Top Banner
Maintenance Hole Structures Technical Addendum Technical Addendum Number: SEWL TA SEW 01 – Revision B MRWA edition version 1.0 of WSAA Sewerage Code WSA 0220022.3 Background Construction validation activities carried out in 2011 identified a number of constructed shallow cast insitu Maintenance Hole structures that did not meet the Design and Construction requirements outlined in the MRWA edition of the WSAA Sewerage Code WSA022002.3. These installations presented occupational health and safety hazards due to the incorrect design and installation of shaft, cone and neck increments. Technical Addendum SEWL TA SEW01 Revision A was published to address this issue and other general Maintenance Hole matters to clarify South East Water’s requirements. Following a recent review of the existing WITS Standard drawings and Sewer Code requirements, this updated technical addendum clarifies South East Water’s requirements for the design and construction of maintenance holes.
9

Maintenance Hole Structures Technical Addendum RevBsoutheastwater.com.au/SiteCollectionDocuments/BuildingAnd... · Maintenance Hole Structures Technical Addendum Technical Addendum

May 24, 2018

Download

Documents

lyxuyen
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Maintenance Hole Structures Technical Addendum RevBsoutheastwater.com.au/SiteCollectionDocuments/BuildingAnd... · Maintenance Hole Structures Technical Addendum Technical Addendum

Maintenance Hole Structures Technical Addendum Technical Addendum Number: SEWL TA SEW‐01 – Revision B MRWA edition version 1.0 of WSAA Sewerage Code WSA 02‐2002‐2.3 

Background  

Construction validation activities carried out in 2011 identified a number of constructed shallow cast in‐situ Maintenance Hole structures  that did not meet  the Design and Construction  requirements outlined  in  the MRWA  edition  of  the WSAA  Sewerage  Code WSA02‐2002.3.  These  installations  presented  occupational health and safety hazards due  to  the  incorrect design and  installation of shaft, cone and neck  increments. Technical Addendum  SEWL  TA  SEW‐01 Revision A was published  to  address  this  issue  and other  general Maintenance Hole matters to clarify South East Water’s requirements.     Following  a  recent  review  of  the  existing WITS  Standard  drawings  and  Sewer  Code  requirements,  this updated  technical addendum clarifies South East Water’s  requirements  for  the design and construction of maintenance holes. 

Page 2: Maintenance Hole Structures Technical Addendum RevBsoutheastwater.com.au/SiteCollectionDocuments/BuildingAnd... · Maintenance Hole Structures Technical Addendum Technical Addendum

SEWL TA SEW‐01 – Rev B  Page 2 of 3  Issued 15 June 2012

Changes to the Sewerage Code Requirements  1. South East Water has  re‐introduced  a  set of drawings,  including  some  former Water  Industry 

Technical  Standard  (WITS)  Drawings.  These  drawings  take  precedent  over  the  equivalent Standard Drawings provided  in  the MRWA edition of  the WSAA Sewerage Code. The  following table summarises the drawings that have been re‐introduced. 

 

Drawing  Revision  Name  Comments and Purpose 

SCH.021  B  Maintenance Hole Landings, Stepirons & Landing Planks 

The Sewerage Code does not currently include a drawing with details for landings and portable standing planks.  

This drawing also provides details for step irons in addition to those shown on the current standard drawing SEW‐1307‐V. 

SCH.031  B  Cast In Situ Maintenance Holes – Flat Top 

These drawings replace SEW‐1301‐V.  

The Designer is required to specify the type of each maintenance hole on the design drawings.  

Drawing SCH.032 includes a table of maintenance hole types and depth ranges, which is to be used as a guide for selecting appropriate maintenance hole types. 

Details for construction joints between the base and shaft have also been included. 

SCH.032  B  Cast In Situ Maintenance Holes – Conical Top 

SCH.033  B  Cast In Situ Maintenance Holes – Truncated Top 

SCH.034  B  Shallow Maintenance Holes 

The Sewerage Code does not currently include drawings with details for shallow maintenance holes. Use of these maintenance holes is subject to prior South East Water approval. 

SEW‐1411  2.1‐B  Water Seal Arrangements – Twin Maintenance Hole System 

Revises SEW‐1411 to include additional details for twin maintenance hole water seals (also referred to as ‘gas check maintenance holes’). 

 WITS  Standard Drawings  SCH.021  Rev  B,  SCH.031    Rev  B,  SCH.032    Rev  B,  SCH‐033    Rev  B, SCH.034    Rev  B  and  SEW‐1411  SE WATER  REV2.1‐B  have  been  attached  to  the  end  of  this Technical Addendum.  In  accordance  with  these  drawing  changes,  the  following  changes  are  being  applied  to  the MRWA edition of the WSAA Sewerage Code WSA 02 – 2002‐2.3:  

Clause 6.1, item (a) will be replaced with “Maintenance Holes (MHs), which are applicable to all  sewer  sizes  and  allow  personnel  and  equipment  access  to  the  sewer  system.  (Refer  to Standard Drawings SEW‐1300‐V, SEW‐1302‐V, SEW‐1303‐V, SEW‐1304‐V, SEW‐1305‐V, SEW‐1306‐V, SEW‐1307‐V, SEW‐1308‐V, SEW‐1309‐V, SEW‐1313‐V, SCH.021 Rev B, SCH.031 Rev B, SCH.032 Rev B, SCH‐033  Rev B  and SCH.034  Rev B.”  

 

Page 3: Maintenance Hole Structures Technical Addendum RevBsoutheastwater.com.au/SiteCollectionDocuments/BuildingAnd... · Maintenance Hole Structures Technical Addendum Technical Addendum

SEWL TA SEW‐01 – Rev B  Page 3 of 3  Issued 15 June 2012

Clause 6.6.2, final paragraph will be replaced with “Special construction details are shown on Standard Drawings SEW‐1309 and SEW‐1313‐V.   WITS Standard Drawing SCH.031 Rev B can be  used  in  conjunction  with  Standard  Drawing  SEW‐1309‐V  for  larger  diameter  MH installations.” 

Clause 7.3.2, final sentence  is replaced with “Default detailed design requirements for water seals  in  sewers  and  gas  check MHs  are  shown  in  Standard Drawing  SEW‐1411  SE WATER REV2.1‐B and SEW‐1409‐V.”  

Clause 9.2.4 includes new items (j) and (k):  

“(j) The Designer must specify each Maintenance Hole type (eg conical, truncated, flat top, 

precast), and whether  they are cast  in  situ  (CI) or precast  (P), on  the Maintenance Hole 

Schedule (refer 9.2.6). 

(k) A base layout must be shown for MHs where there are three or more incoming sewers, 

two or more drops, angles of deflection greater than 90 degrees, unusual configurations of 

incoming sewers, or sewers are offset from the centre of the MH.” 

2. Other Maintenance Hole Technical Addendum  changes being applied  to  the MRWA edition of the WSAA Sewerage Code WSA 02 – 2002‐2.3 are as follows: 

 

a) Protective  coatings:  Clause  4.7.2,  last  sentence  is  to  be  replaced with  “South  East Water requires the application of an approved  lining or protective coating on all new Maintenance Hole  (MH)  structures  on  sewers  ≥DN450,  Gas  check  MHs,  Pressure  sewer/Rising  main discharge MHs,  Sewage  Pumping  station wet well/  valve  pit  chambers,  and  other  specific structures as directed.”   

b) Connection of 10 or more units: Clause 5.5.2, last sentence will be replaced with “Where 10 or more units/apartments are to be connected to the sewer system, this must be done via a Maintenance Hole.” 

c) Cast in situ cover slabs: Clause 6.6.2 (a) is to be replaced with “Poured in situ MH comprising a poured base, channels and walls with a poured or precast concrete cover slab;” 

d) Structural  calculations  for  deep  MHs:  Clause  6.6.3  includes  a  new  paragraph:  “For Maintenance Holes >6.0metres in depth, structural calculations and a design layout must be prepared and submitted to South East Water for auditing purposes.” 

e) Specification of step irons and ladders: Clause 6.6.8, third sentence and dot points are to be replaced with  “Stainless  steel/plastic encapsulated  step  irons or  stainless  steel/GRP  ladders must be specified for all Maintenance Holes located on sewers ≥DN450, within or downstream of industrial developments, and the downstream chamber of a Gas check MH.”  

f) Retrofitted landings: Clause 6.6.8 includes a new paragraph: “Where it is necessary to retrofit a landing in an existing MH, the designer is required to obtain Water Agency approval, submit structural  calculations,  and  show  full  design  details  and  construction methodology  on  the design drawings. Retrofitted concrete landings will not be permitted.” 

Further Information This revision of the Maintenance Hole Structures Technical Addendum will take immediate effect on: 

All  South  East  Water  Land  Development  sewerage  projects  that  have  not  completed lodgement of the Design Verification Form and Design drawing documentation via the SWIFT application. 

All South East Water Capital Works branch sewer and reticulation pipeline projects currently under detail design phase.  

 

If  you  have  any  further  enquiries  or  suggestions  regarding  any  of  the  information  outlined  in  this Technical Addendum, please e‐mail Mr Colin Paxman at [email protected] 

Page 4: Maintenance Hole Structures Technical Addendum RevBsoutheastwater.com.au/SiteCollectionDocuments/BuildingAnd... · Maintenance Hole Structures Technical Addendum Technical Addendum
Page 5: Maintenance Hole Structures Technical Addendum RevBsoutheastwater.com.au/SiteCollectionDocuments/BuildingAnd... · Maintenance Hole Structures Technical Addendum Technical Addendum
Page 6: Maintenance Hole Structures Technical Addendum RevBsoutheastwater.com.au/SiteCollectionDocuments/BuildingAnd... · Maintenance Hole Structures Technical Addendum Technical Addendum
Page 7: Maintenance Hole Structures Technical Addendum RevBsoutheastwater.com.au/SiteCollectionDocuments/BuildingAnd... · Maintenance Hole Structures Technical Addendum Technical Addendum
Page 8: Maintenance Hole Structures Technical Addendum RevBsoutheastwater.com.au/SiteCollectionDocuments/BuildingAnd... · Maintenance Hole Structures Technical Addendum Technical Addendum
Page 9: Maintenance Hole Structures Technical Addendum RevBsoutheastwater.com.au/SiteCollectionDocuments/BuildingAnd... · Maintenance Hole Structures Technical Addendum Technical Addendum