LINE CLEARENCE By: PHANI VENKATA SAI RAM QA OFFICER GULF GLASS MANUFACTURING COMPANY KUWAIT
19

Line clearence by Phani venkata sai ram

Apr 12, 2017

Download

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Line clearence by Phani venkata sai ram

LINE CLEARENCE

By:

PHANI VENKATA SAI RAMQA OFFICER GULF GLASS MANUFACTURING COMPANYKUWAIT

Page 2: Line clearence by Phani venkata sai ram

WHY?

Page 3: Line clearence by Phani venkata sai ram

This procedure have been established to prevent mix-ups of Empty container, component, labels, documents and mistakes while preparing or processing a product during the time of job change.

Page 4: Line clearence by Phani venkata sai ram

3 STAGES OF LINE CLEARANCE

CLEARING

CLEANING

CHECKING

Page 5: Line clearence by Phani venkata sai ram
Page 6: Line clearence by Phani venkata sai ram

To Do:- Remove all the previous job related items from area/line like bottles, tools, mold components, machine parts, plugs, left over solution/material, product, labels , printed cartons, batch coding, packed products, documents.

Responsibility:-Q. Inspectors / D. supervisors to make sure all the previous jobs related products, documents, etc., are placed in their location. & all waste is disposed properly.

-Supervisors to cross check whether it is followed properly and report the same to Team leader’s/Department heads/Managers.

Page 7: Line clearence by Phani venkata sai ram
Page 8: Line clearence by Phani venkata sai ram

To Do:-Clean area/line up to the maximum possible extent -Cleaning to be done only after CLEARING

Responsibility:-Q. Inspectors / D. Supervisors responsibility for cleaning.

-Supervisors & Team leaders responsibility to make sure sufficient arrangement like manpower and resources are arranged to clean the line

Page 9: Line clearence by Phani venkata sai ram
Page 10: Line clearence by Phani venkata sai ram

To Do:-Check & Fill the Line clearance form.-Checking to be carried out only after clearing and cleaning of previous products.-1 person from each department (D&P and Q.A) has to cross check the area / line. The same should be recorded in the Line clearance form.-Area / line clearance failure should be recorded in the same line clearance form after stopping/closing the line, and informed to immediate Team leaders.

Responsibility:-Line/Area Supervisor ensure the clearing and cleaning.

Page 11: Line clearence by Phani venkata sai ram

Line clearance, Line cleaning and Line checking

(Decoration & Packing area)

Line: Shift: Date:

Job name: Last bottle of previous job at Low rater time:

First bottle of new job at Low rater time:

Decoration operator (A): QA Inspector (B):

S.no Check list A YES/NO

B YES/NO

1 Check whether decoration machine job setup card is available for the new job. 2 Check if low rater grippers are clean and free from foreign particles. 3 Check if whether there is any direct metal contact to bottles from low rater to

decoration lehr entrance.

4 Check if decoration machine area is free dust and previous bottles. 5 Check if in feed and out feed conveyors of decoration machine are dust and oil

free.

6 Check if counters are set properly to Zero and adjusted as per bottle height. 7 Check if decoration lehr set point temperature is kept as per the validated setup. 8 Check if the art work of the new job is attached near the visual screen. 9 Check if whether the art work of the previous job is removed for the display board

near the visual screen.

10 Check if whether all the documents of the previous job are replaced with the new one.

11 Check if whether Label/Tag is attached to the incomplete pallets of the previous job and/are cleared for sending to the Quarantine area.

12 Check if Inspection table, single liners and complete area of line is free from previous bottles and foreign particles.

13 Check if the visual screen is cleaned and free form the dust. 14 Check if whether there is any jerking of single liners and any bottle falling

problem for the previous job is cleared.

15 Check if the depallatiser is free from dust and any direct metal contact to the bottles.

16 Check if bottom light is in working condition. 17 Check if pallet packing specification is place in the packing area. 18 Check if the packing area is clean & free from the previous bottles and foreign

particles.

Prepared by Reviewed by Approved by

D&P Operator D&P Supervisor D&P Team leader/D&P HOD.

QA Inspector QA Supervisor QC Team Leader/QA Manager.

Page 12: Line clearence by Phani venkata sai ram

Area/line clearance failure:-Critical line clearance failure must be subjected to issue a Corrective action request (CAR) against the Person/Department and to be investigated to identify the root cause.

Page 13: Line clearence by Phani venkata sai ram
Page 14: Line clearence by Phani venkata sai ram

Control of rejection:-

- Rejected item should be kept in separate pallet with identification tag.

- Online rejected items should be kept in pallets with status label or send directly to re-processing/re-cycling area.

Page 15: Line clearence by Phani venkata sai ram

- Line clearance to be carried out prior to commencement of same product different batch (same job artwork/Label change) or different product (Job change).

- If the line is not used immediately after cleaning and clearing it must be rechecked immediately before start.

NOTE:

Page 16: Line clearence by Phani venkata sai ram

Live line clearance & Test for Effectiveness.

Page 17: Line clearence by Phani venkata sai ram

- Live line clearance has been successfully used as a useful training tool for new operators or for the introduction of new equipment. It involves the placing of ‘dummy’ articles with in the area / line after the checking is completed.

- Operators are then asked to find the dummies. If all of the dummies are not found then this may indicate the need for further operator training or modification to the procedures or checklist.

- The dummies should be placed in areas where clearing or checking are known to be a problem.

- The dummies used should not be capable of being confused for the genuine article. Defaced genuine articles should not be used as dummies.

- Dummies used should not be capable of being packaged or further processed. An example of an acceptable dummy is a colored plastic, magnetic etc.,

Page 18: Line clearence by Phani venkata sai ram

- Also, with frequency based on reasonable level of confidence or at least twice in a year all Q.A in process personnel will be evaluated for line clearance activity effectiveness.

- Q.A and Concerned Departments personnel shall be given training for line clearance activity and evaluated for the effectiveness.

Training frequency & Responsibility

REFERENCE:-

ISO 15378: 2006WWW.FDA.GOV.COM

Page 19: Line clearence by Phani venkata sai ram