8/4/2019 Multi Hole Bypass Valve for EPRI Australia 2008 Final
1/16
Proprietary Information Toshiba Corporation 2008, All Rights Reserved
EPRI MCR meeting in Australia
Multi-hole Bypass ValveOctober 2008Toshiba CorporationToshiba International Corp Pty Ltd.
8/4/2019 Multi Hole Bypass Valve for EPRI Australia 2008 Final
2/16
2Proprietary Information Toshiba Corporation 2008, All Rights Reserved
High erosion rates for units with
solid particle erosion (SPEexfoliation of the boiler tubesfrom thermal transients).
SPE in the steam flow impinges
onto the bypass valve skirt and
erodes the Stellite away. Oncethrough the Stellite, the parentmaterial is softer and wearsfaster.
If left unattended, the skirt will
break apart and go downstreamthrough the turbine. This typically resulted in
replacement of the bypass valveson an annual basis.
Original Main Stop Bypass Valve
8/4/2019 Multi Hole Bypass Valve for EPRI Australia 2008 Final
3/16
3Proprietary Information Toshiba Corporation 2008, All Rights Reserved
If the erosion was allowed to proceed, parts couldhave broken off and carried through to the 1st stagenozzles and through the turbine.
Skirt is partially or fully
erodedValve stem under Skirt is eroded
Example of Damaged Bypass Valve & Stem
8/4/2019 Multi Hole Bypass Valve for EPRI Australia 2008 Final
4/16
4Proprietary Information Toshiba Corporation 2008, All Rights Reserved
8/4/2019 Multi Hole Bypass Valve for EPRI Australia 2008 Final
5/16
5Proprietary Information Toshiba Corporation 2008, All Rights Reserved
Very limited erosion isobserved around Multi-hole
Photo shows
this parts
The photo shows an example of a valve used from 1991 to 2005in a 500MW supercritical turbine.
Multi Hole Bypass Valve needs no repair/replacement
over 10 years even under severe conditions.
SPE Resistance is Proven
8/4/2019 Multi Hole Bypass Valve for EPRI Australia 2008 Final
6/16
6Proprietary Information Toshiba Corporation 2008, All Rights Reserved
Operation Experience of Multi-Hole Valve (MSV) 1/2
8/4/2019 Multi Hole Bypass Valve for EPRI Australia 2008 Final
7/167
Proprietary Information Toshiba Corporation 2008, All Rights Reserved
Plant code
Operation Experience of Multi-Hole Valve (MSV) 2/2
8/4/2019 Multi Hole Bypass Valve for EPRI Australia 2008 Final
8/168
Proprietary Information Toshiba Corporation 2008, All Rights Reserved
Option 1 Option 2 Option 3
Main Valve X X X
Bypass Valve X X X
Valve Stem X12Cr with Nitride
X12Cr with Nitride
XIncoloy
Pressure SealHead
Modify and reuseexisting seal head
X12Cr with Nitride Bush
XStellite Bush
Assembly
Component Life
Expectancy
10+ years 10+ years 10+ years
RecommendedOverhaul Interval
2-4 years(Depends on Oxidation scale of Stem and Bush)
4-8 years(First overhaulafter 2 years)
Variation of Replacement Scope
8/4/2019 Multi Hole Bypass Valve for EPRI Australia 2008 Final
9/169
Proprietary Information Toshiba Corporation 2008, All Rights Reserved
Worldwide application of multi-hole bypass valve
First installations in the mid-late 1980s in Japan. Installed in over 70units in Japan. Long term operation of these units have confirmed the
success of this valve.
First installation outside of Japan in 1999 at Az-Zour #1 in Kuwait(Ministry of Electric Power (MEP), 4 x 300MW units)Now installed at all 4 Az-Zour units.
Installed in Incheon #1 (2004) and Incheon #2 (2005) in Korea (KoreaMidland Power Co (KOMIPO), 2 x 250MW units)
First USA unit installed at Duck Creek (Ameren) in 2006. Now suppliedfor 4 Ameren units.
The first Australian application will be at Mount Piper Powerstation (Delta Electricity, 2 x 660MW). Toshiba will supply andinstall multi-hole bypass valves for both Mt Piper units next year.
8/4/2019 Multi Hole Bypass Valve for EPRI Australia 2008 Final
10/1610
Proprietary Information Toshiba Corporation 2008, All Rights Reserved
Case Study for Ameren (US Utility)
Ameren Reference of Toshiba BypassValve
Duck Creek #1Installed January 2006First inspection February 2007
Second inspection February 2008after approx 200hr bypass operation
Coffeen #1Installed in Autumn (U.S. Spring) 2008
Coffeen #2
Delivered, to be installed Spring (U.S. Fall) 2009 Sioux #1
Installed Spring (U.S. Fall) 2008
Duck Creek #1
8/4/2019 Multi Hole Bypass Valve for EPRI Australia 2008 Final
11/1611
Proprietary Information Toshiba Corporation 2008, All Rights Reserved
Duck Creek #1 The First Application to non-Toshiba unit
The first valves were successfully installed to Ameren Duck Creek #1 in January 2006 in 4days (hardware replacement & adjustment), and the unit restarted without problem.
Replace valve
Adjust valve stroke
Adjust limit switch
Adjust EHC function
8/4/2019 Multi Hole Bypass Valve for EPRI Australia 2008 Final
12/16
12Proprietary Information Toshiba Corporation 2008, All Rights Reserved
Inspection after first year of Operation ~ 35 hours on bypass
Unit removed from service in February 2007for installation of a Toshiba HP-IP turbine,
boiler rebuild and other plant projects. The valves were disassembled and
inspected for condition assessment.
Inspections provided favorable results verylittle erosion, no scale buildup on the stem orbushings
Presentation material courtesy of Ameren
8/4/2019 Multi Hole Bypass Valve for EPRI Australia 2008 Final
13/16
13Proprietary Information Toshiba Corporation 2008, All Rights Reserved
Close-up of bypass holes with minimal erosion
Presentation material courtesy of Ameren
8/4/2019 Multi Hole Bypass Valve for EPRI Australia 2008 Final
14/16
14Proprietary Information Toshiba Corporation 2008, All Rights Reserved
Pressure seal head bushings (stellite liner) with no scale
Presentation material courtesy of Ameren
8/4/2019 Multi Hole Bypass Valve for EPRI Australia 2008 Final
15/16
15Proprietary Information Toshiba Corporation 2008, All Rights Reserved
Incoloy Stem no scale and no bowing
Presentation material courtesy of Ameren
8/4/2019 Multi Hole Bypass Valve for EPRI Australia 2008 Final
16/16
16Proprietary Information Toshiba Corporation 2008 All Rights Reserved
Inspection after 2 year of Operation
Duck Creek Inspection Resultafter approx 200hr Bypass Operation
Average Erosion Most Eroded Portion
Very limited erosion was observed