Page 2: Maintenance

Introduction:

Plant maintenance is an important service function of an efficient production system.

It helps in maintaining and increasing the operational efficiency of plant facilities.

Maintenance is the procedure of finding the faults in any equipment/Machine and also removal of fault.

It may be before the breakdown or after the breakdown.

Page 3: Maintenance

Plant maintenance usually refers to the methods, strategies, and practices used to keep an industrial factory running efficiently. This can include anything from regular checks of equipment to make sure they are functioning properly.

The general aim of plant maintenance is to create a productive working environment that is also safe for workers.

Page 4: Maintenance

Maintenance Objectives:To increase functional reliability of

production facilities.To maximize the useful life of the

equipment.To maximize production capacity from the

given equipment.To minimize the total production cost.To minimize the frequency of interruption

in production by reducing breakdowns.To enhance the safety of the manpower.

Page 5: Maintenance

Maintenance objective

Page 6: Maintenance

Importance of maintenanceIt helps in identify the cause of failure , e.g

whether the failure is due to design defect, or a wear out failure.

It also helps in deciding the type of maintenance and maintenance decision like replace and repair.

It provides the necessary information regarding the life and reliability of the equipment.

With the help of this tool spare parts management got initiated.

Page 7: Maintenance

Different type of maintenance:

Page 8: Maintenance

Planned Maintenance-

In planned maintenance the maintenance action is carried out with some fore thoughts, prior planning , record keeping and control action. These can be further classified as :-Preventive maintenanceCorrective maintenancePredictive maintenance

Page 9: Maintenance

It is based upon the principle that ‘prevention is better than cure’.

It is a set of activities that are performed on plant equipment, machinery, and systems before the occurrence of a failure in order to protect them and to prevent or eliminate any degradation in their operating conditions.

Or the maintenance carried out at predetermined intervals or according to prescribed criteria and intended to reduce the probability of failure or the degradation of the functioning and the effects limited.

It has three types Running maintenance Scheduled maintenance Shut down maintenance

Page 10: Maintenance

Running maintenance:Running maintenance which includes those

maintenance activities that are carried out while the machine or equipment is running.

Example – lubrication, adjustment of nuts and screws, tightening of loose nut and bolts.

Page 11: Maintenance

Scheduled Maintenance:Scheduled Maintenance is any variety of

scheduled maintenance to an object or item of equipment.

Specifically, Planned Maintenance is a scheduled service visit carried out by a competent and suitable agent, to ensure that an item of equipment is operating correctly and to therefore avoid any unscheduled breakdown and downtime.

Good example of PM program is car maintenance. After so many kilometers or miles oil should be changed, parts renewed.

Page 12: Maintenance

Shut Down Maintenance:Which is a set of preventive maintenance activities

that are carried out when the production line is in total stoppage situation.

These are performed generally after three or six months.

These involves the inspection of plant items which are known or suspected to occur.

Page 13: Maintenance

Corrective maintenance: In this type, actions such as repair, replacement, or

restore will be carried out after the occurrence of a failure in order to eliminate the source of this failure or reduce the frequency of its occurrence.

It also include the different types of actions like typical adjustment of redesign equipment.

The difference between corrective maintenance and preventive maintenance is that for the corrective maintenance, the failure should occur before any corrective action is taken.

It is of two types1. Breakdown maintenance2. Shutdown maintenance

Page 14: Maintenance

Breakdown Maintenance:It is an emergency based policy in which the

plant or equipment is operated until it fails and then it is brought back into running condition by repair.

The maintenance staff locate any mechanical, electrical or any other fault to correct it immediately.

It is feasible for the small factories where1. There are few types of equipment.2. Machine and equipments are simple and does

not require any specialist.3. Where sudden failure does not cause any

serious financial loss.

Page 15: Maintenance

Predictive maintenance:As the names implies it involves the

prediction of the failure before it occurs, identifying the root cause for those failures symptoms and eliminating those causes before they result in extensive damage of the equipment.

Type of maintenance performed continuously or at intervals according to the requirements to diagnose and monitor a condition or system. Also called condition based maintenance.

Page 16: Maintenance

Unplanned Maintenance:Maintenance action which is carried out

without any fore thoughts or prior planning is called unplanned maintenance.

Emergency maintenance is one of the example of unplanned maintenance.

In this type of maintenance the maintenance action is executed with the help of all available maintenance resources in least possible time, without any major time lag.

Examples are gas leakage in chemical plant, fire hazards, breakdown of boiler, turbine etc.

Page 17: Maintenance

Nature of maintenance problem:

Page 18: Maintenance

General classification Maintenance problem.

Mechanical Failure Worn out bushes and bearings and other moving parts. Fatigue of machine members Creep of material at high temp Excessive forced vibration, misalignments etc.

Thermal Failure Overheating of the component Lack of lubrication Inadequate of cooling Electrical insulation failure

Chemical Failure Highly corrosive fluids containing abrasive particles Failure of protective linings like glass , rubber etc.

Page 19: Maintenance

Classification maintenance problem based on time span:Short run production problemMaintenance problem which are carried out in a sort

period of time are known as short run production system. It may be hourly, daily ,weekly and monthly.

Example:-Hourly- inspection of correct lubricant, level of

coolant, sharpness of cutting tool.Daily- cleaning of m/c, tightening of nuts, correct

cooling, inspection of various indicators, minor adjustment of parts.

Weekly- Major adjustment, lubrication, tightening of parts.

Monthly- checking for insulation, corrosion, safety guards, checking of worn-out and distorted parts.

Page 20: Maintenance

Procedure of Preventive maintenance

Page 21: Maintenance

1. Job identification by preparing of facility engineerThe very first step of PMP is to prepare the

facility register which defines that what to be maintained. 2. Preparation of maintenance

scheduleIn this step we prepare a maintenance

schedule. It is simply a comprehensive list of all the incident and their time of incidence.

It gives the useful information regarding the method, time and place of maintenance work, besides it also provides secondary information about maintenance man power requirement etc.

It gives the various details regarding maintenance like what, when, how, where.

Page 22: Maintenance

3. Preparation of history cardIt not only gives the useful information about the

result of maintenance events but also furnishes the essential details regarding the uses of machines, free of failures and failure modes.4. Preparation of Job

specificationIn this step the job specification is prepared. It

is simply a document which provide the essential information regarding the maintenance work to be done.

In general practice these job details are specifications compiled from maintenance schedules.

They are a means of communicating the engineer’s requirement to guide the workers.

They are prepared separately for each job.

Page 23: Maintenance

5. Preparation of maintenance ProgrammingIt is a sequential list which allocates specific

maintenance work to a specific period.In order to apply the job specification, the

maintenance programme is generally prepared for long run when the machines/ equipment are to be inspected.

It is not a good practice because an industry can not prepare a long run production well in advance since too many factors arise and they will result into change in production and maintenance requirement.

It presents a overall picture of present and future maintenance commitments.

Page 24: Maintenance

6. Preparation of weekly/Monthly maintenance programmes The next step under plant maintenance procedure is

to prepare the weekly/ Monthly maintenance programmes. The maintenance programmes include the following topics.1. Reconditioning or replacing the lubricating oil2. Repairing and replacing worn out parts and tools etc3. Checking all the electrical connections of the system4. Checking the control system5. Checking the performance of each parts.6. Cleaning the interior parts like spark plugs, filters

radiators, crankcase, cylinders etc.7. It will lie under the long run maintenance programmes.

Page 25: Maintenance

7. Preparing of inspection reportThis step is followed after the maintenance

programme is over. This is simply a document which furnishes the useful information about the maintenance inspections which were performed in the past.

8. Preparing of maintenance request

The next step under plant maintenance procedure is to preparation of maintenance request. It is simply a document or various maintenance suggestions and recommendation given by the inspection report. Suggestions are the useful feedback information that comes from users end workers.

Page 26: Maintenance

9. Feedback mechanismIn the last step the application of corrective

and control actions are available on the basis of feedback mechanism. These corrective actions should be applied to respective plant facilities at the initial stage of maintenance planning or design.

Page 27: Maintenance

Schedules of preventive maintenance:It is simply a comprehensive list of all the

incident and their time of incident. It gives the following useful information regarding the maintenance work.i. What is to be done or maintained?ii. How is to be maintained? iii. When is to be maintained?Besides this it may also provide the secondary

information regarding the place of maintenance and maintenance requirement.

Page 28: Maintenance

 Maintenance Strategy :A maintenance strategy defines the rules for the

sequence of planned maintenance work. It contains general scheduling information, and can therefore be assigned to as many maintenance task lists (PM task lists) and maintenance plans as required. A maintenance strategy contains maintenance packages in which the following information is defined:

The cycle in which the individual work should be performed (for example, every two months, every 3,106.86 miles, every 500 operating hours)

Other data which affects scheduling

Page 29: Maintenance

Structure:A maintenance strategy consists of:Strategy header: Name of the strategy,Scheduling parameters:  Contain the scheduling data for the respective maintenance strategy, which influence the scheduling of maintenance plans.Scheduling indicatorsMaintenance packages

Page 30: Maintenance

Scheduling Indicators:Within a maintenance strategy, you can use different scheduling indicators to specify the type of scheduling you require or to define a cycle set: Time-based (for example, every 30 days) Time-based by key date (for example, every 30 days on the 30th day of the month) Time-based by factory calendar (for example, every 30 working days) Performance-based (for example, every 50 operating hours)

Page 31: Maintenance

Maintenance Packages:Maintenance activities that must be

performed at a particular date or point in time are combined into maintenance packages

Page 32: Maintenance

Total Productive Maintenance (TPM)

Total productive maintenance (TPM) originated in Japan in 1971 as a method for improved machine availability through better utilization of maintenance and production resources

It can be considered as the medical science of machines. Total Productive Maintenance (TPM) is a maintenance

program which involves a newly defined concept for maintaining plants and equipment.

The goal of the TPM program is to markedly increase production while, at the same time, increasing employee morale and job satisfaction.

Page 33: Maintenance

TPM brings maintenance into focus as a necessary and vitally important part of the business.

It is no longer regarded as a non-profit activity. Down time for maintenance is scheduled as a part of the manufacturing day and, in some cases, as an integral part of the manufacturing process.

The goal is to hold emergency and unscheduled maintenance to a minimum.

Page 34: Maintenance

Why TPM :TPM was introduced to achieve the following

objectives. The important ones are listed below.Avoid wastage in a quickly changing economic

environment.Producing goods without reducing product

quality.Reduce cost.Produce a low batch quantity at the earliest

possible time.Goods send to the customers must be non

defective.

Page 35: Maintenance

Conclusion:Today, with competition in industry at an all

time high, TPM may be the only thing that stands between success and total failure for some companies.

It has been proven to be a program that works. It can be adapted to work not only in industrial plants, but in construction, building maintenance, transportation, and in a variety of other situations.

If everyone involved in a TPM program does his or her part, an unusually high rate of return compared to resources invested may be expected.