LESNER BRIDGE REPLACEMENT PROJECT Shore Drive Community Coalition Meeting January 27, 2014 Christopher Wojtowicz, P.E. City of Virginia Beach Department of Public Works City Engineer’s Office Transportation Division
22

LESNER BRIDGE REPLACEMENT PROJECT Shore Drive Community Coalition Meeting January 27, 2014 Christopher Wojtowicz, P.E. City of Virginia Beach Department.

Mar 31, 2015

Download

Documents

Haven Fishburne
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: LESNER BRIDGE REPLACEMENT PROJECT Shore Drive Community Coalition Meeting January 27, 2014 Christopher Wojtowicz, P.E. City of Virginia Beach Department.

LESNER BRIDGE REPLACEMENT PROJECT

Shore Drive Community Coalition Meeting

January 27, 2014

Christopher Wojtowicz, P.E.City of Virginia Beach

Department of Public WorksCity Engineer’s Office

Transportation Division

Page 2: LESNER BRIDGE REPLACEMENT PROJECT Shore Drive Community Coalition Meeting January 27, 2014 Christopher Wojtowicz, P.E. City of Virginia Beach Department.

2

Lesner Bridge Replacement

• Project Location

Page 3: LESNER BRIDGE REPLACEMENT PROJECT Shore Drive Community Coalition Meeting January 27, 2014 Christopher Wojtowicz, P.E. City of Virginia Beach Department.

3

Lesner Bridge Replacement

• Existing Bridge– 1530 ft long twin bridges– EB built 1958, WB built 1967– 28 spans: 25 concrete, 3 steel– Corridor carries ~43,000 vpd

Page 4: LESNER BRIDGE REPLACEMENT PROJECT Shore Drive Community Coalition Meeting January 27, 2014 Christopher Wojtowicz, P.E. City of Virginia Beach Department.

4

Lesner Bridge Replacement

• Background– Bridges were built in early days of prestressed

concrete– Salt environment has corroded steel strands– Corrosion can not be stopped; only slowed with

diligent maintenance

Page 5: LESNER BRIDGE REPLACEMENT PROJECT Shore Drive Community Coalition Meeting January 27, 2014 Christopher Wojtowicz, P.E. City of Virginia Beach Department.

5

Lesner Bridge Replacement

• Background– Other repairs include pile jacketing,

beam end repairs, and steel painting

– Current sufficiency ratings for the bridges are 34.9 (WB) and 39.0 (EB)

Page 6: LESNER BRIDGE REPLACEMENT PROJECT Shore Drive Community Coalition Meeting January 27, 2014 Christopher Wojtowicz, P.E. City of Virginia Beach Department.

6

• Design – Design team of Figg

Engineering/Clark-Nexsen was chosen in 2005

– Provide a signature bridge that reflects the surrounding community

– Extensive public involvement including Listening Tours, Design Charette & Citizen Information Meetings

– Community input on bridge theme, shapes, aesthetics, lighting, and other amenities

Lesner Bridge Replacement

Page 7: LESNER BRIDGE REPLACEMENT PROJECT Shore Drive Community Coalition Meeting January 27, 2014 Christopher Wojtowicz, P.E. City of Virginia Beach Department.

7

• Design Challenges– Maintain 4 lanes of traffic during construction– Tie-in at existing intersections– Limiting r/w impacts based on chosen alignment

Lesner Bridge Replacement

Page 8: LESNER BRIDGE REPLACEMENT PROJECT Shore Drive Community Coalition Meeting January 27, 2014 Christopher Wojtowicz, P.E. City of Virginia Beach Department.

8

Lesner Bridge Replacement

• Design

150’ (typ) 225’ main span

Page 9: LESNER BRIDGE REPLACEMENT PROJECT Shore Drive Community Coalition Meeting January 27, 2014 Christopher Wojtowicz, P.E. City of Virginia Beach Department.

9

Lesner Bridge Replacement

• Construction Staging

Page 10: LESNER BRIDGE REPLACEMENT PROJECT Shore Drive Community Coalition Meeting January 27, 2014 Christopher Wojtowicz, P.E. City of Virginia Beach Department.

10

Lesner Bridge Replacement

• Construction Staging

Page 11: LESNER BRIDGE REPLACEMENT PROJECT Shore Drive Community Coalition Meeting January 27, 2014 Christopher Wojtowicz, P.E. City of Virginia Beach Department.

11

Lesner Bridge Replacement

• Construction Staging

Page 12: LESNER BRIDGE REPLACEMENT PROJECT Shore Drive Community Coalition Meeting January 27, 2014 Christopher Wojtowicz, P.E. City of Virginia Beach Department.

12

Lesner Bridge Replacement

• Construction Staging

Page 13: LESNER BRIDGE REPLACEMENT PROJECT Shore Drive Community Coalition Meeting January 27, 2014 Christopher Wojtowicz, P.E. City of Virginia Beach Department.

13

Casting Yard (Jordan Bridge)

Page 14: LESNER BRIDGE REPLACEMENT PROJECT Shore Drive Community Coalition Meeting January 27, 2014 Christopher Wojtowicz, P.E. City of Virginia Beach Department.

14

Span-by-Span Construction

Page 15: LESNER BRIDGE REPLACEMENT PROJECT Shore Drive Community Coalition Meeting January 27, 2014 Christopher Wojtowicz, P.E. City of Virginia Beach Department.

15

Construction (Jordan Bridge)

Page 16: LESNER BRIDGE REPLACEMENT PROJECT Shore Drive Community Coalition Meeting January 27, 2014 Christopher Wojtowicz, P.E. City of Virginia Beach Department.

16

Construction (Jordan Bridge)

Page 17: LESNER BRIDGE REPLACEMENT PROJECT Shore Drive Community Coalition Meeting January 27, 2014 Christopher Wojtowicz, P.E. City of Virginia Beach Department.

17

Page 18: LESNER BRIDGE REPLACEMENT PROJECT Shore Drive Community Coalition Meeting January 27, 2014 Christopher Wojtowicz, P.E. City of Virginia Beach Department.

18

Page 19: LESNER BRIDGE REPLACEMENT PROJECT Shore Drive Community Coalition Meeting January 27, 2014 Christopher Wojtowicz, P.E. City of Virginia Beach Department.

19

Page 20: LESNER BRIDGE REPLACEMENT PROJECT Shore Drive Community Coalition Meeting January 27, 2014 Christopher Wojtowicz, P.E. City of Virginia Beach Department.

20

Lesner Bridge Replacement

• Project Status– Project is fully funded– Environmental process is complete– Public participation is complete– All Construction Permits are in place– Construction bids were opened Dec 20, 2013– Some discrepancies with low bid, City is working

with VDOT/FHWA to address issues

Page 21: LESNER BRIDGE REPLACEMENT PROJECT Shore Drive Community Coalition Meeting January 27, 2014 Christopher Wojtowicz, P.E. City of Virginia Beach Department.

21

Lesner Bridge Replacement

• Funding– Total project cost: $95 million• Design: $10.2 million (City funded)• RW/Utilities: $14.3 million • Construction: $70.5 million

• Schedule– Notice to Proceed April 2014– Construction scheduled to take 36 months

Page 22: LESNER BRIDGE REPLACEMENT PROJECT Shore Drive Community Coalition Meeting January 27, 2014 Christopher Wojtowicz, P.E. City of Virginia Beach Department.