICS Multiflex ≥ 260 175
Vertical section
Passive house detail
Date: 2009-07-01 Schematic view
0.3.1System connection to windows flush with facade
ETICS Window Sill
airtight window connection foil
bonding
ETICS Window Joint Profile, Special+
brickwork
interior plaster
≥ 260 175 10
≥30
ETICS Insulation Board
ETICS Basecoat + Finishing Coat in system build-up
Horizontal section
Passive house detail
Date: 2009-07-01 Schematic view
0.3.2System connection to semi-attached windows
ETICS Window Sill
ETICS Insulation Board
bonding
ETICS Basecoat + Finishing Coat in system build-up
airtight window connection foil
ETICS Window Joint Profile, Special+
brickwork
interior plaster
≥ 260 175 10
≥ 3
0
Horizontal section
Passive house detail
Date: 2009-07-01 Schematic view
0.3.3System connection to attached windows
ETICS Window Sill
bonding
airtight window connection foil
ETICS Window Joint Profile, Special+
brickwork
interior plaster
≥ 3
0
≥ 260 175 10
ETICS Basecoat + Finishing Coat in system build-up
ETICS Insulation Board
Horizontal section
Passive house detail
Date: 2009-07-01 Schematic view
0.3.4Inclined reveal connection to attached windows
bonding
airtight window connection foil
ETICS Window Joint Profile, Special+
brickwork
interior plaster
≥ 3
0
≥ 260 175 10
ETICS Insulation Board
ETICS Basecoat + Finishing Coat in system build-up
Vertical section
Passive house detail
Date: 2009-07-01 Schematic view
0.4.1System connection ETICS window sill to windows flush with facade
ETICS Sealing Tape
ETICS Sealing Tape
ETICS Wall Anchor
ETICS Insulation Board
airtight window connection foil
ETICS Window Sill
≥ 260 175 10
ETICS Basecoat + Finishing Coat in system build-up
Vertical section
Passive house detail
Date: 2009-07-01 Schematic view
0.4.2System connection ETICS window sill to semi-attached windows
ETICS Sealing Tape
ETICS Sealing Tape
ETICS Wall Anchor
airtight window connection foil
assembly base
ETICS Window Sill
≥ 260 175 10
ETICS Insulation Board
ETICS Basecoat + Finishing Coat in system build-up
Vertical section
Passive house detail
Date: 2009-07-01 Schematic view
0.4.3System connection ETICS window sill to attached windows
ETICS Wall Anchor
airtight window connection foil
assembly base
ETICS Window Sill
≥ 260 175 10
ETICS Insulation Board
ETICS Basecoat + Finishing Coat in system build-up
ETICS Sealing Tape
ETICS Sealing Tape
Horizontal section
Passive house detail
Date: 2009-07-01 Schematic view
0.5.1Exterior corner
interior plaster
bonding
ETICS Basecoat + Finishing Coat in system build-up
ETICS Insulation Board
brickwork
≥ 260 175 10
≥ 2
6017
510
Horizontal section
Passive house detail
Date: 2009-07-01 Schematic view
0.5.2Interior corner
interior plaster
bonding
ETICS Basecoat + Finishing Coat in system build-up
ETICS Insulation Board
brickwork
10 175 ≥ 260
1017
5≥
260
Horizontal section
Passive house detail
Date: 2009-07-01 Schematic view
0.6.1Interior wall/exterior wall
bonding
≥ 260 175 10
interior plaster
brickwork
interior plaster
brickwork
1011
510
ETICS Insulation Board
ETICS Basecoat + Finishing Coat in system build-up
Vertical section
Passive house detail
Date: 2009-07-01 Schematic view
0.6.2Intermediate floor/exterior wall
bonding
≥ 260 175 10
interior plaster
brickwork
interior plaster
brickwork
1020
020
50
ETICS Basecoat + Finishing Coat in system build-up
ETICS Insulation Board
Vertical section
Passive house detail
Date: 2009-07-01 Schematic view
0.7.1Connection to attic
bonding
≥ 260 175 10
interior plaster
sheet metal flashing, ≥ 2 % inclination
brickwork
1020
035
050
ETICS Sealing Tape
ETICS Insulation Board
ETICS Basecoat + Finishing Coat in system build-up
bitumen seal, double
ETICS Sealing Tape
steam barrier/emergency seal
concrete ceiling
Vertical section
Passive house detail
Date: 2009-07-01 Schematic view
0.7.2Upper system connection to pitched roof
chipboard 20 mm
bonding
≥ 260 175 10
3022
240
6012,5
interior plaster
brickwork
1020
020
50
intermediate rafter insulation
air seal
gypsum plasterboard
sub-rafter insulation with installation level
ETICS Basecoat + Finishing Coat in system build-up
ETICS Insulation board
embed air seal in plaster
ETICS Sealing Tape
Vertical section
Passive house detail
Date: 2009-07-01 Schematic view
0.7.3Upper system connection to verge with verge tile
verge tile
bonding
≥ 260 175 10
12,5
5824
022
interior plaster
intermediate rafter insulation
air seal
gypsum plasterboard
sub-rafter insulation with installation level
brickwork
ETICS Sealing Tape
formwork
embed air seal in plaster
ETICS Insulation Board
ETICS Basecoat + Finishing Coat in system build-up