Transcript
  • LIST OF ANNEXURES

    S. No. PARTICULARS PAGE NO.

    ANNEXURE I Environment Clearance Letter of ML Area: 273.033ha 1-6

    ANNEXURE II Environment Clearance Letter of ML Area: 74.843ha 7-12

    ANNEXURE III Consent To Operate of ML Area: 74.843ha valid up to

    28.02.2021

    13-18

  • =

    ANNEXURE-IEnvironment Clearance Letter of ML Area: 273.033ha

  • 1

  • 2

  • 3

  • 4

  • 5

  • 6

  • ANNEXURE-IIEnvironment Clearance Letter of ML Area: 74.843ha

  • 7

  • 8

  • 9

  • 10

  • 11

  • 12

  • ANNEXURE-IIIConsent To Operate of ML Area: 74.843ha valid up to

    28.02.2021

  • -~~

    ~~CHHATTISGARH ENVIRONMENT CONSERVATION BOARD

    Paryavas Bhawan, Sector - 19, Naya Raipur (C.G.) 492002Email [email protected]

    No. C;-2.18 ITS/CECB/2017 Naya Raipur, dated: 22-1/212017To, /

    ~/s Century Cement,p.a. - BaikunthDist- Raipur (C.G.) - 493 116

    ---CHH.',777SGM

  • time and failure (if any), shall be immediately rectified without delay,otherwise some alternate arrangement shall be made. In the event of anyfailure of any pollution control system adopted by the industry, the respectiveproduction unit shall not be restarted until the control measures are rectifiedto achieve the desired efficiency. Industry shall not discharge anytreated/untreated effluent in to the river or any surface water bodies. Noeffluent shall be discharged out side of the mine premises in anycircumstances; hence zero discharge condition outside the mine premisesshall be maintained at all the time.

    3. Mine management shall submit monitoring report of effluent regularly.Industry shall setup laboratory facility for collection and analysis ofenvironmental samples under the supervision of competent technicalpersonnel.

    4. Mine management shall submit characterization report of all the wastegenerated. As per characterization report, if any waste comes under thepurview of Hazardous and Other Wastes (Management and Trans BoundaryMovement) Rules, 2016. Industry shall obtain letter of authorization underHazardous and Other Wastes (Maoagement and Trans BoundaryMovement) Rules, 2016 from the Board.

    5. Mine management shall adopt rainwater-harvesting technique in premisesfor re-charge of ground water. Mine management shall obtain necessarypermission from Central Ground water Authority for drawl of under groundwater (if required).

    6. All internal roads shall be black topped (pucca). Good house keepingpractices shall be adopted by the Industry.

    7. Mine management shall use fly ash brick, fly ash blocks or fly ash basedproducts in their construction/repairing activities.

    8. Industry shall submit Environment Statement to the Board as per provisionof Environment (Protection) amendment Rule, 1993 for the previous yearending 31st March on or before so" September every year.

    9. Green belt of broad leaf local species shall be developed all along theperiphery of the mine area. As far as possible maximum area of openspaces-shall be utilized for plantatien purposes.

    10. Mine management shall not increase production' more than capacitymentioned in the consent letter & shall not initiate any action regardingexpansion without obtaining prior consent of the Board.

    11. This renewal of consent is being issued under the "Scheme of Auto-Renewal of Consent" of the Board issued vide office order no. 5734 dated24/02/2016 as per self certificate submitted by authorized signatory Mr. S.K.Jain, CGM (Chemical) of M/s Century Cement, p.a. - Baikunth, District -Raipur (C.G.).

    12. Chhattisgarh Environment Conservation Board reserves the rights to revokethe Consent at any time for any viOlation/non-compliance.

    13. In case, if the capital investment is increased by such amount that the totalinvestment exceeds the range for which renewal fees has been paid, the

    .e>- 2 -

    D TUtS! 'SIR\CONSENT Lcncrs'Rcucwal Lcucrs'Autc Rcnc\\at\21117\Ccmu~ Cement _(Lllllo.: SIOIIC Mroc- 12 Lac)\Walcr doe

    14

  • industry shall have to pay the difference amount of renewal fees for thecorresponding block years.

    14. In case, the prescribed fee payable is amended in future, the industry shallbe liable to pay the difference amount for corresponding block years.

    Please acknowledge the receipt of this letter.

    For & on behalf ofChhattisgarh Environment Conservation Board Raipur (C.G.)

    t1rMember Secretary

    Chhattisgar~ Environment Conservation Boarder Naya Raipur (C.G.)Endt. No. /TS/CECB/2017 Naya Raipur, dated: / /2017Copy to: -

    Regional Officer, Regional Office, Chhattisgarh EnvironmentConservation Board, Raipur (C.G.). Please ensure compliance andreport, if any condition/conditions are violated by the industry.

    -----Member Secretary

    Chhattisgarh Environment Conservation BoardNaya Raipur (C.G.)

    - 3 -D TULSI SIR CONSENT LcncrsRcncvat Lcucrs\Amo RcnC\lat\20I 7\Ccn1Lu,\ Cement (LuIIC SWIlC Mute- 12 utel \'viller doe

    15

  • -~~

    ~~CHHATTISGARH ENVIRONMENT CONSERVATION BOARD

    Paryavas Bhawan, Sector - 19, Naya Raipur (C.G.) 492002Email [email protected]

    No.

  • failure (if any), shall be immediately rectified without delay otherwise somealternate arrangement shall be made. In the event of any failure of any pollutioncontrol system adopted by the industry, the respective unit shall not berestarted until the control measures are rectified to achieve the desiredefficiency. Chhattisgarh Environment Conservation Board may further stipulatestringent particulate matter emission limit depending upon environmentalconditions.

    3. Regular monitoring for the measurement of air pollutants level in ambient andemission of air pollutants from stack (if any) shall be carried out. Industry shallsubmit stack and ambient air quality monitoring reports to the Board regularly.Industry shall setup laboratory facility for collection and analysis ofenvironmental samples under the supervision of competent technical personnel.

    4. All internal roads shall be black topped (pucca). Good house keeping practicesshall be adopted by the Industry.

    5. Industry shall transport limestone in dully-covered vehicles to avoid fugitive dustemission during transportation.

    6. Industry shall use fly ash brick, fly ash blocks or fly ash based products in theirconstruction/repairing activities.

    7. Green belt of broad leaf local species shall be developed all along the peripheryof the mine area. As far as possible maximum area of open spaces shall beutilized for plantation purposes.

    8. Industry shall submit Environment Statement to the Board as per provision ofEnvironment (Protection) amendment Rule, 1993 for the previous year ending31st March on or before so" September every year.

    9. This renewal of consent is being issued under the "Scheme of Auto-Renewal ofConsent" of the Board issued vide office order no. 5734 dated 24/02/2016 as perself certificate submitted by authorized signatory Mr. S.K. Jain, CGM (Chemical)of M/s Century Cement, P.O. - Baikunth, District - Raipur (C.G.).

    10. Chhattisgarh Environment Conservation Board reserves the rights to revoke theConsent at any time for any violation/non-compliance.

    11. In case, if the capital investment is increased by. such amount that the totalinvestment exceeds the range for which renewal fees has been paid, theindustry shall have to pay the difference amount of renewal fees for thecorresponding block years.

    12. In case, the prescribed fee payable is amended in future, the industry shall beliable to pay the difference amount for corresponding block years.

    Please acknowledge the receipt of this letter.

    For & on behalf ofChhattisgarh Environment Conservation Board Raipur (C.G.)

    ~Member Secretary

    Chhattisgarh Environment Conservation BoardJ- Naya Raipur (C.G.)~

    - 2-17

  • .;;

    Endt. No. /TS/CECB/2017 NayaRaipur, dated: / /2017Copy to: -

    Regional Officer, Regional Office, Chhattisgarh Environment ConservationBoard, Raipur (C.G.). Please ensure compliance and report, if anycondition/conditions are violated by the industry.

    ~Member Secretary

    Chhattisgarh Environment Conservation BoardNaya Raipur (C.G.)

    " . ,.