  • 8/13/2019 Orifice Flange Inspection Report

    1/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13

    Item No. ISO DRWG

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No.

    Reference

    Prepared by Subcontractor Contractor Company

    NAME

    SIGN.

    DATE

    Area/Location

  • 8/13/2019 Orifice Flange Inspection Report

    2/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13 Page- 1 of 3

    Item No. J. NO-05, & 12. ISO DRWG 121A-1110-P-172-02

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-003

    Area/Location A2-Unit-1110 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    NAME

    SIGN.

    DATE

    RIJIL KJ

    1/2/2013

  • 8/13/2019 Orifice Flange Inspection Report

    3/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13 Page- 2 of 3

    Item No. J. NO - 12. ISO DRWG 121A-1110-FCWS-007-02

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-003

    Area/Location A2-Unit-1110 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    NAME RIJIL KJ

    SIGN.

    DATE 1/2/2013

  • 8/13/2019 Orifice Flange Inspection Report

    4/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page-3 of 3

    Item No. J. NO-09. ISO DRWG 121R-1110-UA-001-03

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-003

    Area/Location A2-Unit-1110 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    NAME RIJIL KJ

    SIGN.

    DATE 1/2/2013

  • 8/13/2019 Orifice Flange Inspection Report

    5/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page-3 of 3

    Item No. J. NO-05A. ISO DRWG 121R-1110-P-074-03

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-004

    Area/Location A2-Unit-1110 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    NAME NAVEEN K.H

    SIGN.

    DATE 2/2/2013

  • 8/13/2019 Orifice Flange Inspection Report

    6/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page-1 of 1

    Item No. J. NO-07. ISO DRWG 121R-1110-P-037-12

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-005

    Area/Location A2-Unit-1110 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    NAME RIJIL KJ

    SIGN.

    DATE 4/2/2013

  • 8/13/2019 Orifice Flange Inspection Report

    7/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page-1 of 1

    NAME RIJIL KJ

    SIGN.

    DATE 6/2/2013

    Area/Location A2-Unit-1110 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    Item No. J. NO-05A. ISO DRWG 121A-1110-P-118-05

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-006

  • 8/13/2019 Orifice Flange Inspection Report

    8/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page-1 of 2

    Item No. J. NO-05A. ISO DRWG 121A-1110-P-065-02

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-007

    Area/Location A2-Unit-1110 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    NAME RIJIL KJ

    SIGN.

    DATE 10/2/2013

  • 8/13/2019 Orifice Flange Inspection Report

    9/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page-2 of 2

    Item No. J. NO-08A. ISO DRWG 121A-1110-MS-002-04

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-007

    Area/Location A2-Unit-1110 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    NAME RIJIL KJ

    SIGN.

    DATE 10/2/2013

  • 8/13/2019 Orifice Flange Inspection Report

    10/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page-1 of 1

    NAME RIJIL KJ

    SIGN.

    DATE 26/2/2013

    Area/Location A2-Unit-1110 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    Item No. J. NO-04. ISO DRWG 121A-1110-P-148-02

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-008

  • 8/13/2019 Orifice Flange Inspection Report

    11/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page-1 of 1

    Item No. J. NO-14A,19A ISO DRWG 121R-1110-LS-022-03

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-009

    Area/Location A2-Unit-1110 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    NAME NAVEEN KH

    SIGN.

    DATE 21/3/2013

  • 8/13/2019 Orifice Flange Inspection Report

    12/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page-1 of 1

    NAME CHN REDDY

    SIGN.

    DATE 26/3/2013

    Area/Location A2-Unit-1120 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    Item No. J. NO-10 ISO DRWG 124R-1120-FG-847-03

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-010

  • 8/13/2019 Orifice Flange Inspection Report

    13/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page-1 of 1

    NAME CHN REDDY

    SIGN.

    DATE 03/04/2013

    Area/Location A2-Unit-1120 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    Item No. J. NO- 12, 13 ISO DRWG 124R-1120-TC-096-02

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-011

  • 8/13/2019 Orifice Flange Inspection Report

    14/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page-1 of 1

    Item No. J. NO- 1, 11 ISO DRWG 124A-1130-P-038-02

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-012

    Area/Location A2-Unit-1130 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    NAME CHN REDDY

    SIGN.

    DATE 10/04/2013

  • 8/13/2019 Orifice Flange Inspection Report

    15/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page-1 of 1

    Item No. J. NO- 1, ISO DRWG 124R-1120-FG-847-02

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-013

    Area/Location A2-Unit-1120 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    NAME CHN REDDY

    SIGN.

    DATE 09/05/2013

  • 8/13/2019 Orifice Flange Inspection Report

    16/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page-1 of 1

    Item No. J. NO- 10, ISO DRWG 124R-1120-FG-847-03

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-013

    Area/Location A2-Unit-1120 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    NAME CHN REDDY

    SIGN.

    DATE 09/05/2013

  • 8/13/2019 Orifice Flange Inspection Report

    17/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page-1 of 1

    NAME CHN REDDY

    SIGN.

    DATE 25/05/2013

    Area/Location A2-Unit-1130 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    Item No. J. NO- 1 , 11A, ISO DRWG 124A-1130-P-038-02

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-014

  • 8/13/2019 Orifice Flange Inspection Report

    18/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page-1 of 1

    NAME CHN REDDY

    SIGN.

    DATE 10/05/2013

    Area/Location A2-Unit-1120 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    Item No. J. NO- 7 , 8, ISO DRWG 124A-1120-FC-084-02

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-015

  • 8/13/2019 Orifice Flange Inspection Report

    19/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page-1 of 1

    Item No. J. NO- 5A, ISO DRWG 121A-1110-FCWS-007-02

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-016

    Area/Location A2-Unit-1110 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    NAME THANGARAJ

    SIGN.

    DATE 24/06/2013

  • 8/13/2019 Orifice Flange Inspection Report

    20/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page-1 of 2

    NAME CHN REDDY

    SIGN.

    DATE 04/07/2013

    Area/Location A2-Unit-1130 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    Item No. J. NO- 03, ISO DRWG 124R-1130-IA-002-03

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-017

  • 8/13/2019 Orifice Flange Inspection Report

    21/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page-2 of 2

    NAME CHN REDDY

    SIGN.

    DATE 04/07/2013

    Area/Location A2-Unit-1130 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    Item No. J. NO- 12A, ISO DRWG 124R-1130-IA-002-04

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-017

  • 8/13/2019 Orifice Flange Inspection Report

    22/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page-1 of 4

    Item No. J. NO- 02, ISO DRWG 124R-1130-FCWS-003-04

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-018

    Area/Location A2-Unit-1130 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    NAME CHN REDDY

    SIGN.

    DATE 17/07/2013

  • 8/13/2019 Orifice Flange Inspection Report

    23/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page-2 of 4

    Item No. J. NO- 01, ISO DRWG 124A-1130-FCWS-001-02

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-018

    Area/Location A2-Unit-1130 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    NAME CHN REDDY

    SIGN.

    DATE 17/07/2013

  • 8/13/2019 Orifice Flange Inspection Report

    24/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page-3 of 4

    Item No. J. NO- 01, ISO DRWG 124A-1130-FCWS-002-02

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-018

    Area/Location A2-Unit-1130 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    NAME CHN REDDY

    SIGN.

    DATE 17/07/2013

  • 8/13/2019 Orifice Flange Inspection Report

    25/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page-4 of 4

    Item No. J. NO- 01, ISO DRWG 124A-1130-FCWS-004-02

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-018

    Area/Location A2-Unit-1130 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    NAME CHN REDDY

    SIGN.

    DATE 17/07/2013

  • 8/13/2019 Orifice Flange Inspection Report

    26/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page- 1 of 2

    NAME CHN REDDY

    SIGN.

    DATE 18/07/2013

    Area/Location A2-Unit-1120 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    Item No. J. NO- 03, 08. ISO DRWG 124R-1120-IA-826-02

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-019

  • 8/13/2019 Orifice Flange Inspection Report

    27/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page- 2 of 2

    NAME CHN REDDY

    SIGN.

    DATE 18/07/2013

    Area/Location A2-Unit-1120 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    Item No. J. NO- 17, 12. ISO DRWG 124R-1120-IA-882-01

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-019

  • 8/13/2019 Orifice Flange Inspection Report

    28/155

  • 8/13/2019 Orifice Flange Inspection Report

    29/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page- 2 of 2

    NAME CHN REDDY

    SIGN.

    DATE 29/07/2013

    Area/Location A2-Unit-1120 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    Item No. J. NO- 02, 09. ISO DRWG 124R-1120-FCWS-837-01

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-020

  • 8/13/2019 Orifice Flange Inspection Report

    30/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page- 1 of 1

    Item No. J. NO- 03, 06. ISO DRWG 124R-1120-FC-156-03

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-021

    Area/Location A2-Unit-1120 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    NAME CHN REDDY

    SIGN.

    DATE 31/07/2013

  • 8/13/2019 Orifice Flange Inspection Report

    31/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page- 1 of 1

    NAME CHN REDDY

    SIGN.

    DATE 05/08/2013

    Area/Location A2-Unit-1120 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    Item No. J. NO- 05A , 16. ISO DRWG 124A-1120-P-878-02

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-022

  • 8/13/2019 Orifice Flange Inspection Report

    32/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page- 1 of 1

    Item No. J. NO- 06 , 11. ISO DRWG 124A-1120-FC-536-04

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-023

    Area/Location A2-Unit-1120 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    NAME CHN REDDY

    SIGN.

    DATE 21/08/2013

  • 8/13/2019 Orifice Flange Inspection Report

    33/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page- 1 of 1

    NAME GANESH P

    SIGN.

    DATE 23/08/2013

    Area/Location A2-Unit-1120 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    Item No. J. NO- 04 , 08. ISO DRWG 124A-1120-P-016-04

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-024

  • 8/13/2019 Orifice Flange Inspection Report

    34/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page- 1 of 2

    Item No. J. NO- 08A. ISO DRWG 121A-1110-IA-008-01

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-025

    Area/Location A2-Unit-1110 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    NAME SHARATH KK

    SIGN.

    DATE 10/08/2013

  • 8/13/2019 Orifice Flange Inspection Report

    35/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page- 2 of 2

    Item No. J. NO- 15. ISO DRWG 121A-1110-IA-008-02

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-025

    Area/Location A2-Unit-1110 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    NAME SHARATH KK

    SIGN.

    DATE 10/08/2013

  • 8/13/2019 Orifice Flange Inspection Report

    36/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page- 1 of 2

    NAME GANESH P

    SIGN.

    DATE 29/08/2013

    Area/Location A2-Unit-1130 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    Item No. J. NO- 01 ,02 . ISO DRWG 124A-1130-P-001-09

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-026

  • 8/13/2019 Orifice Flange Inspection Report

    37/155

  • 8/13/2019 Orifice Flange Inspection Report

    38/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page- 1 of 1

    Item No. J. NO- 2 , 7A . ISO DRWG 124R-1130-LS-004-05

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-027

    Area/Location A2-Unit-1130 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    NAME GANESH P

    SIGN.

    DATE 12/09/2013

  • 8/13/2019 Orifice Flange Inspection Report

    39/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page- 1 of 5

    NAME GANESH P

    SIGN.

    DATE 15/09/2013

    Area/Location A2-Unit-1130 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    Item No. J. NO- 06. ISO DRWG 124R-1130-P-007-05

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-028

  • 8/13/2019 Orifice Flange Inspection Report

    40/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page- 2 of 5

    NAME GANESH P

    SIGN.

    DATE 15/09/2013

    Area/Location A2-Unit-1130 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    Item No. J. NO- 09. ISO DRWG 124R-1130-P-007-06

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-028

  • 8/13/2019 Orifice Flange Inspection Report

    41/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page- 3 of 5

    NAME GANESH P

    SIGN.

    DATE 15/09/2013

    Area/Location A2-Unit-1130 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    Item No. J. NO- 01A. ISO DRWG 124A-1130-P-007-08

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-028

  • 8/13/2019 Orifice Flange Inspection Report

    42/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page- 4 of 5

    NAME GANESH P

    SIGN.

    DATE 15/09/2013

    Area/Location A2-Unit-1130 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    Item No. J. NO- 01. ISO DRWG 124A-1130-P-007-09

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-028

  • 8/13/2019 Orifice Flange Inspection Report

    43/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page- 5 of 5

    NAME GANESH P

    SIGN.

    DATE 15/09/2013

    Area/Location A2-Unit-1130 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    Item No. J. NO- 02 ,03. ISO DRWG 124A-1130-P-012-02

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-028

  • 8/13/2019 Orifice Flange Inspection Report

    44/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page- 1 of 4

    NAME VINOTH KUMAR

    SIGN.

    DATE 16/09/2013

    Area/Location A2-Unit-1400 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    Item No. J. NO- 08A, 18A. ISO DRWG 123A-1400-HY-262-01

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-029

  • 8/13/2019 Orifice Flange Inspection Report

    45/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page- 2 of 4

    NAME VINOTH KUMAR

    SIGN.

    DATE 16/09/2013

    Area/Location A2-Unit-1400 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    Item No. J. NO- 08A ,18AC. ISO DRWG 123A-1400-HY-063-05

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-029

  • 8/13/2019 Orifice Flange Inspection Report

    46/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page- 3 of 4

    NAME VINOTH KUMAR

    SIGN.

    DATE 16/09/2013

    Area/Location A2-Unit-1400 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    Item No. J. NO- 08A ,18A. ISO DRWG 123A-1400-HY-261-01

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-029

  • 8/13/2019 Orifice Flange Inspection Report

    47/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page- 4 of 4

    NAME VINOTH KUMAR

    SIGN.

    DATE 16/09/2013

    Area/Location A2-Unit-1400 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    Item No. J. NO- 18A. ISO DRWG 123A-1400-HY-263-01

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-029

  • 8/13/2019 Orifice Flange Inspection Report

    48/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page- 1 of 4

    Item No. J. NO- 12. ISO DRWG 121A-1110-P-023-09

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-030

    Area/Location A2-Unit-1110 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    NAME SHARATH KK

    SIGN.

    DATE 01/09/2013

  • 8/13/2019 Orifice Flange Inspection Report

    49/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page- 2 of 4

    Item No. J. NO- 13A. ISO DRWG 121A-1110-FCWS-004-01

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-030

    Area/Location A2-Unit-1110 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    NAME SHARATH KK

    SIGN.

    DATE 01/09/2013

  • 8/13/2019 Orifice Flange Inspection Report

    50/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page- 3 of 4

    Item No. J. NO- 04. ISO DRWG 121A-1110-FCWS-173-01

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-030

    Area/Location A2-Unit-1110 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    NAME SHARATH KK

    SIGN.

    DATE 01/09/2013

  • 8/13/2019 Orifice Flange Inspection Report

    51/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page- 4 of 4

    Item No. J. NO- 05A. ISO DRWG 121A-1110-FCWS-007-02

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-030

    Area/Location A2-Unit-1110 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    NAME SHARATH KK

    SIGN.

    DATE 01/09/2013

  • 8/13/2019 Orifice Flange Inspection Report

    52/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page- 1 of 3

    Item No. J. NO- 01 ,06. ISO DRWG 124R-1130-UA-001-03

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-031

    Area/Location A2-Unit-1130 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    NAME GANESH P

    SIGN.

    DATE 19/09/2013

  • 8/13/2019 Orifice Flange Inspection Report

    53/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page- 2 of 3

    Item No. J. NO- 02 ,09. ISO DRWG 124R-1130-UN-002-03

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-031

    Area/Location A2-Unit-1130 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    NAME GANESH P

    SIGN.

    DATE 19/09/2013

  • 8/13/2019 Orifice Flange Inspection Report

    54/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page- 3 of 3

    Item No. J. NO- 01 ,12. ISO DRWG 124R-1130-UW-001-03

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-031

    Area/Location A2-Unit-1130 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    NAME GANESH P

    SIGN.

    DATE 19/09/2013

  • 8/13/2019 Orifice Flange Inspection Report

    55/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page- 1 of 1

    Item No. J. NO- 05A. ISO DRWG 121A-1110-P-300-06

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-032

    Area/Location A2-Unit-1110 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    NAME SAJISH P MANI

    SIGN.

    DATE 21/09/2013

  • 8/13/2019 Orifice Flange Inspection Report

    56/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page- 1 of 2

    Item No. J. NO- 01 ,08. ISO DRWG 124A-1120-FC-035-01

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-033

    Area/Location A2-Unit-1120 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    NAME GANESH P

    SIGN.

    DATE 30/09/2013

  • 8/13/2019 Orifice Flange Inspection Report

    57/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page- 2 of 2

    Item No. J. NO- 09 ,14. ISO DRWG 124A-1130-LS-002-01

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-033

    Area/Location A2-Unit-1130 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    NAME GANESH P

    SIGN.

    DATE 30/09/2013

  • 8/13/2019 Orifice Flange Inspection Report

    58/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page- 1 of 1

    NAME GANESH P

    SIGN.

    DATE 04/10/2013

    Area/Location A2-Unit-1130 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    Item No. J. NO- 01,06. ISO DRWG 124A-1130-MS-001-06

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-034

  • 8/13/2019 Orifice Flange Inspection Report

    59/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page- 1 of 2

    NAME GANESH P

    SIGN.

    DATE 29/09/2013

    Area/Location A2-Unit-1110 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    Item No. J. NO- 05A. ISO DRWG 121A-1110-P-065-02

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-035

  • 8/13/2019 Orifice Flange Inspection Report

    60/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page- 2 of 2

    NAME GANESH P

    SIGN.

    DATE 29/09/2013

    Area/Location A2-Unit-1110 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    Item No. J. NO- 02A. ISO DRWG 121A-1110-P-065-03

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-035

  • 8/13/2019 Orifice Flange Inspection Report

    61/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page- 1 of 4

    Item No. J. NO- 04, 09. ISO DRWG 124R-1120-UA-835-03

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-036

    Area/Location A2-Unit-1120 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    NAME GANESH P

    SIGN.

    DATE 02/11/2013

  • 8/13/2019 Orifice Flange Inspection Report

    62/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page- 2 of 4

    Item No. J. NO- 06, 13. ISO DRWG 124R-1120-UN-845-03

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-036

    Area/Location A2-Unit-1120 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    NAME GANESH P

    SIGN.

    DATE 02/11/2013

  • 8/13/2019 Orifice Flange Inspection Report

    63/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page- 3 of 4

    Item No. J. NO- 04 , 15. ISO DRWG 124R-1120-UW-869-03

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-036

    Area/Location A2-Unit-1120 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    NAME GANESH P

    SIGN.

    DATE 02/11/2013

  • 8/13/2019 Orifice Flange Inspection Report

    64/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page- 4 of 4

    Item No. J. NO- 25 , 30. ISO DRWG 124R-1120-LS-801-04

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-036

    Area/Location A2-Unit-1120 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    NAME GANESH P

    SIGN.

    DATE 02/11/2013

  • 8/13/2019 Orifice Flange Inspection Report

    65/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page- 1 of 1

    NAME ALAN

    SIGN.

    DATE 05/11/2013

    Area/Location A2-Unit-1400 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    Item No. J. NO- 05 ISO DRWG 123A-1400-P-172-06

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-037

  • 8/13/2019 Orifice Flange Inspection Report

    66/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page- 1 of 1

    Item No. J. NO- 08A ISO DRWG 121A-1110-MS-002-04

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-039

    Area/Location A2-Unit-1110 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    NAME SHARTH

    SIGN.

    DATE 27/10/2013

  • 8/13/2019 Orifice Flange Inspection Report

    67/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page- 2 of 2

    Item No. J. NO- 02. ISO DRWG 121A-1110-P-108-09

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-040

    Area/Location A2-Unit-1110 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    NAME SHARATH KK

    SIGN.

    DATE 26/10/2013

  • 8/13/2019 Orifice Flange Inspection Report

    68/155

  • 8/13/2019 Orifice Flange Inspection Report

    69/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page- 2 of 2

    NAME GANESH P

    SIGN.

    DATE 20/11/2013

    Area/Location A2-Unit-1120 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    Item No. J. NO- 04.-,05. ISO DRWG 124A-1120-P-866-03

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-041

  • 8/13/2019 Orifice Flange Inspection Report

    70/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page- 1 of 1

    NAME ALAN

    SIGN.

    DATE 03/11/2013

    Area/Location A2-Unit-1400 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    Item No. J. NO- 16. ISO DRWG 123A-1400-P-061-05

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-042

  • 8/13/2019 Orifice Flange Inspection Report

    71/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page- 1 of 1

    Item No. J. NO- 05A. ISO DRWG 121A-1110-P-118-05

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-043

    Area/Location A2-Unit-1110 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    NAME SHARATH KK

    SIGN.

    DATE 06/11/2013

  • 8/13/2019 Orifice Flange Inspection Report

    72/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page- 1 of 1

    NAME ALAN

    SIGN.

    DATE 05/11/2013

    Area/Location A2-Unit-1400 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    Item No. J. NO- 15. ISO DRWG 123R-1400-UA-457-02

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-044

  • 8/13/2019 Orifice Flange Inspection Report

    73/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page- 1 of 1

    Item No. J. NO- 01,.11 ISO DRWG 124A-1130-P-002-07

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-045

    Area/Location A2-Unit-1130 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    NAME GANESH P

    SIGN.

    DATE 03/12/2013

  • 8/13/2019 Orifice Flange Inspection Report

    74/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page- 1 of 1

    Item No. J. NO- 01, 16 ISO DRWG 124A-1130-P-036-06

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-046

    Area/Location A2-Unit-1130 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    NAME GANESH P

    SIGN.

    DATE 03/12/2013

  • 8/13/2019 Orifice Flange Inspection Report

    75/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13

    NAME

    SIGN.

    DATE

    Area/Location Reference

    Prepared by Subcontractor Contractor Company

    Item No. ISO DRWG

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No.

  • 8/13/2019 Orifice Flange Inspection Report

    76/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13 Page- 1 of 3

    NAME RIJIL KJ

    SIGN.

    DATE 1/2/2013

    Area/Location A2-Unit-1110 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    Item No. J. NO-05, & 12. ISO DRWG 121A-1110-P-172-02

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-003

  • 8/13/2019 Orifice Flange Inspection Report

    77/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13 Page- 2 of 3

    NAME RIJIL KJ

    SIGN.

    DATE 1/2/2013

    Area/Location A2-Unit-1110 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    Item No. J. NO - 12. ISO DRWG 121A-1110-FCWS-007-02

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-003

  • 8/13/2019 Orifice Flange Inspection Report

    78/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page-3 of 3

    NAME RIJIL KJ

    SIGN.

    DATE 1/2/2013

    Area/Location A2-Unit-1110 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    Item No. J. NO-09. ISO DRWG 121R-1110-UA-001-03

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-003

  • 8/13/2019 Orifice Flange Inspection Report

    79/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page-3 of 3

    NAME NAVEEN K.H

    SIGN.

    DATE 2/2/2013

    Area/Location A2-Unit-1110 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    Item No. J. NO-05A. ISO DRWG 121R-1110-P-074-03

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-004

  • 8/13/2019 Orifice Flange Inspection Report

    80/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page-1 of 1

    NAME RIJIL KJ

    SIGN.

    DATE 4/2/2013

    Area/Location A2-Unit-1110 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    Item No. J. NO-07. ISO DRWG 121R-1110-P-037-12

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-005

  • 8/13/2019 Orifice Flange Inspection Report

    81/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page-1 of 1

    NAME RIJIL KJ

    SIGN.

    DATE 6/2/2013

    Area/Location A2-Unit-1110 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    Item No. J. NO-05A. ISO DRWG 121A-1110-P-118-05

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-006

  • 8/13/2019 Orifice Flange Inspection Report

    82/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page-1 of 2

    NAME RIJIL KJ

    SIGN.

    DATE 10/2/2013

    Area/Location A2-Unit-1110 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    Item No. J. NO-05A. ISO DRWG 121A-1110-P-065-02

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-007

  • 8/13/2019 Orifice Flange Inspection Report

    83/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page-2 of 2

    NAME RIJIL KJ

    SIGN.

    DATE 10/2/2013

    Area/Location A2-Unit-1110 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    Item No. J. NO-08A. ISO DRWG 121A-1110-MS-002-04

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-007

  • 8/13/2019 Orifice Flange Inspection Report

    84/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page-1 of 1

    NAME RIJIL KJ

    SIGN.

    DATE 26/2/2013

    Area/Location A2-Unit-1110 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    Item No. J. NO-04. ISO DRWG 121A-1110-P-148-02

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-008

  • 8/13/2019 Orifice Flange Inspection Report

    85/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page-1 of 1

    NAME NAVEEN KH

    SIGN.

    DATE 21/3/2013

    Area/Location A2-Unit-1110 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    Item No. J. NO-14A,19A ISO DRWG 121R-1110-LS-022-03

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-009

  • 8/13/2019 Orifice Flange Inspection Report

    86/155

  • 8/13/2019 Orifice Flange Inspection Report

    87/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page-1 of 1

    NAME CHN REDDY

    SIGN.

    DATE 03/04/2013

    Area/Location A2-Unit-1120 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    Item No. J. NO- 12, 13 ISO DRWG 124R-1120-TC-096-02

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-011

  • 8/13/2019 Orifice Flange Inspection Report

    88/155

  • 8/13/2019 Orifice Flange Inspection Report

    89/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page-1 of 1

    NAME CHN REDDY

    SIGN.

    DATE 09/05/2013

    Area/Location A2-Unit-1120 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    Item No. J. NO- 1, ISO DRWG 124R-1120-FG-847-02

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-013

  • 8/13/2019 Orifice Flange Inspection Report

    90/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page-1 of 1

    NAME CHN REDDY

    SIGN.

    DATE 09/05/2013

    Area/Location A2-Unit-1120 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    Item No. J. NO- 10, ISO DRWG 124R-1120-FG-847-03

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-013

  • 8/13/2019 Orifice Flange Inspection Report

    91/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page-1 of 1

    NAME CHN REDDY

    SIGN.

    DATE 25/05/2013

    Area/Location A2-Unit-1130 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    Item No. J. NO- 1 , 11A, ISO DRWG 124A-1130-P-038-02

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-014

  • 8/13/2019 Orifice Flange Inspection Report

    92/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page-1 of 1

    NAME CHN REDDY

    SIGN.

    DATE 10/05/2013

    Area/Location A2-Unit-1120 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    Item No. J. NO- 7 , 8, ISO DRWG 124A-1120-FC-084-02

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-015

  • 8/13/2019 Orifice Flange Inspection Report

    93/155

  • 8/13/2019 Orifice Flange Inspection Report

    94/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page-1 of 2

    NAME CHN REDDY

    SIGN.

    DATE 04/07/2013

    Area/Location A2-Unit-1130 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    Item No. J. NO- 03, ISO DRWG 124R-1130-IA-002-03

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-017

  • 8/13/2019 Orifice Flange Inspection Report

    95/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page-2 of 2

    NAME CHN REDDY

    SIGN.

    DATE 04/07/2013

    Area/Location A2-Unit-1130 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    Item No. J. NO- 12A, ISO DRWG 124R-1130-IA-002-04

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-017

  • 8/13/2019 Orifice Flange Inspection Report

    96/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page-1 of 4

    NAME CHN REDDY

    SIGN.

    DATE 17/07/2013

    Area/Location A2-Unit-1130 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    Item No. J. NO- 02, ISO DRWG 124R-1130-FCWS-003-04

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-018

  • 8/13/2019 Orifice Flange Inspection Report

    97/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page-2 of 4

    NAME CHN REDDY

    SIGN.

    DATE 17/07/2013

    Area/Location A2-Unit-1130 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    Item No. J. NO- 01, ISO DRWG 124A-1130-FCWS-001-02

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-018

  • 8/13/2019 Orifice Flange Inspection Report

    98/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page-3 of 4

    NAME CHN REDDY

    SIGN.

    DATE 17/07/2013

    Area/Location A2-Unit-1130 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    Item No. J. NO- 01, ISO DRWG 124A-1130-FCWS-002-02

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-018

  • 8/13/2019 Orifice Flange Inspection Report

    99/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page-4 of 4

    NAME CHN REDDY

    SIGN.

    DATE 17/07/2013

    Area/Location A2-Unit-1130 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    Item No. J. NO- 01, ISO DRWG 124A-1130-FCWS-004-02

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-018

  • 8/13/2019 Orifice Flange Inspection Report

    100/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page- 1 of 2

    NAME CHN REDDY

    SIGN.

    DATE 18/07/2013

    Area/Location A2-Unit-1120 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    Item No. J. NO- 03, 08. ISO DRWG 124R-1120-IA-826-02

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-019

  • 8/13/2019 Orifice Flange Inspection Report

    101/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page- 2 of 2

    NAME CHN REDDY

    SIGN.

    DATE 18/07/2013

    Area/Location A2-Unit-1120 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    Item No. J. NO- 17, 12. ISO DRWG 124R-1120-IA-882-01

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-019

  • 8/13/2019 Orifice Flange Inspection Report

    102/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page- 1 of 2

    NAME CHN REDDY

    SIGN.

    DATE 29/07/2013

    Area/Location A2-Unit-1120 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    Item No. J. NO- 07, 08. ISO DRWG 124A-1120-FCWS-839-01

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-020

  • 8/13/2019 Orifice Flange Inspection Report

    103/155

  • 8/13/2019 Orifice Flange Inspection Report

    104/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page- 1 of 1

    NAME CHN REDDY

    SIGN.

    DATE 31/07/2013

    Area/Location A2-Unit-1120 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    Item No. J. NO- 03, 06. ISO DRWG 124R-1120-FC-156-03

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-021

  • 8/13/2019 Orifice Flange Inspection Report

    105/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page- 1 of 1

    NAME CHN REDDY

    SIGN.

    DATE 05/08/2013

    Area/Location A2-Unit-1120 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    Item No. J. NO- 05A , 16. ISO DRWG 124A-1120-P-878-02

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-022

  • 8/13/2019 Orifice Flange Inspection Report

    106/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page- 1 of 1

    NAME CHN REDDY

    SIGN.

    DATE 21/08/2013

    Area/Location A2-Unit-1120 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    Item No. J. NO- 06 , 11. ISO DRWG 124A-1120-FC-536-04

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-023

  • 8/13/2019 Orifice Flange Inspection Report

    107/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page- 1 of 1

    NAME GANESH P

    SIGN.

    DATE 23/08/2013

    Area/Location A2-Unit-1120 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    Item No. J. NO- 04 , 08. ISO DRWG 124A-1120-P-016-04

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-024

  • 8/13/2019 Orifice Flange Inspection Report

    108/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page- 1 of 2

    NAME SHARATH KK

    SIGN.

    DATE 10/08/2013

    Area/Location A2-Unit-1110 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    Item No. J. NO- 08A. ISO DRWG 121A-1110-IA-008-01

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-025

  • 8/13/2019 Orifice Flange Inspection Report

    109/155

  • 8/13/2019 Orifice Flange Inspection Report

    110/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page- 1 of 2

    NAME GANESH P

    SIGN.

    DATE 29/08/2013

    Area/Location A2-Unit-1130 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    Item No. J. NO- 01 ,02 . ISO DRWG 124A-1130-P-001-09

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-026

  • 8/13/2019 Orifice Flange Inspection Report

    111/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page- 2 of 2

    NAME GANESH P

    SIGN.

    DATE 29/08/2013

    Area/Location A2-Unit-1120 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    Item No. J. NO- 12 , 15 . ISO DRWG 124R-1120-SC-063-02

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-026

  • 8/13/2019 Orifice Flange Inspection Report

    112/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page- 1 of 1

    NAME GANESH P

    SIGN.

    DATE 12/09/2013

    Area/Location A2-Unit-1130 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    Item No. J. NO- 2 , 7A . ISO DRWG 124R-1130-LS-004-05

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-027

  • 8/13/2019 Orifice Flange Inspection Report

    113/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page- 1 of 5

    NAME GANESH P

    SIGN.

    DATE 15/09/2013

    Area/Location A2-Unit-1130 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    Item No. J. NO- 06. ISO DRWG 124R-1130-P-007-05

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-028

  • 8/13/2019 Orifice Flange Inspection Report

    114/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page- 2 of 5

    NAME GANESH P

    SIGN.

    DATE 15/09/2013

    Area/Location A2-Unit-1130 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    Item No. J. NO- 09. ISO DRWG 124R-1130-P-007-06

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-028

  • 8/13/2019 Orifice Flange Inspection Report

    115/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page- 3 of 5

    NAME GANESH P

    SIGN.

    DATE 15/09/2013

    Area/Location A2-Unit-1130 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    Item No. J. NO- 01A. ISO DRWG 124A-1130-P-007-08

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-028

  • 8/13/2019 Orifice Flange Inspection Report

    116/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page- 4 of 5

    NAME GANESH P

    SIGN.

    DATE 15/09/2013

    Area/Location A2-Unit-1130 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    Item No. J. NO- 01. ISO DRWG 124A-1130-P-007-09

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-028

  • 8/13/2019 Orifice Flange Inspection Report

    117/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page- 5 of 5

    NAME GANESH P

    SIGN.

    DATE 15/09/2013

    Area/Location A2-Unit-1130 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    Item No. J. NO- 02 ,03. ISO DRWG 124A-1130-P-012-02

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-028

  • 8/13/2019 Orifice Flange Inspection Report

    118/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page- 1 of 4

    NAME VINOTH KUMAR

    SIGN.

    DATE 16/09/2013

    Area/Location A2-Unit-1400 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    Item No. J. NO- 08A, 18A. ISO DRWG 123A-1400-HY-262-01

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-029

  • 8/13/2019 Orifice Flange Inspection Report

    119/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page- 2 of 4

    NAME VINOTH KUMAR

    SIGN.

    DATE 16/09/2013

    Area/Location A2-Unit-1400 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    Item No. J. NO- 08A ,18AC. ISO DRWG 123A-1400-HY-063-05

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-029

  • 8/13/2019 Orifice Flange Inspection Report

    120/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page- 3 of 4

    NAME VINOTH KUMAR

    SIGN.

    DATE 16/09/2013

    Area/Location A2-Unit-1400 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    Item No. J. NO- 08A ,18A. ISO DRWG 123A-1400-HY-261-01

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-029

  • 8/13/2019 Orifice Flange Inspection Report

    121/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page- 4 of 4

    NAME VINOTH KUMAR

    SIGN.

    DATE 16/09/2013

    Area/Location A2-Unit-1400 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    Item No. J. NO- 18A. ISO DRWG 123A-1400-HY-263-01

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-029

  • 8/13/2019 Orifice Flange Inspection Report

    122/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page- 1 of 4

    NAME SHARATH KK

    SIGN.

    DATE 01/09/2013

    Area/Location A2-Unit-1110 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    Item No. J. NO- 12. ISO DRWG 121A-1110-P-023-09

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-030

  • 8/13/2019 Orifice Flange Inspection Report

    123/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page- 2 of 4

    NAME SHARATH KK

    SIGN.

    DATE 01/09/2013

    Area/Location A2-Unit-1110 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    Item No. J. NO- 13A. ISO DRWG 121A-1110-FCWS-004-01

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-030

  • 8/13/2019 Orifice Flange Inspection Report

    124/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page- 3 of 4

    NAME SHARATH KK

    SIGN.

    DATE 01/09/2013

    Area/Location A2-Unit-1110 Reference 5578-E1-ITP-PC-006

    Prepared by Subcontractor Contractor Company

    Item No. J. NO- 04. ISO DRWG 121A-1110-FCWS-173-01

    ORIFICE FLANGE VERIFICATION

    Project Ruwais Refinery Expansion project Report No. 5578-EI-QA-A2-PI-BEC-ORF-030

  • 8/13/2019 Orifice Flange Inspection Report

    125/155

    Welds between Pipe and Orifice has been ground smoothly Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Orifice Tap orientation has been varified Up-stream Flange Yes No N/A

    Down-stream Flange Yes No N/A

    Inside ground smoothly

    Form No. : 5578-E1- ITRF-PP-13Page- 4 of 4

    NAME SHARATH KK

    SIGN.

    DATE 01/09/2013

    Area/Loc