  • 8/11/2019 Modeling Sea Level Rise in the Hudson River Estuary

    1/10

  • 8/11/2019 Modeling Sea Level Rise in the Hudson River Estuary

    2/10

    2

    Goals for EffortGoals for Effort Allow public to see river stages over time that resultAllow public to see river stages over time that result

    from different combinations of tide, tributary flows, seafrom different combinations of tide, tributary flows, sea Allow public to see river stages over time that resultAllow public to see river stages over time that result

    from different combinations of tide, tributary flows, seafrom different combinations of tide, tributary flows, sealevel rise, storm surge, wind, channel modifications,level rise, storm surge, wind, channel modifications,and the relative contribution of each.and the relative contribution of each.

    Provide planning studies with reasonable estimates ofProvide planning studies with reasonable estimates ofpossible water levels in the Hudson estuary withpossible water levels in the Hudson estuary withdifferent climatedifferent climate--change scenarios.change scenarios.

    level rise, storm surge, wind, channel modifications,level rise, storm surge, wind, channel modifications,and the relative contribution of each.and the relative contribution of each.

    Provide planning studies with reasonable estimates ofProvide planning studies with reasonable estimates ofpossible water levels in the Hudson estuary withpossible water levels in the Hudson estuary withdifferent climatedifferent climate--change scenarios.change scenarios.

    Allow investigation of value of improved data related toAllow investigation of value of improved data related tobathymetry, land elevation, hydraulic channelbathymetry, land elevation, hydraulic channel

    characteristics and tributary flows.characteristics and tributary flows.

    Allow investigation of value of improved data related toAllow investigation of value of improved data related tobathymetry, land elevation, hydraulic channelbathymetry, land elevation, hydraulic channel

    characteristics and tributary flows.characteristics and tributary flows.

    HudsonRiver

    HudsonRiver

    http://ny.water.usgs.gov/projects/dialer_plots/hsfloc.gif

    NWS Forecasts for AlbanyNWS Forecasts for Albany

    http://newweb.erh.noaa.gov/ahps2/hydrograph.php?wfo=aly&gage=albn6&view=1,1,1,1,1,1,1,0

    HistoricalStage and

    Flow

    HistoricalStage and

    Flow

    What would theseWhat would theselook like under

    different climatechange scenarios?

    look like under

    different climatechange scenarios?

  • 8/11/2019 Modeling Sea Level Rise in the Hudson River Estuary

    3/10

    3

    Illustrative Model OutputIllustrative Model Output

    Water Prof ile - Base Case, t = 01 hrWater Prof ile - Base Case, t = 01 hr

    Water Profile - Base Case, t = 02 hrWater Profile - Base Case, t = 02 hr

    Water Profile - Base Case, t = 03 hrWater Profile - Base Case, t = 03 hr

  • 8/11/2019 Modeling Sea Level Rise in the Hudson River Estuary

    4/10

    4

    Water Prof ile - Base Case, t = 04 hrWater Prof ile - Base Case, t = 04 hr

    Water Prof ile - Base Case, t = 05 hrWater Prof ile - Base Case, t = 05 hr

    Water Profile - Base Case, t = 06 hrWater Profile - Base Case, t = 06 hr

    Water Profile - Base Case, t = 07 hrWater Profile - Base Case, t = 07 hr

  • 8/11/2019 Modeling Sea Level Rise in the Hudson River Estuary

    5/10

    5

    Water Prof ile - Base Case, t = 08 hrWater Prof ile - Base Case, t = 08 hr

    Water Prof ile - Base Case, t = 09 hrWater Prof ile - Base Case, t = 09 hr

    Water Profile - Base Case, t = 10 hrWater Profile - Base Case, t = 10 hr

    Water Profile - Base Case, t = 11 hrWater Profile - Base Case, t = 11 hr

  • 8/11/2019 Modeling Sea Level Rise in the Hudson River Estuary

    6/10

    6

    Illustrative Model OutputIllustrative Model Output

    Water Prof ile - Base Case, t = 01 hrWater Prof ile - Base Case, t = 01 hr

    Water Profile - Base Case, t = 02 hrWater Profile - Base Case, t = 02 hr

    Water Profile - Base Case, t = 03 hrWater Profile - Base Case, t = 03 hr

  • 8/11/2019 Modeling Sea Level Rise in the Hudson River Estuary

    7/10

    7

    Water Prof ile - Base Case, t = 04 hrWater Prof ile - Base Case, t = 04 hr

    Water Prof ile - Base Case, t = 05 hrWater Prof ile - Base Case, t = 05 hr

    Water Profile - Base Case, t = 06 hrWater Profile - Base Case, t = 06 hr

    Water Profile - Base Case, t = 07 hrWater Profile - Base Case, t = 07 hr

  • 8/11/2019 Modeling Sea Level Rise in the Hudson River Estuary

    8/10

    8

    Water Prof ile - Base Case, t = 08 hrWater Prof ile - Base Case, t = 08 hr

    Water Prof ile - Base Case, t = 09 hrWater Prof ile - Base Case, t = 09 hr

    Water Profile - Base Case, t = 10 hrWater Profile - Base Case, t = 10 hr

    Water Profile - Base Case, t = 11 hrWater Profile - Base Case, t = 11 hr

  • 8/11/2019 Modeling Sea Level Rise in the Hudson River Estuary

    9/10

    9

    Water Profile - QuestionWater Profile - Question

    How can a 5 foot t ideHow can a 5 foot t ide

    at the Battery t ravel 150 miles

    to Albany and still be

    be a 5 foot tide, 6 hrs later,

    at the Battery t ravel 150 miles

    to Albany and still be

    be a 5 foot tide, 6 hrs later,

    to resistance?

    to resistance?

    HudsonRiver

    HudsonRiver

    Troy 600 ft 6 ft

    N. Albany 900 ft 17 ft

    S. Albany 1100 ft30 ft

    PK 2,400 ft 50 ft

    Battery 4,500 ft 35 ft

    http://ny.water.usgs.gov/projects/dialer_plots/hsfloc.gif

    Water Prof ile - Max/MinWater Prof ile - Max/Min

    Max&MinWaterSurface

    15

    5

    5

    15

    25

    0 100000 200000 300000 400000 500000 600000 700000 800000

    35

    25

    Distance fromBattery,

    lowestchannelelevationmaximumelevation minimumelevat

    Profile - Max/Min High/Low FlowsProfile - Max/Min High/Low Flows

    25

    15

    5

    5

    15

    0 100000 200000 300000 400000 500000 600000 700000 800000

    35

    25

    DistancefromBattery,NY(f

    lowflowmax lowflowmin highflowmax highflowmin channelbottomelevation

  • 8/11/2019 Modeling Sea Level Rise in the Hudson River Estuary

    10/10

    10

    Profile Upper Estuary -Max/Min High/Low FlowsProfile Upper Estuary -

    Max/Min High/Low Flows

    25

    15

    5

    5

    15

    6 00 00 0 6 20 00 0 6 40 00 0 6 60 00 0 6 80 00 0 7 00 00 0 7 20 00 0 7 40 00 0 7 60 00 0 7 80 00 0 8 00 00 0

    35

    25

    DistancefromBattery,N

    lowflowmax lowflowmin highflowmax highflowm in c ha nn elbottomelevati

    Castleton-on-Hudson

    Flows only affect estuary stage above Castleton-on-Hudson.

    Profile - Max/Min for SLR 0-2-4 ftProfile - Max/Min for SLR 0-2-4 ft

    TidalSwingRange(maxminwatersurfaceelevatio

    3

    4

    5

    6

    7

    0 20 40 60 80 100 120 140 160

    D stancefromBattery,NY m l

    channelbottom 0ftsealevelrisetidalswingran

    2ftsealevelrisetidalswingr ange 4ftsealevelrisetidalswing

    Tides have 12 hour period - amplitude varies over estuary.

    Profile - Max/Min - Storm SurgeProfile - Max/Min - Storm Surge

    15

    25

    25

    15

    5

    5

    0 20 40 60 80 100 120 140 160

    35

    DistancefromBattery,

    stormsurgem ax st or msurgem in c ha nn elbottomeleva

    Storm surge is a long wave lasting 1-2 days - no variation.

    Key FindingsKey Findings1. What information does one team need from another to complete

    their work: NONE1. What information does one team need from another to complete

    their work: NONE

    2. What assumptions do we need to make explicit and to make surewe are in agreement as to those judgments/choices: Using currentgeometry of river as fixed, with same channel independent of SLR.

    3. Remaining work to do: Model mostly running. Defining scenarios.Need to develop form of presentation vehicle, and see if it works forpublic.

    4. What will your final product include in terms of content: Expect final

    2. What assumptions do we need to make explicit and to make surewe are in agreement as to those judgments/choices: Using currentgeometry of river as fixed, with same channel independent of SLR.

    3. Remaining work to do: Model mostly running. Defining scenarios.Need to develop form of presentation vehicle, and see if it works forpublic.

    4. What will your final product include in terms of content: Expect finalproduct by end of the year. Web based tutorial showing how keyfactors (tides, flows, SLR) interact to determine Estuary stages.

    5. Interactions needed in next 6 months to link work across projects:Look for feed back of effectiveness of presentation.

    product by end of the year. Web based tutorial showing how keyfactors (tides, flows, SLR) interact to determine Estuary stages.

    5. Interactions needed in next 6 months to link work across projects:Look for feed back of effectiveness of presentation.