Top Banner
Operation Manual ABB Turbo Systems LtdABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 n Mmax 840 t Mmax 750 n Bmax 800 t Bmax 710 1/s °C 00270 10 50 50 Year 2018 made in Switzerland Application according to the Operation Manual kg HZTL2401 English TPS 50B01 Original Operation Manual
88

neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Mar 24, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Operation Manual

ABB Turbocharging ���

ABB Turbo Systems LtdCH 5401 Baden

Type TPS 50B01 HT843860

nMmax 840 t Mmax 750

nBmax 800 t Bmax 7101/s °C

00270 10 50 50

Year 2018made in Switzerland

Application according tothe Operation Manual

kg

HZ

TL2

401

Eng

lish

TPS 50B01

Orig

inal

Ope

ratio

n M

anua

l

Page 2: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Operating condition and replacement intervals

The operational limits for the turbocharger nBmax, tBmax, nMmax, tMmax, inspection- and replacement intervals for the compon-ents concerned on the rating plate are valid for the operational mode and compressor inlet condition, which has been agreed upon between the engine builder and ABB.

Note: Replacement intervals of components depends on the load profi le, turbine inlet temperature, suction air temperature and turbocharger speed. In case the operation conditions differs signifi cantly from what is considered to be normal for the cur-rent application, it is recommended to contact ABB for a re-calculation of replacement intervals. Frequent load alterations, high temperatures and high speed lower the life of components.

Unless otherwise agreed, the application limits nMmax, tMmax are valid for the test operation for a limited time.

Page 3: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Operation Manual / TPS50

Table of contents Page 1

© 2010 ABB Turbo Systems Ltd ABB

April

201

0 H

ZTL2

401_

EN

Vers

ion

2.1

Table of contents

1 Preliminary remarks

1.1 Purpose of this manual 1.2 Layout and function

1.3 Correct use of the turbocharger 1.4 Essential information

1.5 Symbols and definitions

1.6 Turbocharger rating plate

1.7 CE declaration of conformity (form only)

2 Safety

2.1 Introduction

2.2 Definition of Safety instructions

2.3 Warning plates on the turbocharger 2.4 Safe operation and maintenance

2.5 Hazards during operation and maintenance

2.6 Use of ABB turbochargers on gas engines

2.7 Lifting loads

3 Commissioning

3.1 Oil supply

3.2 Inspection work

3.3 Putting into operation after laying up

4 Operation

4.1 Noise emissions

4.2 Servicing work

4.3 Stopping the engine

5 Maintenance

5.1 Foreword to Maintenance

5.2 Cleaning the compressor during operation

6 Troubleshooting

6.1 Malfunctions when starting

6.2 Surging of the turbocharger

Page 4: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Operation Manual / TPS50

Table of contents Page 2

© 2010 ABB Turbo Systems Ltd ABB

April

201

0 H

ZTL2

401_

EN

Vers

ion

2.1

6.3 Malfunctions during operation

6.4 Malfunctions when stopping

7 Removal and installation

7.1 Turbocharger weights

7.2 Remove the turbocharger 7.3 Installing the turbocharger

8 Disassembly and assembly

8.1 Introduction

8.2 Module weights

8.3 Disassembling and assembling turbochargers

8.4 Axial clearance A and possible radial movement B

8.5 Radial clearances N and R

8.6 Table of tightening torques

9 Taking out of operation

9.1 Shut down turbocharger

10 Mothballing the turbocharger 10.1 Taking out of operation for up to 12 months

10.2 Taking out of operation for more than 12 months

11 Disposal

12 Reserve and spare parts

12.1 Ordering spare parts

12.2 View of turbocharger showing part numbers

12.3 View of cartridge group showing part numbers

Page 5: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Operation Manual / TPS50

Preliminary remarks 1

Purpose of this manual 1.1 Page 1

© 2010 ABB Turbo Systems Ltd ABB

April

201

0 H

ZTL2

401_

EN

Vers

ion

2.1

1 Preliminary remarks 1.1 Purpose of this manual

Operation manual

This operation manual enables you to familiarize yourself with the turbo-charger supplied by ABB Turbo Systems and to use it as intended.

The operation manual provides important information in order that the tur-bocharger can be operated safely, correctly and efficiently.

The operation manual complements and expands existing national regula-tions concerning work safety and accident prevention.

Target group

The operation manual is intended for engineers, mechanics and service-men who are responsible for operating the engine and the turbocharger installed on it.

Availability of operation manual

An operation manual must be available at all times at the place where the turbocharger is used.

Everyone who operates or works on the turbocharger must have first read and understood the operation manual.

Contact address

ABB Turbo Systems AG Bruggerstrasse 71a CH-5401 Baden Switzerland www.abb.com/turbocharging

After-sales service

The Contact Information brochure contains an overview of official ABB Turbo Systems service stations worldwide.

Page 6: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Operation Manual / TPS50

Preliminary remarks 1

Layout and function 1.2 Page 2

© 2010 ABB Turbo Systems Ltd ABB

April

201

0 H

ZTL2

401_

EN

Vers

ion

2.1

1.2 Layout and function 1 2 3 4 5

6

7

8

910

11

1 Compressor casing 7 Turbine 2 Diffuser 8 Nozzle ring 3 Axial thrust bearing 9 Gas inlet casing 4 Radial bearing 10 Bearing casing 5 Radial bearing 11 Compressor wheel 6 Gas outlet flange

Page 7: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Operation Manual / TPS50

Preliminary remarks 1

Layout and function 1.2 Page 3

© 2010 ABB Turbo Systems Ltd ABB

April

201

0 H

ZTL2

401_

EN

Vers

ion

2.1

Mode of operation

The turbocharger is a turbomachine consisting of the following main com-ponents:

turbine compressor

These are mounted on a common shaft.

The exhaust gas from the diesel or gas engine flows through the gas inlet casing (9) and nozzle ring (8) to the turbine (7).

The turbine (7) uses the energy contained in the exhaust gas to drive the compressor wheel (11). The compressor draws in fresh air, compresses it and then forces it into the engine's cylinders.

The exhaust gas escapes into the ambient air through the exhaust gas pi-pe, which is connected to the gas outlet flange (6).

The air, which is necessary for operation of the diesel or gas engine and which is compressed in the turbocharger, is drawn into the compressor wheel (11) through the suction branch or filter silencer or through an axial suction pipe. It then passes through the diffuser (2) and leaves the turbo-charger through the outlet on the compressor casing (1).

The rotor runs in two radial bearings (4/5) which are located in the bearing flange between the compressor and the turbine. The axial thrust bearing (3) is located at the compressor end.

The radial bearings are connected to a central lubricating oil duct which is fed with oil from the engine's lubricating oil circuit. The oil outlet is always at the lowest point of the bearing casing (10).

Page 8: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Operation Manual / TPS50

Preliminary remarks 1

Correct use of the turbocharger 1.3 Page 4

© 2010 ABB Turbo Systems Ltd ABB

April

201

0 H

ZTL2

401_

EN

Vers

ion

2.1

1.3 Correct use of the turbocharger

This turbocharger supplied by ABB Turbo Systems has been developed for use on diesel engines to generate the volume of air and the charg-ing pressure required to operate the engine. The engine manufacturer has provided ABB Turbo Systems with infor-mation regarding the intended purpose of the engine, from which the operating parameters specific to the turbocharger (such as rotating speeds, temperatures, replacement periods / exchange intervals) have been derived and are indicated on the rating plate. If it is used in conjunction with a gas engine, the engine must not be in-stalled in a potentially explosive environment, and precautionary meas-ures must be taken to ensure that the machine room as a whole is clas-sified as not potentially explosive. Any other use will be regarded as a special application which must first be discussed with ABB Turbo Systems. The manufacturer accepts no liability for other applications. If it is used otherwise, ABB Turbo Sys-tems reserves the right to reject all claims under the warranty.

This turbocharger was built according to state-of-the-art technology and is operationally safe according to recognised safety regulations.

Improper operation and maintenance of the turbocharger can result in danger to life and limb of the user or third parties. In addition, improper use may cause damage to the machine. The machine may be operated only by trained personnel.

Use of the turbocharger as intended also includes observance of the in-stallation / fitting, disassembly / removal, operating, maintenance / servic-ing and repair conditions specified by the manufacturer. Disposal regula-tions set down by local authorities must be observed.

The turbocharger may be installed only when in technically perfect condi-tion while observing the instructions given in the engine builder's manual. It may be used only for the intended purpose and operated in compliance with the operation manual.

Malfunctions which could affect safety must be eliminated immediately.

The manufacturer accepts no liability for any damage resulting from unau-thorised alterations to the turbocharger.

NOTE

State of the art

WARNING

Perfect condition

Page 9: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Operation Manual / TPS50

Preliminary remarks 1

Essential information 1.4 Page 5

© 2010 ABB Turbo Systems Ltd ABB

April

201

0 H

ZTL2

401_

EN

Vers

ion

2.1

1.4 Essential information

Organisational measures

In addition to this manual, the general, statutory regulations applicable in the respective country for the prevention of accidents and the protection of the environment must be observed.

This also applies to the provision and wearing of personnel protection equipment.

The safety and risk consciousness of the personnel working on and with the turbocharger must be checked regularly with reference to this manual.

The turbocharger must be shut down immediately by stopping the en-

gine in the event of alterations affecting safety or of corresponding op-erating behaviour. The fault must be reported to the person or depart-ment responsible.

Additions and alterations to, and conversions of the turbocharger that could compromise safety require the prior approval of ABB Turbo Sys-tems.

NOTE

NOTE

Page 10: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Operation Manual / TPS50

Preliminary remarks 1

Essential information 1.4 Page 6

© 2010 ABB Turbo Systems Ltd ABB

April

201

0 H

ZTL2

401_

EN

Vers

ion

2.1

Original parts and safety

Original parts and accessories are especially designed for the turbo-charger supplied by ABB Turbo Systems.

We herewith expressly state that parts and accessories not supplied by us have also not been tested and approved by us.

If components and assemblies not manufactured and tested by ABB Turbo Systems are used, this may have a negative effect on the techni-cal design specifications of the turbocharger. Moreover, the active and/or passive safety of the turbocharger may be compromised by the use of non-original parts. Note that such improper use may endanger personnel and the machine.

ABB Turbo Systems shall not be liable for any damage caused by using non-original parts and accessories.

Qualification of personnel

The turbocharger may be operated and maintained only by trained and authorized personnel.

Work on mechanical components, such as bearings or rotors, may be carried out only by trained fitters from an official service station of ABB Turbo Systems.

NOTE

WARNING

CAUTION

Page 11: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Operation Manual / TPS50

Preliminary remarks 1

Essential information 1.4 Page 7

© 2010 ABB Turbo Systems Ltd ABB

April

201

0 H

ZTL2

401_

EN

Vers

ion

2.1

Design variants

This operating manual is valid for various turbocharger design variants.

This means that some sections and component descriptions in this oper-ating manual do not apply to your turbocharger.

Our service stations and agencies will gladly answer your questions relat-ing specifically to your model.

Accuracy of illustrations

The graphics and images shown in this manual are of a general nature and are intended to assist understanding of the work steps and instruc-tions. Differences may exist in certain details.

Storage of new turbochargers

New turbochargers supplied by ABB Turbo Systems can be stored without additional safeguarding measures for a period of 6 months after the deliv-ery date.

Suitable storage locations are dry rooms only where the relative humidity is between 40-70% and no condensation can form.

After 6 months have passed, spray the surfaces and all accessible spaces in the turbocharger with anticorrosive oil.

Repeat the measures listed for the corrosion protection of your turbo-charger every 6 months.

NOTE

Page 12: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Operation Manual / TPS50

Preliminary remarks 1

Symbols and definitions 1.5 Page 8

© 2010 ABB Turbo Systems Ltd ABB

April

201

0 H

ZTL2

401_

EN

Vers

ion

2.1

1.5 Symbols and definitions The following symbols are used in the documents:

Prerequisite Work step

Enumeration, first level

- Enumeration, second level

Definition of note / instruction

Note The note provides advice to facilitate working with the product.

Definition of caution / warning

The caution and warning signs are described in the chapter Safety.

ABB Turbo Systems

In this document, ABB Turbo Systems Ltd is abbreviated to ABB Turbo Systems.

Official ABB Turbo Systems service stations

In this document, official service stations are specified as ABB turbo-charger service stations. They are inspected and certified regularly by ABB Turbo Systems.

NOTE

Page 13: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Operation Manual / TPS50

Preliminary remarks 1

Turbocharger rating plate 1.6 Page 9

© 2010 ABB Turbo Systems Ltd ABB

April

201

0 H

ZTL2

401_

EN

Vers

ion

2.1

1.6 Turbocharger rating plate

11

1

2

9

5

10

12762

1

8 3 4

1 Turbocharger operating limits at engine overload (110 %). In test rig operation only, unless otherwise agreed with the engine manufacturer.

2 Turbocharger operating limits during operation

3 Inspection interval for plain bearings in 1000 h 4 Replacement interval for the compressor in 1000 h 5 Replacement interval for the turbine in 1000 h

6 Customer part number 7 Description for special design 8 Weight of turbocharger in kg 9 CE marking 10 Turbocharger type 11 Serial number 12 Year of turbocharger construction

Operating limits

Recommended inspection / replacement intervals for turbocharger components

Further instructions

Page 14: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Operation Manual / TPS50

Preliminary remarks 1

Turbocharger rating plate 1.6 Page 10

© 2010 ABB Turbo Systems Ltd ABB

April

201

0 H

ZTL2

401_

EN

Vers

ion

2.1

1.6.1 Explanation of the rating plate

The recommended replacement intervals and the corresponding opera-tional limits are jointly defined with the engine manufacturer. This informa-tion is specific to the system.

Operation above the indicated values nBmax, tBmax can considerably shorten the recommended replacement intervals. In such cases, we recommend that you contact the nearest official service station of ABB Turbo Systems. nMmax, tMmax normally apply only when running at overload (110%) during trials on the engine test bed. These limits can also be permitted during operation for special applications. Operation above nMmax and tMmax is not permitted. Non-observance of the recommended replacement intervals can increase the risk of unpredictable component failures.

Page 15: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Operation Manual / TPS50

Preliminary remarks 1

CE declaration of conformity (form only) 1.7 Page 11

© 2010 ABB Turbo Systems Ltd ABB

April

201

0 H

ZTL2

401_

EN

Vers

ion

2.1

1.7 CE declaration of conformity (form only) Information

ABB turbochargers satisfy the machinery directives 98/37/EC and 2006/42/EC.

ABB Turbo Systems Ltd ABB

ABB

DECLARATION OF CE - CONFORMITY

We,ABB Turbo Systems Ltd.

Bruggerstr. 71a 5401 Baden /Switzerland

hereby declare that the product(s) designated hereafter is (are), with regards to its (their) concept and construction as well as the design offered for sale by us, in conformity with the relevant, fundamental safety and health requirements of the EC - guidelines.

Your order No. (Nos.):

Our order No. (Nos.):

Order Item No. (Nos.):

Serial No. (Nos.):

Type / Description: Turbocharger (type)

Relevant EC– guideline(s): 2006 / 42 / EC

Relevant Standards: EN ISO 12100–1 EN ISO 12100–2 EN 14121-1 EN 1012-1 EN 1679-1

Responsible for documentation: ABB Turbo Systems Ltd., Z-M, S. Höner, Bruggerstr. 71a, 5401 Baden

:erutangiS )etaD( ,nedaB

renöH nafetS M-Z / smetsyS obruT BBA

This Document validates the CE marking on the rating plate of the Turbocharger CE = Communautés Européennes

Page 16: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s
Page 17: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Operation Manual / TPS50

Safety 2

Introduction 2.1 Page 1

© 2010 ABB Turbo Systems Ltd ABB

April

201

0 H

ZTL2

401_

EN

Vers

ion

2.1

2 Safety 2.1 Introduction

Turbochargers manufactured by ABB Turbo Systems are state of the art and comply with the pertinent safety and health-protection requirements that applied when the turbocharger was manufactured. Consequently, the turbocharger is safe to operate. Nevertheless, during turbocharger opera-tion and when working on the turbocharger, residual risks can exist which:

emanate from the turbocharger itself and its accessories emanate from the operating and auxiliary materials used are the consequence of insufficient observance of the safety instruc-

tions are the consequence of unsatisfactory and improper execution of main-

tenance and inspection work

The operator is responsible for the organizational measures that regulate the safe handling of the turbocharger by his personnel.

All instructions in this chapter must be observed to ensure safe and trou-ble-free turbocharger operation and during work on the turbocharger.

In the same vein, all other specially marked safety instructions in every chapter of this manual must be observed (see the section entitled Defini-tion of safety instructions).

Page 18: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Operation Manual / TPS50

Safety 2

Definition of Safety instructions 2.2 Page 2

© 2010 ABB Turbo Systems Ltd ABB

April

201

0 H

ZTL2

401_

EN

Vers

ion

2.1

2.2 Definition of Safety instructions The following symbols and terms used in this manual concern safety or refer to possible hazards:

Definition of warning Serious personal injuries and even accidents with fatal consequences may occur if work and operating instructions marked with this symbol and the word WARNING are either not followed or not followed pre-cisely. Warning signs must be observed at all times.

Definition of caution Serious machine or property damage may occur if work and operating instructions marked with this symbol and the word CAUTION are either not followed or not followed precisely. Caution signs must be observed at all times.

WARNING

CAUTION

Page 19: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Operation Manual / TPS50

Safety 2

Warning plates on the turbocharger 2.3 Page 3

© 2010 ABB Turbo Systems Ltd ABB

April

201

0 H

ZTL2

401_

EN

Vers

ion

2.1

2.3 Warning plates on the turbocharger 72080

81080

Table of warning plates

Part number Size [mm] Product 72080 175 x 22 TPS 81080 105 x 74 TPL / TPR

Turbochargers supplied to the enginebuilder without insulation must be fit-ted later with warning plates to be affixed to the insulation. This is the re-sponsibility of the enginebuilder.

Warning plates must be affixed at the designated locations and must be easily visible. For additional information, please contact an ABB Turbo-charger service station.

Page 20: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Operation Manual / TPS50

Safety 2

Safe operation and maintenance 2.4 Page 4

© 2010 ABB Turbo Systems Ltd ABB

April

201

0 H

ZTL2

401_

EN

Vers

ion

2.1

2.4 Safe operation and maintenance The instructions specified in this section are for the safety of personnel. Together with the instructions in the Hazards during operation and main-tenance section, they allow the user to safely use the turbocharger.

Work safety and work area safety

Risk of falling There is the risk that someone can fall when working on the turbo-charger.

Do not climb on the turbocharger or on parts attached to it or use these as climbing aids.

When working at levels above the head, use climbing aids and work platforms suitable for this purpose.

Observe all general regulations for the prevention of accidents. Do not work on the turbocharger if you are under physical or mental

stress. For each type of work, wear appropriate protective equipment such as:

helmet (hard hat) ear protectors protective glasses protective gloves protective shoes protective clothing hair net (in case of long hair) respiratory mask

Work only with suitable tools as well as equipment and working materi-als that are in perfect condition.

Electric tools must be solidly earthed, and connecting cables may not be damaged.

Keep the workplace clean, clear away loose objects and remove ob-stacles on the floor.

Keep the floor, equipment and the turbocharger clean. Have oil binding materials ready at hand and keep oil catch pans ready

or in position Eliminate leaks. Keep fire-protection materials and fire-extinguishing equipment ready.

WARNING

Page 21: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Operation Manual / TPS50

Safety 2

Safe operation and maintenance 2.4 Page 5

© 2010 ABB Turbo Systems Ltd ABB

April

201

0 H

ZTL2

401_

EN

Vers

ion

2.1

Welding work

If welding work is being carried out above the turbocharger, make sure to cover the filter silencer so that the filter mat is not damaged.

Remove combustible objects and substances out of the range of flying sparks.

Cover all connections on the turbocharger so that no foreign objects can get into the turbocharger.

Safety during start-up / commissioning and operation

Before starting work, carry out a visual inspection of working area. Remove any obstacles and objects lying around. Before start-up / commissioning, check all pipes from and to turbo-

charger for damage and leaks. Refrain from any way of working that could compromise safety when

working on turbocharger. After about every 12 hours of operation or at least once a day, inspect

turbocharger for visible damage and defects. Immediately report any damage or changes in operational performance

to department responsible. If damage is discovered, immediately shut down turbocharger and se-

cure it against inadvertent or unauthorized use. When switching on auxiliary power sources (hydraulics, pneumatics,

electricity, water), keep an eye open for any hazards resulting from supplying these power sources.

Safety during cleaning

It is possible that detergents or solvents will be used for cleaning. In this case, the safety instructions of the Hazard due to operating materials and supplies section in this chapter must always be observed.

Protect the floor against unintentional penetration of detergents or sol-vents before starting cleaning operations.

Wear appropriate protective clothing. Inspect the electric cables for abrasion and damaged areas before and

after your cleaning work.

Page 22: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Operation Manual / TPS50

Safety 2

Safe operation and maintenance 2.4 Page 6

© 2010 ABB Turbo Systems Ltd ABB

April

201

0 H

ZTL2

401_

EN

Vers

ion

2.1

Safety during disassembly, assembly, maintenance and troubleshooting

Always perform the specified adjustments, servicing as well as inspec-tion work and observe inspection intervals.

Inform operating personnel about all service and repair work before beginning.

Before opening a cover or removing a protective device on a turbo-charger, the engine must be switched off and the turbocharger must have come to a standstill.

Ensure that the supply of oil is interrupted, especially with an external oil supply.

Put the engine into operation only after all parts have been refitted pro-perly.

Mechanical work on the turbocharger Possible damage to or destruction of components on the turbocharger.

Perform only those tasks that are described in this manual. Perform work only for which training has been carried out.

Safety when taking out of operation or mothballing

Secure the rotor so it cannot turn. The rotor can turn on its own from the force of the stack draught.

Clean the turbocharger before mothballing it. Wear appropriate protective clothing.

CAUTION

Page 23: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Operation Manual / TPS50

Safety 2

Hazards during operation and maintenance

2.5 Page 7

© 2010 ABB Turbo Systems Ltd ABB

April

201

0 H

ZTL2

401_

EN

Vers

ion

2.1

2.5 Hazards during operation and maintenance

Mechanical hazards during operation

During normal operation, no mechanical hazards emanate from the turbo-charger if it has been installed properly.

Risk of injury Contact with rotating parts can lead to serious injuries. The turbo-charger must never be operated without a filter silencer or an air suction branch. When the engine is at a standstill, the rotor can turn on its own because of stack draught.

Operate the turbocharger in accordance with instructions. During maintenance work, secure the rotor against unintentional ro-

tation.

Mechanical hazards when working on the turbocharger

During maintenance work, various risks can occur through the improper handling of components, through the non-observance of work instructions, due to inadequate care or as a consequence of insufficient training.

Mechanical hazards Serious personal injuries or accidents with fatal consequences can oc-cur through mechanical influences as a result of risky, improper working methods.

Heed the general rules for work safety and accident prevention. Ensure the safety of the work area. Perform only those tasks that are described in this manual. Perform work only for which training has been carried out.

WARNING

WARNING

Page 24: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Operation Manual / TPS50

Safety 2

Hazards during operation and maintenance

2.5 Page 8

© 2010 ABB Turbo Systems Ltd ABB

April

201

0 H

ZTL2

401_

EN

Vers

ion

2.1

Hazards due to noise

The development of noise during operation is influenced by the installation and operating conditions. Noise with a level exceeding 85 dB(A) is harm-ful.

Hazards due to noise The noise can cause impaired hearing, damage to health, mental dis-turbances, irritation and diminished attention.

Always wear ear protectors when engine is running. When noise level is above 85 dB(A), always wear ear protectors.

Reference values for the maximal duration of stay in the area of noise emissions (source: Accident Prevention Regulations for Companies En-gaged in Shipping):

240

y

180

120

60

3015

0 5

85 88 91 94 97 120 x

100105

x Noise level [dB(A)] y Maximal duration of stay [min] per workday

WARNING

Page 25: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Operation Manual / TPS50

Safety 2

Hazards during operation and maintenance

2.5 Page 9

© 2010 ABB Turbo Systems Ltd ABB

April

201

0 H

ZTL2

401_

EN

Vers

ion

2.1

Hazards due to hot surfaces and substances

During operation, turbocharger surfaces and attached parts as well as op-erating materials (lubricating oil) become hot. The surface temperature is dependent on the effectiveness of the insulation being used. The tem-perature can become high enough so that it falls into ranges where burns are possible.

Risk of burning Touching hot surfaces or contact with hot operating materials can lead to serious burns.

Do not touch hot surfaces and heed the warning plate on the turbo-charger.

Wear heat-resistant protective gloves and protective clothing. Allow the turbocharger to cool down before carrying out any work.

Hot surfaces on uninsulated turbochargers Uninsulated turbochargers can cause serious personal injuries (burns). The turbocharger is supplied by ABB Turbo Systems without insulation depending on the order from the engine builder. In this case, the engine builder is responsible for insulating the turbocharger properly or for pro-viding protection against hot surfaces being touched. The engine builder's instructions and specifications about protection

against hot turbocharger surfaces must be observed in every case.

Hazards due to operating and auxiliary materials

Operating and auxiliary materials are substances used for operation or the execution of maintenance work. Oils, greases, coolants, cleaning agents and solvents, acids, etc. can be regarded as hazardous materials. Operat-ing and auxiliary materials can be combustible and easily ignited.

Risk of poisoning, burning Ingestion or inhalation of vapours of the corresponding operating and auxiliary materials or contact with such can cause damage to health.

Avoid inhalation and contact with the skin. Wear protective clothing and a breathing mask.

WARNING

WARNING

WARNING

Page 26: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Operation Manual / TPS50

Safety 2

Hazards during operation and maintenance

2.5 Page 10

© 2010 ABB Turbo Systems Ltd ABB

April

201

0 H

ZTL2

401_

EN

Vers

ion

2.1

Risk of fire, explosion Combustible or easily ignited operating and auxiliary materials can burst into flame, or vapours from them can cause explosions.

Do not allow any exposed flame during cleaning work. Perform cleaning outdoors or ensure for adequate aeration and ven-

tilation.

Risk of environmental damage The escape of operating and auxiliary materials into the atmosphere or contamination of the ground and water due to improper disposal can lead to environmental damage. Handle operating and auxiliary materials carefully.

Heed the instructions for use, safety data sheets and hazard notices on the containers of the operating and auxiliary materials.

Wear appropriate protective clothing. Avoid inhalation and contact with the skin. Ensure that the work space is adequately ventilated. Seal containers tightly immediately after use and put them away. Collect used working and auxiliary materials safely, store them sepa-

rately in suitable containers and dispose of them properly and in an environmentally compatible manner in accordance with statutory regu-lations.

In the event of leaks or after spilling, immediately spread a suitable binding agent and dispose of it properly and in an environmentally compatible manner in accordance with statutory regulations.

Hazards when handling insulating materials

Hazards due to insulating materials Dust and fibres from insulating materials can cause damage to health or irritations. Unsuitable, combustible insulating materials signify a fire hazard. Handle insulating materials cautiously.

Use only suitable, non-combustible insulating materials. Ensure that work area is well ventilated. Wear suitable work clothing (protective glasses, dust mask).

WARNING

CAUTION

WARNING

Page 27: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Operation Manual / TPS50

Safety 2

Hazards during operation and maintenance

2.5 Page 11

© 2010 ABB Turbo Systems Ltd ABB

April

201

0 H

ZTL2

401_

EN

Vers

ion

2.1

Avoid stirring up dust. Use tools and processes that keep dust to a minimum. Remove packing materials only in work area. Take particular care when removing old insulating materials. Dispose of insulating materials properly and in an environmentally

compatible way in accordance with applicable local regulations.

Hazards due to electrical components

Hazards due to electrical components Electrical components operate with voltages, which can present haz-ards to humans.

All work on or with electrical components may only be performed by trained specialists.

Heed any country-specific regulations.

WARNING

Page 28: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Operation Manual / TPS50

Safety 2

Use of ABB turbochargers on gas engines

2.6 Page 12

© 2010 ABB Turbo Systems Ltd ABB

April

201

0 H

ZTL2

401_

EN

Vers

ion

2.1

2.6 Use of ABB turbochargers on gas engines ABB turbochargers withstand a deflagration with a transient pressure in-crease of 12 bar. A maximum of 11 bar was measured during deflagration trials on engines with flame traps. Field operating experience of well-known gas engine builders supports this value. In the past, no damage to ABB turbochargers was ascertained after deflagration incidents.

ABB Turbo Systems recommends that the turbocharger is inspected visu-ally after a deflagration incident. During this inspection, the positions of the turbine casing and the compressor casing relative to the bearing cas-ing as well as any shifting of the bearing casing relative to the bracket must be checked. An inspection of the casing for cracks is also recom-mended. The nearest ABB Turbocharger service station should be com-missioned with this inspection and assessment.

Page 29: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Operation Manual / TPS50

Safety 2

Lifting loads 2.7 Page 13

© 2010 ABB Turbo Systems Ltd ABB

April

201

0 H

ZTL2

401_

EN

Vers

ion

2.1

2.7 Lifting loads

Suspended loads Suspending loads in ways that do not comply with regulations can re-sult in serious or fatal injuries.

Carefully fasten assemblies or individual parts weighing more than 25 kg to technically perfect lifting gear with sufficient loading capac-ity.

Make sure load is hung properly on crane hook. Don't let anyone stand beneath a suspended load.

max.45°

In the case of two or more suspension points, the slinging angle must not exceed 45°. This avoids excessive loading due to inclined tensile loading.

Fasten turbocharger assemblies / components as described in respec-tive handling steps.

Before attaching slings, allow turbocharger components to cool down (maximum 80°C).

Use suitable protection at sharp edges. Completely screw in assembly / fitting devices without fail so that they

cannot work loose during use. Use assembly / fitting devices only for applications described. Make sure removed turbocharger components stand safely and se-

curely.

WARNING

Page 30: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s
Page 31: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Operation Manual / TPS50

Commissioning 3

Oil supply 3.1 Page 1

© 2010 ABB Turbo Systems Ltd ABB

April

201

0 H

ZTL2

401_

EN

Vers

ion

2.1

3 Commissioning 3.1 Oil supply

A carefully designed and installed oil supply, which functions in all possi-ble operational conditions, is an important prerequisite for trouble-free tur-bocharger operation.

The turbocharger is normally lubricated with oil from the engine oil circuit. If a separate lubricating system is used, then emergency lubrication is al-so to be provided.

Heed the instructions of the engine builder when selecting the lubricat-ing oil and oil-change intervals.

Oil filtration

To avoid hazardous wear of bearing parts and bearing in mind the tur-bine specifications as well as the bearings used, impurities of different size must be filtered out of the lubricating oil.

Oil filtration down to 34 µm is specified as standard for the turbocharger. This means that impurities larger than 0.034 mm must be filtered out of the oil with a separation efficiency > 99%.

Fit an accessory filter if engine oil filter is not efficient enough. Arrange for a bypass to be activated that ensures oil is supplied to tur-

bocharger by circumventing filter when engine is cold started and dirty deposits in accessory filter cause flow resistance to rise above 0.5 bar.

Check that oil filters are clean before every start-up.

Also follow the engine builder's instructions regarding filter mesh size and separation efficiency.

Lubricant

All lubricating oils used for engines are admissible.

CAUTION

NOTE

NOTE

Page 32: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Operation Manual / TPS50

Commissioning 3

Oil supply 3.1 Page 2

© 2010 ABB Turbo Systems Ltd ABB

April

201

0 H

ZTL2

401_

EN

Vers

ion

2.1

Oil inlet viscosity and temperature

The temperature at the oil inlet must not exceed 105°C. Permissible vis-cosities and temperatures at the oil inlet are shown in the following chart.

1) Kinematic viscosity (mm2/s = cSt) 2) Oil inlet temperature (°C) A Permissible range

The temperature is allowed to drop below the bottom limit for a short time during the engine start-up. But then, the oil inlet temperature may not drop below 10°C.

Oil pressure

The oil pressure in front of the bearings must be maintained precisely to ensure trouble-free operation.

The oil pressure (gauge) in front of the turbocharger should be between 2.0 ... 4.5 bar when the engine is under load and at least 0.2 bar when id-ling.

NOTE

Page 33: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Operation Manual / TPS50

Commissioning 3

Oil supply 3.1 Page 3

© 2010 ABB Turbo Systems Ltd ABB

April

201

0 H

ZTL2

401_

EN

Vers

ion

2.1

A higher oil pressure up to 8 bar is permissible for a short time during the start-up phase when the oil is cold. The oil pressure must not exceed 1.0 bar during pre- and post-lubrication.

Pre-lubrication

The turbocharger must be supplied with oil from the very first moment the engine is started. Actuate pre-lubrication device before starting engine each time.

CAUTION

Page 34: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Operation Manual / TPS50

Commissioning 3

Inspection work 3.2 Page 4

© 2010 ABB Turbo Systems Ltd ABB

April

201

0 H

ZTL2

401_

EN

Vers

ion

2.1

3.2 Inspection work Inspection work includes preventive visual checks, monitoring and meas-uring tasks, which ensure that the turbocharger functions correctly. They help to identify anomalies before and during a start-up and consequently to avoid machine damage.

3.2.1 Inspection before commissioning

Check for correct functioning.

Check cleanliness before commissioning.

Check the oil pressure in the oil supply lines.

It is strongly recommended that, before commissioning as well as fol-lowing any servicing work on the lubricating system, you install a by-pass pipe in order to thoroughly flush the entire lubricating system with warm, clean oil. Also, we strongly advise you to use a running-in filter when starting up the engine for the first time as well as following all service work on the lubricating system.

Pre-lubrication

The turbocharger must be supplied with oil from the very first moment the engine is started. Actuate pre-lubrication device before starting engine each time.

Monitoring equipment

Oil filter

Manometers oil lines

CAUTION

CAUTION

Page 35: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Operation Manual / TPS50

Commissioning 3

Inspection work 3.2 Page 5

© 2010 ABB Turbo Systems Ltd ABB

April

201

0 H

ZTL2

401_

EN

Vers

ion

2.1

3.2.2 Check after start-up (engine at idling speed)

Lubricating system

Check oil pressure in oil supply lines. Check oil inlet temperature.

The permissible values are listed in the section Oil supply.

Gas, air and oil lines

Check all gas, air and oil lines for leaks after starting the engine. Tighten the V-clamps once to 60 Nm.

Further periodic tightening of the V-clamps is not necessary or recom-mended. Too frequent tightening can lead to wear on the connection.

3.2.3 Check when running up engine

Measure the oil pressure and charging pressure at various engine per-formance levels.

Measure the exhaust gas temperature in front of and behind the tur-bine

Measure the air temperature in front of and behind the compressor.

The measured values must be compared with the values in the accep-tance test report while taking different operating conditions into account.

Lubricants and pastes used during assembly of the turbocharger liquefy or vaporise and might escape as an oily liquid in the first few hours after commissioning. If additional oily liquid continues to escape after this pe-riod, look for the cause of a possible oil leak. The first step is to check for leaks in the oil supply to the turbocharger. If this is not in proper condition, contact an ABB Turbocharger service station.

3.2.4 Inspection after 100 service hours

Clean or replace lubricating oil filters after the first 100 service hours.

NOTE

NOTE

Page 36: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Operation Manual / TPS50

Commissioning 3

Putting into operation after laying up 3.3 Page 6

© 2010 ABB Turbo Systems Ltd ABB

April

201

0 H

ZTL2

401_

EN

Vers

ion

2.1

3.3 Putting into operation after laying up Remove cover plates (blind flanges) between compressor casing outlet

and charge air duct, before gas inlet and after gas outlet.

Inspect exhaust gas duct / line in front of and after turbine for any com-bustion deposits, foreign matter or residual water. Clean and remove.

Inspect air supply line or filter silencer for any foreign matter. Clean and remove.

Start up turbocharger oil circulation system at engine end. Prepare turbocharger for operation as instructed in section "Inspection

work before start-up / commissioning" of chapter headed "Start-up / commissioning".

Start up turbocharger.

If provided

Page 37: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Operation Manual / TPS50

Operation 4

Noise emissions 4.1 Page 1

© 2010 ABB Turbo Systems Ltd ABB

April

201

0 H

ZTL2

401_

EN

Vers

ion

2.1

4 Operation 4.1 Noise emissions

Hazards due to noise The noise can cause impaired hearing, damage to health, mental dis-turbances, irritation and diminished attention.

Always wear ear protectors when engine is running. When noise level is above 85 dB(A), always wear ear protectors.

The sound pressure level (A-weighted) of emissions is measured at a dis-tance of 1 metre from the turbocharger.

The highest sound pressure level of emissions1) reaches a maximum of 105 dB(A) near the filter silencer and over the entire speed range.

The following prerequisites must be fulfilled on the turbocharger in order to observe this limit:

A filter silencer is fitted. All standard, noise-reducing measures have been taken2). The bellows at the air outlet have been perfectly insulated acoustically

by the engine builder. He is also responsible for insulating the charge air / scavenging air pipe and the charge air cooler.

1) Directive 2006/42/EC, 1.7.4.2 / u / paragraph 5 + 7 : A-weighted sound pressure level of emissions

2) In the event of divergent insulation designs, the engine builder must ensure that equivalent acoustic insulating measures are ta-ken.

WARNING

Page 38: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Operation Manual / TPS50

Operation 4

Noise emissions 4.1 Page 2

© 2010 ABB Turbo Systems Ltd ABB

April

201

0 H

ZTL2

401_

EN

Vers

ion

2.1

Proposal for noise insulation of bellows

E

E

F

D

A

B

C

D

D

A Compressor casing D Insulation pads B Compensator E Insulation mat C Charge-air duct / scavenging

air pipe F Sheet-metal cover

Page 39: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Operation Manual / TPS50

Operation 4

Servicing work 4.2 Page 3

© 2010 ABB Turbo Systems Ltd ABB

April

201

0 H

ZTL2

401_

EN

Vers

ion

2.1

4.2 Servicing work Service work to be carried out during operation involves visual checks, monitoring, measuring, inspection work and functional checks. It is then possible for changes to the turbocharger to be identified and rectified. In this way, it can be ensured that the turbocharger remains in full working order.

Service intervals Service work on the turbocharger that is neglected or carried out too la-te can lead to a heavy dirt build-up and operating failures. Carry out service work at specified time intervals.

4.2.1 Servicing work every 25 to 50 hours

Ckeck visually for air, exhaust gas, water and oil leaks. Record operating data and enter in engine logbook. Clarify cause of variances.

Unknown changes during operation The consequences can range from impairment to operating failure. Have unknown causes clarified by an ABB turbocharger service sta-

tion.

4.2.2 Servicing work according to the engine manufacturer's instructions

Clean or replace oil filter when engine is not running.

CAUTION

CAUTION

Oil filter

Page 40: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Operation Manual / TPS50

Operation 4

Servicing work 4.2 Page 4

© 2010 ABB Turbo Systems Ltd ABB

April

201

0 H

ZTL2

401_

EN

Vers

ion

2.1

4.2.3 Servicing work according to the rating plate

(Normally after 8’000 – 12’000 operating hours)

The rotor and bearing parts must be checked and assessed by an ABB Turbocharger service station.

Remove cartridge group as described in chapter Disassembly and as-sembly.

Measure clearances. Clean turbine and compressor casings and check them for cracks and

erosion / corrosion. Clean bearing casing and blow air through oil ports / holes. Clean nozzle ring and check for cracks and erosion.

4.2.4 Entries in engine logbook

By monitoring the engine, conclusions can be drawn about the turbo-charger performance.

The following operating data and measured values must be entered regu-larly in the engine manufacturer's engine logbook:

Engine performance and speed Air intake temperature Exhaust gas temperature in front of and behind the turbine Pressure of charge air Pressure drop in charge air cooler Lubricating oil pressure and lubricating oil temperature

Air temperature behind compressor and charge air cooler Turbocharger speed Pressure loss in air filter

If provided

Page 41: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Operation Manual / TPS50

Operation 4

Stopping the engine 4.3 Page 5

© 2010 ABB Turbo Systems Ltd ABB

April

201

0 H

ZTL2

401_

EN

Vers

ion

2.1

4.3 Stopping the engine

Before the engine is shut down, it must be allowed to idle for about 5 to 10 minutes so that the circulating lubricating oil can take away heat from the turbocharger bearings.

CAUTION

Page 42: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s
Page 43: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Operation Manual / TPS50

Maintenance 5

Foreword to Maintenance 5.1 Page 1

© 2010 ABB Turbo Systems Ltd ABB

April

201

0 H

ZTL2

401_

EN

Vers

ion

2.1

5 Maintenance 5.1 Foreword to Maintenance

Maintenance work involves regular visual checks and cleaning tasks, which are intended to ensure trouble-free functioning of the turbocharger.

The external condition and the dirtiness of the cleaning points given in this chapter must be established by visual checks at the specified in-tervals.

The safety instructions must be observed during all maintenance work.

Page 44: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Operation Manual / TPS50

Maintenance 5

Cleaning the compressor during operation

5.2 Page 2

© 2010 ABB Turbo Systems Ltd ABB

April

201

0 H

ZTL2

401_

EN

Vers

ion

2.1

5.2 Cleaning the compressor during operation How dirty the compressor stage (compressor wheel and diffuser) be-comes, depends on how clean the drawn-in air is.

Deposits of dirt can build up in the flow ducts if the following substances are in the intake air:

Oily or salty mist Solid combustion residues Various kinds of dust

Dirty deposits on the compressor stage have a negative influence on the compressor efficiency and the charging pressure.

This results in higher exhaust temperatures and higher fuel consumption by the engine. Dirty deposits on the compressor can also increase rotor unbalance.

Under no circumstances is periodic cleaning of the compressor during op-eration a substitute for the service work carried out when the turbocharger is completely dismantled and the compressor is cleaned mechanically.

If the coating of dirt is very thick and hard, the compressor can only be cleaned manually when disassembled. This cleaning should be carried out by an ABB Turbocharger service station.

The interval between periodic cleaning is very dependent on the operating conditions. In general, cleaning should be carried out every 25 to 100 op-erating hours.

Cleaning intervals Should the specified cleaning intervals prove incompatible with engine operation, please contact ABB Turbo Systems.

NOTE

Cleaning interval

NOTE

Page 45: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Operation Manual / TPS50

Maintenance 5

Cleaning the compressor during operation

5.2 Page 3

© 2010 ABB Turbo Systems Ltd ABB

April

201

0 H

ZTL2

401_

EN

Vers

ion

2.1

Cleaning method

Cleaning the compressor while in operation is carried out as wet cleaning. This cleaning method has been tested and approved by ABB Turbo Sys-tems.

To clean the compressor stage while in operation, water is injected in front of the compressor wheel from an injection pipe that is built in the filter si-lencer or suction branch.

The water does not act as a solvent in the process, but the deposit is re-moved by the mechanical impact of the drops. This is a very suitable pro-cess, provided that the build-up of deposits is not too advanced.

Corrosion and deposits when cleaning Damage and impairment of turbocharger parts due to salt water and cooling water additives Always use only clean water for cleaning.

The injection pipe must on no account be connected directly via a cock to a water pipe or a dosing vessel larger than the one supplied. This prevents uncontrolled volumes of water entering the turbocharger and engine, which can lead to serious damage.

In the case of V-engines with several turbochargers on each engine, we recommend parallel cleaning of the compressors. This cleaning process is faster and the risk of turbocharger surging is reduced.

In the case of sequential charging, care must be taken to ensure that tur-bocharger compressors are cleaned regularly, especially after periods of operation in the lower performance range.

Principle of wet cleaning

CAUTION

CAUTION

V-engines

Sequential charging

Page 46: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Operation Manual / TPS50

Maintenance 5

Cleaning the compressor during operation

5.2 Page 4

© 2010 ABB Turbo Systems Ltd ABB

April

201

0 H

ZTL2

401_

EN

Vers

ion

2.1

5.2.1 Wet cleaning compressor using external water pressure vessel (XC1)

These instructions for wet cleaning apply only when cleaning is carried out with clean water and the engine manufacturer permits the process.

Supplying water from the externally mounted water vessel is suitable only for those applications where a negative pressure exists in front of the compressor wheel (not used for: blowers connected in front of the compressor or high-pressure compressor stages with two-stage charg-ing).

Operating condition prerequisites for compressor cleaning with XC1

In order to carry out a satisfactory cleaning process that has been tested and is recommended by ABB Turbo Systems, the following pre-requisites must be met:

Full engine load if possible High turbocharger speed Start cleaning cycle according to following description in Procedure

for wet cleaning with XC1.

NOTE

NOTE

NOTE

Page 47: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Operation Manual / TPS50

Maintenance 5

Cleaning the compressor during operation

5.2 Page 5

© 2010 ABB Turbo Systems Ltd ABB

April

201

0 H

ZTL2

401_

EN

Vers

ion

2.1

Procedure for compressor wet cleaning with XC1

X Screw plug D Pressurized air Y Valve activator W Water Z Container

Remove the screw plug (X). Fill the vessel with clean water. Replace the screw plug. Push the valve activator (Y) against the spring and hold it for 10 to 15

seconds until entire volume of water has been injected. After cleaning, wait at least 5 minutes with the engine running to allow

the turbocharger to dry. The cleaning cycle may only be repeated after a stabilisation period of

at least 10 minutes has elapsed.

Operating the water pres-sure vessel

Page 48: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Operation Manual / TPS50

Maintenance 5

Cleaning the compressor during operation

5.2 Page 6

© 2010 ABB Turbo Systems Ltd ABB

April

201

0 H

ZTL2

401_

EN

Vers

ion

2.1

Whether or not cleaning has been successful can be seen from the charging or flushing pressure and also from the exhaust gas tempera-tures. If the cleaning operation is not satisfactory, it can be repeated up to two times. If the cleaning result is still not satisfactory after three attempts and the engine values are also unsatisfactory, we recommend that the turbo-charger be inspected and cleaned by an official ABB Turbocharger ser-vice station.

Turbocharger type Turbocharger speed

Contents of water container

[dm3]

Water injection time

t1 [s] TPS 50 approximately

nBmax 0.4 4 … 10

NOTE

Cleaning parameters per turbocharger compressor

Page 49: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Operation Manual / TPS50

Troubleshooting 6

Malfunctions when starting 6.1 Page 1

© 2010 ABB Turbo Systems Ltd ABB

April

201

0 H

ZTL2

401_

EN

Vers

ion

2.1

6 Troubleshooting 6.1 Malfunctions when starting

Delayed start-up

Possible causes Remedy Turbocharger fouled Clean Bearing damaged Rotor rubbing

Turbo-charger

Foreign object in the turbo-charger

Contact ABB Turbocharger ser-vice station

Vibrations

Possible causes Remedy Rotor unbalance Turbine or compressor damaged

Turbo-charger

Bearing damaged

Contact ABB Turbocharger ser-vice station

Rubbing of rotating parts

Normal behaviour, not a malfunction Turbo-charger

A minimal and uniform wear at the circumference of the rotor com-ponents, caused by slight local rubbing against adjacent compo-nents is permitted. This causes the compressor or turbine blades to be somewhat shortened. To prevent significant loss of efficiency, specific tolerances must be fulfilled. If there is any doubt about the extent of the rubbing, contact an

ABB Turbocharger service station. Have a dimensional check carried out by an ABB Turbocharger

service station.

Page 50: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Operation Manual / TPS50

Troubleshooting 6

Surging of the turbocharger 6.2 Page 2

© 2010 ABB Turbo Systems Ltd ABB

April

201

0 H

ZTL2

401_

EN

Vers

ion

2.1

6.2 Surging of the turbocharger

Surging of the turbocharger

Possible causes Remedy Engine Protective grating in front of

the turbocharger fouled or damaged

Clean/Replace

Filter silencer or diffuser fouledTurbochar-ger Heavy dirt deposits in the tur-

bine or in the nozzle ring

Clean

Cooler fouled Charge-air cooler Charge-air duct blocked

Clean

Continuous or periodic surging Possible damage to components such as compressor wheel, turbine blades, bearing and filter silencer.

Have the cause clarified and remedied immediately by an ABB Tur-bocharger service station.

Have parts assessed for damage and, if necessary, replaced by an ABB Turbocharger service station.

Sporadic surge blows

Surging of the turbocharger can occur during certain operating conditions such as when reducing the engine performance quickly when manoeu-vring. At the same time, the flow direction in the compressor is momentar-ily reversed. Such sporadic surge blows do not impair the safe operation of the turbocharger.

A surge blow is accompanied by a loud bang and escape of hot air from the filter silencer.

CAUTION

Page 51: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Operation Manual / TPS50

Troubleshooting 6

Malfunctions during operation 6.3 Page 3

© 2010 ABB Turbo Systems Ltd ABB

April

201

0 H

ZTL2

401_

EN

Vers

ion

2.1

6.3 Malfunctions during operation

Lubricating oil pressure too low

Possible causes Remedy Oil filter heavily fouled Clean Oil pump in lubricating system defective

Check/replace Engine

Manometer displays incorrectly Replace manometer Turbo-charger

Axial clearance of the rotor ex-cessive

Contact ABB Turbocharger ser-vice station

Drop in speed

Possible causes Remedy Engine Defect on the connected cylin-

ders in pulse charging Contact enginebuilder

Heavy fouling of the turbine Clean Turbo-charger Damaged rotor components or

bearing Contact ABB Turbocharger ser-vice station

Pipes Defects, such as leaks, in the exhaust gas pipes or charge-air ducts

Repair

Increase in speed

Possible causes Remedy Turbo-charger

Heavy fouling of the turbine (on 4-stroke application)

Contact ABB Turbocharger ser-vice station

Page 52: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Operation Manual / TPS50

Troubleshooting 6

Malfunctions during operation 6.3 Page 4

© 2010 ABB Turbo Systems Ltd ABB

April

201

0 H

ZTL2

401_

EN

Vers

ion

2.1

Exhaust gas temperature too high

Engine performance and engine speed unchanged

Possible causes Remedy Engine Malfunction in the injection

system Repair or contact manufacturer

Insufficient air, such as filter silencer blocked by dirt, for example Compressor/turbine fouled

Clean

Exhaust gas back pressure too high

Clean or repair boiler or exhaust gas silencer

Turbochar-ger

Turbine damaged or eroded Contact ABB Turbocharger ser-vice station

Cooler fouled Clean Cooling water volume too low Fill Inlet temperature of cooling water too high

Check/clean cooling system

Charge-air cooler

Insufficient ventilation Improve ventilation

Page 53: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Operation Manual / TPS50

Troubleshooting 6

Malfunctions during operation 6.3 Page 5

© 2010 ABB Turbo Systems Ltd ABB

April

201

0 H

ZTL2

401_

EN

Vers

ion

2.1

Charge-air pressure too low

Engine performance and engine speed unchanged, suction condition normal

Possible causes Remedy Air receiver not sealed Gas pipe between engine and turbine not sealed

Repair

Injection misaligned

Engine

Valve controller not correctly set Set correctly

Manometer display defective Replace manometer Supply pipe to manometer not sealed

Repair leak

Filter silencer fouled, therefore pressure drop too high Compressor/turbine fouled

Clean

Compressor/turbine damaged Contact ABB Turbocharger ser-vice station

Turbo-charger

Exhaust gas back pressure too high

Clean or repair boiler or exhaust gas silencer

Charge-air pressure too high

Engine performance and engine speed unchanged, suction condition normal

Possible causes Remedy Malfunction in the injection sys-tem

Repair or contact manufacturer

Injection misaligned Set correctly

Engine

Engine performance higher than expected

Check engine performance

Turbo-charger

Manometer display defective Replace manometer

Page 54: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Operation Manual / TPS50

Troubleshooting 6

Malfunctions when stopping 6.4 Page 6

© 2010 ABB Turbo Systems Ltd ABB

April

201

0 H

ZTL2

401_

EN

Vers

ion

2.1

6.4 Malfunctions when stopping

Runout noises

Possible causes Remedy Turbocharger fouled Clean Bearing damaged Rotor rubbing

Turbo-charger

Foreign object in the turbo-charger

Contact ABB Turbocharger ser-vice station

Runout time too short

Possible causes Remedy Turbocharger fouled Clean Bearing damaged Rotor rubbing

Turbo-charger

Foreign object in the turbo-charger

Contact ABB Turbocharger ser-vice station

Page 55: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Operation Manual / TPS50

Removal and installation 7

Turbocharger weights 7.1 Page 1

© 2010 ABB Turbo Systems Ltd ABB

April

201

0 H

ZTL2

401_

EN

Vers

ion

2.1

7 Removal and installation 7.1 Turbocharger weights

Turbocharger suspension

Lifting gear with a sufficient load limit must be used for removing and in-stalling the turbocharger. The following weight specification is the heaviest possibility. This guide value can differ from data on the rating plate, de-pending on the specification.

Turbocharger assembly without air suction branch and without exhaust gas pipe

TPS 50 225

Weight [kg]

Page 56: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Operation Manual / TPS50

Removal and installation 7

Remove the turbocharger 7.2 Page 2

© 2010 ABB Turbo Systems Ltd ABB

April

201

0 H

ZTL2

401_

EN

Vers

ion

2.1

7.2 Remove the turbocharger Disconnect all gas and air lines in accordance with the engine builder’s

instructions.

Secure the lifting gear to the bearing casing. Loosen the fixing screws (C) on the bearing casing. Lift the turbocharger off the engine and put it down to one side. Cover the oil connections.

Turbocharger without an exhaust gas pipe

Page 57: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Operation Manual / TPS50

Removal and installation 7

Installing the turbocharger 7.3 Page 3

© 2010 ABB Turbo Systems Ltd ABB

April

201

0 H

ZTL2

401_

EN

Vers

ion

2.1

7.3 Installing the turbocharger Remove the covers from the oil connections. Visually inspect the O-ring gaskets of the oil supply and drain pipe (O-

ring gaskets on the engine side are not included in the scope of deliv-ery from ABB Turbo Systems).

Inspect the lifting gear.

Secure the lifting gear to the bearing casing. Adjust the turbocharger to match the engine. Tighten the fixing screws (C) on the bearing casing in accordance with

engine manufacturer's instructions. Fasten all gas and air lines in accordance with engine builder’s instruc-

tions.

Turbocharger without an exhaust gas pipe

Page 58: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s
Page 59: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Operation Manual / TPS50

Disassembly and assembly 8

Introduction 8.1 Page 1

© 2010 ABB Turbo Systems Ltd ABB

April

201

0 H

ZTL2

401_

EN

Vers

ion

2.1

8 Disassembly and assembly 8.1 Introduction

The precondition for the work described in the following is a turbocharger removed from the engine (see chapter Removal and installation).

Further work Further tasks, which are not described here, may be carried out only by trained personnel from an ABB turbocharger service station. Only carry out those tasks that are described in this chapter.

Marking casing positions for assembly ABB Turbo Systems recommends that the casing positions be marked before disassemblng the turbocharger.

Identifying assembly devices

Not all assembly devices are marked with a part number. They can be identified using the tool list. This list is enclosed in the toolbox.

Maintaining assembly devices Assembly devices must be checked for damage before and after use.

Visually check for corrosion, cracks, deformation and wear. Don't use damaged assembly devices, but replace them.

CAUTION

NOTE

WARNING

Page 60: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Operation Manual / TPS50

Disassembly and assembly 8

Introduction 8.1 Page 2

© 2010 ABB Turbo Systems Ltd ABB

April

201

0 H

ZTL2

401_

EN

Vers

ion

2.1

Customer spare parts kit

Before beginning work, ensure that the required customer spare parts kits are available.

See chapter Reserve and spare parts.

Oil orifice

When disassembling the turbocharger, a fitted oil orifice must not be removed.

Tightening torques for turbocharger components

The specified tightening torques of screw connections for turbocharger components must be observed. (See section Table of tightening torques.)

Tightening torques for assembly devices of ABB Turbo Systems

If nothing else is described, the screws and nuts of the assembly devices must be tightened down firmly.

Definition of terms

Suspension point Defined point of load application on a component or an assembly (blind hole thread, eye / lug, strap / bracket).

Assembly device A device that is mounted on the turbocharger to obtain a suspension point. Assembly devices are specially developed and designed for the defined application. They are not commercially available products. Use assembly / fitting devices only for the applications described.

Lifting gear Equipment for lifting and transporting loads (ropes, chain hoists, cra-nes). Lifting gear is not supplied by ABB Turbo Systems.

Page 61: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Operation Manual / TPS50

Disassembly and assembly 8

Module weights 8.2 Page 3

© 2010 ABB Turbo Systems Ltd ABB

April

201

0 H

ZTL2

401_

EN

Vers

ion

2.1

8.2 Module weights The specified weights of individual parts or assemblies are guides roun-ded off to the next highest value.

Assemblies

1

2

3

4

56

Description TPS 50 1 Compressor casing 55 2 Wall insert 13 3 Diffuser 5 4 Cartridge group 85 5 Turbine casing 65 6 Gas outlet flange 23

Complete compressor casing

TPS 50 70

The total weight of the complete compressor casing is made up of the combined weights of the compressor casing assembly and wall insert assembly.

Weights [kg]

Weight [kg]

NOTE

Page 62: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Operation Manual / TPS50

Disassembly and assembly 8

Disassembling and assembling turbochargers

8.3 Page 4

© 2010 ABB Turbo Systems Ltd ABB

April

201

0 H

ZTL2

401_

EN

Vers

ion

2.1

8.3 Disassembling and assembling turbochar-gers

Removing the compressor casing

90020

72020

72000

72030

Disconnect all air lines in accordance with engine builder’s instructions. Loosen the V-clamp (72020) and remove the filter silencer or air suc-

tion branch. Secure the lifting gear to the assembly-disassembly device (90020)

and clamp it tightly to the compressor casing (72000) (tightening torque 60 Nm).

Page 63: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Operation Manual / TPS50

Disassembly and assembly 8

Disassembling and assembling turbochargers

8.3 Page 5

© 2010 ABB Turbo Systems Ltd ABB

April

201

0 H

ZTL2

401_

EN

Vers

ion

2.1

42005

42010

4201279005

79000

72030

77000 / 77006

77005

72000

Loosen the V-clamp (72030) and horizontally move away the compres-sor casing (72000) with the wall insert (77000).

Tap the wall insert (77000) out of the compressor casing using a nylon hammer and remove the O-ring (77005).

The diffuser (79000) is loose and can drop out.

Remove the diffuser (79000) and the O-rings (79005, 42012).

WARNING

Page 64: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Operation Manual / TPS50

Disassembly and assembly 8

Disassembling and assembling turbochargers

8.3 Page 6

© 2010 ABB Turbo Systems Ltd ABB

April

201

0 H

ZTL2

401_

EN

Vers

ion

2.1

Installing the compressor casing

Always replace the O-rings (see the section entitled Spare parts).

Fit the O-rings (42005 and 79005). Align the hole in the diffuser (79000) with the positioning pin (42010) in

the bearing flange (42005). Clean the V-clamps (72020/72030) thoroughly before assembly. Lubricate the V-clamp thread and the inside part of the profile with ce-

ramic paste. Install the wall insert (77000/77006) with its O-ring (77005) into the

compressor casing (72000)

Secure the lifting gear to the assembly-disassembly device (90020) and clamp it tightly to the compressor casing (72000) (tightening torque 60 Nm).

Install the compressor casing (72000) with the wall insert (77000/77006).

Attach the V-clamp (72030) and tighten it in accordance with the table of tightening torques.

Fit the filter silencer or the air suction branch and attach all air lines in accordance with the engine builder's instructions.

NOTE

If removed

Page 65: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Operation Manual / TPS50

Disassembly and assembly 8

Disassembling and assembling turbochargers

8.3 Page 7

© 2010 ABB Turbo Systems Ltd ABB

April

201

0 H

ZTL2

401_

EN

Vers

ion

2.1

Removing the cartridge group

Disconnect all pipes in accordance with engine manufacturer's instruc-tions. Remove the turbocharger and then the filter silencer as well as the compressor casing (also see the previous chapter).

Treat the screw thread of the V-clamp (52410) with rust remover and allow it to act.

Check the lifting gear and secure it to the bearing casing (10900). Loosen the V-clamp (52410) and remove it. Loosen and remove the fixing screws (C) of the bearing casing

(42001). Remove the cartridge group and set it down to one side.

The V-clamp (52410) is always to be replaced with a new one (see the section entitled Spare parts).

Screw the nozzle ring (56001) off the partition wall. Measure the axial and radial clearances (see the section entitled Axial

and radial clearances).

If provided

If provided

NOTE

Page 66: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Operation Manual / TPS50

Disassembly and assembly 8

Disassembling and assembling turbochargers

8.3 Page 8

© 2010 ABB Turbo Systems Ltd ABB

April

201

0 H

ZTL2

401_

EN

Vers

ion

2.1

Fitting the cartridge group

Measure the axial and radial clearances (see the section entitled Axial and radial clearances).

Screw the nozzle ring (56001) onto the partition wall. Check the lifting gear and fasten it to the bearing casing (42001). Lubricate the centring seats, the inside part of the V-clamp profile and

the screw thread with ceramic paste. Remove the temporary covers from the oil connections.

Take care not to damage or shift the gasket rings in the mounting sup-port when installing the cartridge group. The gasket rings are on the engine side are not included in the scope of delivery from ABB Turbo Systems.

Fit the V-clamp (52410) and tighten it to the specified tightening torque

(use a torque spanner!).

CAUTION

Page 67: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Operation Manual / TPS50

Disassembly and assembly 8

Disassembling and assembling turbochargers

8.3 Page 9

© 2010 ABB Turbo Systems Ltd ABB

April

201

0 H

ZTL2

401_

EN

Vers

ion

2.1

The V-clamp seating is optimized by tapping on the outside of the cov-ering clamp, wherever not well seated, with a nylon hammer.

Fit the bearing casing (42001) with the fixing screws (C). Tighten the fixing screws to the tightening torques specified in the fol-

lowing table.

TPS Fixing screws C [mm] Tightening torques [Nm] 50 M 16 230

Lifting turbine casing

Fasten lifting gear to assembly-disassembly device (90020) and clamp tightly to compressor casing (51000) (tightening torque 60 Nm).

NOTE

Page 68: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Operation Manual / TPS50

Disassembly and assembly 8

Axial clearance A and possible radial movement B

8.4 Page 10

© 2010 ABB Turbo Systems Ltd ABB

April

201

0 H

ZTL2

401_

EN

Vers

ion

2.1

8.4 Axial clearance A and possible radial move-ment B

A

B

After removing and before installing cartridge group, measure and note axial clearance A and radial movement B.

To measure the axial clearance A correctly, the turbine must be raised slightly.

A B TPS 50 0.12…0.19 0.47…0.82

If the clearances are out of tolerance, an ABB Turbocharger service station must be contacted.

NOTE

Axial clearance and pos-sible radial movement [mm]

CAUTION

Page 69: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Operation Manual / TPS50

Disassembly and assembly 8

Radial clearances N and R 8.5 Page 11

© 2010 ABB Turbo Systems Ltd ABB

April

201

0 H

ZTL2

401_

EN

Vers

ion

2.1

8.5 Radial clearances N and R

N2

N1

N

R2R1

R

N and R

These are the theoretical values for the radial clearance between the compressor wheel and the wall insert, or between the turbine wheel and the gas-outlet flange.

The minimum and maximum clearances result from the manufacturing to-lerances of the compressor and turbine wheel or the wall insert and gas-outlet flange.

N1/N2 and R1/R2 are each meas-ured at the same time using two feeler gauges. The feeler gauges may be pushed with some force between the wall insert / compressor wheel or the gas outlet flange / turbine wheel.

Feeler gauge

Page 70: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Operation Manual / TPS50

Disassembly and assembly 8

Radial clearances N and R 8.5 Page 12

© 2010 ABB Turbo Systems Ltd ABB

April

201

0 H

ZTL2

401_

EN

Vers

ion

2.1

N1 + N22 = N R1 + R2

2 = R

The mean values measured must be within the permissible values of ra-dial clearance N and R.

N R TPS 50 0.66…0.92 0.65…0.93

If the clearances are out of tolerance, an ABB Turbocharger service station must be contacted.

Measuring N and R

Radial clearances N and R [mm]

CAUTION

Page 71: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Operation Manual / TPS50

Disassembly and assembly 8

Table of tightening torques 8.6 Page 13

© 2010 ABB Turbo Systems Ltd ABB

April

201

0 H

ZTL2

401_

EN

Vers

ion

2.1

8.6 Table of tightening torques

1 2

3

Item Part number Tightening torques [Nm] 1 72020 / 72030 60 2 52410 / 52420 60 3 43003 40

Page 72: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s
Page 73: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Operation Manual / TPS50

Taking out of operation 9

Shut down turbocharger 9.1 Page 1

© 2010 ABB Turbo Systems Ltd ABB

April

201

0 H

ZTL2

401_

EN

Vers

ion

2.1

9 Taking out of operation 9.1 Shut down turbocharger

If the turbocharger is damaged and the engine can be shut down for only a short time for emergency repairs, proceed as follows:

Fit the cover plate.

Always precisely obey the engine builder's instructions in case of en-gine operation with a blocked/throttled turbocharger!

Dismantling the turbocharger

Perform the work in accordance with the chapter entitled Assembly and disassembly

Remove the filter silencer or the air suction branch. Remove the V-clamp (72030) and the compressor casing (72000)

72000

56001

10900

72030

Remove the cartridge group (10900) with the nozzle ring (56001).

CAUTION

NOTE

Page 74: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Operation Manual / TPS50

Taking out of operation 9

Shut down turbocharger 9.1 Page 2

© 2010 ABB Turbo Systems Ltd ABB

April

201

0 H

ZTL2

401_

EN

Vers

ion

2.1

Fitting the cover plate

Close the opening in the gas outlet casing with the cover plate (91000). Secure the cover plate on the gas inlet casing (51000) with the V-

clamp (52410) and bolt it tightly for support.

The cover plate can be produced in-house according to the drawing.

NOTE

Page 75: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Operation Manual / TPS50

Taking out of operation 9

Shut down turbocharger 9.1 Page 3

© 2010 ABB Turbo Systems Ltd ABB

April

201

0 H

ZTL2

401_

EN

Vers

ion

2.1

Drawing of the cover plate

The cover is not included in the scope of delivery of ABB Turbo Systems and must be manufactured by the operator according to the following drawing.

Material: Common structural steel according to DIN EN 10025-2

Cover plate B1 B2 B3 B4 B5 B6 B7 B8 B9 B10 D1 D2 D3 D4

287-0.1 43 5.2±0.2 1.0 0.5 2.0 9.5 15 180 210 21 324±0.2 287-0.3

306 310

Dimensions in [mm]

Page 76: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s
Page 77: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Operation Manual / TPS50

Mothballing the turbocharger 10

Taking out of operation for up to 12 months

10.1 Page 1

© 2010 ABB Turbo Systems Ltd ABB

April

201

0 H

ZTL2

401_

EN

Vers

ion

2.1

10 Mothballing the turbocharger 10.1 Taking out of operation for up to 12 months

Condition of engine lubricating oil

The turbocharger normally remains mounted on the engine. Preservation for storage of a turbocharger depends on the condition of the lubricating oil:

If the total acid number (TAN) is lower than 2 mg KOH/g no measures have to be taken.

If the engine lubricating oil is replaced by storage oil before the shut-down and this is circulated by the prelubrication pump, no measures have to be taken. Any remaining old engine oil will thus be flushed away and bearing sections largely protected against corrosion.

Storage preservation measures

If the total acid number (TAN) is greater than 2 mg KOH/g, the following storage preservation measures are necessary after a shut-down:

Remove turbocharger. Have rotor and bearing parts removed and refitted by an official ABB

Turbo Systems service station. Clean all parts. Oil machined, bright surfaces of steel and cast parts using anticorro-

sive oil. Refit complete turbocharger.

Rotating rotor in stack draught

If the rotor rotates as a result of the stack draught:

Install blind flange between compressor casing outlet flange and char-ge air duct.

Page 78: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Operation Manual / TPS50

Mothballing the turbocharger 10

Taking out of operation for more than 12 months

10.2 Page 2

© 2010 ABB Turbo Systems Ltd ABB

April

201

0 H

ZTL2

401_

EN

Vers

ion

2.1

10.2 Taking out of operation for more than 12 months If the engine is taken out of service, the following can be done with the turbocharger:

The turbocharger remains mounted on the engine. The turbocharger casing remains mounted on the engine, but the rotor

and the bearing parts are removed and stored separately. The turbocharger, either as a whole or in individual parts, is removed.

See section Shut-down for up to 12 months, under Storage preservation measures, for the measures always necessary when storing turbocharger parts.

If the turbocharger remains mounted on the engine, refer to section Shut-down for up to 12 months, under Rotating rotor in stack draught.

If the whole turbocharger is removed or the turbocharger is re-assembled next to the engine using the individual parts:

Close all turbocharger openings using wooden covers and paraffin pa-per.

Suitable storage locations are dry rooms only where the relative humidity is between 40-70% and no condensation can form.

Condition of stored turbocharger

Check stored turbocharger parts yearly for corrosion. If there are signs of rust: Clean parts thoroughly and renew corrosion

protection.

Page 79: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Operation Manual / TPS50

Disposal 11

Taking out of operation for more than 12 months

10.2 Page 1

© 2010 ABB Turbo Systems Ltd ABB

April

201

0 H

ZTL2

401_

EN

Vers

ion

2.1

11 Disposal

Environmentally compatible disposal of turbocharger components

Disposal must be environmentally compatible, professional and in accor-dance with local regulations.

The turbocharger mainly consists of metal (cast-iron materials, steel, ni-ckel-steel alloys, aluminium, bearing brass).

Other components are: Non-metallic materials (filter components made of felt and polyethylene), lubricants (engine oil), electronic components (speed sensor and associated components), thermal insulation.

Dispose of metals as old metal for recycling. Dispose of non-metallic materials as waste. Dispose of lubricant left-overs as used / waste oil. Dispose of electronic components as electrical / electronic scrap.

Handling damaged thermal insulation Damaged thermal insulation can burden the air with dust. The glass fi-bres can cause mechanical irritation of the eyes, skin and respiratory tracts.

Prevent dust from being produced. Remove dust with a suitable vacuum cleaner. Wear respiratory mask as protection against particles (P1 or P2

mask). Wear leather protective gloves. Wear close-fitting safety goggles.

Dispose of thermal insulation as special waste.

WARNING

Page 80: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s
Page 81: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Operation Manual / TPS50

Reserve and spare parts 12

Ordering spare parts 12.1 Page 1

© 2010 ABB Turbo Systems Ltd ABB

April

201

0 H

ZTL2

401_

EN

Vers

ion

2.1

12 Reserve and spare parts 12.1 Ordering spare parts

When making inquiries or ordering spare parts, the following data must be specified:

Turbocharger type Serial number (HT……) Description and part number

Our service stations and agents take orders for spare parts.

Contact an official ABB Turbocharger service station or an ABB agent if special versions/cases are not addressed in these general instructions.

Spare parts The parts included in the spare parts set are available only as a whole set.

Storaging spare parts All spare parts, ordered with the turbocharger, should be kept complete and ready for use. Parts showing signs of rust should be carefully cleaned and greased.

Dispose of replaced and unusable parts in a professional and environ-mentally compatible way.

NOTE

CAUTION

Page 82: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Operation Manual / TPS50

Reserve and spare parts 12

Ordering spare parts 12.1 Page 2

© 2010 ABB Turbo Systems Ltd ABB

April

201

0 H

ZTL2

401_

EN

Vers

ion

2.1

Spare parts kit

The spare parts kit (97070) is required for the work described in this manual. The parts included in the spare parts kit are available only as a complete set.

Quantity Description Part number

2 O-ring 32222, 42011 1 O-ring 42012 2 O-ring 77006, 79005 2 O-ring 77005, 82010, 83010

All spare parts that have been ordered with the turbocharger should be kept complete and serviceable. Parts showing signs of rust should be carefully cleaned and greased.

Dispose of replaced parts that are no longer usable in a professional

and environmentally compatible manner.

NOTE Spare parts kit (97070)

CAUTION

Page 83: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Operation Manual / TPS50

Reserve and spare parts 12

Ordering spare parts 12.1 Page 3

© 2010 ABB Turbo Systems Ltd ABB

April

201

0 H

ZTL2

401_

EN

Vers

ion

2.1

Page 84: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Operation Manual / TPS50

Reserve and spare parts 12

View of turbocharger showing part numbers

12.2 Page 4

© 2010 ABB Turbo Systems Ltd ABB

April

201

0 H

ZTL2

401_

EN

Vers

ion

2.1

12.2 View of turbocharger showing part numbers

72020

72000

7700577006

77000

72030

7900079005

52420

52400

51000

52410

Page 85: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Operation Manual / TPS50

Reserve and spare parts 12

View of turbocharger showing part numbers

12.2 Page 5

© 2010 ABB Turbo Systems Ltd ABB

April

201

0 H

ZTL2

401_

EN

Vers

ion

2.1

Part number Description 51000 Turbine casing 52400 Gas outlet flange 52410 V-clamp 52420 V-clamp 72000 Compressor casing 72020 V-clamp 72030 V-clamp 77000 Wall insert 77005 (in spare parts kit) O-ring 77006 (in spare parts kit) O-ring 79000 Diffuser 79005 (in spare parts kit) O-ring

Page 86: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Operation Manual / TPS50

Reserve and spare parts 12

View of cartridge group showing part numbers

12.3 Page 6

© 2010 ABB Turbo Systems Ltd ABB

April

201

0 H

ZTL2

401_

EN

Vers

ion

2.1

12.3 View of cartridge group showing part num-bers

42066

42067

32101

32103

42005

321053210632107

32221

32222 4201232108

42002

21004

21003

25000

42011

43001

42001

56001

4300443003

21002 21000

Page 87: neues Deckblatt mit Textbaustein - ABB...Operation Manual ABB Turbocharging ABB Turbo Systems Ltd CH 5401 Baden Type TPS 50B01 HT843860 nMmax 840 t Mmax 750 nBmax 800 t Bmax 710 1/s

Operation Manual / TPS50

Reserve and spare parts 12

View of cartridge group showing part numbers

12.3 Page 7

© 2010 ABB Turbo Systems Ltd ABB

April

201

0 H

ZTL2

401_

EN

Vers

ion

2.1

Part number Description 10900 Cartridge group 21000 Shaft 21002 Piston ring 21003 Lock nut 21004 Cup spring 25000 Compressor wheel 32101 Plain bearing bush 32103 Safety ring 32105 Thrust ring 32106 Thrust bearing 32107 Bearing bush 32108 Piston ring 32221 Bearing cover 32222 (in spare parts kit) O-ring 42001 Bearing casing 42002 Hexagon socket screw 42005 Bearing flange 42011 (in spare parts kit) O-ring 42012 (in spare parts kit) O-ring 42066 Orifice plate 42067 Hexagon socket screw 43001 Partition wall 43003 Hexagon socket screw 43004 Verbusripp washer 56001 Nozzle ring