Top Banner
LYDD Airport development: Airlines and Passengers By: Kadir, Martina, Jana, Anna-Maria, Anita, Sara, Nora, Puja and Amanda.
20
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Lydd presentation 2 (2)

LYDD Airport development:Airlines and Passengers

By: Kadir, Martina, Jana, Anna-Maria, Anita, Sara, Nora, Puja and Amanda.

Page 2: Lydd presentation 2 (2)

APEXAirline Passenger Experience Association:

network of the world’s leading airlines, suppliers and related companies committed to elevating the level of the airline passenger experience.

Introducing ourselves

Page 3: Lydd presentation 2 (2)

• Passenger Issues:o Transportation

o Lydd Services

• Airline Issues:o Demand

o Type of Airline

o Type of Airport Lydd is going to be

o Environment

• Pros and Cons

Information Provided

Page 4: Lydd presentation 2 (2)

Transportation: Passenger View

Pro expansion view:

• Passengers outside the catchment area

• Budget airlines

• Explorer passengers

Page 5: Lydd presentation 2 (2)

Transportation: fast, safe, affordable• London to Lydd Airport 1h 20 m

• Free parking, and £5 is for overnight parking

• Almost all of Kent lies within one hour drive from Lydd

• Within a two hour drive lies places like: o Colchester in Essex, o Stevenage in Hertfordshire,o Bracknell in Berkshire, o Alton in Hampshire,o Haslemere in Surrey o Littlehampton in West Sussex.

Page 6: Lydd presentation 2 (2)

Transportation: fast, safe, affordable

• Train from London to Ashford International Train Station (not to the airport), e.g. St Pancras – Ashford 38min £28

• CONSIDERATION:o DIRECT train from London to the Airporto Keep car park free

and not raise overnight fees

Page 7: Lydd presentation 2 (2)

Lydd Services

• Number of check-in desk• Security checks• Number of gate• Improved passenger check-in and security facilities, larger

arrivals and baggage reclaim areas.• Introduction of an arrivals carousel and check-in desk baggage

conveyors, which will be completed before the end of the year. • The airport is investing more than £240,000 in the upgrade of

services.• The refurbishment also includes additional

state-of-the-art CCTV and electronic

Page 8: Lydd presentation 2 (2)

Airport’s Issues

• existence of restricted airspace• severe operational constraints• competition from Manston Airport, the

Channel Tunnel and Gatwick

Page 9: Lydd presentation 2 (2)

Why will airlines suddenly take an interest in Lydd Airport when the

runway is extended?

Page 10: Lydd presentation 2 (2)

Figures and Statistics

Page 11: Lydd presentation 2 (2)

Figures and Statistics

Page 12: Lydd presentation 2 (2)

“Growth within Greater London is unacceptable. Runway expansion is

unacceptable at Heathrow and City, as a consequence of the localized environmental impacts that would result. A third

runway at Heathrow is strongly opposed by the Mayor.”(Mayor of London, 2011.)

Page 13: Lydd presentation 2 (2)

Types of airlines LYDD can attract

• No Frills

• Charter Airlines

• Charter AD HOC

• Commuter Airlines

• VIP/ Corporate

Airlines

Page 14: Lydd presentation 2 (2)

Services provided by Lydd

• Check in and Gate Handling,

• Meeting & Greeting Passengers,

• Baggage Handling, Lost Baggage,

• Aircraft dispatch: disembarking, cleaning, catering, refueling,

cargo loading/ unloading, boarding

• Escorting of disabled passengers.

Page 15: Lydd presentation 2 (2)

What kind of airport is Lydd going to be?

• Extended runwayo Runway will be extended to 1,800 m runway (plus 150 m

starter extension)o Can handle medium sized airplanes and most popular

business jets

Page 16: Lydd presentation 2 (2)

What kind of airport is Lydd going to be?

• Safety and Securityo Security and safety systems have been

upgraded for NASP complianceo Fire service has been improvedo Better equipped (foam tenders)

• Otherso On site aircraft maintenanceo 20,000 tons cargo capacity

Page 17: Lydd presentation 2 (2)

Environment

• Aircraft noise

• Sustainable Development

• Fuel efficiency

• Aviation in a sustainable context

Page 18: Lydd presentation 2 (2)

Pros and Cons for Airlines and Passengers

• PROo Park Feeo Locationo New market for the growing demand

• CONSo Reduced Serviceso Access from/to London

Page 19: Lydd presentation 2 (2)

Thanks for listening!!!

Page 20: Lydd presentation 2 (2)

Reference list• http://www.lydd-airport.co.uk/documents/The_case_for_LAA.pdf

• http://ojp.nationalrail.co.uk/service/timesandfares/London/AFK/today/1530/dep

• Lydd Airport Action Group (LAAG), 2010. Proof of Evidence. Economic Impact. Littleston: LAAG. [online] Available at: http://www.kentnet.org.uk/laag/LAAG%208%20A%20-%20Economic%20Impact.PDF [Accessed 03 December 2011]

• Department for Transport, 2009. UK Air Passenger Demand and CO2Forecasts. London: DfT Publications. [online] Available at:http://webarchive.nationalarchives.gov.uk/+/http:/www.dft.gov.uk/pgr/aviation/atf/co2forecasts09/co2forecasts09.pdf [Accessed 03 December 2011]

• Mayor of London, 2011. A new airport for London. Part 1 – The Case for New Capacity. London: Greater London Authority. [online] Available at:http://www.london.gov.uk/sites/default/files/AnewairportforLondon.pdf [Accessed 03 December 2011]

• http://www.iata.org/whatwedo/environment/Pages/sustainability.aspx