Top Banner
image Regional Oil and Gas Workshop 2009 MTU VIETNAM Singapore, 9 Dec 2009 By Tran Hoang Trung R2RV
28
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: MTU_PPT_Oil and Gas_Presentation 9 Dec, 2009

image

Regional Oil and Gas Workshop 2009

MTU VIETNAM

Singapore, 9 Dec 2009 By Tran Hoang Trung R2RV

Page 2: MTU_PPT_Oil and Gas_Presentation 9 Dec, 2009

About Us MTU Vietnam

STRICTLY CONFIDENTIAL

Page 2 | Regional Oil and Gas Workshop 2009 |MTU Vietnam, 9 Dec, 2009

Welcome to MTU Vietnam

People and Power. You'll find that's what we're about.

MTU Vietnam is the Vietnam arm of MTU Asia Pte Ltd. MTU Asia Pte Ltd is a direct subsidiary of MTU

Friedrichshafen Gmbh - on leading worldwide manufacturers of large diesel engines and complete drive systems.

In partnership with Detroit Diesel, we are one of the core leading brands of Tognum AG.

Our presence in Vietnam is fuelled by demand for our products and services - one of the most modern and wide-

ranging in the sector.

The diesel engines and drive systems we supply are used for ships, heavy land and rail vehicles, industrial

applications and decentralized power generation plants - and cover diesel engines from 20kW to 9000kW and gas

turbines.

Being about people, it's only natural that we develop and manufacture our own custom-tailored electronic systems

for our clients.

This helps us to control and monitor its engines and drive plants, and most importantly, it helps us to ensure that

our products and services are of top quality.

After all, we want our people - both clients and employees - to be happy.

Page 3: MTU_PPT_Oil and Gas_Presentation 9 Dec, 2009

MTU LOCATED IN VIETNAM FROM 1996

STRICTLY CONFIDENTIAL

Page 3 | Presentation Title | Name of Department, Name I Date

Page 4: MTU_PPT_Oil and Gas_Presentation 9 Dec, 2009

Page 4 |Regional Oil and Gas Workshop 2009 |MTU Vietnam, 9 Dec, 2009

MTU Vietnam Company Ltd.- Offices in Hanoi & Ho Chi Minh City

Ho Chi Minh City Office:104 Nguyen Van Cu StreetDistrict 1, Ho Chi Minh CityTel: +84 8 62611207/8/9Fax: +84 8 62611201Email: [email protected]

Hanoi Office:4 Da Tuong StreetNorth Star Building #606Hoan Kiem District, Hanoi Tel: +84 4 39422758Fax: +84 4 39422760Email: [email protected]

Incorporation : Ho Chi Minh City 1997,Hanoi City 1996

Registration : Hanoi City & Ho Chi Minh City

Share Holders : 100% MTU Asia Pte Ltd

Page 5: MTU_PPT_Oil and Gas_Presentation 9 Dec, 2009

Page 5 Regional Oil and Gas Workshop 2009 MTU Vietnam, 9 Dec, 2009

Vietnam – Engine Population

Engine Population up to December, 2009

386BY ENGINE SERIES

Page 6: MTU_PPT_Oil and Gas_Presentation 9 Dec, 2009

Page 6 |Regional Oil and Gas Workshop 2009 |MTU Vietnam, 9 Dec, 2009

Vietnam – Engine Population

Engine Population up to December, 2009

386BY ENGINE APPLICATION

Page 7: MTU_PPT_Oil and Gas_Presentation 9 Dec, 2009

THERE ARE 3 PARTS

Page 7 |Regional Oil and Gas Workshop 2009 |MTU Vietnam, 9 Dec, 2009

I. GENERAL ABOUT PETROVIETNAM

II. ENGINE SUPPLY TO PETROVIETNAM

III. OTHERS

Page 8: MTU_PPT_Oil and Gas_Presentation 9 Dec, 2009

30% TURNOVER OF VIETNAM HAS BEEN CONTRIBUTED

BY PETROTROVIETNAM

Petrovietnam has been building many thermo-electricity plants (gas, coal-powered), and hydro-electricity plants.

I. Plants in operation:

1. Ca Mau electricity plant No.1

+ Investor: Petrovietnam (100%)

+ Capacity: 750 MW

+ Total investment: nearly 400 million USD

+ Operation: May 2007

2. Ca Mau electricity plant No.2

+ Investor: Petrovietnam (100%)

+ Capacity: 750 MW

+ Total investment: nearly 400 million USD

+ Operation: March 2008

3. Nhon Trach electricity plant No.1N

+ Investor: Petrovietnam (100%)

+ Capacity: 450 MW

+ Total investment: over 6000 billion VND

+ Operation of generator module No.1: June 30th 2008, generator module No.2: August 26th 2008. Full

completion: April 22nd 2009; Opening on August 23rd 2009.

II. Plants being built:

Nhon Trach electricity plant No.2: capacity 750MW (its investment procedure completed, EPC contractor selected

and construction started).

Page 8 | Regional Oil and Gas Workshop 2009 | MTU Vietnam, 9 Dec, 2009

Page 9: MTU_PPT_Oil and Gas_Presentation 9 Dec, 2009

PETROVIETNAM LOCATION MAP

Page 9 | Regional Oil and Gas Workshop 2009 | MTU Vietnam, 9 Dec, 2009

Page 10: MTU_PPT_Oil and Gas_Presentation 9 Dec, 2009

VIETSOVPETRO OVER VIEW – PLATFORM No.: 2

Page 10 | Regional Oil and Gas Workshop 2009 | MTU Vietnam, 9 Dec, 2009

Page 11: MTU_PPT_Oil and Gas_Presentation 9 Dec, 2009

VIETSOVPETRO OVER VIEW – PLATFORM No.: 4

Page 11 | Regional Oil and Gas Workshop 2009 | MTU Vietnam, 9 Dec, 2009

Page 12: MTU_PPT_Oil and Gas_Presentation 9 Dec, 2009

PETROVIETNAM OFFSHORE

CCP2 OF VIETSOVPETRO

Page 12 | Regional Oil and Gas Workshop 2009 | MTU Vietnam, 9 Dec, 2009

Page 13: MTU_PPT_Oil and Gas_Presentation 9 Dec, 2009

DRAGON 1 – VIETSOVPETRO 6 UNIT

8Y RUSSIA ENGINE

Page 13 | Regional Oil and Gas Workshop 2009 | MTU Vietnam, 9 Dec, 2009

Page 14: MTU_PPT_Oil and Gas_Presentation 9 Dec, 2009

DRAGON 2 – VIETSOVPETRO 6 UNIT

DW72 - RUSSIA ENGINE

Page 14 | Regional Oil and Gas Workshop 2009 | MTU Vietnam, 9 Dec, 2009

Page 15: MTU_PPT_Oil and Gas_Presentation 9 Dec, 2009

VIETSOVPETRO PORT NOVEMBER 2009

Page 15 | Regional Oil and Gas Workshop 2009 | MTU Vietnam, 9 Dec, 2009

Page 16: MTU_PPT_Oil and Gas_Presentation 9 Dec, 2009

Type of 317 engines are using in Petrovietnam

I. RUSSIA ENGINE 8Y (450KW).: 56 UNIT

• RUSSIA ENGINE W72 (750 KW).: 6 UNIT

• RUSSIA ENGINE V2 ( 500 KW).: 72 UNIT FOR DRILLING.

II. CAT.: 116 UNIT

USA GAS ENGINE .: 4 UNIT

III. CUMINS.: 40 UNIT

IV. MTU ENGINE.: 21UNIT

V. RUSTON.: 2 UNIT

Page 16 | Regional Oil and Gas Workshop 2009 | MTU Vietnam, 9 Dec, 2009

Page 17: MTU_PPT_Oil and Gas_Presentation 9 Dec, 2009

BP Vung Tau 2 MTU Engines 396 & 2000

Page 17 | Regional Oil and Gas Workshop 2009 | MTU Vietnam, 9 Dec, 2009

Page 18: MTU_PPT_Oil and Gas_Presentation 9 Dec, 2009

BP PLATFORM

2x 16V396TC14

Page 18 | Regional Oil and Gas Workshop 2009 | MTU Vietnam, 9 Dec, 2009

Page 19: MTU_PPT_Oil and Gas_Presentation 9 Dec, 2009

JVPC PLATFORM 2X16V4000P81

Page 19 | Regional Oil and Gas Workshop 2009 | MTU Vietnam, 9 Dec, 2009

Page 20: MTU_PPT_Oil and Gas_Presentation 9 Dec, 2009

CAN THO THERMAL POWER PLANT

2X16V4000G63

Page 20 | Regional Oil and Gas Workshop 2009 | MTU Vietnam, 9 Dec, 2009

Page 21: MTU_PPT_Oil and Gas_Presentation 9 Dec, 2009

DAI HUNG PLATFORM 2X16V396TC14

Page 21 | Regional Oil and Gas Workshop 2009 | MTU Vietnam, 9 Dec, 2009

Page 22: MTU_PPT_Oil and Gas_Presentation 9 Dec, 2009

CUU LONG JOC 16V4000P81

18V2000P01

Page 17| Regional Oil and Gas Workshop 2009 | MTU Vietnam, 9 Dec, 2009

Page 23: MTU_PPT_Oil and Gas_Presentation 9 Dec, 2009

PETROVIETNAM – PTSC PORT 2009

Page 23 | Regional Oil and Gas Workshop 2009 | MTU Vietnam, 9 Dec, 2009

Page 24: MTU_PPT_Oil and Gas_Presentation 9 Dec, 2009

INSTALLATION AND COMISSIONING PLATFORM OF

PTSC - PMC

Page 24 | Regional Oil and Gas Workshop 2009 | MTU Vietnam, 9 Dec, 2009

Page 25: MTU_PPT_Oil and Gas_Presentation 9 Dec, 2009

PETRONAS – RUBY FIELD

Page 25 | Vietnam | R2 I Sept 2009

Page 26: MTU_PPT_Oil and Gas_Presentation 9 Dec, 2009

DUNG QUAT REFINRENY MAP 2009

Page 26 | Regional Oil and Gas Workshop 2009 | MTU Vietnam, 9 Dec, 2009

Page 27: MTU_PPT_Oil and Gas_Presentation 9 Dec, 2009

DUNG QUAT REFINRENY

11 UNIT MERCEDES BENZ ENGINE OM 501 LA

Page 27 | Regional Oil and Gas Workshop 2009 | MTU Vietnam, 9 Dec, 2009

Page 28: MTU_PPT_Oil and Gas_Presentation 9 Dec, 2009

Thank you very much for your attention.