Leonardo Project Transfer of Innovation: “Enterprise as innovation to create new work places at time of global crisis” nº 2010-1-ES1-LEO05-21250. Carlisle, 13th-15th January 2011. 1
50

Leonardo Project Transfer of Innovation: Enterprise as innovation to create new work places at time of global crisis nº 2010-1-ES1-LEO05-21250. Carlisle,

Mar 26, 2015

Download

Documents

Molly Crawford
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Leonardo Project Transfer of Innovation: Enterprise as innovation to create new work places at time of global crisis nº 2010-1-ES1-LEO05-21250. Carlisle,

Leonardo Project Transfer of Innovation:

“Enterprise as innovation to create new work places at time of global crisis”

nº 2010-1-ES1-LEO05-21250.

Carlisle, 13th-15th January 2011.1

Page 2: Leonardo Project Transfer of Innovation: Enterprise as innovation to create new work places at time of global crisis nº 2010-1-ES1-LEO05-21250. Carlisle,

I. PROGRAMME: TOI CARLISLE 13th – 15th January 2011

Friday, January 14th: 9:00 Introduction by the project legal representative Pilar Gredilla and the Project

coordinator in Carlisie Trudy Stammer. 09:45 “Enterprise as innovation to create new work places at time of global crisis” nº

2010-1-ES1-LEO05-21250.Leonardo Transfer of Innovation 1) Project: general approach: 

1.1. New approved budget 1.2. Working schedule 1.3. Partner change 1.4. Detailed approach to the project: working packages, pilot project and the European

final business fair 10:15 2) Project financial management

2.1. Purpose and principles 2.2. Contract commitments for beneficiary 2.3. Contract commitments for partner

11:00 a 11:30 Coffee break 11.30 Project financial management: continuation

2.4.2. Staff costs justification. Time Sheet. 2.4.3. Travel costs and subsitence rates justification 2.4.4. Justification of subcontracting costs, other costs and indirect costs

2

Page 3: Leonardo Project Transfer of Innovation: Enterprise as innovation to create new work places at time of global crisis nº 2010-1-ES1-LEO05-21250. Carlisle,

3. Contracts and amendments 4. Financial management 5. Auditing 12:15 6. Project reports: quarterly report, intermediate report and final report  13:00 Lunch  15:00 Aprende a Emprender programme and its implementation in different

countries: Webpage. Translation of the documents Business plan. Vocational Training in each country.

17:00 Coffee break 17:30 Problems at the time of implementing the programme in each country. (Around

10 minutes for each partner): United Kingdom. Portugal. Turkey. Poland. (Greece). (Slovakia).

19:00 Free time 20:00 Dinner 3

PROGRAMME: TOI CARLISLE 13th – 15th January 2011(2)

Page 4: Leonardo Project Transfer of Innovation: Enterprise as innovation to create new work places at time of global crisis nº 2010-1-ES1-LEO05-21250. Carlisle,

I. 1 ESTIMATED EXPENDITURES AND REVENUE BY OF COST

4

- TYPE OF COST EXPENDITURE REQUESTED

APLICATION FORM

February 2010

EXPENDITURELEONARDO

AGENCY September 2010

EXPENDITURELEONARDO

AGENCY (SLOVAQU

IA)JANUARY 2011

Calculate Your

COST ICO

- A. STAFF COSTS - 128.190 - 169.170,00 - 166.450 - + 40.980

- B.1 TRAVEL AND SUBSISTENCE - 104.656 - 75.353 - 75.353 - - 29.303

- B.2 SUBCONTRACTING - 94.700 - 42.500 - 44.850 - - 52.200

- B.4 OTHER - 48.000 - 34.000 - 34.000 - - 14.000

- TOTAL DIRECT COSTS - 327.546 - 321.023 - 320.653 - - 6.523

- INDIRECT COST - 12.000 - 12.000 - 12.370 - 0

- TOTAL PROJECT EXPENDITURE (A+B)

- 339.546 - 303.023 - 303.023 - - 36.523

- CO-FINANCING % - 74,98 % - 71,67 % - 71,67% - -3,31

- PROPOSED COMMUNITY CONTRIBUTION

- 254.601 - 238.692 - 238.686 - - 15.915

- PARNER´S OWN FUNDINGS - 84.954 - 94.331 - 94.337 - + 9.377

Page 5: Leonardo Project Transfer of Innovation: Enterprise as innovation to create new work places at time of global crisis nº 2010-1-ES1-LEO05-21250. Carlisle,

5

1.2 Working schedule

Page 6: Leonardo Project Transfer of Innovation: Enterprise as innovation to create new work places at time of global crisis nº 2010-1-ES1-LEO05-21250. Carlisle,

1.3 Partner change :

6

Organitation BIC Banská Bystrica, s.r.o. BUSINESS & INNOVATION CENTRE BANSKÁ B

Legal address Rudohorská 33, cp 974 11 ; BANSKÁ BYSTRICA; SK – SLOVAKIA, phone number00421484716411; [email protected]; www.bicbb.sk

Contact person LIVIA HANESOVA [email protected] AND MIROSLAV ŠIPIKAL [email protected]

Description of organisation,

IC Banská Bystrica is an institution with the mission to speed up the economical development of the region through the support of both businesses and public sector. The organisation began operations operating in 1994, and has gradually extended the range of provided services into the educational area and the area of quality management implementation.Nowadays, there is a broad network of Business Innovation Centres in Europe, which are linked together within the European BIC Network (EBN) and are considered as the key factor for regional development. BIC BB is a member of the Association of Advisory Centres (BICs and RPICs) in Slovakia and closely works in co-operation with National Agency for Development of Small and Medium Enterprises (NADSME). BIC Banská Bystrica has been granted the Quality Certificate from the reputable international company BVQI that enables it to provide the wide range of guidance, support and educational services.BIC Banská Bystrica was the first organization in Slovakia to start up the operation of Business Incubator and Technological Centre in Banská Bystrica, which was co-funded from the sources of the PHARE program. BIC Banská Bystrica provides guidance and support services for starting innovative businesses and enterprises placed in the incubator. Support is provided through consulting and educational services with the aim to strengthen the business and to prepare the company for the commercial environment. Banská Bystrica Self-governing Region was ranked among chosen regions that are achieving the highest rate of long-term disadvantaged job seekers. In June 2008 the Ministry of Labor, Social Affairs and Family approved financing of 8 projects of social enterprises, 4 of which are implemented in the Banská Bystrica Self-governing Region. The aim of these projects is to find an effective mechanism for functioning of social enterprises, the pilot check of the establishment and functioning of social enterprises focused on reduction of unemployment and prevention of social exclusion, especially through training, activation of the disadvantaged individuals, reinvestment of surpluses to the development of sustainable providing of services and community development.

Page 7: Leonardo Project Transfer of Innovation: Enterprise as innovation to create new work places at time of global crisis nº 2010-1-ES1-LEO05-21250. Carlisle,

7

DITRIBUTION OF FUNCTIONS IN THE COSORTIUM

P0. ANPE ES Management of the project and partnership , Europass certification. Official announcement of the idea contest

P1. JCYL ES Official announcement of the idea contest . Monitoring the materials of the programme

P2.KERIGMAPortugal PT

Financial supervision Coordination of internal evaluation

P3 CEEI ES Technical management - coordination of technological innovation. Monitoring the materials of the programme

P4. CLLCREDITS UK

Coordination of the project image: marketing

P5. BELKTROTR Turkey;

Monitoring the new materials and its compilation

P6 MSCDNPoland PL

Coordination of teachers / tutors training

P7 EKPOLGreece EL

Coordination / organization of final seminar/ European fair

P8 BICSLOVAQUIA

Coordination and monitoring the quality of the mobilities and evaluation of the cost-benefit ratio of them.

ALL PARNERS All the partners are responsible for the adaptation and implementation of the program in its own country;

USAL ESthe University of Salamanca

External evaluation .will be also in charge of the translation of the programme materials..

Page 8: Leonardo Project Transfer of Innovation: Enterprise as innovation to create new work places at time of global crisis nº 2010-1-ES1-LEO05-21250. Carlisle,

Detailed approach to the project: working packages, pilot project and the European final business fair

8

Page 9: Leonardo Project Transfer of Innovation: Enterprise as innovation to create new work places at time of global crisis nº 2010-1-ES1-LEO05-21250. Carlisle,

WORKPACKAGES:

9

WORK PACKAGE TITLE START MONTH

END MONTH

TOT EUROS:333.023

PACKAGE LIDER

Activities Results and products

1.PROJECT MANAGEMENT 01/10/2010

01/09/2012

47.059 ANPE CASTILLA Y LEON

COORDINATION OF THE PROJECT BY SPAIN TO ENSURE THE SUCCESS OF THE PROJECT, DEVELOPMENT OF THEPROJECT IN THE CENTRES, ENSURING THAT THE TASKS & RESPONSIBILITIES OF EACH PARTNER ARE FULFILLED• INTERNAL EVALUATION• COMMISSIONING EXTERNAL EVALUATION OF THE PROJECT• REGULAR MONITORING OF THE PROJECT MILESTONES AND RESULTS TO ENSURE THAT THE PROJECT IS ON TARGETAND ACHIEVING ITS AIMS

DRAFT OF MATERIALS

2.TRANSLATION OF MATERIALS

01/11/2010

01/01/2011

44.990 ANPE FACULTAD TRADUCCIÓN

• HANDING IN OF THE TRANSLATED MATERIALS TO THE PARTNERS,• TRANSLATION OF THE WEBPAGE,• REVISION OF THE PROGRAMME TO THE REALITY OF EACH ONE OF THE PARTICIPATING COUNTRIES

TRANSLATION OF THE WEBPAGE AND APRENDE A EMPRENDER OTHER MATERIALS

3.TECHNOLOGICAL TRAINING

01/04/2010

01/04/2011

20.172 CEEI JCYL • PROMOTION & FAMILIARISATION TO THE EUROPEAN PARTNERS VIA A LAUNCH CONFERENCE IN SPAIN TO LEARNMORE ABOUT THE PROGRAMME AND THE MATERIALS IN DETAIL AFTER RECEIVING TRANSLATED MATERIALS

TRAININGEUROPASS CERTIFICATION

Page 10: Leonardo Project Transfer of Innovation: Enterprise as innovation to create new work places at time of global crisis nº 2010-1-ES1-LEO05-21250. Carlisle,

WORKPACKAGES:

10

WORK PACKAGE TITLE START MONTH

END MONTH

TOT EUROS:333.023

PACKAGE LIDER

Activities Results and products

4 .PROGRAMME IMPLEMENTATION IN TURKEY

01/02/2011 01/05/2012 14.680 TURQUIA• PROMOTION & FAMILIARISATION TO THE EUROPEAN PARTNERS VIA A LAUNCH CONFERENCE IN SPAIN TO LEARNMORE ABOUT THE PROGRAMME AND THE MATERIALS IN DETAIL AFTER RECEIVING TRANSLATED MATERIALSCORRECTION OF THE TRANSLATED MATERIALS TO MOTHER TONGUE AND REVISION• FAMILIARISATION OF THE PROGRAMME WITH PARTERS AND ADAPTION TO THEIR OWN COUNTRY• ANALYSIS OF HOW THE PROGRAMME CAN BE IMPLEMENTED IN THEIR COUNTRY AND COHERENCE WITH THE EDUCATIONAL & VOCATIONAL EDUCATION & TRAINING SYSTEM• INVESTIGATION OF ACCREDITATION OF COMPETENCIES VIA LEOPASS OR NATIONAL VOCATIONAL EDUCATION SYSTEM IF APPLICABLE• RECRUITMENT & SELECTION OF TEACHERS• TEACHER TRAINING• RECRUITMENT OF STUDENTS• COURSE DELIVERY• INTERNAL EVALUATION OF THE COURSE0

PROGRAMME ADAPTATION TO THE EDUCATIONAL SYSTEM OF TURKEY

5. PROGRAMME IMPLEMENTATION IN POLAND

01/02/2011 01/05/2012 13.000 POLONIA PROGRAMME ADAPTATION TO THE EDUCATIONAL SYSTEM OF POLAND

6. PROGRAMME IMPLEMENTATION IN PORTUGAL

01/02/2011 01/05/2012 19.335 PORTUGAL PROGRAMME ADAPTATION TO THE EDUCATIONAL SYSTEM OF PORTUGAL

7. PROGRAMME IMPLEMENTATION IN GREECE

01/02/2011 01/05/2012 18.070 GRECIA PROGRAMME ADAPTATION TO THE EDUCATIONAL SYSTEM OF GREECE

8. PROGRAMME IMPLEMENTATION IN UNITED KINGDOM

01/02/2011 01/05/2012 32.760 REINO UNIDO PROGRAMME ADAPTATION TO THE EDUCATIONAL SYSTEM OF UNITED KINGDOM

9. PROGRAMME IMPLEMENTATION IN SLOVAKIA

01/02/2011 01/05/2012 8.830 ESLOVAQUIA PROGRAMME ADAPTATION TO THE EDUCATIONAL SYSTEM OF SLOVAKIA

Page 11: Leonardo Project Transfer of Innovation: Enterprise as innovation to create new work places at time of global crisis nº 2010-1-ES1-LEO05-21250. Carlisle,

WORKPACKAGES:

11

WORK PACKAGE

START MONTH

END MONTH

TOT EUROS:333.023

PACKAGE LEADER

Activities Results and products

10. METHODOLOGICAL TRAINING IN POLAND

01/07/2011 11/07/2011 42.367 POLAND 1. Defining the teachers competencies in the use of ICT, especially regarding "Aprende a emprender" tools.

2. Previous knowledge and skills regarding the use of the tools.3. Detection of training necessities.

4. Planning of the training.5. Carrying out training activities

6. Evaluation of the training sessions.7. Intermediate evaluation of the project (internal and external)

INTERMEDIARY REPORT, CERTICATES, TRAINING

11.PROJECT DISSEMINATION

01/02/2011 01/06/2012 43.340 ALL THE PARTNERS, ESPECIALLY SPAIN AND UNITED KINGDOM

• PROMOTION & FAMILIARISATION TO THE EUROPEAN PARTNERS VIA A LAUNCH CONFERENCE IN SPAIN TO LEARNMORE ABOUT THE PROGRAMME AND THE MATERIALS IN DETAIL AFTER RECEIVING TRANSLATED MATERIALS• BY EACH PARTNER TO THEIR MINISTRY OF EDUCATION AND LOCAL EDUCATION AUTHORITIES, THROUGHOUT THEPROJECT• PROMOTION TO TEACHERS IN EDUCATION & VOCATIONAL TRAINING• INTERNAL DISSEMINATION VIA NETWORKS IN EVERY COUNTRY• INTERNAL DISSEMINATION VIA REGULAR PRESS RELEASES & EVENTS TO LOCAL AND REGIONAL NEWSPAPERS INEACH COUNTRY• EXTERNAL DISSEMINATION VIA THE WEBPAGE PROMOTION, BLOG AND ONLINE SOCIAL NETWORKS E.G. FACEBOOK• EXTERNAL DISSEMINATION VIA EACH ORGANISATION´S EUROPEAN NETWORKS• PROMOTION TO OTHER EUROPEAN ORGANISATIONS WITH SIMILAR OBJECTIVES• CLOSING EVALUATION CONFERENCE IN TURKEY AND PRESENTATION OF THE RESULTS OF THE PROJECTEXTERNAL DISSEMINATION VIA THE WEBPAGE PROMOTION, BLOG AND ONLINE SOCIAL NETWORKS E.G. FACEBOOK• TEACHER TRAINING SESSION ADDRESSED TO VET TEACHERS AND CARRIED OUT BY THE THREE PREVIOUSLYTRAINED CONSULTANTS.• OFFICIAL ANNOUNCEMENT OF THE IDEA CONTEST AND SELECTION OF THE STUDENTS

FINAL REPORTPUBLICITY LEAFLETS

12. FINAL VERSION OF THE MATERIALS: DVDS AND WEBPAGE

01/06/2011 01/05/2012 37.420 TURKEY AND SLOVAKIA

Implementation of the new model to all the partner countriesPreparation of new materials adapted to all the countries as far as language and content are concernedDissemination of the results through mass mediaOrganisation of the awareness raising European Fair with the participation of the studentsSending of all the materials to the participating institutions and VET centres in each country

FINAL VERSION OF ALL THE MATERIALS, EUROPEAN FAIR, IDEAS CONTEST

Page 12: Leonardo Project Transfer of Innovation: Enterprise as innovation to create new work places at time of global crisis nº 2010-1-ES1-LEO05-21250. Carlisle,

2. Project financial management

2. 1 PURPOSE AND PRINCIPLES The purpose of the financial guideline for Leonardo da Vinci II Programme project

Proyecto Europeo Leonardo de Transferencia de Innovación “Enterprise as innovation to create new work places at time of global crisis” nº 2010-1-ES1-LEO05-21250–is to follow the rules of the Leonardo da Vinci “Administrative and Financial Handbook for Promoters & Contractors” ( handbook ) to determine the financial management of the project and observe the budget performance of the project during the 01 de octubre de 2010 hasta 30 de septiembre de2012

The financial guideline does not set limits to project agreements and handbook in any way; it only explains different aspects of the agreements, handbook and the budget!

It is very important to specify in every partner's organisation who (person entitled to sign) will endorse, pay and confirm accounting documents (expense receipts and payment documents) for the project accounting.

It is obligatory to inform the Beneficiary about every single possible amendment in the budget before it will be realized!

Please send information with amendment request to the technical coordinator of the project Pilar Gredilla and Guillermo.  Beneficiary confirms your request with Leonardo for [email protected] Office in 10 business days. After accorded permission by Beneficiary the asked change is allowed to accomplish.

12

Page 13: Leonardo Project Transfer of Innovation: Enterprise as innovation to create new work places at time of global crisis nº 2010-1-ES1-LEO05-21250. Carlisle,

2. Project financial management

2. 2 CONTRACT COMMITMENTS FOR BENEFICIARY

The Promoter must submit: a Contracting Form fully completed and signed by the person legally entitled to sign the agreement. When filling in the form the Promoter is required to take into account the breakdown of costs of the consolidated budget and to consider the experts` comments: The Financial Identification Form (to be submitted along with the Contracting

Form) Which is to be completed and signed by the person legally entitled to sign the

Agreement (or the person legally authorised to sign such documents by the organisation) and then further signed and stamped by the bank;

Original Letters of Intent from Partners (where these have not previously been submitted and/or where new or replacement Partners are introduced at the contracting stage).*

13

Page 14: Leonardo Project Transfer of Innovation: Enterprise as innovation to create new work places at time of global crisis nº 2010-1-ES1-LEO05-21250. Carlisle,

2. Project financial management2.3. CONTRACT COMMITMENTS FOR PARTNER

Every Partner is obligated to: a) To use the grant according to the agreement and according to the

financial guide; b) Ensure the required co-funding amount during the project duration

time (from l 01-10-2010 of 30-09-2012 according to the agreements; c) Submit required information and reports (quarterly reports and the

final report) inrequired forms by the required dates to the Beneficiary; d) Inform Beneficiary about changing the responsible person for the

project during 5 business days; e) Guarantee that the costs, expense receipts and payment

documents related to the project are distinguished from the other costs, expense receipts and payment documents among the partner's accounting system;

f) Obey all instructions will be made in operations of controlling and auditing;

g) Use the required forms for drawing up the agreements, reports and expense receipts.* 14

Page 15: Leonardo Project Transfer of Innovation: Enterprise as innovation to create new work places at time of global crisis nº 2010-1-ES1-LEO05-21250. Carlisle,

2. Project financial management 2.4.1. BUDGET AND ELIGIBILITY In general, only costs meeting the following criteria are eligible for funding: they

MUST relate to activities involving the ember States of the European Union and/or the European Economic Area and/or the associated countries participating officially in the programme (Bulgaria, Romania and Turkey). 

They must be directly connected with execution of the project in accordance with the work plan; they must be incurred by partner organisations;

They must be actual costs ie the actual costs incurred must correspond to payments made by the Partnership, supported by invoices or accounting documents of equivalent value.

Where national taxation and accounting rules do not require an invoice, an accounting document of equivalent value means any document produced in order to prove that the accounting entry is accurate and which complies with the applicable accounting law.

The project duration ( 01-10-2010 to 30-09-2012) is that stipulated in the Agreement, ie the eligibility period. Only costs incurred as part of the project and during this period will be regarded as eligible. Costs incurred before or after will not be eligible.*

15

Page 16: Leonardo Project Transfer of Innovation: Enterprise as innovation to create new work places at time of global crisis nº 2010-1-ES1-LEO05-21250. Carlisle,

WOK PACKAGE TITLE START MONTH

END MONTH TOT EUROS:333.023

STAFF COST

TRAVELLING COST

OTHER COST

SUBCONTRATING COST

OVERHEADS COST

1.PROJECT MANAGEMENT 01/10/2010 01/09/2012 47.059 36.620 7.439 0 0 3.000

2.TRANSLATION OF MATERIALS 01/11/2010 01/01/2011 44.990 9.120 0 0 26.500 9.3570

3.TECHNOLOGICAL TRAINING 01/04/2010 01/04/2011 20.172 5.740 12.432 2.000 0 0

4.IPROJECT IMPLEMENTATION IN TURKEY

01/02/2011 01/05/2012 14.680 13.180 0 0 0 1.500

5. IPROJECT IMPLEMENTATION IN POLAND

01/02/2011 01/05/2012 13.000 11.500 0 0 0 1.500

6. IPROJECT IMPLEMENTATION IN PORTUGAL

01/02/2011 01/05/2012 19.335 11.150 6.684 0 0 1.500

7. IPROJECT IMPLEMENTATION IN GREECE

01/02/2011 01/05/2012 18.070 16.570 0 0 0 1.500

8. IPROJECT IMPLEMENTATION IN UNITED KINGDOM

01/02/2011 01/05/2012 32.760 31.260 0 0 0 1.500

9. IPROJECT IMPLEMENTATION IN SLOVAKIA

01/02/2011 01/05/2012 8.830 7.330 0 0 0 1.500

10. METHODOLOGICAL TRAINING IN POLAND

01/07/2011 11/07/2011 42.367 10.320 28.047 4.000 0 0

11.PROJECT DISSEMINTAION 01/02/2011 01/06/2012 43.340 5.740 20.750 10.500 6.350 0

12. FINAL VERSION OF THE MATERIALS: DVDS AND WEBPAGE

01/06/2011 01/05/2012 37.420 7.920 0 17.500 12.000 0

TOTAL COST FOR WORKPACKAGES

01/10/2010 30/09/2011 333.023 166.450 75.353 34.000 44.850 12.370

16

2.4.1. Estimated expenditures by work package and type of costsEstimated expenditures of the project are divided by Work Packages (WP). There are 12 WP in the project. Expenditures by each WP contain different type of costs (staff costs, operational costs and subcontracting costs) according to the budget lines

Page 17: Leonardo Project Transfer of Innovation: Enterprise as innovation to create new work places at time of global crisis nº 2010-1-ES1-LEO05-21250. Carlisle,

2.4.2.1. Estimated staff needs and cost by partner (Budget Line A.)

Staff costs comprise any salary and/or remuneration paid to persons employed by a Partner organisation or working regularly or recurrently for the project . This figure should include salary costs (for salaried and other staff) which are paid under the staff budget (for normal accountancy purposes) plus all the usual contributions paid by the employer, such as social security contributions, social fees, holiday payments and pension costs but must exclude any bonuses, incentive payments or profit-sharing schemes. This figure must not include costs relating to persons undertaking subcontracted tasks.

17

Page 18: Leonardo Project Transfer of Innovation: Enterprise as innovation to create new work places at time of global crisis nº 2010-1-ES1-LEO05-21250. Carlisle,

18

Page 19: Leonardo Project Transfer of Innovation: Enterprise as innovation to create new work places at time of global crisis nº 2010-1-ES1-LEO05-21250. Carlisle,

2.4.2.2. STAFF COST

In the final report a final statement of costs must be presented. The maximum Community contribution towards Staff Costs (or the declared amount for Staff Costs, whichever is lowest) will only be paid in full where the project achieves its contractually agreed aim. Partner has a right to decide how to divide the last 30 % from the grant: 1) partner will pay staff costs to the individual on the basis of submitted time

sheets and it will be compensated in the end of the project or 2) partner will pay staff costs to the individual on the basis of submitted time

sheets after returning the final 30 % from the grant.

19

All costs in Euro

Total P1 P2 P3 P4 P5 P6 P7 P8

Cofunding from StaffLdV grant from Staff

Page 20: Leonardo Project Transfer of Innovation: Enterprise as innovation to create new work places at time of global crisis nº 2010-1-ES1-LEO05-21250. Carlisle,

2.4.2.1 STAFF COST(Time sheet ) Time sheet is a reporting document that contains following information

about every person employed by a partner organisation or working regularly or recurrently for the project:

a) project name; b) project No: c) organisation name; d) name of the employee; e) staff category (ISCO); f) cost per day; g) project acronym; h) partner (No and name); i) project number; j) month; k) dates; l) day worked; m) No of WP; n) place of performance; o) activity/remarks; p) amounts paid from grant, from co-funding and total amount; q) date and signature of the employee;

r) date and signature of the legal representative. 20

Page 21: Leonardo Project Transfer of Innovation: Enterprise as innovation to create new work places at time of global crisis nº 2010-1-ES1-LEO05-21250. Carlisle,

Time sheets of every month are required to submit quarterly.The reporting form for staff costs is following:

21

Date (mm.yyyy)

Name of the employee

Staff category (ISCO)

otal number of days

Cost per day

number of WP

Co-funding (in euro)

Grant from Leonardo (in euro

Taxes cofunding (in euro)

Taxes from Leonardo (in euro

TOTAL STAFF COST

(mm.aaaa)

(……………..)

Total mm aaaa(mm.aaaa)

(…………….) Total mm yyyyTotal staff costs

Page 22: Leonardo Project Transfer of Innovation: Enterprise as innovation to create new work places at time of global crisis nº 2010-1-ES1-LEO05-21250. Carlisle,

2.4.3.1. Travelling (Budget Line B.1.)

TRAVEL COSTS = fixed daily subsistence rate (accommodation, hotel + meal costs or daily allowance + local transport) + international transport

 a) Subsistence Costs (accommodation costs, meal costs or daily allowance, local travel costs) Subsistence costs may be financed by the project, provided:

1. They are reasonable in the light of local prices;

2. They are calculated in accordance with the existing internal rules of the Beneficiary or Partner organisations, which may be on an actual cost (reimbursement of receipts) or daily allowance basis.

3. Subsistence Costs may not, however, exceed the maximum daily rate for the country being visited.

Evidence of the applied payment system (documentation evidencing amounts reimbursed or evidence of payment of daily rates to an individual) should be readily available.Daily Subsistence Rate includes:

- accommodation costs;

- actual meal costs proved with invoices OR daily allowance paid to individual according to the national rate;

- local travel costs (if appears).

Daily allowance is a fixed daily allowance in concrete country paid to individual according to the national rate.

 In countries where daily allowance is not paid, actual meal costs will be taken into consideration for business travels.  Actual meal costs should be proved with invoices.

22

Page 23: Leonardo Project Transfer of Innovation: Enterprise as innovation to create new work places at time of global crisis nº 2010-1-ES1-LEO05-21250. Carlisle,

2.4.3.1. Travelling (Budget Line B.1.)

In calculating the number of days for applying the daily subsistence rate it should be noted that a FULL day normally includes an overnight stay (the National Agency or the Commission may consider an exception to this rule whereby a full day's subsistence is allowed without an overnight stay, according to the internal rules of the Contractor or Partner

organisations, where this is the case the Contractor will need to provide a full explanation).

Very simple formula for calculating the number of days for daily subsistence rate: nights + 0.5 days

Example: Meeting in Riga from the 13 thtill 14th of October. You arrived on the 12 th of October and stayed in the hotel for 2 nights (12 th and 13 thof October). You left Riga on the 14 th of October. In this case you can calculate 2 nights + 0.5 days = 2.5 days for daily subsistence rate. The maximum daily subsistence rate is 174 Euros * 2.5 days = 435 Euros per person. NB! Planned as maximum day rates but must be supported with invoices afterwards!

23

Page 24: Leonardo Project Transfer of Innovation: Enterprise as innovation to create new work places at time of global crisis nº 2010-1-ES1-LEO05-21250. Carlisle,

2.4.3.1. Travelling (Budget Line B.1.)

b) International transport Allowable Travel Costs under the Agreement will be the real Travel Costs. It is required to

use the cheapest means of travel, and Partners will thus have to make every effort to use Apex tickets for air travel and take advantage of reduced fares. Where this is not the case a full explanation should be provided.

Travel Costs should include all costs for travel (rail, bus, taxi, air) from the point of origin to the point of destination and should further include any related travel insurance costs. There can be several interpretations for international and local transport.

According to the Leonardo rules the international transport contains travelling from the origin place to the meeting place (for example from the home to the airport by taxi, to the airport of the destination place by plane and from there to the hotel by taxi – all this together is an international transport).

The local transport is a driving by taxi in the city the innovacreawork meeting takes place, for example taking taxi for driving from the hotel to the meeting place.

24

Page 25: Leonardo Project Transfer of Innovation: Enterprise as innovation to create new work places at time of global crisis nº 2010-1-ES1-LEO05-21250. Carlisle,

25

Page 26: Leonardo Project Transfer of Innovation: Enterprise as innovation to create new work places at time of global crisis nº 2010-1-ES1-LEO05-21250. Carlisle,

SOCIO P4

Meetings planned Time Max daily subsistence rate per day

1

MEETING OF CO-ORDINATORS United Kingdom - UK

13- 15 JANUARY 2011 276

2 LAUNCH CONFERENCE IN SPAIN TRAINING IN THE TECHNICAL DETAILS OF THE PROGRAMM Espana –ES 11-15 APRIL 2011 212

3

INTERMEDIATE EVALUATION OF PROJECT Portugal - PT

JANUARY-FEBRUARY 2012

204

4

FINAL EVALUATION OF PROJECT Turkey - TR

01-07 JUNE 2012 220

5

TEACHER TRAINING ININNOVATION IN POLAND PL

01-07 JULY 2011 213

26

P 8 ESLOVAQUIA subsistence cost

Destination Daily subsistence rate per day per person

Number of persons

Total number of day

Total cost of Partner 8

MEETING OF CO-ORDINATORS United Kingdom - UK

1 2 276 552

CONFERENCE IN SPAIN TRAINING IN THE TECHNICAL Espana –ES

2 4 212 1.696

INTERMEDIATE EVALUATION OF PROJECT Portugal - PT

1 2 204 408

FINAL EVALUATION OF PROJECT Turkey - TR3 2 220 1.320

TEACHER TRAINING ININNOVATION IN POLAND PL

3 4 213 2.556

Total 6514

Page 27: Leonardo Project Transfer of Innovation: Enterprise as innovation to create new work places at time of global crisis nº 2010-1-ES1-LEO05-21250. Carlisle,

P8 ESLOVAQUIA international transportMEETING OF CO-ORDINATORS United Kingdom – UK

1 195 195

CONFERENCE IN SPAIN TRAINING IN THE TECHNICAL Espana –ES

2 143 286

INTERMEDIATE EVALUATION OF PROJECT Portugal – PT

1 225 225

FINAL EVALUATION OF PROJECT Turkey – TR

3 390 1170

TEACHER TRAINING ININNOVATION IN POLAND PL

3 142 426

27

Page 28: Leonardo Project Transfer of Innovation: Enterprise as innovation to create new work places at time of global crisis nº 2010-1-ES1-LEO05-21250. Carlisle,

28

Nº Partner

Name Dates (including travel

Duration

Dates (including travel) Nº Partner Name(days

Origen Destination Objective of trip

Means of transport ( + type of fare)

Travel cost(Euro

Subsistence costs(Euro

Total Travel + Subsistence (Euro

1from (dd/mm/yyyy

to (dd/mm/yyyy

city Countrycode

city Countrycode

2

3

4

5

6

7

8Total:

Page 29: Leonardo Project Transfer of Innovation: Enterprise as innovation to create new work places at time of global crisis nº 2010-1-ES1-LEO05-21250. Carlisle,

2.4.4.1. Overheads (Budget Line C)

Overheads can include the following costs, provided they are specific to the project:daily communications (fax, Telephone, mail, etc.); photocopying; office materials / stationery / office consumables; bank costs relating to the transfer of funds (this excludes account management costs).

The following expenditure will not be accepted in any event: expenditure on rent, heating, electricity, water or any other accommodation costs normally paid for by the Contractor or Partner organisations; structural costs with no obvious link to the project;

29

All figures in Euro Total P0 P2p

P3 P4

p

P5 P6 P7 P8

ES PT ES UK TR PL EL TRB.4. Overheads (up to 7% of your costs). NB! Co-funding

12.370 3.000 1.500 370 1.500 1.500 1.500 1.500 1.500

NB! A maximum amount of not more than 7% of the total project costs will be allowed as overheads which will be provided for in full by the projects own funds or via local/national/regional contributions (to be specified during the contracting of the project). Community funds will provide 0% contribution under this heading.

Page 30: Leonardo Project Transfer of Innovation: Enterprise as innovation to create new work places at time of global crisis nº 2010-1-ES1-LEO05-21250. Carlisle,

2.4.4.2. Other costs (Budget Line B.5)

Other costs are costs which do not fall into any other category of expenditure to be claimed under the Agreement, but which are however considered necessary to the proper performance of the tasks/activities as foreseen and contractually agreed.

30

All figures in Euro Total P0 P2p

P3 P4

p

P5 P6 P7 P8

ES PT ES UK TR PL EL TRB.4. Other: organising seminars (seminar room rent). NB! Catering not allowed for own staff!

34.000 6.000 4.000 0 4.000 4.000 4.000 4.000 4.000

• Other: organising seminars (seminar room rent).Costs under this heading must therefore meet the following criteria: they must not be covered by any other budget heading; they must be necessary to the proper performance of the project; they must not involve any fundamental change in the scope and content of the project; they must be eligible under the Agreement; they must be clearly identifiable.Catering is allowed for OWN STAFF of Partners:1) if it is under subcontracting costs with invoice “Seminar organization”;2) from Travelling budget but participants must then reduce their daily allowances (prearrangement needed!);3) from Other Costs budget only room rent.

Page 31: Leonardo Project Transfer of Innovation: Enterprise as innovation to create new work places at time of global crisis nº 2010-1-ES1-LEO05-21250. Carlisle,

2.4.4.2. Other costs (Budget Line B.5)

31

Please see the Table 23 “Reporting form for other costs”

Nº Partner Nature and Specification

Purpose Unit cost (Euro) Degree of use for the project ( in %)

Total cost (Euro)

1

2

3

4

5

6

7

8

TOTAL:

Page 32: Leonardo Project Transfer of Innovation: Enterprise as innovation to create new work places at time of global crisis nº 2010-1-ES1-LEO05-21250. Carlisle,

2.4.4.3. Subcontracting costs (Budget Line B2.) Any amount paid to an external body or organisation carrying out a specific one-off

task in connection with the project (eg translation, expert consultancy, interpretation, design and printing, conference/seminar organisation) must be charged against subcontracting costs.

32

All figures in Euro Total: P0 P2 p P3 P4 P5 P6 P7 P8

ES PT ES UK TR PL EL TR

TRANSLATION OF THE APRENDE A EMPRENDER KIT MATERIALS

24.000 6.000 3.000 0 3.000 3.000 3.000 3.000 3.000

DESIGNING OF NEW CD-ROM MATERIALS: EUROPEAN GUIDE ONHOW TO BECOME AN ENTREPRENEUR

6.000 3.000 0 0 0 3.000 0 0 0

MATERIALS DESIGN: EUROPEAN GUIDE ON HOW TO BECOME ANENTREPRENEUR

6.000 3.000 0 0 0 3.000 0 0 0

ADAPTATION OF www.ecc.grundtvig.com PLATFORM

2.500 0 2.500 0 0 0 0 0 0

EXTERNAL EVALUATION 6.350 6.350 0 0 0 0 0 0 0TOTAL: 44.850 18.350 5.500 0 3.000 9.000 3.000 3.000 3.000

Page 33: Leonardo Project Transfer of Innovation: Enterprise as innovation to create new work places at time of global crisis nº 2010-1-ES1-LEO05-21250. Carlisle,

2.5. Subcontracting costs (Budget Line B2.) Subcontracting costs in INOVACREAWORK II are following:

1) translation costs (budget line C.1);

2) marketing materials (design, printing) (budget line C.2);

3) software development (budget line C.3);

4) IT management and design (budget line C.4);

5) organising of international conference DAAAM/INNOMET 2006 (promoted by

DAAAM network of conferences) (budget line C.5);

6) intellectual property legislation (consortium agreement, trademark legislation, IP

policy, licensing) (budget line C.6);

7) expert consultancy from sector enterprises and open sector (budget line C.7);

8) accountancy (C.8).

33

Nº Partner Sub-contracted work

Sub-contracting contract Sub-contracting cost

Start date (dd/mm/yyyy) End date (dd/mm/yyyy)

1

2

3

4

5

6

7

8

TOTAL

Page 34: Leonardo Project Transfer of Innovation: Enterprise as innovation to create new work places at time of global crisis nº 2010-1-ES1-LEO05-21250. Carlisle,

34

B-3 LISTA DE LOS SOCIOS Y PRESUPUESTOS POR SOCIO

DATOS PRESUPUESTARIOS Nº Socio Nombre de la organización en la lengua

nacional Total Coste del

Proyecto Asignación Leonardo da Vinci concedida

% Co-funding % of grant

1 ANPE SINDICATO INDEPENDIENTE DE CASTILLA Y LEÓN

66.714 47.814 28,33 18.900 71,672 DIRECCIÓN GENERAL DE FORMACIÓN

PROFESIONAL. CONSEJERÍA DE EDUCACIÓN. JUNTA DE CASTILLA Y LEÓN 0 0 0 0 0

3 KERIGMA-INSTITUTO DE INOVAÇAO E DESENVOLVIMENTO DE BARCELOS

33.358,00 23.909,00 28,33 9.449 71,674 Centros Europeos de Empresas e

Innovación de Castilla y León, S.A. 37764 27.065 28,33 10.699 71,67

5 CUMBRIA CREDITS LIMITED

54.354,00 38.958,00 28,33 15.396 71,676 Bursa Elektronikçiler Odası

42.728,00 30.625,00 28,33 12.103 71,677 Mazovian In Service Teacher Training Centre

32.834,00 23.534,00 28,33 9.300 71,678 ΕΤΑΙΡΕΙΑ ΚΟΙΝΩΝΙΚΗΣ ΠΑΡΕΜΒΑΣΗΣ &

ΠΟΛΙΤΙΣΜΟΥ ΤΗΣ ΝΟΜΑΡΧΙΑΚΗΣ ΑΥΤΟΔΙΟΙΚΗΣΗΣ ΜΑΓΝΗΣΙΑΣ 38.847,00 27.843,00 28,33 11.004 71,67

9 BIC BANSKA BYSTRICA DE ESLOVAQUIA 26424 18.938

28,33 7.486 71,6710 Uludağ Universitesi Teknik Bilimler Meslek

Yüksek Okulu0 ,00 0,00 0

11 DEMİRTAŞPAŞA ENDÜSTRİ MESLEK VE TEKNİK LİSESİ 0,00 0,00 0

12 BURSA İL MİLLİ EĞİTİM MÜDÜRLÜĞÜ 0,00 0,00 0

Total 333.023 238.686 28,33 94.337 71,67

Page 35: Leonardo Project Transfer of Innovation: Enterprise as innovation to create new work places at time of global crisis nº 2010-1-ES1-LEO05-21250. Carlisle,

3. CONTRACTS AND AMENDMENTS 3.1. Contracts

Following contracts are signed for the INNOMET II project: 1) agreement between Leonardo and the Beneficiary ((ANPE) 2) consortium agreement between Partners; 3) agreements between the Beneficiary and Partners. Agreement between the Beneficiary and Partners includes the budget of the project and the

“Financial Guideline for Leonardo da Vinci II Programme Project “INOVACREAWORK – Integrated Human Resources Development and onitoring System for Adding Innovation Capacity of Labour Force and Entrepreneurs of the Metal Engineering, machinery and Apparatus Sector”” as Annexes.Agreement between Leonardo and The Beneficiary is legally binding!

35

3.2. Amendments•Where it is proposed to change budget headings (not overheads or staff costs) simultaneously by more than 10 % (of the total cost of an individual budget heading) and 5 000 Euros, and provided the total cost of the project (estimated and consolidated budget), the maximum Community contribution and the co-financing % remain unchanged, the following procedure must be followed:•The Beneficiary (here the Beneficiary TUT) must complete, sign and submit to the National Agency or the Commission a Contract Amendment request Form justifying the proposed changes and presenting a revised budget (the revised budget must respect the maximum ceilings for of 15 % for ICT and 30 % for sub-contracting) to include the following annexes:

•1) the agreement of all project partners to the proposed budget changes;•2) where formal approval is given and a Supplementary Agreement is thus signed by both parties, the Beneficiary will be subsequently required to submit copies of amendments to the Agreement concluded between the Beneficiary and the project partners (a Model Agreement is provided as an annex to the Agreement.

Page 36: Leonardo Project Transfer of Innovation: Enterprise as innovation to create new work places at time of global crisis nº 2010-1-ES1-LEO05-21250. Carlisle,

4. FINANCIAL MANAGEMENT4.1. General remarks The project management must cover the whole of the budget and costs incurred. This

requires that the Beneficiary sets up an accounting system that also includes Partners' expenses.

4.2. Bank account Where possible, a separate Bank Account should be established for the

project. Where this is not possible, then as a minimum all income/expenditure relating to the project must be easily able to be identified. Costs relating to account management are ineligible; however bank costs relating to the transfer of funds (ie payments to Partners) are eligible under the budget for Overheads. Any interest earned in relation to pre-financing paid to the project (either by the Contractor or by individual Partners) must be declared within the relevant table of the final financial report for eventual reimbursement to the National Agency or the Commission.

4.3. Accounting System/Internal Control Contractors must set up an analytical system or an adequate internal system, which

must make it possible to identify: The sources of project funding; Project expenditure incurred during the eligibility period

All transactions within the eligibility period, relation to actual expenditure/income under the project, must be recorded systematically using a numbering system which specifically identifies the project. As far as possible, the persons responsible for managing the project should not be the same as those responsible for its financial management

36

Page 37: Leonardo Project Transfer of Innovation: Enterprise as innovation to create new work places at time of global crisis nº 2010-1-ES1-LEO05-21250. Carlisle,

4. FINANCIAL MANAGEMENT 4.4. VAT, Customs Duties and Other Taxes on Goods and Services Partners must ascertain from the competent national authorities the provisions, rules and legislation

governing the taxation of training and related activities in their countries. VAT cannot, in any case, be charge to the project unless it is a final charge, ie a charge that is not deductible

and cannot be recovered by the Beneficiary or the Partners. Like VAT, other types of taxation, duty or charges which may arise from Community financing are eligible

costs if they are actually and finally borne by the parties concerned.  4.5. Exchange rates All amounts given in the project reports must be expressed in Euro. In quarterly report please include also

national currency equivalent. Where Euro account is held, the Contractor and Partners must report expenditure at the amount(s) debited in

Euro from their account. Where accounts are held in national currency, then the Contractor and Partners should normally use the

model shown in chapter III.3.5 in Leonardo da Vinci “Administrative and Financial Handbook for Promoters & Contracts”.

 4.6. Payment Arrangements All requests for payment of the balance shall accompany the Final Report and shall present a final

breakdown of costs actually incurred according to the structure of the budget in addition to a complete summary statement of both expenditure and income relating to the project.

Payments arrangements and dates will be laid down in the Agreements. However, for Beneficiary' information and to allow them to plan their budgets, it can be indicated that payment transfers will be made as follow:

• For twelve or eighteen-month projects: 70% on signature of the Agreement and 30% on receipt and Aceptance of the final report;

• For twenty-four, thirty or thirty-six month projects: 40% on signature of the Agreement, 30% on receipt and acceptance of the interim report and 30% on receipt and acceptance of the final report.

37

Page 38: Leonardo Project Transfer of Innovation: Enterprise as innovation to create new work places at time of global crisis nº 2010-1-ES1-LEO05-21250. Carlisle,

4. FINANCIAL MANAGEMENT 4.7. Registration and requirements for the invoices In principle, all documents must be original and dated ; documents from the Partners will be copies, the

original being held by the Partner concerned. An original invoice must include as follows:

1. Partner's name, address and bank details; 2. Remitter's name, address and bank details; 3. Invoice number; 4. Invoice date; 5. Due date; 6. Contents of description; 7. Amount; 8. Accountant name and signature. On the back of every original invoice please write: • project number; • description of the content of the invoice in English (in case the invoice is presented in national

languages). • date; • signature of the person responsible for the work The supporting documents required for each type of cost in as follows:

4.7.1. Personal costs Since personnel costs are covered by a lump sum, promotors will not be required to produce supporting

documents. 38

Page 39: Leonardo Project Transfer of Innovation: Enterprise as innovation to create new work places at time of global crisis nº 2010-1-ES1-LEO05-21250. Carlisle,

4.7.2. Travel and subsistence costs Travel costs will be reimbursed as follow: for train travel: on the basis of original tickets; for air travel: on the basis of original tickets and boarding passes; for travel in a private vehicle: on the basis of a statement from the rail company or airline confirming the train or air fare for the journey; for travel in a hired vehicle: on the basis of the invoice; for taxi journeys; on the basis of the receipt and an expense form (or equivalent)

4.7.3. Subsistence costs, including accommodation and meals, will be reimbursed on a lump-sum basis and may exceed neither the daily rate per person applied by the organization to which the person travelling belongs nor the maximum daily rate per person.

4.7.4. Overheads Since overheads are covered by a lump sum which may amount to 7% of the total estimated project cost (which

is thus fixed at the time of the tender and cannot change in the course of the project), no supporting documents need be produced.

4.7.5. Other costs Only actual costs as shown on the corresponding invoices can be charged to the project.

4.7.8. Subcontracting costs If Partners use the services of a subcontractor, they must be able to produce the agreement concluded with the

latter, the invoice(s) paid and any other supporting document connected with the subcontracting costs set out in the report. The Commission reserves the right not to accept all or part of such expenses if they do not satisfy the eligibility requirements set out in the Agreement.

Proforma invoices will not be accepted, except for expenditure committed and not yet paid, in which case the Partner will have to provide proof of payment at a later date. For payments which have already been made, only final invoices will be accepted and the Beneficiary will have to be able to supply bank statements or other proof of payment. 39

Page 40: Leonardo Project Transfer of Innovation: Enterprise as innovation to create new work places at time of global crisis nº 2010-1-ES1-LEO05-21250. Carlisle,

5. AuditingAs set out in the Agreement, an operational and/or financial audit can be carried out on the

spot by the National Agency, the Commission or the Court of Auditors of the European Union. In such cases, Partners will be notified that an inspection visit is to be made.The purpose of these audits is twofold: Firstly, to check that the project's financial reports presented for payment are

consistent with the Partner's basic accounts and to ensure that Community funds have been spent in accordance with the Agreement and its annexes, that the aims of the projects have been achieved and that the products/results have been generated.

 Secondly, audits provide a good opportunity for contact and dialogue between the auditors and the Partner. If any management problems are found, the auditors will work with the Partner to seek a solution and, if necessary, improve existing internal procedures in order to make the best possible use of Community funds. The auditors will be open to any comments and/or suggestions that to Beneficiary and the Partners may wish to make.

The main evaluation criterion is transparency , rather than strict compliance with contract rules. It is essential for the auditors to have access to full, accurate and properly documented information. Lastly, the audit will cover the use of funds from all sources. An audit certificate may be presented in national language. The auditors must attach a certified translation in English (in case the invoice is presented in national languages). The audit certification must be signed (signature and stamp) and dated by external auditor (or competent public officer).

40

Page 41: Leonardo Project Transfer of Innovation: Enterprise as innovation to create new work places at time of global crisis nº 2010-1-ES1-LEO05-21250. Carlisle,

6. REPORTING As the quarterly and final reports are the main evaluation tools, they must provide as

true a picture of the project as possible. Partners are therefore advised to read the report forms carefully, so that they are familiar with the content and aware of the financial and accounting information required for their completion.

In each report, the various financial tables form a coherent whole: the figures must therefore be consistent . Before submitting the report, the Partner must check that the entries satisfy this requirement.

The amounts given within the Report Forms must be expressed in EUR (in Quarterly Report also in national currency) and rounded to the nearest whole number. Before submitting the reports, the Beneficiary must also check that the totals and sub-totals given are arithmetically correct.

Since the purpose of the final report is to allow an overall evaluation of the project, all contracted project activities must be completed before the Final Report is submitted.

All the project partners have to submit quarterly reports to the Beneficiary in January, April, July and October 2011 and in January in January, April and July 2012.

The requirement of quarterly report proceeds from the consortium agreement with the purpose of facilitating the compilation of final report and monitoring the budget allocation.

41

Page 42: Leonardo Project Transfer of Innovation: Enterprise as innovation to create new work places at time of global crisis nº 2010-1-ES1-LEO05-21250. Carlisle,

6. REPORTING Formal requirements for acceptance of reports. For a report form to be accepted and evaluated, the following formal requirements

must be satisfied: 1. The original of the form must be sent. 2. The form must bear the original signature of the representative legally

entitled to sign of the contracting organisation. The representative's name and position/title in the contracting organisation must be given below the signature, which must be accompanied by the organisation's official stamp.

3. The form must be returned in full (ie all its pages), duly completed and signed at the appropriate place.

4. The financial report must be correctly completed according to the model. 5. The following documents must be attached to the form:

• Copies of the contracts concluded with the project Partners. The Beneficiary must number these using the serial number allocated to each in the financial report.

• Copies of any subcontracting agreements. • Copies of all invoices relating to subcontracting costs.

If the report does not meet the above criteria, the National Agency 2may not evaluate it until its formal presentation is correct.

42

Page 43: Leonardo Project Transfer of Innovation: Enterprise as innovation to create new work places at time of global crisis nº 2010-1-ES1-LEO05-21250. Carlisle,

8.1. Quarterly report

The general purpose of the quarterly report is to facilitate the compilation of the final report. Quarterly report is based on a cash-basis accounting ie it records only transactions in which cash is received or paid. 

Quarterly report must be submitted five times (in January, April, July, October 2006 and in January 2007) during the period of the project by each partner. 

Quarterly report must be sent by e-mail and submitted signed to the Beneficiary (ANPE CYL) 20 days after the end of the quarter the latest. Reporting form of the quarterly report consists of the lists of all expenditures.

Staff costs consist of salaries/wages (based on the time sheet) plus compulsory taxes, which include social security tax, unemployment tax and pension tax. Employee salaries/wages and compulsory taxes must be written on the separate rows. The time sheet must contain monthly staff costs by each person separately.

Travelling costs include travel and subsistence costs. other and sub-contracting costs will be reported. The quarterly report does not include overhead costs separately by each

partner. 43

Page 44: Leonardo Project Transfer of Innovation: Enterprise as innovation to create new work places at time of global crisis nº 2010-1-ES1-LEO05-21250. Carlisle,

6.1. Quarterly report Quarterly report consists of the following annexes:

1. Timesheets – to be completed by each person every month; 2. Reporting form for the staff costs; 3. Reporting form for the travelling costs – to be completed by each person,

requires person's name, travelling date, destination, objective of the trip, means of transport, travel cost, subsistence costs and total travel cost + subsistence costs;

4. Reporting form for the ICT costs; 5. Reporting form for the production costs; 6. Reporting form for the other costs; 7. Reporting form for the subcontracting costs; 8. Reporting form for the expenditures by the type of cost - it consists of budget,

grant from Leonardo, co-funding, total eligible costs and balance at the end of the quarter;

9. Copies of the original invoices: the copies must be numbered in the same order as in the quarterly report (eg Travelling B.1, etc.). For additional conditions please see chapter 7.8.

10. Payment orders (if partner does not have a separate bank account) or bank statement which shows its beginning and ending balances and listing the periods' transactions.

44

Page 45: Leonardo Project Transfer of Innovation: Enterprise as innovation to create new work places at time of global crisis nº 2010-1-ES1-LEO05-21250. Carlisle,

6.1. Quarterly report

Quarterly report is required to submit after every quarter by the 20 th date of the next month:

1) 1stquarterly (activities in October, November, December 2010) report has to be submitted by the 20 th

of January 2011;

  2) 2ndquarterly (activities in January, February, March 2011) report has to be

submitted by the 20thof April 2011;   3) 3rd quarterly (activities in April, May, June 2011 report has to be submitted by the

20 th of July;

  4) 4 thquarterly (activities in July, August, September 2011) report has to be

submitted by the 20thof the October 2011;

  5) 5 thquarterly report (activities in October, November, December 2011) report has

to be submitted by the 20th of the January 2012. 

If the Partner has not submitted the quarterly report by the deadline, the Beneficiary has the right to call in the forfeiture/penal fine from the Partner as fixed in the agreement.

45

Page 46: Leonardo Project Transfer of Innovation: Enterprise as innovation to create new work places at time of global crisis nº 2010-1-ES1-LEO05-21250. Carlisle,

6.2. Final report The final report consists of a balance sheet reporting expenditure over the entire project

duration. Final report is accrual-basis accounting ie accounting that recognizes (records) the impact of a business event as it occurs, whether or not cash has been received or paid. After accepting the costs of the last quarter of the project the last 30% of total budget is received.  

After compiling and submitting the quarterly reports the final report should be basically ready. Final report of each Partner must be sent by e-mail and submitted signed to ANPE by 30 days after the end of the contract the latest.

The analysis of the Final Report will include: Appraisal of the quality of the results of the project (this analysis includes verification of the conformity

of the activities carried out compared with the forecast activities at the time of contractualisation and an analysis of the quality of each of the products/individual results of the project);

Evaluation of the eligibility of declared expenditure and adherence to the budget of the project; Verification of the transfer of the Leonardo da Vinci funds to the Partners, so as to make sure that

no major reduction of the European dimension has occurred, that the minimum European dimension has been espected and that changes made did not have any negative impact on the overall quality of the project.

verification of all the sources of financing of the project including the own resources of each Partner and other possible income.

verification of the measures taken to assure the dissemination of the project results. Partner has a right to decide how to divide the last 30 % from the grant: 1) partner will pay staff costs on the basis of submitted time sheets and it will be compensated by

Leonardo grant in the end of the project or 2) partner will pay staff costs on the basis of submitted time sheets after returning the final 30 % from

the Leonardo 46

Page 47: Leonardo Project Transfer of Innovation: Enterprise as innovation to create new work places at time of global crisis nº 2010-1-ES1-LEO05-21250. Carlisle,

DISSEMINATION: The Beneficiary will mention that the Lifelong Learning

Programme grant was given to them in any dissemination document or publication, in all materials and products that have been issued with the help of the grant and in all communication and interviews that have been carried out according to the visual guide issued by the European Comission available at:

http://ec.europa.eu/dgs/education_culture/publ/graphics/identity_en.html.

The Beneficiary shall keep the track of the progress and the project results conitnuously in the ADAM date base available at:

http://www.adam-europe.eu.

47

Page 48: Leonardo Project Transfer of Innovation: Enterprise as innovation to create new work places at time of global crisis nº 2010-1-ES1-LEO05-21250. Carlisle,

Meeting in Madrid

The www.eccgrundtvig.es will be used by all partners to upload monthly the information about the costs. The information about the costs corresponding the previous month must be uploaded during the first week of the following month.

No costs shall be claimed fifteen days before handing in of the quarterly or final report of September 2011.

VAT is eligible cost if it cannot be recovered. The costs derived directly from the conditions of the present contract are

dissemination of information, specified evaluation of the project, auditing, translations, reproductions, etc. including the cost of financial services and financial guarantees.

The indirect eligible costs are those that according to the conditions of the contract detailed in the article 14.1 cannot be identified as specific costs linked directly to the project. That is why they cannot be claimed directly but they should be identified and justified as connected to the eligible direct costs through the accounting system of the Beneficiary. They cannot be claimed as direct eligible costs.

48

Page 49: Leonardo Project Transfer of Innovation: Enterprise as innovation to create new work places at time of global crisis nº 2010-1-ES1-LEO05-21250. Carlisle,

Meeting in Madrid

In reference to any specific cost, the excell line it is related to must be mentioned.

The rate for the cost of a car, either your own one or rented is 0,22€/Km Management commitee is formed by Trudy, Guillermo and Susana and supervised by

Pilar. To plan all the travels for 2010-2011 Communication on a regular basis through weekly emails and videoconferences

through Skype every first and third Thursday of a month. Project progress report after each meeting. To discuss the way the documents will be handed in to the partners and in which

format.

49

Page 50: Leonardo Project Transfer of Innovation: Enterprise as innovation to create new work places at time of global crisis nº 2010-1-ES1-LEO05-21250. Carlisle,

Meeting in Madrid

MONITORING AND EVALUATION: NATIONAL AGENCY EVALUATION.

The evaluation will be cariied out by TOI department that will issue a monitoring sheet every six months.

The visits will include: advisory service, correcting any Realiza visitas periódicas de asesoramiento, corregir desviaciones, conocer a las personas.

Contenido de la visita: la evolución, resultados a fecha, asistentes, donde ha sido, fotos, evaluación, sostenibilidad, impacto, problemas, proceso de contractualización del proyecto, transferencias del proyecto, visitas de seguimiento no de control.

50