Top Banner
1 August 2018 AEC+ Business Advisory KASIKORNBANK LAO PDR INVESTMENT GUIDE
47

LAO PDR - Facilitiesfuangfah.econ.cmu.ac.th/teacher/nisit/files/201808_LaoPDR_Investm… · • On August 7, the government of Laos announced the suspension of new hydropower project

Aug 04, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: LAO PDR - Facilitiesfuangfah.econ.cmu.ac.th/teacher/nisit/files/201808_LaoPDR_Investm… · • On August 7, the government of Laos announced the suspension of new hydropower project

1

August 2018 AEC+ Business Advisory

KASIKORNBANK

LAO PDR INVESTMENT GUIDE

2

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

3

ldquoLaos a country rich in natural resources and cultural heritagerdquo

Countryrsquos strengths

bull Strategic location bridging the GMS region and China

bull Abundance of mineral resources

bull Substantial hydropower potential

bull Well-balanced climate and fertile land

bull Tremendous potential for tourism

Why Lao PDR

4

S

Luang Prabang

Tourism Logistics Trading Hydropower

Luang Namtha and Phongsali

Industrial agriculture Tourism

Phongsali Louang Namtha

Luang Prabang

Khammouane

Savannakhet

Pakxe

VIENTIANE

Vientiane (Capital and Prefecture)

Logistics Trading Tourism Hydropower Industrial agriculture

Khammouane (Thakhek)

Mining Tourism Industrial agriculture

Savannakhet

Mining Tourism Industrial agriculture Manufacturing

Champasak (Pakse)

Logistics Trading Tourism Hydropower Industrial agriculture

Major Cities for Business Activities by Region

S OUTHERN Happening Southern town with high potential in tourism and industrial agriculture

C ENTRAL Border towns with Thailand are seeing increased business interaction with Thailand

N ORTHERN Border towns with China and now gaining more attention

5

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

6

Country Name Lao Peoplersquos Democratic Republic (Lao PDR)

Area 236800 sqkm

Population 68 million (2018)

Government Single Party Socialist Republic

Currency Lao Kip

GDP (current prices) USD 183 billion (2018) (Equivalent to Samut Prakan Thailand)

GDP per capita (current prices) USD 7930 (2018)

Luang Prabang

Khammouane

Savannakhet

Pakxe

VIENTIANE

2015 2020 2025 2030

Timeline and Milestone

With a 68 average growth rate in the medium term Laos is one of the fastest growing nations in ASEAN driven by foreign investments particularly from China and other ASEAN countries

2020 Graduation from least developed country (LDC) status

2013 WTO membership

2030 Goal Classified as developing country with upper-middle income and sustainable economic growth

Data Source IMF

Country Overview

2025 Transition period of LDC graduation by transforming service industry and agriculture to high-value businesses

7

427

1695

2013 2014 2015 2016 2017

USD

Mill

ion

Data Source KPMG ASEANstatsorg

Foreign Direct Investment

The Belt and Road Initiative(BRI) has significantly affected Laosrsquo FDI (foreign direct investment) structure It has made China the most important foreign investor in the country their investments accounted for 87 of total FDI in 2017

Key FDI Figures Changes in Economic Composition

Service sector growth an indirect effect of FDIs The service sector in Laos including wholesale and retail trading hotels and restaurants financial services and telecommunications expanded as it began to absorb the growing number of foreign workers

China is Lao PDRrsquos major investor Their investments reached USD15 billion in 2017 growing 85 YoY

Other key investors are Malaysia Thailand and

Vietnam with investment values of USD124 million USD12 million and USD09

million respectively

Top sectors of FDIs are hydropower generation mining and agriculture

OBOR effect FDI inflows significantly increased in 2016 and 2017 after Lao PDR and Chinarsquos ground-breaking ceremony of the railroad project was held in December 2015 and construction of the whole route commenced in December 2016

8

Data Source nhandancomvn International Trade Center

Lao PDR Trade Overview

In 2017 Laos mainly exported electricity to its neighboring countries such as Thailand and Vietnam while imports have shifted to electronic and machinery parts for hydropower projects industrial production and infrastructure development

Trade Flows and Balance 2012-2017

Top Trading Partners 2017

Thailand

USD 53 Billion

China

USD 20 Billion

Vietnam

USD 13 Billion

Lao PDRrsquos Key Trade Products 2017

Exports Imports

Total Export Volume

USD 48 Billion

Total Import Volume

USD 60 Billion

Electrical machinery and equipment

14

Machinery amp equipment

13

Fuel products 12

Electricity 25

Mining products 13

Electrical machinery and equipment

12

9

Lao PDR ndash Thailand Border Trade Statistics 2017

Data Source Department of Foreign Trade (Thailand)

Lao PDR ndash Thailand Border Trade

Border trade is the main two-way trade channel between Lao PDR and Thailand

of two-way trade between Lao PDR and Thailand occurs through the border as Lao PDR is a land-locked country and its economic cities are located close to Thailandrsquos border

97 Key Official Trade Points By percentage share () 2017

31 Mukdaharn - Savannakhet

8 Ubon Ratchathani - Champasak

7 Nakhon Panom - Khammouan

30 Nong Khai - Vientiane

12 Nan - Luang Prabang

Mukdahan ndash Savannakhet Strategic border point which is located along the East-West Economic Corridor (EWEC) as well as gateway to Lao PDRrsquos most developed SEZ Savan - Seno Special Economic Zone

Nong Khai ndash Vientiane Gateway to Vientiane the countryrsquos capital city and key economic city

Total Official Trade Points

15

Trade Volume USD 61 Billion

Exports USD 23 Billion

Imports USD 38 Billion

Exports Imports

Diesel fuel (11)

Automobiles and parts (8)

Refined Oil (5)

Machinery amp equipment (7)

Electricity (52)

Copper amp materials (14)

Vegetable amp products (5)

Electronics (12)

10

Data Source Asian Development Bank

Lao PDR - Infrastructure Overview

Road transport is the main mode of transportation in Laos for both freight and passenger transportation Railway development is also under way Due to Laosrsquo geographical characteristic the governmentrsquos primary focus is the development of land transport

Road transport is the primary means of transport carrying over 80 of freight traffic and almost 100 of all domestic passenger traffic Major roads link major cities to key border towns in neighboring countries with routes heading north from Vientiane the capital the more developed and most crowded

Road

Being a land-locked country Laos does not have a sea port and either relies on Thailandrsquos Laem Chabang Port or other sea ports in Vietnam However inland waterways along the Mekong river does support 18 of its freight traffic albeit with limitaitions during the dry season

Water Transport Railway Laos has no rail system However 2 large potential projects are under way The first is the Dansavan-Laobao Railway planned for 2018 operation The second is the Laos-China railway running from Vientiane to the Boten-Bohan borer which is set to be completed by the end of 2021

Aviation Laos has 3 international airports with each in the North Central and Southern regions The airports mainly handle tourist arrivals and business travelers to a lesser extent A small amount of trade is handled at Vientianersquos international airport for special niche products that require express shipment Insuch cases capacity is limited

Attapeu

International Airport

Danang

Foreign Seaport

Savannaket

Confirmed Rail Lines

Lao Bao

Bohan

11

BRI in Lao PDRrsquos Section

Route Boten to Vientiane

Distance 414 km

Construction Period 2017-2021

Investment Pattern Joint Venture ndash Lao PDR 40 and China 60

Cooperation Mechanism Government to Government (G to G)

Total Investment Cost USD 61-68 Billion

Passenger Train Speed 160-200 kmh

Stations 32

Current Status 203 completed (as of December 2017)

Data Source Reuters nationmultimediacom

Lao PDR ndash Belt and Road Initiative (BRI)

The section of the Belt and Road Initiative running through Lao PDR is a USD 6 billion high-speed railway project which will link China with Vientiane the Laotian capital and the Laos-Thailand border

Lao PDR BRI Timeline

2013 bull BRI was announced by Chinese President Xi Jinping The target of this project aims to invest in infrastructure in the central western and southern regions of Asia as well as in Africa and Europe

2016 DEC

bull The construction commenced The part of the BRI project that runs through Lao PDR runs from the Boten-Mohan border (between Laos and China) to Vientiane The project was delayed and restarted in 2017

2021 DEC

bull The project is set to be fully operational in December 2021 It will link Chinas Yunnan province the Lao capital Vientiane with the Thai border province Nong Khai

2015 DEC

bull The ground-breaking ceremony to launch the Lao PDR-China railway project was held on December 2 2015

Project Information

12

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

13

Key Industries and Opportunities

With rapid improvement in logistics infrastructure rich natural resources ample arable areas and cultural sites Lao PDR offers attractive opportunities for investments in the sectors of mining electronic parts and components industrial agriculture and tourism

TOURISM

ELECTRONIC PARTS AND COMPONENTS

MINING

INDUSTRIAL AGRICULTURE

HYDROPOWER

Temporarily Suspended

14

HYDROPOWER

Key Industries amp Opportunities

15

Hydropowerndash Overview

Hydropower exports in Lao PDR surged in 2017 The key destinations are Thailand Cambodia and Vietnam

Data source KResearch the Ministry of Energy and Mines

Total 29125

Magawatts

Number of Hydropower Plants

OPERATING

46

UNDER CONSTRUCTION

143

PENDING APPROVAL

246

Installed Capacities of Hydropower Plants in Lao PDR (Megawatts (MW) as of 2017)

Key Trends

Battery of Southeast Asia bull Due to Southeast Asiarsquos development toward industrialization there

remains a large demand gap for infrastructure support as well as growing demand for electricity to be met in the future

bull Thus Lao PDR with abundant natural resources for electricity generation aims to improve its energy sector to address this energy supply issue and position the country as a key exporter of energy in ASEAN

Lao PDR Electricity Exports

bull Lao PDRrsquos electricity exports have grown 15 annually since 2012

bull Electricity accounts for 24 of Lao PDR total exports

bull Thailand Cambodia and Vietnam are key export destinations with Thailand being the largest buyer

16

Hydropowerndash Opportunity

Lao PDR has ldquosuspendedrdquo new investment in hydropower projects and will conduct safety inspections for all existing dams due to the dam collapse incident in July

Data source laotiantimescom asianewsnetwork

The dam collapse in late July has caused Lao PDR to suspend new investment in hydropower projects in the country

bull On July 23 the ldquoSaddle Dam Drdquo part of the Xe-Pian Xe-Namnoy hydropower project in Champasak and Attapeu provinces has collapsed This disaster had affected around 5000 people in the area

bull On August 7 the government of Laos announced the suspension of new hydropower project approval and the renewed inspection of the existing dams

Key Policy Updates

2018 June

2018 August

The Lao government has suspended new investment in small-scale hydropower projects due to safety concerns

bull Lao PDR announced a temporary suspension of its authorization for investment in small-scale hydropower projects with installed capacity of lt15MW Such suspension is part of the governmentrsquos attempts to ensure the safety of hydropower dams

bull As a result the provincial and central authorities cannot approve new investment proposals for small-scale hydropower projects until concrete measures to ensure dam safety are drawn up

bull The suspension comes after construction of some projects has been found to be lower than the legally stipulated safety standards

17

Mining

Key Industries amp Opportunities

18

Mining ndash Overview

The mining Industry in Lao PDR has declined over the past several years due to fluctuations in global commodity prices and the maturity of some local mines

Data source International Trade Center worldbank

Lao PDR Mining Product Exports (USD Million 2017E)

Precious Stone Exports (USD Million 2017E)

DIAMOND

62 GOLD

1548 SILVER

54

Key Trends

Overall Lao PDRrsquos mining exports have decreased bull Exports of mining products have decreased since 2013 at an average

rate of 147 falling from USD1014 million in 2013 to USD 4575 in 2017

bull Copper and Coal experience the largest decline in export value mainly because some of the copper and coal mines have matured and global commodity prices have fallen

bull Meanwhile cement and sandstone record the highest increase in export value resulting from new investments and increasing domestic demand for these types of materials to use in the countryrsquos infrastructure development projects

Forms of investment in mining Business cooperation under contract

Joint venture between foreign and local firms

100 foreign or domestic ownership

Remark Firms could set up representative office to gather information and investigate investment opportunities

19

Taxes amp Regulations

Mining ndash Opportunity

Mineral resources in Lao PDR offer opportunities to firms with expertise in mining operations from prospection to mining and processing

Prospection Exploration Feasibility Study

Construction Mining amp Processing

2 years + 1 year

3 years + 2 years

1 year + 1 year

2 years + 1 year

20 years + 5 years

License Duration + Renewable

USD 3 -12 ha year USD 05 ndash 1 ha year + royalty (1-

7) Rental Fee

Registered company

Max 300 sqkm Corporate income 25-35

Value added 10

Rules and regulations for the Minerals Law in accordance to international standard partly missing

Limited number and capacity of local workers in mining sector

High number of mineral trade companies rather than professional mining operations firms

Key Issues

20

Electronic Parts and Components Industry

Key Industries amp Opportunities

21

Electronic Parts and Components Industry - Overview

Over the recent years Laos has experienced exponential growth in its exports of electronic parts and components especially to Thailand indicating the initial formation of the regional supply chain

Lao PDR Electronic Part and Component Exports (USD Million 2017)

Increasing investments in Lao PDR Special Economic Zone (SEZ) boosts trade The presence of SEZs and attractive incentives have attracted FDI inflows into Lao PDR especially in the production of digital camera parts and telecom equipment parts Most manufacturing in these sectors is aimed at exporting intermediate products to assemblers of finished electrical and electronic products in other countries

Main Export Destinations 2017

Data source International Trade Center

Why Thailand has become the top export destination

bull ASEAN Free Trade Agreement (AFTA) ndash The agreement minimizes trade barriers and creates free flow of goods and capital within ASEAN

bull Thailand-based industries shift their focus on value added activities - firms relocate labor-intensive activities to Thailandrsquos neighboring countries including Laos

22

Electronic Parts and Components Industry - Opportunity

Industrial development in Laos offers opportunities for firms to form the regional supply chain model and benefit from comparative advantages from both nations

Data source JETRO

Thailand

Product supply chain

Laos

Did you knowhellip

Challenges

Difficulty in getting large pools of labor due to small population

Underdeveloped infrastructure in some regions

Challenge in recruiting higher skilled specialists

Suggestion Set up in major Special Economic Zones eg Vita Park SEZ and Savan-Seno SEZ

Roll out strategic human resource plan including training and capacity building

bull Advanced infrastructure

bull Experienced and high-skilled (management level) workforce

bull Affordable and youthful workforce bull Located between Vietnam and Thailand

both with high electronics parts demand bull Government incentives

Start operation from small scale (less than 500 workers) then scale up

Japanese enterprises have started implementing Thailand+1 model by relocating labor-intensive production to Laos and exporting back to Thailand to complete product assembly eg NIKON (digital camera) Dai-Ichi Denshi (wire harness) Nissei Mizuki (electronics parts) and Toyota boshoku (car seat cover)

Thailand + 1 Model

23

Industrial Agriculture

Key Industries amp Opportunities

24

Industrial Agriculture - Overview

Most industrial agriculture exports from Lao PDR are produced by foreign investors (Chinese Thai and Vietnamese) and local entrepreneurs to a lesser extent

Data source JETRO International Trade Center Produce Report USDA Foreign Agriculture Service

Leading Agricultural Exports by export value (USD Million 2016 and 2017)

A short-term drop in fruit exports in 2017 bull Exports declined because the Lao government suspended

development of large banana and other fruit plantations which typically produce to export to China and placed more stringent control on polluting farms

bull However at the end of 2017 Lao PDR and China negotiated for less stringent terms for Lao PDRrsquos fruit exports to China

Key Trends

Sugar Cane exports rocketing bull In 2017 sugar cane plantation boomed Export volume grew 121

times from 2016

bull The major reason was the relocation of sugar production from China as production costs there are very high approximately double that of Thailand

Organic fruit and vegetable becoming key economic plants bull Local and foreign investors are increasingly investing in organic

agriculture a higher value-added segment which is demanded by major countries such as Europe US Japan and China

Exports (2016)

USD 02 Million

Exports (2017)

USD 20 Million

121 times

25

Industrial Agriculture - Opportunity

Lao industrial agriculture sector offers opportunities for

bull Agricultural inputs andmachinery producers and distributors

bull Plantation operators

bull Processing and trading firms in Thailand

3 Processing and Trading

Key Drivers Lack of capability to process

products at international standard

Lack of market access

Opportunities Market inputs and machinery

to agricultural projects Investor can target both large scale investment

and smallholder farmers

Opportunities Produce high-value agricultural

products organic products herbs and medical plants

Foreign investors operate via (1) contract farming and (2) concession

Opportunities Process raw products to meet

export standards trade products to leverage existing market channels

Agricultural Inputs and Machinery

Key Drivers Limited access to improved

agricultural inputs - Seed - Fertilizer - Quality machinery

1 2

Key Drivers Arable fertile land

low level of chemical pesticides

Plantation ndash High Value Products

26

Tourism

Key Industries amp Opportunities

27

Tourism - Overview

Tourist arrivals are on a steady rise in the past decade especially tourists from Asia Pacific with most of them visiting more developed border towns neighboring Thailand

Data source Ministry of Tourism TRAVEL amp TOURISM ECONOMIC IMPACT 2018 LAOS

Direct Contribution of Travel amp Tourism to GDP (USD Billion 2012-2018E)

bull Both tourist arrivals and revenue from tourism have increased approximately 3 folds in the past decade

bull Most tourists come from Asia Pacific (93) particularly from from Thailand (50) and Vietnam (25) followed by Europe (5)

Top Tourist Arrivals Destinations 2017

1 Vientiane Capital

2 Savannakhet

3 Champasak

Most top tourist destinations are more developed towns bordering Thailand

Nong Khai

Mukdahan

Ubon Ratchathani

World Heritage sites im these following city also attract a considerable number of visitors

Luang Prabang Wat Pu at Champasak

28

Business Opportunities Associated to Tourism Sector

Accommodate increasing tourist arrivals

Provide dining and entertainment services

Develop attractive ecotourism cultural tourism packages

Provide transportation services linking major tourism sites

Produce and market souvenirs applying local arts design and materials

1 Hotel Restaurant Entertainment

2 Tour Company Holiday Package

3 Sourvenirs

4 Transportation Service

Tourism - Opportunity

29

Lao Consumer Income and Behavior

Prefer to cook at home Enjoy drinking alcohol Middle income enjoy

spending evening in beer garden

Lao women wear sinh Follow Thai and Korean

fashion due to influence of TV series

Shop at traditional markets Middle income shop at

Thai border towns (Nong Khai Udon Thani)

Thai and Japanese products are perceived to have high quality Chinese products are perceived as sub-standard quality and Korean products are in between

30

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

31

Major Costs ndash Labor and Utility

Electricity Rate 2017

0 - 25 kwh 004USDkwh

26 - 150 kwh 005USDkwh

151 - 300 kwh 009USDkwh

more than 500 kwh 012USDkwh

301 - 400 kwh 010USDkwh

401 - 500 kwh 011USDkwh

Water Price (Per Unit) for Business and Trade Units

bull Water price for businesses is set to increase from USD USD 036 in 2017 to USD038 per unit this year

Labor minimum monthly wage in ASEAN 2017 USD

32

Tax System

Monthly Income (LAK) Tax Rate

0 ndash 1000000 0

1000001 - 3000000 5

3000001 - 6000000 10

6000001 - 12000000 12

12000001 - 24000000 15

24000001 - 40000000 20

Above 40000000 24

Types of Tax Tax rate

Profit Tax 24

Value Added Tax (VAT) 10

Withholding Tax Dividends 10

(non-residents) Transfer of shares 10

Transfer of assets 5

China

Luxembourg

Malaysia

Singapore

South Korea

Thailand

Vietnam

Income tax treaties for avoidance of double taxation

Note There is no definition of residence for tax purposes in Laos All companies registered under Lao law (including foreign law) are subject to Lao profit tax

Personal Income Tax Corporate Taxes

Data source DFDL

33

Foreign Investment Regulations

Data source JETRO Compiled by World Business Advisory Center

Not Permitted to Foreigner Only for Joint Venture with Local Company 100 Foreign Ownership Allowed

Wholesale and Retail Businesses

100 Foreign Ownership bull If registered capital is 20 billion Lao Kip

(USD 25 million) or more

Maximum 70 Foreign Ownership bull If registered capital is 10 - 20 billion Lao Kip

(USD 125 ndash 25 million)

Maximum 50 Foreign Ownership bull If registered capital is 4 - 10 billion Lao Kip

(USD 05 ndash 125 million)

bull If registered capital is less than 4 billion Lao Kip (USD 05 million)

Hotel and Restaurants Maximum 60 Foreign Ownership bull 3-5 stars hotel with minimum registered capital of

1 billion Lao Kip (USD 125000)

bull Less than 3 stars hotel 100 Foreign Ownership bull NOT ALLOWED

Logistics

100 Foreign Ownership bull Domestic goods transport with minimum

registered capital of 3 billion Lao Kip (USD 375000)

Maximum 49 Foreign Ownership bull Cross border goods transport with minimum

registered capital of 5 billion Lao Kip (USD 625000)

bull Cross border goods transport with less than 5 billion Lao Kip of registered capital

bull Domestic goods transport with less than 3 billion Lao Kip of registered capital

Examples of Foreign Investment Regulations

Foreign enterprises are subject to foreign investment regulations in several business activities Generally small businesses are preserved for Lao enterprises whereas large businesses with certain investment conditions are opened for foreign investors

34

Types of Investment ndash (1) General Business

Data source JETRO Compiled by World Business Advisory Center

Besides foreign investment regulation foreign enterprises are also subject to the investment promotion law which classifies investment into 3 types

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Investment in General Business

Types of Investment in Lao PDR

Description

o An investment in general economic activities

o Activities including controlled businesses ndash businesses that require additional approval from relevant ministries

o Activities excluding concession business

Register Capital

Requirements

o At least 1 billion Lao Kip (USD 125000)

o At the day of establishment must pay 40 (agriculture business) 60 (production and processing) 80 (services) The remainder must be paid within 1 year

Examples of Controlled Businesses 1 Agriculture plantation agriculture fishery 2 Manufacturing petroleum products leathers textile amp clothing papers

printing pesticides pharmaceutical products 3 Businesses related to environment eg wastewater treatment 4 Wholesale and retails of gasoline and petroleum products 5 Transportation 6 Hotel and Restaurant 7 Media and Publication 8 Finance and insurance 9 Legal accounting and tax services 10 Tourism 11 Education 12 Hospital clinic and medical services 13 Recreation (museum and amusement park)

35

Types of Investment ndash (2) Concession Business

Data source JETRO Compiled by World Business Advisory Center

Investment in Concession Business

Description

o An investment that requires a concession or specific authorization from the government to use the governmentrsquos property

o Some concession businesses requires authorization from the central government whereas the other requires only provincial government level of authorization for example

bull At least 5MW electricity generation project requires the central government authorization

bull Less than 5MW electricity generation projects requires only provincial government authorization

Examples of Concession Business

1 Mining 2 Electricity generation 3 Infrastructure

bull Telecommunication bull TV and radio station bull Road railway airport seaport waste disposal site

4 Businesses that use the government land bull Shopping center bull Tourist attraction bull Public park bull Hotel bull Forestry and Logging bull Plantation and Livestock

Register Capital

Requirements

o Must pay at least 20 of registered capital while remaining should be paid within 2 years

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Types of Investment in Lao PDR

36

Types of Investment ndash (3) Business Related to SEZ

Data source JETRO Compiled by World Business Advisory Center

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Types of Investment in Lao PDR

Investment in Business Related to SEZ

Description

o Business related to Special Economic Zone -gt an investment in building infrastructure for a new town

o Business related to Specific Economic Zone -gt an investment in infrastructure development for specific purpose projects such as industrial zone export zone tourist development zone etc

High Potential SEZs in Laos

o Vita Park Special Economic Zone (Vientiane)

o Savan-Seno Special Economic Zone (Savannakhet)

o Pakxe-Japan SME Specific Economic Zone (Champasak)

Special and Specific Economic Zones

1 Boten-Daenkham Specific Economic Zone 2 Luang Prabang Special Economic Zone 3 Golden Triangle Special Economic Zone 4 Thatluang Lake Specific Economic Zone 5 Longthanh Specific Economic Zone 6 Xaysettha Specific Economic Zone 7 Vita Park Special Economic Zone 8 Dongphosy Specific Economic Zone 9 Thakhek Specific Economic Zone 10 Poukiao Specific Economic Zone 11 Savan-Seno Special Economic Zone 12 Pakxe-Japan SME Specific Economic Zone

1

2

3

4

5 6

7

8

9 10

11

12

37

General Business

Concession Business

Business related to

SEZs

Procedure of Investment in Lao PDR

The investment approval procedure varies depending upon type of investment However all foreign investors must go through enterprise registration tax identification number registration and application for capital importation certificate

Apply at Ministry of Planning and

Investment

For developer apply at National Committee for Special Economic Zone

For investor apply at One-Stop Service Unit in

each SEZ

Get Concession

License

Get SEZ Concession

License

For controlled businesses apply for

approval at relevant Ministries

Get Approval License

Apply at Ministry of

Industry and Commerce

For non-controlled businesses

Get Enterprise

Registration Certificate

(ERC)

Apply for Tax

Identification Number TIN

at Tax Department Ministry of

Finance

Apply for Capital

Importation Certificate at Bank of Lao

PDR

Data source JETRO Compiled by World Business Advisory Center

38

Investment Tax Incentives ndash General Zone

Data source JETRO Compiled by World Business Advisory Center

Investment Tax Incentives in Lao PDR

Profit Tax Exemption Period

Level 1 High Promotion

Level 2 Moderate Promotion

Level 3 Low Promotion

Zone 1 10 years 6 years 4 years

Zone 2 6 years 4 years 2 years

Zone 3 4 years 2 years 1 years

Profit Tax Exemption Period by Promotion Sector and Zone

Promoted sectors Agriculture Industrial Handicrafts and Services

Type of Tax Exemption

General Zone Promotion Sector and Zone based Incentives 1 Special amp Specific Economic Zone

Tailor Made Incentives 2

Profit tax in next accounting year in case net profit is used for reinvestment (business

expansion)

Import duties for import of raw material equipment spare parts and

vehicles directly used for production

Export duties for general goods and

products (resource-based products should follow

associated laws)

Permission to carry forward losses to

three consecutive accounting years

39

Sector Period of

Profit Tax Exemption

Profit Tax Rate

After Tax Exemption Period

Hi-Tech Manufacturing 10 year 8

Manufacturing that exports at least 70 of production 10 year 8

Manufacturing that exports 30 - 60 of production 7 year 8

Manufacturing that exports 0 - 29 of production 5 year 8

Other 5 year 8

Investment amount of USD 2 million or more 10 year 8

Investment amount of USD 500000 - USD 2 million 8 year 8

Investment amount of USD 300000 - USD 500000 6 year 10

Investment amount of USD 150000 - USD 300000 4 year 10

Investment amount of USD 50000 - USD 150000 2 year 10

Export Laos products 5 year 10

International trade company 3 year 10

General trade company 2 year 10

a) Manufacturing

b) Service

c) Commerce

Personal Income Tax 5

Dividend Tax after Profit Tax Exemption Period

5

Import Duty Exemption for import of raw material equipment spare parts and

vehicles directly used for production

VAT Exemption for import products

Investment Tax Incentives ndash Special and Specific Economic Zone

Data source JETRO

Investment Tax Incentives in Lao PDR

General Zone Promotion Sector and Zone based Incentives 1 Special amp Specific Economic Zone

Tailor Made Incentives 2 Example of Tax Incentives in Savan-Seno SEZ

Other Tax Incentives

40

Non-Tax Incentives amp Trade Privileges

Data source JETRO

Non-Tax Incentives

Permission

Foreign nationals can undertake feasibility studies

Bring in foreign technicians experts and managers if qualified Lao nationals are not available

Lease land

General business up to 30 years from Lao citizen and up to 50 years from the government (renewable)

Investment in SEZ up to 75 years

Concession business upon negotiation with the government (at present there is an example of 99 years land lease)

Transfer leasehold interests and build on or make improvements or structures to a leased land

Guarantee against nationalization expropriation and requisition without compensation

Protection

Trade Privileges

ASEAN WTO GSP Bilateral trade agreement (over 18 countries)

o Argentina o Belarus o Bulgaria o Cambodia o China o Indonesia o India o Korea DPR o Kuwait

o Malaysia o Mongolia o Myanmar o Philippines o Russian

Federation o Thailand o Turkey o USA o Vietnam

41

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

42

Foreign Currency Exchange

Data source Bank of the Lao PDR

Laos Currency Kip (LAK)

Latest FX Rate (as of August 22 2018)

Remark THB and USD are widely accepted especially in the border trade area

USD 1 ~ LAK 8507

EUR 1 ~ LAK 9851

THB 1 ~ LAK 262

JPY 1 ~ LAK 77

CNY 1 ~ LAK 1193

43

KASIKORNTHAIBANK Service in Lao PDR

Retail Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Current deposit

Lending

Working capital loan

Long term loan

Bank guarantee

Project Financing

FX Services

Corporate Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Remittance

Remittance

Trade Finance Letter of Credit (LC) Standby Letter of Credit (SBLC)

44

KASIKORNTHAI BANK Limited

With establishment KASIKORNTHAIBANK

the first full-scale locally incorporated institution from Thailand is fully committed to support our clientsrsquo cross-border financing and transaction for their trade and investment activities in Lao PDR

45

KASIKORNTHAIBANK in Lao PDR Contacts

bull HEAD OFFICE Unit 12 Lane Xang Avenue Xiangngeun Village Chanthaboury District Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88905 Fax +856 21 253 336 wwwkasikornbankcomla

KASIKORNTHAI BANK Limited

bull PONESINUAN BRANCH

Ban Ponesinuan Unit 14 Sysattanak Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88826 Fax +856 21 410 889

Ms Piyanoot Sangsan Branch Manager KASIKORNTHAI BANK LIMITED Lane Xang Head Office E-mail piyanootskasikornbankcom

Mr Chatuporn Boozaya-Angool Branch Manager Ponesinuan Branch E-mail chatupornbkasikornbankcom

46

About AEC+ Business Advisory The AEC+ Business Advisory is set up by KASIKORNBANK to support businesses in their regional expansion across the ASEAN+3 market by providing local market intelligence and strategic business advice

What we do bull Offer customized and tailor-made advisory services bull Publish investment guides and industry reports bull Deliver in-depth insights via seminars bull Organize business trips to bring first-hand experience

Follow Us Visit our website at

AEC+ BUSINESS ADVISORY

Prepared by Mr Anoot Charoenkiattikul World Business Intelligence Specialist E-mail anootckasikornbankcom

httpswwwkasikornbankcominternational-businessenPagesHomeaspx

47

Page 2: LAO PDR - Facilitiesfuangfah.econ.cmu.ac.th/teacher/nisit/files/201808_LaoPDR_Investm… · • On August 7, the government of Laos announced the suspension of new hydropower project

2

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

3

ldquoLaos a country rich in natural resources and cultural heritagerdquo

Countryrsquos strengths

bull Strategic location bridging the GMS region and China

bull Abundance of mineral resources

bull Substantial hydropower potential

bull Well-balanced climate and fertile land

bull Tremendous potential for tourism

Why Lao PDR

4

S

Luang Prabang

Tourism Logistics Trading Hydropower

Luang Namtha and Phongsali

Industrial agriculture Tourism

Phongsali Louang Namtha

Luang Prabang

Khammouane

Savannakhet

Pakxe

VIENTIANE

Vientiane (Capital and Prefecture)

Logistics Trading Tourism Hydropower Industrial agriculture

Khammouane (Thakhek)

Mining Tourism Industrial agriculture

Savannakhet

Mining Tourism Industrial agriculture Manufacturing

Champasak (Pakse)

Logistics Trading Tourism Hydropower Industrial agriculture

Major Cities for Business Activities by Region

S OUTHERN Happening Southern town with high potential in tourism and industrial agriculture

C ENTRAL Border towns with Thailand are seeing increased business interaction with Thailand

N ORTHERN Border towns with China and now gaining more attention

5

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

6

Country Name Lao Peoplersquos Democratic Republic (Lao PDR)

Area 236800 sqkm

Population 68 million (2018)

Government Single Party Socialist Republic

Currency Lao Kip

GDP (current prices) USD 183 billion (2018) (Equivalent to Samut Prakan Thailand)

GDP per capita (current prices) USD 7930 (2018)

Luang Prabang

Khammouane

Savannakhet

Pakxe

VIENTIANE

2015 2020 2025 2030

Timeline and Milestone

With a 68 average growth rate in the medium term Laos is one of the fastest growing nations in ASEAN driven by foreign investments particularly from China and other ASEAN countries

2020 Graduation from least developed country (LDC) status

2013 WTO membership

2030 Goal Classified as developing country with upper-middle income and sustainable economic growth

Data Source IMF

Country Overview

2025 Transition period of LDC graduation by transforming service industry and agriculture to high-value businesses

7

427

1695

2013 2014 2015 2016 2017

USD

Mill

ion

Data Source KPMG ASEANstatsorg

Foreign Direct Investment

The Belt and Road Initiative(BRI) has significantly affected Laosrsquo FDI (foreign direct investment) structure It has made China the most important foreign investor in the country their investments accounted for 87 of total FDI in 2017

Key FDI Figures Changes in Economic Composition

Service sector growth an indirect effect of FDIs The service sector in Laos including wholesale and retail trading hotels and restaurants financial services and telecommunications expanded as it began to absorb the growing number of foreign workers

China is Lao PDRrsquos major investor Their investments reached USD15 billion in 2017 growing 85 YoY

Other key investors are Malaysia Thailand and

Vietnam with investment values of USD124 million USD12 million and USD09

million respectively

Top sectors of FDIs are hydropower generation mining and agriculture

OBOR effect FDI inflows significantly increased in 2016 and 2017 after Lao PDR and Chinarsquos ground-breaking ceremony of the railroad project was held in December 2015 and construction of the whole route commenced in December 2016

8

Data Source nhandancomvn International Trade Center

Lao PDR Trade Overview

In 2017 Laos mainly exported electricity to its neighboring countries such as Thailand and Vietnam while imports have shifted to electronic and machinery parts for hydropower projects industrial production and infrastructure development

Trade Flows and Balance 2012-2017

Top Trading Partners 2017

Thailand

USD 53 Billion

China

USD 20 Billion

Vietnam

USD 13 Billion

Lao PDRrsquos Key Trade Products 2017

Exports Imports

Total Export Volume

USD 48 Billion

Total Import Volume

USD 60 Billion

Electrical machinery and equipment

14

Machinery amp equipment

13

Fuel products 12

Electricity 25

Mining products 13

Electrical machinery and equipment

12

9

Lao PDR ndash Thailand Border Trade Statistics 2017

Data Source Department of Foreign Trade (Thailand)

Lao PDR ndash Thailand Border Trade

Border trade is the main two-way trade channel between Lao PDR and Thailand

of two-way trade between Lao PDR and Thailand occurs through the border as Lao PDR is a land-locked country and its economic cities are located close to Thailandrsquos border

97 Key Official Trade Points By percentage share () 2017

31 Mukdaharn - Savannakhet

8 Ubon Ratchathani - Champasak

7 Nakhon Panom - Khammouan

30 Nong Khai - Vientiane

12 Nan - Luang Prabang

Mukdahan ndash Savannakhet Strategic border point which is located along the East-West Economic Corridor (EWEC) as well as gateway to Lao PDRrsquos most developed SEZ Savan - Seno Special Economic Zone

Nong Khai ndash Vientiane Gateway to Vientiane the countryrsquos capital city and key economic city

Total Official Trade Points

15

Trade Volume USD 61 Billion

Exports USD 23 Billion

Imports USD 38 Billion

Exports Imports

Diesel fuel (11)

Automobiles and parts (8)

Refined Oil (5)

Machinery amp equipment (7)

Electricity (52)

Copper amp materials (14)

Vegetable amp products (5)

Electronics (12)

10

Data Source Asian Development Bank

Lao PDR - Infrastructure Overview

Road transport is the main mode of transportation in Laos for both freight and passenger transportation Railway development is also under way Due to Laosrsquo geographical characteristic the governmentrsquos primary focus is the development of land transport

Road transport is the primary means of transport carrying over 80 of freight traffic and almost 100 of all domestic passenger traffic Major roads link major cities to key border towns in neighboring countries with routes heading north from Vientiane the capital the more developed and most crowded

Road

Being a land-locked country Laos does not have a sea port and either relies on Thailandrsquos Laem Chabang Port or other sea ports in Vietnam However inland waterways along the Mekong river does support 18 of its freight traffic albeit with limitaitions during the dry season

Water Transport Railway Laos has no rail system However 2 large potential projects are under way The first is the Dansavan-Laobao Railway planned for 2018 operation The second is the Laos-China railway running from Vientiane to the Boten-Bohan borer which is set to be completed by the end of 2021

Aviation Laos has 3 international airports with each in the North Central and Southern regions The airports mainly handle tourist arrivals and business travelers to a lesser extent A small amount of trade is handled at Vientianersquos international airport for special niche products that require express shipment Insuch cases capacity is limited

Attapeu

International Airport

Danang

Foreign Seaport

Savannaket

Confirmed Rail Lines

Lao Bao

Bohan

11

BRI in Lao PDRrsquos Section

Route Boten to Vientiane

Distance 414 km

Construction Period 2017-2021

Investment Pattern Joint Venture ndash Lao PDR 40 and China 60

Cooperation Mechanism Government to Government (G to G)

Total Investment Cost USD 61-68 Billion

Passenger Train Speed 160-200 kmh

Stations 32

Current Status 203 completed (as of December 2017)

Data Source Reuters nationmultimediacom

Lao PDR ndash Belt and Road Initiative (BRI)

The section of the Belt and Road Initiative running through Lao PDR is a USD 6 billion high-speed railway project which will link China with Vientiane the Laotian capital and the Laos-Thailand border

Lao PDR BRI Timeline

2013 bull BRI was announced by Chinese President Xi Jinping The target of this project aims to invest in infrastructure in the central western and southern regions of Asia as well as in Africa and Europe

2016 DEC

bull The construction commenced The part of the BRI project that runs through Lao PDR runs from the Boten-Mohan border (between Laos and China) to Vientiane The project was delayed and restarted in 2017

2021 DEC

bull The project is set to be fully operational in December 2021 It will link Chinas Yunnan province the Lao capital Vientiane with the Thai border province Nong Khai

2015 DEC

bull The ground-breaking ceremony to launch the Lao PDR-China railway project was held on December 2 2015

Project Information

12

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

13

Key Industries and Opportunities

With rapid improvement in logistics infrastructure rich natural resources ample arable areas and cultural sites Lao PDR offers attractive opportunities for investments in the sectors of mining electronic parts and components industrial agriculture and tourism

TOURISM

ELECTRONIC PARTS AND COMPONENTS

MINING

INDUSTRIAL AGRICULTURE

HYDROPOWER

Temporarily Suspended

14

HYDROPOWER

Key Industries amp Opportunities

15

Hydropowerndash Overview

Hydropower exports in Lao PDR surged in 2017 The key destinations are Thailand Cambodia and Vietnam

Data source KResearch the Ministry of Energy and Mines

Total 29125

Magawatts

Number of Hydropower Plants

OPERATING

46

UNDER CONSTRUCTION

143

PENDING APPROVAL

246

Installed Capacities of Hydropower Plants in Lao PDR (Megawatts (MW) as of 2017)

Key Trends

Battery of Southeast Asia bull Due to Southeast Asiarsquos development toward industrialization there

remains a large demand gap for infrastructure support as well as growing demand for electricity to be met in the future

bull Thus Lao PDR with abundant natural resources for electricity generation aims to improve its energy sector to address this energy supply issue and position the country as a key exporter of energy in ASEAN

Lao PDR Electricity Exports

bull Lao PDRrsquos electricity exports have grown 15 annually since 2012

bull Electricity accounts for 24 of Lao PDR total exports

bull Thailand Cambodia and Vietnam are key export destinations with Thailand being the largest buyer

16

Hydropowerndash Opportunity

Lao PDR has ldquosuspendedrdquo new investment in hydropower projects and will conduct safety inspections for all existing dams due to the dam collapse incident in July

Data source laotiantimescom asianewsnetwork

The dam collapse in late July has caused Lao PDR to suspend new investment in hydropower projects in the country

bull On July 23 the ldquoSaddle Dam Drdquo part of the Xe-Pian Xe-Namnoy hydropower project in Champasak and Attapeu provinces has collapsed This disaster had affected around 5000 people in the area

bull On August 7 the government of Laos announced the suspension of new hydropower project approval and the renewed inspection of the existing dams

Key Policy Updates

2018 June

2018 August

The Lao government has suspended new investment in small-scale hydropower projects due to safety concerns

bull Lao PDR announced a temporary suspension of its authorization for investment in small-scale hydropower projects with installed capacity of lt15MW Such suspension is part of the governmentrsquos attempts to ensure the safety of hydropower dams

bull As a result the provincial and central authorities cannot approve new investment proposals for small-scale hydropower projects until concrete measures to ensure dam safety are drawn up

bull The suspension comes after construction of some projects has been found to be lower than the legally stipulated safety standards

17

Mining

Key Industries amp Opportunities

18

Mining ndash Overview

The mining Industry in Lao PDR has declined over the past several years due to fluctuations in global commodity prices and the maturity of some local mines

Data source International Trade Center worldbank

Lao PDR Mining Product Exports (USD Million 2017E)

Precious Stone Exports (USD Million 2017E)

DIAMOND

62 GOLD

1548 SILVER

54

Key Trends

Overall Lao PDRrsquos mining exports have decreased bull Exports of mining products have decreased since 2013 at an average

rate of 147 falling from USD1014 million in 2013 to USD 4575 in 2017

bull Copper and Coal experience the largest decline in export value mainly because some of the copper and coal mines have matured and global commodity prices have fallen

bull Meanwhile cement and sandstone record the highest increase in export value resulting from new investments and increasing domestic demand for these types of materials to use in the countryrsquos infrastructure development projects

Forms of investment in mining Business cooperation under contract

Joint venture between foreign and local firms

100 foreign or domestic ownership

Remark Firms could set up representative office to gather information and investigate investment opportunities

19

Taxes amp Regulations

Mining ndash Opportunity

Mineral resources in Lao PDR offer opportunities to firms with expertise in mining operations from prospection to mining and processing

Prospection Exploration Feasibility Study

Construction Mining amp Processing

2 years + 1 year

3 years + 2 years

1 year + 1 year

2 years + 1 year

20 years + 5 years

License Duration + Renewable

USD 3 -12 ha year USD 05 ndash 1 ha year + royalty (1-

7) Rental Fee

Registered company

Max 300 sqkm Corporate income 25-35

Value added 10

Rules and regulations for the Minerals Law in accordance to international standard partly missing

Limited number and capacity of local workers in mining sector

High number of mineral trade companies rather than professional mining operations firms

Key Issues

20

Electronic Parts and Components Industry

Key Industries amp Opportunities

21

Electronic Parts and Components Industry - Overview

Over the recent years Laos has experienced exponential growth in its exports of electronic parts and components especially to Thailand indicating the initial formation of the regional supply chain

Lao PDR Electronic Part and Component Exports (USD Million 2017)

Increasing investments in Lao PDR Special Economic Zone (SEZ) boosts trade The presence of SEZs and attractive incentives have attracted FDI inflows into Lao PDR especially in the production of digital camera parts and telecom equipment parts Most manufacturing in these sectors is aimed at exporting intermediate products to assemblers of finished electrical and electronic products in other countries

Main Export Destinations 2017

Data source International Trade Center

Why Thailand has become the top export destination

bull ASEAN Free Trade Agreement (AFTA) ndash The agreement minimizes trade barriers and creates free flow of goods and capital within ASEAN

bull Thailand-based industries shift their focus on value added activities - firms relocate labor-intensive activities to Thailandrsquos neighboring countries including Laos

22

Electronic Parts and Components Industry - Opportunity

Industrial development in Laos offers opportunities for firms to form the regional supply chain model and benefit from comparative advantages from both nations

Data source JETRO

Thailand

Product supply chain

Laos

Did you knowhellip

Challenges

Difficulty in getting large pools of labor due to small population

Underdeveloped infrastructure in some regions

Challenge in recruiting higher skilled specialists

Suggestion Set up in major Special Economic Zones eg Vita Park SEZ and Savan-Seno SEZ

Roll out strategic human resource plan including training and capacity building

bull Advanced infrastructure

bull Experienced and high-skilled (management level) workforce

bull Affordable and youthful workforce bull Located between Vietnam and Thailand

both with high electronics parts demand bull Government incentives

Start operation from small scale (less than 500 workers) then scale up

Japanese enterprises have started implementing Thailand+1 model by relocating labor-intensive production to Laos and exporting back to Thailand to complete product assembly eg NIKON (digital camera) Dai-Ichi Denshi (wire harness) Nissei Mizuki (electronics parts) and Toyota boshoku (car seat cover)

Thailand + 1 Model

23

Industrial Agriculture

Key Industries amp Opportunities

24

Industrial Agriculture - Overview

Most industrial agriculture exports from Lao PDR are produced by foreign investors (Chinese Thai and Vietnamese) and local entrepreneurs to a lesser extent

Data source JETRO International Trade Center Produce Report USDA Foreign Agriculture Service

Leading Agricultural Exports by export value (USD Million 2016 and 2017)

A short-term drop in fruit exports in 2017 bull Exports declined because the Lao government suspended

development of large banana and other fruit plantations which typically produce to export to China and placed more stringent control on polluting farms

bull However at the end of 2017 Lao PDR and China negotiated for less stringent terms for Lao PDRrsquos fruit exports to China

Key Trends

Sugar Cane exports rocketing bull In 2017 sugar cane plantation boomed Export volume grew 121

times from 2016

bull The major reason was the relocation of sugar production from China as production costs there are very high approximately double that of Thailand

Organic fruit and vegetable becoming key economic plants bull Local and foreign investors are increasingly investing in organic

agriculture a higher value-added segment which is demanded by major countries such as Europe US Japan and China

Exports (2016)

USD 02 Million

Exports (2017)

USD 20 Million

121 times

25

Industrial Agriculture - Opportunity

Lao industrial agriculture sector offers opportunities for

bull Agricultural inputs andmachinery producers and distributors

bull Plantation operators

bull Processing and trading firms in Thailand

3 Processing and Trading

Key Drivers Lack of capability to process

products at international standard

Lack of market access

Opportunities Market inputs and machinery

to agricultural projects Investor can target both large scale investment

and smallholder farmers

Opportunities Produce high-value agricultural

products organic products herbs and medical plants

Foreign investors operate via (1) contract farming and (2) concession

Opportunities Process raw products to meet

export standards trade products to leverage existing market channels

Agricultural Inputs and Machinery

Key Drivers Limited access to improved

agricultural inputs - Seed - Fertilizer - Quality machinery

1 2

Key Drivers Arable fertile land

low level of chemical pesticides

Plantation ndash High Value Products

26

Tourism

Key Industries amp Opportunities

27

Tourism - Overview

Tourist arrivals are on a steady rise in the past decade especially tourists from Asia Pacific with most of them visiting more developed border towns neighboring Thailand

Data source Ministry of Tourism TRAVEL amp TOURISM ECONOMIC IMPACT 2018 LAOS

Direct Contribution of Travel amp Tourism to GDP (USD Billion 2012-2018E)

bull Both tourist arrivals and revenue from tourism have increased approximately 3 folds in the past decade

bull Most tourists come from Asia Pacific (93) particularly from from Thailand (50) and Vietnam (25) followed by Europe (5)

Top Tourist Arrivals Destinations 2017

1 Vientiane Capital

2 Savannakhet

3 Champasak

Most top tourist destinations are more developed towns bordering Thailand

Nong Khai

Mukdahan

Ubon Ratchathani

World Heritage sites im these following city also attract a considerable number of visitors

Luang Prabang Wat Pu at Champasak

28

Business Opportunities Associated to Tourism Sector

Accommodate increasing tourist arrivals

Provide dining and entertainment services

Develop attractive ecotourism cultural tourism packages

Provide transportation services linking major tourism sites

Produce and market souvenirs applying local arts design and materials

1 Hotel Restaurant Entertainment

2 Tour Company Holiday Package

3 Sourvenirs

4 Transportation Service

Tourism - Opportunity

29

Lao Consumer Income and Behavior

Prefer to cook at home Enjoy drinking alcohol Middle income enjoy

spending evening in beer garden

Lao women wear sinh Follow Thai and Korean

fashion due to influence of TV series

Shop at traditional markets Middle income shop at

Thai border towns (Nong Khai Udon Thani)

Thai and Japanese products are perceived to have high quality Chinese products are perceived as sub-standard quality and Korean products are in between

30

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

31

Major Costs ndash Labor and Utility

Electricity Rate 2017

0 - 25 kwh 004USDkwh

26 - 150 kwh 005USDkwh

151 - 300 kwh 009USDkwh

more than 500 kwh 012USDkwh

301 - 400 kwh 010USDkwh

401 - 500 kwh 011USDkwh

Water Price (Per Unit) for Business and Trade Units

bull Water price for businesses is set to increase from USD USD 036 in 2017 to USD038 per unit this year

Labor minimum monthly wage in ASEAN 2017 USD

32

Tax System

Monthly Income (LAK) Tax Rate

0 ndash 1000000 0

1000001 - 3000000 5

3000001 - 6000000 10

6000001 - 12000000 12

12000001 - 24000000 15

24000001 - 40000000 20

Above 40000000 24

Types of Tax Tax rate

Profit Tax 24

Value Added Tax (VAT) 10

Withholding Tax Dividends 10

(non-residents) Transfer of shares 10

Transfer of assets 5

China

Luxembourg

Malaysia

Singapore

South Korea

Thailand

Vietnam

Income tax treaties for avoidance of double taxation

Note There is no definition of residence for tax purposes in Laos All companies registered under Lao law (including foreign law) are subject to Lao profit tax

Personal Income Tax Corporate Taxes

Data source DFDL

33

Foreign Investment Regulations

Data source JETRO Compiled by World Business Advisory Center

Not Permitted to Foreigner Only for Joint Venture with Local Company 100 Foreign Ownership Allowed

Wholesale and Retail Businesses

100 Foreign Ownership bull If registered capital is 20 billion Lao Kip

(USD 25 million) or more

Maximum 70 Foreign Ownership bull If registered capital is 10 - 20 billion Lao Kip

(USD 125 ndash 25 million)

Maximum 50 Foreign Ownership bull If registered capital is 4 - 10 billion Lao Kip

(USD 05 ndash 125 million)

bull If registered capital is less than 4 billion Lao Kip (USD 05 million)

Hotel and Restaurants Maximum 60 Foreign Ownership bull 3-5 stars hotel with minimum registered capital of

1 billion Lao Kip (USD 125000)

bull Less than 3 stars hotel 100 Foreign Ownership bull NOT ALLOWED

Logistics

100 Foreign Ownership bull Domestic goods transport with minimum

registered capital of 3 billion Lao Kip (USD 375000)

Maximum 49 Foreign Ownership bull Cross border goods transport with minimum

registered capital of 5 billion Lao Kip (USD 625000)

bull Cross border goods transport with less than 5 billion Lao Kip of registered capital

bull Domestic goods transport with less than 3 billion Lao Kip of registered capital

Examples of Foreign Investment Regulations

Foreign enterprises are subject to foreign investment regulations in several business activities Generally small businesses are preserved for Lao enterprises whereas large businesses with certain investment conditions are opened for foreign investors

34

Types of Investment ndash (1) General Business

Data source JETRO Compiled by World Business Advisory Center

Besides foreign investment regulation foreign enterprises are also subject to the investment promotion law which classifies investment into 3 types

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Investment in General Business

Types of Investment in Lao PDR

Description

o An investment in general economic activities

o Activities including controlled businesses ndash businesses that require additional approval from relevant ministries

o Activities excluding concession business

Register Capital

Requirements

o At least 1 billion Lao Kip (USD 125000)

o At the day of establishment must pay 40 (agriculture business) 60 (production and processing) 80 (services) The remainder must be paid within 1 year

Examples of Controlled Businesses 1 Agriculture plantation agriculture fishery 2 Manufacturing petroleum products leathers textile amp clothing papers

printing pesticides pharmaceutical products 3 Businesses related to environment eg wastewater treatment 4 Wholesale and retails of gasoline and petroleum products 5 Transportation 6 Hotel and Restaurant 7 Media and Publication 8 Finance and insurance 9 Legal accounting and tax services 10 Tourism 11 Education 12 Hospital clinic and medical services 13 Recreation (museum and amusement park)

35

Types of Investment ndash (2) Concession Business

Data source JETRO Compiled by World Business Advisory Center

Investment in Concession Business

Description

o An investment that requires a concession or specific authorization from the government to use the governmentrsquos property

o Some concession businesses requires authorization from the central government whereas the other requires only provincial government level of authorization for example

bull At least 5MW electricity generation project requires the central government authorization

bull Less than 5MW electricity generation projects requires only provincial government authorization

Examples of Concession Business

1 Mining 2 Electricity generation 3 Infrastructure

bull Telecommunication bull TV and radio station bull Road railway airport seaport waste disposal site

4 Businesses that use the government land bull Shopping center bull Tourist attraction bull Public park bull Hotel bull Forestry and Logging bull Plantation and Livestock

Register Capital

Requirements

o Must pay at least 20 of registered capital while remaining should be paid within 2 years

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Types of Investment in Lao PDR

36

Types of Investment ndash (3) Business Related to SEZ

Data source JETRO Compiled by World Business Advisory Center

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Types of Investment in Lao PDR

Investment in Business Related to SEZ

Description

o Business related to Special Economic Zone -gt an investment in building infrastructure for a new town

o Business related to Specific Economic Zone -gt an investment in infrastructure development for specific purpose projects such as industrial zone export zone tourist development zone etc

High Potential SEZs in Laos

o Vita Park Special Economic Zone (Vientiane)

o Savan-Seno Special Economic Zone (Savannakhet)

o Pakxe-Japan SME Specific Economic Zone (Champasak)

Special and Specific Economic Zones

1 Boten-Daenkham Specific Economic Zone 2 Luang Prabang Special Economic Zone 3 Golden Triangle Special Economic Zone 4 Thatluang Lake Specific Economic Zone 5 Longthanh Specific Economic Zone 6 Xaysettha Specific Economic Zone 7 Vita Park Special Economic Zone 8 Dongphosy Specific Economic Zone 9 Thakhek Specific Economic Zone 10 Poukiao Specific Economic Zone 11 Savan-Seno Special Economic Zone 12 Pakxe-Japan SME Specific Economic Zone

1

2

3

4

5 6

7

8

9 10

11

12

37

General Business

Concession Business

Business related to

SEZs

Procedure of Investment in Lao PDR

The investment approval procedure varies depending upon type of investment However all foreign investors must go through enterprise registration tax identification number registration and application for capital importation certificate

Apply at Ministry of Planning and

Investment

For developer apply at National Committee for Special Economic Zone

For investor apply at One-Stop Service Unit in

each SEZ

Get Concession

License

Get SEZ Concession

License

For controlled businesses apply for

approval at relevant Ministries

Get Approval License

Apply at Ministry of

Industry and Commerce

For non-controlled businesses

Get Enterprise

Registration Certificate

(ERC)

Apply for Tax

Identification Number TIN

at Tax Department Ministry of

Finance

Apply for Capital

Importation Certificate at Bank of Lao

PDR

Data source JETRO Compiled by World Business Advisory Center

38

Investment Tax Incentives ndash General Zone

Data source JETRO Compiled by World Business Advisory Center

Investment Tax Incentives in Lao PDR

Profit Tax Exemption Period

Level 1 High Promotion

Level 2 Moderate Promotion

Level 3 Low Promotion

Zone 1 10 years 6 years 4 years

Zone 2 6 years 4 years 2 years

Zone 3 4 years 2 years 1 years

Profit Tax Exemption Period by Promotion Sector and Zone

Promoted sectors Agriculture Industrial Handicrafts and Services

Type of Tax Exemption

General Zone Promotion Sector and Zone based Incentives 1 Special amp Specific Economic Zone

Tailor Made Incentives 2

Profit tax in next accounting year in case net profit is used for reinvestment (business

expansion)

Import duties for import of raw material equipment spare parts and

vehicles directly used for production

Export duties for general goods and

products (resource-based products should follow

associated laws)

Permission to carry forward losses to

three consecutive accounting years

39

Sector Period of

Profit Tax Exemption

Profit Tax Rate

After Tax Exemption Period

Hi-Tech Manufacturing 10 year 8

Manufacturing that exports at least 70 of production 10 year 8

Manufacturing that exports 30 - 60 of production 7 year 8

Manufacturing that exports 0 - 29 of production 5 year 8

Other 5 year 8

Investment amount of USD 2 million or more 10 year 8

Investment amount of USD 500000 - USD 2 million 8 year 8

Investment amount of USD 300000 - USD 500000 6 year 10

Investment amount of USD 150000 - USD 300000 4 year 10

Investment amount of USD 50000 - USD 150000 2 year 10

Export Laos products 5 year 10

International trade company 3 year 10

General trade company 2 year 10

a) Manufacturing

b) Service

c) Commerce

Personal Income Tax 5

Dividend Tax after Profit Tax Exemption Period

5

Import Duty Exemption for import of raw material equipment spare parts and

vehicles directly used for production

VAT Exemption for import products

Investment Tax Incentives ndash Special and Specific Economic Zone

Data source JETRO

Investment Tax Incentives in Lao PDR

General Zone Promotion Sector and Zone based Incentives 1 Special amp Specific Economic Zone

Tailor Made Incentives 2 Example of Tax Incentives in Savan-Seno SEZ

Other Tax Incentives

40

Non-Tax Incentives amp Trade Privileges

Data source JETRO

Non-Tax Incentives

Permission

Foreign nationals can undertake feasibility studies

Bring in foreign technicians experts and managers if qualified Lao nationals are not available

Lease land

General business up to 30 years from Lao citizen and up to 50 years from the government (renewable)

Investment in SEZ up to 75 years

Concession business upon negotiation with the government (at present there is an example of 99 years land lease)

Transfer leasehold interests and build on or make improvements or structures to a leased land

Guarantee against nationalization expropriation and requisition without compensation

Protection

Trade Privileges

ASEAN WTO GSP Bilateral trade agreement (over 18 countries)

o Argentina o Belarus o Bulgaria o Cambodia o China o Indonesia o India o Korea DPR o Kuwait

o Malaysia o Mongolia o Myanmar o Philippines o Russian

Federation o Thailand o Turkey o USA o Vietnam

41

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

42

Foreign Currency Exchange

Data source Bank of the Lao PDR

Laos Currency Kip (LAK)

Latest FX Rate (as of August 22 2018)

Remark THB and USD are widely accepted especially in the border trade area

USD 1 ~ LAK 8507

EUR 1 ~ LAK 9851

THB 1 ~ LAK 262

JPY 1 ~ LAK 77

CNY 1 ~ LAK 1193

43

KASIKORNTHAIBANK Service in Lao PDR

Retail Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Current deposit

Lending

Working capital loan

Long term loan

Bank guarantee

Project Financing

FX Services

Corporate Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Remittance

Remittance

Trade Finance Letter of Credit (LC) Standby Letter of Credit (SBLC)

44

KASIKORNTHAI BANK Limited

With establishment KASIKORNTHAIBANK

the first full-scale locally incorporated institution from Thailand is fully committed to support our clientsrsquo cross-border financing and transaction for their trade and investment activities in Lao PDR

45

KASIKORNTHAIBANK in Lao PDR Contacts

bull HEAD OFFICE Unit 12 Lane Xang Avenue Xiangngeun Village Chanthaboury District Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88905 Fax +856 21 253 336 wwwkasikornbankcomla

KASIKORNTHAI BANK Limited

bull PONESINUAN BRANCH

Ban Ponesinuan Unit 14 Sysattanak Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88826 Fax +856 21 410 889

Ms Piyanoot Sangsan Branch Manager KASIKORNTHAI BANK LIMITED Lane Xang Head Office E-mail piyanootskasikornbankcom

Mr Chatuporn Boozaya-Angool Branch Manager Ponesinuan Branch E-mail chatupornbkasikornbankcom

46

About AEC+ Business Advisory The AEC+ Business Advisory is set up by KASIKORNBANK to support businesses in their regional expansion across the ASEAN+3 market by providing local market intelligence and strategic business advice

What we do bull Offer customized and tailor-made advisory services bull Publish investment guides and industry reports bull Deliver in-depth insights via seminars bull Organize business trips to bring first-hand experience

Follow Us Visit our website at

AEC+ BUSINESS ADVISORY

Prepared by Mr Anoot Charoenkiattikul World Business Intelligence Specialist E-mail anootckasikornbankcom

httpswwwkasikornbankcominternational-businessenPagesHomeaspx

47

Page 3: LAO PDR - Facilitiesfuangfah.econ.cmu.ac.th/teacher/nisit/files/201808_LaoPDR_Investm… · • On August 7, the government of Laos announced the suspension of new hydropower project

3

ldquoLaos a country rich in natural resources and cultural heritagerdquo

Countryrsquos strengths

bull Strategic location bridging the GMS region and China

bull Abundance of mineral resources

bull Substantial hydropower potential

bull Well-balanced climate and fertile land

bull Tremendous potential for tourism

Why Lao PDR

4

S

Luang Prabang

Tourism Logistics Trading Hydropower

Luang Namtha and Phongsali

Industrial agriculture Tourism

Phongsali Louang Namtha

Luang Prabang

Khammouane

Savannakhet

Pakxe

VIENTIANE

Vientiane (Capital and Prefecture)

Logistics Trading Tourism Hydropower Industrial agriculture

Khammouane (Thakhek)

Mining Tourism Industrial agriculture

Savannakhet

Mining Tourism Industrial agriculture Manufacturing

Champasak (Pakse)

Logistics Trading Tourism Hydropower Industrial agriculture

Major Cities for Business Activities by Region

S OUTHERN Happening Southern town with high potential in tourism and industrial agriculture

C ENTRAL Border towns with Thailand are seeing increased business interaction with Thailand

N ORTHERN Border towns with China and now gaining more attention

5

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

6

Country Name Lao Peoplersquos Democratic Republic (Lao PDR)

Area 236800 sqkm

Population 68 million (2018)

Government Single Party Socialist Republic

Currency Lao Kip

GDP (current prices) USD 183 billion (2018) (Equivalent to Samut Prakan Thailand)

GDP per capita (current prices) USD 7930 (2018)

Luang Prabang

Khammouane

Savannakhet

Pakxe

VIENTIANE

2015 2020 2025 2030

Timeline and Milestone

With a 68 average growth rate in the medium term Laos is one of the fastest growing nations in ASEAN driven by foreign investments particularly from China and other ASEAN countries

2020 Graduation from least developed country (LDC) status

2013 WTO membership

2030 Goal Classified as developing country with upper-middle income and sustainable economic growth

Data Source IMF

Country Overview

2025 Transition period of LDC graduation by transforming service industry and agriculture to high-value businesses

7

427

1695

2013 2014 2015 2016 2017

USD

Mill

ion

Data Source KPMG ASEANstatsorg

Foreign Direct Investment

The Belt and Road Initiative(BRI) has significantly affected Laosrsquo FDI (foreign direct investment) structure It has made China the most important foreign investor in the country their investments accounted for 87 of total FDI in 2017

Key FDI Figures Changes in Economic Composition

Service sector growth an indirect effect of FDIs The service sector in Laos including wholesale and retail trading hotels and restaurants financial services and telecommunications expanded as it began to absorb the growing number of foreign workers

China is Lao PDRrsquos major investor Their investments reached USD15 billion in 2017 growing 85 YoY

Other key investors are Malaysia Thailand and

Vietnam with investment values of USD124 million USD12 million and USD09

million respectively

Top sectors of FDIs are hydropower generation mining and agriculture

OBOR effect FDI inflows significantly increased in 2016 and 2017 after Lao PDR and Chinarsquos ground-breaking ceremony of the railroad project was held in December 2015 and construction of the whole route commenced in December 2016

8

Data Source nhandancomvn International Trade Center

Lao PDR Trade Overview

In 2017 Laos mainly exported electricity to its neighboring countries such as Thailand and Vietnam while imports have shifted to electronic and machinery parts for hydropower projects industrial production and infrastructure development

Trade Flows and Balance 2012-2017

Top Trading Partners 2017

Thailand

USD 53 Billion

China

USD 20 Billion

Vietnam

USD 13 Billion

Lao PDRrsquos Key Trade Products 2017

Exports Imports

Total Export Volume

USD 48 Billion

Total Import Volume

USD 60 Billion

Electrical machinery and equipment

14

Machinery amp equipment

13

Fuel products 12

Electricity 25

Mining products 13

Electrical machinery and equipment

12

9

Lao PDR ndash Thailand Border Trade Statistics 2017

Data Source Department of Foreign Trade (Thailand)

Lao PDR ndash Thailand Border Trade

Border trade is the main two-way trade channel between Lao PDR and Thailand

of two-way trade between Lao PDR and Thailand occurs through the border as Lao PDR is a land-locked country and its economic cities are located close to Thailandrsquos border

97 Key Official Trade Points By percentage share () 2017

31 Mukdaharn - Savannakhet

8 Ubon Ratchathani - Champasak

7 Nakhon Panom - Khammouan

30 Nong Khai - Vientiane

12 Nan - Luang Prabang

Mukdahan ndash Savannakhet Strategic border point which is located along the East-West Economic Corridor (EWEC) as well as gateway to Lao PDRrsquos most developed SEZ Savan - Seno Special Economic Zone

Nong Khai ndash Vientiane Gateway to Vientiane the countryrsquos capital city and key economic city

Total Official Trade Points

15

Trade Volume USD 61 Billion

Exports USD 23 Billion

Imports USD 38 Billion

Exports Imports

Diesel fuel (11)

Automobiles and parts (8)

Refined Oil (5)

Machinery amp equipment (7)

Electricity (52)

Copper amp materials (14)

Vegetable amp products (5)

Electronics (12)

10

Data Source Asian Development Bank

Lao PDR - Infrastructure Overview

Road transport is the main mode of transportation in Laos for both freight and passenger transportation Railway development is also under way Due to Laosrsquo geographical characteristic the governmentrsquos primary focus is the development of land transport

Road transport is the primary means of transport carrying over 80 of freight traffic and almost 100 of all domestic passenger traffic Major roads link major cities to key border towns in neighboring countries with routes heading north from Vientiane the capital the more developed and most crowded

Road

Being a land-locked country Laos does not have a sea port and either relies on Thailandrsquos Laem Chabang Port or other sea ports in Vietnam However inland waterways along the Mekong river does support 18 of its freight traffic albeit with limitaitions during the dry season

Water Transport Railway Laos has no rail system However 2 large potential projects are under way The first is the Dansavan-Laobao Railway planned for 2018 operation The second is the Laos-China railway running from Vientiane to the Boten-Bohan borer which is set to be completed by the end of 2021

Aviation Laos has 3 international airports with each in the North Central and Southern regions The airports mainly handle tourist arrivals and business travelers to a lesser extent A small amount of trade is handled at Vientianersquos international airport for special niche products that require express shipment Insuch cases capacity is limited

Attapeu

International Airport

Danang

Foreign Seaport

Savannaket

Confirmed Rail Lines

Lao Bao

Bohan

11

BRI in Lao PDRrsquos Section

Route Boten to Vientiane

Distance 414 km

Construction Period 2017-2021

Investment Pattern Joint Venture ndash Lao PDR 40 and China 60

Cooperation Mechanism Government to Government (G to G)

Total Investment Cost USD 61-68 Billion

Passenger Train Speed 160-200 kmh

Stations 32

Current Status 203 completed (as of December 2017)

Data Source Reuters nationmultimediacom

Lao PDR ndash Belt and Road Initiative (BRI)

The section of the Belt and Road Initiative running through Lao PDR is a USD 6 billion high-speed railway project which will link China with Vientiane the Laotian capital and the Laos-Thailand border

Lao PDR BRI Timeline

2013 bull BRI was announced by Chinese President Xi Jinping The target of this project aims to invest in infrastructure in the central western and southern regions of Asia as well as in Africa and Europe

2016 DEC

bull The construction commenced The part of the BRI project that runs through Lao PDR runs from the Boten-Mohan border (between Laos and China) to Vientiane The project was delayed and restarted in 2017

2021 DEC

bull The project is set to be fully operational in December 2021 It will link Chinas Yunnan province the Lao capital Vientiane with the Thai border province Nong Khai

2015 DEC

bull The ground-breaking ceremony to launch the Lao PDR-China railway project was held on December 2 2015

Project Information

12

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

13

Key Industries and Opportunities

With rapid improvement in logistics infrastructure rich natural resources ample arable areas and cultural sites Lao PDR offers attractive opportunities for investments in the sectors of mining electronic parts and components industrial agriculture and tourism

TOURISM

ELECTRONIC PARTS AND COMPONENTS

MINING

INDUSTRIAL AGRICULTURE

HYDROPOWER

Temporarily Suspended

14

HYDROPOWER

Key Industries amp Opportunities

15

Hydropowerndash Overview

Hydropower exports in Lao PDR surged in 2017 The key destinations are Thailand Cambodia and Vietnam

Data source KResearch the Ministry of Energy and Mines

Total 29125

Magawatts

Number of Hydropower Plants

OPERATING

46

UNDER CONSTRUCTION

143

PENDING APPROVAL

246

Installed Capacities of Hydropower Plants in Lao PDR (Megawatts (MW) as of 2017)

Key Trends

Battery of Southeast Asia bull Due to Southeast Asiarsquos development toward industrialization there

remains a large demand gap for infrastructure support as well as growing demand for electricity to be met in the future

bull Thus Lao PDR with abundant natural resources for electricity generation aims to improve its energy sector to address this energy supply issue and position the country as a key exporter of energy in ASEAN

Lao PDR Electricity Exports

bull Lao PDRrsquos electricity exports have grown 15 annually since 2012

bull Electricity accounts for 24 of Lao PDR total exports

bull Thailand Cambodia and Vietnam are key export destinations with Thailand being the largest buyer

16

Hydropowerndash Opportunity

Lao PDR has ldquosuspendedrdquo new investment in hydropower projects and will conduct safety inspections for all existing dams due to the dam collapse incident in July

Data source laotiantimescom asianewsnetwork

The dam collapse in late July has caused Lao PDR to suspend new investment in hydropower projects in the country

bull On July 23 the ldquoSaddle Dam Drdquo part of the Xe-Pian Xe-Namnoy hydropower project in Champasak and Attapeu provinces has collapsed This disaster had affected around 5000 people in the area

bull On August 7 the government of Laos announced the suspension of new hydropower project approval and the renewed inspection of the existing dams

Key Policy Updates

2018 June

2018 August

The Lao government has suspended new investment in small-scale hydropower projects due to safety concerns

bull Lao PDR announced a temporary suspension of its authorization for investment in small-scale hydropower projects with installed capacity of lt15MW Such suspension is part of the governmentrsquos attempts to ensure the safety of hydropower dams

bull As a result the provincial and central authorities cannot approve new investment proposals for small-scale hydropower projects until concrete measures to ensure dam safety are drawn up

bull The suspension comes after construction of some projects has been found to be lower than the legally stipulated safety standards

17

Mining

Key Industries amp Opportunities

18

Mining ndash Overview

The mining Industry in Lao PDR has declined over the past several years due to fluctuations in global commodity prices and the maturity of some local mines

Data source International Trade Center worldbank

Lao PDR Mining Product Exports (USD Million 2017E)

Precious Stone Exports (USD Million 2017E)

DIAMOND

62 GOLD

1548 SILVER

54

Key Trends

Overall Lao PDRrsquos mining exports have decreased bull Exports of mining products have decreased since 2013 at an average

rate of 147 falling from USD1014 million in 2013 to USD 4575 in 2017

bull Copper and Coal experience the largest decline in export value mainly because some of the copper and coal mines have matured and global commodity prices have fallen

bull Meanwhile cement and sandstone record the highest increase in export value resulting from new investments and increasing domestic demand for these types of materials to use in the countryrsquos infrastructure development projects

Forms of investment in mining Business cooperation under contract

Joint venture between foreign and local firms

100 foreign or domestic ownership

Remark Firms could set up representative office to gather information and investigate investment opportunities

19

Taxes amp Regulations

Mining ndash Opportunity

Mineral resources in Lao PDR offer opportunities to firms with expertise in mining operations from prospection to mining and processing

Prospection Exploration Feasibility Study

Construction Mining amp Processing

2 years + 1 year

3 years + 2 years

1 year + 1 year

2 years + 1 year

20 years + 5 years

License Duration + Renewable

USD 3 -12 ha year USD 05 ndash 1 ha year + royalty (1-

7) Rental Fee

Registered company

Max 300 sqkm Corporate income 25-35

Value added 10

Rules and regulations for the Minerals Law in accordance to international standard partly missing

Limited number and capacity of local workers in mining sector

High number of mineral trade companies rather than professional mining operations firms

Key Issues

20

Electronic Parts and Components Industry

Key Industries amp Opportunities

21

Electronic Parts and Components Industry - Overview

Over the recent years Laos has experienced exponential growth in its exports of electronic parts and components especially to Thailand indicating the initial formation of the regional supply chain

Lao PDR Electronic Part and Component Exports (USD Million 2017)

Increasing investments in Lao PDR Special Economic Zone (SEZ) boosts trade The presence of SEZs and attractive incentives have attracted FDI inflows into Lao PDR especially in the production of digital camera parts and telecom equipment parts Most manufacturing in these sectors is aimed at exporting intermediate products to assemblers of finished electrical and electronic products in other countries

Main Export Destinations 2017

Data source International Trade Center

Why Thailand has become the top export destination

bull ASEAN Free Trade Agreement (AFTA) ndash The agreement minimizes trade barriers and creates free flow of goods and capital within ASEAN

bull Thailand-based industries shift their focus on value added activities - firms relocate labor-intensive activities to Thailandrsquos neighboring countries including Laos

22

Electronic Parts and Components Industry - Opportunity

Industrial development in Laos offers opportunities for firms to form the regional supply chain model and benefit from comparative advantages from both nations

Data source JETRO

Thailand

Product supply chain

Laos

Did you knowhellip

Challenges

Difficulty in getting large pools of labor due to small population

Underdeveloped infrastructure in some regions

Challenge in recruiting higher skilled specialists

Suggestion Set up in major Special Economic Zones eg Vita Park SEZ and Savan-Seno SEZ

Roll out strategic human resource plan including training and capacity building

bull Advanced infrastructure

bull Experienced and high-skilled (management level) workforce

bull Affordable and youthful workforce bull Located between Vietnam and Thailand

both with high electronics parts demand bull Government incentives

Start operation from small scale (less than 500 workers) then scale up

Japanese enterprises have started implementing Thailand+1 model by relocating labor-intensive production to Laos and exporting back to Thailand to complete product assembly eg NIKON (digital camera) Dai-Ichi Denshi (wire harness) Nissei Mizuki (electronics parts) and Toyota boshoku (car seat cover)

Thailand + 1 Model

23

Industrial Agriculture

Key Industries amp Opportunities

24

Industrial Agriculture - Overview

Most industrial agriculture exports from Lao PDR are produced by foreign investors (Chinese Thai and Vietnamese) and local entrepreneurs to a lesser extent

Data source JETRO International Trade Center Produce Report USDA Foreign Agriculture Service

Leading Agricultural Exports by export value (USD Million 2016 and 2017)

A short-term drop in fruit exports in 2017 bull Exports declined because the Lao government suspended

development of large banana and other fruit plantations which typically produce to export to China and placed more stringent control on polluting farms

bull However at the end of 2017 Lao PDR and China negotiated for less stringent terms for Lao PDRrsquos fruit exports to China

Key Trends

Sugar Cane exports rocketing bull In 2017 sugar cane plantation boomed Export volume grew 121

times from 2016

bull The major reason was the relocation of sugar production from China as production costs there are very high approximately double that of Thailand

Organic fruit and vegetable becoming key economic plants bull Local and foreign investors are increasingly investing in organic

agriculture a higher value-added segment which is demanded by major countries such as Europe US Japan and China

Exports (2016)

USD 02 Million

Exports (2017)

USD 20 Million

121 times

25

Industrial Agriculture - Opportunity

Lao industrial agriculture sector offers opportunities for

bull Agricultural inputs andmachinery producers and distributors

bull Plantation operators

bull Processing and trading firms in Thailand

3 Processing and Trading

Key Drivers Lack of capability to process

products at international standard

Lack of market access

Opportunities Market inputs and machinery

to agricultural projects Investor can target both large scale investment

and smallholder farmers

Opportunities Produce high-value agricultural

products organic products herbs and medical plants

Foreign investors operate via (1) contract farming and (2) concession

Opportunities Process raw products to meet

export standards trade products to leverage existing market channels

Agricultural Inputs and Machinery

Key Drivers Limited access to improved

agricultural inputs - Seed - Fertilizer - Quality machinery

1 2

Key Drivers Arable fertile land

low level of chemical pesticides

Plantation ndash High Value Products

26

Tourism

Key Industries amp Opportunities

27

Tourism - Overview

Tourist arrivals are on a steady rise in the past decade especially tourists from Asia Pacific with most of them visiting more developed border towns neighboring Thailand

Data source Ministry of Tourism TRAVEL amp TOURISM ECONOMIC IMPACT 2018 LAOS

Direct Contribution of Travel amp Tourism to GDP (USD Billion 2012-2018E)

bull Both tourist arrivals and revenue from tourism have increased approximately 3 folds in the past decade

bull Most tourists come from Asia Pacific (93) particularly from from Thailand (50) and Vietnam (25) followed by Europe (5)

Top Tourist Arrivals Destinations 2017

1 Vientiane Capital

2 Savannakhet

3 Champasak

Most top tourist destinations are more developed towns bordering Thailand

Nong Khai

Mukdahan

Ubon Ratchathani

World Heritage sites im these following city also attract a considerable number of visitors

Luang Prabang Wat Pu at Champasak

28

Business Opportunities Associated to Tourism Sector

Accommodate increasing tourist arrivals

Provide dining and entertainment services

Develop attractive ecotourism cultural tourism packages

Provide transportation services linking major tourism sites

Produce and market souvenirs applying local arts design and materials

1 Hotel Restaurant Entertainment

2 Tour Company Holiday Package

3 Sourvenirs

4 Transportation Service

Tourism - Opportunity

29

Lao Consumer Income and Behavior

Prefer to cook at home Enjoy drinking alcohol Middle income enjoy

spending evening in beer garden

Lao women wear sinh Follow Thai and Korean

fashion due to influence of TV series

Shop at traditional markets Middle income shop at

Thai border towns (Nong Khai Udon Thani)

Thai and Japanese products are perceived to have high quality Chinese products are perceived as sub-standard quality and Korean products are in between

30

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

31

Major Costs ndash Labor and Utility

Electricity Rate 2017

0 - 25 kwh 004USDkwh

26 - 150 kwh 005USDkwh

151 - 300 kwh 009USDkwh

more than 500 kwh 012USDkwh

301 - 400 kwh 010USDkwh

401 - 500 kwh 011USDkwh

Water Price (Per Unit) for Business and Trade Units

bull Water price for businesses is set to increase from USD USD 036 in 2017 to USD038 per unit this year

Labor minimum monthly wage in ASEAN 2017 USD

32

Tax System

Monthly Income (LAK) Tax Rate

0 ndash 1000000 0

1000001 - 3000000 5

3000001 - 6000000 10

6000001 - 12000000 12

12000001 - 24000000 15

24000001 - 40000000 20

Above 40000000 24

Types of Tax Tax rate

Profit Tax 24

Value Added Tax (VAT) 10

Withholding Tax Dividends 10

(non-residents) Transfer of shares 10

Transfer of assets 5

China

Luxembourg

Malaysia

Singapore

South Korea

Thailand

Vietnam

Income tax treaties for avoidance of double taxation

Note There is no definition of residence for tax purposes in Laos All companies registered under Lao law (including foreign law) are subject to Lao profit tax

Personal Income Tax Corporate Taxes

Data source DFDL

33

Foreign Investment Regulations

Data source JETRO Compiled by World Business Advisory Center

Not Permitted to Foreigner Only for Joint Venture with Local Company 100 Foreign Ownership Allowed

Wholesale and Retail Businesses

100 Foreign Ownership bull If registered capital is 20 billion Lao Kip

(USD 25 million) or more

Maximum 70 Foreign Ownership bull If registered capital is 10 - 20 billion Lao Kip

(USD 125 ndash 25 million)

Maximum 50 Foreign Ownership bull If registered capital is 4 - 10 billion Lao Kip

(USD 05 ndash 125 million)

bull If registered capital is less than 4 billion Lao Kip (USD 05 million)

Hotel and Restaurants Maximum 60 Foreign Ownership bull 3-5 stars hotel with minimum registered capital of

1 billion Lao Kip (USD 125000)

bull Less than 3 stars hotel 100 Foreign Ownership bull NOT ALLOWED

Logistics

100 Foreign Ownership bull Domestic goods transport with minimum

registered capital of 3 billion Lao Kip (USD 375000)

Maximum 49 Foreign Ownership bull Cross border goods transport with minimum

registered capital of 5 billion Lao Kip (USD 625000)

bull Cross border goods transport with less than 5 billion Lao Kip of registered capital

bull Domestic goods transport with less than 3 billion Lao Kip of registered capital

Examples of Foreign Investment Regulations

Foreign enterprises are subject to foreign investment regulations in several business activities Generally small businesses are preserved for Lao enterprises whereas large businesses with certain investment conditions are opened for foreign investors

34

Types of Investment ndash (1) General Business

Data source JETRO Compiled by World Business Advisory Center

Besides foreign investment regulation foreign enterprises are also subject to the investment promotion law which classifies investment into 3 types

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Investment in General Business

Types of Investment in Lao PDR

Description

o An investment in general economic activities

o Activities including controlled businesses ndash businesses that require additional approval from relevant ministries

o Activities excluding concession business

Register Capital

Requirements

o At least 1 billion Lao Kip (USD 125000)

o At the day of establishment must pay 40 (agriculture business) 60 (production and processing) 80 (services) The remainder must be paid within 1 year

Examples of Controlled Businesses 1 Agriculture plantation agriculture fishery 2 Manufacturing petroleum products leathers textile amp clothing papers

printing pesticides pharmaceutical products 3 Businesses related to environment eg wastewater treatment 4 Wholesale and retails of gasoline and petroleum products 5 Transportation 6 Hotel and Restaurant 7 Media and Publication 8 Finance and insurance 9 Legal accounting and tax services 10 Tourism 11 Education 12 Hospital clinic and medical services 13 Recreation (museum and amusement park)

35

Types of Investment ndash (2) Concession Business

Data source JETRO Compiled by World Business Advisory Center

Investment in Concession Business

Description

o An investment that requires a concession or specific authorization from the government to use the governmentrsquos property

o Some concession businesses requires authorization from the central government whereas the other requires only provincial government level of authorization for example

bull At least 5MW electricity generation project requires the central government authorization

bull Less than 5MW electricity generation projects requires only provincial government authorization

Examples of Concession Business

1 Mining 2 Electricity generation 3 Infrastructure

bull Telecommunication bull TV and radio station bull Road railway airport seaport waste disposal site

4 Businesses that use the government land bull Shopping center bull Tourist attraction bull Public park bull Hotel bull Forestry and Logging bull Plantation and Livestock

Register Capital

Requirements

o Must pay at least 20 of registered capital while remaining should be paid within 2 years

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Types of Investment in Lao PDR

36

Types of Investment ndash (3) Business Related to SEZ

Data source JETRO Compiled by World Business Advisory Center

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Types of Investment in Lao PDR

Investment in Business Related to SEZ

Description

o Business related to Special Economic Zone -gt an investment in building infrastructure for a new town

o Business related to Specific Economic Zone -gt an investment in infrastructure development for specific purpose projects such as industrial zone export zone tourist development zone etc

High Potential SEZs in Laos

o Vita Park Special Economic Zone (Vientiane)

o Savan-Seno Special Economic Zone (Savannakhet)

o Pakxe-Japan SME Specific Economic Zone (Champasak)

Special and Specific Economic Zones

1 Boten-Daenkham Specific Economic Zone 2 Luang Prabang Special Economic Zone 3 Golden Triangle Special Economic Zone 4 Thatluang Lake Specific Economic Zone 5 Longthanh Specific Economic Zone 6 Xaysettha Specific Economic Zone 7 Vita Park Special Economic Zone 8 Dongphosy Specific Economic Zone 9 Thakhek Specific Economic Zone 10 Poukiao Specific Economic Zone 11 Savan-Seno Special Economic Zone 12 Pakxe-Japan SME Specific Economic Zone

1

2

3

4

5 6

7

8

9 10

11

12

37

General Business

Concession Business

Business related to

SEZs

Procedure of Investment in Lao PDR

The investment approval procedure varies depending upon type of investment However all foreign investors must go through enterprise registration tax identification number registration and application for capital importation certificate

Apply at Ministry of Planning and

Investment

For developer apply at National Committee for Special Economic Zone

For investor apply at One-Stop Service Unit in

each SEZ

Get Concession

License

Get SEZ Concession

License

For controlled businesses apply for

approval at relevant Ministries

Get Approval License

Apply at Ministry of

Industry and Commerce

For non-controlled businesses

Get Enterprise

Registration Certificate

(ERC)

Apply for Tax

Identification Number TIN

at Tax Department Ministry of

Finance

Apply for Capital

Importation Certificate at Bank of Lao

PDR

Data source JETRO Compiled by World Business Advisory Center

38

Investment Tax Incentives ndash General Zone

Data source JETRO Compiled by World Business Advisory Center

Investment Tax Incentives in Lao PDR

Profit Tax Exemption Period

Level 1 High Promotion

Level 2 Moderate Promotion

Level 3 Low Promotion

Zone 1 10 years 6 years 4 years

Zone 2 6 years 4 years 2 years

Zone 3 4 years 2 years 1 years

Profit Tax Exemption Period by Promotion Sector and Zone

Promoted sectors Agriculture Industrial Handicrafts and Services

Type of Tax Exemption

General Zone Promotion Sector and Zone based Incentives 1 Special amp Specific Economic Zone

Tailor Made Incentives 2

Profit tax in next accounting year in case net profit is used for reinvestment (business

expansion)

Import duties for import of raw material equipment spare parts and

vehicles directly used for production

Export duties for general goods and

products (resource-based products should follow

associated laws)

Permission to carry forward losses to

three consecutive accounting years

39

Sector Period of

Profit Tax Exemption

Profit Tax Rate

After Tax Exemption Period

Hi-Tech Manufacturing 10 year 8

Manufacturing that exports at least 70 of production 10 year 8

Manufacturing that exports 30 - 60 of production 7 year 8

Manufacturing that exports 0 - 29 of production 5 year 8

Other 5 year 8

Investment amount of USD 2 million or more 10 year 8

Investment amount of USD 500000 - USD 2 million 8 year 8

Investment amount of USD 300000 - USD 500000 6 year 10

Investment amount of USD 150000 - USD 300000 4 year 10

Investment amount of USD 50000 - USD 150000 2 year 10

Export Laos products 5 year 10

International trade company 3 year 10

General trade company 2 year 10

a) Manufacturing

b) Service

c) Commerce

Personal Income Tax 5

Dividend Tax after Profit Tax Exemption Period

5

Import Duty Exemption for import of raw material equipment spare parts and

vehicles directly used for production

VAT Exemption for import products

Investment Tax Incentives ndash Special and Specific Economic Zone

Data source JETRO

Investment Tax Incentives in Lao PDR

General Zone Promotion Sector and Zone based Incentives 1 Special amp Specific Economic Zone

Tailor Made Incentives 2 Example of Tax Incentives in Savan-Seno SEZ

Other Tax Incentives

40

Non-Tax Incentives amp Trade Privileges

Data source JETRO

Non-Tax Incentives

Permission

Foreign nationals can undertake feasibility studies

Bring in foreign technicians experts and managers if qualified Lao nationals are not available

Lease land

General business up to 30 years from Lao citizen and up to 50 years from the government (renewable)

Investment in SEZ up to 75 years

Concession business upon negotiation with the government (at present there is an example of 99 years land lease)

Transfer leasehold interests and build on or make improvements or structures to a leased land

Guarantee against nationalization expropriation and requisition without compensation

Protection

Trade Privileges

ASEAN WTO GSP Bilateral trade agreement (over 18 countries)

o Argentina o Belarus o Bulgaria o Cambodia o China o Indonesia o India o Korea DPR o Kuwait

o Malaysia o Mongolia o Myanmar o Philippines o Russian

Federation o Thailand o Turkey o USA o Vietnam

41

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

42

Foreign Currency Exchange

Data source Bank of the Lao PDR

Laos Currency Kip (LAK)

Latest FX Rate (as of August 22 2018)

Remark THB and USD are widely accepted especially in the border trade area

USD 1 ~ LAK 8507

EUR 1 ~ LAK 9851

THB 1 ~ LAK 262

JPY 1 ~ LAK 77

CNY 1 ~ LAK 1193

43

KASIKORNTHAIBANK Service in Lao PDR

Retail Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Current deposit

Lending

Working capital loan

Long term loan

Bank guarantee

Project Financing

FX Services

Corporate Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Remittance

Remittance

Trade Finance Letter of Credit (LC) Standby Letter of Credit (SBLC)

44

KASIKORNTHAI BANK Limited

With establishment KASIKORNTHAIBANK

the first full-scale locally incorporated institution from Thailand is fully committed to support our clientsrsquo cross-border financing and transaction for their trade and investment activities in Lao PDR

45

KASIKORNTHAIBANK in Lao PDR Contacts

bull HEAD OFFICE Unit 12 Lane Xang Avenue Xiangngeun Village Chanthaboury District Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88905 Fax +856 21 253 336 wwwkasikornbankcomla

KASIKORNTHAI BANK Limited

bull PONESINUAN BRANCH

Ban Ponesinuan Unit 14 Sysattanak Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88826 Fax +856 21 410 889

Ms Piyanoot Sangsan Branch Manager KASIKORNTHAI BANK LIMITED Lane Xang Head Office E-mail piyanootskasikornbankcom

Mr Chatuporn Boozaya-Angool Branch Manager Ponesinuan Branch E-mail chatupornbkasikornbankcom

46

About AEC+ Business Advisory The AEC+ Business Advisory is set up by KASIKORNBANK to support businesses in their regional expansion across the ASEAN+3 market by providing local market intelligence and strategic business advice

What we do bull Offer customized and tailor-made advisory services bull Publish investment guides and industry reports bull Deliver in-depth insights via seminars bull Organize business trips to bring first-hand experience

Follow Us Visit our website at

AEC+ BUSINESS ADVISORY

Prepared by Mr Anoot Charoenkiattikul World Business Intelligence Specialist E-mail anootckasikornbankcom

httpswwwkasikornbankcominternational-businessenPagesHomeaspx

47

Page 4: LAO PDR - Facilitiesfuangfah.econ.cmu.ac.th/teacher/nisit/files/201808_LaoPDR_Investm… · • On August 7, the government of Laos announced the suspension of new hydropower project

4

S

Luang Prabang

Tourism Logistics Trading Hydropower

Luang Namtha and Phongsali

Industrial agriculture Tourism

Phongsali Louang Namtha

Luang Prabang

Khammouane

Savannakhet

Pakxe

VIENTIANE

Vientiane (Capital and Prefecture)

Logistics Trading Tourism Hydropower Industrial agriculture

Khammouane (Thakhek)

Mining Tourism Industrial agriculture

Savannakhet

Mining Tourism Industrial agriculture Manufacturing

Champasak (Pakse)

Logistics Trading Tourism Hydropower Industrial agriculture

Major Cities for Business Activities by Region

S OUTHERN Happening Southern town with high potential in tourism and industrial agriculture

C ENTRAL Border towns with Thailand are seeing increased business interaction with Thailand

N ORTHERN Border towns with China and now gaining more attention

5

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

6

Country Name Lao Peoplersquos Democratic Republic (Lao PDR)

Area 236800 sqkm

Population 68 million (2018)

Government Single Party Socialist Republic

Currency Lao Kip

GDP (current prices) USD 183 billion (2018) (Equivalent to Samut Prakan Thailand)

GDP per capita (current prices) USD 7930 (2018)

Luang Prabang

Khammouane

Savannakhet

Pakxe

VIENTIANE

2015 2020 2025 2030

Timeline and Milestone

With a 68 average growth rate in the medium term Laos is one of the fastest growing nations in ASEAN driven by foreign investments particularly from China and other ASEAN countries

2020 Graduation from least developed country (LDC) status

2013 WTO membership

2030 Goal Classified as developing country with upper-middle income and sustainable economic growth

Data Source IMF

Country Overview

2025 Transition period of LDC graduation by transforming service industry and agriculture to high-value businesses

7

427

1695

2013 2014 2015 2016 2017

USD

Mill

ion

Data Source KPMG ASEANstatsorg

Foreign Direct Investment

The Belt and Road Initiative(BRI) has significantly affected Laosrsquo FDI (foreign direct investment) structure It has made China the most important foreign investor in the country their investments accounted for 87 of total FDI in 2017

Key FDI Figures Changes in Economic Composition

Service sector growth an indirect effect of FDIs The service sector in Laos including wholesale and retail trading hotels and restaurants financial services and telecommunications expanded as it began to absorb the growing number of foreign workers

China is Lao PDRrsquos major investor Their investments reached USD15 billion in 2017 growing 85 YoY

Other key investors are Malaysia Thailand and

Vietnam with investment values of USD124 million USD12 million and USD09

million respectively

Top sectors of FDIs are hydropower generation mining and agriculture

OBOR effect FDI inflows significantly increased in 2016 and 2017 after Lao PDR and Chinarsquos ground-breaking ceremony of the railroad project was held in December 2015 and construction of the whole route commenced in December 2016

8

Data Source nhandancomvn International Trade Center

Lao PDR Trade Overview

In 2017 Laos mainly exported electricity to its neighboring countries such as Thailand and Vietnam while imports have shifted to electronic and machinery parts for hydropower projects industrial production and infrastructure development

Trade Flows and Balance 2012-2017

Top Trading Partners 2017

Thailand

USD 53 Billion

China

USD 20 Billion

Vietnam

USD 13 Billion

Lao PDRrsquos Key Trade Products 2017

Exports Imports

Total Export Volume

USD 48 Billion

Total Import Volume

USD 60 Billion

Electrical machinery and equipment

14

Machinery amp equipment

13

Fuel products 12

Electricity 25

Mining products 13

Electrical machinery and equipment

12

9

Lao PDR ndash Thailand Border Trade Statistics 2017

Data Source Department of Foreign Trade (Thailand)

Lao PDR ndash Thailand Border Trade

Border trade is the main two-way trade channel between Lao PDR and Thailand

of two-way trade between Lao PDR and Thailand occurs through the border as Lao PDR is a land-locked country and its economic cities are located close to Thailandrsquos border

97 Key Official Trade Points By percentage share () 2017

31 Mukdaharn - Savannakhet

8 Ubon Ratchathani - Champasak

7 Nakhon Panom - Khammouan

30 Nong Khai - Vientiane

12 Nan - Luang Prabang

Mukdahan ndash Savannakhet Strategic border point which is located along the East-West Economic Corridor (EWEC) as well as gateway to Lao PDRrsquos most developed SEZ Savan - Seno Special Economic Zone

Nong Khai ndash Vientiane Gateway to Vientiane the countryrsquos capital city and key economic city

Total Official Trade Points

15

Trade Volume USD 61 Billion

Exports USD 23 Billion

Imports USD 38 Billion

Exports Imports

Diesel fuel (11)

Automobiles and parts (8)

Refined Oil (5)

Machinery amp equipment (7)

Electricity (52)

Copper amp materials (14)

Vegetable amp products (5)

Electronics (12)

10

Data Source Asian Development Bank

Lao PDR - Infrastructure Overview

Road transport is the main mode of transportation in Laos for both freight and passenger transportation Railway development is also under way Due to Laosrsquo geographical characteristic the governmentrsquos primary focus is the development of land transport

Road transport is the primary means of transport carrying over 80 of freight traffic and almost 100 of all domestic passenger traffic Major roads link major cities to key border towns in neighboring countries with routes heading north from Vientiane the capital the more developed and most crowded

Road

Being a land-locked country Laos does not have a sea port and either relies on Thailandrsquos Laem Chabang Port or other sea ports in Vietnam However inland waterways along the Mekong river does support 18 of its freight traffic albeit with limitaitions during the dry season

Water Transport Railway Laos has no rail system However 2 large potential projects are under way The first is the Dansavan-Laobao Railway planned for 2018 operation The second is the Laos-China railway running from Vientiane to the Boten-Bohan borer which is set to be completed by the end of 2021

Aviation Laos has 3 international airports with each in the North Central and Southern regions The airports mainly handle tourist arrivals and business travelers to a lesser extent A small amount of trade is handled at Vientianersquos international airport for special niche products that require express shipment Insuch cases capacity is limited

Attapeu

International Airport

Danang

Foreign Seaport

Savannaket

Confirmed Rail Lines

Lao Bao

Bohan

11

BRI in Lao PDRrsquos Section

Route Boten to Vientiane

Distance 414 km

Construction Period 2017-2021

Investment Pattern Joint Venture ndash Lao PDR 40 and China 60

Cooperation Mechanism Government to Government (G to G)

Total Investment Cost USD 61-68 Billion

Passenger Train Speed 160-200 kmh

Stations 32

Current Status 203 completed (as of December 2017)

Data Source Reuters nationmultimediacom

Lao PDR ndash Belt and Road Initiative (BRI)

The section of the Belt and Road Initiative running through Lao PDR is a USD 6 billion high-speed railway project which will link China with Vientiane the Laotian capital and the Laos-Thailand border

Lao PDR BRI Timeline

2013 bull BRI was announced by Chinese President Xi Jinping The target of this project aims to invest in infrastructure in the central western and southern regions of Asia as well as in Africa and Europe

2016 DEC

bull The construction commenced The part of the BRI project that runs through Lao PDR runs from the Boten-Mohan border (between Laos and China) to Vientiane The project was delayed and restarted in 2017

2021 DEC

bull The project is set to be fully operational in December 2021 It will link Chinas Yunnan province the Lao capital Vientiane with the Thai border province Nong Khai

2015 DEC

bull The ground-breaking ceremony to launch the Lao PDR-China railway project was held on December 2 2015

Project Information

12

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

13

Key Industries and Opportunities

With rapid improvement in logistics infrastructure rich natural resources ample arable areas and cultural sites Lao PDR offers attractive opportunities for investments in the sectors of mining electronic parts and components industrial agriculture and tourism

TOURISM

ELECTRONIC PARTS AND COMPONENTS

MINING

INDUSTRIAL AGRICULTURE

HYDROPOWER

Temporarily Suspended

14

HYDROPOWER

Key Industries amp Opportunities

15

Hydropowerndash Overview

Hydropower exports in Lao PDR surged in 2017 The key destinations are Thailand Cambodia and Vietnam

Data source KResearch the Ministry of Energy and Mines

Total 29125

Magawatts

Number of Hydropower Plants

OPERATING

46

UNDER CONSTRUCTION

143

PENDING APPROVAL

246

Installed Capacities of Hydropower Plants in Lao PDR (Megawatts (MW) as of 2017)

Key Trends

Battery of Southeast Asia bull Due to Southeast Asiarsquos development toward industrialization there

remains a large demand gap for infrastructure support as well as growing demand for electricity to be met in the future

bull Thus Lao PDR with abundant natural resources for electricity generation aims to improve its energy sector to address this energy supply issue and position the country as a key exporter of energy in ASEAN

Lao PDR Electricity Exports

bull Lao PDRrsquos electricity exports have grown 15 annually since 2012

bull Electricity accounts for 24 of Lao PDR total exports

bull Thailand Cambodia and Vietnam are key export destinations with Thailand being the largest buyer

16

Hydropowerndash Opportunity

Lao PDR has ldquosuspendedrdquo new investment in hydropower projects and will conduct safety inspections for all existing dams due to the dam collapse incident in July

Data source laotiantimescom asianewsnetwork

The dam collapse in late July has caused Lao PDR to suspend new investment in hydropower projects in the country

bull On July 23 the ldquoSaddle Dam Drdquo part of the Xe-Pian Xe-Namnoy hydropower project in Champasak and Attapeu provinces has collapsed This disaster had affected around 5000 people in the area

bull On August 7 the government of Laos announced the suspension of new hydropower project approval and the renewed inspection of the existing dams

Key Policy Updates

2018 June

2018 August

The Lao government has suspended new investment in small-scale hydropower projects due to safety concerns

bull Lao PDR announced a temporary suspension of its authorization for investment in small-scale hydropower projects with installed capacity of lt15MW Such suspension is part of the governmentrsquos attempts to ensure the safety of hydropower dams

bull As a result the provincial and central authorities cannot approve new investment proposals for small-scale hydropower projects until concrete measures to ensure dam safety are drawn up

bull The suspension comes after construction of some projects has been found to be lower than the legally stipulated safety standards

17

Mining

Key Industries amp Opportunities

18

Mining ndash Overview

The mining Industry in Lao PDR has declined over the past several years due to fluctuations in global commodity prices and the maturity of some local mines

Data source International Trade Center worldbank

Lao PDR Mining Product Exports (USD Million 2017E)

Precious Stone Exports (USD Million 2017E)

DIAMOND

62 GOLD

1548 SILVER

54

Key Trends

Overall Lao PDRrsquos mining exports have decreased bull Exports of mining products have decreased since 2013 at an average

rate of 147 falling from USD1014 million in 2013 to USD 4575 in 2017

bull Copper and Coal experience the largest decline in export value mainly because some of the copper and coal mines have matured and global commodity prices have fallen

bull Meanwhile cement and sandstone record the highest increase in export value resulting from new investments and increasing domestic demand for these types of materials to use in the countryrsquos infrastructure development projects

Forms of investment in mining Business cooperation under contract

Joint venture between foreign and local firms

100 foreign or domestic ownership

Remark Firms could set up representative office to gather information and investigate investment opportunities

19

Taxes amp Regulations

Mining ndash Opportunity

Mineral resources in Lao PDR offer opportunities to firms with expertise in mining operations from prospection to mining and processing

Prospection Exploration Feasibility Study

Construction Mining amp Processing

2 years + 1 year

3 years + 2 years

1 year + 1 year

2 years + 1 year

20 years + 5 years

License Duration + Renewable

USD 3 -12 ha year USD 05 ndash 1 ha year + royalty (1-

7) Rental Fee

Registered company

Max 300 sqkm Corporate income 25-35

Value added 10

Rules and regulations for the Minerals Law in accordance to international standard partly missing

Limited number and capacity of local workers in mining sector

High number of mineral trade companies rather than professional mining operations firms

Key Issues

20

Electronic Parts and Components Industry

Key Industries amp Opportunities

21

Electronic Parts and Components Industry - Overview

Over the recent years Laos has experienced exponential growth in its exports of electronic parts and components especially to Thailand indicating the initial formation of the regional supply chain

Lao PDR Electronic Part and Component Exports (USD Million 2017)

Increasing investments in Lao PDR Special Economic Zone (SEZ) boosts trade The presence of SEZs and attractive incentives have attracted FDI inflows into Lao PDR especially in the production of digital camera parts and telecom equipment parts Most manufacturing in these sectors is aimed at exporting intermediate products to assemblers of finished electrical and electronic products in other countries

Main Export Destinations 2017

Data source International Trade Center

Why Thailand has become the top export destination

bull ASEAN Free Trade Agreement (AFTA) ndash The agreement minimizes trade barriers and creates free flow of goods and capital within ASEAN

bull Thailand-based industries shift their focus on value added activities - firms relocate labor-intensive activities to Thailandrsquos neighboring countries including Laos

22

Electronic Parts and Components Industry - Opportunity

Industrial development in Laos offers opportunities for firms to form the regional supply chain model and benefit from comparative advantages from both nations

Data source JETRO

Thailand

Product supply chain

Laos

Did you knowhellip

Challenges

Difficulty in getting large pools of labor due to small population

Underdeveloped infrastructure in some regions

Challenge in recruiting higher skilled specialists

Suggestion Set up in major Special Economic Zones eg Vita Park SEZ and Savan-Seno SEZ

Roll out strategic human resource plan including training and capacity building

bull Advanced infrastructure

bull Experienced and high-skilled (management level) workforce

bull Affordable and youthful workforce bull Located between Vietnam and Thailand

both with high electronics parts demand bull Government incentives

Start operation from small scale (less than 500 workers) then scale up

Japanese enterprises have started implementing Thailand+1 model by relocating labor-intensive production to Laos and exporting back to Thailand to complete product assembly eg NIKON (digital camera) Dai-Ichi Denshi (wire harness) Nissei Mizuki (electronics parts) and Toyota boshoku (car seat cover)

Thailand + 1 Model

23

Industrial Agriculture

Key Industries amp Opportunities

24

Industrial Agriculture - Overview

Most industrial agriculture exports from Lao PDR are produced by foreign investors (Chinese Thai and Vietnamese) and local entrepreneurs to a lesser extent

Data source JETRO International Trade Center Produce Report USDA Foreign Agriculture Service

Leading Agricultural Exports by export value (USD Million 2016 and 2017)

A short-term drop in fruit exports in 2017 bull Exports declined because the Lao government suspended

development of large banana and other fruit plantations which typically produce to export to China and placed more stringent control on polluting farms

bull However at the end of 2017 Lao PDR and China negotiated for less stringent terms for Lao PDRrsquos fruit exports to China

Key Trends

Sugar Cane exports rocketing bull In 2017 sugar cane plantation boomed Export volume grew 121

times from 2016

bull The major reason was the relocation of sugar production from China as production costs there are very high approximately double that of Thailand

Organic fruit and vegetable becoming key economic plants bull Local and foreign investors are increasingly investing in organic

agriculture a higher value-added segment which is demanded by major countries such as Europe US Japan and China

Exports (2016)

USD 02 Million

Exports (2017)

USD 20 Million

121 times

25

Industrial Agriculture - Opportunity

Lao industrial agriculture sector offers opportunities for

bull Agricultural inputs andmachinery producers and distributors

bull Plantation operators

bull Processing and trading firms in Thailand

3 Processing and Trading

Key Drivers Lack of capability to process

products at international standard

Lack of market access

Opportunities Market inputs and machinery

to agricultural projects Investor can target both large scale investment

and smallholder farmers

Opportunities Produce high-value agricultural

products organic products herbs and medical plants

Foreign investors operate via (1) contract farming and (2) concession

Opportunities Process raw products to meet

export standards trade products to leverage existing market channels

Agricultural Inputs and Machinery

Key Drivers Limited access to improved

agricultural inputs - Seed - Fertilizer - Quality machinery

1 2

Key Drivers Arable fertile land

low level of chemical pesticides

Plantation ndash High Value Products

26

Tourism

Key Industries amp Opportunities

27

Tourism - Overview

Tourist arrivals are on a steady rise in the past decade especially tourists from Asia Pacific with most of them visiting more developed border towns neighboring Thailand

Data source Ministry of Tourism TRAVEL amp TOURISM ECONOMIC IMPACT 2018 LAOS

Direct Contribution of Travel amp Tourism to GDP (USD Billion 2012-2018E)

bull Both tourist arrivals and revenue from tourism have increased approximately 3 folds in the past decade

bull Most tourists come from Asia Pacific (93) particularly from from Thailand (50) and Vietnam (25) followed by Europe (5)

Top Tourist Arrivals Destinations 2017

1 Vientiane Capital

2 Savannakhet

3 Champasak

Most top tourist destinations are more developed towns bordering Thailand

Nong Khai

Mukdahan

Ubon Ratchathani

World Heritage sites im these following city also attract a considerable number of visitors

Luang Prabang Wat Pu at Champasak

28

Business Opportunities Associated to Tourism Sector

Accommodate increasing tourist arrivals

Provide dining and entertainment services

Develop attractive ecotourism cultural tourism packages

Provide transportation services linking major tourism sites

Produce and market souvenirs applying local arts design and materials

1 Hotel Restaurant Entertainment

2 Tour Company Holiday Package

3 Sourvenirs

4 Transportation Service

Tourism - Opportunity

29

Lao Consumer Income and Behavior

Prefer to cook at home Enjoy drinking alcohol Middle income enjoy

spending evening in beer garden

Lao women wear sinh Follow Thai and Korean

fashion due to influence of TV series

Shop at traditional markets Middle income shop at

Thai border towns (Nong Khai Udon Thani)

Thai and Japanese products are perceived to have high quality Chinese products are perceived as sub-standard quality and Korean products are in between

30

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

31

Major Costs ndash Labor and Utility

Electricity Rate 2017

0 - 25 kwh 004USDkwh

26 - 150 kwh 005USDkwh

151 - 300 kwh 009USDkwh

more than 500 kwh 012USDkwh

301 - 400 kwh 010USDkwh

401 - 500 kwh 011USDkwh

Water Price (Per Unit) for Business and Trade Units

bull Water price for businesses is set to increase from USD USD 036 in 2017 to USD038 per unit this year

Labor minimum monthly wage in ASEAN 2017 USD

32

Tax System

Monthly Income (LAK) Tax Rate

0 ndash 1000000 0

1000001 - 3000000 5

3000001 - 6000000 10

6000001 - 12000000 12

12000001 - 24000000 15

24000001 - 40000000 20

Above 40000000 24

Types of Tax Tax rate

Profit Tax 24

Value Added Tax (VAT) 10

Withholding Tax Dividends 10

(non-residents) Transfer of shares 10

Transfer of assets 5

China

Luxembourg

Malaysia

Singapore

South Korea

Thailand

Vietnam

Income tax treaties for avoidance of double taxation

Note There is no definition of residence for tax purposes in Laos All companies registered under Lao law (including foreign law) are subject to Lao profit tax

Personal Income Tax Corporate Taxes

Data source DFDL

33

Foreign Investment Regulations

Data source JETRO Compiled by World Business Advisory Center

Not Permitted to Foreigner Only for Joint Venture with Local Company 100 Foreign Ownership Allowed

Wholesale and Retail Businesses

100 Foreign Ownership bull If registered capital is 20 billion Lao Kip

(USD 25 million) or more

Maximum 70 Foreign Ownership bull If registered capital is 10 - 20 billion Lao Kip

(USD 125 ndash 25 million)

Maximum 50 Foreign Ownership bull If registered capital is 4 - 10 billion Lao Kip

(USD 05 ndash 125 million)

bull If registered capital is less than 4 billion Lao Kip (USD 05 million)

Hotel and Restaurants Maximum 60 Foreign Ownership bull 3-5 stars hotel with minimum registered capital of

1 billion Lao Kip (USD 125000)

bull Less than 3 stars hotel 100 Foreign Ownership bull NOT ALLOWED

Logistics

100 Foreign Ownership bull Domestic goods transport with minimum

registered capital of 3 billion Lao Kip (USD 375000)

Maximum 49 Foreign Ownership bull Cross border goods transport with minimum

registered capital of 5 billion Lao Kip (USD 625000)

bull Cross border goods transport with less than 5 billion Lao Kip of registered capital

bull Domestic goods transport with less than 3 billion Lao Kip of registered capital

Examples of Foreign Investment Regulations

Foreign enterprises are subject to foreign investment regulations in several business activities Generally small businesses are preserved for Lao enterprises whereas large businesses with certain investment conditions are opened for foreign investors

34

Types of Investment ndash (1) General Business

Data source JETRO Compiled by World Business Advisory Center

Besides foreign investment regulation foreign enterprises are also subject to the investment promotion law which classifies investment into 3 types

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Investment in General Business

Types of Investment in Lao PDR

Description

o An investment in general economic activities

o Activities including controlled businesses ndash businesses that require additional approval from relevant ministries

o Activities excluding concession business

Register Capital

Requirements

o At least 1 billion Lao Kip (USD 125000)

o At the day of establishment must pay 40 (agriculture business) 60 (production and processing) 80 (services) The remainder must be paid within 1 year

Examples of Controlled Businesses 1 Agriculture plantation agriculture fishery 2 Manufacturing petroleum products leathers textile amp clothing papers

printing pesticides pharmaceutical products 3 Businesses related to environment eg wastewater treatment 4 Wholesale and retails of gasoline and petroleum products 5 Transportation 6 Hotel and Restaurant 7 Media and Publication 8 Finance and insurance 9 Legal accounting and tax services 10 Tourism 11 Education 12 Hospital clinic and medical services 13 Recreation (museum and amusement park)

35

Types of Investment ndash (2) Concession Business

Data source JETRO Compiled by World Business Advisory Center

Investment in Concession Business

Description

o An investment that requires a concession or specific authorization from the government to use the governmentrsquos property

o Some concession businesses requires authorization from the central government whereas the other requires only provincial government level of authorization for example

bull At least 5MW electricity generation project requires the central government authorization

bull Less than 5MW electricity generation projects requires only provincial government authorization

Examples of Concession Business

1 Mining 2 Electricity generation 3 Infrastructure

bull Telecommunication bull TV and radio station bull Road railway airport seaport waste disposal site

4 Businesses that use the government land bull Shopping center bull Tourist attraction bull Public park bull Hotel bull Forestry and Logging bull Plantation and Livestock

Register Capital

Requirements

o Must pay at least 20 of registered capital while remaining should be paid within 2 years

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Types of Investment in Lao PDR

36

Types of Investment ndash (3) Business Related to SEZ

Data source JETRO Compiled by World Business Advisory Center

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Types of Investment in Lao PDR

Investment in Business Related to SEZ

Description

o Business related to Special Economic Zone -gt an investment in building infrastructure for a new town

o Business related to Specific Economic Zone -gt an investment in infrastructure development for specific purpose projects such as industrial zone export zone tourist development zone etc

High Potential SEZs in Laos

o Vita Park Special Economic Zone (Vientiane)

o Savan-Seno Special Economic Zone (Savannakhet)

o Pakxe-Japan SME Specific Economic Zone (Champasak)

Special and Specific Economic Zones

1 Boten-Daenkham Specific Economic Zone 2 Luang Prabang Special Economic Zone 3 Golden Triangle Special Economic Zone 4 Thatluang Lake Specific Economic Zone 5 Longthanh Specific Economic Zone 6 Xaysettha Specific Economic Zone 7 Vita Park Special Economic Zone 8 Dongphosy Specific Economic Zone 9 Thakhek Specific Economic Zone 10 Poukiao Specific Economic Zone 11 Savan-Seno Special Economic Zone 12 Pakxe-Japan SME Specific Economic Zone

1

2

3

4

5 6

7

8

9 10

11

12

37

General Business

Concession Business

Business related to

SEZs

Procedure of Investment in Lao PDR

The investment approval procedure varies depending upon type of investment However all foreign investors must go through enterprise registration tax identification number registration and application for capital importation certificate

Apply at Ministry of Planning and

Investment

For developer apply at National Committee for Special Economic Zone

For investor apply at One-Stop Service Unit in

each SEZ

Get Concession

License

Get SEZ Concession

License

For controlled businesses apply for

approval at relevant Ministries

Get Approval License

Apply at Ministry of

Industry and Commerce

For non-controlled businesses

Get Enterprise

Registration Certificate

(ERC)

Apply for Tax

Identification Number TIN

at Tax Department Ministry of

Finance

Apply for Capital

Importation Certificate at Bank of Lao

PDR

Data source JETRO Compiled by World Business Advisory Center

38

Investment Tax Incentives ndash General Zone

Data source JETRO Compiled by World Business Advisory Center

Investment Tax Incentives in Lao PDR

Profit Tax Exemption Period

Level 1 High Promotion

Level 2 Moderate Promotion

Level 3 Low Promotion

Zone 1 10 years 6 years 4 years

Zone 2 6 years 4 years 2 years

Zone 3 4 years 2 years 1 years

Profit Tax Exemption Period by Promotion Sector and Zone

Promoted sectors Agriculture Industrial Handicrafts and Services

Type of Tax Exemption

General Zone Promotion Sector and Zone based Incentives 1 Special amp Specific Economic Zone

Tailor Made Incentives 2

Profit tax in next accounting year in case net profit is used for reinvestment (business

expansion)

Import duties for import of raw material equipment spare parts and

vehicles directly used for production

Export duties for general goods and

products (resource-based products should follow

associated laws)

Permission to carry forward losses to

three consecutive accounting years

39

Sector Period of

Profit Tax Exemption

Profit Tax Rate

After Tax Exemption Period

Hi-Tech Manufacturing 10 year 8

Manufacturing that exports at least 70 of production 10 year 8

Manufacturing that exports 30 - 60 of production 7 year 8

Manufacturing that exports 0 - 29 of production 5 year 8

Other 5 year 8

Investment amount of USD 2 million or more 10 year 8

Investment amount of USD 500000 - USD 2 million 8 year 8

Investment amount of USD 300000 - USD 500000 6 year 10

Investment amount of USD 150000 - USD 300000 4 year 10

Investment amount of USD 50000 - USD 150000 2 year 10

Export Laos products 5 year 10

International trade company 3 year 10

General trade company 2 year 10

a) Manufacturing

b) Service

c) Commerce

Personal Income Tax 5

Dividend Tax after Profit Tax Exemption Period

5

Import Duty Exemption for import of raw material equipment spare parts and

vehicles directly used for production

VAT Exemption for import products

Investment Tax Incentives ndash Special and Specific Economic Zone

Data source JETRO

Investment Tax Incentives in Lao PDR

General Zone Promotion Sector and Zone based Incentives 1 Special amp Specific Economic Zone

Tailor Made Incentives 2 Example of Tax Incentives in Savan-Seno SEZ

Other Tax Incentives

40

Non-Tax Incentives amp Trade Privileges

Data source JETRO

Non-Tax Incentives

Permission

Foreign nationals can undertake feasibility studies

Bring in foreign technicians experts and managers if qualified Lao nationals are not available

Lease land

General business up to 30 years from Lao citizen and up to 50 years from the government (renewable)

Investment in SEZ up to 75 years

Concession business upon negotiation with the government (at present there is an example of 99 years land lease)

Transfer leasehold interests and build on or make improvements or structures to a leased land

Guarantee against nationalization expropriation and requisition without compensation

Protection

Trade Privileges

ASEAN WTO GSP Bilateral trade agreement (over 18 countries)

o Argentina o Belarus o Bulgaria o Cambodia o China o Indonesia o India o Korea DPR o Kuwait

o Malaysia o Mongolia o Myanmar o Philippines o Russian

Federation o Thailand o Turkey o USA o Vietnam

41

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

42

Foreign Currency Exchange

Data source Bank of the Lao PDR

Laos Currency Kip (LAK)

Latest FX Rate (as of August 22 2018)

Remark THB and USD are widely accepted especially in the border trade area

USD 1 ~ LAK 8507

EUR 1 ~ LAK 9851

THB 1 ~ LAK 262

JPY 1 ~ LAK 77

CNY 1 ~ LAK 1193

43

KASIKORNTHAIBANK Service in Lao PDR

Retail Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Current deposit

Lending

Working capital loan

Long term loan

Bank guarantee

Project Financing

FX Services

Corporate Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Remittance

Remittance

Trade Finance Letter of Credit (LC) Standby Letter of Credit (SBLC)

44

KASIKORNTHAI BANK Limited

With establishment KASIKORNTHAIBANK

the first full-scale locally incorporated institution from Thailand is fully committed to support our clientsrsquo cross-border financing and transaction for their trade and investment activities in Lao PDR

45

KASIKORNTHAIBANK in Lao PDR Contacts

bull HEAD OFFICE Unit 12 Lane Xang Avenue Xiangngeun Village Chanthaboury District Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88905 Fax +856 21 253 336 wwwkasikornbankcomla

KASIKORNTHAI BANK Limited

bull PONESINUAN BRANCH

Ban Ponesinuan Unit 14 Sysattanak Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88826 Fax +856 21 410 889

Ms Piyanoot Sangsan Branch Manager KASIKORNTHAI BANK LIMITED Lane Xang Head Office E-mail piyanootskasikornbankcom

Mr Chatuporn Boozaya-Angool Branch Manager Ponesinuan Branch E-mail chatupornbkasikornbankcom

46

About AEC+ Business Advisory The AEC+ Business Advisory is set up by KASIKORNBANK to support businesses in their regional expansion across the ASEAN+3 market by providing local market intelligence and strategic business advice

What we do bull Offer customized and tailor-made advisory services bull Publish investment guides and industry reports bull Deliver in-depth insights via seminars bull Organize business trips to bring first-hand experience

Follow Us Visit our website at

AEC+ BUSINESS ADVISORY

Prepared by Mr Anoot Charoenkiattikul World Business Intelligence Specialist E-mail anootckasikornbankcom

httpswwwkasikornbankcominternational-businessenPagesHomeaspx

47

Page 5: LAO PDR - Facilitiesfuangfah.econ.cmu.ac.th/teacher/nisit/files/201808_LaoPDR_Investm… · • On August 7, the government of Laos announced the suspension of new hydropower project

5

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

6

Country Name Lao Peoplersquos Democratic Republic (Lao PDR)

Area 236800 sqkm

Population 68 million (2018)

Government Single Party Socialist Republic

Currency Lao Kip

GDP (current prices) USD 183 billion (2018) (Equivalent to Samut Prakan Thailand)

GDP per capita (current prices) USD 7930 (2018)

Luang Prabang

Khammouane

Savannakhet

Pakxe

VIENTIANE

2015 2020 2025 2030

Timeline and Milestone

With a 68 average growth rate in the medium term Laos is one of the fastest growing nations in ASEAN driven by foreign investments particularly from China and other ASEAN countries

2020 Graduation from least developed country (LDC) status

2013 WTO membership

2030 Goal Classified as developing country with upper-middle income and sustainable economic growth

Data Source IMF

Country Overview

2025 Transition period of LDC graduation by transforming service industry and agriculture to high-value businesses

7

427

1695

2013 2014 2015 2016 2017

USD

Mill

ion

Data Source KPMG ASEANstatsorg

Foreign Direct Investment

The Belt and Road Initiative(BRI) has significantly affected Laosrsquo FDI (foreign direct investment) structure It has made China the most important foreign investor in the country their investments accounted for 87 of total FDI in 2017

Key FDI Figures Changes in Economic Composition

Service sector growth an indirect effect of FDIs The service sector in Laos including wholesale and retail trading hotels and restaurants financial services and telecommunications expanded as it began to absorb the growing number of foreign workers

China is Lao PDRrsquos major investor Their investments reached USD15 billion in 2017 growing 85 YoY

Other key investors are Malaysia Thailand and

Vietnam with investment values of USD124 million USD12 million and USD09

million respectively

Top sectors of FDIs are hydropower generation mining and agriculture

OBOR effect FDI inflows significantly increased in 2016 and 2017 after Lao PDR and Chinarsquos ground-breaking ceremony of the railroad project was held in December 2015 and construction of the whole route commenced in December 2016

8

Data Source nhandancomvn International Trade Center

Lao PDR Trade Overview

In 2017 Laos mainly exported electricity to its neighboring countries such as Thailand and Vietnam while imports have shifted to electronic and machinery parts for hydropower projects industrial production and infrastructure development

Trade Flows and Balance 2012-2017

Top Trading Partners 2017

Thailand

USD 53 Billion

China

USD 20 Billion

Vietnam

USD 13 Billion

Lao PDRrsquos Key Trade Products 2017

Exports Imports

Total Export Volume

USD 48 Billion

Total Import Volume

USD 60 Billion

Electrical machinery and equipment

14

Machinery amp equipment

13

Fuel products 12

Electricity 25

Mining products 13

Electrical machinery and equipment

12

9

Lao PDR ndash Thailand Border Trade Statistics 2017

Data Source Department of Foreign Trade (Thailand)

Lao PDR ndash Thailand Border Trade

Border trade is the main two-way trade channel between Lao PDR and Thailand

of two-way trade between Lao PDR and Thailand occurs through the border as Lao PDR is a land-locked country and its economic cities are located close to Thailandrsquos border

97 Key Official Trade Points By percentage share () 2017

31 Mukdaharn - Savannakhet

8 Ubon Ratchathani - Champasak

7 Nakhon Panom - Khammouan

30 Nong Khai - Vientiane

12 Nan - Luang Prabang

Mukdahan ndash Savannakhet Strategic border point which is located along the East-West Economic Corridor (EWEC) as well as gateway to Lao PDRrsquos most developed SEZ Savan - Seno Special Economic Zone

Nong Khai ndash Vientiane Gateway to Vientiane the countryrsquos capital city and key economic city

Total Official Trade Points

15

Trade Volume USD 61 Billion

Exports USD 23 Billion

Imports USD 38 Billion

Exports Imports

Diesel fuel (11)

Automobiles and parts (8)

Refined Oil (5)

Machinery amp equipment (7)

Electricity (52)

Copper amp materials (14)

Vegetable amp products (5)

Electronics (12)

10

Data Source Asian Development Bank

Lao PDR - Infrastructure Overview

Road transport is the main mode of transportation in Laos for both freight and passenger transportation Railway development is also under way Due to Laosrsquo geographical characteristic the governmentrsquos primary focus is the development of land transport

Road transport is the primary means of transport carrying over 80 of freight traffic and almost 100 of all domestic passenger traffic Major roads link major cities to key border towns in neighboring countries with routes heading north from Vientiane the capital the more developed and most crowded

Road

Being a land-locked country Laos does not have a sea port and either relies on Thailandrsquos Laem Chabang Port or other sea ports in Vietnam However inland waterways along the Mekong river does support 18 of its freight traffic albeit with limitaitions during the dry season

Water Transport Railway Laos has no rail system However 2 large potential projects are under way The first is the Dansavan-Laobao Railway planned for 2018 operation The second is the Laos-China railway running from Vientiane to the Boten-Bohan borer which is set to be completed by the end of 2021

Aviation Laos has 3 international airports with each in the North Central and Southern regions The airports mainly handle tourist arrivals and business travelers to a lesser extent A small amount of trade is handled at Vientianersquos international airport for special niche products that require express shipment Insuch cases capacity is limited

Attapeu

International Airport

Danang

Foreign Seaport

Savannaket

Confirmed Rail Lines

Lao Bao

Bohan

11

BRI in Lao PDRrsquos Section

Route Boten to Vientiane

Distance 414 km

Construction Period 2017-2021

Investment Pattern Joint Venture ndash Lao PDR 40 and China 60

Cooperation Mechanism Government to Government (G to G)

Total Investment Cost USD 61-68 Billion

Passenger Train Speed 160-200 kmh

Stations 32

Current Status 203 completed (as of December 2017)

Data Source Reuters nationmultimediacom

Lao PDR ndash Belt and Road Initiative (BRI)

The section of the Belt and Road Initiative running through Lao PDR is a USD 6 billion high-speed railway project which will link China with Vientiane the Laotian capital and the Laos-Thailand border

Lao PDR BRI Timeline

2013 bull BRI was announced by Chinese President Xi Jinping The target of this project aims to invest in infrastructure in the central western and southern regions of Asia as well as in Africa and Europe

2016 DEC

bull The construction commenced The part of the BRI project that runs through Lao PDR runs from the Boten-Mohan border (between Laos and China) to Vientiane The project was delayed and restarted in 2017

2021 DEC

bull The project is set to be fully operational in December 2021 It will link Chinas Yunnan province the Lao capital Vientiane with the Thai border province Nong Khai

2015 DEC

bull The ground-breaking ceremony to launch the Lao PDR-China railway project was held on December 2 2015

Project Information

12

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

13

Key Industries and Opportunities

With rapid improvement in logistics infrastructure rich natural resources ample arable areas and cultural sites Lao PDR offers attractive opportunities for investments in the sectors of mining electronic parts and components industrial agriculture and tourism

TOURISM

ELECTRONIC PARTS AND COMPONENTS

MINING

INDUSTRIAL AGRICULTURE

HYDROPOWER

Temporarily Suspended

14

HYDROPOWER

Key Industries amp Opportunities

15

Hydropowerndash Overview

Hydropower exports in Lao PDR surged in 2017 The key destinations are Thailand Cambodia and Vietnam

Data source KResearch the Ministry of Energy and Mines

Total 29125

Magawatts

Number of Hydropower Plants

OPERATING

46

UNDER CONSTRUCTION

143

PENDING APPROVAL

246

Installed Capacities of Hydropower Plants in Lao PDR (Megawatts (MW) as of 2017)

Key Trends

Battery of Southeast Asia bull Due to Southeast Asiarsquos development toward industrialization there

remains a large demand gap for infrastructure support as well as growing demand for electricity to be met in the future

bull Thus Lao PDR with abundant natural resources for electricity generation aims to improve its energy sector to address this energy supply issue and position the country as a key exporter of energy in ASEAN

Lao PDR Electricity Exports

bull Lao PDRrsquos electricity exports have grown 15 annually since 2012

bull Electricity accounts for 24 of Lao PDR total exports

bull Thailand Cambodia and Vietnam are key export destinations with Thailand being the largest buyer

16

Hydropowerndash Opportunity

Lao PDR has ldquosuspendedrdquo new investment in hydropower projects and will conduct safety inspections for all existing dams due to the dam collapse incident in July

Data source laotiantimescom asianewsnetwork

The dam collapse in late July has caused Lao PDR to suspend new investment in hydropower projects in the country

bull On July 23 the ldquoSaddle Dam Drdquo part of the Xe-Pian Xe-Namnoy hydropower project in Champasak and Attapeu provinces has collapsed This disaster had affected around 5000 people in the area

bull On August 7 the government of Laos announced the suspension of new hydropower project approval and the renewed inspection of the existing dams

Key Policy Updates

2018 June

2018 August

The Lao government has suspended new investment in small-scale hydropower projects due to safety concerns

bull Lao PDR announced a temporary suspension of its authorization for investment in small-scale hydropower projects with installed capacity of lt15MW Such suspension is part of the governmentrsquos attempts to ensure the safety of hydropower dams

bull As a result the provincial and central authorities cannot approve new investment proposals for small-scale hydropower projects until concrete measures to ensure dam safety are drawn up

bull The suspension comes after construction of some projects has been found to be lower than the legally stipulated safety standards

17

Mining

Key Industries amp Opportunities

18

Mining ndash Overview

The mining Industry in Lao PDR has declined over the past several years due to fluctuations in global commodity prices and the maturity of some local mines

Data source International Trade Center worldbank

Lao PDR Mining Product Exports (USD Million 2017E)

Precious Stone Exports (USD Million 2017E)

DIAMOND

62 GOLD

1548 SILVER

54

Key Trends

Overall Lao PDRrsquos mining exports have decreased bull Exports of mining products have decreased since 2013 at an average

rate of 147 falling from USD1014 million in 2013 to USD 4575 in 2017

bull Copper and Coal experience the largest decline in export value mainly because some of the copper and coal mines have matured and global commodity prices have fallen

bull Meanwhile cement and sandstone record the highest increase in export value resulting from new investments and increasing domestic demand for these types of materials to use in the countryrsquos infrastructure development projects

Forms of investment in mining Business cooperation under contract

Joint venture between foreign and local firms

100 foreign or domestic ownership

Remark Firms could set up representative office to gather information and investigate investment opportunities

19

Taxes amp Regulations

Mining ndash Opportunity

Mineral resources in Lao PDR offer opportunities to firms with expertise in mining operations from prospection to mining and processing

Prospection Exploration Feasibility Study

Construction Mining amp Processing

2 years + 1 year

3 years + 2 years

1 year + 1 year

2 years + 1 year

20 years + 5 years

License Duration + Renewable

USD 3 -12 ha year USD 05 ndash 1 ha year + royalty (1-

7) Rental Fee

Registered company

Max 300 sqkm Corporate income 25-35

Value added 10

Rules and regulations for the Minerals Law in accordance to international standard partly missing

Limited number and capacity of local workers in mining sector

High number of mineral trade companies rather than professional mining operations firms

Key Issues

20

Electronic Parts and Components Industry

Key Industries amp Opportunities

21

Electronic Parts and Components Industry - Overview

Over the recent years Laos has experienced exponential growth in its exports of electronic parts and components especially to Thailand indicating the initial formation of the regional supply chain

Lao PDR Electronic Part and Component Exports (USD Million 2017)

Increasing investments in Lao PDR Special Economic Zone (SEZ) boosts trade The presence of SEZs and attractive incentives have attracted FDI inflows into Lao PDR especially in the production of digital camera parts and telecom equipment parts Most manufacturing in these sectors is aimed at exporting intermediate products to assemblers of finished electrical and electronic products in other countries

Main Export Destinations 2017

Data source International Trade Center

Why Thailand has become the top export destination

bull ASEAN Free Trade Agreement (AFTA) ndash The agreement minimizes trade barriers and creates free flow of goods and capital within ASEAN

bull Thailand-based industries shift their focus on value added activities - firms relocate labor-intensive activities to Thailandrsquos neighboring countries including Laos

22

Electronic Parts and Components Industry - Opportunity

Industrial development in Laos offers opportunities for firms to form the regional supply chain model and benefit from comparative advantages from both nations

Data source JETRO

Thailand

Product supply chain

Laos

Did you knowhellip

Challenges

Difficulty in getting large pools of labor due to small population

Underdeveloped infrastructure in some regions

Challenge in recruiting higher skilled specialists

Suggestion Set up in major Special Economic Zones eg Vita Park SEZ and Savan-Seno SEZ

Roll out strategic human resource plan including training and capacity building

bull Advanced infrastructure

bull Experienced and high-skilled (management level) workforce

bull Affordable and youthful workforce bull Located between Vietnam and Thailand

both with high electronics parts demand bull Government incentives

Start operation from small scale (less than 500 workers) then scale up

Japanese enterprises have started implementing Thailand+1 model by relocating labor-intensive production to Laos and exporting back to Thailand to complete product assembly eg NIKON (digital camera) Dai-Ichi Denshi (wire harness) Nissei Mizuki (electronics parts) and Toyota boshoku (car seat cover)

Thailand + 1 Model

23

Industrial Agriculture

Key Industries amp Opportunities

24

Industrial Agriculture - Overview

Most industrial agriculture exports from Lao PDR are produced by foreign investors (Chinese Thai and Vietnamese) and local entrepreneurs to a lesser extent

Data source JETRO International Trade Center Produce Report USDA Foreign Agriculture Service

Leading Agricultural Exports by export value (USD Million 2016 and 2017)

A short-term drop in fruit exports in 2017 bull Exports declined because the Lao government suspended

development of large banana and other fruit plantations which typically produce to export to China and placed more stringent control on polluting farms

bull However at the end of 2017 Lao PDR and China negotiated for less stringent terms for Lao PDRrsquos fruit exports to China

Key Trends

Sugar Cane exports rocketing bull In 2017 sugar cane plantation boomed Export volume grew 121

times from 2016

bull The major reason was the relocation of sugar production from China as production costs there are very high approximately double that of Thailand

Organic fruit and vegetable becoming key economic plants bull Local and foreign investors are increasingly investing in organic

agriculture a higher value-added segment which is demanded by major countries such as Europe US Japan and China

Exports (2016)

USD 02 Million

Exports (2017)

USD 20 Million

121 times

25

Industrial Agriculture - Opportunity

Lao industrial agriculture sector offers opportunities for

bull Agricultural inputs andmachinery producers and distributors

bull Plantation operators

bull Processing and trading firms in Thailand

3 Processing and Trading

Key Drivers Lack of capability to process

products at international standard

Lack of market access

Opportunities Market inputs and machinery

to agricultural projects Investor can target both large scale investment

and smallholder farmers

Opportunities Produce high-value agricultural

products organic products herbs and medical plants

Foreign investors operate via (1) contract farming and (2) concession

Opportunities Process raw products to meet

export standards trade products to leverage existing market channels

Agricultural Inputs and Machinery

Key Drivers Limited access to improved

agricultural inputs - Seed - Fertilizer - Quality machinery

1 2

Key Drivers Arable fertile land

low level of chemical pesticides

Plantation ndash High Value Products

26

Tourism

Key Industries amp Opportunities

27

Tourism - Overview

Tourist arrivals are on a steady rise in the past decade especially tourists from Asia Pacific with most of them visiting more developed border towns neighboring Thailand

Data source Ministry of Tourism TRAVEL amp TOURISM ECONOMIC IMPACT 2018 LAOS

Direct Contribution of Travel amp Tourism to GDP (USD Billion 2012-2018E)

bull Both tourist arrivals and revenue from tourism have increased approximately 3 folds in the past decade

bull Most tourists come from Asia Pacific (93) particularly from from Thailand (50) and Vietnam (25) followed by Europe (5)

Top Tourist Arrivals Destinations 2017

1 Vientiane Capital

2 Savannakhet

3 Champasak

Most top tourist destinations are more developed towns bordering Thailand

Nong Khai

Mukdahan

Ubon Ratchathani

World Heritage sites im these following city also attract a considerable number of visitors

Luang Prabang Wat Pu at Champasak

28

Business Opportunities Associated to Tourism Sector

Accommodate increasing tourist arrivals

Provide dining and entertainment services

Develop attractive ecotourism cultural tourism packages

Provide transportation services linking major tourism sites

Produce and market souvenirs applying local arts design and materials

1 Hotel Restaurant Entertainment

2 Tour Company Holiday Package

3 Sourvenirs

4 Transportation Service

Tourism - Opportunity

29

Lao Consumer Income and Behavior

Prefer to cook at home Enjoy drinking alcohol Middle income enjoy

spending evening in beer garden

Lao women wear sinh Follow Thai and Korean

fashion due to influence of TV series

Shop at traditional markets Middle income shop at

Thai border towns (Nong Khai Udon Thani)

Thai and Japanese products are perceived to have high quality Chinese products are perceived as sub-standard quality and Korean products are in between

30

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

31

Major Costs ndash Labor and Utility

Electricity Rate 2017

0 - 25 kwh 004USDkwh

26 - 150 kwh 005USDkwh

151 - 300 kwh 009USDkwh

more than 500 kwh 012USDkwh

301 - 400 kwh 010USDkwh

401 - 500 kwh 011USDkwh

Water Price (Per Unit) for Business and Trade Units

bull Water price for businesses is set to increase from USD USD 036 in 2017 to USD038 per unit this year

Labor minimum monthly wage in ASEAN 2017 USD

32

Tax System

Monthly Income (LAK) Tax Rate

0 ndash 1000000 0

1000001 - 3000000 5

3000001 - 6000000 10

6000001 - 12000000 12

12000001 - 24000000 15

24000001 - 40000000 20

Above 40000000 24

Types of Tax Tax rate

Profit Tax 24

Value Added Tax (VAT) 10

Withholding Tax Dividends 10

(non-residents) Transfer of shares 10

Transfer of assets 5

China

Luxembourg

Malaysia

Singapore

South Korea

Thailand

Vietnam

Income tax treaties for avoidance of double taxation

Note There is no definition of residence for tax purposes in Laos All companies registered under Lao law (including foreign law) are subject to Lao profit tax

Personal Income Tax Corporate Taxes

Data source DFDL

33

Foreign Investment Regulations

Data source JETRO Compiled by World Business Advisory Center

Not Permitted to Foreigner Only for Joint Venture with Local Company 100 Foreign Ownership Allowed

Wholesale and Retail Businesses

100 Foreign Ownership bull If registered capital is 20 billion Lao Kip

(USD 25 million) or more

Maximum 70 Foreign Ownership bull If registered capital is 10 - 20 billion Lao Kip

(USD 125 ndash 25 million)

Maximum 50 Foreign Ownership bull If registered capital is 4 - 10 billion Lao Kip

(USD 05 ndash 125 million)

bull If registered capital is less than 4 billion Lao Kip (USD 05 million)

Hotel and Restaurants Maximum 60 Foreign Ownership bull 3-5 stars hotel with minimum registered capital of

1 billion Lao Kip (USD 125000)

bull Less than 3 stars hotel 100 Foreign Ownership bull NOT ALLOWED

Logistics

100 Foreign Ownership bull Domestic goods transport with minimum

registered capital of 3 billion Lao Kip (USD 375000)

Maximum 49 Foreign Ownership bull Cross border goods transport with minimum

registered capital of 5 billion Lao Kip (USD 625000)

bull Cross border goods transport with less than 5 billion Lao Kip of registered capital

bull Domestic goods transport with less than 3 billion Lao Kip of registered capital

Examples of Foreign Investment Regulations

Foreign enterprises are subject to foreign investment regulations in several business activities Generally small businesses are preserved for Lao enterprises whereas large businesses with certain investment conditions are opened for foreign investors

34

Types of Investment ndash (1) General Business

Data source JETRO Compiled by World Business Advisory Center

Besides foreign investment regulation foreign enterprises are also subject to the investment promotion law which classifies investment into 3 types

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Investment in General Business

Types of Investment in Lao PDR

Description

o An investment in general economic activities

o Activities including controlled businesses ndash businesses that require additional approval from relevant ministries

o Activities excluding concession business

Register Capital

Requirements

o At least 1 billion Lao Kip (USD 125000)

o At the day of establishment must pay 40 (agriculture business) 60 (production and processing) 80 (services) The remainder must be paid within 1 year

Examples of Controlled Businesses 1 Agriculture plantation agriculture fishery 2 Manufacturing petroleum products leathers textile amp clothing papers

printing pesticides pharmaceutical products 3 Businesses related to environment eg wastewater treatment 4 Wholesale and retails of gasoline and petroleum products 5 Transportation 6 Hotel and Restaurant 7 Media and Publication 8 Finance and insurance 9 Legal accounting and tax services 10 Tourism 11 Education 12 Hospital clinic and medical services 13 Recreation (museum and amusement park)

35

Types of Investment ndash (2) Concession Business

Data source JETRO Compiled by World Business Advisory Center

Investment in Concession Business

Description

o An investment that requires a concession or specific authorization from the government to use the governmentrsquos property

o Some concession businesses requires authorization from the central government whereas the other requires only provincial government level of authorization for example

bull At least 5MW electricity generation project requires the central government authorization

bull Less than 5MW electricity generation projects requires only provincial government authorization

Examples of Concession Business

1 Mining 2 Electricity generation 3 Infrastructure

bull Telecommunication bull TV and radio station bull Road railway airport seaport waste disposal site

4 Businesses that use the government land bull Shopping center bull Tourist attraction bull Public park bull Hotel bull Forestry and Logging bull Plantation and Livestock

Register Capital

Requirements

o Must pay at least 20 of registered capital while remaining should be paid within 2 years

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Types of Investment in Lao PDR

36

Types of Investment ndash (3) Business Related to SEZ

Data source JETRO Compiled by World Business Advisory Center

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Types of Investment in Lao PDR

Investment in Business Related to SEZ

Description

o Business related to Special Economic Zone -gt an investment in building infrastructure for a new town

o Business related to Specific Economic Zone -gt an investment in infrastructure development for specific purpose projects such as industrial zone export zone tourist development zone etc

High Potential SEZs in Laos

o Vita Park Special Economic Zone (Vientiane)

o Savan-Seno Special Economic Zone (Savannakhet)

o Pakxe-Japan SME Specific Economic Zone (Champasak)

Special and Specific Economic Zones

1 Boten-Daenkham Specific Economic Zone 2 Luang Prabang Special Economic Zone 3 Golden Triangle Special Economic Zone 4 Thatluang Lake Specific Economic Zone 5 Longthanh Specific Economic Zone 6 Xaysettha Specific Economic Zone 7 Vita Park Special Economic Zone 8 Dongphosy Specific Economic Zone 9 Thakhek Specific Economic Zone 10 Poukiao Specific Economic Zone 11 Savan-Seno Special Economic Zone 12 Pakxe-Japan SME Specific Economic Zone

1

2

3

4

5 6

7

8

9 10

11

12

37

General Business

Concession Business

Business related to

SEZs

Procedure of Investment in Lao PDR

The investment approval procedure varies depending upon type of investment However all foreign investors must go through enterprise registration tax identification number registration and application for capital importation certificate

Apply at Ministry of Planning and

Investment

For developer apply at National Committee for Special Economic Zone

For investor apply at One-Stop Service Unit in

each SEZ

Get Concession

License

Get SEZ Concession

License

For controlled businesses apply for

approval at relevant Ministries

Get Approval License

Apply at Ministry of

Industry and Commerce

For non-controlled businesses

Get Enterprise

Registration Certificate

(ERC)

Apply for Tax

Identification Number TIN

at Tax Department Ministry of

Finance

Apply for Capital

Importation Certificate at Bank of Lao

PDR

Data source JETRO Compiled by World Business Advisory Center

38

Investment Tax Incentives ndash General Zone

Data source JETRO Compiled by World Business Advisory Center

Investment Tax Incentives in Lao PDR

Profit Tax Exemption Period

Level 1 High Promotion

Level 2 Moderate Promotion

Level 3 Low Promotion

Zone 1 10 years 6 years 4 years

Zone 2 6 years 4 years 2 years

Zone 3 4 years 2 years 1 years

Profit Tax Exemption Period by Promotion Sector and Zone

Promoted sectors Agriculture Industrial Handicrafts and Services

Type of Tax Exemption

General Zone Promotion Sector and Zone based Incentives 1 Special amp Specific Economic Zone

Tailor Made Incentives 2

Profit tax in next accounting year in case net profit is used for reinvestment (business

expansion)

Import duties for import of raw material equipment spare parts and

vehicles directly used for production

Export duties for general goods and

products (resource-based products should follow

associated laws)

Permission to carry forward losses to

three consecutive accounting years

39

Sector Period of

Profit Tax Exemption

Profit Tax Rate

After Tax Exemption Period

Hi-Tech Manufacturing 10 year 8

Manufacturing that exports at least 70 of production 10 year 8

Manufacturing that exports 30 - 60 of production 7 year 8

Manufacturing that exports 0 - 29 of production 5 year 8

Other 5 year 8

Investment amount of USD 2 million or more 10 year 8

Investment amount of USD 500000 - USD 2 million 8 year 8

Investment amount of USD 300000 - USD 500000 6 year 10

Investment amount of USD 150000 - USD 300000 4 year 10

Investment amount of USD 50000 - USD 150000 2 year 10

Export Laos products 5 year 10

International trade company 3 year 10

General trade company 2 year 10

a) Manufacturing

b) Service

c) Commerce

Personal Income Tax 5

Dividend Tax after Profit Tax Exemption Period

5

Import Duty Exemption for import of raw material equipment spare parts and

vehicles directly used for production

VAT Exemption for import products

Investment Tax Incentives ndash Special and Specific Economic Zone

Data source JETRO

Investment Tax Incentives in Lao PDR

General Zone Promotion Sector and Zone based Incentives 1 Special amp Specific Economic Zone

Tailor Made Incentives 2 Example of Tax Incentives in Savan-Seno SEZ

Other Tax Incentives

40

Non-Tax Incentives amp Trade Privileges

Data source JETRO

Non-Tax Incentives

Permission

Foreign nationals can undertake feasibility studies

Bring in foreign technicians experts and managers if qualified Lao nationals are not available

Lease land

General business up to 30 years from Lao citizen and up to 50 years from the government (renewable)

Investment in SEZ up to 75 years

Concession business upon negotiation with the government (at present there is an example of 99 years land lease)

Transfer leasehold interests and build on or make improvements or structures to a leased land

Guarantee against nationalization expropriation and requisition without compensation

Protection

Trade Privileges

ASEAN WTO GSP Bilateral trade agreement (over 18 countries)

o Argentina o Belarus o Bulgaria o Cambodia o China o Indonesia o India o Korea DPR o Kuwait

o Malaysia o Mongolia o Myanmar o Philippines o Russian

Federation o Thailand o Turkey o USA o Vietnam

41

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

42

Foreign Currency Exchange

Data source Bank of the Lao PDR

Laos Currency Kip (LAK)

Latest FX Rate (as of August 22 2018)

Remark THB and USD are widely accepted especially in the border trade area

USD 1 ~ LAK 8507

EUR 1 ~ LAK 9851

THB 1 ~ LAK 262

JPY 1 ~ LAK 77

CNY 1 ~ LAK 1193

43

KASIKORNTHAIBANK Service in Lao PDR

Retail Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Current deposit

Lending

Working capital loan

Long term loan

Bank guarantee

Project Financing

FX Services

Corporate Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Remittance

Remittance

Trade Finance Letter of Credit (LC) Standby Letter of Credit (SBLC)

44

KASIKORNTHAI BANK Limited

With establishment KASIKORNTHAIBANK

the first full-scale locally incorporated institution from Thailand is fully committed to support our clientsrsquo cross-border financing and transaction for their trade and investment activities in Lao PDR

45

KASIKORNTHAIBANK in Lao PDR Contacts

bull HEAD OFFICE Unit 12 Lane Xang Avenue Xiangngeun Village Chanthaboury District Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88905 Fax +856 21 253 336 wwwkasikornbankcomla

KASIKORNTHAI BANK Limited

bull PONESINUAN BRANCH

Ban Ponesinuan Unit 14 Sysattanak Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88826 Fax +856 21 410 889

Ms Piyanoot Sangsan Branch Manager KASIKORNTHAI BANK LIMITED Lane Xang Head Office E-mail piyanootskasikornbankcom

Mr Chatuporn Boozaya-Angool Branch Manager Ponesinuan Branch E-mail chatupornbkasikornbankcom

46

About AEC+ Business Advisory The AEC+ Business Advisory is set up by KASIKORNBANK to support businesses in their regional expansion across the ASEAN+3 market by providing local market intelligence and strategic business advice

What we do bull Offer customized and tailor-made advisory services bull Publish investment guides and industry reports bull Deliver in-depth insights via seminars bull Organize business trips to bring first-hand experience

Follow Us Visit our website at

AEC+ BUSINESS ADVISORY

Prepared by Mr Anoot Charoenkiattikul World Business Intelligence Specialist E-mail anootckasikornbankcom

httpswwwkasikornbankcominternational-businessenPagesHomeaspx

47

Page 6: LAO PDR - Facilitiesfuangfah.econ.cmu.ac.th/teacher/nisit/files/201808_LaoPDR_Investm… · • On August 7, the government of Laos announced the suspension of new hydropower project

6

Country Name Lao Peoplersquos Democratic Republic (Lao PDR)

Area 236800 sqkm

Population 68 million (2018)

Government Single Party Socialist Republic

Currency Lao Kip

GDP (current prices) USD 183 billion (2018) (Equivalent to Samut Prakan Thailand)

GDP per capita (current prices) USD 7930 (2018)

Luang Prabang

Khammouane

Savannakhet

Pakxe

VIENTIANE

2015 2020 2025 2030

Timeline and Milestone

With a 68 average growth rate in the medium term Laos is one of the fastest growing nations in ASEAN driven by foreign investments particularly from China and other ASEAN countries

2020 Graduation from least developed country (LDC) status

2013 WTO membership

2030 Goal Classified as developing country with upper-middle income and sustainable economic growth

Data Source IMF

Country Overview

2025 Transition period of LDC graduation by transforming service industry and agriculture to high-value businesses

7

427

1695

2013 2014 2015 2016 2017

USD

Mill

ion

Data Source KPMG ASEANstatsorg

Foreign Direct Investment

The Belt and Road Initiative(BRI) has significantly affected Laosrsquo FDI (foreign direct investment) structure It has made China the most important foreign investor in the country their investments accounted for 87 of total FDI in 2017

Key FDI Figures Changes in Economic Composition

Service sector growth an indirect effect of FDIs The service sector in Laos including wholesale and retail trading hotels and restaurants financial services and telecommunications expanded as it began to absorb the growing number of foreign workers

China is Lao PDRrsquos major investor Their investments reached USD15 billion in 2017 growing 85 YoY

Other key investors are Malaysia Thailand and

Vietnam with investment values of USD124 million USD12 million and USD09

million respectively

Top sectors of FDIs are hydropower generation mining and agriculture

OBOR effect FDI inflows significantly increased in 2016 and 2017 after Lao PDR and Chinarsquos ground-breaking ceremony of the railroad project was held in December 2015 and construction of the whole route commenced in December 2016

8

Data Source nhandancomvn International Trade Center

Lao PDR Trade Overview

In 2017 Laos mainly exported electricity to its neighboring countries such as Thailand and Vietnam while imports have shifted to electronic and machinery parts for hydropower projects industrial production and infrastructure development

Trade Flows and Balance 2012-2017

Top Trading Partners 2017

Thailand

USD 53 Billion

China

USD 20 Billion

Vietnam

USD 13 Billion

Lao PDRrsquos Key Trade Products 2017

Exports Imports

Total Export Volume

USD 48 Billion

Total Import Volume

USD 60 Billion

Electrical machinery and equipment

14

Machinery amp equipment

13

Fuel products 12

Electricity 25

Mining products 13

Electrical machinery and equipment

12

9

Lao PDR ndash Thailand Border Trade Statistics 2017

Data Source Department of Foreign Trade (Thailand)

Lao PDR ndash Thailand Border Trade

Border trade is the main two-way trade channel between Lao PDR and Thailand

of two-way trade between Lao PDR and Thailand occurs through the border as Lao PDR is a land-locked country and its economic cities are located close to Thailandrsquos border

97 Key Official Trade Points By percentage share () 2017

31 Mukdaharn - Savannakhet

8 Ubon Ratchathani - Champasak

7 Nakhon Panom - Khammouan

30 Nong Khai - Vientiane

12 Nan - Luang Prabang

Mukdahan ndash Savannakhet Strategic border point which is located along the East-West Economic Corridor (EWEC) as well as gateway to Lao PDRrsquos most developed SEZ Savan - Seno Special Economic Zone

Nong Khai ndash Vientiane Gateway to Vientiane the countryrsquos capital city and key economic city

Total Official Trade Points

15

Trade Volume USD 61 Billion

Exports USD 23 Billion

Imports USD 38 Billion

Exports Imports

Diesel fuel (11)

Automobiles and parts (8)

Refined Oil (5)

Machinery amp equipment (7)

Electricity (52)

Copper amp materials (14)

Vegetable amp products (5)

Electronics (12)

10

Data Source Asian Development Bank

Lao PDR - Infrastructure Overview

Road transport is the main mode of transportation in Laos for both freight and passenger transportation Railway development is also under way Due to Laosrsquo geographical characteristic the governmentrsquos primary focus is the development of land transport

Road transport is the primary means of transport carrying over 80 of freight traffic and almost 100 of all domestic passenger traffic Major roads link major cities to key border towns in neighboring countries with routes heading north from Vientiane the capital the more developed and most crowded

Road

Being a land-locked country Laos does not have a sea port and either relies on Thailandrsquos Laem Chabang Port or other sea ports in Vietnam However inland waterways along the Mekong river does support 18 of its freight traffic albeit with limitaitions during the dry season

Water Transport Railway Laos has no rail system However 2 large potential projects are under way The first is the Dansavan-Laobao Railway planned for 2018 operation The second is the Laos-China railway running from Vientiane to the Boten-Bohan borer which is set to be completed by the end of 2021

Aviation Laos has 3 international airports with each in the North Central and Southern regions The airports mainly handle tourist arrivals and business travelers to a lesser extent A small amount of trade is handled at Vientianersquos international airport for special niche products that require express shipment Insuch cases capacity is limited

Attapeu

International Airport

Danang

Foreign Seaport

Savannaket

Confirmed Rail Lines

Lao Bao

Bohan

11

BRI in Lao PDRrsquos Section

Route Boten to Vientiane

Distance 414 km

Construction Period 2017-2021

Investment Pattern Joint Venture ndash Lao PDR 40 and China 60

Cooperation Mechanism Government to Government (G to G)

Total Investment Cost USD 61-68 Billion

Passenger Train Speed 160-200 kmh

Stations 32

Current Status 203 completed (as of December 2017)

Data Source Reuters nationmultimediacom

Lao PDR ndash Belt and Road Initiative (BRI)

The section of the Belt and Road Initiative running through Lao PDR is a USD 6 billion high-speed railway project which will link China with Vientiane the Laotian capital and the Laos-Thailand border

Lao PDR BRI Timeline

2013 bull BRI was announced by Chinese President Xi Jinping The target of this project aims to invest in infrastructure in the central western and southern regions of Asia as well as in Africa and Europe

2016 DEC

bull The construction commenced The part of the BRI project that runs through Lao PDR runs from the Boten-Mohan border (between Laos and China) to Vientiane The project was delayed and restarted in 2017

2021 DEC

bull The project is set to be fully operational in December 2021 It will link Chinas Yunnan province the Lao capital Vientiane with the Thai border province Nong Khai

2015 DEC

bull The ground-breaking ceremony to launch the Lao PDR-China railway project was held on December 2 2015

Project Information

12

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

13

Key Industries and Opportunities

With rapid improvement in logistics infrastructure rich natural resources ample arable areas and cultural sites Lao PDR offers attractive opportunities for investments in the sectors of mining electronic parts and components industrial agriculture and tourism

TOURISM

ELECTRONIC PARTS AND COMPONENTS

MINING

INDUSTRIAL AGRICULTURE

HYDROPOWER

Temporarily Suspended

14

HYDROPOWER

Key Industries amp Opportunities

15

Hydropowerndash Overview

Hydropower exports in Lao PDR surged in 2017 The key destinations are Thailand Cambodia and Vietnam

Data source KResearch the Ministry of Energy and Mines

Total 29125

Magawatts

Number of Hydropower Plants

OPERATING

46

UNDER CONSTRUCTION

143

PENDING APPROVAL

246

Installed Capacities of Hydropower Plants in Lao PDR (Megawatts (MW) as of 2017)

Key Trends

Battery of Southeast Asia bull Due to Southeast Asiarsquos development toward industrialization there

remains a large demand gap for infrastructure support as well as growing demand for electricity to be met in the future

bull Thus Lao PDR with abundant natural resources for electricity generation aims to improve its energy sector to address this energy supply issue and position the country as a key exporter of energy in ASEAN

Lao PDR Electricity Exports

bull Lao PDRrsquos electricity exports have grown 15 annually since 2012

bull Electricity accounts for 24 of Lao PDR total exports

bull Thailand Cambodia and Vietnam are key export destinations with Thailand being the largest buyer

16

Hydropowerndash Opportunity

Lao PDR has ldquosuspendedrdquo new investment in hydropower projects and will conduct safety inspections for all existing dams due to the dam collapse incident in July

Data source laotiantimescom asianewsnetwork

The dam collapse in late July has caused Lao PDR to suspend new investment in hydropower projects in the country

bull On July 23 the ldquoSaddle Dam Drdquo part of the Xe-Pian Xe-Namnoy hydropower project in Champasak and Attapeu provinces has collapsed This disaster had affected around 5000 people in the area

bull On August 7 the government of Laos announced the suspension of new hydropower project approval and the renewed inspection of the existing dams

Key Policy Updates

2018 June

2018 August

The Lao government has suspended new investment in small-scale hydropower projects due to safety concerns

bull Lao PDR announced a temporary suspension of its authorization for investment in small-scale hydropower projects with installed capacity of lt15MW Such suspension is part of the governmentrsquos attempts to ensure the safety of hydropower dams

bull As a result the provincial and central authorities cannot approve new investment proposals for small-scale hydropower projects until concrete measures to ensure dam safety are drawn up

bull The suspension comes after construction of some projects has been found to be lower than the legally stipulated safety standards

17

Mining

Key Industries amp Opportunities

18

Mining ndash Overview

The mining Industry in Lao PDR has declined over the past several years due to fluctuations in global commodity prices and the maturity of some local mines

Data source International Trade Center worldbank

Lao PDR Mining Product Exports (USD Million 2017E)

Precious Stone Exports (USD Million 2017E)

DIAMOND

62 GOLD

1548 SILVER

54

Key Trends

Overall Lao PDRrsquos mining exports have decreased bull Exports of mining products have decreased since 2013 at an average

rate of 147 falling from USD1014 million in 2013 to USD 4575 in 2017

bull Copper and Coal experience the largest decline in export value mainly because some of the copper and coal mines have matured and global commodity prices have fallen

bull Meanwhile cement and sandstone record the highest increase in export value resulting from new investments and increasing domestic demand for these types of materials to use in the countryrsquos infrastructure development projects

Forms of investment in mining Business cooperation under contract

Joint venture between foreign and local firms

100 foreign or domestic ownership

Remark Firms could set up representative office to gather information and investigate investment opportunities

19

Taxes amp Regulations

Mining ndash Opportunity

Mineral resources in Lao PDR offer opportunities to firms with expertise in mining operations from prospection to mining and processing

Prospection Exploration Feasibility Study

Construction Mining amp Processing

2 years + 1 year

3 years + 2 years

1 year + 1 year

2 years + 1 year

20 years + 5 years

License Duration + Renewable

USD 3 -12 ha year USD 05 ndash 1 ha year + royalty (1-

7) Rental Fee

Registered company

Max 300 sqkm Corporate income 25-35

Value added 10

Rules and regulations for the Minerals Law in accordance to international standard partly missing

Limited number and capacity of local workers in mining sector

High number of mineral trade companies rather than professional mining operations firms

Key Issues

20

Electronic Parts and Components Industry

Key Industries amp Opportunities

21

Electronic Parts and Components Industry - Overview

Over the recent years Laos has experienced exponential growth in its exports of electronic parts and components especially to Thailand indicating the initial formation of the regional supply chain

Lao PDR Electronic Part and Component Exports (USD Million 2017)

Increasing investments in Lao PDR Special Economic Zone (SEZ) boosts trade The presence of SEZs and attractive incentives have attracted FDI inflows into Lao PDR especially in the production of digital camera parts and telecom equipment parts Most manufacturing in these sectors is aimed at exporting intermediate products to assemblers of finished electrical and electronic products in other countries

Main Export Destinations 2017

Data source International Trade Center

Why Thailand has become the top export destination

bull ASEAN Free Trade Agreement (AFTA) ndash The agreement minimizes trade barriers and creates free flow of goods and capital within ASEAN

bull Thailand-based industries shift their focus on value added activities - firms relocate labor-intensive activities to Thailandrsquos neighboring countries including Laos

22

Electronic Parts and Components Industry - Opportunity

Industrial development in Laos offers opportunities for firms to form the regional supply chain model and benefit from comparative advantages from both nations

Data source JETRO

Thailand

Product supply chain

Laos

Did you knowhellip

Challenges

Difficulty in getting large pools of labor due to small population

Underdeveloped infrastructure in some regions

Challenge in recruiting higher skilled specialists

Suggestion Set up in major Special Economic Zones eg Vita Park SEZ and Savan-Seno SEZ

Roll out strategic human resource plan including training and capacity building

bull Advanced infrastructure

bull Experienced and high-skilled (management level) workforce

bull Affordable and youthful workforce bull Located between Vietnam and Thailand

both with high electronics parts demand bull Government incentives

Start operation from small scale (less than 500 workers) then scale up

Japanese enterprises have started implementing Thailand+1 model by relocating labor-intensive production to Laos and exporting back to Thailand to complete product assembly eg NIKON (digital camera) Dai-Ichi Denshi (wire harness) Nissei Mizuki (electronics parts) and Toyota boshoku (car seat cover)

Thailand + 1 Model

23

Industrial Agriculture

Key Industries amp Opportunities

24

Industrial Agriculture - Overview

Most industrial agriculture exports from Lao PDR are produced by foreign investors (Chinese Thai and Vietnamese) and local entrepreneurs to a lesser extent

Data source JETRO International Trade Center Produce Report USDA Foreign Agriculture Service

Leading Agricultural Exports by export value (USD Million 2016 and 2017)

A short-term drop in fruit exports in 2017 bull Exports declined because the Lao government suspended

development of large banana and other fruit plantations which typically produce to export to China and placed more stringent control on polluting farms

bull However at the end of 2017 Lao PDR and China negotiated for less stringent terms for Lao PDRrsquos fruit exports to China

Key Trends

Sugar Cane exports rocketing bull In 2017 sugar cane plantation boomed Export volume grew 121

times from 2016

bull The major reason was the relocation of sugar production from China as production costs there are very high approximately double that of Thailand

Organic fruit and vegetable becoming key economic plants bull Local and foreign investors are increasingly investing in organic

agriculture a higher value-added segment which is demanded by major countries such as Europe US Japan and China

Exports (2016)

USD 02 Million

Exports (2017)

USD 20 Million

121 times

25

Industrial Agriculture - Opportunity

Lao industrial agriculture sector offers opportunities for

bull Agricultural inputs andmachinery producers and distributors

bull Plantation operators

bull Processing and trading firms in Thailand

3 Processing and Trading

Key Drivers Lack of capability to process

products at international standard

Lack of market access

Opportunities Market inputs and machinery

to agricultural projects Investor can target both large scale investment

and smallholder farmers

Opportunities Produce high-value agricultural

products organic products herbs and medical plants

Foreign investors operate via (1) contract farming and (2) concession

Opportunities Process raw products to meet

export standards trade products to leverage existing market channels

Agricultural Inputs and Machinery

Key Drivers Limited access to improved

agricultural inputs - Seed - Fertilizer - Quality machinery

1 2

Key Drivers Arable fertile land

low level of chemical pesticides

Plantation ndash High Value Products

26

Tourism

Key Industries amp Opportunities

27

Tourism - Overview

Tourist arrivals are on a steady rise in the past decade especially tourists from Asia Pacific with most of them visiting more developed border towns neighboring Thailand

Data source Ministry of Tourism TRAVEL amp TOURISM ECONOMIC IMPACT 2018 LAOS

Direct Contribution of Travel amp Tourism to GDP (USD Billion 2012-2018E)

bull Both tourist arrivals and revenue from tourism have increased approximately 3 folds in the past decade

bull Most tourists come from Asia Pacific (93) particularly from from Thailand (50) and Vietnam (25) followed by Europe (5)

Top Tourist Arrivals Destinations 2017

1 Vientiane Capital

2 Savannakhet

3 Champasak

Most top tourist destinations are more developed towns bordering Thailand

Nong Khai

Mukdahan

Ubon Ratchathani

World Heritage sites im these following city also attract a considerable number of visitors

Luang Prabang Wat Pu at Champasak

28

Business Opportunities Associated to Tourism Sector

Accommodate increasing tourist arrivals

Provide dining and entertainment services

Develop attractive ecotourism cultural tourism packages

Provide transportation services linking major tourism sites

Produce and market souvenirs applying local arts design and materials

1 Hotel Restaurant Entertainment

2 Tour Company Holiday Package

3 Sourvenirs

4 Transportation Service

Tourism - Opportunity

29

Lao Consumer Income and Behavior

Prefer to cook at home Enjoy drinking alcohol Middle income enjoy

spending evening in beer garden

Lao women wear sinh Follow Thai and Korean

fashion due to influence of TV series

Shop at traditional markets Middle income shop at

Thai border towns (Nong Khai Udon Thani)

Thai and Japanese products are perceived to have high quality Chinese products are perceived as sub-standard quality and Korean products are in between

30

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

31

Major Costs ndash Labor and Utility

Electricity Rate 2017

0 - 25 kwh 004USDkwh

26 - 150 kwh 005USDkwh

151 - 300 kwh 009USDkwh

more than 500 kwh 012USDkwh

301 - 400 kwh 010USDkwh

401 - 500 kwh 011USDkwh

Water Price (Per Unit) for Business and Trade Units

bull Water price for businesses is set to increase from USD USD 036 in 2017 to USD038 per unit this year

Labor minimum monthly wage in ASEAN 2017 USD

32

Tax System

Monthly Income (LAK) Tax Rate

0 ndash 1000000 0

1000001 - 3000000 5

3000001 - 6000000 10

6000001 - 12000000 12

12000001 - 24000000 15

24000001 - 40000000 20

Above 40000000 24

Types of Tax Tax rate

Profit Tax 24

Value Added Tax (VAT) 10

Withholding Tax Dividends 10

(non-residents) Transfer of shares 10

Transfer of assets 5

China

Luxembourg

Malaysia

Singapore

South Korea

Thailand

Vietnam

Income tax treaties for avoidance of double taxation

Note There is no definition of residence for tax purposes in Laos All companies registered under Lao law (including foreign law) are subject to Lao profit tax

Personal Income Tax Corporate Taxes

Data source DFDL

33

Foreign Investment Regulations

Data source JETRO Compiled by World Business Advisory Center

Not Permitted to Foreigner Only for Joint Venture with Local Company 100 Foreign Ownership Allowed

Wholesale and Retail Businesses

100 Foreign Ownership bull If registered capital is 20 billion Lao Kip

(USD 25 million) or more

Maximum 70 Foreign Ownership bull If registered capital is 10 - 20 billion Lao Kip

(USD 125 ndash 25 million)

Maximum 50 Foreign Ownership bull If registered capital is 4 - 10 billion Lao Kip

(USD 05 ndash 125 million)

bull If registered capital is less than 4 billion Lao Kip (USD 05 million)

Hotel and Restaurants Maximum 60 Foreign Ownership bull 3-5 stars hotel with minimum registered capital of

1 billion Lao Kip (USD 125000)

bull Less than 3 stars hotel 100 Foreign Ownership bull NOT ALLOWED

Logistics

100 Foreign Ownership bull Domestic goods transport with minimum

registered capital of 3 billion Lao Kip (USD 375000)

Maximum 49 Foreign Ownership bull Cross border goods transport with minimum

registered capital of 5 billion Lao Kip (USD 625000)

bull Cross border goods transport with less than 5 billion Lao Kip of registered capital

bull Domestic goods transport with less than 3 billion Lao Kip of registered capital

Examples of Foreign Investment Regulations

Foreign enterprises are subject to foreign investment regulations in several business activities Generally small businesses are preserved for Lao enterprises whereas large businesses with certain investment conditions are opened for foreign investors

34

Types of Investment ndash (1) General Business

Data source JETRO Compiled by World Business Advisory Center

Besides foreign investment regulation foreign enterprises are also subject to the investment promotion law which classifies investment into 3 types

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Investment in General Business

Types of Investment in Lao PDR

Description

o An investment in general economic activities

o Activities including controlled businesses ndash businesses that require additional approval from relevant ministries

o Activities excluding concession business

Register Capital

Requirements

o At least 1 billion Lao Kip (USD 125000)

o At the day of establishment must pay 40 (agriculture business) 60 (production and processing) 80 (services) The remainder must be paid within 1 year

Examples of Controlled Businesses 1 Agriculture plantation agriculture fishery 2 Manufacturing petroleum products leathers textile amp clothing papers

printing pesticides pharmaceutical products 3 Businesses related to environment eg wastewater treatment 4 Wholesale and retails of gasoline and petroleum products 5 Transportation 6 Hotel and Restaurant 7 Media and Publication 8 Finance and insurance 9 Legal accounting and tax services 10 Tourism 11 Education 12 Hospital clinic and medical services 13 Recreation (museum and amusement park)

35

Types of Investment ndash (2) Concession Business

Data source JETRO Compiled by World Business Advisory Center

Investment in Concession Business

Description

o An investment that requires a concession or specific authorization from the government to use the governmentrsquos property

o Some concession businesses requires authorization from the central government whereas the other requires only provincial government level of authorization for example

bull At least 5MW electricity generation project requires the central government authorization

bull Less than 5MW electricity generation projects requires only provincial government authorization

Examples of Concession Business

1 Mining 2 Electricity generation 3 Infrastructure

bull Telecommunication bull TV and radio station bull Road railway airport seaport waste disposal site

4 Businesses that use the government land bull Shopping center bull Tourist attraction bull Public park bull Hotel bull Forestry and Logging bull Plantation and Livestock

Register Capital

Requirements

o Must pay at least 20 of registered capital while remaining should be paid within 2 years

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Types of Investment in Lao PDR

36

Types of Investment ndash (3) Business Related to SEZ

Data source JETRO Compiled by World Business Advisory Center

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Types of Investment in Lao PDR

Investment in Business Related to SEZ

Description

o Business related to Special Economic Zone -gt an investment in building infrastructure for a new town

o Business related to Specific Economic Zone -gt an investment in infrastructure development for specific purpose projects such as industrial zone export zone tourist development zone etc

High Potential SEZs in Laos

o Vita Park Special Economic Zone (Vientiane)

o Savan-Seno Special Economic Zone (Savannakhet)

o Pakxe-Japan SME Specific Economic Zone (Champasak)

Special and Specific Economic Zones

1 Boten-Daenkham Specific Economic Zone 2 Luang Prabang Special Economic Zone 3 Golden Triangle Special Economic Zone 4 Thatluang Lake Specific Economic Zone 5 Longthanh Specific Economic Zone 6 Xaysettha Specific Economic Zone 7 Vita Park Special Economic Zone 8 Dongphosy Specific Economic Zone 9 Thakhek Specific Economic Zone 10 Poukiao Specific Economic Zone 11 Savan-Seno Special Economic Zone 12 Pakxe-Japan SME Specific Economic Zone

1

2

3

4

5 6

7

8

9 10

11

12

37

General Business

Concession Business

Business related to

SEZs

Procedure of Investment in Lao PDR

The investment approval procedure varies depending upon type of investment However all foreign investors must go through enterprise registration tax identification number registration and application for capital importation certificate

Apply at Ministry of Planning and

Investment

For developer apply at National Committee for Special Economic Zone

For investor apply at One-Stop Service Unit in

each SEZ

Get Concession

License

Get SEZ Concession

License

For controlled businesses apply for

approval at relevant Ministries

Get Approval License

Apply at Ministry of

Industry and Commerce

For non-controlled businesses

Get Enterprise

Registration Certificate

(ERC)

Apply for Tax

Identification Number TIN

at Tax Department Ministry of

Finance

Apply for Capital

Importation Certificate at Bank of Lao

PDR

Data source JETRO Compiled by World Business Advisory Center

38

Investment Tax Incentives ndash General Zone

Data source JETRO Compiled by World Business Advisory Center

Investment Tax Incentives in Lao PDR

Profit Tax Exemption Period

Level 1 High Promotion

Level 2 Moderate Promotion

Level 3 Low Promotion

Zone 1 10 years 6 years 4 years

Zone 2 6 years 4 years 2 years

Zone 3 4 years 2 years 1 years

Profit Tax Exemption Period by Promotion Sector and Zone

Promoted sectors Agriculture Industrial Handicrafts and Services

Type of Tax Exemption

General Zone Promotion Sector and Zone based Incentives 1 Special amp Specific Economic Zone

Tailor Made Incentives 2

Profit tax in next accounting year in case net profit is used for reinvestment (business

expansion)

Import duties for import of raw material equipment spare parts and

vehicles directly used for production

Export duties for general goods and

products (resource-based products should follow

associated laws)

Permission to carry forward losses to

three consecutive accounting years

39

Sector Period of

Profit Tax Exemption

Profit Tax Rate

After Tax Exemption Period

Hi-Tech Manufacturing 10 year 8

Manufacturing that exports at least 70 of production 10 year 8

Manufacturing that exports 30 - 60 of production 7 year 8

Manufacturing that exports 0 - 29 of production 5 year 8

Other 5 year 8

Investment amount of USD 2 million or more 10 year 8

Investment amount of USD 500000 - USD 2 million 8 year 8

Investment amount of USD 300000 - USD 500000 6 year 10

Investment amount of USD 150000 - USD 300000 4 year 10

Investment amount of USD 50000 - USD 150000 2 year 10

Export Laos products 5 year 10

International trade company 3 year 10

General trade company 2 year 10

a) Manufacturing

b) Service

c) Commerce

Personal Income Tax 5

Dividend Tax after Profit Tax Exemption Period

5

Import Duty Exemption for import of raw material equipment spare parts and

vehicles directly used for production

VAT Exemption for import products

Investment Tax Incentives ndash Special and Specific Economic Zone

Data source JETRO

Investment Tax Incentives in Lao PDR

General Zone Promotion Sector and Zone based Incentives 1 Special amp Specific Economic Zone

Tailor Made Incentives 2 Example of Tax Incentives in Savan-Seno SEZ

Other Tax Incentives

40

Non-Tax Incentives amp Trade Privileges

Data source JETRO

Non-Tax Incentives

Permission

Foreign nationals can undertake feasibility studies

Bring in foreign technicians experts and managers if qualified Lao nationals are not available

Lease land

General business up to 30 years from Lao citizen and up to 50 years from the government (renewable)

Investment in SEZ up to 75 years

Concession business upon negotiation with the government (at present there is an example of 99 years land lease)

Transfer leasehold interests and build on or make improvements or structures to a leased land

Guarantee against nationalization expropriation and requisition without compensation

Protection

Trade Privileges

ASEAN WTO GSP Bilateral trade agreement (over 18 countries)

o Argentina o Belarus o Bulgaria o Cambodia o China o Indonesia o India o Korea DPR o Kuwait

o Malaysia o Mongolia o Myanmar o Philippines o Russian

Federation o Thailand o Turkey o USA o Vietnam

41

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

42

Foreign Currency Exchange

Data source Bank of the Lao PDR

Laos Currency Kip (LAK)

Latest FX Rate (as of August 22 2018)

Remark THB and USD are widely accepted especially in the border trade area

USD 1 ~ LAK 8507

EUR 1 ~ LAK 9851

THB 1 ~ LAK 262

JPY 1 ~ LAK 77

CNY 1 ~ LAK 1193

43

KASIKORNTHAIBANK Service in Lao PDR

Retail Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Current deposit

Lending

Working capital loan

Long term loan

Bank guarantee

Project Financing

FX Services

Corporate Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Remittance

Remittance

Trade Finance Letter of Credit (LC) Standby Letter of Credit (SBLC)

44

KASIKORNTHAI BANK Limited

With establishment KASIKORNTHAIBANK

the first full-scale locally incorporated institution from Thailand is fully committed to support our clientsrsquo cross-border financing and transaction for their trade and investment activities in Lao PDR

45

KASIKORNTHAIBANK in Lao PDR Contacts

bull HEAD OFFICE Unit 12 Lane Xang Avenue Xiangngeun Village Chanthaboury District Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88905 Fax +856 21 253 336 wwwkasikornbankcomla

KASIKORNTHAI BANK Limited

bull PONESINUAN BRANCH

Ban Ponesinuan Unit 14 Sysattanak Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88826 Fax +856 21 410 889

Ms Piyanoot Sangsan Branch Manager KASIKORNTHAI BANK LIMITED Lane Xang Head Office E-mail piyanootskasikornbankcom

Mr Chatuporn Boozaya-Angool Branch Manager Ponesinuan Branch E-mail chatupornbkasikornbankcom

46

About AEC+ Business Advisory The AEC+ Business Advisory is set up by KASIKORNBANK to support businesses in their regional expansion across the ASEAN+3 market by providing local market intelligence and strategic business advice

What we do bull Offer customized and tailor-made advisory services bull Publish investment guides and industry reports bull Deliver in-depth insights via seminars bull Organize business trips to bring first-hand experience

Follow Us Visit our website at

AEC+ BUSINESS ADVISORY

Prepared by Mr Anoot Charoenkiattikul World Business Intelligence Specialist E-mail anootckasikornbankcom

httpswwwkasikornbankcominternational-businessenPagesHomeaspx

47

Page 7: LAO PDR - Facilitiesfuangfah.econ.cmu.ac.th/teacher/nisit/files/201808_LaoPDR_Investm… · • On August 7, the government of Laos announced the suspension of new hydropower project

7

427

1695

2013 2014 2015 2016 2017

USD

Mill

ion

Data Source KPMG ASEANstatsorg

Foreign Direct Investment

The Belt and Road Initiative(BRI) has significantly affected Laosrsquo FDI (foreign direct investment) structure It has made China the most important foreign investor in the country their investments accounted for 87 of total FDI in 2017

Key FDI Figures Changes in Economic Composition

Service sector growth an indirect effect of FDIs The service sector in Laos including wholesale and retail trading hotels and restaurants financial services and telecommunications expanded as it began to absorb the growing number of foreign workers

China is Lao PDRrsquos major investor Their investments reached USD15 billion in 2017 growing 85 YoY

Other key investors are Malaysia Thailand and

Vietnam with investment values of USD124 million USD12 million and USD09

million respectively

Top sectors of FDIs are hydropower generation mining and agriculture

OBOR effect FDI inflows significantly increased in 2016 and 2017 after Lao PDR and Chinarsquos ground-breaking ceremony of the railroad project was held in December 2015 and construction of the whole route commenced in December 2016

8

Data Source nhandancomvn International Trade Center

Lao PDR Trade Overview

In 2017 Laos mainly exported electricity to its neighboring countries such as Thailand and Vietnam while imports have shifted to electronic and machinery parts for hydropower projects industrial production and infrastructure development

Trade Flows and Balance 2012-2017

Top Trading Partners 2017

Thailand

USD 53 Billion

China

USD 20 Billion

Vietnam

USD 13 Billion

Lao PDRrsquos Key Trade Products 2017

Exports Imports

Total Export Volume

USD 48 Billion

Total Import Volume

USD 60 Billion

Electrical machinery and equipment

14

Machinery amp equipment

13

Fuel products 12

Electricity 25

Mining products 13

Electrical machinery and equipment

12

9

Lao PDR ndash Thailand Border Trade Statistics 2017

Data Source Department of Foreign Trade (Thailand)

Lao PDR ndash Thailand Border Trade

Border trade is the main two-way trade channel between Lao PDR and Thailand

of two-way trade between Lao PDR and Thailand occurs through the border as Lao PDR is a land-locked country and its economic cities are located close to Thailandrsquos border

97 Key Official Trade Points By percentage share () 2017

31 Mukdaharn - Savannakhet

8 Ubon Ratchathani - Champasak

7 Nakhon Panom - Khammouan

30 Nong Khai - Vientiane

12 Nan - Luang Prabang

Mukdahan ndash Savannakhet Strategic border point which is located along the East-West Economic Corridor (EWEC) as well as gateway to Lao PDRrsquos most developed SEZ Savan - Seno Special Economic Zone

Nong Khai ndash Vientiane Gateway to Vientiane the countryrsquos capital city and key economic city

Total Official Trade Points

15

Trade Volume USD 61 Billion

Exports USD 23 Billion

Imports USD 38 Billion

Exports Imports

Diesel fuel (11)

Automobiles and parts (8)

Refined Oil (5)

Machinery amp equipment (7)

Electricity (52)

Copper amp materials (14)

Vegetable amp products (5)

Electronics (12)

10

Data Source Asian Development Bank

Lao PDR - Infrastructure Overview

Road transport is the main mode of transportation in Laos for both freight and passenger transportation Railway development is also under way Due to Laosrsquo geographical characteristic the governmentrsquos primary focus is the development of land transport

Road transport is the primary means of transport carrying over 80 of freight traffic and almost 100 of all domestic passenger traffic Major roads link major cities to key border towns in neighboring countries with routes heading north from Vientiane the capital the more developed and most crowded

Road

Being a land-locked country Laos does not have a sea port and either relies on Thailandrsquos Laem Chabang Port or other sea ports in Vietnam However inland waterways along the Mekong river does support 18 of its freight traffic albeit with limitaitions during the dry season

Water Transport Railway Laos has no rail system However 2 large potential projects are under way The first is the Dansavan-Laobao Railway planned for 2018 operation The second is the Laos-China railway running from Vientiane to the Boten-Bohan borer which is set to be completed by the end of 2021

Aviation Laos has 3 international airports with each in the North Central and Southern regions The airports mainly handle tourist arrivals and business travelers to a lesser extent A small amount of trade is handled at Vientianersquos international airport for special niche products that require express shipment Insuch cases capacity is limited

Attapeu

International Airport

Danang

Foreign Seaport

Savannaket

Confirmed Rail Lines

Lao Bao

Bohan

11

BRI in Lao PDRrsquos Section

Route Boten to Vientiane

Distance 414 km

Construction Period 2017-2021

Investment Pattern Joint Venture ndash Lao PDR 40 and China 60

Cooperation Mechanism Government to Government (G to G)

Total Investment Cost USD 61-68 Billion

Passenger Train Speed 160-200 kmh

Stations 32

Current Status 203 completed (as of December 2017)

Data Source Reuters nationmultimediacom

Lao PDR ndash Belt and Road Initiative (BRI)

The section of the Belt and Road Initiative running through Lao PDR is a USD 6 billion high-speed railway project which will link China with Vientiane the Laotian capital and the Laos-Thailand border

Lao PDR BRI Timeline

2013 bull BRI was announced by Chinese President Xi Jinping The target of this project aims to invest in infrastructure in the central western and southern regions of Asia as well as in Africa and Europe

2016 DEC

bull The construction commenced The part of the BRI project that runs through Lao PDR runs from the Boten-Mohan border (between Laos and China) to Vientiane The project was delayed and restarted in 2017

2021 DEC

bull The project is set to be fully operational in December 2021 It will link Chinas Yunnan province the Lao capital Vientiane with the Thai border province Nong Khai

2015 DEC

bull The ground-breaking ceremony to launch the Lao PDR-China railway project was held on December 2 2015

Project Information

12

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

13

Key Industries and Opportunities

With rapid improvement in logistics infrastructure rich natural resources ample arable areas and cultural sites Lao PDR offers attractive opportunities for investments in the sectors of mining electronic parts and components industrial agriculture and tourism

TOURISM

ELECTRONIC PARTS AND COMPONENTS

MINING

INDUSTRIAL AGRICULTURE

HYDROPOWER

Temporarily Suspended

14

HYDROPOWER

Key Industries amp Opportunities

15

Hydropowerndash Overview

Hydropower exports in Lao PDR surged in 2017 The key destinations are Thailand Cambodia and Vietnam

Data source KResearch the Ministry of Energy and Mines

Total 29125

Magawatts

Number of Hydropower Plants

OPERATING

46

UNDER CONSTRUCTION

143

PENDING APPROVAL

246

Installed Capacities of Hydropower Plants in Lao PDR (Megawatts (MW) as of 2017)

Key Trends

Battery of Southeast Asia bull Due to Southeast Asiarsquos development toward industrialization there

remains a large demand gap for infrastructure support as well as growing demand for electricity to be met in the future

bull Thus Lao PDR with abundant natural resources for electricity generation aims to improve its energy sector to address this energy supply issue and position the country as a key exporter of energy in ASEAN

Lao PDR Electricity Exports

bull Lao PDRrsquos electricity exports have grown 15 annually since 2012

bull Electricity accounts for 24 of Lao PDR total exports

bull Thailand Cambodia and Vietnam are key export destinations with Thailand being the largest buyer

16

Hydropowerndash Opportunity

Lao PDR has ldquosuspendedrdquo new investment in hydropower projects and will conduct safety inspections for all existing dams due to the dam collapse incident in July

Data source laotiantimescom asianewsnetwork

The dam collapse in late July has caused Lao PDR to suspend new investment in hydropower projects in the country

bull On July 23 the ldquoSaddle Dam Drdquo part of the Xe-Pian Xe-Namnoy hydropower project in Champasak and Attapeu provinces has collapsed This disaster had affected around 5000 people in the area

bull On August 7 the government of Laos announced the suspension of new hydropower project approval and the renewed inspection of the existing dams

Key Policy Updates

2018 June

2018 August

The Lao government has suspended new investment in small-scale hydropower projects due to safety concerns

bull Lao PDR announced a temporary suspension of its authorization for investment in small-scale hydropower projects with installed capacity of lt15MW Such suspension is part of the governmentrsquos attempts to ensure the safety of hydropower dams

bull As a result the provincial and central authorities cannot approve new investment proposals for small-scale hydropower projects until concrete measures to ensure dam safety are drawn up

bull The suspension comes after construction of some projects has been found to be lower than the legally stipulated safety standards

17

Mining

Key Industries amp Opportunities

18

Mining ndash Overview

The mining Industry in Lao PDR has declined over the past several years due to fluctuations in global commodity prices and the maturity of some local mines

Data source International Trade Center worldbank

Lao PDR Mining Product Exports (USD Million 2017E)

Precious Stone Exports (USD Million 2017E)

DIAMOND

62 GOLD

1548 SILVER

54

Key Trends

Overall Lao PDRrsquos mining exports have decreased bull Exports of mining products have decreased since 2013 at an average

rate of 147 falling from USD1014 million in 2013 to USD 4575 in 2017

bull Copper and Coal experience the largest decline in export value mainly because some of the copper and coal mines have matured and global commodity prices have fallen

bull Meanwhile cement and sandstone record the highest increase in export value resulting from new investments and increasing domestic demand for these types of materials to use in the countryrsquos infrastructure development projects

Forms of investment in mining Business cooperation under contract

Joint venture between foreign and local firms

100 foreign or domestic ownership

Remark Firms could set up representative office to gather information and investigate investment opportunities

19

Taxes amp Regulations

Mining ndash Opportunity

Mineral resources in Lao PDR offer opportunities to firms with expertise in mining operations from prospection to mining and processing

Prospection Exploration Feasibility Study

Construction Mining amp Processing

2 years + 1 year

3 years + 2 years

1 year + 1 year

2 years + 1 year

20 years + 5 years

License Duration + Renewable

USD 3 -12 ha year USD 05 ndash 1 ha year + royalty (1-

7) Rental Fee

Registered company

Max 300 sqkm Corporate income 25-35

Value added 10

Rules and regulations for the Minerals Law in accordance to international standard partly missing

Limited number and capacity of local workers in mining sector

High number of mineral trade companies rather than professional mining operations firms

Key Issues

20

Electronic Parts and Components Industry

Key Industries amp Opportunities

21

Electronic Parts and Components Industry - Overview

Over the recent years Laos has experienced exponential growth in its exports of electronic parts and components especially to Thailand indicating the initial formation of the regional supply chain

Lao PDR Electronic Part and Component Exports (USD Million 2017)

Increasing investments in Lao PDR Special Economic Zone (SEZ) boosts trade The presence of SEZs and attractive incentives have attracted FDI inflows into Lao PDR especially in the production of digital camera parts and telecom equipment parts Most manufacturing in these sectors is aimed at exporting intermediate products to assemblers of finished electrical and electronic products in other countries

Main Export Destinations 2017

Data source International Trade Center

Why Thailand has become the top export destination

bull ASEAN Free Trade Agreement (AFTA) ndash The agreement minimizes trade barriers and creates free flow of goods and capital within ASEAN

bull Thailand-based industries shift their focus on value added activities - firms relocate labor-intensive activities to Thailandrsquos neighboring countries including Laos

22

Electronic Parts and Components Industry - Opportunity

Industrial development in Laos offers opportunities for firms to form the regional supply chain model and benefit from comparative advantages from both nations

Data source JETRO

Thailand

Product supply chain

Laos

Did you knowhellip

Challenges

Difficulty in getting large pools of labor due to small population

Underdeveloped infrastructure in some regions

Challenge in recruiting higher skilled specialists

Suggestion Set up in major Special Economic Zones eg Vita Park SEZ and Savan-Seno SEZ

Roll out strategic human resource plan including training and capacity building

bull Advanced infrastructure

bull Experienced and high-skilled (management level) workforce

bull Affordable and youthful workforce bull Located between Vietnam and Thailand

both with high electronics parts demand bull Government incentives

Start operation from small scale (less than 500 workers) then scale up

Japanese enterprises have started implementing Thailand+1 model by relocating labor-intensive production to Laos and exporting back to Thailand to complete product assembly eg NIKON (digital camera) Dai-Ichi Denshi (wire harness) Nissei Mizuki (electronics parts) and Toyota boshoku (car seat cover)

Thailand + 1 Model

23

Industrial Agriculture

Key Industries amp Opportunities

24

Industrial Agriculture - Overview

Most industrial agriculture exports from Lao PDR are produced by foreign investors (Chinese Thai and Vietnamese) and local entrepreneurs to a lesser extent

Data source JETRO International Trade Center Produce Report USDA Foreign Agriculture Service

Leading Agricultural Exports by export value (USD Million 2016 and 2017)

A short-term drop in fruit exports in 2017 bull Exports declined because the Lao government suspended

development of large banana and other fruit plantations which typically produce to export to China and placed more stringent control on polluting farms

bull However at the end of 2017 Lao PDR and China negotiated for less stringent terms for Lao PDRrsquos fruit exports to China

Key Trends

Sugar Cane exports rocketing bull In 2017 sugar cane plantation boomed Export volume grew 121

times from 2016

bull The major reason was the relocation of sugar production from China as production costs there are very high approximately double that of Thailand

Organic fruit and vegetable becoming key economic plants bull Local and foreign investors are increasingly investing in organic

agriculture a higher value-added segment which is demanded by major countries such as Europe US Japan and China

Exports (2016)

USD 02 Million

Exports (2017)

USD 20 Million

121 times

25

Industrial Agriculture - Opportunity

Lao industrial agriculture sector offers opportunities for

bull Agricultural inputs andmachinery producers and distributors

bull Plantation operators

bull Processing and trading firms in Thailand

3 Processing and Trading

Key Drivers Lack of capability to process

products at international standard

Lack of market access

Opportunities Market inputs and machinery

to agricultural projects Investor can target both large scale investment

and smallholder farmers

Opportunities Produce high-value agricultural

products organic products herbs and medical plants

Foreign investors operate via (1) contract farming and (2) concession

Opportunities Process raw products to meet

export standards trade products to leverage existing market channels

Agricultural Inputs and Machinery

Key Drivers Limited access to improved

agricultural inputs - Seed - Fertilizer - Quality machinery

1 2

Key Drivers Arable fertile land

low level of chemical pesticides

Plantation ndash High Value Products

26

Tourism

Key Industries amp Opportunities

27

Tourism - Overview

Tourist arrivals are on a steady rise in the past decade especially tourists from Asia Pacific with most of them visiting more developed border towns neighboring Thailand

Data source Ministry of Tourism TRAVEL amp TOURISM ECONOMIC IMPACT 2018 LAOS

Direct Contribution of Travel amp Tourism to GDP (USD Billion 2012-2018E)

bull Both tourist arrivals and revenue from tourism have increased approximately 3 folds in the past decade

bull Most tourists come from Asia Pacific (93) particularly from from Thailand (50) and Vietnam (25) followed by Europe (5)

Top Tourist Arrivals Destinations 2017

1 Vientiane Capital

2 Savannakhet

3 Champasak

Most top tourist destinations are more developed towns bordering Thailand

Nong Khai

Mukdahan

Ubon Ratchathani

World Heritage sites im these following city also attract a considerable number of visitors

Luang Prabang Wat Pu at Champasak

28

Business Opportunities Associated to Tourism Sector

Accommodate increasing tourist arrivals

Provide dining and entertainment services

Develop attractive ecotourism cultural tourism packages

Provide transportation services linking major tourism sites

Produce and market souvenirs applying local arts design and materials

1 Hotel Restaurant Entertainment

2 Tour Company Holiday Package

3 Sourvenirs

4 Transportation Service

Tourism - Opportunity

29

Lao Consumer Income and Behavior

Prefer to cook at home Enjoy drinking alcohol Middle income enjoy

spending evening in beer garden

Lao women wear sinh Follow Thai and Korean

fashion due to influence of TV series

Shop at traditional markets Middle income shop at

Thai border towns (Nong Khai Udon Thani)

Thai and Japanese products are perceived to have high quality Chinese products are perceived as sub-standard quality and Korean products are in between

30

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

31

Major Costs ndash Labor and Utility

Electricity Rate 2017

0 - 25 kwh 004USDkwh

26 - 150 kwh 005USDkwh

151 - 300 kwh 009USDkwh

more than 500 kwh 012USDkwh

301 - 400 kwh 010USDkwh

401 - 500 kwh 011USDkwh

Water Price (Per Unit) for Business and Trade Units

bull Water price for businesses is set to increase from USD USD 036 in 2017 to USD038 per unit this year

Labor minimum monthly wage in ASEAN 2017 USD

32

Tax System

Monthly Income (LAK) Tax Rate

0 ndash 1000000 0

1000001 - 3000000 5

3000001 - 6000000 10

6000001 - 12000000 12

12000001 - 24000000 15

24000001 - 40000000 20

Above 40000000 24

Types of Tax Tax rate

Profit Tax 24

Value Added Tax (VAT) 10

Withholding Tax Dividends 10

(non-residents) Transfer of shares 10

Transfer of assets 5

China

Luxembourg

Malaysia

Singapore

South Korea

Thailand

Vietnam

Income tax treaties for avoidance of double taxation

Note There is no definition of residence for tax purposes in Laos All companies registered under Lao law (including foreign law) are subject to Lao profit tax

Personal Income Tax Corporate Taxes

Data source DFDL

33

Foreign Investment Regulations

Data source JETRO Compiled by World Business Advisory Center

Not Permitted to Foreigner Only for Joint Venture with Local Company 100 Foreign Ownership Allowed

Wholesale and Retail Businesses

100 Foreign Ownership bull If registered capital is 20 billion Lao Kip

(USD 25 million) or more

Maximum 70 Foreign Ownership bull If registered capital is 10 - 20 billion Lao Kip

(USD 125 ndash 25 million)

Maximum 50 Foreign Ownership bull If registered capital is 4 - 10 billion Lao Kip

(USD 05 ndash 125 million)

bull If registered capital is less than 4 billion Lao Kip (USD 05 million)

Hotel and Restaurants Maximum 60 Foreign Ownership bull 3-5 stars hotel with minimum registered capital of

1 billion Lao Kip (USD 125000)

bull Less than 3 stars hotel 100 Foreign Ownership bull NOT ALLOWED

Logistics

100 Foreign Ownership bull Domestic goods transport with minimum

registered capital of 3 billion Lao Kip (USD 375000)

Maximum 49 Foreign Ownership bull Cross border goods transport with minimum

registered capital of 5 billion Lao Kip (USD 625000)

bull Cross border goods transport with less than 5 billion Lao Kip of registered capital

bull Domestic goods transport with less than 3 billion Lao Kip of registered capital

Examples of Foreign Investment Regulations

Foreign enterprises are subject to foreign investment regulations in several business activities Generally small businesses are preserved for Lao enterprises whereas large businesses with certain investment conditions are opened for foreign investors

34

Types of Investment ndash (1) General Business

Data source JETRO Compiled by World Business Advisory Center

Besides foreign investment regulation foreign enterprises are also subject to the investment promotion law which classifies investment into 3 types

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Investment in General Business

Types of Investment in Lao PDR

Description

o An investment in general economic activities

o Activities including controlled businesses ndash businesses that require additional approval from relevant ministries

o Activities excluding concession business

Register Capital

Requirements

o At least 1 billion Lao Kip (USD 125000)

o At the day of establishment must pay 40 (agriculture business) 60 (production and processing) 80 (services) The remainder must be paid within 1 year

Examples of Controlled Businesses 1 Agriculture plantation agriculture fishery 2 Manufacturing petroleum products leathers textile amp clothing papers

printing pesticides pharmaceutical products 3 Businesses related to environment eg wastewater treatment 4 Wholesale and retails of gasoline and petroleum products 5 Transportation 6 Hotel and Restaurant 7 Media and Publication 8 Finance and insurance 9 Legal accounting and tax services 10 Tourism 11 Education 12 Hospital clinic and medical services 13 Recreation (museum and amusement park)

35

Types of Investment ndash (2) Concession Business

Data source JETRO Compiled by World Business Advisory Center

Investment in Concession Business

Description

o An investment that requires a concession or specific authorization from the government to use the governmentrsquos property

o Some concession businesses requires authorization from the central government whereas the other requires only provincial government level of authorization for example

bull At least 5MW electricity generation project requires the central government authorization

bull Less than 5MW electricity generation projects requires only provincial government authorization

Examples of Concession Business

1 Mining 2 Electricity generation 3 Infrastructure

bull Telecommunication bull TV and radio station bull Road railway airport seaport waste disposal site

4 Businesses that use the government land bull Shopping center bull Tourist attraction bull Public park bull Hotel bull Forestry and Logging bull Plantation and Livestock

Register Capital

Requirements

o Must pay at least 20 of registered capital while remaining should be paid within 2 years

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Types of Investment in Lao PDR

36

Types of Investment ndash (3) Business Related to SEZ

Data source JETRO Compiled by World Business Advisory Center

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Types of Investment in Lao PDR

Investment in Business Related to SEZ

Description

o Business related to Special Economic Zone -gt an investment in building infrastructure for a new town

o Business related to Specific Economic Zone -gt an investment in infrastructure development for specific purpose projects such as industrial zone export zone tourist development zone etc

High Potential SEZs in Laos

o Vita Park Special Economic Zone (Vientiane)

o Savan-Seno Special Economic Zone (Savannakhet)

o Pakxe-Japan SME Specific Economic Zone (Champasak)

Special and Specific Economic Zones

1 Boten-Daenkham Specific Economic Zone 2 Luang Prabang Special Economic Zone 3 Golden Triangle Special Economic Zone 4 Thatluang Lake Specific Economic Zone 5 Longthanh Specific Economic Zone 6 Xaysettha Specific Economic Zone 7 Vita Park Special Economic Zone 8 Dongphosy Specific Economic Zone 9 Thakhek Specific Economic Zone 10 Poukiao Specific Economic Zone 11 Savan-Seno Special Economic Zone 12 Pakxe-Japan SME Specific Economic Zone

1

2

3

4

5 6

7

8

9 10

11

12

37

General Business

Concession Business

Business related to

SEZs

Procedure of Investment in Lao PDR

The investment approval procedure varies depending upon type of investment However all foreign investors must go through enterprise registration tax identification number registration and application for capital importation certificate

Apply at Ministry of Planning and

Investment

For developer apply at National Committee for Special Economic Zone

For investor apply at One-Stop Service Unit in

each SEZ

Get Concession

License

Get SEZ Concession

License

For controlled businesses apply for

approval at relevant Ministries

Get Approval License

Apply at Ministry of

Industry and Commerce

For non-controlled businesses

Get Enterprise

Registration Certificate

(ERC)

Apply for Tax

Identification Number TIN

at Tax Department Ministry of

Finance

Apply for Capital

Importation Certificate at Bank of Lao

PDR

Data source JETRO Compiled by World Business Advisory Center

38

Investment Tax Incentives ndash General Zone

Data source JETRO Compiled by World Business Advisory Center

Investment Tax Incentives in Lao PDR

Profit Tax Exemption Period

Level 1 High Promotion

Level 2 Moderate Promotion

Level 3 Low Promotion

Zone 1 10 years 6 years 4 years

Zone 2 6 years 4 years 2 years

Zone 3 4 years 2 years 1 years

Profit Tax Exemption Period by Promotion Sector and Zone

Promoted sectors Agriculture Industrial Handicrafts and Services

Type of Tax Exemption

General Zone Promotion Sector and Zone based Incentives 1 Special amp Specific Economic Zone

Tailor Made Incentives 2

Profit tax in next accounting year in case net profit is used for reinvestment (business

expansion)

Import duties for import of raw material equipment spare parts and

vehicles directly used for production

Export duties for general goods and

products (resource-based products should follow

associated laws)

Permission to carry forward losses to

three consecutive accounting years

39

Sector Period of

Profit Tax Exemption

Profit Tax Rate

After Tax Exemption Period

Hi-Tech Manufacturing 10 year 8

Manufacturing that exports at least 70 of production 10 year 8

Manufacturing that exports 30 - 60 of production 7 year 8

Manufacturing that exports 0 - 29 of production 5 year 8

Other 5 year 8

Investment amount of USD 2 million or more 10 year 8

Investment amount of USD 500000 - USD 2 million 8 year 8

Investment amount of USD 300000 - USD 500000 6 year 10

Investment amount of USD 150000 - USD 300000 4 year 10

Investment amount of USD 50000 - USD 150000 2 year 10

Export Laos products 5 year 10

International trade company 3 year 10

General trade company 2 year 10

a) Manufacturing

b) Service

c) Commerce

Personal Income Tax 5

Dividend Tax after Profit Tax Exemption Period

5

Import Duty Exemption for import of raw material equipment spare parts and

vehicles directly used for production

VAT Exemption for import products

Investment Tax Incentives ndash Special and Specific Economic Zone

Data source JETRO

Investment Tax Incentives in Lao PDR

General Zone Promotion Sector and Zone based Incentives 1 Special amp Specific Economic Zone

Tailor Made Incentives 2 Example of Tax Incentives in Savan-Seno SEZ

Other Tax Incentives

40

Non-Tax Incentives amp Trade Privileges

Data source JETRO

Non-Tax Incentives

Permission

Foreign nationals can undertake feasibility studies

Bring in foreign technicians experts and managers if qualified Lao nationals are not available

Lease land

General business up to 30 years from Lao citizen and up to 50 years from the government (renewable)

Investment in SEZ up to 75 years

Concession business upon negotiation with the government (at present there is an example of 99 years land lease)

Transfer leasehold interests and build on or make improvements or structures to a leased land

Guarantee against nationalization expropriation and requisition without compensation

Protection

Trade Privileges

ASEAN WTO GSP Bilateral trade agreement (over 18 countries)

o Argentina o Belarus o Bulgaria o Cambodia o China o Indonesia o India o Korea DPR o Kuwait

o Malaysia o Mongolia o Myanmar o Philippines o Russian

Federation o Thailand o Turkey o USA o Vietnam

41

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

42

Foreign Currency Exchange

Data source Bank of the Lao PDR

Laos Currency Kip (LAK)

Latest FX Rate (as of August 22 2018)

Remark THB and USD are widely accepted especially in the border trade area

USD 1 ~ LAK 8507

EUR 1 ~ LAK 9851

THB 1 ~ LAK 262

JPY 1 ~ LAK 77

CNY 1 ~ LAK 1193

43

KASIKORNTHAIBANK Service in Lao PDR

Retail Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Current deposit

Lending

Working capital loan

Long term loan

Bank guarantee

Project Financing

FX Services

Corporate Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Remittance

Remittance

Trade Finance Letter of Credit (LC) Standby Letter of Credit (SBLC)

44

KASIKORNTHAI BANK Limited

With establishment KASIKORNTHAIBANK

the first full-scale locally incorporated institution from Thailand is fully committed to support our clientsrsquo cross-border financing and transaction for their trade and investment activities in Lao PDR

45

KASIKORNTHAIBANK in Lao PDR Contacts

bull HEAD OFFICE Unit 12 Lane Xang Avenue Xiangngeun Village Chanthaboury District Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88905 Fax +856 21 253 336 wwwkasikornbankcomla

KASIKORNTHAI BANK Limited

bull PONESINUAN BRANCH

Ban Ponesinuan Unit 14 Sysattanak Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88826 Fax +856 21 410 889

Ms Piyanoot Sangsan Branch Manager KASIKORNTHAI BANK LIMITED Lane Xang Head Office E-mail piyanootskasikornbankcom

Mr Chatuporn Boozaya-Angool Branch Manager Ponesinuan Branch E-mail chatupornbkasikornbankcom

46

About AEC+ Business Advisory The AEC+ Business Advisory is set up by KASIKORNBANK to support businesses in their regional expansion across the ASEAN+3 market by providing local market intelligence and strategic business advice

What we do bull Offer customized and tailor-made advisory services bull Publish investment guides and industry reports bull Deliver in-depth insights via seminars bull Organize business trips to bring first-hand experience

Follow Us Visit our website at

AEC+ BUSINESS ADVISORY

Prepared by Mr Anoot Charoenkiattikul World Business Intelligence Specialist E-mail anootckasikornbankcom

httpswwwkasikornbankcominternational-businessenPagesHomeaspx

47

Page 8: LAO PDR - Facilitiesfuangfah.econ.cmu.ac.th/teacher/nisit/files/201808_LaoPDR_Investm… · • On August 7, the government of Laos announced the suspension of new hydropower project

8

Data Source nhandancomvn International Trade Center

Lao PDR Trade Overview

In 2017 Laos mainly exported electricity to its neighboring countries such as Thailand and Vietnam while imports have shifted to electronic and machinery parts for hydropower projects industrial production and infrastructure development

Trade Flows and Balance 2012-2017

Top Trading Partners 2017

Thailand

USD 53 Billion

China

USD 20 Billion

Vietnam

USD 13 Billion

Lao PDRrsquos Key Trade Products 2017

Exports Imports

Total Export Volume

USD 48 Billion

Total Import Volume

USD 60 Billion

Electrical machinery and equipment

14

Machinery amp equipment

13

Fuel products 12

Electricity 25

Mining products 13

Electrical machinery and equipment

12

9

Lao PDR ndash Thailand Border Trade Statistics 2017

Data Source Department of Foreign Trade (Thailand)

Lao PDR ndash Thailand Border Trade

Border trade is the main two-way trade channel between Lao PDR and Thailand

of two-way trade between Lao PDR and Thailand occurs through the border as Lao PDR is a land-locked country and its economic cities are located close to Thailandrsquos border

97 Key Official Trade Points By percentage share () 2017

31 Mukdaharn - Savannakhet

8 Ubon Ratchathani - Champasak

7 Nakhon Panom - Khammouan

30 Nong Khai - Vientiane

12 Nan - Luang Prabang

Mukdahan ndash Savannakhet Strategic border point which is located along the East-West Economic Corridor (EWEC) as well as gateway to Lao PDRrsquos most developed SEZ Savan - Seno Special Economic Zone

Nong Khai ndash Vientiane Gateway to Vientiane the countryrsquos capital city and key economic city

Total Official Trade Points

15

Trade Volume USD 61 Billion

Exports USD 23 Billion

Imports USD 38 Billion

Exports Imports

Diesel fuel (11)

Automobiles and parts (8)

Refined Oil (5)

Machinery amp equipment (7)

Electricity (52)

Copper amp materials (14)

Vegetable amp products (5)

Electronics (12)

10

Data Source Asian Development Bank

Lao PDR - Infrastructure Overview

Road transport is the main mode of transportation in Laos for both freight and passenger transportation Railway development is also under way Due to Laosrsquo geographical characteristic the governmentrsquos primary focus is the development of land transport

Road transport is the primary means of transport carrying over 80 of freight traffic and almost 100 of all domestic passenger traffic Major roads link major cities to key border towns in neighboring countries with routes heading north from Vientiane the capital the more developed and most crowded

Road

Being a land-locked country Laos does not have a sea port and either relies on Thailandrsquos Laem Chabang Port or other sea ports in Vietnam However inland waterways along the Mekong river does support 18 of its freight traffic albeit with limitaitions during the dry season

Water Transport Railway Laos has no rail system However 2 large potential projects are under way The first is the Dansavan-Laobao Railway planned for 2018 operation The second is the Laos-China railway running from Vientiane to the Boten-Bohan borer which is set to be completed by the end of 2021

Aviation Laos has 3 international airports with each in the North Central and Southern regions The airports mainly handle tourist arrivals and business travelers to a lesser extent A small amount of trade is handled at Vientianersquos international airport for special niche products that require express shipment Insuch cases capacity is limited

Attapeu

International Airport

Danang

Foreign Seaport

Savannaket

Confirmed Rail Lines

Lao Bao

Bohan

11

BRI in Lao PDRrsquos Section

Route Boten to Vientiane

Distance 414 km

Construction Period 2017-2021

Investment Pattern Joint Venture ndash Lao PDR 40 and China 60

Cooperation Mechanism Government to Government (G to G)

Total Investment Cost USD 61-68 Billion

Passenger Train Speed 160-200 kmh

Stations 32

Current Status 203 completed (as of December 2017)

Data Source Reuters nationmultimediacom

Lao PDR ndash Belt and Road Initiative (BRI)

The section of the Belt and Road Initiative running through Lao PDR is a USD 6 billion high-speed railway project which will link China with Vientiane the Laotian capital and the Laos-Thailand border

Lao PDR BRI Timeline

2013 bull BRI was announced by Chinese President Xi Jinping The target of this project aims to invest in infrastructure in the central western and southern regions of Asia as well as in Africa and Europe

2016 DEC

bull The construction commenced The part of the BRI project that runs through Lao PDR runs from the Boten-Mohan border (between Laos and China) to Vientiane The project was delayed and restarted in 2017

2021 DEC

bull The project is set to be fully operational in December 2021 It will link Chinas Yunnan province the Lao capital Vientiane with the Thai border province Nong Khai

2015 DEC

bull The ground-breaking ceremony to launch the Lao PDR-China railway project was held on December 2 2015

Project Information

12

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

13

Key Industries and Opportunities

With rapid improvement in logistics infrastructure rich natural resources ample arable areas and cultural sites Lao PDR offers attractive opportunities for investments in the sectors of mining electronic parts and components industrial agriculture and tourism

TOURISM

ELECTRONIC PARTS AND COMPONENTS

MINING

INDUSTRIAL AGRICULTURE

HYDROPOWER

Temporarily Suspended

14

HYDROPOWER

Key Industries amp Opportunities

15

Hydropowerndash Overview

Hydropower exports in Lao PDR surged in 2017 The key destinations are Thailand Cambodia and Vietnam

Data source KResearch the Ministry of Energy and Mines

Total 29125

Magawatts

Number of Hydropower Plants

OPERATING

46

UNDER CONSTRUCTION

143

PENDING APPROVAL

246

Installed Capacities of Hydropower Plants in Lao PDR (Megawatts (MW) as of 2017)

Key Trends

Battery of Southeast Asia bull Due to Southeast Asiarsquos development toward industrialization there

remains a large demand gap for infrastructure support as well as growing demand for electricity to be met in the future

bull Thus Lao PDR with abundant natural resources for electricity generation aims to improve its energy sector to address this energy supply issue and position the country as a key exporter of energy in ASEAN

Lao PDR Electricity Exports

bull Lao PDRrsquos electricity exports have grown 15 annually since 2012

bull Electricity accounts for 24 of Lao PDR total exports

bull Thailand Cambodia and Vietnam are key export destinations with Thailand being the largest buyer

16

Hydropowerndash Opportunity

Lao PDR has ldquosuspendedrdquo new investment in hydropower projects and will conduct safety inspections for all existing dams due to the dam collapse incident in July

Data source laotiantimescom asianewsnetwork

The dam collapse in late July has caused Lao PDR to suspend new investment in hydropower projects in the country

bull On July 23 the ldquoSaddle Dam Drdquo part of the Xe-Pian Xe-Namnoy hydropower project in Champasak and Attapeu provinces has collapsed This disaster had affected around 5000 people in the area

bull On August 7 the government of Laos announced the suspension of new hydropower project approval and the renewed inspection of the existing dams

Key Policy Updates

2018 June

2018 August

The Lao government has suspended new investment in small-scale hydropower projects due to safety concerns

bull Lao PDR announced a temporary suspension of its authorization for investment in small-scale hydropower projects with installed capacity of lt15MW Such suspension is part of the governmentrsquos attempts to ensure the safety of hydropower dams

bull As a result the provincial and central authorities cannot approve new investment proposals for small-scale hydropower projects until concrete measures to ensure dam safety are drawn up

bull The suspension comes after construction of some projects has been found to be lower than the legally stipulated safety standards

17

Mining

Key Industries amp Opportunities

18

Mining ndash Overview

The mining Industry in Lao PDR has declined over the past several years due to fluctuations in global commodity prices and the maturity of some local mines

Data source International Trade Center worldbank

Lao PDR Mining Product Exports (USD Million 2017E)

Precious Stone Exports (USD Million 2017E)

DIAMOND

62 GOLD

1548 SILVER

54

Key Trends

Overall Lao PDRrsquos mining exports have decreased bull Exports of mining products have decreased since 2013 at an average

rate of 147 falling from USD1014 million in 2013 to USD 4575 in 2017

bull Copper and Coal experience the largest decline in export value mainly because some of the copper and coal mines have matured and global commodity prices have fallen

bull Meanwhile cement and sandstone record the highest increase in export value resulting from new investments and increasing domestic demand for these types of materials to use in the countryrsquos infrastructure development projects

Forms of investment in mining Business cooperation under contract

Joint venture between foreign and local firms

100 foreign or domestic ownership

Remark Firms could set up representative office to gather information and investigate investment opportunities

19

Taxes amp Regulations

Mining ndash Opportunity

Mineral resources in Lao PDR offer opportunities to firms with expertise in mining operations from prospection to mining and processing

Prospection Exploration Feasibility Study

Construction Mining amp Processing

2 years + 1 year

3 years + 2 years

1 year + 1 year

2 years + 1 year

20 years + 5 years

License Duration + Renewable

USD 3 -12 ha year USD 05 ndash 1 ha year + royalty (1-

7) Rental Fee

Registered company

Max 300 sqkm Corporate income 25-35

Value added 10

Rules and regulations for the Minerals Law in accordance to international standard partly missing

Limited number and capacity of local workers in mining sector

High number of mineral trade companies rather than professional mining operations firms

Key Issues

20

Electronic Parts and Components Industry

Key Industries amp Opportunities

21

Electronic Parts and Components Industry - Overview

Over the recent years Laos has experienced exponential growth in its exports of electronic parts and components especially to Thailand indicating the initial formation of the regional supply chain

Lao PDR Electronic Part and Component Exports (USD Million 2017)

Increasing investments in Lao PDR Special Economic Zone (SEZ) boosts trade The presence of SEZs and attractive incentives have attracted FDI inflows into Lao PDR especially in the production of digital camera parts and telecom equipment parts Most manufacturing in these sectors is aimed at exporting intermediate products to assemblers of finished electrical and electronic products in other countries

Main Export Destinations 2017

Data source International Trade Center

Why Thailand has become the top export destination

bull ASEAN Free Trade Agreement (AFTA) ndash The agreement minimizes trade barriers and creates free flow of goods and capital within ASEAN

bull Thailand-based industries shift their focus on value added activities - firms relocate labor-intensive activities to Thailandrsquos neighboring countries including Laos

22

Electronic Parts and Components Industry - Opportunity

Industrial development in Laos offers opportunities for firms to form the regional supply chain model and benefit from comparative advantages from both nations

Data source JETRO

Thailand

Product supply chain

Laos

Did you knowhellip

Challenges

Difficulty in getting large pools of labor due to small population

Underdeveloped infrastructure in some regions

Challenge in recruiting higher skilled specialists

Suggestion Set up in major Special Economic Zones eg Vita Park SEZ and Savan-Seno SEZ

Roll out strategic human resource plan including training and capacity building

bull Advanced infrastructure

bull Experienced and high-skilled (management level) workforce

bull Affordable and youthful workforce bull Located between Vietnam and Thailand

both with high electronics parts demand bull Government incentives

Start operation from small scale (less than 500 workers) then scale up

Japanese enterprises have started implementing Thailand+1 model by relocating labor-intensive production to Laos and exporting back to Thailand to complete product assembly eg NIKON (digital camera) Dai-Ichi Denshi (wire harness) Nissei Mizuki (electronics parts) and Toyota boshoku (car seat cover)

Thailand + 1 Model

23

Industrial Agriculture

Key Industries amp Opportunities

24

Industrial Agriculture - Overview

Most industrial agriculture exports from Lao PDR are produced by foreign investors (Chinese Thai and Vietnamese) and local entrepreneurs to a lesser extent

Data source JETRO International Trade Center Produce Report USDA Foreign Agriculture Service

Leading Agricultural Exports by export value (USD Million 2016 and 2017)

A short-term drop in fruit exports in 2017 bull Exports declined because the Lao government suspended

development of large banana and other fruit plantations which typically produce to export to China and placed more stringent control on polluting farms

bull However at the end of 2017 Lao PDR and China negotiated for less stringent terms for Lao PDRrsquos fruit exports to China

Key Trends

Sugar Cane exports rocketing bull In 2017 sugar cane plantation boomed Export volume grew 121

times from 2016

bull The major reason was the relocation of sugar production from China as production costs there are very high approximately double that of Thailand

Organic fruit and vegetable becoming key economic plants bull Local and foreign investors are increasingly investing in organic

agriculture a higher value-added segment which is demanded by major countries such as Europe US Japan and China

Exports (2016)

USD 02 Million

Exports (2017)

USD 20 Million

121 times

25

Industrial Agriculture - Opportunity

Lao industrial agriculture sector offers opportunities for

bull Agricultural inputs andmachinery producers and distributors

bull Plantation operators

bull Processing and trading firms in Thailand

3 Processing and Trading

Key Drivers Lack of capability to process

products at international standard

Lack of market access

Opportunities Market inputs and machinery

to agricultural projects Investor can target both large scale investment

and smallholder farmers

Opportunities Produce high-value agricultural

products organic products herbs and medical plants

Foreign investors operate via (1) contract farming and (2) concession

Opportunities Process raw products to meet

export standards trade products to leverage existing market channels

Agricultural Inputs and Machinery

Key Drivers Limited access to improved

agricultural inputs - Seed - Fertilizer - Quality machinery

1 2

Key Drivers Arable fertile land

low level of chemical pesticides

Plantation ndash High Value Products

26

Tourism

Key Industries amp Opportunities

27

Tourism - Overview

Tourist arrivals are on a steady rise in the past decade especially tourists from Asia Pacific with most of them visiting more developed border towns neighboring Thailand

Data source Ministry of Tourism TRAVEL amp TOURISM ECONOMIC IMPACT 2018 LAOS

Direct Contribution of Travel amp Tourism to GDP (USD Billion 2012-2018E)

bull Both tourist arrivals and revenue from tourism have increased approximately 3 folds in the past decade

bull Most tourists come from Asia Pacific (93) particularly from from Thailand (50) and Vietnam (25) followed by Europe (5)

Top Tourist Arrivals Destinations 2017

1 Vientiane Capital

2 Savannakhet

3 Champasak

Most top tourist destinations are more developed towns bordering Thailand

Nong Khai

Mukdahan

Ubon Ratchathani

World Heritage sites im these following city also attract a considerable number of visitors

Luang Prabang Wat Pu at Champasak

28

Business Opportunities Associated to Tourism Sector

Accommodate increasing tourist arrivals

Provide dining and entertainment services

Develop attractive ecotourism cultural tourism packages

Provide transportation services linking major tourism sites

Produce and market souvenirs applying local arts design and materials

1 Hotel Restaurant Entertainment

2 Tour Company Holiday Package

3 Sourvenirs

4 Transportation Service

Tourism - Opportunity

29

Lao Consumer Income and Behavior

Prefer to cook at home Enjoy drinking alcohol Middle income enjoy

spending evening in beer garden

Lao women wear sinh Follow Thai and Korean

fashion due to influence of TV series

Shop at traditional markets Middle income shop at

Thai border towns (Nong Khai Udon Thani)

Thai and Japanese products are perceived to have high quality Chinese products are perceived as sub-standard quality and Korean products are in between

30

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

31

Major Costs ndash Labor and Utility

Electricity Rate 2017

0 - 25 kwh 004USDkwh

26 - 150 kwh 005USDkwh

151 - 300 kwh 009USDkwh

more than 500 kwh 012USDkwh

301 - 400 kwh 010USDkwh

401 - 500 kwh 011USDkwh

Water Price (Per Unit) for Business and Trade Units

bull Water price for businesses is set to increase from USD USD 036 in 2017 to USD038 per unit this year

Labor minimum monthly wage in ASEAN 2017 USD

32

Tax System

Monthly Income (LAK) Tax Rate

0 ndash 1000000 0

1000001 - 3000000 5

3000001 - 6000000 10

6000001 - 12000000 12

12000001 - 24000000 15

24000001 - 40000000 20

Above 40000000 24

Types of Tax Tax rate

Profit Tax 24

Value Added Tax (VAT) 10

Withholding Tax Dividends 10

(non-residents) Transfer of shares 10

Transfer of assets 5

China

Luxembourg

Malaysia

Singapore

South Korea

Thailand

Vietnam

Income tax treaties for avoidance of double taxation

Note There is no definition of residence for tax purposes in Laos All companies registered under Lao law (including foreign law) are subject to Lao profit tax

Personal Income Tax Corporate Taxes

Data source DFDL

33

Foreign Investment Regulations

Data source JETRO Compiled by World Business Advisory Center

Not Permitted to Foreigner Only for Joint Venture with Local Company 100 Foreign Ownership Allowed

Wholesale and Retail Businesses

100 Foreign Ownership bull If registered capital is 20 billion Lao Kip

(USD 25 million) or more

Maximum 70 Foreign Ownership bull If registered capital is 10 - 20 billion Lao Kip

(USD 125 ndash 25 million)

Maximum 50 Foreign Ownership bull If registered capital is 4 - 10 billion Lao Kip

(USD 05 ndash 125 million)

bull If registered capital is less than 4 billion Lao Kip (USD 05 million)

Hotel and Restaurants Maximum 60 Foreign Ownership bull 3-5 stars hotel with minimum registered capital of

1 billion Lao Kip (USD 125000)

bull Less than 3 stars hotel 100 Foreign Ownership bull NOT ALLOWED

Logistics

100 Foreign Ownership bull Domestic goods transport with minimum

registered capital of 3 billion Lao Kip (USD 375000)

Maximum 49 Foreign Ownership bull Cross border goods transport with minimum

registered capital of 5 billion Lao Kip (USD 625000)

bull Cross border goods transport with less than 5 billion Lao Kip of registered capital

bull Domestic goods transport with less than 3 billion Lao Kip of registered capital

Examples of Foreign Investment Regulations

Foreign enterprises are subject to foreign investment regulations in several business activities Generally small businesses are preserved for Lao enterprises whereas large businesses with certain investment conditions are opened for foreign investors

34

Types of Investment ndash (1) General Business

Data source JETRO Compiled by World Business Advisory Center

Besides foreign investment regulation foreign enterprises are also subject to the investment promotion law which classifies investment into 3 types

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Investment in General Business

Types of Investment in Lao PDR

Description

o An investment in general economic activities

o Activities including controlled businesses ndash businesses that require additional approval from relevant ministries

o Activities excluding concession business

Register Capital

Requirements

o At least 1 billion Lao Kip (USD 125000)

o At the day of establishment must pay 40 (agriculture business) 60 (production and processing) 80 (services) The remainder must be paid within 1 year

Examples of Controlled Businesses 1 Agriculture plantation agriculture fishery 2 Manufacturing petroleum products leathers textile amp clothing papers

printing pesticides pharmaceutical products 3 Businesses related to environment eg wastewater treatment 4 Wholesale and retails of gasoline and petroleum products 5 Transportation 6 Hotel and Restaurant 7 Media and Publication 8 Finance and insurance 9 Legal accounting and tax services 10 Tourism 11 Education 12 Hospital clinic and medical services 13 Recreation (museum and amusement park)

35

Types of Investment ndash (2) Concession Business

Data source JETRO Compiled by World Business Advisory Center

Investment in Concession Business

Description

o An investment that requires a concession or specific authorization from the government to use the governmentrsquos property

o Some concession businesses requires authorization from the central government whereas the other requires only provincial government level of authorization for example

bull At least 5MW electricity generation project requires the central government authorization

bull Less than 5MW electricity generation projects requires only provincial government authorization

Examples of Concession Business

1 Mining 2 Electricity generation 3 Infrastructure

bull Telecommunication bull TV and radio station bull Road railway airport seaport waste disposal site

4 Businesses that use the government land bull Shopping center bull Tourist attraction bull Public park bull Hotel bull Forestry and Logging bull Plantation and Livestock

Register Capital

Requirements

o Must pay at least 20 of registered capital while remaining should be paid within 2 years

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Types of Investment in Lao PDR

36

Types of Investment ndash (3) Business Related to SEZ

Data source JETRO Compiled by World Business Advisory Center

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Types of Investment in Lao PDR

Investment in Business Related to SEZ

Description

o Business related to Special Economic Zone -gt an investment in building infrastructure for a new town

o Business related to Specific Economic Zone -gt an investment in infrastructure development for specific purpose projects such as industrial zone export zone tourist development zone etc

High Potential SEZs in Laos

o Vita Park Special Economic Zone (Vientiane)

o Savan-Seno Special Economic Zone (Savannakhet)

o Pakxe-Japan SME Specific Economic Zone (Champasak)

Special and Specific Economic Zones

1 Boten-Daenkham Specific Economic Zone 2 Luang Prabang Special Economic Zone 3 Golden Triangle Special Economic Zone 4 Thatluang Lake Specific Economic Zone 5 Longthanh Specific Economic Zone 6 Xaysettha Specific Economic Zone 7 Vita Park Special Economic Zone 8 Dongphosy Specific Economic Zone 9 Thakhek Specific Economic Zone 10 Poukiao Specific Economic Zone 11 Savan-Seno Special Economic Zone 12 Pakxe-Japan SME Specific Economic Zone

1

2

3

4

5 6

7

8

9 10

11

12

37

General Business

Concession Business

Business related to

SEZs

Procedure of Investment in Lao PDR

The investment approval procedure varies depending upon type of investment However all foreign investors must go through enterprise registration tax identification number registration and application for capital importation certificate

Apply at Ministry of Planning and

Investment

For developer apply at National Committee for Special Economic Zone

For investor apply at One-Stop Service Unit in

each SEZ

Get Concession

License

Get SEZ Concession

License

For controlled businesses apply for

approval at relevant Ministries

Get Approval License

Apply at Ministry of

Industry and Commerce

For non-controlled businesses

Get Enterprise

Registration Certificate

(ERC)

Apply for Tax

Identification Number TIN

at Tax Department Ministry of

Finance

Apply for Capital

Importation Certificate at Bank of Lao

PDR

Data source JETRO Compiled by World Business Advisory Center

38

Investment Tax Incentives ndash General Zone

Data source JETRO Compiled by World Business Advisory Center

Investment Tax Incentives in Lao PDR

Profit Tax Exemption Period

Level 1 High Promotion

Level 2 Moderate Promotion

Level 3 Low Promotion

Zone 1 10 years 6 years 4 years

Zone 2 6 years 4 years 2 years

Zone 3 4 years 2 years 1 years

Profit Tax Exemption Period by Promotion Sector and Zone

Promoted sectors Agriculture Industrial Handicrafts and Services

Type of Tax Exemption

General Zone Promotion Sector and Zone based Incentives 1 Special amp Specific Economic Zone

Tailor Made Incentives 2

Profit tax in next accounting year in case net profit is used for reinvestment (business

expansion)

Import duties for import of raw material equipment spare parts and

vehicles directly used for production

Export duties for general goods and

products (resource-based products should follow

associated laws)

Permission to carry forward losses to

three consecutive accounting years

39

Sector Period of

Profit Tax Exemption

Profit Tax Rate

After Tax Exemption Period

Hi-Tech Manufacturing 10 year 8

Manufacturing that exports at least 70 of production 10 year 8

Manufacturing that exports 30 - 60 of production 7 year 8

Manufacturing that exports 0 - 29 of production 5 year 8

Other 5 year 8

Investment amount of USD 2 million or more 10 year 8

Investment amount of USD 500000 - USD 2 million 8 year 8

Investment amount of USD 300000 - USD 500000 6 year 10

Investment amount of USD 150000 - USD 300000 4 year 10

Investment amount of USD 50000 - USD 150000 2 year 10

Export Laos products 5 year 10

International trade company 3 year 10

General trade company 2 year 10

a) Manufacturing

b) Service

c) Commerce

Personal Income Tax 5

Dividend Tax after Profit Tax Exemption Period

5

Import Duty Exemption for import of raw material equipment spare parts and

vehicles directly used for production

VAT Exemption for import products

Investment Tax Incentives ndash Special and Specific Economic Zone

Data source JETRO

Investment Tax Incentives in Lao PDR

General Zone Promotion Sector and Zone based Incentives 1 Special amp Specific Economic Zone

Tailor Made Incentives 2 Example of Tax Incentives in Savan-Seno SEZ

Other Tax Incentives

40

Non-Tax Incentives amp Trade Privileges

Data source JETRO

Non-Tax Incentives

Permission

Foreign nationals can undertake feasibility studies

Bring in foreign technicians experts and managers if qualified Lao nationals are not available

Lease land

General business up to 30 years from Lao citizen and up to 50 years from the government (renewable)

Investment in SEZ up to 75 years

Concession business upon negotiation with the government (at present there is an example of 99 years land lease)

Transfer leasehold interests and build on or make improvements or structures to a leased land

Guarantee against nationalization expropriation and requisition without compensation

Protection

Trade Privileges

ASEAN WTO GSP Bilateral trade agreement (over 18 countries)

o Argentina o Belarus o Bulgaria o Cambodia o China o Indonesia o India o Korea DPR o Kuwait

o Malaysia o Mongolia o Myanmar o Philippines o Russian

Federation o Thailand o Turkey o USA o Vietnam

41

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

42

Foreign Currency Exchange

Data source Bank of the Lao PDR

Laos Currency Kip (LAK)

Latest FX Rate (as of August 22 2018)

Remark THB and USD are widely accepted especially in the border trade area

USD 1 ~ LAK 8507

EUR 1 ~ LAK 9851

THB 1 ~ LAK 262

JPY 1 ~ LAK 77

CNY 1 ~ LAK 1193

43

KASIKORNTHAIBANK Service in Lao PDR

Retail Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Current deposit

Lending

Working capital loan

Long term loan

Bank guarantee

Project Financing

FX Services

Corporate Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Remittance

Remittance

Trade Finance Letter of Credit (LC) Standby Letter of Credit (SBLC)

44

KASIKORNTHAI BANK Limited

With establishment KASIKORNTHAIBANK

the first full-scale locally incorporated institution from Thailand is fully committed to support our clientsrsquo cross-border financing and transaction for their trade and investment activities in Lao PDR

45

KASIKORNTHAIBANK in Lao PDR Contacts

bull HEAD OFFICE Unit 12 Lane Xang Avenue Xiangngeun Village Chanthaboury District Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88905 Fax +856 21 253 336 wwwkasikornbankcomla

KASIKORNTHAI BANK Limited

bull PONESINUAN BRANCH

Ban Ponesinuan Unit 14 Sysattanak Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88826 Fax +856 21 410 889

Ms Piyanoot Sangsan Branch Manager KASIKORNTHAI BANK LIMITED Lane Xang Head Office E-mail piyanootskasikornbankcom

Mr Chatuporn Boozaya-Angool Branch Manager Ponesinuan Branch E-mail chatupornbkasikornbankcom

46

About AEC+ Business Advisory The AEC+ Business Advisory is set up by KASIKORNBANK to support businesses in their regional expansion across the ASEAN+3 market by providing local market intelligence and strategic business advice

What we do bull Offer customized and tailor-made advisory services bull Publish investment guides and industry reports bull Deliver in-depth insights via seminars bull Organize business trips to bring first-hand experience

Follow Us Visit our website at

AEC+ BUSINESS ADVISORY

Prepared by Mr Anoot Charoenkiattikul World Business Intelligence Specialist E-mail anootckasikornbankcom

httpswwwkasikornbankcominternational-businessenPagesHomeaspx

47

Page 9: LAO PDR - Facilitiesfuangfah.econ.cmu.ac.th/teacher/nisit/files/201808_LaoPDR_Investm… · • On August 7, the government of Laos announced the suspension of new hydropower project

9

Lao PDR ndash Thailand Border Trade Statistics 2017

Data Source Department of Foreign Trade (Thailand)

Lao PDR ndash Thailand Border Trade

Border trade is the main two-way trade channel between Lao PDR and Thailand

of two-way trade between Lao PDR and Thailand occurs through the border as Lao PDR is a land-locked country and its economic cities are located close to Thailandrsquos border

97 Key Official Trade Points By percentage share () 2017

31 Mukdaharn - Savannakhet

8 Ubon Ratchathani - Champasak

7 Nakhon Panom - Khammouan

30 Nong Khai - Vientiane

12 Nan - Luang Prabang

Mukdahan ndash Savannakhet Strategic border point which is located along the East-West Economic Corridor (EWEC) as well as gateway to Lao PDRrsquos most developed SEZ Savan - Seno Special Economic Zone

Nong Khai ndash Vientiane Gateway to Vientiane the countryrsquos capital city and key economic city

Total Official Trade Points

15

Trade Volume USD 61 Billion

Exports USD 23 Billion

Imports USD 38 Billion

Exports Imports

Diesel fuel (11)

Automobiles and parts (8)

Refined Oil (5)

Machinery amp equipment (7)

Electricity (52)

Copper amp materials (14)

Vegetable amp products (5)

Electronics (12)

10

Data Source Asian Development Bank

Lao PDR - Infrastructure Overview

Road transport is the main mode of transportation in Laos for both freight and passenger transportation Railway development is also under way Due to Laosrsquo geographical characteristic the governmentrsquos primary focus is the development of land transport

Road transport is the primary means of transport carrying over 80 of freight traffic and almost 100 of all domestic passenger traffic Major roads link major cities to key border towns in neighboring countries with routes heading north from Vientiane the capital the more developed and most crowded

Road

Being a land-locked country Laos does not have a sea port and either relies on Thailandrsquos Laem Chabang Port or other sea ports in Vietnam However inland waterways along the Mekong river does support 18 of its freight traffic albeit with limitaitions during the dry season

Water Transport Railway Laos has no rail system However 2 large potential projects are under way The first is the Dansavan-Laobao Railway planned for 2018 operation The second is the Laos-China railway running from Vientiane to the Boten-Bohan borer which is set to be completed by the end of 2021

Aviation Laos has 3 international airports with each in the North Central and Southern regions The airports mainly handle tourist arrivals and business travelers to a lesser extent A small amount of trade is handled at Vientianersquos international airport for special niche products that require express shipment Insuch cases capacity is limited

Attapeu

International Airport

Danang

Foreign Seaport

Savannaket

Confirmed Rail Lines

Lao Bao

Bohan

11

BRI in Lao PDRrsquos Section

Route Boten to Vientiane

Distance 414 km

Construction Period 2017-2021

Investment Pattern Joint Venture ndash Lao PDR 40 and China 60

Cooperation Mechanism Government to Government (G to G)

Total Investment Cost USD 61-68 Billion

Passenger Train Speed 160-200 kmh

Stations 32

Current Status 203 completed (as of December 2017)

Data Source Reuters nationmultimediacom

Lao PDR ndash Belt and Road Initiative (BRI)

The section of the Belt and Road Initiative running through Lao PDR is a USD 6 billion high-speed railway project which will link China with Vientiane the Laotian capital and the Laos-Thailand border

Lao PDR BRI Timeline

2013 bull BRI was announced by Chinese President Xi Jinping The target of this project aims to invest in infrastructure in the central western and southern regions of Asia as well as in Africa and Europe

2016 DEC

bull The construction commenced The part of the BRI project that runs through Lao PDR runs from the Boten-Mohan border (between Laos and China) to Vientiane The project was delayed and restarted in 2017

2021 DEC

bull The project is set to be fully operational in December 2021 It will link Chinas Yunnan province the Lao capital Vientiane with the Thai border province Nong Khai

2015 DEC

bull The ground-breaking ceremony to launch the Lao PDR-China railway project was held on December 2 2015

Project Information

12

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

13

Key Industries and Opportunities

With rapid improvement in logistics infrastructure rich natural resources ample arable areas and cultural sites Lao PDR offers attractive opportunities for investments in the sectors of mining electronic parts and components industrial agriculture and tourism

TOURISM

ELECTRONIC PARTS AND COMPONENTS

MINING

INDUSTRIAL AGRICULTURE

HYDROPOWER

Temporarily Suspended

14

HYDROPOWER

Key Industries amp Opportunities

15

Hydropowerndash Overview

Hydropower exports in Lao PDR surged in 2017 The key destinations are Thailand Cambodia and Vietnam

Data source KResearch the Ministry of Energy and Mines

Total 29125

Magawatts

Number of Hydropower Plants

OPERATING

46

UNDER CONSTRUCTION

143

PENDING APPROVAL

246

Installed Capacities of Hydropower Plants in Lao PDR (Megawatts (MW) as of 2017)

Key Trends

Battery of Southeast Asia bull Due to Southeast Asiarsquos development toward industrialization there

remains a large demand gap for infrastructure support as well as growing demand for electricity to be met in the future

bull Thus Lao PDR with abundant natural resources for electricity generation aims to improve its energy sector to address this energy supply issue and position the country as a key exporter of energy in ASEAN

Lao PDR Electricity Exports

bull Lao PDRrsquos electricity exports have grown 15 annually since 2012

bull Electricity accounts for 24 of Lao PDR total exports

bull Thailand Cambodia and Vietnam are key export destinations with Thailand being the largest buyer

16

Hydropowerndash Opportunity

Lao PDR has ldquosuspendedrdquo new investment in hydropower projects and will conduct safety inspections for all existing dams due to the dam collapse incident in July

Data source laotiantimescom asianewsnetwork

The dam collapse in late July has caused Lao PDR to suspend new investment in hydropower projects in the country

bull On July 23 the ldquoSaddle Dam Drdquo part of the Xe-Pian Xe-Namnoy hydropower project in Champasak and Attapeu provinces has collapsed This disaster had affected around 5000 people in the area

bull On August 7 the government of Laos announced the suspension of new hydropower project approval and the renewed inspection of the existing dams

Key Policy Updates

2018 June

2018 August

The Lao government has suspended new investment in small-scale hydropower projects due to safety concerns

bull Lao PDR announced a temporary suspension of its authorization for investment in small-scale hydropower projects with installed capacity of lt15MW Such suspension is part of the governmentrsquos attempts to ensure the safety of hydropower dams

bull As a result the provincial and central authorities cannot approve new investment proposals for small-scale hydropower projects until concrete measures to ensure dam safety are drawn up

bull The suspension comes after construction of some projects has been found to be lower than the legally stipulated safety standards

17

Mining

Key Industries amp Opportunities

18

Mining ndash Overview

The mining Industry in Lao PDR has declined over the past several years due to fluctuations in global commodity prices and the maturity of some local mines

Data source International Trade Center worldbank

Lao PDR Mining Product Exports (USD Million 2017E)

Precious Stone Exports (USD Million 2017E)

DIAMOND

62 GOLD

1548 SILVER

54

Key Trends

Overall Lao PDRrsquos mining exports have decreased bull Exports of mining products have decreased since 2013 at an average

rate of 147 falling from USD1014 million in 2013 to USD 4575 in 2017

bull Copper and Coal experience the largest decline in export value mainly because some of the copper and coal mines have matured and global commodity prices have fallen

bull Meanwhile cement and sandstone record the highest increase in export value resulting from new investments and increasing domestic demand for these types of materials to use in the countryrsquos infrastructure development projects

Forms of investment in mining Business cooperation under contract

Joint venture between foreign and local firms

100 foreign or domestic ownership

Remark Firms could set up representative office to gather information and investigate investment opportunities

19

Taxes amp Regulations

Mining ndash Opportunity

Mineral resources in Lao PDR offer opportunities to firms with expertise in mining operations from prospection to mining and processing

Prospection Exploration Feasibility Study

Construction Mining amp Processing

2 years + 1 year

3 years + 2 years

1 year + 1 year

2 years + 1 year

20 years + 5 years

License Duration + Renewable

USD 3 -12 ha year USD 05 ndash 1 ha year + royalty (1-

7) Rental Fee

Registered company

Max 300 sqkm Corporate income 25-35

Value added 10

Rules and regulations for the Minerals Law in accordance to international standard partly missing

Limited number and capacity of local workers in mining sector

High number of mineral trade companies rather than professional mining operations firms

Key Issues

20

Electronic Parts and Components Industry

Key Industries amp Opportunities

21

Electronic Parts and Components Industry - Overview

Over the recent years Laos has experienced exponential growth in its exports of electronic parts and components especially to Thailand indicating the initial formation of the regional supply chain

Lao PDR Electronic Part and Component Exports (USD Million 2017)

Increasing investments in Lao PDR Special Economic Zone (SEZ) boosts trade The presence of SEZs and attractive incentives have attracted FDI inflows into Lao PDR especially in the production of digital camera parts and telecom equipment parts Most manufacturing in these sectors is aimed at exporting intermediate products to assemblers of finished electrical and electronic products in other countries

Main Export Destinations 2017

Data source International Trade Center

Why Thailand has become the top export destination

bull ASEAN Free Trade Agreement (AFTA) ndash The agreement minimizes trade barriers and creates free flow of goods and capital within ASEAN

bull Thailand-based industries shift their focus on value added activities - firms relocate labor-intensive activities to Thailandrsquos neighboring countries including Laos

22

Electronic Parts and Components Industry - Opportunity

Industrial development in Laos offers opportunities for firms to form the regional supply chain model and benefit from comparative advantages from both nations

Data source JETRO

Thailand

Product supply chain

Laos

Did you knowhellip

Challenges

Difficulty in getting large pools of labor due to small population

Underdeveloped infrastructure in some regions

Challenge in recruiting higher skilled specialists

Suggestion Set up in major Special Economic Zones eg Vita Park SEZ and Savan-Seno SEZ

Roll out strategic human resource plan including training and capacity building

bull Advanced infrastructure

bull Experienced and high-skilled (management level) workforce

bull Affordable and youthful workforce bull Located between Vietnam and Thailand

both with high electronics parts demand bull Government incentives

Start operation from small scale (less than 500 workers) then scale up

Japanese enterprises have started implementing Thailand+1 model by relocating labor-intensive production to Laos and exporting back to Thailand to complete product assembly eg NIKON (digital camera) Dai-Ichi Denshi (wire harness) Nissei Mizuki (electronics parts) and Toyota boshoku (car seat cover)

Thailand + 1 Model

23

Industrial Agriculture

Key Industries amp Opportunities

24

Industrial Agriculture - Overview

Most industrial agriculture exports from Lao PDR are produced by foreign investors (Chinese Thai and Vietnamese) and local entrepreneurs to a lesser extent

Data source JETRO International Trade Center Produce Report USDA Foreign Agriculture Service

Leading Agricultural Exports by export value (USD Million 2016 and 2017)

A short-term drop in fruit exports in 2017 bull Exports declined because the Lao government suspended

development of large banana and other fruit plantations which typically produce to export to China and placed more stringent control on polluting farms

bull However at the end of 2017 Lao PDR and China negotiated for less stringent terms for Lao PDRrsquos fruit exports to China

Key Trends

Sugar Cane exports rocketing bull In 2017 sugar cane plantation boomed Export volume grew 121

times from 2016

bull The major reason was the relocation of sugar production from China as production costs there are very high approximately double that of Thailand

Organic fruit and vegetable becoming key economic plants bull Local and foreign investors are increasingly investing in organic

agriculture a higher value-added segment which is demanded by major countries such as Europe US Japan and China

Exports (2016)

USD 02 Million

Exports (2017)

USD 20 Million

121 times

25

Industrial Agriculture - Opportunity

Lao industrial agriculture sector offers opportunities for

bull Agricultural inputs andmachinery producers and distributors

bull Plantation operators

bull Processing and trading firms in Thailand

3 Processing and Trading

Key Drivers Lack of capability to process

products at international standard

Lack of market access

Opportunities Market inputs and machinery

to agricultural projects Investor can target both large scale investment

and smallholder farmers

Opportunities Produce high-value agricultural

products organic products herbs and medical plants

Foreign investors operate via (1) contract farming and (2) concession

Opportunities Process raw products to meet

export standards trade products to leverage existing market channels

Agricultural Inputs and Machinery

Key Drivers Limited access to improved

agricultural inputs - Seed - Fertilizer - Quality machinery

1 2

Key Drivers Arable fertile land

low level of chemical pesticides

Plantation ndash High Value Products

26

Tourism

Key Industries amp Opportunities

27

Tourism - Overview

Tourist arrivals are on a steady rise in the past decade especially tourists from Asia Pacific with most of them visiting more developed border towns neighboring Thailand

Data source Ministry of Tourism TRAVEL amp TOURISM ECONOMIC IMPACT 2018 LAOS

Direct Contribution of Travel amp Tourism to GDP (USD Billion 2012-2018E)

bull Both tourist arrivals and revenue from tourism have increased approximately 3 folds in the past decade

bull Most tourists come from Asia Pacific (93) particularly from from Thailand (50) and Vietnam (25) followed by Europe (5)

Top Tourist Arrivals Destinations 2017

1 Vientiane Capital

2 Savannakhet

3 Champasak

Most top tourist destinations are more developed towns bordering Thailand

Nong Khai

Mukdahan

Ubon Ratchathani

World Heritage sites im these following city also attract a considerable number of visitors

Luang Prabang Wat Pu at Champasak

28

Business Opportunities Associated to Tourism Sector

Accommodate increasing tourist arrivals

Provide dining and entertainment services

Develop attractive ecotourism cultural tourism packages

Provide transportation services linking major tourism sites

Produce and market souvenirs applying local arts design and materials

1 Hotel Restaurant Entertainment

2 Tour Company Holiday Package

3 Sourvenirs

4 Transportation Service

Tourism - Opportunity

29

Lao Consumer Income and Behavior

Prefer to cook at home Enjoy drinking alcohol Middle income enjoy

spending evening in beer garden

Lao women wear sinh Follow Thai and Korean

fashion due to influence of TV series

Shop at traditional markets Middle income shop at

Thai border towns (Nong Khai Udon Thani)

Thai and Japanese products are perceived to have high quality Chinese products are perceived as sub-standard quality and Korean products are in between

30

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

31

Major Costs ndash Labor and Utility

Electricity Rate 2017

0 - 25 kwh 004USDkwh

26 - 150 kwh 005USDkwh

151 - 300 kwh 009USDkwh

more than 500 kwh 012USDkwh

301 - 400 kwh 010USDkwh

401 - 500 kwh 011USDkwh

Water Price (Per Unit) for Business and Trade Units

bull Water price for businesses is set to increase from USD USD 036 in 2017 to USD038 per unit this year

Labor minimum monthly wage in ASEAN 2017 USD

32

Tax System

Monthly Income (LAK) Tax Rate

0 ndash 1000000 0

1000001 - 3000000 5

3000001 - 6000000 10

6000001 - 12000000 12

12000001 - 24000000 15

24000001 - 40000000 20

Above 40000000 24

Types of Tax Tax rate

Profit Tax 24

Value Added Tax (VAT) 10

Withholding Tax Dividends 10

(non-residents) Transfer of shares 10

Transfer of assets 5

China

Luxembourg

Malaysia

Singapore

South Korea

Thailand

Vietnam

Income tax treaties for avoidance of double taxation

Note There is no definition of residence for tax purposes in Laos All companies registered under Lao law (including foreign law) are subject to Lao profit tax

Personal Income Tax Corporate Taxes

Data source DFDL

33

Foreign Investment Regulations

Data source JETRO Compiled by World Business Advisory Center

Not Permitted to Foreigner Only for Joint Venture with Local Company 100 Foreign Ownership Allowed

Wholesale and Retail Businesses

100 Foreign Ownership bull If registered capital is 20 billion Lao Kip

(USD 25 million) or more

Maximum 70 Foreign Ownership bull If registered capital is 10 - 20 billion Lao Kip

(USD 125 ndash 25 million)

Maximum 50 Foreign Ownership bull If registered capital is 4 - 10 billion Lao Kip

(USD 05 ndash 125 million)

bull If registered capital is less than 4 billion Lao Kip (USD 05 million)

Hotel and Restaurants Maximum 60 Foreign Ownership bull 3-5 stars hotel with minimum registered capital of

1 billion Lao Kip (USD 125000)

bull Less than 3 stars hotel 100 Foreign Ownership bull NOT ALLOWED

Logistics

100 Foreign Ownership bull Domestic goods transport with minimum

registered capital of 3 billion Lao Kip (USD 375000)

Maximum 49 Foreign Ownership bull Cross border goods transport with minimum

registered capital of 5 billion Lao Kip (USD 625000)

bull Cross border goods transport with less than 5 billion Lao Kip of registered capital

bull Domestic goods transport with less than 3 billion Lao Kip of registered capital

Examples of Foreign Investment Regulations

Foreign enterprises are subject to foreign investment regulations in several business activities Generally small businesses are preserved for Lao enterprises whereas large businesses with certain investment conditions are opened for foreign investors

34

Types of Investment ndash (1) General Business

Data source JETRO Compiled by World Business Advisory Center

Besides foreign investment regulation foreign enterprises are also subject to the investment promotion law which classifies investment into 3 types

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Investment in General Business

Types of Investment in Lao PDR

Description

o An investment in general economic activities

o Activities including controlled businesses ndash businesses that require additional approval from relevant ministries

o Activities excluding concession business

Register Capital

Requirements

o At least 1 billion Lao Kip (USD 125000)

o At the day of establishment must pay 40 (agriculture business) 60 (production and processing) 80 (services) The remainder must be paid within 1 year

Examples of Controlled Businesses 1 Agriculture plantation agriculture fishery 2 Manufacturing petroleum products leathers textile amp clothing papers

printing pesticides pharmaceutical products 3 Businesses related to environment eg wastewater treatment 4 Wholesale and retails of gasoline and petroleum products 5 Transportation 6 Hotel and Restaurant 7 Media and Publication 8 Finance and insurance 9 Legal accounting and tax services 10 Tourism 11 Education 12 Hospital clinic and medical services 13 Recreation (museum and amusement park)

35

Types of Investment ndash (2) Concession Business

Data source JETRO Compiled by World Business Advisory Center

Investment in Concession Business

Description

o An investment that requires a concession or specific authorization from the government to use the governmentrsquos property

o Some concession businesses requires authorization from the central government whereas the other requires only provincial government level of authorization for example

bull At least 5MW electricity generation project requires the central government authorization

bull Less than 5MW electricity generation projects requires only provincial government authorization

Examples of Concession Business

1 Mining 2 Electricity generation 3 Infrastructure

bull Telecommunication bull TV and radio station bull Road railway airport seaport waste disposal site

4 Businesses that use the government land bull Shopping center bull Tourist attraction bull Public park bull Hotel bull Forestry and Logging bull Plantation and Livestock

Register Capital

Requirements

o Must pay at least 20 of registered capital while remaining should be paid within 2 years

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Types of Investment in Lao PDR

36

Types of Investment ndash (3) Business Related to SEZ

Data source JETRO Compiled by World Business Advisory Center

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Types of Investment in Lao PDR

Investment in Business Related to SEZ

Description

o Business related to Special Economic Zone -gt an investment in building infrastructure for a new town

o Business related to Specific Economic Zone -gt an investment in infrastructure development for specific purpose projects such as industrial zone export zone tourist development zone etc

High Potential SEZs in Laos

o Vita Park Special Economic Zone (Vientiane)

o Savan-Seno Special Economic Zone (Savannakhet)

o Pakxe-Japan SME Specific Economic Zone (Champasak)

Special and Specific Economic Zones

1 Boten-Daenkham Specific Economic Zone 2 Luang Prabang Special Economic Zone 3 Golden Triangle Special Economic Zone 4 Thatluang Lake Specific Economic Zone 5 Longthanh Specific Economic Zone 6 Xaysettha Specific Economic Zone 7 Vita Park Special Economic Zone 8 Dongphosy Specific Economic Zone 9 Thakhek Specific Economic Zone 10 Poukiao Specific Economic Zone 11 Savan-Seno Special Economic Zone 12 Pakxe-Japan SME Specific Economic Zone

1

2

3

4

5 6

7

8

9 10

11

12

37

General Business

Concession Business

Business related to

SEZs

Procedure of Investment in Lao PDR

The investment approval procedure varies depending upon type of investment However all foreign investors must go through enterprise registration tax identification number registration and application for capital importation certificate

Apply at Ministry of Planning and

Investment

For developer apply at National Committee for Special Economic Zone

For investor apply at One-Stop Service Unit in

each SEZ

Get Concession

License

Get SEZ Concession

License

For controlled businesses apply for

approval at relevant Ministries

Get Approval License

Apply at Ministry of

Industry and Commerce

For non-controlled businesses

Get Enterprise

Registration Certificate

(ERC)

Apply for Tax

Identification Number TIN

at Tax Department Ministry of

Finance

Apply for Capital

Importation Certificate at Bank of Lao

PDR

Data source JETRO Compiled by World Business Advisory Center

38

Investment Tax Incentives ndash General Zone

Data source JETRO Compiled by World Business Advisory Center

Investment Tax Incentives in Lao PDR

Profit Tax Exemption Period

Level 1 High Promotion

Level 2 Moderate Promotion

Level 3 Low Promotion

Zone 1 10 years 6 years 4 years

Zone 2 6 years 4 years 2 years

Zone 3 4 years 2 years 1 years

Profit Tax Exemption Period by Promotion Sector and Zone

Promoted sectors Agriculture Industrial Handicrafts and Services

Type of Tax Exemption

General Zone Promotion Sector and Zone based Incentives 1 Special amp Specific Economic Zone

Tailor Made Incentives 2

Profit tax in next accounting year in case net profit is used for reinvestment (business

expansion)

Import duties for import of raw material equipment spare parts and

vehicles directly used for production

Export duties for general goods and

products (resource-based products should follow

associated laws)

Permission to carry forward losses to

three consecutive accounting years

39

Sector Period of

Profit Tax Exemption

Profit Tax Rate

After Tax Exemption Period

Hi-Tech Manufacturing 10 year 8

Manufacturing that exports at least 70 of production 10 year 8

Manufacturing that exports 30 - 60 of production 7 year 8

Manufacturing that exports 0 - 29 of production 5 year 8

Other 5 year 8

Investment amount of USD 2 million or more 10 year 8

Investment amount of USD 500000 - USD 2 million 8 year 8

Investment amount of USD 300000 - USD 500000 6 year 10

Investment amount of USD 150000 - USD 300000 4 year 10

Investment amount of USD 50000 - USD 150000 2 year 10

Export Laos products 5 year 10

International trade company 3 year 10

General trade company 2 year 10

a) Manufacturing

b) Service

c) Commerce

Personal Income Tax 5

Dividend Tax after Profit Tax Exemption Period

5

Import Duty Exemption for import of raw material equipment spare parts and

vehicles directly used for production

VAT Exemption for import products

Investment Tax Incentives ndash Special and Specific Economic Zone

Data source JETRO

Investment Tax Incentives in Lao PDR

General Zone Promotion Sector and Zone based Incentives 1 Special amp Specific Economic Zone

Tailor Made Incentives 2 Example of Tax Incentives in Savan-Seno SEZ

Other Tax Incentives

40

Non-Tax Incentives amp Trade Privileges

Data source JETRO

Non-Tax Incentives

Permission

Foreign nationals can undertake feasibility studies

Bring in foreign technicians experts and managers if qualified Lao nationals are not available

Lease land

General business up to 30 years from Lao citizen and up to 50 years from the government (renewable)

Investment in SEZ up to 75 years

Concession business upon negotiation with the government (at present there is an example of 99 years land lease)

Transfer leasehold interests and build on or make improvements or structures to a leased land

Guarantee against nationalization expropriation and requisition without compensation

Protection

Trade Privileges

ASEAN WTO GSP Bilateral trade agreement (over 18 countries)

o Argentina o Belarus o Bulgaria o Cambodia o China o Indonesia o India o Korea DPR o Kuwait

o Malaysia o Mongolia o Myanmar o Philippines o Russian

Federation o Thailand o Turkey o USA o Vietnam

41

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

42

Foreign Currency Exchange

Data source Bank of the Lao PDR

Laos Currency Kip (LAK)

Latest FX Rate (as of August 22 2018)

Remark THB and USD are widely accepted especially in the border trade area

USD 1 ~ LAK 8507

EUR 1 ~ LAK 9851

THB 1 ~ LAK 262

JPY 1 ~ LAK 77

CNY 1 ~ LAK 1193

43

KASIKORNTHAIBANK Service in Lao PDR

Retail Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Current deposit

Lending

Working capital loan

Long term loan

Bank guarantee

Project Financing

FX Services

Corporate Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Remittance

Remittance

Trade Finance Letter of Credit (LC) Standby Letter of Credit (SBLC)

44

KASIKORNTHAI BANK Limited

With establishment KASIKORNTHAIBANK

the first full-scale locally incorporated institution from Thailand is fully committed to support our clientsrsquo cross-border financing and transaction for their trade and investment activities in Lao PDR

45

KASIKORNTHAIBANK in Lao PDR Contacts

bull HEAD OFFICE Unit 12 Lane Xang Avenue Xiangngeun Village Chanthaboury District Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88905 Fax +856 21 253 336 wwwkasikornbankcomla

KASIKORNTHAI BANK Limited

bull PONESINUAN BRANCH

Ban Ponesinuan Unit 14 Sysattanak Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88826 Fax +856 21 410 889

Ms Piyanoot Sangsan Branch Manager KASIKORNTHAI BANK LIMITED Lane Xang Head Office E-mail piyanootskasikornbankcom

Mr Chatuporn Boozaya-Angool Branch Manager Ponesinuan Branch E-mail chatupornbkasikornbankcom

46

About AEC+ Business Advisory The AEC+ Business Advisory is set up by KASIKORNBANK to support businesses in their regional expansion across the ASEAN+3 market by providing local market intelligence and strategic business advice

What we do bull Offer customized and tailor-made advisory services bull Publish investment guides and industry reports bull Deliver in-depth insights via seminars bull Organize business trips to bring first-hand experience

Follow Us Visit our website at

AEC+ BUSINESS ADVISORY

Prepared by Mr Anoot Charoenkiattikul World Business Intelligence Specialist E-mail anootckasikornbankcom

httpswwwkasikornbankcominternational-businessenPagesHomeaspx

47

Page 10: LAO PDR - Facilitiesfuangfah.econ.cmu.ac.th/teacher/nisit/files/201808_LaoPDR_Investm… · • On August 7, the government of Laos announced the suspension of new hydropower project

10

Data Source Asian Development Bank

Lao PDR - Infrastructure Overview

Road transport is the main mode of transportation in Laos for both freight and passenger transportation Railway development is also under way Due to Laosrsquo geographical characteristic the governmentrsquos primary focus is the development of land transport

Road transport is the primary means of transport carrying over 80 of freight traffic and almost 100 of all domestic passenger traffic Major roads link major cities to key border towns in neighboring countries with routes heading north from Vientiane the capital the more developed and most crowded

Road

Being a land-locked country Laos does not have a sea port and either relies on Thailandrsquos Laem Chabang Port or other sea ports in Vietnam However inland waterways along the Mekong river does support 18 of its freight traffic albeit with limitaitions during the dry season

Water Transport Railway Laos has no rail system However 2 large potential projects are under way The first is the Dansavan-Laobao Railway planned for 2018 operation The second is the Laos-China railway running from Vientiane to the Boten-Bohan borer which is set to be completed by the end of 2021

Aviation Laos has 3 international airports with each in the North Central and Southern regions The airports mainly handle tourist arrivals and business travelers to a lesser extent A small amount of trade is handled at Vientianersquos international airport for special niche products that require express shipment Insuch cases capacity is limited

Attapeu

International Airport

Danang

Foreign Seaport

Savannaket

Confirmed Rail Lines

Lao Bao

Bohan

11

BRI in Lao PDRrsquos Section

Route Boten to Vientiane

Distance 414 km

Construction Period 2017-2021

Investment Pattern Joint Venture ndash Lao PDR 40 and China 60

Cooperation Mechanism Government to Government (G to G)

Total Investment Cost USD 61-68 Billion

Passenger Train Speed 160-200 kmh

Stations 32

Current Status 203 completed (as of December 2017)

Data Source Reuters nationmultimediacom

Lao PDR ndash Belt and Road Initiative (BRI)

The section of the Belt and Road Initiative running through Lao PDR is a USD 6 billion high-speed railway project which will link China with Vientiane the Laotian capital and the Laos-Thailand border

Lao PDR BRI Timeline

2013 bull BRI was announced by Chinese President Xi Jinping The target of this project aims to invest in infrastructure in the central western and southern regions of Asia as well as in Africa and Europe

2016 DEC

bull The construction commenced The part of the BRI project that runs through Lao PDR runs from the Boten-Mohan border (between Laos and China) to Vientiane The project was delayed and restarted in 2017

2021 DEC

bull The project is set to be fully operational in December 2021 It will link Chinas Yunnan province the Lao capital Vientiane with the Thai border province Nong Khai

2015 DEC

bull The ground-breaking ceremony to launch the Lao PDR-China railway project was held on December 2 2015

Project Information

12

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

13

Key Industries and Opportunities

With rapid improvement in logistics infrastructure rich natural resources ample arable areas and cultural sites Lao PDR offers attractive opportunities for investments in the sectors of mining electronic parts and components industrial agriculture and tourism

TOURISM

ELECTRONIC PARTS AND COMPONENTS

MINING

INDUSTRIAL AGRICULTURE

HYDROPOWER

Temporarily Suspended

14

HYDROPOWER

Key Industries amp Opportunities

15

Hydropowerndash Overview

Hydropower exports in Lao PDR surged in 2017 The key destinations are Thailand Cambodia and Vietnam

Data source KResearch the Ministry of Energy and Mines

Total 29125

Magawatts

Number of Hydropower Plants

OPERATING

46

UNDER CONSTRUCTION

143

PENDING APPROVAL

246

Installed Capacities of Hydropower Plants in Lao PDR (Megawatts (MW) as of 2017)

Key Trends

Battery of Southeast Asia bull Due to Southeast Asiarsquos development toward industrialization there

remains a large demand gap for infrastructure support as well as growing demand for electricity to be met in the future

bull Thus Lao PDR with abundant natural resources for electricity generation aims to improve its energy sector to address this energy supply issue and position the country as a key exporter of energy in ASEAN

Lao PDR Electricity Exports

bull Lao PDRrsquos electricity exports have grown 15 annually since 2012

bull Electricity accounts for 24 of Lao PDR total exports

bull Thailand Cambodia and Vietnam are key export destinations with Thailand being the largest buyer

16

Hydropowerndash Opportunity

Lao PDR has ldquosuspendedrdquo new investment in hydropower projects and will conduct safety inspections for all existing dams due to the dam collapse incident in July

Data source laotiantimescom asianewsnetwork

The dam collapse in late July has caused Lao PDR to suspend new investment in hydropower projects in the country

bull On July 23 the ldquoSaddle Dam Drdquo part of the Xe-Pian Xe-Namnoy hydropower project in Champasak and Attapeu provinces has collapsed This disaster had affected around 5000 people in the area

bull On August 7 the government of Laos announced the suspension of new hydropower project approval and the renewed inspection of the existing dams

Key Policy Updates

2018 June

2018 August

The Lao government has suspended new investment in small-scale hydropower projects due to safety concerns

bull Lao PDR announced a temporary suspension of its authorization for investment in small-scale hydropower projects with installed capacity of lt15MW Such suspension is part of the governmentrsquos attempts to ensure the safety of hydropower dams

bull As a result the provincial and central authorities cannot approve new investment proposals for small-scale hydropower projects until concrete measures to ensure dam safety are drawn up

bull The suspension comes after construction of some projects has been found to be lower than the legally stipulated safety standards

17

Mining

Key Industries amp Opportunities

18

Mining ndash Overview

The mining Industry in Lao PDR has declined over the past several years due to fluctuations in global commodity prices and the maturity of some local mines

Data source International Trade Center worldbank

Lao PDR Mining Product Exports (USD Million 2017E)

Precious Stone Exports (USD Million 2017E)

DIAMOND

62 GOLD

1548 SILVER

54

Key Trends

Overall Lao PDRrsquos mining exports have decreased bull Exports of mining products have decreased since 2013 at an average

rate of 147 falling from USD1014 million in 2013 to USD 4575 in 2017

bull Copper and Coal experience the largest decline in export value mainly because some of the copper and coal mines have matured and global commodity prices have fallen

bull Meanwhile cement and sandstone record the highest increase in export value resulting from new investments and increasing domestic demand for these types of materials to use in the countryrsquos infrastructure development projects

Forms of investment in mining Business cooperation under contract

Joint venture between foreign and local firms

100 foreign or domestic ownership

Remark Firms could set up representative office to gather information and investigate investment opportunities

19

Taxes amp Regulations

Mining ndash Opportunity

Mineral resources in Lao PDR offer opportunities to firms with expertise in mining operations from prospection to mining and processing

Prospection Exploration Feasibility Study

Construction Mining amp Processing

2 years + 1 year

3 years + 2 years

1 year + 1 year

2 years + 1 year

20 years + 5 years

License Duration + Renewable

USD 3 -12 ha year USD 05 ndash 1 ha year + royalty (1-

7) Rental Fee

Registered company

Max 300 sqkm Corporate income 25-35

Value added 10

Rules and regulations for the Minerals Law in accordance to international standard partly missing

Limited number and capacity of local workers in mining sector

High number of mineral trade companies rather than professional mining operations firms

Key Issues

20

Electronic Parts and Components Industry

Key Industries amp Opportunities

21

Electronic Parts and Components Industry - Overview

Over the recent years Laos has experienced exponential growth in its exports of electronic parts and components especially to Thailand indicating the initial formation of the regional supply chain

Lao PDR Electronic Part and Component Exports (USD Million 2017)

Increasing investments in Lao PDR Special Economic Zone (SEZ) boosts trade The presence of SEZs and attractive incentives have attracted FDI inflows into Lao PDR especially in the production of digital camera parts and telecom equipment parts Most manufacturing in these sectors is aimed at exporting intermediate products to assemblers of finished electrical and electronic products in other countries

Main Export Destinations 2017

Data source International Trade Center

Why Thailand has become the top export destination

bull ASEAN Free Trade Agreement (AFTA) ndash The agreement minimizes trade barriers and creates free flow of goods and capital within ASEAN

bull Thailand-based industries shift their focus on value added activities - firms relocate labor-intensive activities to Thailandrsquos neighboring countries including Laos

22

Electronic Parts and Components Industry - Opportunity

Industrial development in Laos offers opportunities for firms to form the regional supply chain model and benefit from comparative advantages from both nations

Data source JETRO

Thailand

Product supply chain

Laos

Did you knowhellip

Challenges

Difficulty in getting large pools of labor due to small population

Underdeveloped infrastructure in some regions

Challenge in recruiting higher skilled specialists

Suggestion Set up in major Special Economic Zones eg Vita Park SEZ and Savan-Seno SEZ

Roll out strategic human resource plan including training and capacity building

bull Advanced infrastructure

bull Experienced and high-skilled (management level) workforce

bull Affordable and youthful workforce bull Located between Vietnam and Thailand

both with high electronics parts demand bull Government incentives

Start operation from small scale (less than 500 workers) then scale up

Japanese enterprises have started implementing Thailand+1 model by relocating labor-intensive production to Laos and exporting back to Thailand to complete product assembly eg NIKON (digital camera) Dai-Ichi Denshi (wire harness) Nissei Mizuki (electronics parts) and Toyota boshoku (car seat cover)

Thailand + 1 Model

23

Industrial Agriculture

Key Industries amp Opportunities

24

Industrial Agriculture - Overview

Most industrial agriculture exports from Lao PDR are produced by foreign investors (Chinese Thai and Vietnamese) and local entrepreneurs to a lesser extent

Data source JETRO International Trade Center Produce Report USDA Foreign Agriculture Service

Leading Agricultural Exports by export value (USD Million 2016 and 2017)

A short-term drop in fruit exports in 2017 bull Exports declined because the Lao government suspended

development of large banana and other fruit plantations which typically produce to export to China and placed more stringent control on polluting farms

bull However at the end of 2017 Lao PDR and China negotiated for less stringent terms for Lao PDRrsquos fruit exports to China

Key Trends

Sugar Cane exports rocketing bull In 2017 sugar cane plantation boomed Export volume grew 121

times from 2016

bull The major reason was the relocation of sugar production from China as production costs there are very high approximately double that of Thailand

Organic fruit and vegetable becoming key economic plants bull Local and foreign investors are increasingly investing in organic

agriculture a higher value-added segment which is demanded by major countries such as Europe US Japan and China

Exports (2016)

USD 02 Million

Exports (2017)

USD 20 Million

121 times

25

Industrial Agriculture - Opportunity

Lao industrial agriculture sector offers opportunities for

bull Agricultural inputs andmachinery producers and distributors

bull Plantation operators

bull Processing and trading firms in Thailand

3 Processing and Trading

Key Drivers Lack of capability to process

products at international standard

Lack of market access

Opportunities Market inputs and machinery

to agricultural projects Investor can target both large scale investment

and smallholder farmers

Opportunities Produce high-value agricultural

products organic products herbs and medical plants

Foreign investors operate via (1) contract farming and (2) concession

Opportunities Process raw products to meet

export standards trade products to leverage existing market channels

Agricultural Inputs and Machinery

Key Drivers Limited access to improved

agricultural inputs - Seed - Fertilizer - Quality machinery

1 2

Key Drivers Arable fertile land

low level of chemical pesticides

Plantation ndash High Value Products

26

Tourism

Key Industries amp Opportunities

27

Tourism - Overview

Tourist arrivals are on a steady rise in the past decade especially tourists from Asia Pacific with most of them visiting more developed border towns neighboring Thailand

Data source Ministry of Tourism TRAVEL amp TOURISM ECONOMIC IMPACT 2018 LAOS

Direct Contribution of Travel amp Tourism to GDP (USD Billion 2012-2018E)

bull Both tourist arrivals and revenue from tourism have increased approximately 3 folds in the past decade

bull Most tourists come from Asia Pacific (93) particularly from from Thailand (50) and Vietnam (25) followed by Europe (5)

Top Tourist Arrivals Destinations 2017

1 Vientiane Capital

2 Savannakhet

3 Champasak

Most top tourist destinations are more developed towns bordering Thailand

Nong Khai

Mukdahan

Ubon Ratchathani

World Heritage sites im these following city also attract a considerable number of visitors

Luang Prabang Wat Pu at Champasak

28

Business Opportunities Associated to Tourism Sector

Accommodate increasing tourist arrivals

Provide dining and entertainment services

Develop attractive ecotourism cultural tourism packages

Provide transportation services linking major tourism sites

Produce and market souvenirs applying local arts design and materials

1 Hotel Restaurant Entertainment

2 Tour Company Holiday Package

3 Sourvenirs

4 Transportation Service

Tourism - Opportunity

29

Lao Consumer Income and Behavior

Prefer to cook at home Enjoy drinking alcohol Middle income enjoy

spending evening in beer garden

Lao women wear sinh Follow Thai and Korean

fashion due to influence of TV series

Shop at traditional markets Middle income shop at

Thai border towns (Nong Khai Udon Thani)

Thai and Japanese products are perceived to have high quality Chinese products are perceived as sub-standard quality and Korean products are in between

30

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

31

Major Costs ndash Labor and Utility

Electricity Rate 2017

0 - 25 kwh 004USDkwh

26 - 150 kwh 005USDkwh

151 - 300 kwh 009USDkwh

more than 500 kwh 012USDkwh

301 - 400 kwh 010USDkwh

401 - 500 kwh 011USDkwh

Water Price (Per Unit) for Business and Trade Units

bull Water price for businesses is set to increase from USD USD 036 in 2017 to USD038 per unit this year

Labor minimum monthly wage in ASEAN 2017 USD

32

Tax System

Monthly Income (LAK) Tax Rate

0 ndash 1000000 0

1000001 - 3000000 5

3000001 - 6000000 10

6000001 - 12000000 12

12000001 - 24000000 15

24000001 - 40000000 20

Above 40000000 24

Types of Tax Tax rate

Profit Tax 24

Value Added Tax (VAT) 10

Withholding Tax Dividends 10

(non-residents) Transfer of shares 10

Transfer of assets 5

China

Luxembourg

Malaysia

Singapore

South Korea

Thailand

Vietnam

Income tax treaties for avoidance of double taxation

Note There is no definition of residence for tax purposes in Laos All companies registered under Lao law (including foreign law) are subject to Lao profit tax

Personal Income Tax Corporate Taxes

Data source DFDL

33

Foreign Investment Regulations

Data source JETRO Compiled by World Business Advisory Center

Not Permitted to Foreigner Only for Joint Venture with Local Company 100 Foreign Ownership Allowed

Wholesale and Retail Businesses

100 Foreign Ownership bull If registered capital is 20 billion Lao Kip

(USD 25 million) or more

Maximum 70 Foreign Ownership bull If registered capital is 10 - 20 billion Lao Kip

(USD 125 ndash 25 million)

Maximum 50 Foreign Ownership bull If registered capital is 4 - 10 billion Lao Kip

(USD 05 ndash 125 million)

bull If registered capital is less than 4 billion Lao Kip (USD 05 million)

Hotel and Restaurants Maximum 60 Foreign Ownership bull 3-5 stars hotel with minimum registered capital of

1 billion Lao Kip (USD 125000)

bull Less than 3 stars hotel 100 Foreign Ownership bull NOT ALLOWED

Logistics

100 Foreign Ownership bull Domestic goods transport with minimum

registered capital of 3 billion Lao Kip (USD 375000)

Maximum 49 Foreign Ownership bull Cross border goods transport with minimum

registered capital of 5 billion Lao Kip (USD 625000)

bull Cross border goods transport with less than 5 billion Lao Kip of registered capital

bull Domestic goods transport with less than 3 billion Lao Kip of registered capital

Examples of Foreign Investment Regulations

Foreign enterprises are subject to foreign investment regulations in several business activities Generally small businesses are preserved for Lao enterprises whereas large businesses with certain investment conditions are opened for foreign investors

34

Types of Investment ndash (1) General Business

Data source JETRO Compiled by World Business Advisory Center

Besides foreign investment regulation foreign enterprises are also subject to the investment promotion law which classifies investment into 3 types

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Investment in General Business

Types of Investment in Lao PDR

Description

o An investment in general economic activities

o Activities including controlled businesses ndash businesses that require additional approval from relevant ministries

o Activities excluding concession business

Register Capital

Requirements

o At least 1 billion Lao Kip (USD 125000)

o At the day of establishment must pay 40 (agriculture business) 60 (production and processing) 80 (services) The remainder must be paid within 1 year

Examples of Controlled Businesses 1 Agriculture plantation agriculture fishery 2 Manufacturing petroleum products leathers textile amp clothing papers

printing pesticides pharmaceutical products 3 Businesses related to environment eg wastewater treatment 4 Wholesale and retails of gasoline and petroleum products 5 Transportation 6 Hotel and Restaurant 7 Media and Publication 8 Finance and insurance 9 Legal accounting and tax services 10 Tourism 11 Education 12 Hospital clinic and medical services 13 Recreation (museum and amusement park)

35

Types of Investment ndash (2) Concession Business

Data source JETRO Compiled by World Business Advisory Center

Investment in Concession Business

Description

o An investment that requires a concession or specific authorization from the government to use the governmentrsquos property

o Some concession businesses requires authorization from the central government whereas the other requires only provincial government level of authorization for example

bull At least 5MW electricity generation project requires the central government authorization

bull Less than 5MW electricity generation projects requires only provincial government authorization

Examples of Concession Business

1 Mining 2 Electricity generation 3 Infrastructure

bull Telecommunication bull TV and radio station bull Road railway airport seaport waste disposal site

4 Businesses that use the government land bull Shopping center bull Tourist attraction bull Public park bull Hotel bull Forestry and Logging bull Plantation and Livestock

Register Capital

Requirements

o Must pay at least 20 of registered capital while remaining should be paid within 2 years

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Types of Investment in Lao PDR

36

Types of Investment ndash (3) Business Related to SEZ

Data source JETRO Compiled by World Business Advisory Center

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Types of Investment in Lao PDR

Investment in Business Related to SEZ

Description

o Business related to Special Economic Zone -gt an investment in building infrastructure for a new town

o Business related to Specific Economic Zone -gt an investment in infrastructure development for specific purpose projects such as industrial zone export zone tourist development zone etc

High Potential SEZs in Laos

o Vita Park Special Economic Zone (Vientiane)

o Savan-Seno Special Economic Zone (Savannakhet)

o Pakxe-Japan SME Specific Economic Zone (Champasak)

Special and Specific Economic Zones

1 Boten-Daenkham Specific Economic Zone 2 Luang Prabang Special Economic Zone 3 Golden Triangle Special Economic Zone 4 Thatluang Lake Specific Economic Zone 5 Longthanh Specific Economic Zone 6 Xaysettha Specific Economic Zone 7 Vita Park Special Economic Zone 8 Dongphosy Specific Economic Zone 9 Thakhek Specific Economic Zone 10 Poukiao Specific Economic Zone 11 Savan-Seno Special Economic Zone 12 Pakxe-Japan SME Specific Economic Zone

1

2

3

4

5 6

7

8

9 10

11

12

37

General Business

Concession Business

Business related to

SEZs

Procedure of Investment in Lao PDR

The investment approval procedure varies depending upon type of investment However all foreign investors must go through enterprise registration tax identification number registration and application for capital importation certificate

Apply at Ministry of Planning and

Investment

For developer apply at National Committee for Special Economic Zone

For investor apply at One-Stop Service Unit in

each SEZ

Get Concession

License

Get SEZ Concession

License

For controlled businesses apply for

approval at relevant Ministries

Get Approval License

Apply at Ministry of

Industry and Commerce

For non-controlled businesses

Get Enterprise

Registration Certificate

(ERC)

Apply for Tax

Identification Number TIN

at Tax Department Ministry of

Finance

Apply for Capital

Importation Certificate at Bank of Lao

PDR

Data source JETRO Compiled by World Business Advisory Center

38

Investment Tax Incentives ndash General Zone

Data source JETRO Compiled by World Business Advisory Center

Investment Tax Incentives in Lao PDR

Profit Tax Exemption Period

Level 1 High Promotion

Level 2 Moderate Promotion

Level 3 Low Promotion

Zone 1 10 years 6 years 4 years

Zone 2 6 years 4 years 2 years

Zone 3 4 years 2 years 1 years

Profit Tax Exemption Period by Promotion Sector and Zone

Promoted sectors Agriculture Industrial Handicrafts and Services

Type of Tax Exemption

General Zone Promotion Sector and Zone based Incentives 1 Special amp Specific Economic Zone

Tailor Made Incentives 2

Profit tax in next accounting year in case net profit is used for reinvestment (business

expansion)

Import duties for import of raw material equipment spare parts and

vehicles directly used for production

Export duties for general goods and

products (resource-based products should follow

associated laws)

Permission to carry forward losses to

three consecutive accounting years

39

Sector Period of

Profit Tax Exemption

Profit Tax Rate

After Tax Exemption Period

Hi-Tech Manufacturing 10 year 8

Manufacturing that exports at least 70 of production 10 year 8

Manufacturing that exports 30 - 60 of production 7 year 8

Manufacturing that exports 0 - 29 of production 5 year 8

Other 5 year 8

Investment amount of USD 2 million or more 10 year 8

Investment amount of USD 500000 - USD 2 million 8 year 8

Investment amount of USD 300000 - USD 500000 6 year 10

Investment amount of USD 150000 - USD 300000 4 year 10

Investment amount of USD 50000 - USD 150000 2 year 10

Export Laos products 5 year 10

International trade company 3 year 10

General trade company 2 year 10

a) Manufacturing

b) Service

c) Commerce

Personal Income Tax 5

Dividend Tax after Profit Tax Exemption Period

5

Import Duty Exemption for import of raw material equipment spare parts and

vehicles directly used for production

VAT Exemption for import products

Investment Tax Incentives ndash Special and Specific Economic Zone

Data source JETRO

Investment Tax Incentives in Lao PDR

General Zone Promotion Sector and Zone based Incentives 1 Special amp Specific Economic Zone

Tailor Made Incentives 2 Example of Tax Incentives in Savan-Seno SEZ

Other Tax Incentives

40

Non-Tax Incentives amp Trade Privileges

Data source JETRO

Non-Tax Incentives

Permission

Foreign nationals can undertake feasibility studies

Bring in foreign technicians experts and managers if qualified Lao nationals are not available

Lease land

General business up to 30 years from Lao citizen and up to 50 years from the government (renewable)

Investment in SEZ up to 75 years

Concession business upon negotiation with the government (at present there is an example of 99 years land lease)

Transfer leasehold interests and build on or make improvements or structures to a leased land

Guarantee against nationalization expropriation and requisition without compensation

Protection

Trade Privileges

ASEAN WTO GSP Bilateral trade agreement (over 18 countries)

o Argentina o Belarus o Bulgaria o Cambodia o China o Indonesia o India o Korea DPR o Kuwait

o Malaysia o Mongolia o Myanmar o Philippines o Russian

Federation o Thailand o Turkey o USA o Vietnam

41

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

42

Foreign Currency Exchange

Data source Bank of the Lao PDR

Laos Currency Kip (LAK)

Latest FX Rate (as of August 22 2018)

Remark THB and USD are widely accepted especially in the border trade area

USD 1 ~ LAK 8507

EUR 1 ~ LAK 9851

THB 1 ~ LAK 262

JPY 1 ~ LAK 77

CNY 1 ~ LAK 1193

43

KASIKORNTHAIBANK Service in Lao PDR

Retail Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Current deposit

Lending

Working capital loan

Long term loan

Bank guarantee

Project Financing

FX Services

Corporate Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Remittance

Remittance

Trade Finance Letter of Credit (LC) Standby Letter of Credit (SBLC)

44

KASIKORNTHAI BANK Limited

With establishment KASIKORNTHAIBANK

the first full-scale locally incorporated institution from Thailand is fully committed to support our clientsrsquo cross-border financing and transaction for their trade and investment activities in Lao PDR

45

KASIKORNTHAIBANK in Lao PDR Contacts

bull HEAD OFFICE Unit 12 Lane Xang Avenue Xiangngeun Village Chanthaboury District Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88905 Fax +856 21 253 336 wwwkasikornbankcomla

KASIKORNTHAI BANK Limited

bull PONESINUAN BRANCH

Ban Ponesinuan Unit 14 Sysattanak Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88826 Fax +856 21 410 889

Ms Piyanoot Sangsan Branch Manager KASIKORNTHAI BANK LIMITED Lane Xang Head Office E-mail piyanootskasikornbankcom

Mr Chatuporn Boozaya-Angool Branch Manager Ponesinuan Branch E-mail chatupornbkasikornbankcom

46

About AEC+ Business Advisory The AEC+ Business Advisory is set up by KASIKORNBANK to support businesses in their regional expansion across the ASEAN+3 market by providing local market intelligence and strategic business advice

What we do bull Offer customized and tailor-made advisory services bull Publish investment guides and industry reports bull Deliver in-depth insights via seminars bull Organize business trips to bring first-hand experience

Follow Us Visit our website at

AEC+ BUSINESS ADVISORY

Prepared by Mr Anoot Charoenkiattikul World Business Intelligence Specialist E-mail anootckasikornbankcom

httpswwwkasikornbankcominternational-businessenPagesHomeaspx

47

Page 11: LAO PDR - Facilitiesfuangfah.econ.cmu.ac.th/teacher/nisit/files/201808_LaoPDR_Investm… · • On August 7, the government of Laos announced the suspension of new hydropower project

11

BRI in Lao PDRrsquos Section

Route Boten to Vientiane

Distance 414 km

Construction Period 2017-2021

Investment Pattern Joint Venture ndash Lao PDR 40 and China 60

Cooperation Mechanism Government to Government (G to G)

Total Investment Cost USD 61-68 Billion

Passenger Train Speed 160-200 kmh

Stations 32

Current Status 203 completed (as of December 2017)

Data Source Reuters nationmultimediacom

Lao PDR ndash Belt and Road Initiative (BRI)

The section of the Belt and Road Initiative running through Lao PDR is a USD 6 billion high-speed railway project which will link China with Vientiane the Laotian capital and the Laos-Thailand border

Lao PDR BRI Timeline

2013 bull BRI was announced by Chinese President Xi Jinping The target of this project aims to invest in infrastructure in the central western and southern regions of Asia as well as in Africa and Europe

2016 DEC

bull The construction commenced The part of the BRI project that runs through Lao PDR runs from the Boten-Mohan border (between Laos and China) to Vientiane The project was delayed and restarted in 2017

2021 DEC

bull The project is set to be fully operational in December 2021 It will link Chinas Yunnan province the Lao capital Vientiane with the Thai border province Nong Khai

2015 DEC

bull The ground-breaking ceremony to launch the Lao PDR-China railway project was held on December 2 2015

Project Information

12

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

13

Key Industries and Opportunities

With rapid improvement in logistics infrastructure rich natural resources ample arable areas and cultural sites Lao PDR offers attractive opportunities for investments in the sectors of mining electronic parts and components industrial agriculture and tourism

TOURISM

ELECTRONIC PARTS AND COMPONENTS

MINING

INDUSTRIAL AGRICULTURE

HYDROPOWER

Temporarily Suspended

14

HYDROPOWER

Key Industries amp Opportunities

15

Hydropowerndash Overview

Hydropower exports in Lao PDR surged in 2017 The key destinations are Thailand Cambodia and Vietnam

Data source KResearch the Ministry of Energy and Mines

Total 29125

Magawatts

Number of Hydropower Plants

OPERATING

46

UNDER CONSTRUCTION

143

PENDING APPROVAL

246

Installed Capacities of Hydropower Plants in Lao PDR (Megawatts (MW) as of 2017)

Key Trends

Battery of Southeast Asia bull Due to Southeast Asiarsquos development toward industrialization there

remains a large demand gap for infrastructure support as well as growing demand for electricity to be met in the future

bull Thus Lao PDR with abundant natural resources for electricity generation aims to improve its energy sector to address this energy supply issue and position the country as a key exporter of energy in ASEAN

Lao PDR Electricity Exports

bull Lao PDRrsquos electricity exports have grown 15 annually since 2012

bull Electricity accounts for 24 of Lao PDR total exports

bull Thailand Cambodia and Vietnam are key export destinations with Thailand being the largest buyer

16

Hydropowerndash Opportunity

Lao PDR has ldquosuspendedrdquo new investment in hydropower projects and will conduct safety inspections for all existing dams due to the dam collapse incident in July

Data source laotiantimescom asianewsnetwork

The dam collapse in late July has caused Lao PDR to suspend new investment in hydropower projects in the country

bull On July 23 the ldquoSaddle Dam Drdquo part of the Xe-Pian Xe-Namnoy hydropower project in Champasak and Attapeu provinces has collapsed This disaster had affected around 5000 people in the area

bull On August 7 the government of Laos announced the suspension of new hydropower project approval and the renewed inspection of the existing dams

Key Policy Updates

2018 June

2018 August

The Lao government has suspended new investment in small-scale hydropower projects due to safety concerns

bull Lao PDR announced a temporary suspension of its authorization for investment in small-scale hydropower projects with installed capacity of lt15MW Such suspension is part of the governmentrsquos attempts to ensure the safety of hydropower dams

bull As a result the provincial and central authorities cannot approve new investment proposals for small-scale hydropower projects until concrete measures to ensure dam safety are drawn up

bull The suspension comes after construction of some projects has been found to be lower than the legally stipulated safety standards

17

Mining

Key Industries amp Opportunities

18

Mining ndash Overview

The mining Industry in Lao PDR has declined over the past several years due to fluctuations in global commodity prices and the maturity of some local mines

Data source International Trade Center worldbank

Lao PDR Mining Product Exports (USD Million 2017E)

Precious Stone Exports (USD Million 2017E)

DIAMOND

62 GOLD

1548 SILVER

54

Key Trends

Overall Lao PDRrsquos mining exports have decreased bull Exports of mining products have decreased since 2013 at an average

rate of 147 falling from USD1014 million in 2013 to USD 4575 in 2017

bull Copper and Coal experience the largest decline in export value mainly because some of the copper and coal mines have matured and global commodity prices have fallen

bull Meanwhile cement and sandstone record the highest increase in export value resulting from new investments and increasing domestic demand for these types of materials to use in the countryrsquos infrastructure development projects

Forms of investment in mining Business cooperation under contract

Joint venture between foreign and local firms

100 foreign or domestic ownership

Remark Firms could set up representative office to gather information and investigate investment opportunities

19

Taxes amp Regulations

Mining ndash Opportunity

Mineral resources in Lao PDR offer opportunities to firms with expertise in mining operations from prospection to mining and processing

Prospection Exploration Feasibility Study

Construction Mining amp Processing

2 years + 1 year

3 years + 2 years

1 year + 1 year

2 years + 1 year

20 years + 5 years

License Duration + Renewable

USD 3 -12 ha year USD 05 ndash 1 ha year + royalty (1-

7) Rental Fee

Registered company

Max 300 sqkm Corporate income 25-35

Value added 10

Rules and regulations for the Minerals Law in accordance to international standard partly missing

Limited number and capacity of local workers in mining sector

High number of mineral trade companies rather than professional mining operations firms

Key Issues

20

Electronic Parts and Components Industry

Key Industries amp Opportunities

21

Electronic Parts and Components Industry - Overview

Over the recent years Laos has experienced exponential growth in its exports of electronic parts and components especially to Thailand indicating the initial formation of the regional supply chain

Lao PDR Electronic Part and Component Exports (USD Million 2017)

Increasing investments in Lao PDR Special Economic Zone (SEZ) boosts trade The presence of SEZs and attractive incentives have attracted FDI inflows into Lao PDR especially in the production of digital camera parts and telecom equipment parts Most manufacturing in these sectors is aimed at exporting intermediate products to assemblers of finished electrical and electronic products in other countries

Main Export Destinations 2017

Data source International Trade Center

Why Thailand has become the top export destination

bull ASEAN Free Trade Agreement (AFTA) ndash The agreement minimizes trade barriers and creates free flow of goods and capital within ASEAN

bull Thailand-based industries shift their focus on value added activities - firms relocate labor-intensive activities to Thailandrsquos neighboring countries including Laos

22

Electronic Parts and Components Industry - Opportunity

Industrial development in Laos offers opportunities for firms to form the regional supply chain model and benefit from comparative advantages from both nations

Data source JETRO

Thailand

Product supply chain

Laos

Did you knowhellip

Challenges

Difficulty in getting large pools of labor due to small population

Underdeveloped infrastructure in some regions

Challenge in recruiting higher skilled specialists

Suggestion Set up in major Special Economic Zones eg Vita Park SEZ and Savan-Seno SEZ

Roll out strategic human resource plan including training and capacity building

bull Advanced infrastructure

bull Experienced and high-skilled (management level) workforce

bull Affordable and youthful workforce bull Located between Vietnam and Thailand

both with high electronics parts demand bull Government incentives

Start operation from small scale (less than 500 workers) then scale up

Japanese enterprises have started implementing Thailand+1 model by relocating labor-intensive production to Laos and exporting back to Thailand to complete product assembly eg NIKON (digital camera) Dai-Ichi Denshi (wire harness) Nissei Mizuki (electronics parts) and Toyota boshoku (car seat cover)

Thailand + 1 Model

23

Industrial Agriculture

Key Industries amp Opportunities

24

Industrial Agriculture - Overview

Most industrial agriculture exports from Lao PDR are produced by foreign investors (Chinese Thai and Vietnamese) and local entrepreneurs to a lesser extent

Data source JETRO International Trade Center Produce Report USDA Foreign Agriculture Service

Leading Agricultural Exports by export value (USD Million 2016 and 2017)

A short-term drop in fruit exports in 2017 bull Exports declined because the Lao government suspended

development of large banana and other fruit plantations which typically produce to export to China and placed more stringent control on polluting farms

bull However at the end of 2017 Lao PDR and China negotiated for less stringent terms for Lao PDRrsquos fruit exports to China

Key Trends

Sugar Cane exports rocketing bull In 2017 sugar cane plantation boomed Export volume grew 121

times from 2016

bull The major reason was the relocation of sugar production from China as production costs there are very high approximately double that of Thailand

Organic fruit and vegetable becoming key economic plants bull Local and foreign investors are increasingly investing in organic

agriculture a higher value-added segment which is demanded by major countries such as Europe US Japan and China

Exports (2016)

USD 02 Million

Exports (2017)

USD 20 Million

121 times

25

Industrial Agriculture - Opportunity

Lao industrial agriculture sector offers opportunities for

bull Agricultural inputs andmachinery producers and distributors

bull Plantation operators

bull Processing and trading firms in Thailand

3 Processing and Trading

Key Drivers Lack of capability to process

products at international standard

Lack of market access

Opportunities Market inputs and machinery

to agricultural projects Investor can target both large scale investment

and smallholder farmers

Opportunities Produce high-value agricultural

products organic products herbs and medical plants

Foreign investors operate via (1) contract farming and (2) concession

Opportunities Process raw products to meet

export standards trade products to leverage existing market channels

Agricultural Inputs and Machinery

Key Drivers Limited access to improved

agricultural inputs - Seed - Fertilizer - Quality machinery

1 2

Key Drivers Arable fertile land

low level of chemical pesticides

Plantation ndash High Value Products

26

Tourism

Key Industries amp Opportunities

27

Tourism - Overview

Tourist arrivals are on a steady rise in the past decade especially tourists from Asia Pacific with most of them visiting more developed border towns neighboring Thailand

Data source Ministry of Tourism TRAVEL amp TOURISM ECONOMIC IMPACT 2018 LAOS

Direct Contribution of Travel amp Tourism to GDP (USD Billion 2012-2018E)

bull Both tourist arrivals and revenue from tourism have increased approximately 3 folds in the past decade

bull Most tourists come from Asia Pacific (93) particularly from from Thailand (50) and Vietnam (25) followed by Europe (5)

Top Tourist Arrivals Destinations 2017

1 Vientiane Capital

2 Savannakhet

3 Champasak

Most top tourist destinations are more developed towns bordering Thailand

Nong Khai

Mukdahan

Ubon Ratchathani

World Heritage sites im these following city also attract a considerable number of visitors

Luang Prabang Wat Pu at Champasak

28

Business Opportunities Associated to Tourism Sector

Accommodate increasing tourist arrivals

Provide dining and entertainment services

Develop attractive ecotourism cultural tourism packages

Provide transportation services linking major tourism sites

Produce and market souvenirs applying local arts design and materials

1 Hotel Restaurant Entertainment

2 Tour Company Holiday Package

3 Sourvenirs

4 Transportation Service

Tourism - Opportunity

29

Lao Consumer Income and Behavior

Prefer to cook at home Enjoy drinking alcohol Middle income enjoy

spending evening in beer garden

Lao women wear sinh Follow Thai and Korean

fashion due to influence of TV series

Shop at traditional markets Middle income shop at

Thai border towns (Nong Khai Udon Thani)

Thai and Japanese products are perceived to have high quality Chinese products are perceived as sub-standard quality and Korean products are in between

30

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

31

Major Costs ndash Labor and Utility

Electricity Rate 2017

0 - 25 kwh 004USDkwh

26 - 150 kwh 005USDkwh

151 - 300 kwh 009USDkwh

more than 500 kwh 012USDkwh

301 - 400 kwh 010USDkwh

401 - 500 kwh 011USDkwh

Water Price (Per Unit) for Business and Trade Units

bull Water price for businesses is set to increase from USD USD 036 in 2017 to USD038 per unit this year

Labor minimum monthly wage in ASEAN 2017 USD

32

Tax System

Monthly Income (LAK) Tax Rate

0 ndash 1000000 0

1000001 - 3000000 5

3000001 - 6000000 10

6000001 - 12000000 12

12000001 - 24000000 15

24000001 - 40000000 20

Above 40000000 24

Types of Tax Tax rate

Profit Tax 24

Value Added Tax (VAT) 10

Withholding Tax Dividends 10

(non-residents) Transfer of shares 10

Transfer of assets 5

China

Luxembourg

Malaysia

Singapore

South Korea

Thailand

Vietnam

Income tax treaties for avoidance of double taxation

Note There is no definition of residence for tax purposes in Laos All companies registered under Lao law (including foreign law) are subject to Lao profit tax

Personal Income Tax Corporate Taxes

Data source DFDL

33

Foreign Investment Regulations

Data source JETRO Compiled by World Business Advisory Center

Not Permitted to Foreigner Only for Joint Venture with Local Company 100 Foreign Ownership Allowed

Wholesale and Retail Businesses

100 Foreign Ownership bull If registered capital is 20 billion Lao Kip

(USD 25 million) or more

Maximum 70 Foreign Ownership bull If registered capital is 10 - 20 billion Lao Kip

(USD 125 ndash 25 million)

Maximum 50 Foreign Ownership bull If registered capital is 4 - 10 billion Lao Kip

(USD 05 ndash 125 million)

bull If registered capital is less than 4 billion Lao Kip (USD 05 million)

Hotel and Restaurants Maximum 60 Foreign Ownership bull 3-5 stars hotel with minimum registered capital of

1 billion Lao Kip (USD 125000)

bull Less than 3 stars hotel 100 Foreign Ownership bull NOT ALLOWED

Logistics

100 Foreign Ownership bull Domestic goods transport with minimum

registered capital of 3 billion Lao Kip (USD 375000)

Maximum 49 Foreign Ownership bull Cross border goods transport with minimum

registered capital of 5 billion Lao Kip (USD 625000)

bull Cross border goods transport with less than 5 billion Lao Kip of registered capital

bull Domestic goods transport with less than 3 billion Lao Kip of registered capital

Examples of Foreign Investment Regulations

Foreign enterprises are subject to foreign investment regulations in several business activities Generally small businesses are preserved for Lao enterprises whereas large businesses with certain investment conditions are opened for foreign investors

34

Types of Investment ndash (1) General Business

Data source JETRO Compiled by World Business Advisory Center

Besides foreign investment regulation foreign enterprises are also subject to the investment promotion law which classifies investment into 3 types

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Investment in General Business

Types of Investment in Lao PDR

Description

o An investment in general economic activities

o Activities including controlled businesses ndash businesses that require additional approval from relevant ministries

o Activities excluding concession business

Register Capital

Requirements

o At least 1 billion Lao Kip (USD 125000)

o At the day of establishment must pay 40 (agriculture business) 60 (production and processing) 80 (services) The remainder must be paid within 1 year

Examples of Controlled Businesses 1 Agriculture plantation agriculture fishery 2 Manufacturing petroleum products leathers textile amp clothing papers

printing pesticides pharmaceutical products 3 Businesses related to environment eg wastewater treatment 4 Wholesale and retails of gasoline and petroleum products 5 Transportation 6 Hotel and Restaurant 7 Media and Publication 8 Finance and insurance 9 Legal accounting and tax services 10 Tourism 11 Education 12 Hospital clinic and medical services 13 Recreation (museum and amusement park)

35

Types of Investment ndash (2) Concession Business

Data source JETRO Compiled by World Business Advisory Center

Investment in Concession Business

Description

o An investment that requires a concession or specific authorization from the government to use the governmentrsquos property

o Some concession businesses requires authorization from the central government whereas the other requires only provincial government level of authorization for example

bull At least 5MW electricity generation project requires the central government authorization

bull Less than 5MW electricity generation projects requires only provincial government authorization

Examples of Concession Business

1 Mining 2 Electricity generation 3 Infrastructure

bull Telecommunication bull TV and radio station bull Road railway airport seaport waste disposal site

4 Businesses that use the government land bull Shopping center bull Tourist attraction bull Public park bull Hotel bull Forestry and Logging bull Plantation and Livestock

Register Capital

Requirements

o Must pay at least 20 of registered capital while remaining should be paid within 2 years

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Types of Investment in Lao PDR

36

Types of Investment ndash (3) Business Related to SEZ

Data source JETRO Compiled by World Business Advisory Center

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Types of Investment in Lao PDR

Investment in Business Related to SEZ

Description

o Business related to Special Economic Zone -gt an investment in building infrastructure for a new town

o Business related to Specific Economic Zone -gt an investment in infrastructure development for specific purpose projects such as industrial zone export zone tourist development zone etc

High Potential SEZs in Laos

o Vita Park Special Economic Zone (Vientiane)

o Savan-Seno Special Economic Zone (Savannakhet)

o Pakxe-Japan SME Specific Economic Zone (Champasak)

Special and Specific Economic Zones

1 Boten-Daenkham Specific Economic Zone 2 Luang Prabang Special Economic Zone 3 Golden Triangle Special Economic Zone 4 Thatluang Lake Specific Economic Zone 5 Longthanh Specific Economic Zone 6 Xaysettha Specific Economic Zone 7 Vita Park Special Economic Zone 8 Dongphosy Specific Economic Zone 9 Thakhek Specific Economic Zone 10 Poukiao Specific Economic Zone 11 Savan-Seno Special Economic Zone 12 Pakxe-Japan SME Specific Economic Zone

1

2

3

4

5 6

7

8

9 10

11

12

37

General Business

Concession Business

Business related to

SEZs

Procedure of Investment in Lao PDR

The investment approval procedure varies depending upon type of investment However all foreign investors must go through enterprise registration tax identification number registration and application for capital importation certificate

Apply at Ministry of Planning and

Investment

For developer apply at National Committee for Special Economic Zone

For investor apply at One-Stop Service Unit in

each SEZ

Get Concession

License

Get SEZ Concession

License

For controlled businesses apply for

approval at relevant Ministries

Get Approval License

Apply at Ministry of

Industry and Commerce

For non-controlled businesses

Get Enterprise

Registration Certificate

(ERC)

Apply for Tax

Identification Number TIN

at Tax Department Ministry of

Finance

Apply for Capital

Importation Certificate at Bank of Lao

PDR

Data source JETRO Compiled by World Business Advisory Center

38

Investment Tax Incentives ndash General Zone

Data source JETRO Compiled by World Business Advisory Center

Investment Tax Incentives in Lao PDR

Profit Tax Exemption Period

Level 1 High Promotion

Level 2 Moderate Promotion

Level 3 Low Promotion

Zone 1 10 years 6 years 4 years

Zone 2 6 years 4 years 2 years

Zone 3 4 years 2 years 1 years

Profit Tax Exemption Period by Promotion Sector and Zone

Promoted sectors Agriculture Industrial Handicrafts and Services

Type of Tax Exemption

General Zone Promotion Sector and Zone based Incentives 1 Special amp Specific Economic Zone

Tailor Made Incentives 2

Profit tax in next accounting year in case net profit is used for reinvestment (business

expansion)

Import duties for import of raw material equipment spare parts and

vehicles directly used for production

Export duties for general goods and

products (resource-based products should follow

associated laws)

Permission to carry forward losses to

three consecutive accounting years

39

Sector Period of

Profit Tax Exemption

Profit Tax Rate

After Tax Exemption Period

Hi-Tech Manufacturing 10 year 8

Manufacturing that exports at least 70 of production 10 year 8

Manufacturing that exports 30 - 60 of production 7 year 8

Manufacturing that exports 0 - 29 of production 5 year 8

Other 5 year 8

Investment amount of USD 2 million or more 10 year 8

Investment amount of USD 500000 - USD 2 million 8 year 8

Investment amount of USD 300000 - USD 500000 6 year 10

Investment amount of USD 150000 - USD 300000 4 year 10

Investment amount of USD 50000 - USD 150000 2 year 10

Export Laos products 5 year 10

International trade company 3 year 10

General trade company 2 year 10

a) Manufacturing

b) Service

c) Commerce

Personal Income Tax 5

Dividend Tax after Profit Tax Exemption Period

5

Import Duty Exemption for import of raw material equipment spare parts and

vehicles directly used for production

VAT Exemption for import products

Investment Tax Incentives ndash Special and Specific Economic Zone

Data source JETRO

Investment Tax Incentives in Lao PDR

General Zone Promotion Sector and Zone based Incentives 1 Special amp Specific Economic Zone

Tailor Made Incentives 2 Example of Tax Incentives in Savan-Seno SEZ

Other Tax Incentives

40

Non-Tax Incentives amp Trade Privileges

Data source JETRO

Non-Tax Incentives

Permission

Foreign nationals can undertake feasibility studies

Bring in foreign technicians experts and managers if qualified Lao nationals are not available

Lease land

General business up to 30 years from Lao citizen and up to 50 years from the government (renewable)

Investment in SEZ up to 75 years

Concession business upon negotiation with the government (at present there is an example of 99 years land lease)

Transfer leasehold interests and build on or make improvements or structures to a leased land

Guarantee against nationalization expropriation and requisition without compensation

Protection

Trade Privileges

ASEAN WTO GSP Bilateral trade agreement (over 18 countries)

o Argentina o Belarus o Bulgaria o Cambodia o China o Indonesia o India o Korea DPR o Kuwait

o Malaysia o Mongolia o Myanmar o Philippines o Russian

Federation o Thailand o Turkey o USA o Vietnam

41

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

42

Foreign Currency Exchange

Data source Bank of the Lao PDR

Laos Currency Kip (LAK)

Latest FX Rate (as of August 22 2018)

Remark THB and USD are widely accepted especially in the border trade area

USD 1 ~ LAK 8507

EUR 1 ~ LAK 9851

THB 1 ~ LAK 262

JPY 1 ~ LAK 77

CNY 1 ~ LAK 1193

43

KASIKORNTHAIBANK Service in Lao PDR

Retail Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Current deposit

Lending

Working capital loan

Long term loan

Bank guarantee

Project Financing

FX Services

Corporate Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Remittance

Remittance

Trade Finance Letter of Credit (LC) Standby Letter of Credit (SBLC)

44

KASIKORNTHAI BANK Limited

With establishment KASIKORNTHAIBANK

the first full-scale locally incorporated institution from Thailand is fully committed to support our clientsrsquo cross-border financing and transaction for their trade and investment activities in Lao PDR

45

KASIKORNTHAIBANK in Lao PDR Contacts

bull HEAD OFFICE Unit 12 Lane Xang Avenue Xiangngeun Village Chanthaboury District Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88905 Fax +856 21 253 336 wwwkasikornbankcomla

KASIKORNTHAI BANK Limited

bull PONESINUAN BRANCH

Ban Ponesinuan Unit 14 Sysattanak Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88826 Fax +856 21 410 889

Ms Piyanoot Sangsan Branch Manager KASIKORNTHAI BANK LIMITED Lane Xang Head Office E-mail piyanootskasikornbankcom

Mr Chatuporn Boozaya-Angool Branch Manager Ponesinuan Branch E-mail chatupornbkasikornbankcom

46

About AEC+ Business Advisory The AEC+ Business Advisory is set up by KASIKORNBANK to support businesses in their regional expansion across the ASEAN+3 market by providing local market intelligence and strategic business advice

What we do bull Offer customized and tailor-made advisory services bull Publish investment guides and industry reports bull Deliver in-depth insights via seminars bull Organize business trips to bring first-hand experience

Follow Us Visit our website at

AEC+ BUSINESS ADVISORY

Prepared by Mr Anoot Charoenkiattikul World Business Intelligence Specialist E-mail anootckasikornbankcom

httpswwwkasikornbankcominternational-businessenPagesHomeaspx

47

Page 12: LAO PDR - Facilitiesfuangfah.econ.cmu.ac.th/teacher/nisit/files/201808_LaoPDR_Investm… · • On August 7, the government of Laos announced the suspension of new hydropower project

12

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

13

Key Industries and Opportunities

With rapid improvement in logistics infrastructure rich natural resources ample arable areas and cultural sites Lao PDR offers attractive opportunities for investments in the sectors of mining electronic parts and components industrial agriculture and tourism

TOURISM

ELECTRONIC PARTS AND COMPONENTS

MINING

INDUSTRIAL AGRICULTURE

HYDROPOWER

Temporarily Suspended

14

HYDROPOWER

Key Industries amp Opportunities

15

Hydropowerndash Overview

Hydropower exports in Lao PDR surged in 2017 The key destinations are Thailand Cambodia and Vietnam

Data source KResearch the Ministry of Energy and Mines

Total 29125

Magawatts

Number of Hydropower Plants

OPERATING

46

UNDER CONSTRUCTION

143

PENDING APPROVAL

246

Installed Capacities of Hydropower Plants in Lao PDR (Megawatts (MW) as of 2017)

Key Trends

Battery of Southeast Asia bull Due to Southeast Asiarsquos development toward industrialization there

remains a large demand gap for infrastructure support as well as growing demand for electricity to be met in the future

bull Thus Lao PDR with abundant natural resources for electricity generation aims to improve its energy sector to address this energy supply issue and position the country as a key exporter of energy in ASEAN

Lao PDR Electricity Exports

bull Lao PDRrsquos electricity exports have grown 15 annually since 2012

bull Electricity accounts for 24 of Lao PDR total exports

bull Thailand Cambodia and Vietnam are key export destinations with Thailand being the largest buyer

16

Hydropowerndash Opportunity

Lao PDR has ldquosuspendedrdquo new investment in hydropower projects and will conduct safety inspections for all existing dams due to the dam collapse incident in July

Data source laotiantimescom asianewsnetwork

The dam collapse in late July has caused Lao PDR to suspend new investment in hydropower projects in the country

bull On July 23 the ldquoSaddle Dam Drdquo part of the Xe-Pian Xe-Namnoy hydropower project in Champasak and Attapeu provinces has collapsed This disaster had affected around 5000 people in the area

bull On August 7 the government of Laos announced the suspension of new hydropower project approval and the renewed inspection of the existing dams

Key Policy Updates

2018 June

2018 August

The Lao government has suspended new investment in small-scale hydropower projects due to safety concerns

bull Lao PDR announced a temporary suspension of its authorization for investment in small-scale hydropower projects with installed capacity of lt15MW Such suspension is part of the governmentrsquos attempts to ensure the safety of hydropower dams

bull As a result the provincial and central authorities cannot approve new investment proposals for small-scale hydropower projects until concrete measures to ensure dam safety are drawn up

bull The suspension comes after construction of some projects has been found to be lower than the legally stipulated safety standards

17

Mining

Key Industries amp Opportunities

18

Mining ndash Overview

The mining Industry in Lao PDR has declined over the past several years due to fluctuations in global commodity prices and the maturity of some local mines

Data source International Trade Center worldbank

Lao PDR Mining Product Exports (USD Million 2017E)

Precious Stone Exports (USD Million 2017E)

DIAMOND

62 GOLD

1548 SILVER

54

Key Trends

Overall Lao PDRrsquos mining exports have decreased bull Exports of mining products have decreased since 2013 at an average

rate of 147 falling from USD1014 million in 2013 to USD 4575 in 2017

bull Copper and Coal experience the largest decline in export value mainly because some of the copper and coal mines have matured and global commodity prices have fallen

bull Meanwhile cement and sandstone record the highest increase in export value resulting from new investments and increasing domestic demand for these types of materials to use in the countryrsquos infrastructure development projects

Forms of investment in mining Business cooperation under contract

Joint venture between foreign and local firms

100 foreign or domestic ownership

Remark Firms could set up representative office to gather information and investigate investment opportunities

19

Taxes amp Regulations

Mining ndash Opportunity

Mineral resources in Lao PDR offer opportunities to firms with expertise in mining operations from prospection to mining and processing

Prospection Exploration Feasibility Study

Construction Mining amp Processing

2 years + 1 year

3 years + 2 years

1 year + 1 year

2 years + 1 year

20 years + 5 years

License Duration + Renewable

USD 3 -12 ha year USD 05 ndash 1 ha year + royalty (1-

7) Rental Fee

Registered company

Max 300 sqkm Corporate income 25-35

Value added 10

Rules and regulations for the Minerals Law in accordance to international standard partly missing

Limited number and capacity of local workers in mining sector

High number of mineral trade companies rather than professional mining operations firms

Key Issues

20

Electronic Parts and Components Industry

Key Industries amp Opportunities

21

Electronic Parts and Components Industry - Overview

Over the recent years Laos has experienced exponential growth in its exports of electronic parts and components especially to Thailand indicating the initial formation of the regional supply chain

Lao PDR Electronic Part and Component Exports (USD Million 2017)

Increasing investments in Lao PDR Special Economic Zone (SEZ) boosts trade The presence of SEZs and attractive incentives have attracted FDI inflows into Lao PDR especially in the production of digital camera parts and telecom equipment parts Most manufacturing in these sectors is aimed at exporting intermediate products to assemblers of finished electrical and electronic products in other countries

Main Export Destinations 2017

Data source International Trade Center

Why Thailand has become the top export destination

bull ASEAN Free Trade Agreement (AFTA) ndash The agreement minimizes trade barriers and creates free flow of goods and capital within ASEAN

bull Thailand-based industries shift their focus on value added activities - firms relocate labor-intensive activities to Thailandrsquos neighboring countries including Laos

22

Electronic Parts and Components Industry - Opportunity

Industrial development in Laos offers opportunities for firms to form the regional supply chain model and benefit from comparative advantages from both nations

Data source JETRO

Thailand

Product supply chain

Laos

Did you knowhellip

Challenges

Difficulty in getting large pools of labor due to small population

Underdeveloped infrastructure in some regions

Challenge in recruiting higher skilled specialists

Suggestion Set up in major Special Economic Zones eg Vita Park SEZ and Savan-Seno SEZ

Roll out strategic human resource plan including training and capacity building

bull Advanced infrastructure

bull Experienced and high-skilled (management level) workforce

bull Affordable and youthful workforce bull Located between Vietnam and Thailand

both with high electronics parts demand bull Government incentives

Start operation from small scale (less than 500 workers) then scale up

Japanese enterprises have started implementing Thailand+1 model by relocating labor-intensive production to Laos and exporting back to Thailand to complete product assembly eg NIKON (digital camera) Dai-Ichi Denshi (wire harness) Nissei Mizuki (electronics parts) and Toyota boshoku (car seat cover)

Thailand + 1 Model

23

Industrial Agriculture

Key Industries amp Opportunities

24

Industrial Agriculture - Overview

Most industrial agriculture exports from Lao PDR are produced by foreign investors (Chinese Thai and Vietnamese) and local entrepreneurs to a lesser extent

Data source JETRO International Trade Center Produce Report USDA Foreign Agriculture Service

Leading Agricultural Exports by export value (USD Million 2016 and 2017)

A short-term drop in fruit exports in 2017 bull Exports declined because the Lao government suspended

development of large banana and other fruit plantations which typically produce to export to China and placed more stringent control on polluting farms

bull However at the end of 2017 Lao PDR and China negotiated for less stringent terms for Lao PDRrsquos fruit exports to China

Key Trends

Sugar Cane exports rocketing bull In 2017 sugar cane plantation boomed Export volume grew 121

times from 2016

bull The major reason was the relocation of sugar production from China as production costs there are very high approximately double that of Thailand

Organic fruit and vegetable becoming key economic plants bull Local and foreign investors are increasingly investing in organic

agriculture a higher value-added segment which is demanded by major countries such as Europe US Japan and China

Exports (2016)

USD 02 Million

Exports (2017)

USD 20 Million

121 times

25

Industrial Agriculture - Opportunity

Lao industrial agriculture sector offers opportunities for

bull Agricultural inputs andmachinery producers and distributors

bull Plantation operators

bull Processing and trading firms in Thailand

3 Processing and Trading

Key Drivers Lack of capability to process

products at international standard

Lack of market access

Opportunities Market inputs and machinery

to agricultural projects Investor can target both large scale investment

and smallholder farmers

Opportunities Produce high-value agricultural

products organic products herbs and medical plants

Foreign investors operate via (1) contract farming and (2) concession

Opportunities Process raw products to meet

export standards trade products to leverage existing market channels

Agricultural Inputs and Machinery

Key Drivers Limited access to improved

agricultural inputs - Seed - Fertilizer - Quality machinery

1 2

Key Drivers Arable fertile land

low level of chemical pesticides

Plantation ndash High Value Products

26

Tourism

Key Industries amp Opportunities

27

Tourism - Overview

Tourist arrivals are on a steady rise in the past decade especially tourists from Asia Pacific with most of them visiting more developed border towns neighboring Thailand

Data source Ministry of Tourism TRAVEL amp TOURISM ECONOMIC IMPACT 2018 LAOS

Direct Contribution of Travel amp Tourism to GDP (USD Billion 2012-2018E)

bull Both tourist arrivals and revenue from tourism have increased approximately 3 folds in the past decade

bull Most tourists come from Asia Pacific (93) particularly from from Thailand (50) and Vietnam (25) followed by Europe (5)

Top Tourist Arrivals Destinations 2017

1 Vientiane Capital

2 Savannakhet

3 Champasak

Most top tourist destinations are more developed towns bordering Thailand

Nong Khai

Mukdahan

Ubon Ratchathani

World Heritage sites im these following city also attract a considerable number of visitors

Luang Prabang Wat Pu at Champasak

28

Business Opportunities Associated to Tourism Sector

Accommodate increasing tourist arrivals

Provide dining and entertainment services

Develop attractive ecotourism cultural tourism packages

Provide transportation services linking major tourism sites

Produce and market souvenirs applying local arts design and materials

1 Hotel Restaurant Entertainment

2 Tour Company Holiday Package

3 Sourvenirs

4 Transportation Service

Tourism - Opportunity

29

Lao Consumer Income and Behavior

Prefer to cook at home Enjoy drinking alcohol Middle income enjoy

spending evening in beer garden

Lao women wear sinh Follow Thai and Korean

fashion due to influence of TV series

Shop at traditional markets Middle income shop at

Thai border towns (Nong Khai Udon Thani)

Thai and Japanese products are perceived to have high quality Chinese products are perceived as sub-standard quality and Korean products are in between

30

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

31

Major Costs ndash Labor and Utility

Electricity Rate 2017

0 - 25 kwh 004USDkwh

26 - 150 kwh 005USDkwh

151 - 300 kwh 009USDkwh

more than 500 kwh 012USDkwh

301 - 400 kwh 010USDkwh

401 - 500 kwh 011USDkwh

Water Price (Per Unit) for Business and Trade Units

bull Water price for businesses is set to increase from USD USD 036 in 2017 to USD038 per unit this year

Labor minimum monthly wage in ASEAN 2017 USD

32

Tax System

Monthly Income (LAK) Tax Rate

0 ndash 1000000 0

1000001 - 3000000 5

3000001 - 6000000 10

6000001 - 12000000 12

12000001 - 24000000 15

24000001 - 40000000 20

Above 40000000 24

Types of Tax Tax rate

Profit Tax 24

Value Added Tax (VAT) 10

Withholding Tax Dividends 10

(non-residents) Transfer of shares 10

Transfer of assets 5

China

Luxembourg

Malaysia

Singapore

South Korea

Thailand

Vietnam

Income tax treaties for avoidance of double taxation

Note There is no definition of residence for tax purposes in Laos All companies registered under Lao law (including foreign law) are subject to Lao profit tax

Personal Income Tax Corporate Taxes

Data source DFDL

33

Foreign Investment Regulations

Data source JETRO Compiled by World Business Advisory Center

Not Permitted to Foreigner Only for Joint Venture with Local Company 100 Foreign Ownership Allowed

Wholesale and Retail Businesses

100 Foreign Ownership bull If registered capital is 20 billion Lao Kip

(USD 25 million) or more

Maximum 70 Foreign Ownership bull If registered capital is 10 - 20 billion Lao Kip

(USD 125 ndash 25 million)

Maximum 50 Foreign Ownership bull If registered capital is 4 - 10 billion Lao Kip

(USD 05 ndash 125 million)

bull If registered capital is less than 4 billion Lao Kip (USD 05 million)

Hotel and Restaurants Maximum 60 Foreign Ownership bull 3-5 stars hotel with minimum registered capital of

1 billion Lao Kip (USD 125000)

bull Less than 3 stars hotel 100 Foreign Ownership bull NOT ALLOWED

Logistics

100 Foreign Ownership bull Domestic goods transport with minimum

registered capital of 3 billion Lao Kip (USD 375000)

Maximum 49 Foreign Ownership bull Cross border goods transport with minimum

registered capital of 5 billion Lao Kip (USD 625000)

bull Cross border goods transport with less than 5 billion Lao Kip of registered capital

bull Domestic goods transport with less than 3 billion Lao Kip of registered capital

Examples of Foreign Investment Regulations

Foreign enterprises are subject to foreign investment regulations in several business activities Generally small businesses are preserved for Lao enterprises whereas large businesses with certain investment conditions are opened for foreign investors

34

Types of Investment ndash (1) General Business

Data source JETRO Compiled by World Business Advisory Center

Besides foreign investment regulation foreign enterprises are also subject to the investment promotion law which classifies investment into 3 types

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Investment in General Business

Types of Investment in Lao PDR

Description

o An investment in general economic activities

o Activities including controlled businesses ndash businesses that require additional approval from relevant ministries

o Activities excluding concession business

Register Capital

Requirements

o At least 1 billion Lao Kip (USD 125000)

o At the day of establishment must pay 40 (agriculture business) 60 (production and processing) 80 (services) The remainder must be paid within 1 year

Examples of Controlled Businesses 1 Agriculture plantation agriculture fishery 2 Manufacturing petroleum products leathers textile amp clothing papers

printing pesticides pharmaceutical products 3 Businesses related to environment eg wastewater treatment 4 Wholesale and retails of gasoline and petroleum products 5 Transportation 6 Hotel and Restaurant 7 Media and Publication 8 Finance and insurance 9 Legal accounting and tax services 10 Tourism 11 Education 12 Hospital clinic and medical services 13 Recreation (museum and amusement park)

35

Types of Investment ndash (2) Concession Business

Data source JETRO Compiled by World Business Advisory Center

Investment in Concession Business

Description

o An investment that requires a concession or specific authorization from the government to use the governmentrsquos property

o Some concession businesses requires authorization from the central government whereas the other requires only provincial government level of authorization for example

bull At least 5MW electricity generation project requires the central government authorization

bull Less than 5MW electricity generation projects requires only provincial government authorization

Examples of Concession Business

1 Mining 2 Electricity generation 3 Infrastructure

bull Telecommunication bull TV and radio station bull Road railway airport seaport waste disposal site

4 Businesses that use the government land bull Shopping center bull Tourist attraction bull Public park bull Hotel bull Forestry and Logging bull Plantation and Livestock

Register Capital

Requirements

o Must pay at least 20 of registered capital while remaining should be paid within 2 years

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Types of Investment in Lao PDR

36

Types of Investment ndash (3) Business Related to SEZ

Data source JETRO Compiled by World Business Advisory Center

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Types of Investment in Lao PDR

Investment in Business Related to SEZ

Description

o Business related to Special Economic Zone -gt an investment in building infrastructure for a new town

o Business related to Specific Economic Zone -gt an investment in infrastructure development for specific purpose projects such as industrial zone export zone tourist development zone etc

High Potential SEZs in Laos

o Vita Park Special Economic Zone (Vientiane)

o Savan-Seno Special Economic Zone (Savannakhet)

o Pakxe-Japan SME Specific Economic Zone (Champasak)

Special and Specific Economic Zones

1 Boten-Daenkham Specific Economic Zone 2 Luang Prabang Special Economic Zone 3 Golden Triangle Special Economic Zone 4 Thatluang Lake Specific Economic Zone 5 Longthanh Specific Economic Zone 6 Xaysettha Specific Economic Zone 7 Vita Park Special Economic Zone 8 Dongphosy Specific Economic Zone 9 Thakhek Specific Economic Zone 10 Poukiao Specific Economic Zone 11 Savan-Seno Special Economic Zone 12 Pakxe-Japan SME Specific Economic Zone

1

2

3

4

5 6

7

8

9 10

11

12

37

General Business

Concession Business

Business related to

SEZs

Procedure of Investment in Lao PDR

The investment approval procedure varies depending upon type of investment However all foreign investors must go through enterprise registration tax identification number registration and application for capital importation certificate

Apply at Ministry of Planning and

Investment

For developer apply at National Committee for Special Economic Zone

For investor apply at One-Stop Service Unit in

each SEZ

Get Concession

License

Get SEZ Concession

License

For controlled businesses apply for

approval at relevant Ministries

Get Approval License

Apply at Ministry of

Industry and Commerce

For non-controlled businesses

Get Enterprise

Registration Certificate

(ERC)

Apply for Tax

Identification Number TIN

at Tax Department Ministry of

Finance

Apply for Capital

Importation Certificate at Bank of Lao

PDR

Data source JETRO Compiled by World Business Advisory Center

38

Investment Tax Incentives ndash General Zone

Data source JETRO Compiled by World Business Advisory Center

Investment Tax Incentives in Lao PDR

Profit Tax Exemption Period

Level 1 High Promotion

Level 2 Moderate Promotion

Level 3 Low Promotion

Zone 1 10 years 6 years 4 years

Zone 2 6 years 4 years 2 years

Zone 3 4 years 2 years 1 years

Profit Tax Exemption Period by Promotion Sector and Zone

Promoted sectors Agriculture Industrial Handicrafts and Services

Type of Tax Exemption

General Zone Promotion Sector and Zone based Incentives 1 Special amp Specific Economic Zone

Tailor Made Incentives 2

Profit tax in next accounting year in case net profit is used for reinvestment (business

expansion)

Import duties for import of raw material equipment spare parts and

vehicles directly used for production

Export duties for general goods and

products (resource-based products should follow

associated laws)

Permission to carry forward losses to

three consecutive accounting years

39

Sector Period of

Profit Tax Exemption

Profit Tax Rate

After Tax Exemption Period

Hi-Tech Manufacturing 10 year 8

Manufacturing that exports at least 70 of production 10 year 8

Manufacturing that exports 30 - 60 of production 7 year 8

Manufacturing that exports 0 - 29 of production 5 year 8

Other 5 year 8

Investment amount of USD 2 million or more 10 year 8

Investment amount of USD 500000 - USD 2 million 8 year 8

Investment amount of USD 300000 - USD 500000 6 year 10

Investment amount of USD 150000 - USD 300000 4 year 10

Investment amount of USD 50000 - USD 150000 2 year 10

Export Laos products 5 year 10

International trade company 3 year 10

General trade company 2 year 10

a) Manufacturing

b) Service

c) Commerce

Personal Income Tax 5

Dividend Tax after Profit Tax Exemption Period

5

Import Duty Exemption for import of raw material equipment spare parts and

vehicles directly used for production

VAT Exemption for import products

Investment Tax Incentives ndash Special and Specific Economic Zone

Data source JETRO

Investment Tax Incentives in Lao PDR

General Zone Promotion Sector and Zone based Incentives 1 Special amp Specific Economic Zone

Tailor Made Incentives 2 Example of Tax Incentives in Savan-Seno SEZ

Other Tax Incentives

40

Non-Tax Incentives amp Trade Privileges

Data source JETRO

Non-Tax Incentives

Permission

Foreign nationals can undertake feasibility studies

Bring in foreign technicians experts and managers if qualified Lao nationals are not available

Lease land

General business up to 30 years from Lao citizen and up to 50 years from the government (renewable)

Investment in SEZ up to 75 years

Concession business upon negotiation with the government (at present there is an example of 99 years land lease)

Transfer leasehold interests and build on or make improvements or structures to a leased land

Guarantee against nationalization expropriation and requisition without compensation

Protection

Trade Privileges

ASEAN WTO GSP Bilateral trade agreement (over 18 countries)

o Argentina o Belarus o Bulgaria o Cambodia o China o Indonesia o India o Korea DPR o Kuwait

o Malaysia o Mongolia o Myanmar o Philippines o Russian

Federation o Thailand o Turkey o USA o Vietnam

41

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

42

Foreign Currency Exchange

Data source Bank of the Lao PDR

Laos Currency Kip (LAK)

Latest FX Rate (as of August 22 2018)

Remark THB and USD are widely accepted especially in the border trade area

USD 1 ~ LAK 8507

EUR 1 ~ LAK 9851

THB 1 ~ LAK 262

JPY 1 ~ LAK 77

CNY 1 ~ LAK 1193

43

KASIKORNTHAIBANK Service in Lao PDR

Retail Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Current deposit

Lending

Working capital loan

Long term loan

Bank guarantee

Project Financing

FX Services

Corporate Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Remittance

Remittance

Trade Finance Letter of Credit (LC) Standby Letter of Credit (SBLC)

44

KASIKORNTHAI BANK Limited

With establishment KASIKORNTHAIBANK

the first full-scale locally incorporated institution from Thailand is fully committed to support our clientsrsquo cross-border financing and transaction for their trade and investment activities in Lao PDR

45

KASIKORNTHAIBANK in Lao PDR Contacts

bull HEAD OFFICE Unit 12 Lane Xang Avenue Xiangngeun Village Chanthaboury District Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88905 Fax +856 21 253 336 wwwkasikornbankcomla

KASIKORNTHAI BANK Limited

bull PONESINUAN BRANCH

Ban Ponesinuan Unit 14 Sysattanak Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88826 Fax +856 21 410 889

Ms Piyanoot Sangsan Branch Manager KASIKORNTHAI BANK LIMITED Lane Xang Head Office E-mail piyanootskasikornbankcom

Mr Chatuporn Boozaya-Angool Branch Manager Ponesinuan Branch E-mail chatupornbkasikornbankcom

46

About AEC+ Business Advisory The AEC+ Business Advisory is set up by KASIKORNBANK to support businesses in their regional expansion across the ASEAN+3 market by providing local market intelligence and strategic business advice

What we do bull Offer customized and tailor-made advisory services bull Publish investment guides and industry reports bull Deliver in-depth insights via seminars bull Organize business trips to bring first-hand experience

Follow Us Visit our website at

AEC+ BUSINESS ADVISORY

Prepared by Mr Anoot Charoenkiattikul World Business Intelligence Specialist E-mail anootckasikornbankcom

httpswwwkasikornbankcominternational-businessenPagesHomeaspx

47

Page 13: LAO PDR - Facilitiesfuangfah.econ.cmu.ac.th/teacher/nisit/files/201808_LaoPDR_Investm… · • On August 7, the government of Laos announced the suspension of new hydropower project

13

Key Industries and Opportunities

With rapid improvement in logistics infrastructure rich natural resources ample arable areas and cultural sites Lao PDR offers attractive opportunities for investments in the sectors of mining electronic parts and components industrial agriculture and tourism

TOURISM

ELECTRONIC PARTS AND COMPONENTS

MINING

INDUSTRIAL AGRICULTURE

HYDROPOWER

Temporarily Suspended

14

HYDROPOWER

Key Industries amp Opportunities

15

Hydropowerndash Overview

Hydropower exports in Lao PDR surged in 2017 The key destinations are Thailand Cambodia and Vietnam

Data source KResearch the Ministry of Energy and Mines

Total 29125

Magawatts

Number of Hydropower Plants

OPERATING

46

UNDER CONSTRUCTION

143

PENDING APPROVAL

246

Installed Capacities of Hydropower Plants in Lao PDR (Megawatts (MW) as of 2017)

Key Trends

Battery of Southeast Asia bull Due to Southeast Asiarsquos development toward industrialization there

remains a large demand gap for infrastructure support as well as growing demand for electricity to be met in the future

bull Thus Lao PDR with abundant natural resources for electricity generation aims to improve its energy sector to address this energy supply issue and position the country as a key exporter of energy in ASEAN

Lao PDR Electricity Exports

bull Lao PDRrsquos electricity exports have grown 15 annually since 2012

bull Electricity accounts for 24 of Lao PDR total exports

bull Thailand Cambodia and Vietnam are key export destinations with Thailand being the largest buyer

16

Hydropowerndash Opportunity

Lao PDR has ldquosuspendedrdquo new investment in hydropower projects and will conduct safety inspections for all existing dams due to the dam collapse incident in July

Data source laotiantimescom asianewsnetwork

The dam collapse in late July has caused Lao PDR to suspend new investment in hydropower projects in the country

bull On July 23 the ldquoSaddle Dam Drdquo part of the Xe-Pian Xe-Namnoy hydropower project in Champasak and Attapeu provinces has collapsed This disaster had affected around 5000 people in the area

bull On August 7 the government of Laos announced the suspension of new hydropower project approval and the renewed inspection of the existing dams

Key Policy Updates

2018 June

2018 August

The Lao government has suspended new investment in small-scale hydropower projects due to safety concerns

bull Lao PDR announced a temporary suspension of its authorization for investment in small-scale hydropower projects with installed capacity of lt15MW Such suspension is part of the governmentrsquos attempts to ensure the safety of hydropower dams

bull As a result the provincial and central authorities cannot approve new investment proposals for small-scale hydropower projects until concrete measures to ensure dam safety are drawn up

bull The suspension comes after construction of some projects has been found to be lower than the legally stipulated safety standards

17

Mining

Key Industries amp Opportunities

18

Mining ndash Overview

The mining Industry in Lao PDR has declined over the past several years due to fluctuations in global commodity prices and the maturity of some local mines

Data source International Trade Center worldbank

Lao PDR Mining Product Exports (USD Million 2017E)

Precious Stone Exports (USD Million 2017E)

DIAMOND

62 GOLD

1548 SILVER

54

Key Trends

Overall Lao PDRrsquos mining exports have decreased bull Exports of mining products have decreased since 2013 at an average

rate of 147 falling from USD1014 million in 2013 to USD 4575 in 2017

bull Copper and Coal experience the largest decline in export value mainly because some of the copper and coal mines have matured and global commodity prices have fallen

bull Meanwhile cement and sandstone record the highest increase in export value resulting from new investments and increasing domestic demand for these types of materials to use in the countryrsquos infrastructure development projects

Forms of investment in mining Business cooperation under contract

Joint venture between foreign and local firms

100 foreign or domestic ownership

Remark Firms could set up representative office to gather information and investigate investment opportunities

19

Taxes amp Regulations

Mining ndash Opportunity

Mineral resources in Lao PDR offer opportunities to firms with expertise in mining operations from prospection to mining and processing

Prospection Exploration Feasibility Study

Construction Mining amp Processing

2 years + 1 year

3 years + 2 years

1 year + 1 year

2 years + 1 year

20 years + 5 years

License Duration + Renewable

USD 3 -12 ha year USD 05 ndash 1 ha year + royalty (1-

7) Rental Fee

Registered company

Max 300 sqkm Corporate income 25-35

Value added 10

Rules and regulations for the Minerals Law in accordance to international standard partly missing

Limited number and capacity of local workers in mining sector

High number of mineral trade companies rather than professional mining operations firms

Key Issues

20

Electronic Parts and Components Industry

Key Industries amp Opportunities

21

Electronic Parts and Components Industry - Overview

Over the recent years Laos has experienced exponential growth in its exports of electronic parts and components especially to Thailand indicating the initial formation of the regional supply chain

Lao PDR Electronic Part and Component Exports (USD Million 2017)

Increasing investments in Lao PDR Special Economic Zone (SEZ) boosts trade The presence of SEZs and attractive incentives have attracted FDI inflows into Lao PDR especially in the production of digital camera parts and telecom equipment parts Most manufacturing in these sectors is aimed at exporting intermediate products to assemblers of finished electrical and electronic products in other countries

Main Export Destinations 2017

Data source International Trade Center

Why Thailand has become the top export destination

bull ASEAN Free Trade Agreement (AFTA) ndash The agreement minimizes trade barriers and creates free flow of goods and capital within ASEAN

bull Thailand-based industries shift their focus on value added activities - firms relocate labor-intensive activities to Thailandrsquos neighboring countries including Laos

22

Electronic Parts and Components Industry - Opportunity

Industrial development in Laos offers opportunities for firms to form the regional supply chain model and benefit from comparative advantages from both nations

Data source JETRO

Thailand

Product supply chain

Laos

Did you knowhellip

Challenges

Difficulty in getting large pools of labor due to small population

Underdeveloped infrastructure in some regions

Challenge in recruiting higher skilled specialists

Suggestion Set up in major Special Economic Zones eg Vita Park SEZ and Savan-Seno SEZ

Roll out strategic human resource plan including training and capacity building

bull Advanced infrastructure

bull Experienced and high-skilled (management level) workforce

bull Affordable and youthful workforce bull Located between Vietnam and Thailand

both with high electronics parts demand bull Government incentives

Start operation from small scale (less than 500 workers) then scale up

Japanese enterprises have started implementing Thailand+1 model by relocating labor-intensive production to Laos and exporting back to Thailand to complete product assembly eg NIKON (digital camera) Dai-Ichi Denshi (wire harness) Nissei Mizuki (electronics parts) and Toyota boshoku (car seat cover)

Thailand + 1 Model

23

Industrial Agriculture

Key Industries amp Opportunities

24

Industrial Agriculture - Overview

Most industrial agriculture exports from Lao PDR are produced by foreign investors (Chinese Thai and Vietnamese) and local entrepreneurs to a lesser extent

Data source JETRO International Trade Center Produce Report USDA Foreign Agriculture Service

Leading Agricultural Exports by export value (USD Million 2016 and 2017)

A short-term drop in fruit exports in 2017 bull Exports declined because the Lao government suspended

development of large banana and other fruit plantations which typically produce to export to China and placed more stringent control on polluting farms

bull However at the end of 2017 Lao PDR and China negotiated for less stringent terms for Lao PDRrsquos fruit exports to China

Key Trends

Sugar Cane exports rocketing bull In 2017 sugar cane plantation boomed Export volume grew 121

times from 2016

bull The major reason was the relocation of sugar production from China as production costs there are very high approximately double that of Thailand

Organic fruit and vegetable becoming key economic plants bull Local and foreign investors are increasingly investing in organic

agriculture a higher value-added segment which is demanded by major countries such as Europe US Japan and China

Exports (2016)

USD 02 Million

Exports (2017)

USD 20 Million

121 times

25

Industrial Agriculture - Opportunity

Lao industrial agriculture sector offers opportunities for

bull Agricultural inputs andmachinery producers and distributors

bull Plantation operators

bull Processing and trading firms in Thailand

3 Processing and Trading

Key Drivers Lack of capability to process

products at international standard

Lack of market access

Opportunities Market inputs and machinery

to agricultural projects Investor can target both large scale investment

and smallholder farmers

Opportunities Produce high-value agricultural

products organic products herbs and medical plants

Foreign investors operate via (1) contract farming and (2) concession

Opportunities Process raw products to meet

export standards trade products to leverage existing market channels

Agricultural Inputs and Machinery

Key Drivers Limited access to improved

agricultural inputs - Seed - Fertilizer - Quality machinery

1 2

Key Drivers Arable fertile land

low level of chemical pesticides

Plantation ndash High Value Products

26

Tourism

Key Industries amp Opportunities

27

Tourism - Overview

Tourist arrivals are on a steady rise in the past decade especially tourists from Asia Pacific with most of them visiting more developed border towns neighboring Thailand

Data source Ministry of Tourism TRAVEL amp TOURISM ECONOMIC IMPACT 2018 LAOS

Direct Contribution of Travel amp Tourism to GDP (USD Billion 2012-2018E)

bull Both tourist arrivals and revenue from tourism have increased approximately 3 folds in the past decade

bull Most tourists come from Asia Pacific (93) particularly from from Thailand (50) and Vietnam (25) followed by Europe (5)

Top Tourist Arrivals Destinations 2017

1 Vientiane Capital

2 Savannakhet

3 Champasak

Most top tourist destinations are more developed towns bordering Thailand

Nong Khai

Mukdahan

Ubon Ratchathani

World Heritage sites im these following city also attract a considerable number of visitors

Luang Prabang Wat Pu at Champasak

28

Business Opportunities Associated to Tourism Sector

Accommodate increasing tourist arrivals

Provide dining and entertainment services

Develop attractive ecotourism cultural tourism packages

Provide transportation services linking major tourism sites

Produce and market souvenirs applying local arts design and materials

1 Hotel Restaurant Entertainment

2 Tour Company Holiday Package

3 Sourvenirs

4 Transportation Service

Tourism - Opportunity

29

Lao Consumer Income and Behavior

Prefer to cook at home Enjoy drinking alcohol Middle income enjoy

spending evening in beer garden

Lao women wear sinh Follow Thai and Korean

fashion due to influence of TV series

Shop at traditional markets Middle income shop at

Thai border towns (Nong Khai Udon Thani)

Thai and Japanese products are perceived to have high quality Chinese products are perceived as sub-standard quality and Korean products are in between

30

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

31

Major Costs ndash Labor and Utility

Electricity Rate 2017

0 - 25 kwh 004USDkwh

26 - 150 kwh 005USDkwh

151 - 300 kwh 009USDkwh

more than 500 kwh 012USDkwh

301 - 400 kwh 010USDkwh

401 - 500 kwh 011USDkwh

Water Price (Per Unit) for Business and Trade Units

bull Water price for businesses is set to increase from USD USD 036 in 2017 to USD038 per unit this year

Labor minimum monthly wage in ASEAN 2017 USD

32

Tax System

Monthly Income (LAK) Tax Rate

0 ndash 1000000 0

1000001 - 3000000 5

3000001 - 6000000 10

6000001 - 12000000 12

12000001 - 24000000 15

24000001 - 40000000 20

Above 40000000 24

Types of Tax Tax rate

Profit Tax 24

Value Added Tax (VAT) 10

Withholding Tax Dividends 10

(non-residents) Transfer of shares 10

Transfer of assets 5

China

Luxembourg

Malaysia

Singapore

South Korea

Thailand

Vietnam

Income tax treaties for avoidance of double taxation

Note There is no definition of residence for tax purposes in Laos All companies registered under Lao law (including foreign law) are subject to Lao profit tax

Personal Income Tax Corporate Taxes

Data source DFDL

33

Foreign Investment Regulations

Data source JETRO Compiled by World Business Advisory Center

Not Permitted to Foreigner Only for Joint Venture with Local Company 100 Foreign Ownership Allowed

Wholesale and Retail Businesses

100 Foreign Ownership bull If registered capital is 20 billion Lao Kip

(USD 25 million) or more

Maximum 70 Foreign Ownership bull If registered capital is 10 - 20 billion Lao Kip

(USD 125 ndash 25 million)

Maximum 50 Foreign Ownership bull If registered capital is 4 - 10 billion Lao Kip

(USD 05 ndash 125 million)

bull If registered capital is less than 4 billion Lao Kip (USD 05 million)

Hotel and Restaurants Maximum 60 Foreign Ownership bull 3-5 stars hotel with minimum registered capital of

1 billion Lao Kip (USD 125000)

bull Less than 3 stars hotel 100 Foreign Ownership bull NOT ALLOWED

Logistics

100 Foreign Ownership bull Domestic goods transport with minimum

registered capital of 3 billion Lao Kip (USD 375000)

Maximum 49 Foreign Ownership bull Cross border goods transport with minimum

registered capital of 5 billion Lao Kip (USD 625000)

bull Cross border goods transport with less than 5 billion Lao Kip of registered capital

bull Domestic goods transport with less than 3 billion Lao Kip of registered capital

Examples of Foreign Investment Regulations

Foreign enterprises are subject to foreign investment regulations in several business activities Generally small businesses are preserved for Lao enterprises whereas large businesses with certain investment conditions are opened for foreign investors

34

Types of Investment ndash (1) General Business

Data source JETRO Compiled by World Business Advisory Center

Besides foreign investment regulation foreign enterprises are also subject to the investment promotion law which classifies investment into 3 types

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Investment in General Business

Types of Investment in Lao PDR

Description

o An investment in general economic activities

o Activities including controlled businesses ndash businesses that require additional approval from relevant ministries

o Activities excluding concession business

Register Capital

Requirements

o At least 1 billion Lao Kip (USD 125000)

o At the day of establishment must pay 40 (agriculture business) 60 (production and processing) 80 (services) The remainder must be paid within 1 year

Examples of Controlled Businesses 1 Agriculture plantation agriculture fishery 2 Manufacturing petroleum products leathers textile amp clothing papers

printing pesticides pharmaceutical products 3 Businesses related to environment eg wastewater treatment 4 Wholesale and retails of gasoline and petroleum products 5 Transportation 6 Hotel and Restaurant 7 Media and Publication 8 Finance and insurance 9 Legal accounting and tax services 10 Tourism 11 Education 12 Hospital clinic and medical services 13 Recreation (museum and amusement park)

35

Types of Investment ndash (2) Concession Business

Data source JETRO Compiled by World Business Advisory Center

Investment in Concession Business

Description

o An investment that requires a concession or specific authorization from the government to use the governmentrsquos property

o Some concession businesses requires authorization from the central government whereas the other requires only provincial government level of authorization for example

bull At least 5MW electricity generation project requires the central government authorization

bull Less than 5MW electricity generation projects requires only provincial government authorization

Examples of Concession Business

1 Mining 2 Electricity generation 3 Infrastructure

bull Telecommunication bull TV and radio station bull Road railway airport seaport waste disposal site

4 Businesses that use the government land bull Shopping center bull Tourist attraction bull Public park bull Hotel bull Forestry and Logging bull Plantation and Livestock

Register Capital

Requirements

o Must pay at least 20 of registered capital while remaining should be paid within 2 years

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Types of Investment in Lao PDR

36

Types of Investment ndash (3) Business Related to SEZ

Data source JETRO Compiled by World Business Advisory Center

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Types of Investment in Lao PDR

Investment in Business Related to SEZ

Description

o Business related to Special Economic Zone -gt an investment in building infrastructure for a new town

o Business related to Specific Economic Zone -gt an investment in infrastructure development for specific purpose projects such as industrial zone export zone tourist development zone etc

High Potential SEZs in Laos

o Vita Park Special Economic Zone (Vientiane)

o Savan-Seno Special Economic Zone (Savannakhet)

o Pakxe-Japan SME Specific Economic Zone (Champasak)

Special and Specific Economic Zones

1 Boten-Daenkham Specific Economic Zone 2 Luang Prabang Special Economic Zone 3 Golden Triangle Special Economic Zone 4 Thatluang Lake Specific Economic Zone 5 Longthanh Specific Economic Zone 6 Xaysettha Specific Economic Zone 7 Vita Park Special Economic Zone 8 Dongphosy Specific Economic Zone 9 Thakhek Specific Economic Zone 10 Poukiao Specific Economic Zone 11 Savan-Seno Special Economic Zone 12 Pakxe-Japan SME Specific Economic Zone

1

2

3

4

5 6

7

8

9 10

11

12

37

General Business

Concession Business

Business related to

SEZs

Procedure of Investment in Lao PDR

The investment approval procedure varies depending upon type of investment However all foreign investors must go through enterprise registration tax identification number registration and application for capital importation certificate

Apply at Ministry of Planning and

Investment

For developer apply at National Committee for Special Economic Zone

For investor apply at One-Stop Service Unit in

each SEZ

Get Concession

License

Get SEZ Concession

License

For controlled businesses apply for

approval at relevant Ministries

Get Approval License

Apply at Ministry of

Industry and Commerce

For non-controlled businesses

Get Enterprise

Registration Certificate

(ERC)

Apply for Tax

Identification Number TIN

at Tax Department Ministry of

Finance

Apply for Capital

Importation Certificate at Bank of Lao

PDR

Data source JETRO Compiled by World Business Advisory Center

38

Investment Tax Incentives ndash General Zone

Data source JETRO Compiled by World Business Advisory Center

Investment Tax Incentives in Lao PDR

Profit Tax Exemption Period

Level 1 High Promotion

Level 2 Moderate Promotion

Level 3 Low Promotion

Zone 1 10 years 6 years 4 years

Zone 2 6 years 4 years 2 years

Zone 3 4 years 2 years 1 years

Profit Tax Exemption Period by Promotion Sector and Zone

Promoted sectors Agriculture Industrial Handicrafts and Services

Type of Tax Exemption

General Zone Promotion Sector and Zone based Incentives 1 Special amp Specific Economic Zone

Tailor Made Incentives 2

Profit tax in next accounting year in case net profit is used for reinvestment (business

expansion)

Import duties for import of raw material equipment spare parts and

vehicles directly used for production

Export duties for general goods and

products (resource-based products should follow

associated laws)

Permission to carry forward losses to

three consecutive accounting years

39

Sector Period of

Profit Tax Exemption

Profit Tax Rate

After Tax Exemption Period

Hi-Tech Manufacturing 10 year 8

Manufacturing that exports at least 70 of production 10 year 8

Manufacturing that exports 30 - 60 of production 7 year 8

Manufacturing that exports 0 - 29 of production 5 year 8

Other 5 year 8

Investment amount of USD 2 million or more 10 year 8

Investment amount of USD 500000 - USD 2 million 8 year 8

Investment amount of USD 300000 - USD 500000 6 year 10

Investment amount of USD 150000 - USD 300000 4 year 10

Investment amount of USD 50000 - USD 150000 2 year 10

Export Laos products 5 year 10

International trade company 3 year 10

General trade company 2 year 10

a) Manufacturing

b) Service

c) Commerce

Personal Income Tax 5

Dividend Tax after Profit Tax Exemption Period

5

Import Duty Exemption for import of raw material equipment spare parts and

vehicles directly used for production

VAT Exemption for import products

Investment Tax Incentives ndash Special and Specific Economic Zone

Data source JETRO

Investment Tax Incentives in Lao PDR

General Zone Promotion Sector and Zone based Incentives 1 Special amp Specific Economic Zone

Tailor Made Incentives 2 Example of Tax Incentives in Savan-Seno SEZ

Other Tax Incentives

40

Non-Tax Incentives amp Trade Privileges

Data source JETRO

Non-Tax Incentives

Permission

Foreign nationals can undertake feasibility studies

Bring in foreign technicians experts and managers if qualified Lao nationals are not available

Lease land

General business up to 30 years from Lao citizen and up to 50 years from the government (renewable)

Investment in SEZ up to 75 years

Concession business upon negotiation with the government (at present there is an example of 99 years land lease)

Transfer leasehold interests and build on or make improvements or structures to a leased land

Guarantee against nationalization expropriation and requisition without compensation

Protection

Trade Privileges

ASEAN WTO GSP Bilateral trade agreement (over 18 countries)

o Argentina o Belarus o Bulgaria o Cambodia o China o Indonesia o India o Korea DPR o Kuwait

o Malaysia o Mongolia o Myanmar o Philippines o Russian

Federation o Thailand o Turkey o USA o Vietnam

41

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

42

Foreign Currency Exchange

Data source Bank of the Lao PDR

Laos Currency Kip (LAK)

Latest FX Rate (as of August 22 2018)

Remark THB and USD are widely accepted especially in the border trade area

USD 1 ~ LAK 8507

EUR 1 ~ LAK 9851

THB 1 ~ LAK 262

JPY 1 ~ LAK 77

CNY 1 ~ LAK 1193

43

KASIKORNTHAIBANK Service in Lao PDR

Retail Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Current deposit

Lending

Working capital loan

Long term loan

Bank guarantee

Project Financing

FX Services

Corporate Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Remittance

Remittance

Trade Finance Letter of Credit (LC) Standby Letter of Credit (SBLC)

44

KASIKORNTHAI BANK Limited

With establishment KASIKORNTHAIBANK

the first full-scale locally incorporated institution from Thailand is fully committed to support our clientsrsquo cross-border financing and transaction for their trade and investment activities in Lao PDR

45

KASIKORNTHAIBANK in Lao PDR Contacts

bull HEAD OFFICE Unit 12 Lane Xang Avenue Xiangngeun Village Chanthaboury District Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88905 Fax +856 21 253 336 wwwkasikornbankcomla

KASIKORNTHAI BANK Limited

bull PONESINUAN BRANCH

Ban Ponesinuan Unit 14 Sysattanak Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88826 Fax +856 21 410 889

Ms Piyanoot Sangsan Branch Manager KASIKORNTHAI BANK LIMITED Lane Xang Head Office E-mail piyanootskasikornbankcom

Mr Chatuporn Boozaya-Angool Branch Manager Ponesinuan Branch E-mail chatupornbkasikornbankcom

46

About AEC+ Business Advisory The AEC+ Business Advisory is set up by KASIKORNBANK to support businesses in their regional expansion across the ASEAN+3 market by providing local market intelligence and strategic business advice

What we do bull Offer customized and tailor-made advisory services bull Publish investment guides and industry reports bull Deliver in-depth insights via seminars bull Organize business trips to bring first-hand experience

Follow Us Visit our website at

AEC+ BUSINESS ADVISORY

Prepared by Mr Anoot Charoenkiattikul World Business Intelligence Specialist E-mail anootckasikornbankcom

httpswwwkasikornbankcominternational-businessenPagesHomeaspx

47

Page 14: LAO PDR - Facilitiesfuangfah.econ.cmu.ac.th/teacher/nisit/files/201808_LaoPDR_Investm… · • On August 7, the government of Laos announced the suspension of new hydropower project

14

HYDROPOWER

Key Industries amp Opportunities

15

Hydropowerndash Overview

Hydropower exports in Lao PDR surged in 2017 The key destinations are Thailand Cambodia and Vietnam

Data source KResearch the Ministry of Energy and Mines

Total 29125

Magawatts

Number of Hydropower Plants

OPERATING

46

UNDER CONSTRUCTION

143

PENDING APPROVAL

246

Installed Capacities of Hydropower Plants in Lao PDR (Megawatts (MW) as of 2017)

Key Trends

Battery of Southeast Asia bull Due to Southeast Asiarsquos development toward industrialization there

remains a large demand gap for infrastructure support as well as growing demand for electricity to be met in the future

bull Thus Lao PDR with abundant natural resources for electricity generation aims to improve its energy sector to address this energy supply issue and position the country as a key exporter of energy in ASEAN

Lao PDR Electricity Exports

bull Lao PDRrsquos electricity exports have grown 15 annually since 2012

bull Electricity accounts for 24 of Lao PDR total exports

bull Thailand Cambodia and Vietnam are key export destinations with Thailand being the largest buyer

16

Hydropowerndash Opportunity

Lao PDR has ldquosuspendedrdquo new investment in hydropower projects and will conduct safety inspections for all existing dams due to the dam collapse incident in July

Data source laotiantimescom asianewsnetwork

The dam collapse in late July has caused Lao PDR to suspend new investment in hydropower projects in the country

bull On July 23 the ldquoSaddle Dam Drdquo part of the Xe-Pian Xe-Namnoy hydropower project in Champasak and Attapeu provinces has collapsed This disaster had affected around 5000 people in the area

bull On August 7 the government of Laos announced the suspension of new hydropower project approval and the renewed inspection of the existing dams

Key Policy Updates

2018 June

2018 August

The Lao government has suspended new investment in small-scale hydropower projects due to safety concerns

bull Lao PDR announced a temporary suspension of its authorization for investment in small-scale hydropower projects with installed capacity of lt15MW Such suspension is part of the governmentrsquos attempts to ensure the safety of hydropower dams

bull As a result the provincial and central authorities cannot approve new investment proposals for small-scale hydropower projects until concrete measures to ensure dam safety are drawn up

bull The suspension comes after construction of some projects has been found to be lower than the legally stipulated safety standards

17

Mining

Key Industries amp Opportunities

18

Mining ndash Overview

The mining Industry in Lao PDR has declined over the past several years due to fluctuations in global commodity prices and the maturity of some local mines

Data source International Trade Center worldbank

Lao PDR Mining Product Exports (USD Million 2017E)

Precious Stone Exports (USD Million 2017E)

DIAMOND

62 GOLD

1548 SILVER

54

Key Trends

Overall Lao PDRrsquos mining exports have decreased bull Exports of mining products have decreased since 2013 at an average

rate of 147 falling from USD1014 million in 2013 to USD 4575 in 2017

bull Copper and Coal experience the largest decline in export value mainly because some of the copper and coal mines have matured and global commodity prices have fallen

bull Meanwhile cement and sandstone record the highest increase in export value resulting from new investments and increasing domestic demand for these types of materials to use in the countryrsquos infrastructure development projects

Forms of investment in mining Business cooperation under contract

Joint venture between foreign and local firms

100 foreign or domestic ownership

Remark Firms could set up representative office to gather information and investigate investment opportunities

19

Taxes amp Regulations

Mining ndash Opportunity

Mineral resources in Lao PDR offer opportunities to firms with expertise in mining operations from prospection to mining and processing

Prospection Exploration Feasibility Study

Construction Mining amp Processing

2 years + 1 year

3 years + 2 years

1 year + 1 year

2 years + 1 year

20 years + 5 years

License Duration + Renewable

USD 3 -12 ha year USD 05 ndash 1 ha year + royalty (1-

7) Rental Fee

Registered company

Max 300 sqkm Corporate income 25-35

Value added 10

Rules and regulations for the Minerals Law in accordance to international standard partly missing

Limited number and capacity of local workers in mining sector

High number of mineral trade companies rather than professional mining operations firms

Key Issues

20

Electronic Parts and Components Industry

Key Industries amp Opportunities

21

Electronic Parts and Components Industry - Overview

Over the recent years Laos has experienced exponential growth in its exports of electronic parts and components especially to Thailand indicating the initial formation of the regional supply chain

Lao PDR Electronic Part and Component Exports (USD Million 2017)

Increasing investments in Lao PDR Special Economic Zone (SEZ) boosts trade The presence of SEZs and attractive incentives have attracted FDI inflows into Lao PDR especially in the production of digital camera parts and telecom equipment parts Most manufacturing in these sectors is aimed at exporting intermediate products to assemblers of finished electrical and electronic products in other countries

Main Export Destinations 2017

Data source International Trade Center

Why Thailand has become the top export destination

bull ASEAN Free Trade Agreement (AFTA) ndash The agreement minimizes trade barriers and creates free flow of goods and capital within ASEAN

bull Thailand-based industries shift their focus on value added activities - firms relocate labor-intensive activities to Thailandrsquos neighboring countries including Laos

22

Electronic Parts and Components Industry - Opportunity

Industrial development in Laos offers opportunities for firms to form the regional supply chain model and benefit from comparative advantages from both nations

Data source JETRO

Thailand

Product supply chain

Laos

Did you knowhellip

Challenges

Difficulty in getting large pools of labor due to small population

Underdeveloped infrastructure in some regions

Challenge in recruiting higher skilled specialists

Suggestion Set up in major Special Economic Zones eg Vita Park SEZ and Savan-Seno SEZ

Roll out strategic human resource plan including training and capacity building

bull Advanced infrastructure

bull Experienced and high-skilled (management level) workforce

bull Affordable and youthful workforce bull Located between Vietnam and Thailand

both with high electronics parts demand bull Government incentives

Start operation from small scale (less than 500 workers) then scale up

Japanese enterprises have started implementing Thailand+1 model by relocating labor-intensive production to Laos and exporting back to Thailand to complete product assembly eg NIKON (digital camera) Dai-Ichi Denshi (wire harness) Nissei Mizuki (electronics parts) and Toyota boshoku (car seat cover)

Thailand + 1 Model

23

Industrial Agriculture

Key Industries amp Opportunities

24

Industrial Agriculture - Overview

Most industrial agriculture exports from Lao PDR are produced by foreign investors (Chinese Thai and Vietnamese) and local entrepreneurs to a lesser extent

Data source JETRO International Trade Center Produce Report USDA Foreign Agriculture Service

Leading Agricultural Exports by export value (USD Million 2016 and 2017)

A short-term drop in fruit exports in 2017 bull Exports declined because the Lao government suspended

development of large banana and other fruit plantations which typically produce to export to China and placed more stringent control on polluting farms

bull However at the end of 2017 Lao PDR and China negotiated for less stringent terms for Lao PDRrsquos fruit exports to China

Key Trends

Sugar Cane exports rocketing bull In 2017 sugar cane plantation boomed Export volume grew 121

times from 2016

bull The major reason was the relocation of sugar production from China as production costs there are very high approximately double that of Thailand

Organic fruit and vegetable becoming key economic plants bull Local and foreign investors are increasingly investing in organic

agriculture a higher value-added segment which is demanded by major countries such as Europe US Japan and China

Exports (2016)

USD 02 Million

Exports (2017)

USD 20 Million

121 times

25

Industrial Agriculture - Opportunity

Lao industrial agriculture sector offers opportunities for

bull Agricultural inputs andmachinery producers and distributors

bull Plantation operators

bull Processing and trading firms in Thailand

3 Processing and Trading

Key Drivers Lack of capability to process

products at international standard

Lack of market access

Opportunities Market inputs and machinery

to agricultural projects Investor can target both large scale investment

and smallholder farmers

Opportunities Produce high-value agricultural

products organic products herbs and medical plants

Foreign investors operate via (1) contract farming and (2) concession

Opportunities Process raw products to meet

export standards trade products to leverage existing market channels

Agricultural Inputs and Machinery

Key Drivers Limited access to improved

agricultural inputs - Seed - Fertilizer - Quality machinery

1 2

Key Drivers Arable fertile land

low level of chemical pesticides

Plantation ndash High Value Products

26

Tourism

Key Industries amp Opportunities

27

Tourism - Overview

Tourist arrivals are on a steady rise in the past decade especially tourists from Asia Pacific with most of them visiting more developed border towns neighboring Thailand

Data source Ministry of Tourism TRAVEL amp TOURISM ECONOMIC IMPACT 2018 LAOS

Direct Contribution of Travel amp Tourism to GDP (USD Billion 2012-2018E)

bull Both tourist arrivals and revenue from tourism have increased approximately 3 folds in the past decade

bull Most tourists come from Asia Pacific (93) particularly from from Thailand (50) and Vietnam (25) followed by Europe (5)

Top Tourist Arrivals Destinations 2017

1 Vientiane Capital

2 Savannakhet

3 Champasak

Most top tourist destinations are more developed towns bordering Thailand

Nong Khai

Mukdahan

Ubon Ratchathani

World Heritage sites im these following city also attract a considerable number of visitors

Luang Prabang Wat Pu at Champasak

28

Business Opportunities Associated to Tourism Sector

Accommodate increasing tourist arrivals

Provide dining and entertainment services

Develop attractive ecotourism cultural tourism packages

Provide transportation services linking major tourism sites

Produce and market souvenirs applying local arts design and materials

1 Hotel Restaurant Entertainment

2 Tour Company Holiday Package

3 Sourvenirs

4 Transportation Service

Tourism - Opportunity

29

Lao Consumer Income and Behavior

Prefer to cook at home Enjoy drinking alcohol Middle income enjoy

spending evening in beer garden

Lao women wear sinh Follow Thai and Korean

fashion due to influence of TV series

Shop at traditional markets Middle income shop at

Thai border towns (Nong Khai Udon Thani)

Thai and Japanese products are perceived to have high quality Chinese products are perceived as sub-standard quality and Korean products are in between

30

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

31

Major Costs ndash Labor and Utility

Electricity Rate 2017

0 - 25 kwh 004USDkwh

26 - 150 kwh 005USDkwh

151 - 300 kwh 009USDkwh

more than 500 kwh 012USDkwh

301 - 400 kwh 010USDkwh

401 - 500 kwh 011USDkwh

Water Price (Per Unit) for Business and Trade Units

bull Water price for businesses is set to increase from USD USD 036 in 2017 to USD038 per unit this year

Labor minimum monthly wage in ASEAN 2017 USD

32

Tax System

Monthly Income (LAK) Tax Rate

0 ndash 1000000 0

1000001 - 3000000 5

3000001 - 6000000 10

6000001 - 12000000 12

12000001 - 24000000 15

24000001 - 40000000 20

Above 40000000 24

Types of Tax Tax rate

Profit Tax 24

Value Added Tax (VAT) 10

Withholding Tax Dividends 10

(non-residents) Transfer of shares 10

Transfer of assets 5

China

Luxembourg

Malaysia

Singapore

South Korea

Thailand

Vietnam

Income tax treaties for avoidance of double taxation

Note There is no definition of residence for tax purposes in Laos All companies registered under Lao law (including foreign law) are subject to Lao profit tax

Personal Income Tax Corporate Taxes

Data source DFDL

33

Foreign Investment Regulations

Data source JETRO Compiled by World Business Advisory Center

Not Permitted to Foreigner Only for Joint Venture with Local Company 100 Foreign Ownership Allowed

Wholesale and Retail Businesses

100 Foreign Ownership bull If registered capital is 20 billion Lao Kip

(USD 25 million) or more

Maximum 70 Foreign Ownership bull If registered capital is 10 - 20 billion Lao Kip

(USD 125 ndash 25 million)

Maximum 50 Foreign Ownership bull If registered capital is 4 - 10 billion Lao Kip

(USD 05 ndash 125 million)

bull If registered capital is less than 4 billion Lao Kip (USD 05 million)

Hotel and Restaurants Maximum 60 Foreign Ownership bull 3-5 stars hotel with minimum registered capital of

1 billion Lao Kip (USD 125000)

bull Less than 3 stars hotel 100 Foreign Ownership bull NOT ALLOWED

Logistics

100 Foreign Ownership bull Domestic goods transport with minimum

registered capital of 3 billion Lao Kip (USD 375000)

Maximum 49 Foreign Ownership bull Cross border goods transport with minimum

registered capital of 5 billion Lao Kip (USD 625000)

bull Cross border goods transport with less than 5 billion Lao Kip of registered capital

bull Domestic goods transport with less than 3 billion Lao Kip of registered capital

Examples of Foreign Investment Regulations

Foreign enterprises are subject to foreign investment regulations in several business activities Generally small businesses are preserved for Lao enterprises whereas large businesses with certain investment conditions are opened for foreign investors

34

Types of Investment ndash (1) General Business

Data source JETRO Compiled by World Business Advisory Center

Besides foreign investment regulation foreign enterprises are also subject to the investment promotion law which classifies investment into 3 types

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Investment in General Business

Types of Investment in Lao PDR

Description

o An investment in general economic activities

o Activities including controlled businesses ndash businesses that require additional approval from relevant ministries

o Activities excluding concession business

Register Capital

Requirements

o At least 1 billion Lao Kip (USD 125000)

o At the day of establishment must pay 40 (agriculture business) 60 (production and processing) 80 (services) The remainder must be paid within 1 year

Examples of Controlled Businesses 1 Agriculture plantation agriculture fishery 2 Manufacturing petroleum products leathers textile amp clothing papers

printing pesticides pharmaceutical products 3 Businesses related to environment eg wastewater treatment 4 Wholesale and retails of gasoline and petroleum products 5 Transportation 6 Hotel and Restaurant 7 Media and Publication 8 Finance and insurance 9 Legal accounting and tax services 10 Tourism 11 Education 12 Hospital clinic and medical services 13 Recreation (museum and amusement park)

35

Types of Investment ndash (2) Concession Business

Data source JETRO Compiled by World Business Advisory Center

Investment in Concession Business

Description

o An investment that requires a concession or specific authorization from the government to use the governmentrsquos property

o Some concession businesses requires authorization from the central government whereas the other requires only provincial government level of authorization for example

bull At least 5MW electricity generation project requires the central government authorization

bull Less than 5MW electricity generation projects requires only provincial government authorization

Examples of Concession Business

1 Mining 2 Electricity generation 3 Infrastructure

bull Telecommunication bull TV and radio station bull Road railway airport seaport waste disposal site

4 Businesses that use the government land bull Shopping center bull Tourist attraction bull Public park bull Hotel bull Forestry and Logging bull Plantation and Livestock

Register Capital

Requirements

o Must pay at least 20 of registered capital while remaining should be paid within 2 years

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Types of Investment in Lao PDR

36

Types of Investment ndash (3) Business Related to SEZ

Data source JETRO Compiled by World Business Advisory Center

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Types of Investment in Lao PDR

Investment in Business Related to SEZ

Description

o Business related to Special Economic Zone -gt an investment in building infrastructure for a new town

o Business related to Specific Economic Zone -gt an investment in infrastructure development for specific purpose projects such as industrial zone export zone tourist development zone etc

High Potential SEZs in Laos

o Vita Park Special Economic Zone (Vientiane)

o Savan-Seno Special Economic Zone (Savannakhet)

o Pakxe-Japan SME Specific Economic Zone (Champasak)

Special and Specific Economic Zones

1 Boten-Daenkham Specific Economic Zone 2 Luang Prabang Special Economic Zone 3 Golden Triangle Special Economic Zone 4 Thatluang Lake Specific Economic Zone 5 Longthanh Specific Economic Zone 6 Xaysettha Specific Economic Zone 7 Vita Park Special Economic Zone 8 Dongphosy Specific Economic Zone 9 Thakhek Specific Economic Zone 10 Poukiao Specific Economic Zone 11 Savan-Seno Special Economic Zone 12 Pakxe-Japan SME Specific Economic Zone

1

2

3

4

5 6

7

8

9 10

11

12

37

General Business

Concession Business

Business related to

SEZs

Procedure of Investment in Lao PDR

The investment approval procedure varies depending upon type of investment However all foreign investors must go through enterprise registration tax identification number registration and application for capital importation certificate

Apply at Ministry of Planning and

Investment

For developer apply at National Committee for Special Economic Zone

For investor apply at One-Stop Service Unit in

each SEZ

Get Concession

License

Get SEZ Concession

License

For controlled businesses apply for

approval at relevant Ministries

Get Approval License

Apply at Ministry of

Industry and Commerce

For non-controlled businesses

Get Enterprise

Registration Certificate

(ERC)

Apply for Tax

Identification Number TIN

at Tax Department Ministry of

Finance

Apply for Capital

Importation Certificate at Bank of Lao

PDR

Data source JETRO Compiled by World Business Advisory Center

38

Investment Tax Incentives ndash General Zone

Data source JETRO Compiled by World Business Advisory Center

Investment Tax Incentives in Lao PDR

Profit Tax Exemption Period

Level 1 High Promotion

Level 2 Moderate Promotion

Level 3 Low Promotion

Zone 1 10 years 6 years 4 years

Zone 2 6 years 4 years 2 years

Zone 3 4 years 2 years 1 years

Profit Tax Exemption Period by Promotion Sector and Zone

Promoted sectors Agriculture Industrial Handicrafts and Services

Type of Tax Exemption

General Zone Promotion Sector and Zone based Incentives 1 Special amp Specific Economic Zone

Tailor Made Incentives 2

Profit tax in next accounting year in case net profit is used for reinvestment (business

expansion)

Import duties for import of raw material equipment spare parts and

vehicles directly used for production

Export duties for general goods and

products (resource-based products should follow

associated laws)

Permission to carry forward losses to

three consecutive accounting years

39

Sector Period of

Profit Tax Exemption

Profit Tax Rate

After Tax Exemption Period

Hi-Tech Manufacturing 10 year 8

Manufacturing that exports at least 70 of production 10 year 8

Manufacturing that exports 30 - 60 of production 7 year 8

Manufacturing that exports 0 - 29 of production 5 year 8

Other 5 year 8

Investment amount of USD 2 million or more 10 year 8

Investment amount of USD 500000 - USD 2 million 8 year 8

Investment amount of USD 300000 - USD 500000 6 year 10

Investment amount of USD 150000 - USD 300000 4 year 10

Investment amount of USD 50000 - USD 150000 2 year 10

Export Laos products 5 year 10

International trade company 3 year 10

General trade company 2 year 10

a) Manufacturing

b) Service

c) Commerce

Personal Income Tax 5

Dividend Tax after Profit Tax Exemption Period

5

Import Duty Exemption for import of raw material equipment spare parts and

vehicles directly used for production

VAT Exemption for import products

Investment Tax Incentives ndash Special and Specific Economic Zone

Data source JETRO

Investment Tax Incentives in Lao PDR

General Zone Promotion Sector and Zone based Incentives 1 Special amp Specific Economic Zone

Tailor Made Incentives 2 Example of Tax Incentives in Savan-Seno SEZ

Other Tax Incentives

40

Non-Tax Incentives amp Trade Privileges

Data source JETRO

Non-Tax Incentives

Permission

Foreign nationals can undertake feasibility studies

Bring in foreign technicians experts and managers if qualified Lao nationals are not available

Lease land

General business up to 30 years from Lao citizen and up to 50 years from the government (renewable)

Investment in SEZ up to 75 years

Concession business upon negotiation with the government (at present there is an example of 99 years land lease)

Transfer leasehold interests and build on or make improvements or structures to a leased land

Guarantee against nationalization expropriation and requisition without compensation

Protection

Trade Privileges

ASEAN WTO GSP Bilateral trade agreement (over 18 countries)

o Argentina o Belarus o Bulgaria o Cambodia o China o Indonesia o India o Korea DPR o Kuwait

o Malaysia o Mongolia o Myanmar o Philippines o Russian

Federation o Thailand o Turkey o USA o Vietnam

41

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

42

Foreign Currency Exchange

Data source Bank of the Lao PDR

Laos Currency Kip (LAK)

Latest FX Rate (as of August 22 2018)

Remark THB and USD are widely accepted especially in the border trade area

USD 1 ~ LAK 8507

EUR 1 ~ LAK 9851

THB 1 ~ LAK 262

JPY 1 ~ LAK 77

CNY 1 ~ LAK 1193

43

KASIKORNTHAIBANK Service in Lao PDR

Retail Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Current deposit

Lending

Working capital loan

Long term loan

Bank guarantee

Project Financing

FX Services

Corporate Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Remittance

Remittance

Trade Finance Letter of Credit (LC) Standby Letter of Credit (SBLC)

44

KASIKORNTHAI BANK Limited

With establishment KASIKORNTHAIBANK

the first full-scale locally incorporated institution from Thailand is fully committed to support our clientsrsquo cross-border financing and transaction for their trade and investment activities in Lao PDR

45

KASIKORNTHAIBANK in Lao PDR Contacts

bull HEAD OFFICE Unit 12 Lane Xang Avenue Xiangngeun Village Chanthaboury District Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88905 Fax +856 21 253 336 wwwkasikornbankcomla

KASIKORNTHAI BANK Limited

bull PONESINUAN BRANCH

Ban Ponesinuan Unit 14 Sysattanak Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88826 Fax +856 21 410 889

Ms Piyanoot Sangsan Branch Manager KASIKORNTHAI BANK LIMITED Lane Xang Head Office E-mail piyanootskasikornbankcom

Mr Chatuporn Boozaya-Angool Branch Manager Ponesinuan Branch E-mail chatupornbkasikornbankcom

46

About AEC+ Business Advisory The AEC+ Business Advisory is set up by KASIKORNBANK to support businesses in their regional expansion across the ASEAN+3 market by providing local market intelligence and strategic business advice

What we do bull Offer customized and tailor-made advisory services bull Publish investment guides and industry reports bull Deliver in-depth insights via seminars bull Organize business trips to bring first-hand experience

Follow Us Visit our website at

AEC+ BUSINESS ADVISORY

Prepared by Mr Anoot Charoenkiattikul World Business Intelligence Specialist E-mail anootckasikornbankcom

httpswwwkasikornbankcominternational-businessenPagesHomeaspx

47

Page 15: LAO PDR - Facilitiesfuangfah.econ.cmu.ac.th/teacher/nisit/files/201808_LaoPDR_Investm… · • On August 7, the government of Laos announced the suspension of new hydropower project

15

Hydropowerndash Overview

Hydropower exports in Lao PDR surged in 2017 The key destinations are Thailand Cambodia and Vietnam

Data source KResearch the Ministry of Energy and Mines

Total 29125

Magawatts

Number of Hydropower Plants

OPERATING

46

UNDER CONSTRUCTION

143

PENDING APPROVAL

246

Installed Capacities of Hydropower Plants in Lao PDR (Megawatts (MW) as of 2017)

Key Trends

Battery of Southeast Asia bull Due to Southeast Asiarsquos development toward industrialization there

remains a large demand gap for infrastructure support as well as growing demand for electricity to be met in the future

bull Thus Lao PDR with abundant natural resources for electricity generation aims to improve its energy sector to address this energy supply issue and position the country as a key exporter of energy in ASEAN

Lao PDR Electricity Exports

bull Lao PDRrsquos electricity exports have grown 15 annually since 2012

bull Electricity accounts for 24 of Lao PDR total exports

bull Thailand Cambodia and Vietnam are key export destinations with Thailand being the largest buyer

16

Hydropowerndash Opportunity

Lao PDR has ldquosuspendedrdquo new investment in hydropower projects and will conduct safety inspections for all existing dams due to the dam collapse incident in July

Data source laotiantimescom asianewsnetwork

The dam collapse in late July has caused Lao PDR to suspend new investment in hydropower projects in the country

bull On July 23 the ldquoSaddle Dam Drdquo part of the Xe-Pian Xe-Namnoy hydropower project in Champasak and Attapeu provinces has collapsed This disaster had affected around 5000 people in the area

bull On August 7 the government of Laos announced the suspension of new hydropower project approval and the renewed inspection of the existing dams

Key Policy Updates

2018 June

2018 August

The Lao government has suspended new investment in small-scale hydropower projects due to safety concerns

bull Lao PDR announced a temporary suspension of its authorization for investment in small-scale hydropower projects with installed capacity of lt15MW Such suspension is part of the governmentrsquos attempts to ensure the safety of hydropower dams

bull As a result the provincial and central authorities cannot approve new investment proposals for small-scale hydropower projects until concrete measures to ensure dam safety are drawn up

bull The suspension comes after construction of some projects has been found to be lower than the legally stipulated safety standards

17

Mining

Key Industries amp Opportunities

18

Mining ndash Overview

The mining Industry in Lao PDR has declined over the past several years due to fluctuations in global commodity prices and the maturity of some local mines

Data source International Trade Center worldbank

Lao PDR Mining Product Exports (USD Million 2017E)

Precious Stone Exports (USD Million 2017E)

DIAMOND

62 GOLD

1548 SILVER

54

Key Trends

Overall Lao PDRrsquos mining exports have decreased bull Exports of mining products have decreased since 2013 at an average

rate of 147 falling from USD1014 million in 2013 to USD 4575 in 2017

bull Copper and Coal experience the largest decline in export value mainly because some of the copper and coal mines have matured and global commodity prices have fallen

bull Meanwhile cement and sandstone record the highest increase in export value resulting from new investments and increasing domestic demand for these types of materials to use in the countryrsquos infrastructure development projects

Forms of investment in mining Business cooperation under contract

Joint venture between foreign and local firms

100 foreign or domestic ownership

Remark Firms could set up representative office to gather information and investigate investment opportunities

19

Taxes amp Regulations

Mining ndash Opportunity

Mineral resources in Lao PDR offer opportunities to firms with expertise in mining operations from prospection to mining and processing

Prospection Exploration Feasibility Study

Construction Mining amp Processing

2 years + 1 year

3 years + 2 years

1 year + 1 year

2 years + 1 year

20 years + 5 years

License Duration + Renewable

USD 3 -12 ha year USD 05 ndash 1 ha year + royalty (1-

7) Rental Fee

Registered company

Max 300 sqkm Corporate income 25-35

Value added 10

Rules and regulations for the Minerals Law in accordance to international standard partly missing

Limited number and capacity of local workers in mining sector

High number of mineral trade companies rather than professional mining operations firms

Key Issues

20

Electronic Parts and Components Industry

Key Industries amp Opportunities

21

Electronic Parts and Components Industry - Overview

Over the recent years Laos has experienced exponential growth in its exports of electronic parts and components especially to Thailand indicating the initial formation of the regional supply chain

Lao PDR Electronic Part and Component Exports (USD Million 2017)

Increasing investments in Lao PDR Special Economic Zone (SEZ) boosts trade The presence of SEZs and attractive incentives have attracted FDI inflows into Lao PDR especially in the production of digital camera parts and telecom equipment parts Most manufacturing in these sectors is aimed at exporting intermediate products to assemblers of finished electrical and electronic products in other countries

Main Export Destinations 2017

Data source International Trade Center

Why Thailand has become the top export destination

bull ASEAN Free Trade Agreement (AFTA) ndash The agreement minimizes trade barriers and creates free flow of goods and capital within ASEAN

bull Thailand-based industries shift their focus on value added activities - firms relocate labor-intensive activities to Thailandrsquos neighboring countries including Laos

22

Electronic Parts and Components Industry - Opportunity

Industrial development in Laos offers opportunities for firms to form the regional supply chain model and benefit from comparative advantages from both nations

Data source JETRO

Thailand

Product supply chain

Laos

Did you knowhellip

Challenges

Difficulty in getting large pools of labor due to small population

Underdeveloped infrastructure in some regions

Challenge in recruiting higher skilled specialists

Suggestion Set up in major Special Economic Zones eg Vita Park SEZ and Savan-Seno SEZ

Roll out strategic human resource plan including training and capacity building

bull Advanced infrastructure

bull Experienced and high-skilled (management level) workforce

bull Affordable and youthful workforce bull Located between Vietnam and Thailand

both with high electronics parts demand bull Government incentives

Start operation from small scale (less than 500 workers) then scale up

Japanese enterprises have started implementing Thailand+1 model by relocating labor-intensive production to Laos and exporting back to Thailand to complete product assembly eg NIKON (digital camera) Dai-Ichi Denshi (wire harness) Nissei Mizuki (electronics parts) and Toyota boshoku (car seat cover)

Thailand + 1 Model

23

Industrial Agriculture

Key Industries amp Opportunities

24

Industrial Agriculture - Overview

Most industrial agriculture exports from Lao PDR are produced by foreign investors (Chinese Thai and Vietnamese) and local entrepreneurs to a lesser extent

Data source JETRO International Trade Center Produce Report USDA Foreign Agriculture Service

Leading Agricultural Exports by export value (USD Million 2016 and 2017)

A short-term drop in fruit exports in 2017 bull Exports declined because the Lao government suspended

development of large banana and other fruit plantations which typically produce to export to China and placed more stringent control on polluting farms

bull However at the end of 2017 Lao PDR and China negotiated for less stringent terms for Lao PDRrsquos fruit exports to China

Key Trends

Sugar Cane exports rocketing bull In 2017 sugar cane plantation boomed Export volume grew 121

times from 2016

bull The major reason was the relocation of sugar production from China as production costs there are very high approximately double that of Thailand

Organic fruit and vegetable becoming key economic plants bull Local and foreign investors are increasingly investing in organic

agriculture a higher value-added segment which is demanded by major countries such as Europe US Japan and China

Exports (2016)

USD 02 Million

Exports (2017)

USD 20 Million

121 times

25

Industrial Agriculture - Opportunity

Lao industrial agriculture sector offers opportunities for

bull Agricultural inputs andmachinery producers and distributors

bull Plantation operators

bull Processing and trading firms in Thailand

3 Processing and Trading

Key Drivers Lack of capability to process

products at international standard

Lack of market access

Opportunities Market inputs and machinery

to agricultural projects Investor can target both large scale investment

and smallholder farmers

Opportunities Produce high-value agricultural

products organic products herbs and medical plants

Foreign investors operate via (1) contract farming and (2) concession

Opportunities Process raw products to meet

export standards trade products to leverage existing market channels

Agricultural Inputs and Machinery

Key Drivers Limited access to improved

agricultural inputs - Seed - Fertilizer - Quality machinery

1 2

Key Drivers Arable fertile land

low level of chemical pesticides

Plantation ndash High Value Products

26

Tourism

Key Industries amp Opportunities

27

Tourism - Overview

Tourist arrivals are on a steady rise in the past decade especially tourists from Asia Pacific with most of them visiting more developed border towns neighboring Thailand

Data source Ministry of Tourism TRAVEL amp TOURISM ECONOMIC IMPACT 2018 LAOS

Direct Contribution of Travel amp Tourism to GDP (USD Billion 2012-2018E)

bull Both tourist arrivals and revenue from tourism have increased approximately 3 folds in the past decade

bull Most tourists come from Asia Pacific (93) particularly from from Thailand (50) and Vietnam (25) followed by Europe (5)

Top Tourist Arrivals Destinations 2017

1 Vientiane Capital

2 Savannakhet

3 Champasak

Most top tourist destinations are more developed towns bordering Thailand

Nong Khai

Mukdahan

Ubon Ratchathani

World Heritage sites im these following city also attract a considerable number of visitors

Luang Prabang Wat Pu at Champasak

28

Business Opportunities Associated to Tourism Sector

Accommodate increasing tourist arrivals

Provide dining and entertainment services

Develop attractive ecotourism cultural tourism packages

Provide transportation services linking major tourism sites

Produce and market souvenirs applying local arts design and materials

1 Hotel Restaurant Entertainment

2 Tour Company Holiday Package

3 Sourvenirs

4 Transportation Service

Tourism - Opportunity

29

Lao Consumer Income and Behavior

Prefer to cook at home Enjoy drinking alcohol Middle income enjoy

spending evening in beer garden

Lao women wear sinh Follow Thai and Korean

fashion due to influence of TV series

Shop at traditional markets Middle income shop at

Thai border towns (Nong Khai Udon Thani)

Thai and Japanese products are perceived to have high quality Chinese products are perceived as sub-standard quality and Korean products are in between

30

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

31

Major Costs ndash Labor and Utility

Electricity Rate 2017

0 - 25 kwh 004USDkwh

26 - 150 kwh 005USDkwh

151 - 300 kwh 009USDkwh

more than 500 kwh 012USDkwh

301 - 400 kwh 010USDkwh

401 - 500 kwh 011USDkwh

Water Price (Per Unit) for Business and Trade Units

bull Water price for businesses is set to increase from USD USD 036 in 2017 to USD038 per unit this year

Labor minimum monthly wage in ASEAN 2017 USD

32

Tax System

Monthly Income (LAK) Tax Rate

0 ndash 1000000 0

1000001 - 3000000 5

3000001 - 6000000 10

6000001 - 12000000 12

12000001 - 24000000 15

24000001 - 40000000 20

Above 40000000 24

Types of Tax Tax rate

Profit Tax 24

Value Added Tax (VAT) 10

Withholding Tax Dividends 10

(non-residents) Transfer of shares 10

Transfer of assets 5

China

Luxembourg

Malaysia

Singapore

South Korea

Thailand

Vietnam

Income tax treaties for avoidance of double taxation

Note There is no definition of residence for tax purposes in Laos All companies registered under Lao law (including foreign law) are subject to Lao profit tax

Personal Income Tax Corporate Taxes

Data source DFDL

33

Foreign Investment Regulations

Data source JETRO Compiled by World Business Advisory Center

Not Permitted to Foreigner Only for Joint Venture with Local Company 100 Foreign Ownership Allowed

Wholesale and Retail Businesses

100 Foreign Ownership bull If registered capital is 20 billion Lao Kip

(USD 25 million) or more

Maximum 70 Foreign Ownership bull If registered capital is 10 - 20 billion Lao Kip

(USD 125 ndash 25 million)

Maximum 50 Foreign Ownership bull If registered capital is 4 - 10 billion Lao Kip

(USD 05 ndash 125 million)

bull If registered capital is less than 4 billion Lao Kip (USD 05 million)

Hotel and Restaurants Maximum 60 Foreign Ownership bull 3-5 stars hotel with minimum registered capital of

1 billion Lao Kip (USD 125000)

bull Less than 3 stars hotel 100 Foreign Ownership bull NOT ALLOWED

Logistics

100 Foreign Ownership bull Domestic goods transport with minimum

registered capital of 3 billion Lao Kip (USD 375000)

Maximum 49 Foreign Ownership bull Cross border goods transport with minimum

registered capital of 5 billion Lao Kip (USD 625000)

bull Cross border goods transport with less than 5 billion Lao Kip of registered capital

bull Domestic goods transport with less than 3 billion Lao Kip of registered capital

Examples of Foreign Investment Regulations

Foreign enterprises are subject to foreign investment regulations in several business activities Generally small businesses are preserved for Lao enterprises whereas large businesses with certain investment conditions are opened for foreign investors

34

Types of Investment ndash (1) General Business

Data source JETRO Compiled by World Business Advisory Center

Besides foreign investment regulation foreign enterprises are also subject to the investment promotion law which classifies investment into 3 types

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Investment in General Business

Types of Investment in Lao PDR

Description

o An investment in general economic activities

o Activities including controlled businesses ndash businesses that require additional approval from relevant ministries

o Activities excluding concession business

Register Capital

Requirements

o At least 1 billion Lao Kip (USD 125000)

o At the day of establishment must pay 40 (agriculture business) 60 (production and processing) 80 (services) The remainder must be paid within 1 year

Examples of Controlled Businesses 1 Agriculture plantation agriculture fishery 2 Manufacturing petroleum products leathers textile amp clothing papers

printing pesticides pharmaceutical products 3 Businesses related to environment eg wastewater treatment 4 Wholesale and retails of gasoline and petroleum products 5 Transportation 6 Hotel and Restaurant 7 Media and Publication 8 Finance and insurance 9 Legal accounting and tax services 10 Tourism 11 Education 12 Hospital clinic and medical services 13 Recreation (museum and amusement park)

35

Types of Investment ndash (2) Concession Business

Data source JETRO Compiled by World Business Advisory Center

Investment in Concession Business

Description

o An investment that requires a concession or specific authorization from the government to use the governmentrsquos property

o Some concession businesses requires authorization from the central government whereas the other requires only provincial government level of authorization for example

bull At least 5MW electricity generation project requires the central government authorization

bull Less than 5MW electricity generation projects requires only provincial government authorization

Examples of Concession Business

1 Mining 2 Electricity generation 3 Infrastructure

bull Telecommunication bull TV and radio station bull Road railway airport seaport waste disposal site

4 Businesses that use the government land bull Shopping center bull Tourist attraction bull Public park bull Hotel bull Forestry and Logging bull Plantation and Livestock

Register Capital

Requirements

o Must pay at least 20 of registered capital while remaining should be paid within 2 years

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Types of Investment in Lao PDR

36

Types of Investment ndash (3) Business Related to SEZ

Data source JETRO Compiled by World Business Advisory Center

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Types of Investment in Lao PDR

Investment in Business Related to SEZ

Description

o Business related to Special Economic Zone -gt an investment in building infrastructure for a new town

o Business related to Specific Economic Zone -gt an investment in infrastructure development for specific purpose projects such as industrial zone export zone tourist development zone etc

High Potential SEZs in Laos

o Vita Park Special Economic Zone (Vientiane)

o Savan-Seno Special Economic Zone (Savannakhet)

o Pakxe-Japan SME Specific Economic Zone (Champasak)

Special and Specific Economic Zones

1 Boten-Daenkham Specific Economic Zone 2 Luang Prabang Special Economic Zone 3 Golden Triangle Special Economic Zone 4 Thatluang Lake Specific Economic Zone 5 Longthanh Specific Economic Zone 6 Xaysettha Specific Economic Zone 7 Vita Park Special Economic Zone 8 Dongphosy Specific Economic Zone 9 Thakhek Specific Economic Zone 10 Poukiao Specific Economic Zone 11 Savan-Seno Special Economic Zone 12 Pakxe-Japan SME Specific Economic Zone

1

2

3

4

5 6

7

8

9 10

11

12

37

General Business

Concession Business

Business related to

SEZs

Procedure of Investment in Lao PDR

The investment approval procedure varies depending upon type of investment However all foreign investors must go through enterprise registration tax identification number registration and application for capital importation certificate

Apply at Ministry of Planning and

Investment

For developer apply at National Committee for Special Economic Zone

For investor apply at One-Stop Service Unit in

each SEZ

Get Concession

License

Get SEZ Concession

License

For controlled businesses apply for

approval at relevant Ministries

Get Approval License

Apply at Ministry of

Industry and Commerce

For non-controlled businesses

Get Enterprise

Registration Certificate

(ERC)

Apply for Tax

Identification Number TIN

at Tax Department Ministry of

Finance

Apply for Capital

Importation Certificate at Bank of Lao

PDR

Data source JETRO Compiled by World Business Advisory Center

38

Investment Tax Incentives ndash General Zone

Data source JETRO Compiled by World Business Advisory Center

Investment Tax Incentives in Lao PDR

Profit Tax Exemption Period

Level 1 High Promotion

Level 2 Moderate Promotion

Level 3 Low Promotion

Zone 1 10 years 6 years 4 years

Zone 2 6 years 4 years 2 years

Zone 3 4 years 2 years 1 years

Profit Tax Exemption Period by Promotion Sector and Zone

Promoted sectors Agriculture Industrial Handicrafts and Services

Type of Tax Exemption

General Zone Promotion Sector and Zone based Incentives 1 Special amp Specific Economic Zone

Tailor Made Incentives 2

Profit tax in next accounting year in case net profit is used for reinvestment (business

expansion)

Import duties for import of raw material equipment spare parts and

vehicles directly used for production

Export duties for general goods and

products (resource-based products should follow

associated laws)

Permission to carry forward losses to

three consecutive accounting years

39

Sector Period of

Profit Tax Exemption

Profit Tax Rate

After Tax Exemption Period

Hi-Tech Manufacturing 10 year 8

Manufacturing that exports at least 70 of production 10 year 8

Manufacturing that exports 30 - 60 of production 7 year 8

Manufacturing that exports 0 - 29 of production 5 year 8

Other 5 year 8

Investment amount of USD 2 million or more 10 year 8

Investment amount of USD 500000 - USD 2 million 8 year 8

Investment amount of USD 300000 - USD 500000 6 year 10

Investment amount of USD 150000 - USD 300000 4 year 10

Investment amount of USD 50000 - USD 150000 2 year 10

Export Laos products 5 year 10

International trade company 3 year 10

General trade company 2 year 10

a) Manufacturing

b) Service

c) Commerce

Personal Income Tax 5

Dividend Tax after Profit Tax Exemption Period

5

Import Duty Exemption for import of raw material equipment spare parts and

vehicles directly used for production

VAT Exemption for import products

Investment Tax Incentives ndash Special and Specific Economic Zone

Data source JETRO

Investment Tax Incentives in Lao PDR

General Zone Promotion Sector and Zone based Incentives 1 Special amp Specific Economic Zone

Tailor Made Incentives 2 Example of Tax Incentives in Savan-Seno SEZ

Other Tax Incentives

40

Non-Tax Incentives amp Trade Privileges

Data source JETRO

Non-Tax Incentives

Permission

Foreign nationals can undertake feasibility studies

Bring in foreign technicians experts and managers if qualified Lao nationals are not available

Lease land

General business up to 30 years from Lao citizen and up to 50 years from the government (renewable)

Investment in SEZ up to 75 years

Concession business upon negotiation with the government (at present there is an example of 99 years land lease)

Transfer leasehold interests and build on or make improvements or structures to a leased land

Guarantee against nationalization expropriation and requisition without compensation

Protection

Trade Privileges

ASEAN WTO GSP Bilateral trade agreement (over 18 countries)

o Argentina o Belarus o Bulgaria o Cambodia o China o Indonesia o India o Korea DPR o Kuwait

o Malaysia o Mongolia o Myanmar o Philippines o Russian

Federation o Thailand o Turkey o USA o Vietnam

41

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

42

Foreign Currency Exchange

Data source Bank of the Lao PDR

Laos Currency Kip (LAK)

Latest FX Rate (as of August 22 2018)

Remark THB and USD are widely accepted especially in the border trade area

USD 1 ~ LAK 8507

EUR 1 ~ LAK 9851

THB 1 ~ LAK 262

JPY 1 ~ LAK 77

CNY 1 ~ LAK 1193

43

KASIKORNTHAIBANK Service in Lao PDR

Retail Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Current deposit

Lending

Working capital loan

Long term loan

Bank guarantee

Project Financing

FX Services

Corporate Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Remittance

Remittance

Trade Finance Letter of Credit (LC) Standby Letter of Credit (SBLC)

44

KASIKORNTHAI BANK Limited

With establishment KASIKORNTHAIBANK

the first full-scale locally incorporated institution from Thailand is fully committed to support our clientsrsquo cross-border financing and transaction for their trade and investment activities in Lao PDR

45

KASIKORNTHAIBANK in Lao PDR Contacts

bull HEAD OFFICE Unit 12 Lane Xang Avenue Xiangngeun Village Chanthaboury District Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88905 Fax +856 21 253 336 wwwkasikornbankcomla

KASIKORNTHAI BANK Limited

bull PONESINUAN BRANCH

Ban Ponesinuan Unit 14 Sysattanak Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88826 Fax +856 21 410 889

Ms Piyanoot Sangsan Branch Manager KASIKORNTHAI BANK LIMITED Lane Xang Head Office E-mail piyanootskasikornbankcom

Mr Chatuporn Boozaya-Angool Branch Manager Ponesinuan Branch E-mail chatupornbkasikornbankcom

46

About AEC+ Business Advisory The AEC+ Business Advisory is set up by KASIKORNBANK to support businesses in their regional expansion across the ASEAN+3 market by providing local market intelligence and strategic business advice

What we do bull Offer customized and tailor-made advisory services bull Publish investment guides and industry reports bull Deliver in-depth insights via seminars bull Organize business trips to bring first-hand experience

Follow Us Visit our website at

AEC+ BUSINESS ADVISORY

Prepared by Mr Anoot Charoenkiattikul World Business Intelligence Specialist E-mail anootckasikornbankcom

httpswwwkasikornbankcominternational-businessenPagesHomeaspx

47

Page 16: LAO PDR - Facilitiesfuangfah.econ.cmu.ac.th/teacher/nisit/files/201808_LaoPDR_Investm… · • On August 7, the government of Laos announced the suspension of new hydropower project

16

Hydropowerndash Opportunity

Lao PDR has ldquosuspendedrdquo new investment in hydropower projects and will conduct safety inspections for all existing dams due to the dam collapse incident in July

Data source laotiantimescom asianewsnetwork

The dam collapse in late July has caused Lao PDR to suspend new investment in hydropower projects in the country

bull On July 23 the ldquoSaddle Dam Drdquo part of the Xe-Pian Xe-Namnoy hydropower project in Champasak and Attapeu provinces has collapsed This disaster had affected around 5000 people in the area

bull On August 7 the government of Laos announced the suspension of new hydropower project approval and the renewed inspection of the existing dams

Key Policy Updates

2018 June

2018 August

The Lao government has suspended new investment in small-scale hydropower projects due to safety concerns

bull Lao PDR announced a temporary suspension of its authorization for investment in small-scale hydropower projects with installed capacity of lt15MW Such suspension is part of the governmentrsquos attempts to ensure the safety of hydropower dams

bull As a result the provincial and central authorities cannot approve new investment proposals for small-scale hydropower projects until concrete measures to ensure dam safety are drawn up

bull The suspension comes after construction of some projects has been found to be lower than the legally stipulated safety standards

17

Mining

Key Industries amp Opportunities

18

Mining ndash Overview

The mining Industry in Lao PDR has declined over the past several years due to fluctuations in global commodity prices and the maturity of some local mines

Data source International Trade Center worldbank

Lao PDR Mining Product Exports (USD Million 2017E)

Precious Stone Exports (USD Million 2017E)

DIAMOND

62 GOLD

1548 SILVER

54

Key Trends

Overall Lao PDRrsquos mining exports have decreased bull Exports of mining products have decreased since 2013 at an average

rate of 147 falling from USD1014 million in 2013 to USD 4575 in 2017

bull Copper and Coal experience the largest decline in export value mainly because some of the copper and coal mines have matured and global commodity prices have fallen

bull Meanwhile cement and sandstone record the highest increase in export value resulting from new investments and increasing domestic demand for these types of materials to use in the countryrsquos infrastructure development projects

Forms of investment in mining Business cooperation under contract

Joint venture between foreign and local firms

100 foreign or domestic ownership

Remark Firms could set up representative office to gather information and investigate investment opportunities

19

Taxes amp Regulations

Mining ndash Opportunity

Mineral resources in Lao PDR offer opportunities to firms with expertise in mining operations from prospection to mining and processing

Prospection Exploration Feasibility Study

Construction Mining amp Processing

2 years + 1 year

3 years + 2 years

1 year + 1 year

2 years + 1 year

20 years + 5 years

License Duration + Renewable

USD 3 -12 ha year USD 05 ndash 1 ha year + royalty (1-

7) Rental Fee

Registered company

Max 300 sqkm Corporate income 25-35

Value added 10

Rules and regulations for the Minerals Law in accordance to international standard partly missing

Limited number and capacity of local workers in mining sector

High number of mineral trade companies rather than professional mining operations firms

Key Issues

20

Electronic Parts and Components Industry

Key Industries amp Opportunities

21

Electronic Parts and Components Industry - Overview

Over the recent years Laos has experienced exponential growth in its exports of electronic parts and components especially to Thailand indicating the initial formation of the regional supply chain

Lao PDR Electronic Part and Component Exports (USD Million 2017)

Increasing investments in Lao PDR Special Economic Zone (SEZ) boosts trade The presence of SEZs and attractive incentives have attracted FDI inflows into Lao PDR especially in the production of digital camera parts and telecom equipment parts Most manufacturing in these sectors is aimed at exporting intermediate products to assemblers of finished electrical and electronic products in other countries

Main Export Destinations 2017

Data source International Trade Center

Why Thailand has become the top export destination

bull ASEAN Free Trade Agreement (AFTA) ndash The agreement minimizes trade barriers and creates free flow of goods and capital within ASEAN

bull Thailand-based industries shift their focus on value added activities - firms relocate labor-intensive activities to Thailandrsquos neighboring countries including Laos

22

Electronic Parts and Components Industry - Opportunity

Industrial development in Laos offers opportunities for firms to form the regional supply chain model and benefit from comparative advantages from both nations

Data source JETRO

Thailand

Product supply chain

Laos

Did you knowhellip

Challenges

Difficulty in getting large pools of labor due to small population

Underdeveloped infrastructure in some regions

Challenge in recruiting higher skilled specialists

Suggestion Set up in major Special Economic Zones eg Vita Park SEZ and Savan-Seno SEZ

Roll out strategic human resource plan including training and capacity building

bull Advanced infrastructure

bull Experienced and high-skilled (management level) workforce

bull Affordable and youthful workforce bull Located between Vietnam and Thailand

both with high electronics parts demand bull Government incentives

Start operation from small scale (less than 500 workers) then scale up

Japanese enterprises have started implementing Thailand+1 model by relocating labor-intensive production to Laos and exporting back to Thailand to complete product assembly eg NIKON (digital camera) Dai-Ichi Denshi (wire harness) Nissei Mizuki (electronics parts) and Toyota boshoku (car seat cover)

Thailand + 1 Model

23

Industrial Agriculture

Key Industries amp Opportunities

24

Industrial Agriculture - Overview

Most industrial agriculture exports from Lao PDR are produced by foreign investors (Chinese Thai and Vietnamese) and local entrepreneurs to a lesser extent

Data source JETRO International Trade Center Produce Report USDA Foreign Agriculture Service

Leading Agricultural Exports by export value (USD Million 2016 and 2017)

A short-term drop in fruit exports in 2017 bull Exports declined because the Lao government suspended

development of large banana and other fruit plantations which typically produce to export to China and placed more stringent control on polluting farms

bull However at the end of 2017 Lao PDR and China negotiated for less stringent terms for Lao PDRrsquos fruit exports to China

Key Trends

Sugar Cane exports rocketing bull In 2017 sugar cane plantation boomed Export volume grew 121

times from 2016

bull The major reason was the relocation of sugar production from China as production costs there are very high approximately double that of Thailand

Organic fruit and vegetable becoming key economic plants bull Local and foreign investors are increasingly investing in organic

agriculture a higher value-added segment which is demanded by major countries such as Europe US Japan and China

Exports (2016)

USD 02 Million

Exports (2017)

USD 20 Million

121 times

25

Industrial Agriculture - Opportunity

Lao industrial agriculture sector offers opportunities for

bull Agricultural inputs andmachinery producers and distributors

bull Plantation operators

bull Processing and trading firms in Thailand

3 Processing and Trading

Key Drivers Lack of capability to process

products at international standard

Lack of market access

Opportunities Market inputs and machinery

to agricultural projects Investor can target both large scale investment

and smallholder farmers

Opportunities Produce high-value agricultural

products organic products herbs and medical plants

Foreign investors operate via (1) contract farming and (2) concession

Opportunities Process raw products to meet

export standards trade products to leverage existing market channels

Agricultural Inputs and Machinery

Key Drivers Limited access to improved

agricultural inputs - Seed - Fertilizer - Quality machinery

1 2

Key Drivers Arable fertile land

low level of chemical pesticides

Plantation ndash High Value Products

26

Tourism

Key Industries amp Opportunities

27

Tourism - Overview

Tourist arrivals are on a steady rise in the past decade especially tourists from Asia Pacific with most of them visiting more developed border towns neighboring Thailand

Data source Ministry of Tourism TRAVEL amp TOURISM ECONOMIC IMPACT 2018 LAOS

Direct Contribution of Travel amp Tourism to GDP (USD Billion 2012-2018E)

bull Both tourist arrivals and revenue from tourism have increased approximately 3 folds in the past decade

bull Most tourists come from Asia Pacific (93) particularly from from Thailand (50) and Vietnam (25) followed by Europe (5)

Top Tourist Arrivals Destinations 2017

1 Vientiane Capital

2 Savannakhet

3 Champasak

Most top tourist destinations are more developed towns bordering Thailand

Nong Khai

Mukdahan

Ubon Ratchathani

World Heritage sites im these following city also attract a considerable number of visitors

Luang Prabang Wat Pu at Champasak

28

Business Opportunities Associated to Tourism Sector

Accommodate increasing tourist arrivals

Provide dining and entertainment services

Develop attractive ecotourism cultural tourism packages

Provide transportation services linking major tourism sites

Produce and market souvenirs applying local arts design and materials

1 Hotel Restaurant Entertainment

2 Tour Company Holiday Package

3 Sourvenirs

4 Transportation Service

Tourism - Opportunity

29

Lao Consumer Income and Behavior

Prefer to cook at home Enjoy drinking alcohol Middle income enjoy

spending evening in beer garden

Lao women wear sinh Follow Thai and Korean

fashion due to influence of TV series

Shop at traditional markets Middle income shop at

Thai border towns (Nong Khai Udon Thani)

Thai and Japanese products are perceived to have high quality Chinese products are perceived as sub-standard quality and Korean products are in between

30

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

31

Major Costs ndash Labor and Utility

Electricity Rate 2017

0 - 25 kwh 004USDkwh

26 - 150 kwh 005USDkwh

151 - 300 kwh 009USDkwh

more than 500 kwh 012USDkwh

301 - 400 kwh 010USDkwh

401 - 500 kwh 011USDkwh

Water Price (Per Unit) for Business and Trade Units

bull Water price for businesses is set to increase from USD USD 036 in 2017 to USD038 per unit this year

Labor minimum monthly wage in ASEAN 2017 USD

32

Tax System

Monthly Income (LAK) Tax Rate

0 ndash 1000000 0

1000001 - 3000000 5

3000001 - 6000000 10

6000001 - 12000000 12

12000001 - 24000000 15

24000001 - 40000000 20

Above 40000000 24

Types of Tax Tax rate

Profit Tax 24

Value Added Tax (VAT) 10

Withholding Tax Dividends 10

(non-residents) Transfer of shares 10

Transfer of assets 5

China

Luxembourg

Malaysia

Singapore

South Korea

Thailand

Vietnam

Income tax treaties for avoidance of double taxation

Note There is no definition of residence for tax purposes in Laos All companies registered under Lao law (including foreign law) are subject to Lao profit tax

Personal Income Tax Corporate Taxes

Data source DFDL

33

Foreign Investment Regulations

Data source JETRO Compiled by World Business Advisory Center

Not Permitted to Foreigner Only for Joint Venture with Local Company 100 Foreign Ownership Allowed

Wholesale and Retail Businesses

100 Foreign Ownership bull If registered capital is 20 billion Lao Kip

(USD 25 million) or more

Maximum 70 Foreign Ownership bull If registered capital is 10 - 20 billion Lao Kip

(USD 125 ndash 25 million)

Maximum 50 Foreign Ownership bull If registered capital is 4 - 10 billion Lao Kip

(USD 05 ndash 125 million)

bull If registered capital is less than 4 billion Lao Kip (USD 05 million)

Hotel and Restaurants Maximum 60 Foreign Ownership bull 3-5 stars hotel with minimum registered capital of

1 billion Lao Kip (USD 125000)

bull Less than 3 stars hotel 100 Foreign Ownership bull NOT ALLOWED

Logistics

100 Foreign Ownership bull Domestic goods transport with minimum

registered capital of 3 billion Lao Kip (USD 375000)

Maximum 49 Foreign Ownership bull Cross border goods transport with minimum

registered capital of 5 billion Lao Kip (USD 625000)

bull Cross border goods transport with less than 5 billion Lao Kip of registered capital

bull Domestic goods transport with less than 3 billion Lao Kip of registered capital

Examples of Foreign Investment Regulations

Foreign enterprises are subject to foreign investment regulations in several business activities Generally small businesses are preserved for Lao enterprises whereas large businesses with certain investment conditions are opened for foreign investors

34

Types of Investment ndash (1) General Business

Data source JETRO Compiled by World Business Advisory Center

Besides foreign investment regulation foreign enterprises are also subject to the investment promotion law which classifies investment into 3 types

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Investment in General Business

Types of Investment in Lao PDR

Description

o An investment in general economic activities

o Activities including controlled businesses ndash businesses that require additional approval from relevant ministries

o Activities excluding concession business

Register Capital

Requirements

o At least 1 billion Lao Kip (USD 125000)

o At the day of establishment must pay 40 (agriculture business) 60 (production and processing) 80 (services) The remainder must be paid within 1 year

Examples of Controlled Businesses 1 Agriculture plantation agriculture fishery 2 Manufacturing petroleum products leathers textile amp clothing papers

printing pesticides pharmaceutical products 3 Businesses related to environment eg wastewater treatment 4 Wholesale and retails of gasoline and petroleum products 5 Transportation 6 Hotel and Restaurant 7 Media and Publication 8 Finance and insurance 9 Legal accounting and tax services 10 Tourism 11 Education 12 Hospital clinic and medical services 13 Recreation (museum and amusement park)

35

Types of Investment ndash (2) Concession Business

Data source JETRO Compiled by World Business Advisory Center

Investment in Concession Business

Description

o An investment that requires a concession or specific authorization from the government to use the governmentrsquos property

o Some concession businesses requires authorization from the central government whereas the other requires only provincial government level of authorization for example

bull At least 5MW electricity generation project requires the central government authorization

bull Less than 5MW electricity generation projects requires only provincial government authorization

Examples of Concession Business

1 Mining 2 Electricity generation 3 Infrastructure

bull Telecommunication bull TV and radio station bull Road railway airport seaport waste disposal site

4 Businesses that use the government land bull Shopping center bull Tourist attraction bull Public park bull Hotel bull Forestry and Logging bull Plantation and Livestock

Register Capital

Requirements

o Must pay at least 20 of registered capital while remaining should be paid within 2 years

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Types of Investment in Lao PDR

36

Types of Investment ndash (3) Business Related to SEZ

Data source JETRO Compiled by World Business Advisory Center

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Types of Investment in Lao PDR

Investment in Business Related to SEZ

Description

o Business related to Special Economic Zone -gt an investment in building infrastructure for a new town

o Business related to Specific Economic Zone -gt an investment in infrastructure development for specific purpose projects such as industrial zone export zone tourist development zone etc

High Potential SEZs in Laos

o Vita Park Special Economic Zone (Vientiane)

o Savan-Seno Special Economic Zone (Savannakhet)

o Pakxe-Japan SME Specific Economic Zone (Champasak)

Special and Specific Economic Zones

1 Boten-Daenkham Specific Economic Zone 2 Luang Prabang Special Economic Zone 3 Golden Triangle Special Economic Zone 4 Thatluang Lake Specific Economic Zone 5 Longthanh Specific Economic Zone 6 Xaysettha Specific Economic Zone 7 Vita Park Special Economic Zone 8 Dongphosy Specific Economic Zone 9 Thakhek Specific Economic Zone 10 Poukiao Specific Economic Zone 11 Savan-Seno Special Economic Zone 12 Pakxe-Japan SME Specific Economic Zone

1

2

3

4

5 6

7

8

9 10

11

12

37

General Business

Concession Business

Business related to

SEZs

Procedure of Investment in Lao PDR

The investment approval procedure varies depending upon type of investment However all foreign investors must go through enterprise registration tax identification number registration and application for capital importation certificate

Apply at Ministry of Planning and

Investment

For developer apply at National Committee for Special Economic Zone

For investor apply at One-Stop Service Unit in

each SEZ

Get Concession

License

Get SEZ Concession

License

For controlled businesses apply for

approval at relevant Ministries

Get Approval License

Apply at Ministry of

Industry and Commerce

For non-controlled businesses

Get Enterprise

Registration Certificate

(ERC)

Apply for Tax

Identification Number TIN

at Tax Department Ministry of

Finance

Apply for Capital

Importation Certificate at Bank of Lao

PDR

Data source JETRO Compiled by World Business Advisory Center

38

Investment Tax Incentives ndash General Zone

Data source JETRO Compiled by World Business Advisory Center

Investment Tax Incentives in Lao PDR

Profit Tax Exemption Period

Level 1 High Promotion

Level 2 Moderate Promotion

Level 3 Low Promotion

Zone 1 10 years 6 years 4 years

Zone 2 6 years 4 years 2 years

Zone 3 4 years 2 years 1 years

Profit Tax Exemption Period by Promotion Sector and Zone

Promoted sectors Agriculture Industrial Handicrafts and Services

Type of Tax Exemption

General Zone Promotion Sector and Zone based Incentives 1 Special amp Specific Economic Zone

Tailor Made Incentives 2

Profit tax in next accounting year in case net profit is used for reinvestment (business

expansion)

Import duties for import of raw material equipment spare parts and

vehicles directly used for production

Export duties for general goods and

products (resource-based products should follow

associated laws)

Permission to carry forward losses to

three consecutive accounting years

39

Sector Period of

Profit Tax Exemption

Profit Tax Rate

After Tax Exemption Period

Hi-Tech Manufacturing 10 year 8

Manufacturing that exports at least 70 of production 10 year 8

Manufacturing that exports 30 - 60 of production 7 year 8

Manufacturing that exports 0 - 29 of production 5 year 8

Other 5 year 8

Investment amount of USD 2 million or more 10 year 8

Investment amount of USD 500000 - USD 2 million 8 year 8

Investment amount of USD 300000 - USD 500000 6 year 10

Investment amount of USD 150000 - USD 300000 4 year 10

Investment amount of USD 50000 - USD 150000 2 year 10

Export Laos products 5 year 10

International trade company 3 year 10

General trade company 2 year 10

a) Manufacturing

b) Service

c) Commerce

Personal Income Tax 5

Dividend Tax after Profit Tax Exemption Period

5

Import Duty Exemption for import of raw material equipment spare parts and

vehicles directly used for production

VAT Exemption for import products

Investment Tax Incentives ndash Special and Specific Economic Zone

Data source JETRO

Investment Tax Incentives in Lao PDR

General Zone Promotion Sector and Zone based Incentives 1 Special amp Specific Economic Zone

Tailor Made Incentives 2 Example of Tax Incentives in Savan-Seno SEZ

Other Tax Incentives

40

Non-Tax Incentives amp Trade Privileges

Data source JETRO

Non-Tax Incentives

Permission

Foreign nationals can undertake feasibility studies

Bring in foreign technicians experts and managers if qualified Lao nationals are not available

Lease land

General business up to 30 years from Lao citizen and up to 50 years from the government (renewable)

Investment in SEZ up to 75 years

Concession business upon negotiation with the government (at present there is an example of 99 years land lease)

Transfer leasehold interests and build on or make improvements or structures to a leased land

Guarantee against nationalization expropriation and requisition without compensation

Protection

Trade Privileges

ASEAN WTO GSP Bilateral trade agreement (over 18 countries)

o Argentina o Belarus o Bulgaria o Cambodia o China o Indonesia o India o Korea DPR o Kuwait

o Malaysia o Mongolia o Myanmar o Philippines o Russian

Federation o Thailand o Turkey o USA o Vietnam

41

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

42

Foreign Currency Exchange

Data source Bank of the Lao PDR

Laos Currency Kip (LAK)

Latest FX Rate (as of August 22 2018)

Remark THB and USD are widely accepted especially in the border trade area

USD 1 ~ LAK 8507

EUR 1 ~ LAK 9851

THB 1 ~ LAK 262

JPY 1 ~ LAK 77

CNY 1 ~ LAK 1193

43

KASIKORNTHAIBANK Service in Lao PDR

Retail Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Current deposit

Lending

Working capital loan

Long term loan

Bank guarantee

Project Financing

FX Services

Corporate Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Remittance

Remittance

Trade Finance Letter of Credit (LC) Standby Letter of Credit (SBLC)

44

KASIKORNTHAI BANK Limited

With establishment KASIKORNTHAIBANK

the first full-scale locally incorporated institution from Thailand is fully committed to support our clientsrsquo cross-border financing and transaction for their trade and investment activities in Lao PDR

45

KASIKORNTHAIBANK in Lao PDR Contacts

bull HEAD OFFICE Unit 12 Lane Xang Avenue Xiangngeun Village Chanthaboury District Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88905 Fax +856 21 253 336 wwwkasikornbankcomla

KASIKORNTHAI BANK Limited

bull PONESINUAN BRANCH

Ban Ponesinuan Unit 14 Sysattanak Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88826 Fax +856 21 410 889

Ms Piyanoot Sangsan Branch Manager KASIKORNTHAI BANK LIMITED Lane Xang Head Office E-mail piyanootskasikornbankcom

Mr Chatuporn Boozaya-Angool Branch Manager Ponesinuan Branch E-mail chatupornbkasikornbankcom

46

About AEC+ Business Advisory The AEC+ Business Advisory is set up by KASIKORNBANK to support businesses in their regional expansion across the ASEAN+3 market by providing local market intelligence and strategic business advice

What we do bull Offer customized and tailor-made advisory services bull Publish investment guides and industry reports bull Deliver in-depth insights via seminars bull Organize business trips to bring first-hand experience

Follow Us Visit our website at

AEC+ BUSINESS ADVISORY

Prepared by Mr Anoot Charoenkiattikul World Business Intelligence Specialist E-mail anootckasikornbankcom

httpswwwkasikornbankcominternational-businessenPagesHomeaspx

47

Page 17: LAO PDR - Facilitiesfuangfah.econ.cmu.ac.th/teacher/nisit/files/201808_LaoPDR_Investm… · • On August 7, the government of Laos announced the suspension of new hydropower project

17

Mining

Key Industries amp Opportunities

18

Mining ndash Overview

The mining Industry in Lao PDR has declined over the past several years due to fluctuations in global commodity prices and the maturity of some local mines

Data source International Trade Center worldbank

Lao PDR Mining Product Exports (USD Million 2017E)

Precious Stone Exports (USD Million 2017E)

DIAMOND

62 GOLD

1548 SILVER

54

Key Trends

Overall Lao PDRrsquos mining exports have decreased bull Exports of mining products have decreased since 2013 at an average

rate of 147 falling from USD1014 million in 2013 to USD 4575 in 2017

bull Copper and Coal experience the largest decline in export value mainly because some of the copper and coal mines have matured and global commodity prices have fallen

bull Meanwhile cement and sandstone record the highest increase in export value resulting from new investments and increasing domestic demand for these types of materials to use in the countryrsquos infrastructure development projects

Forms of investment in mining Business cooperation under contract

Joint venture between foreign and local firms

100 foreign or domestic ownership

Remark Firms could set up representative office to gather information and investigate investment opportunities

19

Taxes amp Regulations

Mining ndash Opportunity

Mineral resources in Lao PDR offer opportunities to firms with expertise in mining operations from prospection to mining and processing

Prospection Exploration Feasibility Study

Construction Mining amp Processing

2 years + 1 year

3 years + 2 years

1 year + 1 year

2 years + 1 year

20 years + 5 years

License Duration + Renewable

USD 3 -12 ha year USD 05 ndash 1 ha year + royalty (1-

7) Rental Fee

Registered company

Max 300 sqkm Corporate income 25-35

Value added 10

Rules and regulations for the Minerals Law in accordance to international standard partly missing

Limited number and capacity of local workers in mining sector

High number of mineral trade companies rather than professional mining operations firms

Key Issues

20

Electronic Parts and Components Industry

Key Industries amp Opportunities

21

Electronic Parts and Components Industry - Overview

Over the recent years Laos has experienced exponential growth in its exports of electronic parts and components especially to Thailand indicating the initial formation of the regional supply chain

Lao PDR Electronic Part and Component Exports (USD Million 2017)

Increasing investments in Lao PDR Special Economic Zone (SEZ) boosts trade The presence of SEZs and attractive incentives have attracted FDI inflows into Lao PDR especially in the production of digital camera parts and telecom equipment parts Most manufacturing in these sectors is aimed at exporting intermediate products to assemblers of finished electrical and electronic products in other countries

Main Export Destinations 2017

Data source International Trade Center

Why Thailand has become the top export destination

bull ASEAN Free Trade Agreement (AFTA) ndash The agreement minimizes trade barriers and creates free flow of goods and capital within ASEAN

bull Thailand-based industries shift their focus on value added activities - firms relocate labor-intensive activities to Thailandrsquos neighboring countries including Laos

22

Electronic Parts and Components Industry - Opportunity

Industrial development in Laos offers opportunities for firms to form the regional supply chain model and benefit from comparative advantages from both nations

Data source JETRO

Thailand

Product supply chain

Laos

Did you knowhellip

Challenges

Difficulty in getting large pools of labor due to small population

Underdeveloped infrastructure in some regions

Challenge in recruiting higher skilled specialists

Suggestion Set up in major Special Economic Zones eg Vita Park SEZ and Savan-Seno SEZ

Roll out strategic human resource plan including training and capacity building

bull Advanced infrastructure

bull Experienced and high-skilled (management level) workforce

bull Affordable and youthful workforce bull Located between Vietnam and Thailand

both with high electronics parts demand bull Government incentives

Start operation from small scale (less than 500 workers) then scale up

Japanese enterprises have started implementing Thailand+1 model by relocating labor-intensive production to Laos and exporting back to Thailand to complete product assembly eg NIKON (digital camera) Dai-Ichi Denshi (wire harness) Nissei Mizuki (electronics parts) and Toyota boshoku (car seat cover)

Thailand + 1 Model

23

Industrial Agriculture

Key Industries amp Opportunities

24

Industrial Agriculture - Overview

Most industrial agriculture exports from Lao PDR are produced by foreign investors (Chinese Thai and Vietnamese) and local entrepreneurs to a lesser extent

Data source JETRO International Trade Center Produce Report USDA Foreign Agriculture Service

Leading Agricultural Exports by export value (USD Million 2016 and 2017)

A short-term drop in fruit exports in 2017 bull Exports declined because the Lao government suspended

development of large banana and other fruit plantations which typically produce to export to China and placed more stringent control on polluting farms

bull However at the end of 2017 Lao PDR and China negotiated for less stringent terms for Lao PDRrsquos fruit exports to China

Key Trends

Sugar Cane exports rocketing bull In 2017 sugar cane plantation boomed Export volume grew 121

times from 2016

bull The major reason was the relocation of sugar production from China as production costs there are very high approximately double that of Thailand

Organic fruit and vegetable becoming key economic plants bull Local and foreign investors are increasingly investing in organic

agriculture a higher value-added segment which is demanded by major countries such as Europe US Japan and China

Exports (2016)

USD 02 Million

Exports (2017)

USD 20 Million

121 times

25

Industrial Agriculture - Opportunity

Lao industrial agriculture sector offers opportunities for

bull Agricultural inputs andmachinery producers and distributors

bull Plantation operators

bull Processing and trading firms in Thailand

3 Processing and Trading

Key Drivers Lack of capability to process

products at international standard

Lack of market access

Opportunities Market inputs and machinery

to agricultural projects Investor can target both large scale investment

and smallholder farmers

Opportunities Produce high-value agricultural

products organic products herbs and medical plants

Foreign investors operate via (1) contract farming and (2) concession

Opportunities Process raw products to meet

export standards trade products to leverage existing market channels

Agricultural Inputs and Machinery

Key Drivers Limited access to improved

agricultural inputs - Seed - Fertilizer - Quality machinery

1 2

Key Drivers Arable fertile land

low level of chemical pesticides

Plantation ndash High Value Products

26

Tourism

Key Industries amp Opportunities

27

Tourism - Overview

Tourist arrivals are on a steady rise in the past decade especially tourists from Asia Pacific with most of them visiting more developed border towns neighboring Thailand

Data source Ministry of Tourism TRAVEL amp TOURISM ECONOMIC IMPACT 2018 LAOS

Direct Contribution of Travel amp Tourism to GDP (USD Billion 2012-2018E)

bull Both tourist arrivals and revenue from tourism have increased approximately 3 folds in the past decade

bull Most tourists come from Asia Pacific (93) particularly from from Thailand (50) and Vietnam (25) followed by Europe (5)

Top Tourist Arrivals Destinations 2017

1 Vientiane Capital

2 Savannakhet

3 Champasak

Most top tourist destinations are more developed towns bordering Thailand

Nong Khai

Mukdahan

Ubon Ratchathani

World Heritage sites im these following city also attract a considerable number of visitors

Luang Prabang Wat Pu at Champasak

28

Business Opportunities Associated to Tourism Sector

Accommodate increasing tourist arrivals

Provide dining and entertainment services

Develop attractive ecotourism cultural tourism packages

Provide transportation services linking major tourism sites

Produce and market souvenirs applying local arts design and materials

1 Hotel Restaurant Entertainment

2 Tour Company Holiday Package

3 Sourvenirs

4 Transportation Service

Tourism - Opportunity

29

Lao Consumer Income and Behavior

Prefer to cook at home Enjoy drinking alcohol Middle income enjoy

spending evening in beer garden

Lao women wear sinh Follow Thai and Korean

fashion due to influence of TV series

Shop at traditional markets Middle income shop at

Thai border towns (Nong Khai Udon Thani)

Thai and Japanese products are perceived to have high quality Chinese products are perceived as sub-standard quality and Korean products are in between

30

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

31

Major Costs ndash Labor and Utility

Electricity Rate 2017

0 - 25 kwh 004USDkwh

26 - 150 kwh 005USDkwh

151 - 300 kwh 009USDkwh

more than 500 kwh 012USDkwh

301 - 400 kwh 010USDkwh

401 - 500 kwh 011USDkwh

Water Price (Per Unit) for Business and Trade Units

bull Water price for businesses is set to increase from USD USD 036 in 2017 to USD038 per unit this year

Labor minimum monthly wage in ASEAN 2017 USD

32

Tax System

Monthly Income (LAK) Tax Rate

0 ndash 1000000 0

1000001 - 3000000 5

3000001 - 6000000 10

6000001 - 12000000 12

12000001 - 24000000 15

24000001 - 40000000 20

Above 40000000 24

Types of Tax Tax rate

Profit Tax 24

Value Added Tax (VAT) 10

Withholding Tax Dividends 10

(non-residents) Transfer of shares 10

Transfer of assets 5

China

Luxembourg

Malaysia

Singapore

South Korea

Thailand

Vietnam

Income tax treaties for avoidance of double taxation

Note There is no definition of residence for tax purposes in Laos All companies registered under Lao law (including foreign law) are subject to Lao profit tax

Personal Income Tax Corporate Taxes

Data source DFDL

33

Foreign Investment Regulations

Data source JETRO Compiled by World Business Advisory Center

Not Permitted to Foreigner Only for Joint Venture with Local Company 100 Foreign Ownership Allowed

Wholesale and Retail Businesses

100 Foreign Ownership bull If registered capital is 20 billion Lao Kip

(USD 25 million) or more

Maximum 70 Foreign Ownership bull If registered capital is 10 - 20 billion Lao Kip

(USD 125 ndash 25 million)

Maximum 50 Foreign Ownership bull If registered capital is 4 - 10 billion Lao Kip

(USD 05 ndash 125 million)

bull If registered capital is less than 4 billion Lao Kip (USD 05 million)

Hotel and Restaurants Maximum 60 Foreign Ownership bull 3-5 stars hotel with minimum registered capital of

1 billion Lao Kip (USD 125000)

bull Less than 3 stars hotel 100 Foreign Ownership bull NOT ALLOWED

Logistics

100 Foreign Ownership bull Domestic goods transport with minimum

registered capital of 3 billion Lao Kip (USD 375000)

Maximum 49 Foreign Ownership bull Cross border goods transport with minimum

registered capital of 5 billion Lao Kip (USD 625000)

bull Cross border goods transport with less than 5 billion Lao Kip of registered capital

bull Domestic goods transport with less than 3 billion Lao Kip of registered capital

Examples of Foreign Investment Regulations

Foreign enterprises are subject to foreign investment regulations in several business activities Generally small businesses are preserved for Lao enterprises whereas large businesses with certain investment conditions are opened for foreign investors

34

Types of Investment ndash (1) General Business

Data source JETRO Compiled by World Business Advisory Center

Besides foreign investment regulation foreign enterprises are also subject to the investment promotion law which classifies investment into 3 types

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Investment in General Business

Types of Investment in Lao PDR

Description

o An investment in general economic activities

o Activities including controlled businesses ndash businesses that require additional approval from relevant ministries

o Activities excluding concession business

Register Capital

Requirements

o At least 1 billion Lao Kip (USD 125000)

o At the day of establishment must pay 40 (agriculture business) 60 (production and processing) 80 (services) The remainder must be paid within 1 year

Examples of Controlled Businesses 1 Agriculture plantation agriculture fishery 2 Manufacturing petroleum products leathers textile amp clothing papers

printing pesticides pharmaceutical products 3 Businesses related to environment eg wastewater treatment 4 Wholesale and retails of gasoline and petroleum products 5 Transportation 6 Hotel and Restaurant 7 Media and Publication 8 Finance and insurance 9 Legal accounting and tax services 10 Tourism 11 Education 12 Hospital clinic and medical services 13 Recreation (museum and amusement park)

35

Types of Investment ndash (2) Concession Business

Data source JETRO Compiled by World Business Advisory Center

Investment in Concession Business

Description

o An investment that requires a concession or specific authorization from the government to use the governmentrsquos property

o Some concession businesses requires authorization from the central government whereas the other requires only provincial government level of authorization for example

bull At least 5MW electricity generation project requires the central government authorization

bull Less than 5MW electricity generation projects requires only provincial government authorization

Examples of Concession Business

1 Mining 2 Electricity generation 3 Infrastructure

bull Telecommunication bull TV and radio station bull Road railway airport seaport waste disposal site

4 Businesses that use the government land bull Shopping center bull Tourist attraction bull Public park bull Hotel bull Forestry and Logging bull Plantation and Livestock

Register Capital

Requirements

o Must pay at least 20 of registered capital while remaining should be paid within 2 years

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Types of Investment in Lao PDR

36

Types of Investment ndash (3) Business Related to SEZ

Data source JETRO Compiled by World Business Advisory Center

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Types of Investment in Lao PDR

Investment in Business Related to SEZ

Description

o Business related to Special Economic Zone -gt an investment in building infrastructure for a new town

o Business related to Specific Economic Zone -gt an investment in infrastructure development for specific purpose projects such as industrial zone export zone tourist development zone etc

High Potential SEZs in Laos

o Vita Park Special Economic Zone (Vientiane)

o Savan-Seno Special Economic Zone (Savannakhet)

o Pakxe-Japan SME Specific Economic Zone (Champasak)

Special and Specific Economic Zones

1 Boten-Daenkham Specific Economic Zone 2 Luang Prabang Special Economic Zone 3 Golden Triangle Special Economic Zone 4 Thatluang Lake Specific Economic Zone 5 Longthanh Specific Economic Zone 6 Xaysettha Specific Economic Zone 7 Vita Park Special Economic Zone 8 Dongphosy Specific Economic Zone 9 Thakhek Specific Economic Zone 10 Poukiao Specific Economic Zone 11 Savan-Seno Special Economic Zone 12 Pakxe-Japan SME Specific Economic Zone

1

2

3

4

5 6

7

8

9 10

11

12

37

General Business

Concession Business

Business related to

SEZs

Procedure of Investment in Lao PDR

The investment approval procedure varies depending upon type of investment However all foreign investors must go through enterprise registration tax identification number registration and application for capital importation certificate

Apply at Ministry of Planning and

Investment

For developer apply at National Committee for Special Economic Zone

For investor apply at One-Stop Service Unit in

each SEZ

Get Concession

License

Get SEZ Concession

License

For controlled businesses apply for

approval at relevant Ministries

Get Approval License

Apply at Ministry of

Industry and Commerce

For non-controlled businesses

Get Enterprise

Registration Certificate

(ERC)

Apply for Tax

Identification Number TIN

at Tax Department Ministry of

Finance

Apply for Capital

Importation Certificate at Bank of Lao

PDR

Data source JETRO Compiled by World Business Advisory Center

38

Investment Tax Incentives ndash General Zone

Data source JETRO Compiled by World Business Advisory Center

Investment Tax Incentives in Lao PDR

Profit Tax Exemption Period

Level 1 High Promotion

Level 2 Moderate Promotion

Level 3 Low Promotion

Zone 1 10 years 6 years 4 years

Zone 2 6 years 4 years 2 years

Zone 3 4 years 2 years 1 years

Profit Tax Exemption Period by Promotion Sector and Zone

Promoted sectors Agriculture Industrial Handicrafts and Services

Type of Tax Exemption

General Zone Promotion Sector and Zone based Incentives 1 Special amp Specific Economic Zone

Tailor Made Incentives 2

Profit tax in next accounting year in case net profit is used for reinvestment (business

expansion)

Import duties for import of raw material equipment spare parts and

vehicles directly used for production

Export duties for general goods and

products (resource-based products should follow

associated laws)

Permission to carry forward losses to

three consecutive accounting years

39

Sector Period of

Profit Tax Exemption

Profit Tax Rate

After Tax Exemption Period

Hi-Tech Manufacturing 10 year 8

Manufacturing that exports at least 70 of production 10 year 8

Manufacturing that exports 30 - 60 of production 7 year 8

Manufacturing that exports 0 - 29 of production 5 year 8

Other 5 year 8

Investment amount of USD 2 million or more 10 year 8

Investment amount of USD 500000 - USD 2 million 8 year 8

Investment amount of USD 300000 - USD 500000 6 year 10

Investment amount of USD 150000 - USD 300000 4 year 10

Investment amount of USD 50000 - USD 150000 2 year 10

Export Laos products 5 year 10

International trade company 3 year 10

General trade company 2 year 10

a) Manufacturing

b) Service

c) Commerce

Personal Income Tax 5

Dividend Tax after Profit Tax Exemption Period

5

Import Duty Exemption for import of raw material equipment spare parts and

vehicles directly used for production

VAT Exemption for import products

Investment Tax Incentives ndash Special and Specific Economic Zone

Data source JETRO

Investment Tax Incentives in Lao PDR

General Zone Promotion Sector and Zone based Incentives 1 Special amp Specific Economic Zone

Tailor Made Incentives 2 Example of Tax Incentives in Savan-Seno SEZ

Other Tax Incentives

40

Non-Tax Incentives amp Trade Privileges

Data source JETRO

Non-Tax Incentives

Permission

Foreign nationals can undertake feasibility studies

Bring in foreign technicians experts and managers if qualified Lao nationals are not available

Lease land

General business up to 30 years from Lao citizen and up to 50 years from the government (renewable)

Investment in SEZ up to 75 years

Concession business upon negotiation with the government (at present there is an example of 99 years land lease)

Transfer leasehold interests and build on or make improvements or structures to a leased land

Guarantee against nationalization expropriation and requisition without compensation

Protection

Trade Privileges

ASEAN WTO GSP Bilateral trade agreement (over 18 countries)

o Argentina o Belarus o Bulgaria o Cambodia o China o Indonesia o India o Korea DPR o Kuwait

o Malaysia o Mongolia o Myanmar o Philippines o Russian

Federation o Thailand o Turkey o USA o Vietnam

41

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

42

Foreign Currency Exchange

Data source Bank of the Lao PDR

Laos Currency Kip (LAK)

Latest FX Rate (as of August 22 2018)

Remark THB and USD are widely accepted especially in the border trade area

USD 1 ~ LAK 8507

EUR 1 ~ LAK 9851

THB 1 ~ LAK 262

JPY 1 ~ LAK 77

CNY 1 ~ LAK 1193

43

KASIKORNTHAIBANK Service in Lao PDR

Retail Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Current deposit

Lending

Working capital loan

Long term loan

Bank guarantee

Project Financing

FX Services

Corporate Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Remittance

Remittance

Trade Finance Letter of Credit (LC) Standby Letter of Credit (SBLC)

44

KASIKORNTHAI BANK Limited

With establishment KASIKORNTHAIBANK

the first full-scale locally incorporated institution from Thailand is fully committed to support our clientsrsquo cross-border financing and transaction for their trade and investment activities in Lao PDR

45

KASIKORNTHAIBANK in Lao PDR Contacts

bull HEAD OFFICE Unit 12 Lane Xang Avenue Xiangngeun Village Chanthaboury District Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88905 Fax +856 21 253 336 wwwkasikornbankcomla

KASIKORNTHAI BANK Limited

bull PONESINUAN BRANCH

Ban Ponesinuan Unit 14 Sysattanak Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88826 Fax +856 21 410 889

Ms Piyanoot Sangsan Branch Manager KASIKORNTHAI BANK LIMITED Lane Xang Head Office E-mail piyanootskasikornbankcom

Mr Chatuporn Boozaya-Angool Branch Manager Ponesinuan Branch E-mail chatupornbkasikornbankcom

46

About AEC+ Business Advisory The AEC+ Business Advisory is set up by KASIKORNBANK to support businesses in their regional expansion across the ASEAN+3 market by providing local market intelligence and strategic business advice

What we do bull Offer customized and tailor-made advisory services bull Publish investment guides and industry reports bull Deliver in-depth insights via seminars bull Organize business trips to bring first-hand experience

Follow Us Visit our website at

AEC+ BUSINESS ADVISORY

Prepared by Mr Anoot Charoenkiattikul World Business Intelligence Specialist E-mail anootckasikornbankcom

httpswwwkasikornbankcominternational-businessenPagesHomeaspx

47

Page 18: LAO PDR - Facilitiesfuangfah.econ.cmu.ac.th/teacher/nisit/files/201808_LaoPDR_Investm… · • On August 7, the government of Laos announced the suspension of new hydropower project

18

Mining ndash Overview

The mining Industry in Lao PDR has declined over the past several years due to fluctuations in global commodity prices and the maturity of some local mines

Data source International Trade Center worldbank

Lao PDR Mining Product Exports (USD Million 2017E)

Precious Stone Exports (USD Million 2017E)

DIAMOND

62 GOLD

1548 SILVER

54

Key Trends

Overall Lao PDRrsquos mining exports have decreased bull Exports of mining products have decreased since 2013 at an average

rate of 147 falling from USD1014 million in 2013 to USD 4575 in 2017

bull Copper and Coal experience the largest decline in export value mainly because some of the copper and coal mines have matured and global commodity prices have fallen

bull Meanwhile cement and sandstone record the highest increase in export value resulting from new investments and increasing domestic demand for these types of materials to use in the countryrsquos infrastructure development projects

Forms of investment in mining Business cooperation under contract

Joint venture between foreign and local firms

100 foreign or domestic ownership

Remark Firms could set up representative office to gather information and investigate investment opportunities

19

Taxes amp Regulations

Mining ndash Opportunity

Mineral resources in Lao PDR offer opportunities to firms with expertise in mining operations from prospection to mining and processing

Prospection Exploration Feasibility Study

Construction Mining amp Processing

2 years + 1 year

3 years + 2 years

1 year + 1 year

2 years + 1 year

20 years + 5 years

License Duration + Renewable

USD 3 -12 ha year USD 05 ndash 1 ha year + royalty (1-

7) Rental Fee

Registered company

Max 300 sqkm Corporate income 25-35

Value added 10

Rules and regulations for the Minerals Law in accordance to international standard partly missing

Limited number and capacity of local workers in mining sector

High number of mineral trade companies rather than professional mining operations firms

Key Issues

20

Electronic Parts and Components Industry

Key Industries amp Opportunities

21

Electronic Parts and Components Industry - Overview

Over the recent years Laos has experienced exponential growth in its exports of electronic parts and components especially to Thailand indicating the initial formation of the regional supply chain

Lao PDR Electronic Part and Component Exports (USD Million 2017)

Increasing investments in Lao PDR Special Economic Zone (SEZ) boosts trade The presence of SEZs and attractive incentives have attracted FDI inflows into Lao PDR especially in the production of digital camera parts and telecom equipment parts Most manufacturing in these sectors is aimed at exporting intermediate products to assemblers of finished electrical and electronic products in other countries

Main Export Destinations 2017

Data source International Trade Center

Why Thailand has become the top export destination

bull ASEAN Free Trade Agreement (AFTA) ndash The agreement minimizes trade barriers and creates free flow of goods and capital within ASEAN

bull Thailand-based industries shift their focus on value added activities - firms relocate labor-intensive activities to Thailandrsquos neighboring countries including Laos

22

Electronic Parts and Components Industry - Opportunity

Industrial development in Laos offers opportunities for firms to form the regional supply chain model and benefit from comparative advantages from both nations

Data source JETRO

Thailand

Product supply chain

Laos

Did you knowhellip

Challenges

Difficulty in getting large pools of labor due to small population

Underdeveloped infrastructure in some regions

Challenge in recruiting higher skilled specialists

Suggestion Set up in major Special Economic Zones eg Vita Park SEZ and Savan-Seno SEZ

Roll out strategic human resource plan including training and capacity building

bull Advanced infrastructure

bull Experienced and high-skilled (management level) workforce

bull Affordable and youthful workforce bull Located between Vietnam and Thailand

both with high electronics parts demand bull Government incentives

Start operation from small scale (less than 500 workers) then scale up

Japanese enterprises have started implementing Thailand+1 model by relocating labor-intensive production to Laos and exporting back to Thailand to complete product assembly eg NIKON (digital camera) Dai-Ichi Denshi (wire harness) Nissei Mizuki (electronics parts) and Toyota boshoku (car seat cover)

Thailand + 1 Model

23

Industrial Agriculture

Key Industries amp Opportunities

24

Industrial Agriculture - Overview

Most industrial agriculture exports from Lao PDR are produced by foreign investors (Chinese Thai and Vietnamese) and local entrepreneurs to a lesser extent

Data source JETRO International Trade Center Produce Report USDA Foreign Agriculture Service

Leading Agricultural Exports by export value (USD Million 2016 and 2017)

A short-term drop in fruit exports in 2017 bull Exports declined because the Lao government suspended

development of large banana and other fruit plantations which typically produce to export to China and placed more stringent control on polluting farms

bull However at the end of 2017 Lao PDR and China negotiated for less stringent terms for Lao PDRrsquos fruit exports to China

Key Trends

Sugar Cane exports rocketing bull In 2017 sugar cane plantation boomed Export volume grew 121

times from 2016

bull The major reason was the relocation of sugar production from China as production costs there are very high approximately double that of Thailand

Organic fruit and vegetable becoming key economic plants bull Local and foreign investors are increasingly investing in organic

agriculture a higher value-added segment which is demanded by major countries such as Europe US Japan and China

Exports (2016)

USD 02 Million

Exports (2017)

USD 20 Million

121 times

25

Industrial Agriculture - Opportunity

Lao industrial agriculture sector offers opportunities for

bull Agricultural inputs andmachinery producers and distributors

bull Plantation operators

bull Processing and trading firms in Thailand

3 Processing and Trading

Key Drivers Lack of capability to process

products at international standard

Lack of market access

Opportunities Market inputs and machinery

to agricultural projects Investor can target both large scale investment

and smallholder farmers

Opportunities Produce high-value agricultural

products organic products herbs and medical plants

Foreign investors operate via (1) contract farming and (2) concession

Opportunities Process raw products to meet

export standards trade products to leverage existing market channels

Agricultural Inputs and Machinery

Key Drivers Limited access to improved

agricultural inputs - Seed - Fertilizer - Quality machinery

1 2

Key Drivers Arable fertile land

low level of chemical pesticides

Plantation ndash High Value Products

26

Tourism

Key Industries amp Opportunities

27

Tourism - Overview

Tourist arrivals are on a steady rise in the past decade especially tourists from Asia Pacific with most of them visiting more developed border towns neighboring Thailand

Data source Ministry of Tourism TRAVEL amp TOURISM ECONOMIC IMPACT 2018 LAOS

Direct Contribution of Travel amp Tourism to GDP (USD Billion 2012-2018E)

bull Both tourist arrivals and revenue from tourism have increased approximately 3 folds in the past decade

bull Most tourists come from Asia Pacific (93) particularly from from Thailand (50) and Vietnam (25) followed by Europe (5)

Top Tourist Arrivals Destinations 2017

1 Vientiane Capital

2 Savannakhet

3 Champasak

Most top tourist destinations are more developed towns bordering Thailand

Nong Khai

Mukdahan

Ubon Ratchathani

World Heritage sites im these following city also attract a considerable number of visitors

Luang Prabang Wat Pu at Champasak

28

Business Opportunities Associated to Tourism Sector

Accommodate increasing tourist arrivals

Provide dining and entertainment services

Develop attractive ecotourism cultural tourism packages

Provide transportation services linking major tourism sites

Produce and market souvenirs applying local arts design and materials

1 Hotel Restaurant Entertainment

2 Tour Company Holiday Package

3 Sourvenirs

4 Transportation Service

Tourism - Opportunity

29

Lao Consumer Income and Behavior

Prefer to cook at home Enjoy drinking alcohol Middle income enjoy

spending evening in beer garden

Lao women wear sinh Follow Thai and Korean

fashion due to influence of TV series

Shop at traditional markets Middle income shop at

Thai border towns (Nong Khai Udon Thani)

Thai and Japanese products are perceived to have high quality Chinese products are perceived as sub-standard quality and Korean products are in between

30

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

31

Major Costs ndash Labor and Utility

Electricity Rate 2017

0 - 25 kwh 004USDkwh

26 - 150 kwh 005USDkwh

151 - 300 kwh 009USDkwh

more than 500 kwh 012USDkwh

301 - 400 kwh 010USDkwh

401 - 500 kwh 011USDkwh

Water Price (Per Unit) for Business and Trade Units

bull Water price for businesses is set to increase from USD USD 036 in 2017 to USD038 per unit this year

Labor minimum monthly wage in ASEAN 2017 USD

32

Tax System

Monthly Income (LAK) Tax Rate

0 ndash 1000000 0

1000001 - 3000000 5

3000001 - 6000000 10

6000001 - 12000000 12

12000001 - 24000000 15

24000001 - 40000000 20

Above 40000000 24

Types of Tax Tax rate

Profit Tax 24

Value Added Tax (VAT) 10

Withholding Tax Dividends 10

(non-residents) Transfer of shares 10

Transfer of assets 5

China

Luxembourg

Malaysia

Singapore

South Korea

Thailand

Vietnam

Income tax treaties for avoidance of double taxation

Note There is no definition of residence for tax purposes in Laos All companies registered under Lao law (including foreign law) are subject to Lao profit tax

Personal Income Tax Corporate Taxes

Data source DFDL

33

Foreign Investment Regulations

Data source JETRO Compiled by World Business Advisory Center

Not Permitted to Foreigner Only for Joint Venture with Local Company 100 Foreign Ownership Allowed

Wholesale and Retail Businesses

100 Foreign Ownership bull If registered capital is 20 billion Lao Kip

(USD 25 million) or more

Maximum 70 Foreign Ownership bull If registered capital is 10 - 20 billion Lao Kip

(USD 125 ndash 25 million)

Maximum 50 Foreign Ownership bull If registered capital is 4 - 10 billion Lao Kip

(USD 05 ndash 125 million)

bull If registered capital is less than 4 billion Lao Kip (USD 05 million)

Hotel and Restaurants Maximum 60 Foreign Ownership bull 3-5 stars hotel with minimum registered capital of

1 billion Lao Kip (USD 125000)

bull Less than 3 stars hotel 100 Foreign Ownership bull NOT ALLOWED

Logistics

100 Foreign Ownership bull Domestic goods transport with minimum

registered capital of 3 billion Lao Kip (USD 375000)

Maximum 49 Foreign Ownership bull Cross border goods transport with minimum

registered capital of 5 billion Lao Kip (USD 625000)

bull Cross border goods transport with less than 5 billion Lao Kip of registered capital

bull Domestic goods transport with less than 3 billion Lao Kip of registered capital

Examples of Foreign Investment Regulations

Foreign enterprises are subject to foreign investment regulations in several business activities Generally small businesses are preserved for Lao enterprises whereas large businesses with certain investment conditions are opened for foreign investors

34

Types of Investment ndash (1) General Business

Data source JETRO Compiled by World Business Advisory Center

Besides foreign investment regulation foreign enterprises are also subject to the investment promotion law which classifies investment into 3 types

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Investment in General Business

Types of Investment in Lao PDR

Description

o An investment in general economic activities

o Activities including controlled businesses ndash businesses that require additional approval from relevant ministries

o Activities excluding concession business

Register Capital

Requirements

o At least 1 billion Lao Kip (USD 125000)

o At the day of establishment must pay 40 (agriculture business) 60 (production and processing) 80 (services) The remainder must be paid within 1 year

Examples of Controlled Businesses 1 Agriculture plantation agriculture fishery 2 Manufacturing petroleum products leathers textile amp clothing papers

printing pesticides pharmaceutical products 3 Businesses related to environment eg wastewater treatment 4 Wholesale and retails of gasoline and petroleum products 5 Transportation 6 Hotel and Restaurant 7 Media and Publication 8 Finance and insurance 9 Legal accounting and tax services 10 Tourism 11 Education 12 Hospital clinic and medical services 13 Recreation (museum and amusement park)

35

Types of Investment ndash (2) Concession Business

Data source JETRO Compiled by World Business Advisory Center

Investment in Concession Business

Description

o An investment that requires a concession or specific authorization from the government to use the governmentrsquos property

o Some concession businesses requires authorization from the central government whereas the other requires only provincial government level of authorization for example

bull At least 5MW electricity generation project requires the central government authorization

bull Less than 5MW electricity generation projects requires only provincial government authorization

Examples of Concession Business

1 Mining 2 Electricity generation 3 Infrastructure

bull Telecommunication bull TV and radio station bull Road railway airport seaport waste disposal site

4 Businesses that use the government land bull Shopping center bull Tourist attraction bull Public park bull Hotel bull Forestry and Logging bull Plantation and Livestock

Register Capital

Requirements

o Must pay at least 20 of registered capital while remaining should be paid within 2 years

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Types of Investment in Lao PDR

36

Types of Investment ndash (3) Business Related to SEZ

Data source JETRO Compiled by World Business Advisory Center

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Types of Investment in Lao PDR

Investment in Business Related to SEZ

Description

o Business related to Special Economic Zone -gt an investment in building infrastructure for a new town

o Business related to Specific Economic Zone -gt an investment in infrastructure development for specific purpose projects such as industrial zone export zone tourist development zone etc

High Potential SEZs in Laos

o Vita Park Special Economic Zone (Vientiane)

o Savan-Seno Special Economic Zone (Savannakhet)

o Pakxe-Japan SME Specific Economic Zone (Champasak)

Special and Specific Economic Zones

1 Boten-Daenkham Specific Economic Zone 2 Luang Prabang Special Economic Zone 3 Golden Triangle Special Economic Zone 4 Thatluang Lake Specific Economic Zone 5 Longthanh Specific Economic Zone 6 Xaysettha Specific Economic Zone 7 Vita Park Special Economic Zone 8 Dongphosy Specific Economic Zone 9 Thakhek Specific Economic Zone 10 Poukiao Specific Economic Zone 11 Savan-Seno Special Economic Zone 12 Pakxe-Japan SME Specific Economic Zone

1

2

3

4

5 6

7

8

9 10

11

12

37

General Business

Concession Business

Business related to

SEZs

Procedure of Investment in Lao PDR

The investment approval procedure varies depending upon type of investment However all foreign investors must go through enterprise registration tax identification number registration and application for capital importation certificate

Apply at Ministry of Planning and

Investment

For developer apply at National Committee for Special Economic Zone

For investor apply at One-Stop Service Unit in

each SEZ

Get Concession

License

Get SEZ Concession

License

For controlled businesses apply for

approval at relevant Ministries

Get Approval License

Apply at Ministry of

Industry and Commerce

For non-controlled businesses

Get Enterprise

Registration Certificate

(ERC)

Apply for Tax

Identification Number TIN

at Tax Department Ministry of

Finance

Apply for Capital

Importation Certificate at Bank of Lao

PDR

Data source JETRO Compiled by World Business Advisory Center

38

Investment Tax Incentives ndash General Zone

Data source JETRO Compiled by World Business Advisory Center

Investment Tax Incentives in Lao PDR

Profit Tax Exemption Period

Level 1 High Promotion

Level 2 Moderate Promotion

Level 3 Low Promotion

Zone 1 10 years 6 years 4 years

Zone 2 6 years 4 years 2 years

Zone 3 4 years 2 years 1 years

Profit Tax Exemption Period by Promotion Sector and Zone

Promoted sectors Agriculture Industrial Handicrafts and Services

Type of Tax Exemption

General Zone Promotion Sector and Zone based Incentives 1 Special amp Specific Economic Zone

Tailor Made Incentives 2

Profit tax in next accounting year in case net profit is used for reinvestment (business

expansion)

Import duties for import of raw material equipment spare parts and

vehicles directly used for production

Export duties for general goods and

products (resource-based products should follow

associated laws)

Permission to carry forward losses to

three consecutive accounting years

39

Sector Period of

Profit Tax Exemption

Profit Tax Rate

After Tax Exemption Period

Hi-Tech Manufacturing 10 year 8

Manufacturing that exports at least 70 of production 10 year 8

Manufacturing that exports 30 - 60 of production 7 year 8

Manufacturing that exports 0 - 29 of production 5 year 8

Other 5 year 8

Investment amount of USD 2 million or more 10 year 8

Investment amount of USD 500000 - USD 2 million 8 year 8

Investment amount of USD 300000 - USD 500000 6 year 10

Investment amount of USD 150000 - USD 300000 4 year 10

Investment amount of USD 50000 - USD 150000 2 year 10

Export Laos products 5 year 10

International trade company 3 year 10

General trade company 2 year 10

a) Manufacturing

b) Service

c) Commerce

Personal Income Tax 5

Dividend Tax after Profit Tax Exemption Period

5

Import Duty Exemption for import of raw material equipment spare parts and

vehicles directly used for production

VAT Exemption for import products

Investment Tax Incentives ndash Special and Specific Economic Zone

Data source JETRO

Investment Tax Incentives in Lao PDR

General Zone Promotion Sector and Zone based Incentives 1 Special amp Specific Economic Zone

Tailor Made Incentives 2 Example of Tax Incentives in Savan-Seno SEZ

Other Tax Incentives

40

Non-Tax Incentives amp Trade Privileges

Data source JETRO

Non-Tax Incentives

Permission

Foreign nationals can undertake feasibility studies

Bring in foreign technicians experts and managers if qualified Lao nationals are not available

Lease land

General business up to 30 years from Lao citizen and up to 50 years from the government (renewable)

Investment in SEZ up to 75 years

Concession business upon negotiation with the government (at present there is an example of 99 years land lease)

Transfer leasehold interests and build on or make improvements or structures to a leased land

Guarantee against nationalization expropriation and requisition without compensation

Protection

Trade Privileges

ASEAN WTO GSP Bilateral trade agreement (over 18 countries)

o Argentina o Belarus o Bulgaria o Cambodia o China o Indonesia o India o Korea DPR o Kuwait

o Malaysia o Mongolia o Myanmar o Philippines o Russian

Federation o Thailand o Turkey o USA o Vietnam

41

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

42

Foreign Currency Exchange

Data source Bank of the Lao PDR

Laos Currency Kip (LAK)

Latest FX Rate (as of August 22 2018)

Remark THB and USD are widely accepted especially in the border trade area

USD 1 ~ LAK 8507

EUR 1 ~ LAK 9851

THB 1 ~ LAK 262

JPY 1 ~ LAK 77

CNY 1 ~ LAK 1193

43

KASIKORNTHAIBANK Service in Lao PDR

Retail Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Current deposit

Lending

Working capital loan

Long term loan

Bank guarantee

Project Financing

FX Services

Corporate Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Remittance

Remittance

Trade Finance Letter of Credit (LC) Standby Letter of Credit (SBLC)

44

KASIKORNTHAI BANK Limited

With establishment KASIKORNTHAIBANK

the first full-scale locally incorporated institution from Thailand is fully committed to support our clientsrsquo cross-border financing and transaction for their trade and investment activities in Lao PDR

45

KASIKORNTHAIBANK in Lao PDR Contacts

bull HEAD OFFICE Unit 12 Lane Xang Avenue Xiangngeun Village Chanthaboury District Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88905 Fax +856 21 253 336 wwwkasikornbankcomla

KASIKORNTHAI BANK Limited

bull PONESINUAN BRANCH

Ban Ponesinuan Unit 14 Sysattanak Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88826 Fax +856 21 410 889

Ms Piyanoot Sangsan Branch Manager KASIKORNTHAI BANK LIMITED Lane Xang Head Office E-mail piyanootskasikornbankcom

Mr Chatuporn Boozaya-Angool Branch Manager Ponesinuan Branch E-mail chatupornbkasikornbankcom

46

About AEC+ Business Advisory The AEC+ Business Advisory is set up by KASIKORNBANK to support businesses in their regional expansion across the ASEAN+3 market by providing local market intelligence and strategic business advice

What we do bull Offer customized and tailor-made advisory services bull Publish investment guides and industry reports bull Deliver in-depth insights via seminars bull Organize business trips to bring first-hand experience

Follow Us Visit our website at

AEC+ BUSINESS ADVISORY

Prepared by Mr Anoot Charoenkiattikul World Business Intelligence Specialist E-mail anootckasikornbankcom

httpswwwkasikornbankcominternational-businessenPagesHomeaspx

47

Page 19: LAO PDR - Facilitiesfuangfah.econ.cmu.ac.th/teacher/nisit/files/201808_LaoPDR_Investm… · • On August 7, the government of Laos announced the suspension of new hydropower project

19

Taxes amp Regulations

Mining ndash Opportunity

Mineral resources in Lao PDR offer opportunities to firms with expertise in mining operations from prospection to mining and processing

Prospection Exploration Feasibility Study

Construction Mining amp Processing

2 years + 1 year

3 years + 2 years

1 year + 1 year

2 years + 1 year

20 years + 5 years

License Duration + Renewable

USD 3 -12 ha year USD 05 ndash 1 ha year + royalty (1-

7) Rental Fee

Registered company

Max 300 sqkm Corporate income 25-35

Value added 10

Rules and regulations for the Minerals Law in accordance to international standard partly missing

Limited number and capacity of local workers in mining sector

High number of mineral trade companies rather than professional mining operations firms

Key Issues

20

Electronic Parts and Components Industry

Key Industries amp Opportunities

21

Electronic Parts and Components Industry - Overview

Over the recent years Laos has experienced exponential growth in its exports of electronic parts and components especially to Thailand indicating the initial formation of the regional supply chain

Lao PDR Electronic Part and Component Exports (USD Million 2017)

Increasing investments in Lao PDR Special Economic Zone (SEZ) boosts trade The presence of SEZs and attractive incentives have attracted FDI inflows into Lao PDR especially in the production of digital camera parts and telecom equipment parts Most manufacturing in these sectors is aimed at exporting intermediate products to assemblers of finished electrical and electronic products in other countries

Main Export Destinations 2017

Data source International Trade Center

Why Thailand has become the top export destination

bull ASEAN Free Trade Agreement (AFTA) ndash The agreement minimizes trade barriers and creates free flow of goods and capital within ASEAN

bull Thailand-based industries shift their focus on value added activities - firms relocate labor-intensive activities to Thailandrsquos neighboring countries including Laos

22

Electronic Parts and Components Industry - Opportunity

Industrial development in Laos offers opportunities for firms to form the regional supply chain model and benefit from comparative advantages from both nations

Data source JETRO

Thailand

Product supply chain

Laos

Did you knowhellip

Challenges

Difficulty in getting large pools of labor due to small population

Underdeveloped infrastructure in some regions

Challenge in recruiting higher skilled specialists

Suggestion Set up in major Special Economic Zones eg Vita Park SEZ and Savan-Seno SEZ

Roll out strategic human resource plan including training and capacity building

bull Advanced infrastructure

bull Experienced and high-skilled (management level) workforce

bull Affordable and youthful workforce bull Located between Vietnam and Thailand

both with high electronics parts demand bull Government incentives

Start operation from small scale (less than 500 workers) then scale up

Japanese enterprises have started implementing Thailand+1 model by relocating labor-intensive production to Laos and exporting back to Thailand to complete product assembly eg NIKON (digital camera) Dai-Ichi Denshi (wire harness) Nissei Mizuki (electronics parts) and Toyota boshoku (car seat cover)

Thailand + 1 Model

23

Industrial Agriculture

Key Industries amp Opportunities

24

Industrial Agriculture - Overview

Most industrial agriculture exports from Lao PDR are produced by foreign investors (Chinese Thai and Vietnamese) and local entrepreneurs to a lesser extent

Data source JETRO International Trade Center Produce Report USDA Foreign Agriculture Service

Leading Agricultural Exports by export value (USD Million 2016 and 2017)

A short-term drop in fruit exports in 2017 bull Exports declined because the Lao government suspended

development of large banana and other fruit plantations which typically produce to export to China and placed more stringent control on polluting farms

bull However at the end of 2017 Lao PDR and China negotiated for less stringent terms for Lao PDRrsquos fruit exports to China

Key Trends

Sugar Cane exports rocketing bull In 2017 sugar cane plantation boomed Export volume grew 121

times from 2016

bull The major reason was the relocation of sugar production from China as production costs there are very high approximately double that of Thailand

Organic fruit and vegetable becoming key economic plants bull Local and foreign investors are increasingly investing in organic

agriculture a higher value-added segment which is demanded by major countries such as Europe US Japan and China

Exports (2016)

USD 02 Million

Exports (2017)

USD 20 Million

121 times

25

Industrial Agriculture - Opportunity

Lao industrial agriculture sector offers opportunities for

bull Agricultural inputs andmachinery producers and distributors

bull Plantation operators

bull Processing and trading firms in Thailand

3 Processing and Trading

Key Drivers Lack of capability to process

products at international standard

Lack of market access

Opportunities Market inputs and machinery

to agricultural projects Investor can target both large scale investment

and smallholder farmers

Opportunities Produce high-value agricultural

products organic products herbs and medical plants

Foreign investors operate via (1) contract farming and (2) concession

Opportunities Process raw products to meet

export standards trade products to leverage existing market channels

Agricultural Inputs and Machinery

Key Drivers Limited access to improved

agricultural inputs - Seed - Fertilizer - Quality machinery

1 2

Key Drivers Arable fertile land

low level of chemical pesticides

Plantation ndash High Value Products

26

Tourism

Key Industries amp Opportunities

27

Tourism - Overview

Tourist arrivals are on a steady rise in the past decade especially tourists from Asia Pacific with most of them visiting more developed border towns neighboring Thailand

Data source Ministry of Tourism TRAVEL amp TOURISM ECONOMIC IMPACT 2018 LAOS

Direct Contribution of Travel amp Tourism to GDP (USD Billion 2012-2018E)

bull Both tourist arrivals and revenue from tourism have increased approximately 3 folds in the past decade

bull Most tourists come from Asia Pacific (93) particularly from from Thailand (50) and Vietnam (25) followed by Europe (5)

Top Tourist Arrivals Destinations 2017

1 Vientiane Capital

2 Savannakhet

3 Champasak

Most top tourist destinations are more developed towns bordering Thailand

Nong Khai

Mukdahan

Ubon Ratchathani

World Heritage sites im these following city also attract a considerable number of visitors

Luang Prabang Wat Pu at Champasak

28

Business Opportunities Associated to Tourism Sector

Accommodate increasing tourist arrivals

Provide dining and entertainment services

Develop attractive ecotourism cultural tourism packages

Provide transportation services linking major tourism sites

Produce and market souvenirs applying local arts design and materials

1 Hotel Restaurant Entertainment

2 Tour Company Holiday Package

3 Sourvenirs

4 Transportation Service

Tourism - Opportunity

29

Lao Consumer Income and Behavior

Prefer to cook at home Enjoy drinking alcohol Middle income enjoy

spending evening in beer garden

Lao women wear sinh Follow Thai and Korean

fashion due to influence of TV series

Shop at traditional markets Middle income shop at

Thai border towns (Nong Khai Udon Thani)

Thai and Japanese products are perceived to have high quality Chinese products are perceived as sub-standard quality and Korean products are in between

30

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

31

Major Costs ndash Labor and Utility

Electricity Rate 2017

0 - 25 kwh 004USDkwh

26 - 150 kwh 005USDkwh

151 - 300 kwh 009USDkwh

more than 500 kwh 012USDkwh

301 - 400 kwh 010USDkwh

401 - 500 kwh 011USDkwh

Water Price (Per Unit) for Business and Trade Units

bull Water price for businesses is set to increase from USD USD 036 in 2017 to USD038 per unit this year

Labor minimum monthly wage in ASEAN 2017 USD

32

Tax System

Monthly Income (LAK) Tax Rate

0 ndash 1000000 0

1000001 - 3000000 5

3000001 - 6000000 10

6000001 - 12000000 12

12000001 - 24000000 15

24000001 - 40000000 20

Above 40000000 24

Types of Tax Tax rate

Profit Tax 24

Value Added Tax (VAT) 10

Withholding Tax Dividends 10

(non-residents) Transfer of shares 10

Transfer of assets 5

China

Luxembourg

Malaysia

Singapore

South Korea

Thailand

Vietnam

Income tax treaties for avoidance of double taxation

Note There is no definition of residence for tax purposes in Laos All companies registered under Lao law (including foreign law) are subject to Lao profit tax

Personal Income Tax Corporate Taxes

Data source DFDL

33

Foreign Investment Regulations

Data source JETRO Compiled by World Business Advisory Center

Not Permitted to Foreigner Only for Joint Venture with Local Company 100 Foreign Ownership Allowed

Wholesale and Retail Businesses

100 Foreign Ownership bull If registered capital is 20 billion Lao Kip

(USD 25 million) or more

Maximum 70 Foreign Ownership bull If registered capital is 10 - 20 billion Lao Kip

(USD 125 ndash 25 million)

Maximum 50 Foreign Ownership bull If registered capital is 4 - 10 billion Lao Kip

(USD 05 ndash 125 million)

bull If registered capital is less than 4 billion Lao Kip (USD 05 million)

Hotel and Restaurants Maximum 60 Foreign Ownership bull 3-5 stars hotel with minimum registered capital of

1 billion Lao Kip (USD 125000)

bull Less than 3 stars hotel 100 Foreign Ownership bull NOT ALLOWED

Logistics

100 Foreign Ownership bull Domestic goods transport with minimum

registered capital of 3 billion Lao Kip (USD 375000)

Maximum 49 Foreign Ownership bull Cross border goods transport with minimum

registered capital of 5 billion Lao Kip (USD 625000)

bull Cross border goods transport with less than 5 billion Lao Kip of registered capital

bull Domestic goods transport with less than 3 billion Lao Kip of registered capital

Examples of Foreign Investment Regulations

Foreign enterprises are subject to foreign investment regulations in several business activities Generally small businesses are preserved for Lao enterprises whereas large businesses with certain investment conditions are opened for foreign investors

34

Types of Investment ndash (1) General Business

Data source JETRO Compiled by World Business Advisory Center

Besides foreign investment regulation foreign enterprises are also subject to the investment promotion law which classifies investment into 3 types

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Investment in General Business

Types of Investment in Lao PDR

Description

o An investment in general economic activities

o Activities including controlled businesses ndash businesses that require additional approval from relevant ministries

o Activities excluding concession business

Register Capital

Requirements

o At least 1 billion Lao Kip (USD 125000)

o At the day of establishment must pay 40 (agriculture business) 60 (production and processing) 80 (services) The remainder must be paid within 1 year

Examples of Controlled Businesses 1 Agriculture plantation agriculture fishery 2 Manufacturing petroleum products leathers textile amp clothing papers

printing pesticides pharmaceutical products 3 Businesses related to environment eg wastewater treatment 4 Wholesale and retails of gasoline and petroleum products 5 Transportation 6 Hotel and Restaurant 7 Media and Publication 8 Finance and insurance 9 Legal accounting and tax services 10 Tourism 11 Education 12 Hospital clinic and medical services 13 Recreation (museum and amusement park)

35

Types of Investment ndash (2) Concession Business

Data source JETRO Compiled by World Business Advisory Center

Investment in Concession Business

Description

o An investment that requires a concession or specific authorization from the government to use the governmentrsquos property

o Some concession businesses requires authorization from the central government whereas the other requires only provincial government level of authorization for example

bull At least 5MW electricity generation project requires the central government authorization

bull Less than 5MW electricity generation projects requires only provincial government authorization

Examples of Concession Business

1 Mining 2 Electricity generation 3 Infrastructure

bull Telecommunication bull TV and radio station bull Road railway airport seaport waste disposal site

4 Businesses that use the government land bull Shopping center bull Tourist attraction bull Public park bull Hotel bull Forestry and Logging bull Plantation and Livestock

Register Capital

Requirements

o Must pay at least 20 of registered capital while remaining should be paid within 2 years

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Types of Investment in Lao PDR

36

Types of Investment ndash (3) Business Related to SEZ

Data source JETRO Compiled by World Business Advisory Center

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Types of Investment in Lao PDR

Investment in Business Related to SEZ

Description

o Business related to Special Economic Zone -gt an investment in building infrastructure for a new town

o Business related to Specific Economic Zone -gt an investment in infrastructure development for specific purpose projects such as industrial zone export zone tourist development zone etc

High Potential SEZs in Laos

o Vita Park Special Economic Zone (Vientiane)

o Savan-Seno Special Economic Zone (Savannakhet)

o Pakxe-Japan SME Specific Economic Zone (Champasak)

Special and Specific Economic Zones

1 Boten-Daenkham Specific Economic Zone 2 Luang Prabang Special Economic Zone 3 Golden Triangle Special Economic Zone 4 Thatluang Lake Specific Economic Zone 5 Longthanh Specific Economic Zone 6 Xaysettha Specific Economic Zone 7 Vita Park Special Economic Zone 8 Dongphosy Specific Economic Zone 9 Thakhek Specific Economic Zone 10 Poukiao Specific Economic Zone 11 Savan-Seno Special Economic Zone 12 Pakxe-Japan SME Specific Economic Zone

1

2

3

4

5 6

7

8

9 10

11

12

37

General Business

Concession Business

Business related to

SEZs

Procedure of Investment in Lao PDR

The investment approval procedure varies depending upon type of investment However all foreign investors must go through enterprise registration tax identification number registration and application for capital importation certificate

Apply at Ministry of Planning and

Investment

For developer apply at National Committee for Special Economic Zone

For investor apply at One-Stop Service Unit in

each SEZ

Get Concession

License

Get SEZ Concession

License

For controlled businesses apply for

approval at relevant Ministries

Get Approval License

Apply at Ministry of

Industry and Commerce

For non-controlled businesses

Get Enterprise

Registration Certificate

(ERC)

Apply for Tax

Identification Number TIN

at Tax Department Ministry of

Finance

Apply for Capital

Importation Certificate at Bank of Lao

PDR

Data source JETRO Compiled by World Business Advisory Center

38

Investment Tax Incentives ndash General Zone

Data source JETRO Compiled by World Business Advisory Center

Investment Tax Incentives in Lao PDR

Profit Tax Exemption Period

Level 1 High Promotion

Level 2 Moderate Promotion

Level 3 Low Promotion

Zone 1 10 years 6 years 4 years

Zone 2 6 years 4 years 2 years

Zone 3 4 years 2 years 1 years

Profit Tax Exemption Period by Promotion Sector and Zone

Promoted sectors Agriculture Industrial Handicrafts and Services

Type of Tax Exemption

General Zone Promotion Sector and Zone based Incentives 1 Special amp Specific Economic Zone

Tailor Made Incentives 2

Profit tax in next accounting year in case net profit is used for reinvestment (business

expansion)

Import duties for import of raw material equipment spare parts and

vehicles directly used for production

Export duties for general goods and

products (resource-based products should follow

associated laws)

Permission to carry forward losses to

three consecutive accounting years

39

Sector Period of

Profit Tax Exemption

Profit Tax Rate

After Tax Exemption Period

Hi-Tech Manufacturing 10 year 8

Manufacturing that exports at least 70 of production 10 year 8

Manufacturing that exports 30 - 60 of production 7 year 8

Manufacturing that exports 0 - 29 of production 5 year 8

Other 5 year 8

Investment amount of USD 2 million or more 10 year 8

Investment amount of USD 500000 - USD 2 million 8 year 8

Investment amount of USD 300000 - USD 500000 6 year 10

Investment amount of USD 150000 - USD 300000 4 year 10

Investment amount of USD 50000 - USD 150000 2 year 10

Export Laos products 5 year 10

International trade company 3 year 10

General trade company 2 year 10

a) Manufacturing

b) Service

c) Commerce

Personal Income Tax 5

Dividend Tax after Profit Tax Exemption Period

5

Import Duty Exemption for import of raw material equipment spare parts and

vehicles directly used for production

VAT Exemption for import products

Investment Tax Incentives ndash Special and Specific Economic Zone

Data source JETRO

Investment Tax Incentives in Lao PDR

General Zone Promotion Sector and Zone based Incentives 1 Special amp Specific Economic Zone

Tailor Made Incentives 2 Example of Tax Incentives in Savan-Seno SEZ

Other Tax Incentives

40

Non-Tax Incentives amp Trade Privileges

Data source JETRO

Non-Tax Incentives

Permission

Foreign nationals can undertake feasibility studies

Bring in foreign technicians experts and managers if qualified Lao nationals are not available

Lease land

General business up to 30 years from Lao citizen and up to 50 years from the government (renewable)

Investment in SEZ up to 75 years

Concession business upon negotiation with the government (at present there is an example of 99 years land lease)

Transfer leasehold interests and build on or make improvements or structures to a leased land

Guarantee against nationalization expropriation and requisition without compensation

Protection

Trade Privileges

ASEAN WTO GSP Bilateral trade agreement (over 18 countries)

o Argentina o Belarus o Bulgaria o Cambodia o China o Indonesia o India o Korea DPR o Kuwait

o Malaysia o Mongolia o Myanmar o Philippines o Russian

Federation o Thailand o Turkey o USA o Vietnam

41

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

42

Foreign Currency Exchange

Data source Bank of the Lao PDR

Laos Currency Kip (LAK)

Latest FX Rate (as of August 22 2018)

Remark THB and USD are widely accepted especially in the border trade area

USD 1 ~ LAK 8507

EUR 1 ~ LAK 9851

THB 1 ~ LAK 262

JPY 1 ~ LAK 77

CNY 1 ~ LAK 1193

43

KASIKORNTHAIBANK Service in Lao PDR

Retail Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Current deposit

Lending

Working capital loan

Long term loan

Bank guarantee

Project Financing

FX Services

Corporate Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Remittance

Remittance

Trade Finance Letter of Credit (LC) Standby Letter of Credit (SBLC)

44

KASIKORNTHAI BANK Limited

With establishment KASIKORNTHAIBANK

the first full-scale locally incorporated institution from Thailand is fully committed to support our clientsrsquo cross-border financing and transaction for their trade and investment activities in Lao PDR

45

KASIKORNTHAIBANK in Lao PDR Contacts

bull HEAD OFFICE Unit 12 Lane Xang Avenue Xiangngeun Village Chanthaboury District Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88905 Fax +856 21 253 336 wwwkasikornbankcomla

KASIKORNTHAI BANK Limited

bull PONESINUAN BRANCH

Ban Ponesinuan Unit 14 Sysattanak Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88826 Fax +856 21 410 889

Ms Piyanoot Sangsan Branch Manager KASIKORNTHAI BANK LIMITED Lane Xang Head Office E-mail piyanootskasikornbankcom

Mr Chatuporn Boozaya-Angool Branch Manager Ponesinuan Branch E-mail chatupornbkasikornbankcom

46

About AEC+ Business Advisory The AEC+ Business Advisory is set up by KASIKORNBANK to support businesses in their regional expansion across the ASEAN+3 market by providing local market intelligence and strategic business advice

What we do bull Offer customized and tailor-made advisory services bull Publish investment guides and industry reports bull Deliver in-depth insights via seminars bull Organize business trips to bring first-hand experience

Follow Us Visit our website at

AEC+ BUSINESS ADVISORY

Prepared by Mr Anoot Charoenkiattikul World Business Intelligence Specialist E-mail anootckasikornbankcom

httpswwwkasikornbankcominternational-businessenPagesHomeaspx

47

Page 20: LAO PDR - Facilitiesfuangfah.econ.cmu.ac.th/teacher/nisit/files/201808_LaoPDR_Investm… · • On August 7, the government of Laos announced the suspension of new hydropower project

20

Electronic Parts and Components Industry

Key Industries amp Opportunities

21

Electronic Parts and Components Industry - Overview

Over the recent years Laos has experienced exponential growth in its exports of electronic parts and components especially to Thailand indicating the initial formation of the regional supply chain

Lao PDR Electronic Part and Component Exports (USD Million 2017)

Increasing investments in Lao PDR Special Economic Zone (SEZ) boosts trade The presence of SEZs and attractive incentives have attracted FDI inflows into Lao PDR especially in the production of digital camera parts and telecom equipment parts Most manufacturing in these sectors is aimed at exporting intermediate products to assemblers of finished electrical and electronic products in other countries

Main Export Destinations 2017

Data source International Trade Center

Why Thailand has become the top export destination

bull ASEAN Free Trade Agreement (AFTA) ndash The agreement minimizes trade barriers and creates free flow of goods and capital within ASEAN

bull Thailand-based industries shift their focus on value added activities - firms relocate labor-intensive activities to Thailandrsquos neighboring countries including Laos

22

Electronic Parts and Components Industry - Opportunity

Industrial development in Laos offers opportunities for firms to form the regional supply chain model and benefit from comparative advantages from both nations

Data source JETRO

Thailand

Product supply chain

Laos

Did you knowhellip

Challenges

Difficulty in getting large pools of labor due to small population

Underdeveloped infrastructure in some regions

Challenge in recruiting higher skilled specialists

Suggestion Set up in major Special Economic Zones eg Vita Park SEZ and Savan-Seno SEZ

Roll out strategic human resource plan including training and capacity building

bull Advanced infrastructure

bull Experienced and high-skilled (management level) workforce

bull Affordable and youthful workforce bull Located between Vietnam and Thailand

both with high electronics parts demand bull Government incentives

Start operation from small scale (less than 500 workers) then scale up

Japanese enterprises have started implementing Thailand+1 model by relocating labor-intensive production to Laos and exporting back to Thailand to complete product assembly eg NIKON (digital camera) Dai-Ichi Denshi (wire harness) Nissei Mizuki (electronics parts) and Toyota boshoku (car seat cover)

Thailand + 1 Model

23

Industrial Agriculture

Key Industries amp Opportunities

24

Industrial Agriculture - Overview

Most industrial agriculture exports from Lao PDR are produced by foreign investors (Chinese Thai and Vietnamese) and local entrepreneurs to a lesser extent

Data source JETRO International Trade Center Produce Report USDA Foreign Agriculture Service

Leading Agricultural Exports by export value (USD Million 2016 and 2017)

A short-term drop in fruit exports in 2017 bull Exports declined because the Lao government suspended

development of large banana and other fruit plantations which typically produce to export to China and placed more stringent control on polluting farms

bull However at the end of 2017 Lao PDR and China negotiated for less stringent terms for Lao PDRrsquos fruit exports to China

Key Trends

Sugar Cane exports rocketing bull In 2017 sugar cane plantation boomed Export volume grew 121

times from 2016

bull The major reason was the relocation of sugar production from China as production costs there are very high approximately double that of Thailand

Organic fruit and vegetable becoming key economic plants bull Local and foreign investors are increasingly investing in organic

agriculture a higher value-added segment which is demanded by major countries such as Europe US Japan and China

Exports (2016)

USD 02 Million

Exports (2017)

USD 20 Million

121 times

25

Industrial Agriculture - Opportunity

Lao industrial agriculture sector offers opportunities for

bull Agricultural inputs andmachinery producers and distributors

bull Plantation operators

bull Processing and trading firms in Thailand

3 Processing and Trading

Key Drivers Lack of capability to process

products at international standard

Lack of market access

Opportunities Market inputs and machinery

to agricultural projects Investor can target both large scale investment

and smallholder farmers

Opportunities Produce high-value agricultural

products organic products herbs and medical plants

Foreign investors operate via (1) contract farming and (2) concession

Opportunities Process raw products to meet

export standards trade products to leverage existing market channels

Agricultural Inputs and Machinery

Key Drivers Limited access to improved

agricultural inputs - Seed - Fertilizer - Quality machinery

1 2

Key Drivers Arable fertile land

low level of chemical pesticides

Plantation ndash High Value Products

26

Tourism

Key Industries amp Opportunities

27

Tourism - Overview

Tourist arrivals are on a steady rise in the past decade especially tourists from Asia Pacific with most of them visiting more developed border towns neighboring Thailand

Data source Ministry of Tourism TRAVEL amp TOURISM ECONOMIC IMPACT 2018 LAOS

Direct Contribution of Travel amp Tourism to GDP (USD Billion 2012-2018E)

bull Both tourist arrivals and revenue from tourism have increased approximately 3 folds in the past decade

bull Most tourists come from Asia Pacific (93) particularly from from Thailand (50) and Vietnam (25) followed by Europe (5)

Top Tourist Arrivals Destinations 2017

1 Vientiane Capital

2 Savannakhet

3 Champasak

Most top tourist destinations are more developed towns bordering Thailand

Nong Khai

Mukdahan

Ubon Ratchathani

World Heritage sites im these following city also attract a considerable number of visitors

Luang Prabang Wat Pu at Champasak

28

Business Opportunities Associated to Tourism Sector

Accommodate increasing tourist arrivals

Provide dining and entertainment services

Develop attractive ecotourism cultural tourism packages

Provide transportation services linking major tourism sites

Produce and market souvenirs applying local arts design and materials

1 Hotel Restaurant Entertainment

2 Tour Company Holiday Package

3 Sourvenirs

4 Transportation Service

Tourism - Opportunity

29

Lao Consumer Income and Behavior

Prefer to cook at home Enjoy drinking alcohol Middle income enjoy

spending evening in beer garden

Lao women wear sinh Follow Thai and Korean

fashion due to influence of TV series

Shop at traditional markets Middle income shop at

Thai border towns (Nong Khai Udon Thani)

Thai and Japanese products are perceived to have high quality Chinese products are perceived as sub-standard quality and Korean products are in between

30

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

31

Major Costs ndash Labor and Utility

Electricity Rate 2017

0 - 25 kwh 004USDkwh

26 - 150 kwh 005USDkwh

151 - 300 kwh 009USDkwh

more than 500 kwh 012USDkwh

301 - 400 kwh 010USDkwh

401 - 500 kwh 011USDkwh

Water Price (Per Unit) for Business and Trade Units

bull Water price for businesses is set to increase from USD USD 036 in 2017 to USD038 per unit this year

Labor minimum monthly wage in ASEAN 2017 USD

32

Tax System

Monthly Income (LAK) Tax Rate

0 ndash 1000000 0

1000001 - 3000000 5

3000001 - 6000000 10

6000001 - 12000000 12

12000001 - 24000000 15

24000001 - 40000000 20

Above 40000000 24

Types of Tax Tax rate

Profit Tax 24

Value Added Tax (VAT) 10

Withholding Tax Dividends 10

(non-residents) Transfer of shares 10

Transfer of assets 5

China

Luxembourg

Malaysia

Singapore

South Korea

Thailand

Vietnam

Income tax treaties for avoidance of double taxation

Note There is no definition of residence for tax purposes in Laos All companies registered under Lao law (including foreign law) are subject to Lao profit tax

Personal Income Tax Corporate Taxes

Data source DFDL

33

Foreign Investment Regulations

Data source JETRO Compiled by World Business Advisory Center

Not Permitted to Foreigner Only for Joint Venture with Local Company 100 Foreign Ownership Allowed

Wholesale and Retail Businesses

100 Foreign Ownership bull If registered capital is 20 billion Lao Kip

(USD 25 million) or more

Maximum 70 Foreign Ownership bull If registered capital is 10 - 20 billion Lao Kip

(USD 125 ndash 25 million)

Maximum 50 Foreign Ownership bull If registered capital is 4 - 10 billion Lao Kip

(USD 05 ndash 125 million)

bull If registered capital is less than 4 billion Lao Kip (USD 05 million)

Hotel and Restaurants Maximum 60 Foreign Ownership bull 3-5 stars hotel with minimum registered capital of

1 billion Lao Kip (USD 125000)

bull Less than 3 stars hotel 100 Foreign Ownership bull NOT ALLOWED

Logistics

100 Foreign Ownership bull Domestic goods transport with minimum

registered capital of 3 billion Lao Kip (USD 375000)

Maximum 49 Foreign Ownership bull Cross border goods transport with minimum

registered capital of 5 billion Lao Kip (USD 625000)

bull Cross border goods transport with less than 5 billion Lao Kip of registered capital

bull Domestic goods transport with less than 3 billion Lao Kip of registered capital

Examples of Foreign Investment Regulations

Foreign enterprises are subject to foreign investment regulations in several business activities Generally small businesses are preserved for Lao enterprises whereas large businesses with certain investment conditions are opened for foreign investors

34

Types of Investment ndash (1) General Business

Data source JETRO Compiled by World Business Advisory Center

Besides foreign investment regulation foreign enterprises are also subject to the investment promotion law which classifies investment into 3 types

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Investment in General Business

Types of Investment in Lao PDR

Description

o An investment in general economic activities

o Activities including controlled businesses ndash businesses that require additional approval from relevant ministries

o Activities excluding concession business

Register Capital

Requirements

o At least 1 billion Lao Kip (USD 125000)

o At the day of establishment must pay 40 (agriculture business) 60 (production and processing) 80 (services) The remainder must be paid within 1 year

Examples of Controlled Businesses 1 Agriculture plantation agriculture fishery 2 Manufacturing petroleum products leathers textile amp clothing papers

printing pesticides pharmaceutical products 3 Businesses related to environment eg wastewater treatment 4 Wholesale and retails of gasoline and petroleum products 5 Transportation 6 Hotel and Restaurant 7 Media and Publication 8 Finance and insurance 9 Legal accounting and tax services 10 Tourism 11 Education 12 Hospital clinic and medical services 13 Recreation (museum and amusement park)

35

Types of Investment ndash (2) Concession Business

Data source JETRO Compiled by World Business Advisory Center

Investment in Concession Business

Description

o An investment that requires a concession or specific authorization from the government to use the governmentrsquos property

o Some concession businesses requires authorization from the central government whereas the other requires only provincial government level of authorization for example

bull At least 5MW electricity generation project requires the central government authorization

bull Less than 5MW electricity generation projects requires only provincial government authorization

Examples of Concession Business

1 Mining 2 Electricity generation 3 Infrastructure

bull Telecommunication bull TV and radio station bull Road railway airport seaport waste disposal site

4 Businesses that use the government land bull Shopping center bull Tourist attraction bull Public park bull Hotel bull Forestry and Logging bull Plantation and Livestock

Register Capital

Requirements

o Must pay at least 20 of registered capital while remaining should be paid within 2 years

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Types of Investment in Lao PDR

36

Types of Investment ndash (3) Business Related to SEZ

Data source JETRO Compiled by World Business Advisory Center

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Types of Investment in Lao PDR

Investment in Business Related to SEZ

Description

o Business related to Special Economic Zone -gt an investment in building infrastructure for a new town

o Business related to Specific Economic Zone -gt an investment in infrastructure development for specific purpose projects such as industrial zone export zone tourist development zone etc

High Potential SEZs in Laos

o Vita Park Special Economic Zone (Vientiane)

o Savan-Seno Special Economic Zone (Savannakhet)

o Pakxe-Japan SME Specific Economic Zone (Champasak)

Special and Specific Economic Zones

1 Boten-Daenkham Specific Economic Zone 2 Luang Prabang Special Economic Zone 3 Golden Triangle Special Economic Zone 4 Thatluang Lake Specific Economic Zone 5 Longthanh Specific Economic Zone 6 Xaysettha Specific Economic Zone 7 Vita Park Special Economic Zone 8 Dongphosy Specific Economic Zone 9 Thakhek Specific Economic Zone 10 Poukiao Specific Economic Zone 11 Savan-Seno Special Economic Zone 12 Pakxe-Japan SME Specific Economic Zone

1

2

3

4

5 6

7

8

9 10

11

12

37

General Business

Concession Business

Business related to

SEZs

Procedure of Investment in Lao PDR

The investment approval procedure varies depending upon type of investment However all foreign investors must go through enterprise registration tax identification number registration and application for capital importation certificate

Apply at Ministry of Planning and

Investment

For developer apply at National Committee for Special Economic Zone

For investor apply at One-Stop Service Unit in

each SEZ

Get Concession

License

Get SEZ Concession

License

For controlled businesses apply for

approval at relevant Ministries

Get Approval License

Apply at Ministry of

Industry and Commerce

For non-controlled businesses

Get Enterprise

Registration Certificate

(ERC)

Apply for Tax

Identification Number TIN

at Tax Department Ministry of

Finance

Apply for Capital

Importation Certificate at Bank of Lao

PDR

Data source JETRO Compiled by World Business Advisory Center

38

Investment Tax Incentives ndash General Zone

Data source JETRO Compiled by World Business Advisory Center

Investment Tax Incentives in Lao PDR

Profit Tax Exemption Period

Level 1 High Promotion

Level 2 Moderate Promotion

Level 3 Low Promotion

Zone 1 10 years 6 years 4 years

Zone 2 6 years 4 years 2 years

Zone 3 4 years 2 years 1 years

Profit Tax Exemption Period by Promotion Sector and Zone

Promoted sectors Agriculture Industrial Handicrafts and Services

Type of Tax Exemption

General Zone Promotion Sector and Zone based Incentives 1 Special amp Specific Economic Zone

Tailor Made Incentives 2

Profit tax in next accounting year in case net profit is used for reinvestment (business

expansion)

Import duties for import of raw material equipment spare parts and

vehicles directly used for production

Export duties for general goods and

products (resource-based products should follow

associated laws)

Permission to carry forward losses to

three consecutive accounting years

39

Sector Period of

Profit Tax Exemption

Profit Tax Rate

After Tax Exemption Period

Hi-Tech Manufacturing 10 year 8

Manufacturing that exports at least 70 of production 10 year 8

Manufacturing that exports 30 - 60 of production 7 year 8

Manufacturing that exports 0 - 29 of production 5 year 8

Other 5 year 8

Investment amount of USD 2 million or more 10 year 8

Investment amount of USD 500000 - USD 2 million 8 year 8

Investment amount of USD 300000 - USD 500000 6 year 10

Investment amount of USD 150000 - USD 300000 4 year 10

Investment amount of USD 50000 - USD 150000 2 year 10

Export Laos products 5 year 10

International trade company 3 year 10

General trade company 2 year 10

a) Manufacturing

b) Service

c) Commerce

Personal Income Tax 5

Dividend Tax after Profit Tax Exemption Period

5

Import Duty Exemption for import of raw material equipment spare parts and

vehicles directly used for production

VAT Exemption for import products

Investment Tax Incentives ndash Special and Specific Economic Zone

Data source JETRO

Investment Tax Incentives in Lao PDR

General Zone Promotion Sector and Zone based Incentives 1 Special amp Specific Economic Zone

Tailor Made Incentives 2 Example of Tax Incentives in Savan-Seno SEZ

Other Tax Incentives

40

Non-Tax Incentives amp Trade Privileges

Data source JETRO

Non-Tax Incentives

Permission

Foreign nationals can undertake feasibility studies

Bring in foreign technicians experts and managers if qualified Lao nationals are not available

Lease land

General business up to 30 years from Lao citizen and up to 50 years from the government (renewable)

Investment in SEZ up to 75 years

Concession business upon negotiation with the government (at present there is an example of 99 years land lease)

Transfer leasehold interests and build on or make improvements or structures to a leased land

Guarantee against nationalization expropriation and requisition without compensation

Protection

Trade Privileges

ASEAN WTO GSP Bilateral trade agreement (over 18 countries)

o Argentina o Belarus o Bulgaria o Cambodia o China o Indonesia o India o Korea DPR o Kuwait

o Malaysia o Mongolia o Myanmar o Philippines o Russian

Federation o Thailand o Turkey o USA o Vietnam

41

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

42

Foreign Currency Exchange

Data source Bank of the Lao PDR

Laos Currency Kip (LAK)

Latest FX Rate (as of August 22 2018)

Remark THB and USD are widely accepted especially in the border trade area

USD 1 ~ LAK 8507

EUR 1 ~ LAK 9851

THB 1 ~ LAK 262

JPY 1 ~ LAK 77

CNY 1 ~ LAK 1193

43

KASIKORNTHAIBANK Service in Lao PDR

Retail Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Current deposit

Lending

Working capital loan

Long term loan

Bank guarantee

Project Financing

FX Services

Corporate Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Remittance

Remittance

Trade Finance Letter of Credit (LC) Standby Letter of Credit (SBLC)

44

KASIKORNTHAI BANK Limited

With establishment KASIKORNTHAIBANK

the first full-scale locally incorporated institution from Thailand is fully committed to support our clientsrsquo cross-border financing and transaction for their trade and investment activities in Lao PDR

45

KASIKORNTHAIBANK in Lao PDR Contacts

bull HEAD OFFICE Unit 12 Lane Xang Avenue Xiangngeun Village Chanthaboury District Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88905 Fax +856 21 253 336 wwwkasikornbankcomla

KASIKORNTHAI BANK Limited

bull PONESINUAN BRANCH

Ban Ponesinuan Unit 14 Sysattanak Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88826 Fax +856 21 410 889

Ms Piyanoot Sangsan Branch Manager KASIKORNTHAI BANK LIMITED Lane Xang Head Office E-mail piyanootskasikornbankcom

Mr Chatuporn Boozaya-Angool Branch Manager Ponesinuan Branch E-mail chatupornbkasikornbankcom

46

About AEC+ Business Advisory The AEC+ Business Advisory is set up by KASIKORNBANK to support businesses in their regional expansion across the ASEAN+3 market by providing local market intelligence and strategic business advice

What we do bull Offer customized and tailor-made advisory services bull Publish investment guides and industry reports bull Deliver in-depth insights via seminars bull Organize business trips to bring first-hand experience

Follow Us Visit our website at

AEC+ BUSINESS ADVISORY

Prepared by Mr Anoot Charoenkiattikul World Business Intelligence Specialist E-mail anootckasikornbankcom

httpswwwkasikornbankcominternational-businessenPagesHomeaspx

47

Page 21: LAO PDR - Facilitiesfuangfah.econ.cmu.ac.th/teacher/nisit/files/201808_LaoPDR_Investm… · • On August 7, the government of Laos announced the suspension of new hydropower project

21

Electronic Parts and Components Industry - Overview

Over the recent years Laos has experienced exponential growth in its exports of electronic parts and components especially to Thailand indicating the initial formation of the regional supply chain

Lao PDR Electronic Part and Component Exports (USD Million 2017)

Increasing investments in Lao PDR Special Economic Zone (SEZ) boosts trade The presence of SEZs and attractive incentives have attracted FDI inflows into Lao PDR especially in the production of digital camera parts and telecom equipment parts Most manufacturing in these sectors is aimed at exporting intermediate products to assemblers of finished electrical and electronic products in other countries

Main Export Destinations 2017

Data source International Trade Center

Why Thailand has become the top export destination

bull ASEAN Free Trade Agreement (AFTA) ndash The agreement minimizes trade barriers and creates free flow of goods and capital within ASEAN

bull Thailand-based industries shift their focus on value added activities - firms relocate labor-intensive activities to Thailandrsquos neighboring countries including Laos

22

Electronic Parts and Components Industry - Opportunity

Industrial development in Laos offers opportunities for firms to form the regional supply chain model and benefit from comparative advantages from both nations

Data source JETRO

Thailand

Product supply chain

Laos

Did you knowhellip

Challenges

Difficulty in getting large pools of labor due to small population

Underdeveloped infrastructure in some regions

Challenge in recruiting higher skilled specialists

Suggestion Set up in major Special Economic Zones eg Vita Park SEZ and Savan-Seno SEZ

Roll out strategic human resource plan including training and capacity building

bull Advanced infrastructure

bull Experienced and high-skilled (management level) workforce

bull Affordable and youthful workforce bull Located between Vietnam and Thailand

both with high electronics parts demand bull Government incentives

Start operation from small scale (less than 500 workers) then scale up

Japanese enterprises have started implementing Thailand+1 model by relocating labor-intensive production to Laos and exporting back to Thailand to complete product assembly eg NIKON (digital camera) Dai-Ichi Denshi (wire harness) Nissei Mizuki (electronics parts) and Toyota boshoku (car seat cover)

Thailand + 1 Model

23

Industrial Agriculture

Key Industries amp Opportunities

24

Industrial Agriculture - Overview

Most industrial agriculture exports from Lao PDR are produced by foreign investors (Chinese Thai and Vietnamese) and local entrepreneurs to a lesser extent

Data source JETRO International Trade Center Produce Report USDA Foreign Agriculture Service

Leading Agricultural Exports by export value (USD Million 2016 and 2017)

A short-term drop in fruit exports in 2017 bull Exports declined because the Lao government suspended

development of large banana and other fruit plantations which typically produce to export to China and placed more stringent control on polluting farms

bull However at the end of 2017 Lao PDR and China negotiated for less stringent terms for Lao PDRrsquos fruit exports to China

Key Trends

Sugar Cane exports rocketing bull In 2017 sugar cane plantation boomed Export volume grew 121

times from 2016

bull The major reason was the relocation of sugar production from China as production costs there are very high approximately double that of Thailand

Organic fruit and vegetable becoming key economic plants bull Local and foreign investors are increasingly investing in organic

agriculture a higher value-added segment which is demanded by major countries such as Europe US Japan and China

Exports (2016)

USD 02 Million

Exports (2017)

USD 20 Million

121 times

25

Industrial Agriculture - Opportunity

Lao industrial agriculture sector offers opportunities for

bull Agricultural inputs andmachinery producers and distributors

bull Plantation operators

bull Processing and trading firms in Thailand

3 Processing and Trading

Key Drivers Lack of capability to process

products at international standard

Lack of market access

Opportunities Market inputs and machinery

to agricultural projects Investor can target both large scale investment

and smallholder farmers

Opportunities Produce high-value agricultural

products organic products herbs and medical plants

Foreign investors operate via (1) contract farming and (2) concession

Opportunities Process raw products to meet

export standards trade products to leverage existing market channels

Agricultural Inputs and Machinery

Key Drivers Limited access to improved

agricultural inputs - Seed - Fertilizer - Quality machinery

1 2

Key Drivers Arable fertile land

low level of chemical pesticides

Plantation ndash High Value Products

26

Tourism

Key Industries amp Opportunities

27

Tourism - Overview

Tourist arrivals are on a steady rise in the past decade especially tourists from Asia Pacific with most of them visiting more developed border towns neighboring Thailand

Data source Ministry of Tourism TRAVEL amp TOURISM ECONOMIC IMPACT 2018 LAOS

Direct Contribution of Travel amp Tourism to GDP (USD Billion 2012-2018E)

bull Both tourist arrivals and revenue from tourism have increased approximately 3 folds in the past decade

bull Most tourists come from Asia Pacific (93) particularly from from Thailand (50) and Vietnam (25) followed by Europe (5)

Top Tourist Arrivals Destinations 2017

1 Vientiane Capital

2 Savannakhet

3 Champasak

Most top tourist destinations are more developed towns bordering Thailand

Nong Khai

Mukdahan

Ubon Ratchathani

World Heritage sites im these following city also attract a considerable number of visitors

Luang Prabang Wat Pu at Champasak

28

Business Opportunities Associated to Tourism Sector

Accommodate increasing tourist arrivals

Provide dining and entertainment services

Develop attractive ecotourism cultural tourism packages

Provide transportation services linking major tourism sites

Produce and market souvenirs applying local arts design and materials

1 Hotel Restaurant Entertainment

2 Tour Company Holiday Package

3 Sourvenirs

4 Transportation Service

Tourism - Opportunity

29

Lao Consumer Income and Behavior

Prefer to cook at home Enjoy drinking alcohol Middle income enjoy

spending evening in beer garden

Lao women wear sinh Follow Thai and Korean

fashion due to influence of TV series

Shop at traditional markets Middle income shop at

Thai border towns (Nong Khai Udon Thani)

Thai and Japanese products are perceived to have high quality Chinese products are perceived as sub-standard quality and Korean products are in between

30

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

31

Major Costs ndash Labor and Utility

Electricity Rate 2017

0 - 25 kwh 004USDkwh

26 - 150 kwh 005USDkwh

151 - 300 kwh 009USDkwh

more than 500 kwh 012USDkwh

301 - 400 kwh 010USDkwh

401 - 500 kwh 011USDkwh

Water Price (Per Unit) for Business and Trade Units

bull Water price for businesses is set to increase from USD USD 036 in 2017 to USD038 per unit this year

Labor minimum monthly wage in ASEAN 2017 USD

32

Tax System

Monthly Income (LAK) Tax Rate

0 ndash 1000000 0

1000001 - 3000000 5

3000001 - 6000000 10

6000001 - 12000000 12

12000001 - 24000000 15

24000001 - 40000000 20

Above 40000000 24

Types of Tax Tax rate

Profit Tax 24

Value Added Tax (VAT) 10

Withholding Tax Dividends 10

(non-residents) Transfer of shares 10

Transfer of assets 5

China

Luxembourg

Malaysia

Singapore

South Korea

Thailand

Vietnam

Income tax treaties for avoidance of double taxation

Note There is no definition of residence for tax purposes in Laos All companies registered under Lao law (including foreign law) are subject to Lao profit tax

Personal Income Tax Corporate Taxes

Data source DFDL

33

Foreign Investment Regulations

Data source JETRO Compiled by World Business Advisory Center

Not Permitted to Foreigner Only for Joint Venture with Local Company 100 Foreign Ownership Allowed

Wholesale and Retail Businesses

100 Foreign Ownership bull If registered capital is 20 billion Lao Kip

(USD 25 million) or more

Maximum 70 Foreign Ownership bull If registered capital is 10 - 20 billion Lao Kip

(USD 125 ndash 25 million)

Maximum 50 Foreign Ownership bull If registered capital is 4 - 10 billion Lao Kip

(USD 05 ndash 125 million)

bull If registered capital is less than 4 billion Lao Kip (USD 05 million)

Hotel and Restaurants Maximum 60 Foreign Ownership bull 3-5 stars hotel with minimum registered capital of

1 billion Lao Kip (USD 125000)

bull Less than 3 stars hotel 100 Foreign Ownership bull NOT ALLOWED

Logistics

100 Foreign Ownership bull Domestic goods transport with minimum

registered capital of 3 billion Lao Kip (USD 375000)

Maximum 49 Foreign Ownership bull Cross border goods transport with minimum

registered capital of 5 billion Lao Kip (USD 625000)

bull Cross border goods transport with less than 5 billion Lao Kip of registered capital

bull Domestic goods transport with less than 3 billion Lao Kip of registered capital

Examples of Foreign Investment Regulations

Foreign enterprises are subject to foreign investment regulations in several business activities Generally small businesses are preserved for Lao enterprises whereas large businesses with certain investment conditions are opened for foreign investors

34

Types of Investment ndash (1) General Business

Data source JETRO Compiled by World Business Advisory Center

Besides foreign investment regulation foreign enterprises are also subject to the investment promotion law which classifies investment into 3 types

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Investment in General Business

Types of Investment in Lao PDR

Description

o An investment in general economic activities

o Activities including controlled businesses ndash businesses that require additional approval from relevant ministries

o Activities excluding concession business

Register Capital

Requirements

o At least 1 billion Lao Kip (USD 125000)

o At the day of establishment must pay 40 (agriculture business) 60 (production and processing) 80 (services) The remainder must be paid within 1 year

Examples of Controlled Businesses 1 Agriculture plantation agriculture fishery 2 Manufacturing petroleum products leathers textile amp clothing papers

printing pesticides pharmaceutical products 3 Businesses related to environment eg wastewater treatment 4 Wholesale and retails of gasoline and petroleum products 5 Transportation 6 Hotel and Restaurant 7 Media and Publication 8 Finance and insurance 9 Legal accounting and tax services 10 Tourism 11 Education 12 Hospital clinic and medical services 13 Recreation (museum and amusement park)

35

Types of Investment ndash (2) Concession Business

Data source JETRO Compiled by World Business Advisory Center

Investment in Concession Business

Description

o An investment that requires a concession or specific authorization from the government to use the governmentrsquos property

o Some concession businesses requires authorization from the central government whereas the other requires only provincial government level of authorization for example

bull At least 5MW electricity generation project requires the central government authorization

bull Less than 5MW electricity generation projects requires only provincial government authorization

Examples of Concession Business

1 Mining 2 Electricity generation 3 Infrastructure

bull Telecommunication bull TV and radio station bull Road railway airport seaport waste disposal site

4 Businesses that use the government land bull Shopping center bull Tourist attraction bull Public park bull Hotel bull Forestry and Logging bull Plantation and Livestock

Register Capital

Requirements

o Must pay at least 20 of registered capital while remaining should be paid within 2 years

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Types of Investment in Lao PDR

36

Types of Investment ndash (3) Business Related to SEZ

Data source JETRO Compiled by World Business Advisory Center

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Types of Investment in Lao PDR

Investment in Business Related to SEZ

Description

o Business related to Special Economic Zone -gt an investment in building infrastructure for a new town

o Business related to Specific Economic Zone -gt an investment in infrastructure development for specific purpose projects such as industrial zone export zone tourist development zone etc

High Potential SEZs in Laos

o Vita Park Special Economic Zone (Vientiane)

o Savan-Seno Special Economic Zone (Savannakhet)

o Pakxe-Japan SME Specific Economic Zone (Champasak)

Special and Specific Economic Zones

1 Boten-Daenkham Specific Economic Zone 2 Luang Prabang Special Economic Zone 3 Golden Triangle Special Economic Zone 4 Thatluang Lake Specific Economic Zone 5 Longthanh Specific Economic Zone 6 Xaysettha Specific Economic Zone 7 Vita Park Special Economic Zone 8 Dongphosy Specific Economic Zone 9 Thakhek Specific Economic Zone 10 Poukiao Specific Economic Zone 11 Savan-Seno Special Economic Zone 12 Pakxe-Japan SME Specific Economic Zone

1

2

3

4

5 6

7

8

9 10

11

12

37

General Business

Concession Business

Business related to

SEZs

Procedure of Investment in Lao PDR

The investment approval procedure varies depending upon type of investment However all foreign investors must go through enterprise registration tax identification number registration and application for capital importation certificate

Apply at Ministry of Planning and

Investment

For developer apply at National Committee for Special Economic Zone

For investor apply at One-Stop Service Unit in

each SEZ

Get Concession

License

Get SEZ Concession

License

For controlled businesses apply for

approval at relevant Ministries

Get Approval License

Apply at Ministry of

Industry and Commerce

For non-controlled businesses

Get Enterprise

Registration Certificate

(ERC)

Apply for Tax

Identification Number TIN

at Tax Department Ministry of

Finance

Apply for Capital

Importation Certificate at Bank of Lao

PDR

Data source JETRO Compiled by World Business Advisory Center

38

Investment Tax Incentives ndash General Zone

Data source JETRO Compiled by World Business Advisory Center

Investment Tax Incentives in Lao PDR

Profit Tax Exemption Period

Level 1 High Promotion

Level 2 Moderate Promotion

Level 3 Low Promotion

Zone 1 10 years 6 years 4 years

Zone 2 6 years 4 years 2 years

Zone 3 4 years 2 years 1 years

Profit Tax Exemption Period by Promotion Sector and Zone

Promoted sectors Agriculture Industrial Handicrafts and Services

Type of Tax Exemption

General Zone Promotion Sector and Zone based Incentives 1 Special amp Specific Economic Zone

Tailor Made Incentives 2

Profit tax in next accounting year in case net profit is used for reinvestment (business

expansion)

Import duties for import of raw material equipment spare parts and

vehicles directly used for production

Export duties for general goods and

products (resource-based products should follow

associated laws)

Permission to carry forward losses to

three consecutive accounting years

39

Sector Period of

Profit Tax Exemption

Profit Tax Rate

After Tax Exemption Period

Hi-Tech Manufacturing 10 year 8

Manufacturing that exports at least 70 of production 10 year 8

Manufacturing that exports 30 - 60 of production 7 year 8

Manufacturing that exports 0 - 29 of production 5 year 8

Other 5 year 8

Investment amount of USD 2 million or more 10 year 8

Investment amount of USD 500000 - USD 2 million 8 year 8

Investment amount of USD 300000 - USD 500000 6 year 10

Investment amount of USD 150000 - USD 300000 4 year 10

Investment amount of USD 50000 - USD 150000 2 year 10

Export Laos products 5 year 10

International trade company 3 year 10

General trade company 2 year 10

a) Manufacturing

b) Service

c) Commerce

Personal Income Tax 5

Dividend Tax after Profit Tax Exemption Period

5

Import Duty Exemption for import of raw material equipment spare parts and

vehicles directly used for production

VAT Exemption for import products

Investment Tax Incentives ndash Special and Specific Economic Zone

Data source JETRO

Investment Tax Incentives in Lao PDR

General Zone Promotion Sector and Zone based Incentives 1 Special amp Specific Economic Zone

Tailor Made Incentives 2 Example of Tax Incentives in Savan-Seno SEZ

Other Tax Incentives

40

Non-Tax Incentives amp Trade Privileges

Data source JETRO

Non-Tax Incentives

Permission

Foreign nationals can undertake feasibility studies

Bring in foreign technicians experts and managers if qualified Lao nationals are not available

Lease land

General business up to 30 years from Lao citizen and up to 50 years from the government (renewable)

Investment in SEZ up to 75 years

Concession business upon negotiation with the government (at present there is an example of 99 years land lease)

Transfer leasehold interests and build on or make improvements or structures to a leased land

Guarantee against nationalization expropriation and requisition without compensation

Protection

Trade Privileges

ASEAN WTO GSP Bilateral trade agreement (over 18 countries)

o Argentina o Belarus o Bulgaria o Cambodia o China o Indonesia o India o Korea DPR o Kuwait

o Malaysia o Mongolia o Myanmar o Philippines o Russian

Federation o Thailand o Turkey o USA o Vietnam

41

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

42

Foreign Currency Exchange

Data source Bank of the Lao PDR

Laos Currency Kip (LAK)

Latest FX Rate (as of August 22 2018)

Remark THB and USD are widely accepted especially in the border trade area

USD 1 ~ LAK 8507

EUR 1 ~ LAK 9851

THB 1 ~ LAK 262

JPY 1 ~ LAK 77

CNY 1 ~ LAK 1193

43

KASIKORNTHAIBANK Service in Lao PDR

Retail Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Current deposit

Lending

Working capital loan

Long term loan

Bank guarantee

Project Financing

FX Services

Corporate Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Remittance

Remittance

Trade Finance Letter of Credit (LC) Standby Letter of Credit (SBLC)

44

KASIKORNTHAI BANK Limited

With establishment KASIKORNTHAIBANK

the first full-scale locally incorporated institution from Thailand is fully committed to support our clientsrsquo cross-border financing and transaction for their trade and investment activities in Lao PDR

45

KASIKORNTHAIBANK in Lao PDR Contacts

bull HEAD OFFICE Unit 12 Lane Xang Avenue Xiangngeun Village Chanthaboury District Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88905 Fax +856 21 253 336 wwwkasikornbankcomla

KASIKORNTHAI BANK Limited

bull PONESINUAN BRANCH

Ban Ponesinuan Unit 14 Sysattanak Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88826 Fax +856 21 410 889

Ms Piyanoot Sangsan Branch Manager KASIKORNTHAI BANK LIMITED Lane Xang Head Office E-mail piyanootskasikornbankcom

Mr Chatuporn Boozaya-Angool Branch Manager Ponesinuan Branch E-mail chatupornbkasikornbankcom

46

About AEC+ Business Advisory The AEC+ Business Advisory is set up by KASIKORNBANK to support businesses in their regional expansion across the ASEAN+3 market by providing local market intelligence and strategic business advice

What we do bull Offer customized and tailor-made advisory services bull Publish investment guides and industry reports bull Deliver in-depth insights via seminars bull Organize business trips to bring first-hand experience

Follow Us Visit our website at

AEC+ BUSINESS ADVISORY

Prepared by Mr Anoot Charoenkiattikul World Business Intelligence Specialist E-mail anootckasikornbankcom

httpswwwkasikornbankcominternational-businessenPagesHomeaspx

47

Page 22: LAO PDR - Facilitiesfuangfah.econ.cmu.ac.th/teacher/nisit/files/201808_LaoPDR_Investm… · • On August 7, the government of Laos announced the suspension of new hydropower project

22

Electronic Parts and Components Industry - Opportunity

Industrial development in Laos offers opportunities for firms to form the regional supply chain model and benefit from comparative advantages from both nations

Data source JETRO

Thailand

Product supply chain

Laos

Did you knowhellip

Challenges

Difficulty in getting large pools of labor due to small population

Underdeveloped infrastructure in some regions

Challenge in recruiting higher skilled specialists

Suggestion Set up in major Special Economic Zones eg Vita Park SEZ and Savan-Seno SEZ

Roll out strategic human resource plan including training and capacity building

bull Advanced infrastructure

bull Experienced and high-skilled (management level) workforce

bull Affordable and youthful workforce bull Located between Vietnam and Thailand

both with high electronics parts demand bull Government incentives

Start operation from small scale (less than 500 workers) then scale up

Japanese enterprises have started implementing Thailand+1 model by relocating labor-intensive production to Laos and exporting back to Thailand to complete product assembly eg NIKON (digital camera) Dai-Ichi Denshi (wire harness) Nissei Mizuki (electronics parts) and Toyota boshoku (car seat cover)

Thailand + 1 Model

23

Industrial Agriculture

Key Industries amp Opportunities

24

Industrial Agriculture - Overview

Most industrial agriculture exports from Lao PDR are produced by foreign investors (Chinese Thai and Vietnamese) and local entrepreneurs to a lesser extent

Data source JETRO International Trade Center Produce Report USDA Foreign Agriculture Service

Leading Agricultural Exports by export value (USD Million 2016 and 2017)

A short-term drop in fruit exports in 2017 bull Exports declined because the Lao government suspended

development of large banana and other fruit plantations which typically produce to export to China and placed more stringent control on polluting farms

bull However at the end of 2017 Lao PDR and China negotiated for less stringent terms for Lao PDRrsquos fruit exports to China

Key Trends

Sugar Cane exports rocketing bull In 2017 sugar cane plantation boomed Export volume grew 121

times from 2016

bull The major reason was the relocation of sugar production from China as production costs there are very high approximately double that of Thailand

Organic fruit and vegetable becoming key economic plants bull Local and foreign investors are increasingly investing in organic

agriculture a higher value-added segment which is demanded by major countries such as Europe US Japan and China

Exports (2016)

USD 02 Million

Exports (2017)

USD 20 Million

121 times

25

Industrial Agriculture - Opportunity

Lao industrial agriculture sector offers opportunities for

bull Agricultural inputs andmachinery producers and distributors

bull Plantation operators

bull Processing and trading firms in Thailand

3 Processing and Trading

Key Drivers Lack of capability to process

products at international standard

Lack of market access

Opportunities Market inputs and machinery

to agricultural projects Investor can target both large scale investment

and smallholder farmers

Opportunities Produce high-value agricultural

products organic products herbs and medical plants

Foreign investors operate via (1) contract farming and (2) concession

Opportunities Process raw products to meet

export standards trade products to leverage existing market channels

Agricultural Inputs and Machinery

Key Drivers Limited access to improved

agricultural inputs - Seed - Fertilizer - Quality machinery

1 2

Key Drivers Arable fertile land

low level of chemical pesticides

Plantation ndash High Value Products

26

Tourism

Key Industries amp Opportunities

27

Tourism - Overview

Tourist arrivals are on a steady rise in the past decade especially tourists from Asia Pacific with most of them visiting more developed border towns neighboring Thailand

Data source Ministry of Tourism TRAVEL amp TOURISM ECONOMIC IMPACT 2018 LAOS

Direct Contribution of Travel amp Tourism to GDP (USD Billion 2012-2018E)

bull Both tourist arrivals and revenue from tourism have increased approximately 3 folds in the past decade

bull Most tourists come from Asia Pacific (93) particularly from from Thailand (50) and Vietnam (25) followed by Europe (5)

Top Tourist Arrivals Destinations 2017

1 Vientiane Capital

2 Savannakhet

3 Champasak

Most top tourist destinations are more developed towns bordering Thailand

Nong Khai

Mukdahan

Ubon Ratchathani

World Heritage sites im these following city also attract a considerable number of visitors

Luang Prabang Wat Pu at Champasak

28

Business Opportunities Associated to Tourism Sector

Accommodate increasing tourist arrivals

Provide dining and entertainment services

Develop attractive ecotourism cultural tourism packages

Provide transportation services linking major tourism sites

Produce and market souvenirs applying local arts design and materials

1 Hotel Restaurant Entertainment

2 Tour Company Holiday Package

3 Sourvenirs

4 Transportation Service

Tourism - Opportunity

29

Lao Consumer Income and Behavior

Prefer to cook at home Enjoy drinking alcohol Middle income enjoy

spending evening in beer garden

Lao women wear sinh Follow Thai and Korean

fashion due to influence of TV series

Shop at traditional markets Middle income shop at

Thai border towns (Nong Khai Udon Thani)

Thai and Japanese products are perceived to have high quality Chinese products are perceived as sub-standard quality and Korean products are in between

30

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

31

Major Costs ndash Labor and Utility

Electricity Rate 2017

0 - 25 kwh 004USDkwh

26 - 150 kwh 005USDkwh

151 - 300 kwh 009USDkwh

more than 500 kwh 012USDkwh

301 - 400 kwh 010USDkwh

401 - 500 kwh 011USDkwh

Water Price (Per Unit) for Business and Trade Units

bull Water price for businesses is set to increase from USD USD 036 in 2017 to USD038 per unit this year

Labor minimum monthly wage in ASEAN 2017 USD

32

Tax System

Monthly Income (LAK) Tax Rate

0 ndash 1000000 0

1000001 - 3000000 5

3000001 - 6000000 10

6000001 - 12000000 12

12000001 - 24000000 15

24000001 - 40000000 20

Above 40000000 24

Types of Tax Tax rate

Profit Tax 24

Value Added Tax (VAT) 10

Withholding Tax Dividends 10

(non-residents) Transfer of shares 10

Transfer of assets 5

China

Luxembourg

Malaysia

Singapore

South Korea

Thailand

Vietnam

Income tax treaties for avoidance of double taxation

Note There is no definition of residence for tax purposes in Laos All companies registered under Lao law (including foreign law) are subject to Lao profit tax

Personal Income Tax Corporate Taxes

Data source DFDL

33

Foreign Investment Regulations

Data source JETRO Compiled by World Business Advisory Center

Not Permitted to Foreigner Only for Joint Venture with Local Company 100 Foreign Ownership Allowed

Wholesale and Retail Businesses

100 Foreign Ownership bull If registered capital is 20 billion Lao Kip

(USD 25 million) or more

Maximum 70 Foreign Ownership bull If registered capital is 10 - 20 billion Lao Kip

(USD 125 ndash 25 million)

Maximum 50 Foreign Ownership bull If registered capital is 4 - 10 billion Lao Kip

(USD 05 ndash 125 million)

bull If registered capital is less than 4 billion Lao Kip (USD 05 million)

Hotel and Restaurants Maximum 60 Foreign Ownership bull 3-5 stars hotel with minimum registered capital of

1 billion Lao Kip (USD 125000)

bull Less than 3 stars hotel 100 Foreign Ownership bull NOT ALLOWED

Logistics

100 Foreign Ownership bull Domestic goods transport with minimum

registered capital of 3 billion Lao Kip (USD 375000)

Maximum 49 Foreign Ownership bull Cross border goods transport with minimum

registered capital of 5 billion Lao Kip (USD 625000)

bull Cross border goods transport with less than 5 billion Lao Kip of registered capital

bull Domestic goods transport with less than 3 billion Lao Kip of registered capital

Examples of Foreign Investment Regulations

Foreign enterprises are subject to foreign investment regulations in several business activities Generally small businesses are preserved for Lao enterprises whereas large businesses with certain investment conditions are opened for foreign investors

34

Types of Investment ndash (1) General Business

Data source JETRO Compiled by World Business Advisory Center

Besides foreign investment regulation foreign enterprises are also subject to the investment promotion law which classifies investment into 3 types

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Investment in General Business

Types of Investment in Lao PDR

Description

o An investment in general economic activities

o Activities including controlled businesses ndash businesses that require additional approval from relevant ministries

o Activities excluding concession business

Register Capital

Requirements

o At least 1 billion Lao Kip (USD 125000)

o At the day of establishment must pay 40 (agriculture business) 60 (production and processing) 80 (services) The remainder must be paid within 1 year

Examples of Controlled Businesses 1 Agriculture plantation agriculture fishery 2 Manufacturing petroleum products leathers textile amp clothing papers

printing pesticides pharmaceutical products 3 Businesses related to environment eg wastewater treatment 4 Wholesale and retails of gasoline and petroleum products 5 Transportation 6 Hotel and Restaurant 7 Media and Publication 8 Finance and insurance 9 Legal accounting and tax services 10 Tourism 11 Education 12 Hospital clinic and medical services 13 Recreation (museum and amusement park)

35

Types of Investment ndash (2) Concession Business

Data source JETRO Compiled by World Business Advisory Center

Investment in Concession Business

Description

o An investment that requires a concession or specific authorization from the government to use the governmentrsquos property

o Some concession businesses requires authorization from the central government whereas the other requires only provincial government level of authorization for example

bull At least 5MW electricity generation project requires the central government authorization

bull Less than 5MW electricity generation projects requires only provincial government authorization

Examples of Concession Business

1 Mining 2 Electricity generation 3 Infrastructure

bull Telecommunication bull TV and radio station bull Road railway airport seaport waste disposal site

4 Businesses that use the government land bull Shopping center bull Tourist attraction bull Public park bull Hotel bull Forestry and Logging bull Plantation and Livestock

Register Capital

Requirements

o Must pay at least 20 of registered capital while remaining should be paid within 2 years

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Types of Investment in Lao PDR

36

Types of Investment ndash (3) Business Related to SEZ

Data source JETRO Compiled by World Business Advisory Center

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Types of Investment in Lao PDR

Investment in Business Related to SEZ

Description

o Business related to Special Economic Zone -gt an investment in building infrastructure for a new town

o Business related to Specific Economic Zone -gt an investment in infrastructure development for specific purpose projects such as industrial zone export zone tourist development zone etc

High Potential SEZs in Laos

o Vita Park Special Economic Zone (Vientiane)

o Savan-Seno Special Economic Zone (Savannakhet)

o Pakxe-Japan SME Specific Economic Zone (Champasak)

Special and Specific Economic Zones

1 Boten-Daenkham Specific Economic Zone 2 Luang Prabang Special Economic Zone 3 Golden Triangle Special Economic Zone 4 Thatluang Lake Specific Economic Zone 5 Longthanh Specific Economic Zone 6 Xaysettha Specific Economic Zone 7 Vita Park Special Economic Zone 8 Dongphosy Specific Economic Zone 9 Thakhek Specific Economic Zone 10 Poukiao Specific Economic Zone 11 Savan-Seno Special Economic Zone 12 Pakxe-Japan SME Specific Economic Zone

1

2

3

4

5 6

7

8

9 10

11

12

37

General Business

Concession Business

Business related to

SEZs

Procedure of Investment in Lao PDR

The investment approval procedure varies depending upon type of investment However all foreign investors must go through enterprise registration tax identification number registration and application for capital importation certificate

Apply at Ministry of Planning and

Investment

For developer apply at National Committee for Special Economic Zone

For investor apply at One-Stop Service Unit in

each SEZ

Get Concession

License

Get SEZ Concession

License

For controlled businesses apply for

approval at relevant Ministries

Get Approval License

Apply at Ministry of

Industry and Commerce

For non-controlled businesses

Get Enterprise

Registration Certificate

(ERC)

Apply for Tax

Identification Number TIN

at Tax Department Ministry of

Finance

Apply for Capital

Importation Certificate at Bank of Lao

PDR

Data source JETRO Compiled by World Business Advisory Center

38

Investment Tax Incentives ndash General Zone

Data source JETRO Compiled by World Business Advisory Center

Investment Tax Incentives in Lao PDR

Profit Tax Exemption Period

Level 1 High Promotion

Level 2 Moderate Promotion

Level 3 Low Promotion

Zone 1 10 years 6 years 4 years

Zone 2 6 years 4 years 2 years

Zone 3 4 years 2 years 1 years

Profit Tax Exemption Period by Promotion Sector and Zone

Promoted sectors Agriculture Industrial Handicrafts and Services

Type of Tax Exemption

General Zone Promotion Sector and Zone based Incentives 1 Special amp Specific Economic Zone

Tailor Made Incentives 2

Profit tax in next accounting year in case net profit is used for reinvestment (business

expansion)

Import duties for import of raw material equipment spare parts and

vehicles directly used for production

Export duties for general goods and

products (resource-based products should follow

associated laws)

Permission to carry forward losses to

three consecutive accounting years

39

Sector Period of

Profit Tax Exemption

Profit Tax Rate

After Tax Exemption Period

Hi-Tech Manufacturing 10 year 8

Manufacturing that exports at least 70 of production 10 year 8

Manufacturing that exports 30 - 60 of production 7 year 8

Manufacturing that exports 0 - 29 of production 5 year 8

Other 5 year 8

Investment amount of USD 2 million or more 10 year 8

Investment amount of USD 500000 - USD 2 million 8 year 8

Investment amount of USD 300000 - USD 500000 6 year 10

Investment amount of USD 150000 - USD 300000 4 year 10

Investment amount of USD 50000 - USD 150000 2 year 10

Export Laos products 5 year 10

International trade company 3 year 10

General trade company 2 year 10

a) Manufacturing

b) Service

c) Commerce

Personal Income Tax 5

Dividend Tax after Profit Tax Exemption Period

5

Import Duty Exemption for import of raw material equipment spare parts and

vehicles directly used for production

VAT Exemption for import products

Investment Tax Incentives ndash Special and Specific Economic Zone

Data source JETRO

Investment Tax Incentives in Lao PDR

General Zone Promotion Sector and Zone based Incentives 1 Special amp Specific Economic Zone

Tailor Made Incentives 2 Example of Tax Incentives in Savan-Seno SEZ

Other Tax Incentives

40

Non-Tax Incentives amp Trade Privileges

Data source JETRO

Non-Tax Incentives

Permission

Foreign nationals can undertake feasibility studies

Bring in foreign technicians experts and managers if qualified Lao nationals are not available

Lease land

General business up to 30 years from Lao citizen and up to 50 years from the government (renewable)

Investment in SEZ up to 75 years

Concession business upon negotiation with the government (at present there is an example of 99 years land lease)

Transfer leasehold interests and build on or make improvements or structures to a leased land

Guarantee against nationalization expropriation and requisition without compensation

Protection

Trade Privileges

ASEAN WTO GSP Bilateral trade agreement (over 18 countries)

o Argentina o Belarus o Bulgaria o Cambodia o China o Indonesia o India o Korea DPR o Kuwait

o Malaysia o Mongolia o Myanmar o Philippines o Russian

Federation o Thailand o Turkey o USA o Vietnam

41

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

42

Foreign Currency Exchange

Data source Bank of the Lao PDR

Laos Currency Kip (LAK)

Latest FX Rate (as of August 22 2018)

Remark THB and USD are widely accepted especially in the border trade area

USD 1 ~ LAK 8507

EUR 1 ~ LAK 9851

THB 1 ~ LAK 262

JPY 1 ~ LAK 77

CNY 1 ~ LAK 1193

43

KASIKORNTHAIBANK Service in Lao PDR

Retail Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Current deposit

Lending

Working capital loan

Long term loan

Bank guarantee

Project Financing

FX Services

Corporate Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Remittance

Remittance

Trade Finance Letter of Credit (LC) Standby Letter of Credit (SBLC)

44

KASIKORNTHAI BANK Limited

With establishment KASIKORNTHAIBANK

the first full-scale locally incorporated institution from Thailand is fully committed to support our clientsrsquo cross-border financing and transaction for their trade and investment activities in Lao PDR

45

KASIKORNTHAIBANK in Lao PDR Contacts

bull HEAD OFFICE Unit 12 Lane Xang Avenue Xiangngeun Village Chanthaboury District Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88905 Fax +856 21 253 336 wwwkasikornbankcomla

KASIKORNTHAI BANK Limited

bull PONESINUAN BRANCH

Ban Ponesinuan Unit 14 Sysattanak Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88826 Fax +856 21 410 889

Ms Piyanoot Sangsan Branch Manager KASIKORNTHAI BANK LIMITED Lane Xang Head Office E-mail piyanootskasikornbankcom

Mr Chatuporn Boozaya-Angool Branch Manager Ponesinuan Branch E-mail chatupornbkasikornbankcom

46

About AEC+ Business Advisory The AEC+ Business Advisory is set up by KASIKORNBANK to support businesses in their regional expansion across the ASEAN+3 market by providing local market intelligence and strategic business advice

What we do bull Offer customized and tailor-made advisory services bull Publish investment guides and industry reports bull Deliver in-depth insights via seminars bull Organize business trips to bring first-hand experience

Follow Us Visit our website at

AEC+ BUSINESS ADVISORY

Prepared by Mr Anoot Charoenkiattikul World Business Intelligence Specialist E-mail anootckasikornbankcom

httpswwwkasikornbankcominternational-businessenPagesHomeaspx

47

Page 23: LAO PDR - Facilitiesfuangfah.econ.cmu.ac.th/teacher/nisit/files/201808_LaoPDR_Investm… · • On August 7, the government of Laos announced the suspension of new hydropower project

23

Industrial Agriculture

Key Industries amp Opportunities

24

Industrial Agriculture - Overview

Most industrial agriculture exports from Lao PDR are produced by foreign investors (Chinese Thai and Vietnamese) and local entrepreneurs to a lesser extent

Data source JETRO International Trade Center Produce Report USDA Foreign Agriculture Service

Leading Agricultural Exports by export value (USD Million 2016 and 2017)

A short-term drop in fruit exports in 2017 bull Exports declined because the Lao government suspended

development of large banana and other fruit plantations which typically produce to export to China and placed more stringent control on polluting farms

bull However at the end of 2017 Lao PDR and China negotiated for less stringent terms for Lao PDRrsquos fruit exports to China

Key Trends

Sugar Cane exports rocketing bull In 2017 sugar cane plantation boomed Export volume grew 121

times from 2016

bull The major reason was the relocation of sugar production from China as production costs there are very high approximately double that of Thailand

Organic fruit and vegetable becoming key economic plants bull Local and foreign investors are increasingly investing in organic

agriculture a higher value-added segment which is demanded by major countries such as Europe US Japan and China

Exports (2016)

USD 02 Million

Exports (2017)

USD 20 Million

121 times

25

Industrial Agriculture - Opportunity

Lao industrial agriculture sector offers opportunities for

bull Agricultural inputs andmachinery producers and distributors

bull Plantation operators

bull Processing and trading firms in Thailand

3 Processing and Trading

Key Drivers Lack of capability to process

products at international standard

Lack of market access

Opportunities Market inputs and machinery

to agricultural projects Investor can target both large scale investment

and smallholder farmers

Opportunities Produce high-value agricultural

products organic products herbs and medical plants

Foreign investors operate via (1) contract farming and (2) concession

Opportunities Process raw products to meet

export standards trade products to leverage existing market channels

Agricultural Inputs and Machinery

Key Drivers Limited access to improved

agricultural inputs - Seed - Fertilizer - Quality machinery

1 2

Key Drivers Arable fertile land

low level of chemical pesticides

Plantation ndash High Value Products

26

Tourism

Key Industries amp Opportunities

27

Tourism - Overview

Tourist arrivals are on a steady rise in the past decade especially tourists from Asia Pacific with most of them visiting more developed border towns neighboring Thailand

Data source Ministry of Tourism TRAVEL amp TOURISM ECONOMIC IMPACT 2018 LAOS

Direct Contribution of Travel amp Tourism to GDP (USD Billion 2012-2018E)

bull Both tourist arrivals and revenue from tourism have increased approximately 3 folds in the past decade

bull Most tourists come from Asia Pacific (93) particularly from from Thailand (50) and Vietnam (25) followed by Europe (5)

Top Tourist Arrivals Destinations 2017

1 Vientiane Capital

2 Savannakhet

3 Champasak

Most top tourist destinations are more developed towns bordering Thailand

Nong Khai

Mukdahan

Ubon Ratchathani

World Heritage sites im these following city also attract a considerable number of visitors

Luang Prabang Wat Pu at Champasak

28

Business Opportunities Associated to Tourism Sector

Accommodate increasing tourist arrivals

Provide dining and entertainment services

Develop attractive ecotourism cultural tourism packages

Provide transportation services linking major tourism sites

Produce and market souvenirs applying local arts design and materials

1 Hotel Restaurant Entertainment

2 Tour Company Holiday Package

3 Sourvenirs

4 Transportation Service

Tourism - Opportunity

29

Lao Consumer Income and Behavior

Prefer to cook at home Enjoy drinking alcohol Middle income enjoy

spending evening in beer garden

Lao women wear sinh Follow Thai and Korean

fashion due to influence of TV series

Shop at traditional markets Middle income shop at

Thai border towns (Nong Khai Udon Thani)

Thai and Japanese products are perceived to have high quality Chinese products are perceived as sub-standard quality and Korean products are in between

30

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

31

Major Costs ndash Labor and Utility

Electricity Rate 2017

0 - 25 kwh 004USDkwh

26 - 150 kwh 005USDkwh

151 - 300 kwh 009USDkwh

more than 500 kwh 012USDkwh

301 - 400 kwh 010USDkwh

401 - 500 kwh 011USDkwh

Water Price (Per Unit) for Business and Trade Units

bull Water price for businesses is set to increase from USD USD 036 in 2017 to USD038 per unit this year

Labor minimum monthly wage in ASEAN 2017 USD

32

Tax System

Monthly Income (LAK) Tax Rate

0 ndash 1000000 0

1000001 - 3000000 5

3000001 - 6000000 10

6000001 - 12000000 12

12000001 - 24000000 15

24000001 - 40000000 20

Above 40000000 24

Types of Tax Tax rate

Profit Tax 24

Value Added Tax (VAT) 10

Withholding Tax Dividends 10

(non-residents) Transfer of shares 10

Transfer of assets 5

China

Luxembourg

Malaysia

Singapore

South Korea

Thailand

Vietnam

Income tax treaties for avoidance of double taxation

Note There is no definition of residence for tax purposes in Laos All companies registered under Lao law (including foreign law) are subject to Lao profit tax

Personal Income Tax Corporate Taxes

Data source DFDL

33

Foreign Investment Regulations

Data source JETRO Compiled by World Business Advisory Center

Not Permitted to Foreigner Only for Joint Venture with Local Company 100 Foreign Ownership Allowed

Wholesale and Retail Businesses

100 Foreign Ownership bull If registered capital is 20 billion Lao Kip

(USD 25 million) or more

Maximum 70 Foreign Ownership bull If registered capital is 10 - 20 billion Lao Kip

(USD 125 ndash 25 million)

Maximum 50 Foreign Ownership bull If registered capital is 4 - 10 billion Lao Kip

(USD 05 ndash 125 million)

bull If registered capital is less than 4 billion Lao Kip (USD 05 million)

Hotel and Restaurants Maximum 60 Foreign Ownership bull 3-5 stars hotel with minimum registered capital of

1 billion Lao Kip (USD 125000)

bull Less than 3 stars hotel 100 Foreign Ownership bull NOT ALLOWED

Logistics

100 Foreign Ownership bull Domestic goods transport with minimum

registered capital of 3 billion Lao Kip (USD 375000)

Maximum 49 Foreign Ownership bull Cross border goods transport with minimum

registered capital of 5 billion Lao Kip (USD 625000)

bull Cross border goods transport with less than 5 billion Lao Kip of registered capital

bull Domestic goods transport with less than 3 billion Lao Kip of registered capital

Examples of Foreign Investment Regulations

Foreign enterprises are subject to foreign investment regulations in several business activities Generally small businesses are preserved for Lao enterprises whereas large businesses with certain investment conditions are opened for foreign investors

34

Types of Investment ndash (1) General Business

Data source JETRO Compiled by World Business Advisory Center

Besides foreign investment regulation foreign enterprises are also subject to the investment promotion law which classifies investment into 3 types

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Investment in General Business

Types of Investment in Lao PDR

Description

o An investment in general economic activities

o Activities including controlled businesses ndash businesses that require additional approval from relevant ministries

o Activities excluding concession business

Register Capital

Requirements

o At least 1 billion Lao Kip (USD 125000)

o At the day of establishment must pay 40 (agriculture business) 60 (production and processing) 80 (services) The remainder must be paid within 1 year

Examples of Controlled Businesses 1 Agriculture plantation agriculture fishery 2 Manufacturing petroleum products leathers textile amp clothing papers

printing pesticides pharmaceutical products 3 Businesses related to environment eg wastewater treatment 4 Wholesale and retails of gasoline and petroleum products 5 Transportation 6 Hotel and Restaurant 7 Media and Publication 8 Finance and insurance 9 Legal accounting and tax services 10 Tourism 11 Education 12 Hospital clinic and medical services 13 Recreation (museum and amusement park)

35

Types of Investment ndash (2) Concession Business

Data source JETRO Compiled by World Business Advisory Center

Investment in Concession Business

Description

o An investment that requires a concession or specific authorization from the government to use the governmentrsquos property

o Some concession businesses requires authorization from the central government whereas the other requires only provincial government level of authorization for example

bull At least 5MW electricity generation project requires the central government authorization

bull Less than 5MW electricity generation projects requires only provincial government authorization

Examples of Concession Business

1 Mining 2 Electricity generation 3 Infrastructure

bull Telecommunication bull TV and radio station bull Road railway airport seaport waste disposal site

4 Businesses that use the government land bull Shopping center bull Tourist attraction bull Public park bull Hotel bull Forestry and Logging bull Plantation and Livestock

Register Capital

Requirements

o Must pay at least 20 of registered capital while remaining should be paid within 2 years

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Types of Investment in Lao PDR

36

Types of Investment ndash (3) Business Related to SEZ

Data source JETRO Compiled by World Business Advisory Center

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Types of Investment in Lao PDR

Investment in Business Related to SEZ

Description

o Business related to Special Economic Zone -gt an investment in building infrastructure for a new town

o Business related to Specific Economic Zone -gt an investment in infrastructure development for specific purpose projects such as industrial zone export zone tourist development zone etc

High Potential SEZs in Laos

o Vita Park Special Economic Zone (Vientiane)

o Savan-Seno Special Economic Zone (Savannakhet)

o Pakxe-Japan SME Specific Economic Zone (Champasak)

Special and Specific Economic Zones

1 Boten-Daenkham Specific Economic Zone 2 Luang Prabang Special Economic Zone 3 Golden Triangle Special Economic Zone 4 Thatluang Lake Specific Economic Zone 5 Longthanh Specific Economic Zone 6 Xaysettha Specific Economic Zone 7 Vita Park Special Economic Zone 8 Dongphosy Specific Economic Zone 9 Thakhek Specific Economic Zone 10 Poukiao Specific Economic Zone 11 Savan-Seno Special Economic Zone 12 Pakxe-Japan SME Specific Economic Zone

1

2

3

4

5 6

7

8

9 10

11

12

37

General Business

Concession Business

Business related to

SEZs

Procedure of Investment in Lao PDR

The investment approval procedure varies depending upon type of investment However all foreign investors must go through enterprise registration tax identification number registration and application for capital importation certificate

Apply at Ministry of Planning and

Investment

For developer apply at National Committee for Special Economic Zone

For investor apply at One-Stop Service Unit in

each SEZ

Get Concession

License

Get SEZ Concession

License

For controlled businesses apply for

approval at relevant Ministries

Get Approval License

Apply at Ministry of

Industry and Commerce

For non-controlled businesses

Get Enterprise

Registration Certificate

(ERC)

Apply for Tax

Identification Number TIN

at Tax Department Ministry of

Finance

Apply for Capital

Importation Certificate at Bank of Lao

PDR

Data source JETRO Compiled by World Business Advisory Center

38

Investment Tax Incentives ndash General Zone

Data source JETRO Compiled by World Business Advisory Center

Investment Tax Incentives in Lao PDR

Profit Tax Exemption Period

Level 1 High Promotion

Level 2 Moderate Promotion

Level 3 Low Promotion

Zone 1 10 years 6 years 4 years

Zone 2 6 years 4 years 2 years

Zone 3 4 years 2 years 1 years

Profit Tax Exemption Period by Promotion Sector and Zone

Promoted sectors Agriculture Industrial Handicrafts and Services

Type of Tax Exemption

General Zone Promotion Sector and Zone based Incentives 1 Special amp Specific Economic Zone

Tailor Made Incentives 2

Profit tax in next accounting year in case net profit is used for reinvestment (business

expansion)

Import duties for import of raw material equipment spare parts and

vehicles directly used for production

Export duties for general goods and

products (resource-based products should follow

associated laws)

Permission to carry forward losses to

three consecutive accounting years

39

Sector Period of

Profit Tax Exemption

Profit Tax Rate

After Tax Exemption Period

Hi-Tech Manufacturing 10 year 8

Manufacturing that exports at least 70 of production 10 year 8

Manufacturing that exports 30 - 60 of production 7 year 8

Manufacturing that exports 0 - 29 of production 5 year 8

Other 5 year 8

Investment amount of USD 2 million or more 10 year 8

Investment amount of USD 500000 - USD 2 million 8 year 8

Investment amount of USD 300000 - USD 500000 6 year 10

Investment amount of USD 150000 - USD 300000 4 year 10

Investment amount of USD 50000 - USD 150000 2 year 10

Export Laos products 5 year 10

International trade company 3 year 10

General trade company 2 year 10

a) Manufacturing

b) Service

c) Commerce

Personal Income Tax 5

Dividend Tax after Profit Tax Exemption Period

5

Import Duty Exemption for import of raw material equipment spare parts and

vehicles directly used for production

VAT Exemption for import products

Investment Tax Incentives ndash Special and Specific Economic Zone

Data source JETRO

Investment Tax Incentives in Lao PDR

General Zone Promotion Sector and Zone based Incentives 1 Special amp Specific Economic Zone

Tailor Made Incentives 2 Example of Tax Incentives in Savan-Seno SEZ

Other Tax Incentives

40

Non-Tax Incentives amp Trade Privileges

Data source JETRO

Non-Tax Incentives

Permission

Foreign nationals can undertake feasibility studies

Bring in foreign technicians experts and managers if qualified Lao nationals are not available

Lease land

General business up to 30 years from Lao citizen and up to 50 years from the government (renewable)

Investment in SEZ up to 75 years

Concession business upon negotiation with the government (at present there is an example of 99 years land lease)

Transfer leasehold interests and build on or make improvements or structures to a leased land

Guarantee against nationalization expropriation and requisition without compensation

Protection

Trade Privileges

ASEAN WTO GSP Bilateral trade agreement (over 18 countries)

o Argentina o Belarus o Bulgaria o Cambodia o China o Indonesia o India o Korea DPR o Kuwait

o Malaysia o Mongolia o Myanmar o Philippines o Russian

Federation o Thailand o Turkey o USA o Vietnam

41

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

42

Foreign Currency Exchange

Data source Bank of the Lao PDR

Laos Currency Kip (LAK)

Latest FX Rate (as of August 22 2018)

Remark THB and USD are widely accepted especially in the border trade area

USD 1 ~ LAK 8507

EUR 1 ~ LAK 9851

THB 1 ~ LAK 262

JPY 1 ~ LAK 77

CNY 1 ~ LAK 1193

43

KASIKORNTHAIBANK Service in Lao PDR

Retail Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Current deposit

Lending

Working capital loan

Long term loan

Bank guarantee

Project Financing

FX Services

Corporate Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Remittance

Remittance

Trade Finance Letter of Credit (LC) Standby Letter of Credit (SBLC)

44

KASIKORNTHAI BANK Limited

With establishment KASIKORNTHAIBANK

the first full-scale locally incorporated institution from Thailand is fully committed to support our clientsrsquo cross-border financing and transaction for their trade and investment activities in Lao PDR

45

KASIKORNTHAIBANK in Lao PDR Contacts

bull HEAD OFFICE Unit 12 Lane Xang Avenue Xiangngeun Village Chanthaboury District Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88905 Fax +856 21 253 336 wwwkasikornbankcomla

KASIKORNTHAI BANK Limited

bull PONESINUAN BRANCH

Ban Ponesinuan Unit 14 Sysattanak Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88826 Fax +856 21 410 889

Ms Piyanoot Sangsan Branch Manager KASIKORNTHAI BANK LIMITED Lane Xang Head Office E-mail piyanootskasikornbankcom

Mr Chatuporn Boozaya-Angool Branch Manager Ponesinuan Branch E-mail chatupornbkasikornbankcom

46

About AEC+ Business Advisory The AEC+ Business Advisory is set up by KASIKORNBANK to support businesses in their regional expansion across the ASEAN+3 market by providing local market intelligence and strategic business advice

What we do bull Offer customized and tailor-made advisory services bull Publish investment guides and industry reports bull Deliver in-depth insights via seminars bull Organize business trips to bring first-hand experience

Follow Us Visit our website at

AEC+ BUSINESS ADVISORY

Prepared by Mr Anoot Charoenkiattikul World Business Intelligence Specialist E-mail anootckasikornbankcom

httpswwwkasikornbankcominternational-businessenPagesHomeaspx

47

Page 24: LAO PDR - Facilitiesfuangfah.econ.cmu.ac.th/teacher/nisit/files/201808_LaoPDR_Investm… · • On August 7, the government of Laos announced the suspension of new hydropower project

24

Industrial Agriculture - Overview

Most industrial agriculture exports from Lao PDR are produced by foreign investors (Chinese Thai and Vietnamese) and local entrepreneurs to a lesser extent

Data source JETRO International Trade Center Produce Report USDA Foreign Agriculture Service

Leading Agricultural Exports by export value (USD Million 2016 and 2017)

A short-term drop in fruit exports in 2017 bull Exports declined because the Lao government suspended

development of large banana and other fruit plantations which typically produce to export to China and placed more stringent control on polluting farms

bull However at the end of 2017 Lao PDR and China negotiated for less stringent terms for Lao PDRrsquos fruit exports to China

Key Trends

Sugar Cane exports rocketing bull In 2017 sugar cane plantation boomed Export volume grew 121

times from 2016

bull The major reason was the relocation of sugar production from China as production costs there are very high approximately double that of Thailand

Organic fruit and vegetable becoming key economic plants bull Local and foreign investors are increasingly investing in organic

agriculture a higher value-added segment which is demanded by major countries such as Europe US Japan and China

Exports (2016)

USD 02 Million

Exports (2017)

USD 20 Million

121 times

25

Industrial Agriculture - Opportunity

Lao industrial agriculture sector offers opportunities for

bull Agricultural inputs andmachinery producers and distributors

bull Plantation operators

bull Processing and trading firms in Thailand

3 Processing and Trading

Key Drivers Lack of capability to process

products at international standard

Lack of market access

Opportunities Market inputs and machinery

to agricultural projects Investor can target both large scale investment

and smallholder farmers

Opportunities Produce high-value agricultural

products organic products herbs and medical plants

Foreign investors operate via (1) contract farming and (2) concession

Opportunities Process raw products to meet

export standards trade products to leverage existing market channels

Agricultural Inputs and Machinery

Key Drivers Limited access to improved

agricultural inputs - Seed - Fertilizer - Quality machinery

1 2

Key Drivers Arable fertile land

low level of chemical pesticides

Plantation ndash High Value Products

26

Tourism

Key Industries amp Opportunities

27

Tourism - Overview

Tourist arrivals are on a steady rise in the past decade especially tourists from Asia Pacific with most of them visiting more developed border towns neighboring Thailand

Data source Ministry of Tourism TRAVEL amp TOURISM ECONOMIC IMPACT 2018 LAOS

Direct Contribution of Travel amp Tourism to GDP (USD Billion 2012-2018E)

bull Both tourist arrivals and revenue from tourism have increased approximately 3 folds in the past decade

bull Most tourists come from Asia Pacific (93) particularly from from Thailand (50) and Vietnam (25) followed by Europe (5)

Top Tourist Arrivals Destinations 2017

1 Vientiane Capital

2 Savannakhet

3 Champasak

Most top tourist destinations are more developed towns bordering Thailand

Nong Khai

Mukdahan

Ubon Ratchathani

World Heritage sites im these following city also attract a considerable number of visitors

Luang Prabang Wat Pu at Champasak

28

Business Opportunities Associated to Tourism Sector

Accommodate increasing tourist arrivals

Provide dining and entertainment services

Develop attractive ecotourism cultural tourism packages

Provide transportation services linking major tourism sites

Produce and market souvenirs applying local arts design and materials

1 Hotel Restaurant Entertainment

2 Tour Company Holiday Package

3 Sourvenirs

4 Transportation Service

Tourism - Opportunity

29

Lao Consumer Income and Behavior

Prefer to cook at home Enjoy drinking alcohol Middle income enjoy

spending evening in beer garden

Lao women wear sinh Follow Thai and Korean

fashion due to influence of TV series

Shop at traditional markets Middle income shop at

Thai border towns (Nong Khai Udon Thani)

Thai and Japanese products are perceived to have high quality Chinese products are perceived as sub-standard quality and Korean products are in between

30

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

31

Major Costs ndash Labor and Utility

Electricity Rate 2017

0 - 25 kwh 004USDkwh

26 - 150 kwh 005USDkwh

151 - 300 kwh 009USDkwh

more than 500 kwh 012USDkwh

301 - 400 kwh 010USDkwh

401 - 500 kwh 011USDkwh

Water Price (Per Unit) for Business and Trade Units

bull Water price for businesses is set to increase from USD USD 036 in 2017 to USD038 per unit this year

Labor minimum monthly wage in ASEAN 2017 USD

32

Tax System

Monthly Income (LAK) Tax Rate

0 ndash 1000000 0

1000001 - 3000000 5

3000001 - 6000000 10

6000001 - 12000000 12

12000001 - 24000000 15

24000001 - 40000000 20

Above 40000000 24

Types of Tax Tax rate

Profit Tax 24

Value Added Tax (VAT) 10

Withholding Tax Dividends 10

(non-residents) Transfer of shares 10

Transfer of assets 5

China

Luxembourg

Malaysia

Singapore

South Korea

Thailand

Vietnam

Income tax treaties for avoidance of double taxation

Note There is no definition of residence for tax purposes in Laos All companies registered under Lao law (including foreign law) are subject to Lao profit tax

Personal Income Tax Corporate Taxes

Data source DFDL

33

Foreign Investment Regulations

Data source JETRO Compiled by World Business Advisory Center

Not Permitted to Foreigner Only for Joint Venture with Local Company 100 Foreign Ownership Allowed

Wholesale and Retail Businesses

100 Foreign Ownership bull If registered capital is 20 billion Lao Kip

(USD 25 million) or more

Maximum 70 Foreign Ownership bull If registered capital is 10 - 20 billion Lao Kip

(USD 125 ndash 25 million)

Maximum 50 Foreign Ownership bull If registered capital is 4 - 10 billion Lao Kip

(USD 05 ndash 125 million)

bull If registered capital is less than 4 billion Lao Kip (USD 05 million)

Hotel and Restaurants Maximum 60 Foreign Ownership bull 3-5 stars hotel with minimum registered capital of

1 billion Lao Kip (USD 125000)

bull Less than 3 stars hotel 100 Foreign Ownership bull NOT ALLOWED

Logistics

100 Foreign Ownership bull Domestic goods transport with minimum

registered capital of 3 billion Lao Kip (USD 375000)

Maximum 49 Foreign Ownership bull Cross border goods transport with minimum

registered capital of 5 billion Lao Kip (USD 625000)

bull Cross border goods transport with less than 5 billion Lao Kip of registered capital

bull Domestic goods transport with less than 3 billion Lao Kip of registered capital

Examples of Foreign Investment Regulations

Foreign enterprises are subject to foreign investment regulations in several business activities Generally small businesses are preserved for Lao enterprises whereas large businesses with certain investment conditions are opened for foreign investors

34

Types of Investment ndash (1) General Business

Data source JETRO Compiled by World Business Advisory Center

Besides foreign investment regulation foreign enterprises are also subject to the investment promotion law which classifies investment into 3 types

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Investment in General Business

Types of Investment in Lao PDR

Description

o An investment in general economic activities

o Activities including controlled businesses ndash businesses that require additional approval from relevant ministries

o Activities excluding concession business

Register Capital

Requirements

o At least 1 billion Lao Kip (USD 125000)

o At the day of establishment must pay 40 (agriculture business) 60 (production and processing) 80 (services) The remainder must be paid within 1 year

Examples of Controlled Businesses 1 Agriculture plantation agriculture fishery 2 Manufacturing petroleum products leathers textile amp clothing papers

printing pesticides pharmaceutical products 3 Businesses related to environment eg wastewater treatment 4 Wholesale and retails of gasoline and petroleum products 5 Transportation 6 Hotel and Restaurant 7 Media and Publication 8 Finance and insurance 9 Legal accounting and tax services 10 Tourism 11 Education 12 Hospital clinic and medical services 13 Recreation (museum and amusement park)

35

Types of Investment ndash (2) Concession Business

Data source JETRO Compiled by World Business Advisory Center

Investment in Concession Business

Description

o An investment that requires a concession or specific authorization from the government to use the governmentrsquos property

o Some concession businesses requires authorization from the central government whereas the other requires only provincial government level of authorization for example

bull At least 5MW electricity generation project requires the central government authorization

bull Less than 5MW electricity generation projects requires only provincial government authorization

Examples of Concession Business

1 Mining 2 Electricity generation 3 Infrastructure

bull Telecommunication bull TV and radio station bull Road railway airport seaport waste disposal site

4 Businesses that use the government land bull Shopping center bull Tourist attraction bull Public park bull Hotel bull Forestry and Logging bull Plantation and Livestock

Register Capital

Requirements

o Must pay at least 20 of registered capital while remaining should be paid within 2 years

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Types of Investment in Lao PDR

36

Types of Investment ndash (3) Business Related to SEZ

Data source JETRO Compiled by World Business Advisory Center

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Types of Investment in Lao PDR

Investment in Business Related to SEZ

Description

o Business related to Special Economic Zone -gt an investment in building infrastructure for a new town

o Business related to Specific Economic Zone -gt an investment in infrastructure development for specific purpose projects such as industrial zone export zone tourist development zone etc

High Potential SEZs in Laos

o Vita Park Special Economic Zone (Vientiane)

o Savan-Seno Special Economic Zone (Savannakhet)

o Pakxe-Japan SME Specific Economic Zone (Champasak)

Special and Specific Economic Zones

1 Boten-Daenkham Specific Economic Zone 2 Luang Prabang Special Economic Zone 3 Golden Triangle Special Economic Zone 4 Thatluang Lake Specific Economic Zone 5 Longthanh Specific Economic Zone 6 Xaysettha Specific Economic Zone 7 Vita Park Special Economic Zone 8 Dongphosy Specific Economic Zone 9 Thakhek Specific Economic Zone 10 Poukiao Specific Economic Zone 11 Savan-Seno Special Economic Zone 12 Pakxe-Japan SME Specific Economic Zone

1

2

3

4

5 6

7

8

9 10

11

12

37

General Business

Concession Business

Business related to

SEZs

Procedure of Investment in Lao PDR

The investment approval procedure varies depending upon type of investment However all foreign investors must go through enterprise registration tax identification number registration and application for capital importation certificate

Apply at Ministry of Planning and

Investment

For developer apply at National Committee for Special Economic Zone

For investor apply at One-Stop Service Unit in

each SEZ

Get Concession

License

Get SEZ Concession

License

For controlled businesses apply for

approval at relevant Ministries

Get Approval License

Apply at Ministry of

Industry and Commerce

For non-controlled businesses

Get Enterprise

Registration Certificate

(ERC)

Apply for Tax

Identification Number TIN

at Tax Department Ministry of

Finance

Apply for Capital

Importation Certificate at Bank of Lao

PDR

Data source JETRO Compiled by World Business Advisory Center

38

Investment Tax Incentives ndash General Zone

Data source JETRO Compiled by World Business Advisory Center

Investment Tax Incentives in Lao PDR

Profit Tax Exemption Period

Level 1 High Promotion

Level 2 Moderate Promotion

Level 3 Low Promotion

Zone 1 10 years 6 years 4 years

Zone 2 6 years 4 years 2 years

Zone 3 4 years 2 years 1 years

Profit Tax Exemption Period by Promotion Sector and Zone

Promoted sectors Agriculture Industrial Handicrafts and Services

Type of Tax Exemption

General Zone Promotion Sector and Zone based Incentives 1 Special amp Specific Economic Zone

Tailor Made Incentives 2

Profit tax in next accounting year in case net profit is used for reinvestment (business

expansion)

Import duties for import of raw material equipment spare parts and

vehicles directly used for production

Export duties for general goods and

products (resource-based products should follow

associated laws)

Permission to carry forward losses to

three consecutive accounting years

39

Sector Period of

Profit Tax Exemption

Profit Tax Rate

After Tax Exemption Period

Hi-Tech Manufacturing 10 year 8

Manufacturing that exports at least 70 of production 10 year 8

Manufacturing that exports 30 - 60 of production 7 year 8

Manufacturing that exports 0 - 29 of production 5 year 8

Other 5 year 8

Investment amount of USD 2 million or more 10 year 8

Investment amount of USD 500000 - USD 2 million 8 year 8

Investment amount of USD 300000 - USD 500000 6 year 10

Investment amount of USD 150000 - USD 300000 4 year 10

Investment amount of USD 50000 - USD 150000 2 year 10

Export Laos products 5 year 10

International trade company 3 year 10

General trade company 2 year 10

a) Manufacturing

b) Service

c) Commerce

Personal Income Tax 5

Dividend Tax after Profit Tax Exemption Period

5

Import Duty Exemption for import of raw material equipment spare parts and

vehicles directly used for production

VAT Exemption for import products

Investment Tax Incentives ndash Special and Specific Economic Zone

Data source JETRO

Investment Tax Incentives in Lao PDR

General Zone Promotion Sector and Zone based Incentives 1 Special amp Specific Economic Zone

Tailor Made Incentives 2 Example of Tax Incentives in Savan-Seno SEZ

Other Tax Incentives

40

Non-Tax Incentives amp Trade Privileges

Data source JETRO

Non-Tax Incentives

Permission

Foreign nationals can undertake feasibility studies

Bring in foreign technicians experts and managers if qualified Lao nationals are not available

Lease land

General business up to 30 years from Lao citizen and up to 50 years from the government (renewable)

Investment in SEZ up to 75 years

Concession business upon negotiation with the government (at present there is an example of 99 years land lease)

Transfer leasehold interests and build on or make improvements or structures to a leased land

Guarantee against nationalization expropriation and requisition without compensation

Protection

Trade Privileges

ASEAN WTO GSP Bilateral trade agreement (over 18 countries)

o Argentina o Belarus o Bulgaria o Cambodia o China o Indonesia o India o Korea DPR o Kuwait

o Malaysia o Mongolia o Myanmar o Philippines o Russian

Federation o Thailand o Turkey o USA o Vietnam

41

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

42

Foreign Currency Exchange

Data source Bank of the Lao PDR

Laos Currency Kip (LAK)

Latest FX Rate (as of August 22 2018)

Remark THB and USD are widely accepted especially in the border trade area

USD 1 ~ LAK 8507

EUR 1 ~ LAK 9851

THB 1 ~ LAK 262

JPY 1 ~ LAK 77

CNY 1 ~ LAK 1193

43

KASIKORNTHAIBANK Service in Lao PDR

Retail Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Current deposit

Lending

Working capital loan

Long term loan

Bank guarantee

Project Financing

FX Services

Corporate Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Remittance

Remittance

Trade Finance Letter of Credit (LC) Standby Letter of Credit (SBLC)

44

KASIKORNTHAI BANK Limited

With establishment KASIKORNTHAIBANK

the first full-scale locally incorporated institution from Thailand is fully committed to support our clientsrsquo cross-border financing and transaction for their trade and investment activities in Lao PDR

45

KASIKORNTHAIBANK in Lao PDR Contacts

bull HEAD OFFICE Unit 12 Lane Xang Avenue Xiangngeun Village Chanthaboury District Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88905 Fax +856 21 253 336 wwwkasikornbankcomla

KASIKORNTHAI BANK Limited

bull PONESINUAN BRANCH

Ban Ponesinuan Unit 14 Sysattanak Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88826 Fax +856 21 410 889

Ms Piyanoot Sangsan Branch Manager KASIKORNTHAI BANK LIMITED Lane Xang Head Office E-mail piyanootskasikornbankcom

Mr Chatuporn Boozaya-Angool Branch Manager Ponesinuan Branch E-mail chatupornbkasikornbankcom

46

About AEC+ Business Advisory The AEC+ Business Advisory is set up by KASIKORNBANK to support businesses in their regional expansion across the ASEAN+3 market by providing local market intelligence and strategic business advice

What we do bull Offer customized and tailor-made advisory services bull Publish investment guides and industry reports bull Deliver in-depth insights via seminars bull Organize business trips to bring first-hand experience

Follow Us Visit our website at

AEC+ BUSINESS ADVISORY

Prepared by Mr Anoot Charoenkiattikul World Business Intelligence Specialist E-mail anootckasikornbankcom

httpswwwkasikornbankcominternational-businessenPagesHomeaspx

47

Page 25: LAO PDR - Facilitiesfuangfah.econ.cmu.ac.th/teacher/nisit/files/201808_LaoPDR_Investm… · • On August 7, the government of Laos announced the suspension of new hydropower project

25

Industrial Agriculture - Opportunity

Lao industrial agriculture sector offers opportunities for

bull Agricultural inputs andmachinery producers and distributors

bull Plantation operators

bull Processing and trading firms in Thailand

3 Processing and Trading

Key Drivers Lack of capability to process

products at international standard

Lack of market access

Opportunities Market inputs and machinery

to agricultural projects Investor can target both large scale investment

and smallholder farmers

Opportunities Produce high-value agricultural

products organic products herbs and medical plants

Foreign investors operate via (1) contract farming and (2) concession

Opportunities Process raw products to meet

export standards trade products to leverage existing market channels

Agricultural Inputs and Machinery

Key Drivers Limited access to improved

agricultural inputs - Seed - Fertilizer - Quality machinery

1 2

Key Drivers Arable fertile land

low level of chemical pesticides

Plantation ndash High Value Products

26

Tourism

Key Industries amp Opportunities

27

Tourism - Overview

Tourist arrivals are on a steady rise in the past decade especially tourists from Asia Pacific with most of them visiting more developed border towns neighboring Thailand

Data source Ministry of Tourism TRAVEL amp TOURISM ECONOMIC IMPACT 2018 LAOS

Direct Contribution of Travel amp Tourism to GDP (USD Billion 2012-2018E)

bull Both tourist arrivals and revenue from tourism have increased approximately 3 folds in the past decade

bull Most tourists come from Asia Pacific (93) particularly from from Thailand (50) and Vietnam (25) followed by Europe (5)

Top Tourist Arrivals Destinations 2017

1 Vientiane Capital

2 Savannakhet

3 Champasak

Most top tourist destinations are more developed towns bordering Thailand

Nong Khai

Mukdahan

Ubon Ratchathani

World Heritage sites im these following city also attract a considerable number of visitors

Luang Prabang Wat Pu at Champasak

28

Business Opportunities Associated to Tourism Sector

Accommodate increasing tourist arrivals

Provide dining and entertainment services

Develop attractive ecotourism cultural tourism packages

Provide transportation services linking major tourism sites

Produce and market souvenirs applying local arts design and materials

1 Hotel Restaurant Entertainment

2 Tour Company Holiday Package

3 Sourvenirs

4 Transportation Service

Tourism - Opportunity

29

Lao Consumer Income and Behavior

Prefer to cook at home Enjoy drinking alcohol Middle income enjoy

spending evening in beer garden

Lao women wear sinh Follow Thai and Korean

fashion due to influence of TV series

Shop at traditional markets Middle income shop at

Thai border towns (Nong Khai Udon Thani)

Thai and Japanese products are perceived to have high quality Chinese products are perceived as sub-standard quality and Korean products are in between

30

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

31

Major Costs ndash Labor and Utility

Electricity Rate 2017

0 - 25 kwh 004USDkwh

26 - 150 kwh 005USDkwh

151 - 300 kwh 009USDkwh

more than 500 kwh 012USDkwh

301 - 400 kwh 010USDkwh

401 - 500 kwh 011USDkwh

Water Price (Per Unit) for Business and Trade Units

bull Water price for businesses is set to increase from USD USD 036 in 2017 to USD038 per unit this year

Labor minimum monthly wage in ASEAN 2017 USD

32

Tax System

Monthly Income (LAK) Tax Rate

0 ndash 1000000 0

1000001 - 3000000 5

3000001 - 6000000 10

6000001 - 12000000 12

12000001 - 24000000 15

24000001 - 40000000 20

Above 40000000 24

Types of Tax Tax rate

Profit Tax 24

Value Added Tax (VAT) 10

Withholding Tax Dividends 10

(non-residents) Transfer of shares 10

Transfer of assets 5

China

Luxembourg

Malaysia

Singapore

South Korea

Thailand

Vietnam

Income tax treaties for avoidance of double taxation

Note There is no definition of residence for tax purposes in Laos All companies registered under Lao law (including foreign law) are subject to Lao profit tax

Personal Income Tax Corporate Taxes

Data source DFDL

33

Foreign Investment Regulations

Data source JETRO Compiled by World Business Advisory Center

Not Permitted to Foreigner Only for Joint Venture with Local Company 100 Foreign Ownership Allowed

Wholesale and Retail Businesses

100 Foreign Ownership bull If registered capital is 20 billion Lao Kip

(USD 25 million) or more

Maximum 70 Foreign Ownership bull If registered capital is 10 - 20 billion Lao Kip

(USD 125 ndash 25 million)

Maximum 50 Foreign Ownership bull If registered capital is 4 - 10 billion Lao Kip

(USD 05 ndash 125 million)

bull If registered capital is less than 4 billion Lao Kip (USD 05 million)

Hotel and Restaurants Maximum 60 Foreign Ownership bull 3-5 stars hotel with minimum registered capital of

1 billion Lao Kip (USD 125000)

bull Less than 3 stars hotel 100 Foreign Ownership bull NOT ALLOWED

Logistics

100 Foreign Ownership bull Domestic goods transport with minimum

registered capital of 3 billion Lao Kip (USD 375000)

Maximum 49 Foreign Ownership bull Cross border goods transport with minimum

registered capital of 5 billion Lao Kip (USD 625000)

bull Cross border goods transport with less than 5 billion Lao Kip of registered capital

bull Domestic goods transport with less than 3 billion Lao Kip of registered capital

Examples of Foreign Investment Regulations

Foreign enterprises are subject to foreign investment regulations in several business activities Generally small businesses are preserved for Lao enterprises whereas large businesses with certain investment conditions are opened for foreign investors

34

Types of Investment ndash (1) General Business

Data source JETRO Compiled by World Business Advisory Center

Besides foreign investment regulation foreign enterprises are also subject to the investment promotion law which classifies investment into 3 types

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Investment in General Business

Types of Investment in Lao PDR

Description

o An investment in general economic activities

o Activities including controlled businesses ndash businesses that require additional approval from relevant ministries

o Activities excluding concession business

Register Capital

Requirements

o At least 1 billion Lao Kip (USD 125000)

o At the day of establishment must pay 40 (agriculture business) 60 (production and processing) 80 (services) The remainder must be paid within 1 year

Examples of Controlled Businesses 1 Agriculture plantation agriculture fishery 2 Manufacturing petroleum products leathers textile amp clothing papers

printing pesticides pharmaceutical products 3 Businesses related to environment eg wastewater treatment 4 Wholesale and retails of gasoline and petroleum products 5 Transportation 6 Hotel and Restaurant 7 Media and Publication 8 Finance and insurance 9 Legal accounting and tax services 10 Tourism 11 Education 12 Hospital clinic and medical services 13 Recreation (museum and amusement park)

35

Types of Investment ndash (2) Concession Business

Data source JETRO Compiled by World Business Advisory Center

Investment in Concession Business

Description

o An investment that requires a concession or specific authorization from the government to use the governmentrsquos property

o Some concession businesses requires authorization from the central government whereas the other requires only provincial government level of authorization for example

bull At least 5MW electricity generation project requires the central government authorization

bull Less than 5MW electricity generation projects requires only provincial government authorization

Examples of Concession Business

1 Mining 2 Electricity generation 3 Infrastructure

bull Telecommunication bull TV and radio station bull Road railway airport seaport waste disposal site

4 Businesses that use the government land bull Shopping center bull Tourist attraction bull Public park bull Hotel bull Forestry and Logging bull Plantation and Livestock

Register Capital

Requirements

o Must pay at least 20 of registered capital while remaining should be paid within 2 years

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Types of Investment in Lao PDR

36

Types of Investment ndash (3) Business Related to SEZ

Data source JETRO Compiled by World Business Advisory Center

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Types of Investment in Lao PDR

Investment in Business Related to SEZ

Description

o Business related to Special Economic Zone -gt an investment in building infrastructure for a new town

o Business related to Specific Economic Zone -gt an investment in infrastructure development for specific purpose projects such as industrial zone export zone tourist development zone etc

High Potential SEZs in Laos

o Vita Park Special Economic Zone (Vientiane)

o Savan-Seno Special Economic Zone (Savannakhet)

o Pakxe-Japan SME Specific Economic Zone (Champasak)

Special and Specific Economic Zones

1 Boten-Daenkham Specific Economic Zone 2 Luang Prabang Special Economic Zone 3 Golden Triangle Special Economic Zone 4 Thatluang Lake Specific Economic Zone 5 Longthanh Specific Economic Zone 6 Xaysettha Specific Economic Zone 7 Vita Park Special Economic Zone 8 Dongphosy Specific Economic Zone 9 Thakhek Specific Economic Zone 10 Poukiao Specific Economic Zone 11 Savan-Seno Special Economic Zone 12 Pakxe-Japan SME Specific Economic Zone

1

2

3

4

5 6

7

8

9 10

11

12

37

General Business

Concession Business

Business related to

SEZs

Procedure of Investment in Lao PDR

The investment approval procedure varies depending upon type of investment However all foreign investors must go through enterprise registration tax identification number registration and application for capital importation certificate

Apply at Ministry of Planning and

Investment

For developer apply at National Committee for Special Economic Zone

For investor apply at One-Stop Service Unit in

each SEZ

Get Concession

License

Get SEZ Concession

License

For controlled businesses apply for

approval at relevant Ministries

Get Approval License

Apply at Ministry of

Industry and Commerce

For non-controlled businesses

Get Enterprise

Registration Certificate

(ERC)

Apply for Tax

Identification Number TIN

at Tax Department Ministry of

Finance

Apply for Capital

Importation Certificate at Bank of Lao

PDR

Data source JETRO Compiled by World Business Advisory Center

38

Investment Tax Incentives ndash General Zone

Data source JETRO Compiled by World Business Advisory Center

Investment Tax Incentives in Lao PDR

Profit Tax Exemption Period

Level 1 High Promotion

Level 2 Moderate Promotion

Level 3 Low Promotion

Zone 1 10 years 6 years 4 years

Zone 2 6 years 4 years 2 years

Zone 3 4 years 2 years 1 years

Profit Tax Exemption Period by Promotion Sector and Zone

Promoted sectors Agriculture Industrial Handicrafts and Services

Type of Tax Exemption

General Zone Promotion Sector and Zone based Incentives 1 Special amp Specific Economic Zone

Tailor Made Incentives 2

Profit tax in next accounting year in case net profit is used for reinvestment (business

expansion)

Import duties for import of raw material equipment spare parts and

vehicles directly used for production

Export duties for general goods and

products (resource-based products should follow

associated laws)

Permission to carry forward losses to

three consecutive accounting years

39

Sector Period of

Profit Tax Exemption

Profit Tax Rate

After Tax Exemption Period

Hi-Tech Manufacturing 10 year 8

Manufacturing that exports at least 70 of production 10 year 8

Manufacturing that exports 30 - 60 of production 7 year 8

Manufacturing that exports 0 - 29 of production 5 year 8

Other 5 year 8

Investment amount of USD 2 million or more 10 year 8

Investment amount of USD 500000 - USD 2 million 8 year 8

Investment amount of USD 300000 - USD 500000 6 year 10

Investment amount of USD 150000 - USD 300000 4 year 10

Investment amount of USD 50000 - USD 150000 2 year 10

Export Laos products 5 year 10

International trade company 3 year 10

General trade company 2 year 10

a) Manufacturing

b) Service

c) Commerce

Personal Income Tax 5

Dividend Tax after Profit Tax Exemption Period

5

Import Duty Exemption for import of raw material equipment spare parts and

vehicles directly used for production

VAT Exemption for import products

Investment Tax Incentives ndash Special and Specific Economic Zone

Data source JETRO

Investment Tax Incentives in Lao PDR

General Zone Promotion Sector and Zone based Incentives 1 Special amp Specific Economic Zone

Tailor Made Incentives 2 Example of Tax Incentives in Savan-Seno SEZ

Other Tax Incentives

40

Non-Tax Incentives amp Trade Privileges

Data source JETRO

Non-Tax Incentives

Permission

Foreign nationals can undertake feasibility studies

Bring in foreign technicians experts and managers if qualified Lao nationals are not available

Lease land

General business up to 30 years from Lao citizen and up to 50 years from the government (renewable)

Investment in SEZ up to 75 years

Concession business upon negotiation with the government (at present there is an example of 99 years land lease)

Transfer leasehold interests and build on or make improvements or structures to a leased land

Guarantee against nationalization expropriation and requisition without compensation

Protection

Trade Privileges

ASEAN WTO GSP Bilateral trade agreement (over 18 countries)

o Argentina o Belarus o Bulgaria o Cambodia o China o Indonesia o India o Korea DPR o Kuwait

o Malaysia o Mongolia o Myanmar o Philippines o Russian

Federation o Thailand o Turkey o USA o Vietnam

41

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

42

Foreign Currency Exchange

Data source Bank of the Lao PDR

Laos Currency Kip (LAK)

Latest FX Rate (as of August 22 2018)

Remark THB and USD are widely accepted especially in the border trade area

USD 1 ~ LAK 8507

EUR 1 ~ LAK 9851

THB 1 ~ LAK 262

JPY 1 ~ LAK 77

CNY 1 ~ LAK 1193

43

KASIKORNTHAIBANK Service in Lao PDR

Retail Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Current deposit

Lending

Working capital loan

Long term loan

Bank guarantee

Project Financing

FX Services

Corporate Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Remittance

Remittance

Trade Finance Letter of Credit (LC) Standby Letter of Credit (SBLC)

44

KASIKORNTHAI BANK Limited

With establishment KASIKORNTHAIBANK

the first full-scale locally incorporated institution from Thailand is fully committed to support our clientsrsquo cross-border financing and transaction for their trade and investment activities in Lao PDR

45

KASIKORNTHAIBANK in Lao PDR Contacts

bull HEAD OFFICE Unit 12 Lane Xang Avenue Xiangngeun Village Chanthaboury District Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88905 Fax +856 21 253 336 wwwkasikornbankcomla

KASIKORNTHAI BANK Limited

bull PONESINUAN BRANCH

Ban Ponesinuan Unit 14 Sysattanak Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88826 Fax +856 21 410 889

Ms Piyanoot Sangsan Branch Manager KASIKORNTHAI BANK LIMITED Lane Xang Head Office E-mail piyanootskasikornbankcom

Mr Chatuporn Boozaya-Angool Branch Manager Ponesinuan Branch E-mail chatupornbkasikornbankcom

46

About AEC+ Business Advisory The AEC+ Business Advisory is set up by KASIKORNBANK to support businesses in their regional expansion across the ASEAN+3 market by providing local market intelligence and strategic business advice

What we do bull Offer customized and tailor-made advisory services bull Publish investment guides and industry reports bull Deliver in-depth insights via seminars bull Organize business trips to bring first-hand experience

Follow Us Visit our website at

AEC+ BUSINESS ADVISORY

Prepared by Mr Anoot Charoenkiattikul World Business Intelligence Specialist E-mail anootckasikornbankcom

httpswwwkasikornbankcominternational-businessenPagesHomeaspx

47

Page 26: LAO PDR - Facilitiesfuangfah.econ.cmu.ac.th/teacher/nisit/files/201808_LaoPDR_Investm… · • On August 7, the government of Laos announced the suspension of new hydropower project

26

Tourism

Key Industries amp Opportunities

27

Tourism - Overview

Tourist arrivals are on a steady rise in the past decade especially tourists from Asia Pacific with most of them visiting more developed border towns neighboring Thailand

Data source Ministry of Tourism TRAVEL amp TOURISM ECONOMIC IMPACT 2018 LAOS

Direct Contribution of Travel amp Tourism to GDP (USD Billion 2012-2018E)

bull Both tourist arrivals and revenue from tourism have increased approximately 3 folds in the past decade

bull Most tourists come from Asia Pacific (93) particularly from from Thailand (50) and Vietnam (25) followed by Europe (5)

Top Tourist Arrivals Destinations 2017

1 Vientiane Capital

2 Savannakhet

3 Champasak

Most top tourist destinations are more developed towns bordering Thailand

Nong Khai

Mukdahan

Ubon Ratchathani

World Heritage sites im these following city also attract a considerable number of visitors

Luang Prabang Wat Pu at Champasak

28

Business Opportunities Associated to Tourism Sector

Accommodate increasing tourist arrivals

Provide dining and entertainment services

Develop attractive ecotourism cultural tourism packages

Provide transportation services linking major tourism sites

Produce and market souvenirs applying local arts design and materials

1 Hotel Restaurant Entertainment

2 Tour Company Holiday Package

3 Sourvenirs

4 Transportation Service

Tourism - Opportunity

29

Lao Consumer Income and Behavior

Prefer to cook at home Enjoy drinking alcohol Middle income enjoy

spending evening in beer garden

Lao women wear sinh Follow Thai and Korean

fashion due to influence of TV series

Shop at traditional markets Middle income shop at

Thai border towns (Nong Khai Udon Thani)

Thai and Japanese products are perceived to have high quality Chinese products are perceived as sub-standard quality and Korean products are in between

30

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

31

Major Costs ndash Labor and Utility

Electricity Rate 2017

0 - 25 kwh 004USDkwh

26 - 150 kwh 005USDkwh

151 - 300 kwh 009USDkwh

more than 500 kwh 012USDkwh

301 - 400 kwh 010USDkwh

401 - 500 kwh 011USDkwh

Water Price (Per Unit) for Business and Trade Units

bull Water price for businesses is set to increase from USD USD 036 in 2017 to USD038 per unit this year

Labor minimum monthly wage in ASEAN 2017 USD

32

Tax System

Monthly Income (LAK) Tax Rate

0 ndash 1000000 0

1000001 - 3000000 5

3000001 - 6000000 10

6000001 - 12000000 12

12000001 - 24000000 15

24000001 - 40000000 20

Above 40000000 24

Types of Tax Tax rate

Profit Tax 24

Value Added Tax (VAT) 10

Withholding Tax Dividends 10

(non-residents) Transfer of shares 10

Transfer of assets 5

China

Luxembourg

Malaysia

Singapore

South Korea

Thailand

Vietnam

Income tax treaties for avoidance of double taxation

Note There is no definition of residence for tax purposes in Laos All companies registered under Lao law (including foreign law) are subject to Lao profit tax

Personal Income Tax Corporate Taxes

Data source DFDL

33

Foreign Investment Regulations

Data source JETRO Compiled by World Business Advisory Center

Not Permitted to Foreigner Only for Joint Venture with Local Company 100 Foreign Ownership Allowed

Wholesale and Retail Businesses

100 Foreign Ownership bull If registered capital is 20 billion Lao Kip

(USD 25 million) or more

Maximum 70 Foreign Ownership bull If registered capital is 10 - 20 billion Lao Kip

(USD 125 ndash 25 million)

Maximum 50 Foreign Ownership bull If registered capital is 4 - 10 billion Lao Kip

(USD 05 ndash 125 million)

bull If registered capital is less than 4 billion Lao Kip (USD 05 million)

Hotel and Restaurants Maximum 60 Foreign Ownership bull 3-5 stars hotel with minimum registered capital of

1 billion Lao Kip (USD 125000)

bull Less than 3 stars hotel 100 Foreign Ownership bull NOT ALLOWED

Logistics

100 Foreign Ownership bull Domestic goods transport with minimum

registered capital of 3 billion Lao Kip (USD 375000)

Maximum 49 Foreign Ownership bull Cross border goods transport with minimum

registered capital of 5 billion Lao Kip (USD 625000)

bull Cross border goods transport with less than 5 billion Lao Kip of registered capital

bull Domestic goods transport with less than 3 billion Lao Kip of registered capital

Examples of Foreign Investment Regulations

Foreign enterprises are subject to foreign investment regulations in several business activities Generally small businesses are preserved for Lao enterprises whereas large businesses with certain investment conditions are opened for foreign investors

34

Types of Investment ndash (1) General Business

Data source JETRO Compiled by World Business Advisory Center

Besides foreign investment regulation foreign enterprises are also subject to the investment promotion law which classifies investment into 3 types

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Investment in General Business

Types of Investment in Lao PDR

Description

o An investment in general economic activities

o Activities including controlled businesses ndash businesses that require additional approval from relevant ministries

o Activities excluding concession business

Register Capital

Requirements

o At least 1 billion Lao Kip (USD 125000)

o At the day of establishment must pay 40 (agriculture business) 60 (production and processing) 80 (services) The remainder must be paid within 1 year

Examples of Controlled Businesses 1 Agriculture plantation agriculture fishery 2 Manufacturing petroleum products leathers textile amp clothing papers

printing pesticides pharmaceutical products 3 Businesses related to environment eg wastewater treatment 4 Wholesale and retails of gasoline and petroleum products 5 Transportation 6 Hotel and Restaurant 7 Media and Publication 8 Finance and insurance 9 Legal accounting and tax services 10 Tourism 11 Education 12 Hospital clinic and medical services 13 Recreation (museum and amusement park)

35

Types of Investment ndash (2) Concession Business

Data source JETRO Compiled by World Business Advisory Center

Investment in Concession Business

Description

o An investment that requires a concession or specific authorization from the government to use the governmentrsquos property

o Some concession businesses requires authorization from the central government whereas the other requires only provincial government level of authorization for example

bull At least 5MW electricity generation project requires the central government authorization

bull Less than 5MW electricity generation projects requires only provincial government authorization

Examples of Concession Business

1 Mining 2 Electricity generation 3 Infrastructure

bull Telecommunication bull TV and radio station bull Road railway airport seaport waste disposal site

4 Businesses that use the government land bull Shopping center bull Tourist attraction bull Public park bull Hotel bull Forestry and Logging bull Plantation and Livestock

Register Capital

Requirements

o Must pay at least 20 of registered capital while remaining should be paid within 2 years

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Types of Investment in Lao PDR

36

Types of Investment ndash (3) Business Related to SEZ

Data source JETRO Compiled by World Business Advisory Center

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Types of Investment in Lao PDR

Investment in Business Related to SEZ

Description

o Business related to Special Economic Zone -gt an investment in building infrastructure for a new town

o Business related to Specific Economic Zone -gt an investment in infrastructure development for specific purpose projects such as industrial zone export zone tourist development zone etc

High Potential SEZs in Laos

o Vita Park Special Economic Zone (Vientiane)

o Savan-Seno Special Economic Zone (Savannakhet)

o Pakxe-Japan SME Specific Economic Zone (Champasak)

Special and Specific Economic Zones

1 Boten-Daenkham Specific Economic Zone 2 Luang Prabang Special Economic Zone 3 Golden Triangle Special Economic Zone 4 Thatluang Lake Specific Economic Zone 5 Longthanh Specific Economic Zone 6 Xaysettha Specific Economic Zone 7 Vita Park Special Economic Zone 8 Dongphosy Specific Economic Zone 9 Thakhek Specific Economic Zone 10 Poukiao Specific Economic Zone 11 Savan-Seno Special Economic Zone 12 Pakxe-Japan SME Specific Economic Zone

1

2

3

4

5 6

7

8

9 10

11

12

37

General Business

Concession Business

Business related to

SEZs

Procedure of Investment in Lao PDR

The investment approval procedure varies depending upon type of investment However all foreign investors must go through enterprise registration tax identification number registration and application for capital importation certificate

Apply at Ministry of Planning and

Investment

For developer apply at National Committee for Special Economic Zone

For investor apply at One-Stop Service Unit in

each SEZ

Get Concession

License

Get SEZ Concession

License

For controlled businesses apply for

approval at relevant Ministries

Get Approval License

Apply at Ministry of

Industry and Commerce

For non-controlled businesses

Get Enterprise

Registration Certificate

(ERC)

Apply for Tax

Identification Number TIN

at Tax Department Ministry of

Finance

Apply for Capital

Importation Certificate at Bank of Lao

PDR

Data source JETRO Compiled by World Business Advisory Center

38

Investment Tax Incentives ndash General Zone

Data source JETRO Compiled by World Business Advisory Center

Investment Tax Incentives in Lao PDR

Profit Tax Exemption Period

Level 1 High Promotion

Level 2 Moderate Promotion

Level 3 Low Promotion

Zone 1 10 years 6 years 4 years

Zone 2 6 years 4 years 2 years

Zone 3 4 years 2 years 1 years

Profit Tax Exemption Period by Promotion Sector and Zone

Promoted sectors Agriculture Industrial Handicrafts and Services

Type of Tax Exemption

General Zone Promotion Sector and Zone based Incentives 1 Special amp Specific Economic Zone

Tailor Made Incentives 2

Profit tax in next accounting year in case net profit is used for reinvestment (business

expansion)

Import duties for import of raw material equipment spare parts and

vehicles directly used for production

Export duties for general goods and

products (resource-based products should follow

associated laws)

Permission to carry forward losses to

three consecutive accounting years

39

Sector Period of

Profit Tax Exemption

Profit Tax Rate

After Tax Exemption Period

Hi-Tech Manufacturing 10 year 8

Manufacturing that exports at least 70 of production 10 year 8

Manufacturing that exports 30 - 60 of production 7 year 8

Manufacturing that exports 0 - 29 of production 5 year 8

Other 5 year 8

Investment amount of USD 2 million or more 10 year 8

Investment amount of USD 500000 - USD 2 million 8 year 8

Investment amount of USD 300000 - USD 500000 6 year 10

Investment amount of USD 150000 - USD 300000 4 year 10

Investment amount of USD 50000 - USD 150000 2 year 10

Export Laos products 5 year 10

International trade company 3 year 10

General trade company 2 year 10

a) Manufacturing

b) Service

c) Commerce

Personal Income Tax 5

Dividend Tax after Profit Tax Exemption Period

5

Import Duty Exemption for import of raw material equipment spare parts and

vehicles directly used for production

VAT Exemption for import products

Investment Tax Incentives ndash Special and Specific Economic Zone

Data source JETRO

Investment Tax Incentives in Lao PDR

General Zone Promotion Sector and Zone based Incentives 1 Special amp Specific Economic Zone

Tailor Made Incentives 2 Example of Tax Incentives in Savan-Seno SEZ

Other Tax Incentives

40

Non-Tax Incentives amp Trade Privileges

Data source JETRO

Non-Tax Incentives

Permission

Foreign nationals can undertake feasibility studies

Bring in foreign technicians experts and managers if qualified Lao nationals are not available

Lease land

General business up to 30 years from Lao citizen and up to 50 years from the government (renewable)

Investment in SEZ up to 75 years

Concession business upon negotiation with the government (at present there is an example of 99 years land lease)

Transfer leasehold interests and build on or make improvements or structures to a leased land

Guarantee against nationalization expropriation and requisition without compensation

Protection

Trade Privileges

ASEAN WTO GSP Bilateral trade agreement (over 18 countries)

o Argentina o Belarus o Bulgaria o Cambodia o China o Indonesia o India o Korea DPR o Kuwait

o Malaysia o Mongolia o Myanmar o Philippines o Russian

Federation o Thailand o Turkey o USA o Vietnam

41

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

42

Foreign Currency Exchange

Data source Bank of the Lao PDR

Laos Currency Kip (LAK)

Latest FX Rate (as of August 22 2018)

Remark THB and USD are widely accepted especially in the border trade area

USD 1 ~ LAK 8507

EUR 1 ~ LAK 9851

THB 1 ~ LAK 262

JPY 1 ~ LAK 77

CNY 1 ~ LAK 1193

43

KASIKORNTHAIBANK Service in Lao PDR

Retail Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Current deposit

Lending

Working capital loan

Long term loan

Bank guarantee

Project Financing

FX Services

Corporate Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Remittance

Remittance

Trade Finance Letter of Credit (LC) Standby Letter of Credit (SBLC)

44

KASIKORNTHAI BANK Limited

With establishment KASIKORNTHAIBANK

the first full-scale locally incorporated institution from Thailand is fully committed to support our clientsrsquo cross-border financing and transaction for their trade and investment activities in Lao PDR

45

KASIKORNTHAIBANK in Lao PDR Contacts

bull HEAD OFFICE Unit 12 Lane Xang Avenue Xiangngeun Village Chanthaboury District Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88905 Fax +856 21 253 336 wwwkasikornbankcomla

KASIKORNTHAI BANK Limited

bull PONESINUAN BRANCH

Ban Ponesinuan Unit 14 Sysattanak Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88826 Fax +856 21 410 889

Ms Piyanoot Sangsan Branch Manager KASIKORNTHAI BANK LIMITED Lane Xang Head Office E-mail piyanootskasikornbankcom

Mr Chatuporn Boozaya-Angool Branch Manager Ponesinuan Branch E-mail chatupornbkasikornbankcom

46

About AEC+ Business Advisory The AEC+ Business Advisory is set up by KASIKORNBANK to support businesses in their regional expansion across the ASEAN+3 market by providing local market intelligence and strategic business advice

What we do bull Offer customized and tailor-made advisory services bull Publish investment guides and industry reports bull Deliver in-depth insights via seminars bull Organize business trips to bring first-hand experience

Follow Us Visit our website at

AEC+ BUSINESS ADVISORY

Prepared by Mr Anoot Charoenkiattikul World Business Intelligence Specialist E-mail anootckasikornbankcom

httpswwwkasikornbankcominternational-businessenPagesHomeaspx

47

Page 27: LAO PDR - Facilitiesfuangfah.econ.cmu.ac.th/teacher/nisit/files/201808_LaoPDR_Investm… · • On August 7, the government of Laos announced the suspension of new hydropower project

27

Tourism - Overview

Tourist arrivals are on a steady rise in the past decade especially tourists from Asia Pacific with most of them visiting more developed border towns neighboring Thailand

Data source Ministry of Tourism TRAVEL amp TOURISM ECONOMIC IMPACT 2018 LAOS

Direct Contribution of Travel amp Tourism to GDP (USD Billion 2012-2018E)

bull Both tourist arrivals and revenue from tourism have increased approximately 3 folds in the past decade

bull Most tourists come from Asia Pacific (93) particularly from from Thailand (50) and Vietnam (25) followed by Europe (5)

Top Tourist Arrivals Destinations 2017

1 Vientiane Capital

2 Savannakhet

3 Champasak

Most top tourist destinations are more developed towns bordering Thailand

Nong Khai

Mukdahan

Ubon Ratchathani

World Heritage sites im these following city also attract a considerable number of visitors

Luang Prabang Wat Pu at Champasak

28

Business Opportunities Associated to Tourism Sector

Accommodate increasing tourist arrivals

Provide dining and entertainment services

Develop attractive ecotourism cultural tourism packages

Provide transportation services linking major tourism sites

Produce and market souvenirs applying local arts design and materials

1 Hotel Restaurant Entertainment

2 Tour Company Holiday Package

3 Sourvenirs

4 Transportation Service

Tourism - Opportunity

29

Lao Consumer Income and Behavior

Prefer to cook at home Enjoy drinking alcohol Middle income enjoy

spending evening in beer garden

Lao women wear sinh Follow Thai and Korean

fashion due to influence of TV series

Shop at traditional markets Middle income shop at

Thai border towns (Nong Khai Udon Thani)

Thai and Japanese products are perceived to have high quality Chinese products are perceived as sub-standard quality and Korean products are in between

30

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

31

Major Costs ndash Labor and Utility

Electricity Rate 2017

0 - 25 kwh 004USDkwh

26 - 150 kwh 005USDkwh

151 - 300 kwh 009USDkwh

more than 500 kwh 012USDkwh

301 - 400 kwh 010USDkwh

401 - 500 kwh 011USDkwh

Water Price (Per Unit) for Business and Trade Units

bull Water price for businesses is set to increase from USD USD 036 in 2017 to USD038 per unit this year

Labor minimum monthly wage in ASEAN 2017 USD

32

Tax System

Monthly Income (LAK) Tax Rate

0 ndash 1000000 0

1000001 - 3000000 5

3000001 - 6000000 10

6000001 - 12000000 12

12000001 - 24000000 15

24000001 - 40000000 20

Above 40000000 24

Types of Tax Tax rate

Profit Tax 24

Value Added Tax (VAT) 10

Withholding Tax Dividends 10

(non-residents) Transfer of shares 10

Transfer of assets 5

China

Luxembourg

Malaysia

Singapore

South Korea

Thailand

Vietnam

Income tax treaties for avoidance of double taxation

Note There is no definition of residence for tax purposes in Laos All companies registered under Lao law (including foreign law) are subject to Lao profit tax

Personal Income Tax Corporate Taxes

Data source DFDL

33

Foreign Investment Regulations

Data source JETRO Compiled by World Business Advisory Center

Not Permitted to Foreigner Only for Joint Venture with Local Company 100 Foreign Ownership Allowed

Wholesale and Retail Businesses

100 Foreign Ownership bull If registered capital is 20 billion Lao Kip

(USD 25 million) or more

Maximum 70 Foreign Ownership bull If registered capital is 10 - 20 billion Lao Kip

(USD 125 ndash 25 million)

Maximum 50 Foreign Ownership bull If registered capital is 4 - 10 billion Lao Kip

(USD 05 ndash 125 million)

bull If registered capital is less than 4 billion Lao Kip (USD 05 million)

Hotel and Restaurants Maximum 60 Foreign Ownership bull 3-5 stars hotel with minimum registered capital of

1 billion Lao Kip (USD 125000)

bull Less than 3 stars hotel 100 Foreign Ownership bull NOT ALLOWED

Logistics

100 Foreign Ownership bull Domestic goods transport with minimum

registered capital of 3 billion Lao Kip (USD 375000)

Maximum 49 Foreign Ownership bull Cross border goods transport with minimum

registered capital of 5 billion Lao Kip (USD 625000)

bull Cross border goods transport with less than 5 billion Lao Kip of registered capital

bull Domestic goods transport with less than 3 billion Lao Kip of registered capital

Examples of Foreign Investment Regulations

Foreign enterprises are subject to foreign investment regulations in several business activities Generally small businesses are preserved for Lao enterprises whereas large businesses with certain investment conditions are opened for foreign investors

34

Types of Investment ndash (1) General Business

Data source JETRO Compiled by World Business Advisory Center

Besides foreign investment regulation foreign enterprises are also subject to the investment promotion law which classifies investment into 3 types

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Investment in General Business

Types of Investment in Lao PDR

Description

o An investment in general economic activities

o Activities including controlled businesses ndash businesses that require additional approval from relevant ministries

o Activities excluding concession business

Register Capital

Requirements

o At least 1 billion Lao Kip (USD 125000)

o At the day of establishment must pay 40 (agriculture business) 60 (production and processing) 80 (services) The remainder must be paid within 1 year

Examples of Controlled Businesses 1 Agriculture plantation agriculture fishery 2 Manufacturing petroleum products leathers textile amp clothing papers

printing pesticides pharmaceutical products 3 Businesses related to environment eg wastewater treatment 4 Wholesale and retails of gasoline and petroleum products 5 Transportation 6 Hotel and Restaurant 7 Media and Publication 8 Finance and insurance 9 Legal accounting and tax services 10 Tourism 11 Education 12 Hospital clinic and medical services 13 Recreation (museum and amusement park)

35

Types of Investment ndash (2) Concession Business

Data source JETRO Compiled by World Business Advisory Center

Investment in Concession Business

Description

o An investment that requires a concession or specific authorization from the government to use the governmentrsquos property

o Some concession businesses requires authorization from the central government whereas the other requires only provincial government level of authorization for example

bull At least 5MW electricity generation project requires the central government authorization

bull Less than 5MW electricity generation projects requires only provincial government authorization

Examples of Concession Business

1 Mining 2 Electricity generation 3 Infrastructure

bull Telecommunication bull TV and radio station bull Road railway airport seaport waste disposal site

4 Businesses that use the government land bull Shopping center bull Tourist attraction bull Public park bull Hotel bull Forestry and Logging bull Plantation and Livestock

Register Capital

Requirements

o Must pay at least 20 of registered capital while remaining should be paid within 2 years

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Types of Investment in Lao PDR

36

Types of Investment ndash (3) Business Related to SEZ

Data source JETRO Compiled by World Business Advisory Center

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Types of Investment in Lao PDR

Investment in Business Related to SEZ

Description

o Business related to Special Economic Zone -gt an investment in building infrastructure for a new town

o Business related to Specific Economic Zone -gt an investment in infrastructure development for specific purpose projects such as industrial zone export zone tourist development zone etc

High Potential SEZs in Laos

o Vita Park Special Economic Zone (Vientiane)

o Savan-Seno Special Economic Zone (Savannakhet)

o Pakxe-Japan SME Specific Economic Zone (Champasak)

Special and Specific Economic Zones

1 Boten-Daenkham Specific Economic Zone 2 Luang Prabang Special Economic Zone 3 Golden Triangle Special Economic Zone 4 Thatluang Lake Specific Economic Zone 5 Longthanh Specific Economic Zone 6 Xaysettha Specific Economic Zone 7 Vita Park Special Economic Zone 8 Dongphosy Specific Economic Zone 9 Thakhek Specific Economic Zone 10 Poukiao Specific Economic Zone 11 Savan-Seno Special Economic Zone 12 Pakxe-Japan SME Specific Economic Zone

1

2

3

4

5 6

7

8

9 10

11

12

37

General Business

Concession Business

Business related to

SEZs

Procedure of Investment in Lao PDR

The investment approval procedure varies depending upon type of investment However all foreign investors must go through enterprise registration tax identification number registration and application for capital importation certificate

Apply at Ministry of Planning and

Investment

For developer apply at National Committee for Special Economic Zone

For investor apply at One-Stop Service Unit in

each SEZ

Get Concession

License

Get SEZ Concession

License

For controlled businesses apply for

approval at relevant Ministries

Get Approval License

Apply at Ministry of

Industry and Commerce

For non-controlled businesses

Get Enterprise

Registration Certificate

(ERC)

Apply for Tax

Identification Number TIN

at Tax Department Ministry of

Finance

Apply for Capital

Importation Certificate at Bank of Lao

PDR

Data source JETRO Compiled by World Business Advisory Center

38

Investment Tax Incentives ndash General Zone

Data source JETRO Compiled by World Business Advisory Center

Investment Tax Incentives in Lao PDR

Profit Tax Exemption Period

Level 1 High Promotion

Level 2 Moderate Promotion

Level 3 Low Promotion

Zone 1 10 years 6 years 4 years

Zone 2 6 years 4 years 2 years

Zone 3 4 years 2 years 1 years

Profit Tax Exemption Period by Promotion Sector and Zone

Promoted sectors Agriculture Industrial Handicrafts and Services

Type of Tax Exemption

General Zone Promotion Sector and Zone based Incentives 1 Special amp Specific Economic Zone

Tailor Made Incentives 2

Profit tax in next accounting year in case net profit is used for reinvestment (business

expansion)

Import duties for import of raw material equipment spare parts and

vehicles directly used for production

Export duties for general goods and

products (resource-based products should follow

associated laws)

Permission to carry forward losses to

three consecutive accounting years

39

Sector Period of

Profit Tax Exemption

Profit Tax Rate

After Tax Exemption Period

Hi-Tech Manufacturing 10 year 8

Manufacturing that exports at least 70 of production 10 year 8

Manufacturing that exports 30 - 60 of production 7 year 8

Manufacturing that exports 0 - 29 of production 5 year 8

Other 5 year 8

Investment amount of USD 2 million or more 10 year 8

Investment amount of USD 500000 - USD 2 million 8 year 8

Investment amount of USD 300000 - USD 500000 6 year 10

Investment amount of USD 150000 - USD 300000 4 year 10

Investment amount of USD 50000 - USD 150000 2 year 10

Export Laos products 5 year 10

International trade company 3 year 10

General trade company 2 year 10

a) Manufacturing

b) Service

c) Commerce

Personal Income Tax 5

Dividend Tax after Profit Tax Exemption Period

5

Import Duty Exemption for import of raw material equipment spare parts and

vehicles directly used for production

VAT Exemption for import products

Investment Tax Incentives ndash Special and Specific Economic Zone

Data source JETRO

Investment Tax Incentives in Lao PDR

General Zone Promotion Sector and Zone based Incentives 1 Special amp Specific Economic Zone

Tailor Made Incentives 2 Example of Tax Incentives in Savan-Seno SEZ

Other Tax Incentives

40

Non-Tax Incentives amp Trade Privileges

Data source JETRO

Non-Tax Incentives

Permission

Foreign nationals can undertake feasibility studies

Bring in foreign technicians experts and managers if qualified Lao nationals are not available

Lease land

General business up to 30 years from Lao citizen and up to 50 years from the government (renewable)

Investment in SEZ up to 75 years

Concession business upon negotiation with the government (at present there is an example of 99 years land lease)

Transfer leasehold interests and build on or make improvements or structures to a leased land

Guarantee against nationalization expropriation and requisition without compensation

Protection

Trade Privileges

ASEAN WTO GSP Bilateral trade agreement (over 18 countries)

o Argentina o Belarus o Bulgaria o Cambodia o China o Indonesia o India o Korea DPR o Kuwait

o Malaysia o Mongolia o Myanmar o Philippines o Russian

Federation o Thailand o Turkey o USA o Vietnam

41

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

42

Foreign Currency Exchange

Data source Bank of the Lao PDR

Laos Currency Kip (LAK)

Latest FX Rate (as of August 22 2018)

Remark THB and USD are widely accepted especially in the border trade area

USD 1 ~ LAK 8507

EUR 1 ~ LAK 9851

THB 1 ~ LAK 262

JPY 1 ~ LAK 77

CNY 1 ~ LAK 1193

43

KASIKORNTHAIBANK Service in Lao PDR

Retail Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Current deposit

Lending

Working capital loan

Long term loan

Bank guarantee

Project Financing

FX Services

Corporate Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Remittance

Remittance

Trade Finance Letter of Credit (LC) Standby Letter of Credit (SBLC)

44

KASIKORNTHAI BANK Limited

With establishment KASIKORNTHAIBANK

the first full-scale locally incorporated institution from Thailand is fully committed to support our clientsrsquo cross-border financing and transaction for their trade and investment activities in Lao PDR

45

KASIKORNTHAIBANK in Lao PDR Contacts

bull HEAD OFFICE Unit 12 Lane Xang Avenue Xiangngeun Village Chanthaboury District Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88905 Fax +856 21 253 336 wwwkasikornbankcomla

KASIKORNTHAI BANK Limited

bull PONESINUAN BRANCH

Ban Ponesinuan Unit 14 Sysattanak Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88826 Fax +856 21 410 889

Ms Piyanoot Sangsan Branch Manager KASIKORNTHAI BANK LIMITED Lane Xang Head Office E-mail piyanootskasikornbankcom

Mr Chatuporn Boozaya-Angool Branch Manager Ponesinuan Branch E-mail chatupornbkasikornbankcom

46

About AEC+ Business Advisory The AEC+ Business Advisory is set up by KASIKORNBANK to support businesses in their regional expansion across the ASEAN+3 market by providing local market intelligence and strategic business advice

What we do bull Offer customized and tailor-made advisory services bull Publish investment guides and industry reports bull Deliver in-depth insights via seminars bull Organize business trips to bring first-hand experience

Follow Us Visit our website at

AEC+ BUSINESS ADVISORY

Prepared by Mr Anoot Charoenkiattikul World Business Intelligence Specialist E-mail anootckasikornbankcom

httpswwwkasikornbankcominternational-businessenPagesHomeaspx

47

Page 28: LAO PDR - Facilitiesfuangfah.econ.cmu.ac.th/teacher/nisit/files/201808_LaoPDR_Investm… · • On August 7, the government of Laos announced the suspension of new hydropower project

28

Business Opportunities Associated to Tourism Sector

Accommodate increasing tourist arrivals

Provide dining and entertainment services

Develop attractive ecotourism cultural tourism packages

Provide transportation services linking major tourism sites

Produce and market souvenirs applying local arts design and materials

1 Hotel Restaurant Entertainment

2 Tour Company Holiday Package

3 Sourvenirs

4 Transportation Service

Tourism - Opportunity

29

Lao Consumer Income and Behavior

Prefer to cook at home Enjoy drinking alcohol Middle income enjoy

spending evening in beer garden

Lao women wear sinh Follow Thai and Korean

fashion due to influence of TV series

Shop at traditional markets Middle income shop at

Thai border towns (Nong Khai Udon Thani)

Thai and Japanese products are perceived to have high quality Chinese products are perceived as sub-standard quality and Korean products are in between

30

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

31

Major Costs ndash Labor and Utility

Electricity Rate 2017

0 - 25 kwh 004USDkwh

26 - 150 kwh 005USDkwh

151 - 300 kwh 009USDkwh

more than 500 kwh 012USDkwh

301 - 400 kwh 010USDkwh

401 - 500 kwh 011USDkwh

Water Price (Per Unit) for Business and Trade Units

bull Water price for businesses is set to increase from USD USD 036 in 2017 to USD038 per unit this year

Labor minimum monthly wage in ASEAN 2017 USD

32

Tax System

Monthly Income (LAK) Tax Rate

0 ndash 1000000 0

1000001 - 3000000 5

3000001 - 6000000 10

6000001 - 12000000 12

12000001 - 24000000 15

24000001 - 40000000 20

Above 40000000 24

Types of Tax Tax rate

Profit Tax 24

Value Added Tax (VAT) 10

Withholding Tax Dividends 10

(non-residents) Transfer of shares 10

Transfer of assets 5

China

Luxembourg

Malaysia

Singapore

South Korea

Thailand

Vietnam

Income tax treaties for avoidance of double taxation

Note There is no definition of residence for tax purposes in Laos All companies registered under Lao law (including foreign law) are subject to Lao profit tax

Personal Income Tax Corporate Taxes

Data source DFDL

33

Foreign Investment Regulations

Data source JETRO Compiled by World Business Advisory Center

Not Permitted to Foreigner Only for Joint Venture with Local Company 100 Foreign Ownership Allowed

Wholesale and Retail Businesses

100 Foreign Ownership bull If registered capital is 20 billion Lao Kip

(USD 25 million) or more

Maximum 70 Foreign Ownership bull If registered capital is 10 - 20 billion Lao Kip

(USD 125 ndash 25 million)

Maximum 50 Foreign Ownership bull If registered capital is 4 - 10 billion Lao Kip

(USD 05 ndash 125 million)

bull If registered capital is less than 4 billion Lao Kip (USD 05 million)

Hotel and Restaurants Maximum 60 Foreign Ownership bull 3-5 stars hotel with minimum registered capital of

1 billion Lao Kip (USD 125000)

bull Less than 3 stars hotel 100 Foreign Ownership bull NOT ALLOWED

Logistics

100 Foreign Ownership bull Domestic goods transport with minimum

registered capital of 3 billion Lao Kip (USD 375000)

Maximum 49 Foreign Ownership bull Cross border goods transport with minimum

registered capital of 5 billion Lao Kip (USD 625000)

bull Cross border goods transport with less than 5 billion Lao Kip of registered capital

bull Domestic goods transport with less than 3 billion Lao Kip of registered capital

Examples of Foreign Investment Regulations

Foreign enterprises are subject to foreign investment regulations in several business activities Generally small businesses are preserved for Lao enterprises whereas large businesses with certain investment conditions are opened for foreign investors

34

Types of Investment ndash (1) General Business

Data source JETRO Compiled by World Business Advisory Center

Besides foreign investment regulation foreign enterprises are also subject to the investment promotion law which classifies investment into 3 types

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Investment in General Business

Types of Investment in Lao PDR

Description

o An investment in general economic activities

o Activities including controlled businesses ndash businesses that require additional approval from relevant ministries

o Activities excluding concession business

Register Capital

Requirements

o At least 1 billion Lao Kip (USD 125000)

o At the day of establishment must pay 40 (agriculture business) 60 (production and processing) 80 (services) The remainder must be paid within 1 year

Examples of Controlled Businesses 1 Agriculture plantation agriculture fishery 2 Manufacturing petroleum products leathers textile amp clothing papers

printing pesticides pharmaceutical products 3 Businesses related to environment eg wastewater treatment 4 Wholesale and retails of gasoline and petroleum products 5 Transportation 6 Hotel and Restaurant 7 Media and Publication 8 Finance and insurance 9 Legal accounting and tax services 10 Tourism 11 Education 12 Hospital clinic and medical services 13 Recreation (museum and amusement park)

35

Types of Investment ndash (2) Concession Business

Data source JETRO Compiled by World Business Advisory Center

Investment in Concession Business

Description

o An investment that requires a concession or specific authorization from the government to use the governmentrsquos property

o Some concession businesses requires authorization from the central government whereas the other requires only provincial government level of authorization for example

bull At least 5MW electricity generation project requires the central government authorization

bull Less than 5MW electricity generation projects requires only provincial government authorization

Examples of Concession Business

1 Mining 2 Electricity generation 3 Infrastructure

bull Telecommunication bull TV and radio station bull Road railway airport seaport waste disposal site

4 Businesses that use the government land bull Shopping center bull Tourist attraction bull Public park bull Hotel bull Forestry and Logging bull Plantation and Livestock

Register Capital

Requirements

o Must pay at least 20 of registered capital while remaining should be paid within 2 years

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Types of Investment in Lao PDR

36

Types of Investment ndash (3) Business Related to SEZ

Data source JETRO Compiled by World Business Advisory Center

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Types of Investment in Lao PDR

Investment in Business Related to SEZ

Description

o Business related to Special Economic Zone -gt an investment in building infrastructure for a new town

o Business related to Specific Economic Zone -gt an investment in infrastructure development for specific purpose projects such as industrial zone export zone tourist development zone etc

High Potential SEZs in Laos

o Vita Park Special Economic Zone (Vientiane)

o Savan-Seno Special Economic Zone (Savannakhet)

o Pakxe-Japan SME Specific Economic Zone (Champasak)

Special and Specific Economic Zones

1 Boten-Daenkham Specific Economic Zone 2 Luang Prabang Special Economic Zone 3 Golden Triangle Special Economic Zone 4 Thatluang Lake Specific Economic Zone 5 Longthanh Specific Economic Zone 6 Xaysettha Specific Economic Zone 7 Vita Park Special Economic Zone 8 Dongphosy Specific Economic Zone 9 Thakhek Specific Economic Zone 10 Poukiao Specific Economic Zone 11 Savan-Seno Special Economic Zone 12 Pakxe-Japan SME Specific Economic Zone

1

2

3

4

5 6

7

8

9 10

11

12

37

General Business

Concession Business

Business related to

SEZs

Procedure of Investment in Lao PDR

The investment approval procedure varies depending upon type of investment However all foreign investors must go through enterprise registration tax identification number registration and application for capital importation certificate

Apply at Ministry of Planning and

Investment

For developer apply at National Committee for Special Economic Zone

For investor apply at One-Stop Service Unit in

each SEZ

Get Concession

License

Get SEZ Concession

License

For controlled businesses apply for

approval at relevant Ministries

Get Approval License

Apply at Ministry of

Industry and Commerce

For non-controlled businesses

Get Enterprise

Registration Certificate

(ERC)

Apply for Tax

Identification Number TIN

at Tax Department Ministry of

Finance

Apply for Capital

Importation Certificate at Bank of Lao

PDR

Data source JETRO Compiled by World Business Advisory Center

38

Investment Tax Incentives ndash General Zone

Data source JETRO Compiled by World Business Advisory Center

Investment Tax Incentives in Lao PDR

Profit Tax Exemption Period

Level 1 High Promotion

Level 2 Moderate Promotion

Level 3 Low Promotion

Zone 1 10 years 6 years 4 years

Zone 2 6 years 4 years 2 years

Zone 3 4 years 2 years 1 years

Profit Tax Exemption Period by Promotion Sector and Zone

Promoted sectors Agriculture Industrial Handicrafts and Services

Type of Tax Exemption

General Zone Promotion Sector and Zone based Incentives 1 Special amp Specific Economic Zone

Tailor Made Incentives 2

Profit tax in next accounting year in case net profit is used for reinvestment (business

expansion)

Import duties for import of raw material equipment spare parts and

vehicles directly used for production

Export duties for general goods and

products (resource-based products should follow

associated laws)

Permission to carry forward losses to

three consecutive accounting years

39

Sector Period of

Profit Tax Exemption

Profit Tax Rate

After Tax Exemption Period

Hi-Tech Manufacturing 10 year 8

Manufacturing that exports at least 70 of production 10 year 8

Manufacturing that exports 30 - 60 of production 7 year 8

Manufacturing that exports 0 - 29 of production 5 year 8

Other 5 year 8

Investment amount of USD 2 million or more 10 year 8

Investment amount of USD 500000 - USD 2 million 8 year 8

Investment amount of USD 300000 - USD 500000 6 year 10

Investment amount of USD 150000 - USD 300000 4 year 10

Investment amount of USD 50000 - USD 150000 2 year 10

Export Laos products 5 year 10

International trade company 3 year 10

General trade company 2 year 10

a) Manufacturing

b) Service

c) Commerce

Personal Income Tax 5

Dividend Tax after Profit Tax Exemption Period

5

Import Duty Exemption for import of raw material equipment spare parts and

vehicles directly used for production

VAT Exemption for import products

Investment Tax Incentives ndash Special and Specific Economic Zone

Data source JETRO

Investment Tax Incentives in Lao PDR

General Zone Promotion Sector and Zone based Incentives 1 Special amp Specific Economic Zone

Tailor Made Incentives 2 Example of Tax Incentives in Savan-Seno SEZ

Other Tax Incentives

40

Non-Tax Incentives amp Trade Privileges

Data source JETRO

Non-Tax Incentives

Permission

Foreign nationals can undertake feasibility studies

Bring in foreign technicians experts and managers if qualified Lao nationals are not available

Lease land

General business up to 30 years from Lao citizen and up to 50 years from the government (renewable)

Investment in SEZ up to 75 years

Concession business upon negotiation with the government (at present there is an example of 99 years land lease)

Transfer leasehold interests and build on or make improvements or structures to a leased land

Guarantee against nationalization expropriation and requisition without compensation

Protection

Trade Privileges

ASEAN WTO GSP Bilateral trade agreement (over 18 countries)

o Argentina o Belarus o Bulgaria o Cambodia o China o Indonesia o India o Korea DPR o Kuwait

o Malaysia o Mongolia o Myanmar o Philippines o Russian

Federation o Thailand o Turkey o USA o Vietnam

41

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

42

Foreign Currency Exchange

Data source Bank of the Lao PDR

Laos Currency Kip (LAK)

Latest FX Rate (as of August 22 2018)

Remark THB and USD are widely accepted especially in the border trade area

USD 1 ~ LAK 8507

EUR 1 ~ LAK 9851

THB 1 ~ LAK 262

JPY 1 ~ LAK 77

CNY 1 ~ LAK 1193

43

KASIKORNTHAIBANK Service in Lao PDR

Retail Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Current deposit

Lending

Working capital loan

Long term loan

Bank guarantee

Project Financing

FX Services

Corporate Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Remittance

Remittance

Trade Finance Letter of Credit (LC) Standby Letter of Credit (SBLC)

44

KASIKORNTHAI BANK Limited

With establishment KASIKORNTHAIBANK

the first full-scale locally incorporated institution from Thailand is fully committed to support our clientsrsquo cross-border financing and transaction for their trade and investment activities in Lao PDR

45

KASIKORNTHAIBANK in Lao PDR Contacts

bull HEAD OFFICE Unit 12 Lane Xang Avenue Xiangngeun Village Chanthaboury District Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88905 Fax +856 21 253 336 wwwkasikornbankcomla

KASIKORNTHAI BANK Limited

bull PONESINUAN BRANCH

Ban Ponesinuan Unit 14 Sysattanak Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88826 Fax +856 21 410 889

Ms Piyanoot Sangsan Branch Manager KASIKORNTHAI BANK LIMITED Lane Xang Head Office E-mail piyanootskasikornbankcom

Mr Chatuporn Boozaya-Angool Branch Manager Ponesinuan Branch E-mail chatupornbkasikornbankcom

46

About AEC+ Business Advisory The AEC+ Business Advisory is set up by KASIKORNBANK to support businesses in their regional expansion across the ASEAN+3 market by providing local market intelligence and strategic business advice

What we do bull Offer customized and tailor-made advisory services bull Publish investment guides and industry reports bull Deliver in-depth insights via seminars bull Organize business trips to bring first-hand experience

Follow Us Visit our website at

AEC+ BUSINESS ADVISORY

Prepared by Mr Anoot Charoenkiattikul World Business Intelligence Specialist E-mail anootckasikornbankcom

httpswwwkasikornbankcominternational-businessenPagesHomeaspx

47

Page 29: LAO PDR - Facilitiesfuangfah.econ.cmu.ac.th/teacher/nisit/files/201808_LaoPDR_Investm… · • On August 7, the government of Laos announced the suspension of new hydropower project

29

Lao Consumer Income and Behavior

Prefer to cook at home Enjoy drinking alcohol Middle income enjoy

spending evening in beer garden

Lao women wear sinh Follow Thai and Korean

fashion due to influence of TV series

Shop at traditional markets Middle income shop at

Thai border towns (Nong Khai Udon Thani)

Thai and Japanese products are perceived to have high quality Chinese products are perceived as sub-standard quality and Korean products are in between

30

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

31

Major Costs ndash Labor and Utility

Electricity Rate 2017

0 - 25 kwh 004USDkwh

26 - 150 kwh 005USDkwh

151 - 300 kwh 009USDkwh

more than 500 kwh 012USDkwh

301 - 400 kwh 010USDkwh

401 - 500 kwh 011USDkwh

Water Price (Per Unit) for Business and Trade Units

bull Water price for businesses is set to increase from USD USD 036 in 2017 to USD038 per unit this year

Labor minimum monthly wage in ASEAN 2017 USD

32

Tax System

Monthly Income (LAK) Tax Rate

0 ndash 1000000 0

1000001 - 3000000 5

3000001 - 6000000 10

6000001 - 12000000 12

12000001 - 24000000 15

24000001 - 40000000 20

Above 40000000 24

Types of Tax Tax rate

Profit Tax 24

Value Added Tax (VAT) 10

Withholding Tax Dividends 10

(non-residents) Transfer of shares 10

Transfer of assets 5

China

Luxembourg

Malaysia

Singapore

South Korea

Thailand

Vietnam

Income tax treaties for avoidance of double taxation

Note There is no definition of residence for tax purposes in Laos All companies registered under Lao law (including foreign law) are subject to Lao profit tax

Personal Income Tax Corporate Taxes

Data source DFDL

33

Foreign Investment Regulations

Data source JETRO Compiled by World Business Advisory Center

Not Permitted to Foreigner Only for Joint Venture with Local Company 100 Foreign Ownership Allowed

Wholesale and Retail Businesses

100 Foreign Ownership bull If registered capital is 20 billion Lao Kip

(USD 25 million) or more

Maximum 70 Foreign Ownership bull If registered capital is 10 - 20 billion Lao Kip

(USD 125 ndash 25 million)

Maximum 50 Foreign Ownership bull If registered capital is 4 - 10 billion Lao Kip

(USD 05 ndash 125 million)

bull If registered capital is less than 4 billion Lao Kip (USD 05 million)

Hotel and Restaurants Maximum 60 Foreign Ownership bull 3-5 stars hotel with minimum registered capital of

1 billion Lao Kip (USD 125000)

bull Less than 3 stars hotel 100 Foreign Ownership bull NOT ALLOWED

Logistics

100 Foreign Ownership bull Domestic goods transport with minimum

registered capital of 3 billion Lao Kip (USD 375000)

Maximum 49 Foreign Ownership bull Cross border goods transport with minimum

registered capital of 5 billion Lao Kip (USD 625000)

bull Cross border goods transport with less than 5 billion Lao Kip of registered capital

bull Domestic goods transport with less than 3 billion Lao Kip of registered capital

Examples of Foreign Investment Regulations

Foreign enterprises are subject to foreign investment regulations in several business activities Generally small businesses are preserved for Lao enterprises whereas large businesses with certain investment conditions are opened for foreign investors

34

Types of Investment ndash (1) General Business

Data source JETRO Compiled by World Business Advisory Center

Besides foreign investment regulation foreign enterprises are also subject to the investment promotion law which classifies investment into 3 types

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Investment in General Business

Types of Investment in Lao PDR

Description

o An investment in general economic activities

o Activities including controlled businesses ndash businesses that require additional approval from relevant ministries

o Activities excluding concession business

Register Capital

Requirements

o At least 1 billion Lao Kip (USD 125000)

o At the day of establishment must pay 40 (agriculture business) 60 (production and processing) 80 (services) The remainder must be paid within 1 year

Examples of Controlled Businesses 1 Agriculture plantation agriculture fishery 2 Manufacturing petroleum products leathers textile amp clothing papers

printing pesticides pharmaceutical products 3 Businesses related to environment eg wastewater treatment 4 Wholesale and retails of gasoline and petroleum products 5 Transportation 6 Hotel and Restaurant 7 Media and Publication 8 Finance and insurance 9 Legal accounting and tax services 10 Tourism 11 Education 12 Hospital clinic and medical services 13 Recreation (museum and amusement park)

35

Types of Investment ndash (2) Concession Business

Data source JETRO Compiled by World Business Advisory Center

Investment in Concession Business

Description

o An investment that requires a concession or specific authorization from the government to use the governmentrsquos property

o Some concession businesses requires authorization from the central government whereas the other requires only provincial government level of authorization for example

bull At least 5MW electricity generation project requires the central government authorization

bull Less than 5MW electricity generation projects requires only provincial government authorization

Examples of Concession Business

1 Mining 2 Electricity generation 3 Infrastructure

bull Telecommunication bull TV and radio station bull Road railway airport seaport waste disposal site

4 Businesses that use the government land bull Shopping center bull Tourist attraction bull Public park bull Hotel bull Forestry and Logging bull Plantation and Livestock

Register Capital

Requirements

o Must pay at least 20 of registered capital while remaining should be paid within 2 years

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Types of Investment in Lao PDR

36

Types of Investment ndash (3) Business Related to SEZ

Data source JETRO Compiled by World Business Advisory Center

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Types of Investment in Lao PDR

Investment in Business Related to SEZ

Description

o Business related to Special Economic Zone -gt an investment in building infrastructure for a new town

o Business related to Specific Economic Zone -gt an investment in infrastructure development for specific purpose projects such as industrial zone export zone tourist development zone etc

High Potential SEZs in Laos

o Vita Park Special Economic Zone (Vientiane)

o Savan-Seno Special Economic Zone (Savannakhet)

o Pakxe-Japan SME Specific Economic Zone (Champasak)

Special and Specific Economic Zones

1 Boten-Daenkham Specific Economic Zone 2 Luang Prabang Special Economic Zone 3 Golden Triangle Special Economic Zone 4 Thatluang Lake Specific Economic Zone 5 Longthanh Specific Economic Zone 6 Xaysettha Specific Economic Zone 7 Vita Park Special Economic Zone 8 Dongphosy Specific Economic Zone 9 Thakhek Specific Economic Zone 10 Poukiao Specific Economic Zone 11 Savan-Seno Special Economic Zone 12 Pakxe-Japan SME Specific Economic Zone

1

2

3

4

5 6

7

8

9 10

11

12

37

General Business

Concession Business

Business related to

SEZs

Procedure of Investment in Lao PDR

The investment approval procedure varies depending upon type of investment However all foreign investors must go through enterprise registration tax identification number registration and application for capital importation certificate

Apply at Ministry of Planning and

Investment

For developer apply at National Committee for Special Economic Zone

For investor apply at One-Stop Service Unit in

each SEZ

Get Concession

License

Get SEZ Concession

License

For controlled businesses apply for

approval at relevant Ministries

Get Approval License

Apply at Ministry of

Industry and Commerce

For non-controlled businesses

Get Enterprise

Registration Certificate

(ERC)

Apply for Tax

Identification Number TIN

at Tax Department Ministry of

Finance

Apply for Capital

Importation Certificate at Bank of Lao

PDR

Data source JETRO Compiled by World Business Advisory Center

38

Investment Tax Incentives ndash General Zone

Data source JETRO Compiled by World Business Advisory Center

Investment Tax Incentives in Lao PDR

Profit Tax Exemption Period

Level 1 High Promotion

Level 2 Moderate Promotion

Level 3 Low Promotion

Zone 1 10 years 6 years 4 years

Zone 2 6 years 4 years 2 years

Zone 3 4 years 2 years 1 years

Profit Tax Exemption Period by Promotion Sector and Zone

Promoted sectors Agriculture Industrial Handicrafts and Services

Type of Tax Exemption

General Zone Promotion Sector and Zone based Incentives 1 Special amp Specific Economic Zone

Tailor Made Incentives 2

Profit tax in next accounting year in case net profit is used for reinvestment (business

expansion)

Import duties for import of raw material equipment spare parts and

vehicles directly used for production

Export duties for general goods and

products (resource-based products should follow

associated laws)

Permission to carry forward losses to

three consecutive accounting years

39

Sector Period of

Profit Tax Exemption

Profit Tax Rate

After Tax Exemption Period

Hi-Tech Manufacturing 10 year 8

Manufacturing that exports at least 70 of production 10 year 8

Manufacturing that exports 30 - 60 of production 7 year 8

Manufacturing that exports 0 - 29 of production 5 year 8

Other 5 year 8

Investment amount of USD 2 million or more 10 year 8

Investment amount of USD 500000 - USD 2 million 8 year 8

Investment amount of USD 300000 - USD 500000 6 year 10

Investment amount of USD 150000 - USD 300000 4 year 10

Investment amount of USD 50000 - USD 150000 2 year 10

Export Laos products 5 year 10

International trade company 3 year 10

General trade company 2 year 10

a) Manufacturing

b) Service

c) Commerce

Personal Income Tax 5

Dividend Tax after Profit Tax Exemption Period

5

Import Duty Exemption for import of raw material equipment spare parts and

vehicles directly used for production

VAT Exemption for import products

Investment Tax Incentives ndash Special and Specific Economic Zone

Data source JETRO

Investment Tax Incentives in Lao PDR

General Zone Promotion Sector and Zone based Incentives 1 Special amp Specific Economic Zone

Tailor Made Incentives 2 Example of Tax Incentives in Savan-Seno SEZ

Other Tax Incentives

40

Non-Tax Incentives amp Trade Privileges

Data source JETRO

Non-Tax Incentives

Permission

Foreign nationals can undertake feasibility studies

Bring in foreign technicians experts and managers if qualified Lao nationals are not available

Lease land

General business up to 30 years from Lao citizen and up to 50 years from the government (renewable)

Investment in SEZ up to 75 years

Concession business upon negotiation with the government (at present there is an example of 99 years land lease)

Transfer leasehold interests and build on or make improvements or structures to a leased land

Guarantee against nationalization expropriation and requisition without compensation

Protection

Trade Privileges

ASEAN WTO GSP Bilateral trade agreement (over 18 countries)

o Argentina o Belarus o Bulgaria o Cambodia o China o Indonesia o India o Korea DPR o Kuwait

o Malaysia o Mongolia o Myanmar o Philippines o Russian

Federation o Thailand o Turkey o USA o Vietnam

41

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

42

Foreign Currency Exchange

Data source Bank of the Lao PDR

Laos Currency Kip (LAK)

Latest FX Rate (as of August 22 2018)

Remark THB and USD are widely accepted especially in the border trade area

USD 1 ~ LAK 8507

EUR 1 ~ LAK 9851

THB 1 ~ LAK 262

JPY 1 ~ LAK 77

CNY 1 ~ LAK 1193

43

KASIKORNTHAIBANK Service in Lao PDR

Retail Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Current deposit

Lending

Working capital loan

Long term loan

Bank guarantee

Project Financing

FX Services

Corporate Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Remittance

Remittance

Trade Finance Letter of Credit (LC) Standby Letter of Credit (SBLC)

44

KASIKORNTHAI BANK Limited

With establishment KASIKORNTHAIBANK

the first full-scale locally incorporated institution from Thailand is fully committed to support our clientsrsquo cross-border financing and transaction for their trade and investment activities in Lao PDR

45

KASIKORNTHAIBANK in Lao PDR Contacts

bull HEAD OFFICE Unit 12 Lane Xang Avenue Xiangngeun Village Chanthaboury District Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88905 Fax +856 21 253 336 wwwkasikornbankcomla

KASIKORNTHAI BANK Limited

bull PONESINUAN BRANCH

Ban Ponesinuan Unit 14 Sysattanak Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88826 Fax +856 21 410 889

Ms Piyanoot Sangsan Branch Manager KASIKORNTHAI BANK LIMITED Lane Xang Head Office E-mail piyanootskasikornbankcom

Mr Chatuporn Boozaya-Angool Branch Manager Ponesinuan Branch E-mail chatupornbkasikornbankcom

46

About AEC+ Business Advisory The AEC+ Business Advisory is set up by KASIKORNBANK to support businesses in their regional expansion across the ASEAN+3 market by providing local market intelligence and strategic business advice

What we do bull Offer customized and tailor-made advisory services bull Publish investment guides and industry reports bull Deliver in-depth insights via seminars bull Organize business trips to bring first-hand experience

Follow Us Visit our website at

AEC+ BUSINESS ADVISORY

Prepared by Mr Anoot Charoenkiattikul World Business Intelligence Specialist E-mail anootckasikornbankcom

httpswwwkasikornbankcominternational-businessenPagesHomeaspx

47

Page 30: LAO PDR - Facilitiesfuangfah.econ.cmu.ac.th/teacher/nisit/files/201808_LaoPDR_Investm… · • On August 7, the government of Laos announced the suspension of new hydropower project

30

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

31

Major Costs ndash Labor and Utility

Electricity Rate 2017

0 - 25 kwh 004USDkwh

26 - 150 kwh 005USDkwh

151 - 300 kwh 009USDkwh

more than 500 kwh 012USDkwh

301 - 400 kwh 010USDkwh

401 - 500 kwh 011USDkwh

Water Price (Per Unit) for Business and Trade Units

bull Water price for businesses is set to increase from USD USD 036 in 2017 to USD038 per unit this year

Labor minimum monthly wage in ASEAN 2017 USD

32

Tax System

Monthly Income (LAK) Tax Rate

0 ndash 1000000 0

1000001 - 3000000 5

3000001 - 6000000 10

6000001 - 12000000 12

12000001 - 24000000 15

24000001 - 40000000 20

Above 40000000 24

Types of Tax Tax rate

Profit Tax 24

Value Added Tax (VAT) 10

Withholding Tax Dividends 10

(non-residents) Transfer of shares 10

Transfer of assets 5

China

Luxembourg

Malaysia

Singapore

South Korea

Thailand

Vietnam

Income tax treaties for avoidance of double taxation

Note There is no definition of residence for tax purposes in Laos All companies registered under Lao law (including foreign law) are subject to Lao profit tax

Personal Income Tax Corporate Taxes

Data source DFDL

33

Foreign Investment Regulations

Data source JETRO Compiled by World Business Advisory Center

Not Permitted to Foreigner Only for Joint Venture with Local Company 100 Foreign Ownership Allowed

Wholesale and Retail Businesses

100 Foreign Ownership bull If registered capital is 20 billion Lao Kip

(USD 25 million) or more

Maximum 70 Foreign Ownership bull If registered capital is 10 - 20 billion Lao Kip

(USD 125 ndash 25 million)

Maximum 50 Foreign Ownership bull If registered capital is 4 - 10 billion Lao Kip

(USD 05 ndash 125 million)

bull If registered capital is less than 4 billion Lao Kip (USD 05 million)

Hotel and Restaurants Maximum 60 Foreign Ownership bull 3-5 stars hotel with minimum registered capital of

1 billion Lao Kip (USD 125000)

bull Less than 3 stars hotel 100 Foreign Ownership bull NOT ALLOWED

Logistics

100 Foreign Ownership bull Domestic goods transport with minimum

registered capital of 3 billion Lao Kip (USD 375000)

Maximum 49 Foreign Ownership bull Cross border goods transport with minimum

registered capital of 5 billion Lao Kip (USD 625000)

bull Cross border goods transport with less than 5 billion Lao Kip of registered capital

bull Domestic goods transport with less than 3 billion Lao Kip of registered capital

Examples of Foreign Investment Regulations

Foreign enterprises are subject to foreign investment regulations in several business activities Generally small businesses are preserved for Lao enterprises whereas large businesses with certain investment conditions are opened for foreign investors

34

Types of Investment ndash (1) General Business

Data source JETRO Compiled by World Business Advisory Center

Besides foreign investment regulation foreign enterprises are also subject to the investment promotion law which classifies investment into 3 types

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Investment in General Business

Types of Investment in Lao PDR

Description

o An investment in general economic activities

o Activities including controlled businesses ndash businesses that require additional approval from relevant ministries

o Activities excluding concession business

Register Capital

Requirements

o At least 1 billion Lao Kip (USD 125000)

o At the day of establishment must pay 40 (agriculture business) 60 (production and processing) 80 (services) The remainder must be paid within 1 year

Examples of Controlled Businesses 1 Agriculture plantation agriculture fishery 2 Manufacturing petroleum products leathers textile amp clothing papers

printing pesticides pharmaceutical products 3 Businesses related to environment eg wastewater treatment 4 Wholesale and retails of gasoline and petroleum products 5 Transportation 6 Hotel and Restaurant 7 Media and Publication 8 Finance and insurance 9 Legal accounting and tax services 10 Tourism 11 Education 12 Hospital clinic and medical services 13 Recreation (museum and amusement park)

35

Types of Investment ndash (2) Concession Business

Data source JETRO Compiled by World Business Advisory Center

Investment in Concession Business

Description

o An investment that requires a concession or specific authorization from the government to use the governmentrsquos property

o Some concession businesses requires authorization from the central government whereas the other requires only provincial government level of authorization for example

bull At least 5MW electricity generation project requires the central government authorization

bull Less than 5MW electricity generation projects requires only provincial government authorization

Examples of Concession Business

1 Mining 2 Electricity generation 3 Infrastructure

bull Telecommunication bull TV and radio station bull Road railway airport seaport waste disposal site

4 Businesses that use the government land bull Shopping center bull Tourist attraction bull Public park bull Hotel bull Forestry and Logging bull Plantation and Livestock

Register Capital

Requirements

o Must pay at least 20 of registered capital while remaining should be paid within 2 years

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Types of Investment in Lao PDR

36

Types of Investment ndash (3) Business Related to SEZ

Data source JETRO Compiled by World Business Advisory Center

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Types of Investment in Lao PDR

Investment in Business Related to SEZ

Description

o Business related to Special Economic Zone -gt an investment in building infrastructure for a new town

o Business related to Specific Economic Zone -gt an investment in infrastructure development for specific purpose projects such as industrial zone export zone tourist development zone etc

High Potential SEZs in Laos

o Vita Park Special Economic Zone (Vientiane)

o Savan-Seno Special Economic Zone (Savannakhet)

o Pakxe-Japan SME Specific Economic Zone (Champasak)

Special and Specific Economic Zones

1 Boten-Daenkham Specific Economic Zone 2 Luang Prabang Special Economic Zone 3 Golden Triangle Special Economic Zone 4 Thatluang Lake Specific Economic Zone 5 Longthanh Specific Economic Zone 6 Xaysettha Specific Economic Zone 7 Vita Park Special Economic Zone 8 Dongphosy Specific Economic Zone 9 Thakhek Specific Economic Zone 10 Poukiao Specific Economic Zone 11 Savan-Seno Special Economic Zone 12 Pakxe-Japan SME Specific Economic Zone

1

2

3

4

5 6

7

8

9 10

11

12

37

General Business

Concession Business

Business related to

SEZs

Procedure of Investment in Lao PDR

The investment approval procedure varies depending upon type of investment However all foreign investors must go through enterprise registration tax identification number registration and application for capital importation certificate

Apply at Ministry of Planning and

Investment

For developer apply at National Committee for Special Economic Zone

For investor apply at One-Stop Service Unit in

each SEZ

Get Concession

License

Get SEZ Concession

License

For controlled businesses apply for

approval at relevant Ministries

Get Approval License

Apply at Ministry of

Industry and Commerce

For non-controlled businesses

Get Enterprise

Registration Certificate

(ERC)

Apply for Tax

Identification Number TIN

at Tax Department Ministry of

Finance

Apply for Capital

Importation Certificate at Bank of Lao

PDR

Data source JETRO Compiled by World Business Advisory Center

38

Investment Tax Incentives ndash General Zone

Data source JETRO Compiled by World Business Advisory Center

Investment Tax Incentives in Lao PDR

Profit Tax Exemption Period

Level 1 High Promotion

Level 2 Moderate Promotion

Level 3 Low Promotion

Zone 1 10 years 6 years 4 years

Zone 2 6 years 4 years 2 years

Zone 3 4 years 2 years 1 years

Profit Tax Exemption Period by Promotion Sector and Zone

Promoted sectors Agriculture Industrial Handicrafts and Services

Type of Tax Exemption

General Zone Promotion Sector and Zone based Incentives 1 Special amp Specific Economic Zone

Tailor Made Incentives 2

Profit tax in next accounting year in case net profit is used for reinvestment (business

expansion)

Import duties for import of raw material equipment spare parts and

vehicles directly used for production

Export duties for general goods and

products (resource-based products should follow

associated laws)

Permission to carry forward losses to

three consecutive accounting years

39

Sector Period of

Profit Tax Exemption

Profit Tax Rate

After Tax Exemption Period

Hi-Tech Manufacturing 10 year 8

Manufacturing that exports at least 70 of production 10 year 8

Manufacturing that exports 30 - 60 of production 7 year 8

Manufacturing that exports 0 - 29 of production 5 year 8

Other 5 year 8

Investment amount of USD 2 million or more 10 year 8

Investment amount of USD 500000 - USD 2 million 8 year 8

Investment amount of USD 300000 - USD 500000 6 year 10

Investment amount of USD 150000 - USD 300000 4 year 10

Investment amount of USD 50000 - USD 150000 2 year 10

Export Laos products 5 year 10

International trade company 3 year 10

General trade company 2 year 10

a) Manufacturing

b) Service

c) Commerce

Personal Income Tax 5

Dividend Tax after Profit Tax Exemption Period

5

Import Duty Exemption for import of raw material equipment spare parts and

vehicles directly used for production

VAT Exemption for import products

Investment Tax Incentives ndash Special and Specific Economic Zone

Data source JETRO

Investment Tax Incentives in Lao PDR

General Zone Promotion Sector and Zone based Incentives 1 Special amp Specific Economic Zone

Tailor Made Incentives 2 Example of Tax Incentives in Savan-Seno SEZ

Other Tax Incentives

40

Non-Tax Incentives amp Trade Privileges

Data source JETRO

Non-Tax Incentives

Permission

Foreign nationals can undertake feasibility studies

Bring in foreign technicians experts and managers if qualified Lao nationals are not available

Lease land

General business up to 30 years from Lao citizen and up to 50 years from the government (renewable)

Investment in SEZ up to 75 years

Concession business upon negotiation with the government (at present there is an example of 99 years land lease)

Transfer leasehold interests and build on or make improvements or structures to a leased land

Guarantee against nationalization expropriation and requisition without compensation

Protection

Trade Privileges

ASEAN WTO GSP Bilateral trade agreement (over 18 countries)

o Argentina o Belarus o Bulgaria o Cambodia o China o Indonesia o India o Korea DPR o Kuwait

o Malaysia o Mongolia o Myanmar o Philippines o Russian

Federation o Thailand o Turkey o USA o Vietnam

41

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

42

Foreign Currency Exchange

Data source Bank of the Lao PDR

Laos Currency Kip (LAK)

Latest FX Rate (as of August 22 2018)

Remark THB and USD are widely accepted especially in the border trade area

USD 1 ~ LAK 8507

EUR 1 ~ LAK 9851

THB 1 ~ LAK 262

JPY 1 ~ LAK 77

CNY 1 ~ LAK 1193

43

KASIKORNTHAIBANK Service in Lao PDR

Retail Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Current deposit

Lending

Working capital loan

Long term loan

Bank guarantee

Project Financing

FX Services

Corporate Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Remittance

Remittance

Trade Finance Letter of Credit (LC) Standby Letter of Credit (SBLC)

44

KASIKORNTHAI BANK Limited

With establishment KASIKORNTHAIBANK

the first full-scale locally incorporated institution from Thailand is fully committed to support our clientsrsquo cross-border financing and transaction for their trade and investment activities in Lao PDR

45

KASIKORNTHAIBANK in Lao PDR Contacts

bull HEAD OFFICE Unit 12 Lane Xang Avenue Xiangngeun Village Chanthaboury District Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88905 Fax +856 21 253 336 wwwkasikornbankcomla

KASIKORNTHAI BANK Limited

bull PONESINUAN BRANCH

Ban Ponesinuan Unit 14 Sysattanak Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88826 Fax +856 21 410 889

Ms Piyanoot Sangsan Branch Manager KASIKORNTHAI BANK LIMITED Lane Xang Head Office E-mail piyanootskasikornbankcom

Mr Chatuporn Boozaya-Angool Branch Manager Ponesinuan Branch E-mail chatupornbkasikornbankcom

46

About AEC+ Business Advisory The AEC+ Business Advisory is set up by KASIKORNBANK to support businesses in their regional expansion across the ASEAN+3 market by providing local market intelligence and strategic business advice

What we do bull Offer customized and tailor-made advisory services bull Publish investment guides and industry reports bull Deliver in-depth insights via seminars bull Organize business trips to bring first-hand experience

Follow Us Visit our website at

AEC+ BUSINESS ADVISORY

Prepared by Mr Anoot Charoenkiattikul World Business Intelligence Specialist E-mail anootckasikornbankcom

httpswwwkasikornbankcominternational-businessenPagesHomeaspx

47

Page 31: LAO PDR - Facilitiesfuangfah.econ.cmu.ac.th/teacher/nisit/files/201808_LaoPDR_Investm… · • On August 7, the government of Laos announced the suspension of new hydropower project

31

Major Costs ndash Labor and Utility

Electricity Rate 2017

0 - 25 kwh 004USDkwh

26 - 150 kwh 005USDkwh

151 - 300 kwh 009USDkwh

more than 500 kwh 012USDkwh

301 - 400 kwh 010USDkwh

401 - 500 kwh 011USDkwh

Water Price (Per Unit) for Business and Trade Units

bull Water price for businesses is set to increase from USD USD 036 in 2017 to USD038 per unit this year

Labor minimum monthly wage in ASEAN 2017 USD

32

Tax System

Monthly Income (LAK) Tax Rate

0 ndash 1000000 0

1000001 - 3000000 5

3000001 - 6000000 10

6000001 - 12000000 12

12000001 - 24000000 15

24000001 - 40000000 20

Above 40000000 24

Types of Tax Tax rate

Profit Tax 24

Value Added Tax (VAT) 10

Withholding Tax Dividends 10

(non-residents) Transfer of shares 10

Transfer of assets 5

China

Luxembourg

Malaysia

Singapore

South Korea

Thailand

Vietnam

Income tax treaties for avoidance of double taxation

Note There is no definition of residence for tax purposes in Laos All companies registered under Lao law (including foreign law) are subject to Lao profit tax

Personal Income Tax Corporate Taxes

Data source DFDL

33

Foreign Investment Regulations

Data source JETRO Compiled by World Business Advisory Center

Not Permitted to Foreigner Only for Joint Venture with Local Company 100 Foreign Ownership Allowed

Wholesale and Retail Businesses

100 Foreign Ownership bull If registered capital is 20 billion Lao Kip

(USD 25 million) or more

Maximum 70 Foreign Ownership bull If registered capital is 10 - 20 billion Lao Kip

(USD 125 ndash 25 million)

Maximum 50 Foreign Ownership bull If registered capital is 4 - 10 billion Lao Kip

(USD 05 ndash 125 million)

bull If registered capital is less than 4 billion Lao Kip (USD 05 million)

Hotel and Restaurants Maximum 60 Foreign Ownership bull 3-5 stars hotel with minimum registered capital of

1 billion Lao Kip (USD 125000)

bull Less than 3 stars hotel 100 Foreign Ownership bull NOT ALLOWED

Logistics

100 Foreign Ownership bull Domestic goods transport with minimum

registered capital of 3 billion Lao Kip (USD 375000)

Maximum 49 Foreign Ownership bull Cross border goods transport with minimum

registered capital of 5 billion Lao Kip (USD 625000)

bull Cross border goods transport with less than 5 billion Lao Kip of registered capital

bull Domestic goods transport with less than 3 billion Lao Kip of registered capital

Examples of Foreign Investment Regulations

Foreign enterprises are subject to foreign investment regulations in several business activities Generally small businesses are preserved for Lao enterprises whereas large businesses with certain investment conditions are opened for foreign investors

34

Types of Investment ndash (1) General Business

Data source JETRO Compiled by World Business Advisory Center

Besides foreign investment regulation foreign enterprises are also subject to the investment promotion law which classifies investment into 3 types

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Investment in General Business

Types of Investment in Lao PDR

Description

o An investment in general economic activities

o Activities including controlled businesses ndash businesses that require additional approval from relevant ministries

o Activities excluding concession business

Register Capital

Requirements

o At least 1 billion Lao Kip (USD 125000)

o At the day of establishment must pay 40 (agriculture business) 60 (production and processing) 80 (services) The remainder must be paid within 1 year

Examples of Controlled Businesses 1 Agriculture plantation agriculture fishery 2 Manufacturing petroleum products leathers textile amp clothing papers

printing pesticides pharmaceutical products 3 Businesses related to environment eg wastewater treatment 4 Wholesale and retails of gasoline and petroleum products 5 Transportation 6 Hotel and Restaurant 7 Media and Publication 8 Finance and insurance 9 Legal accounting and tax services 10 Tourism 11 Education 12 Hospital clinic and medical services 13 Recreation (museum and amusement park)

35

Types of Investment ndash (2) Concession Business

Data source JETRO Compiled by World Business Advisory Center

Investment in Concession Business

Description

o An investment that requires a concession or specific authorization from the government to use the governmentrsquos property

o Some concession businesses requires authorization from the central government whereas the other requires only provincial government level of authorization for example

bull At least 5MW electricity generation project requires the central government authorization

bull Less than 5MW electricity generation projects requires only provincial government authorization

Examples of Concession Business

1 Mining 2 Electricity generation 3 Infrastructure

bull Telecommunication bull TV and radio station bull Road railway airport seaport waste disposal site

4 Businesses that use the government land bull Shopping center bull Tourist attraction bull Public park bull Hotel bull Forestry and Logging bull Plantation and Livestock

Register Capital

Requirements

o Must pay at least 20 of registered capital while remaining should be paid within 2 years

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Types of Investment in Lao PDR

36

Types of Investment ndash (3) Business Related to SEZ

Data source JETRO Compiled by World Business Advisory Center

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Types of Investment in Lao PDR

Investment in Business Related to SEZ

Description

o Business related to Special Economic Zone -gt an investment in building infrastructure for a new town

o Business related to Specific Economic Zone -gt an investment in infrastructure development for specific purpose projects such as industrial zone export zone tourist development zone etc

High Potential SEZs in Laos

o Vita Park Special Economic Zone (Vientiane)

o Savan-Seno Special Economic Zone (Savannakhet)

o Pakxe-Japan SME Specific Economic Zone (Champasak)

Special and Specific Economic Zones

1 Boten-Daenkham Specific Economic Zone 2 Luang Prabang Special Economic Zone 3 Golden Triangle Special Economic Zone 4 Thatluang Lake Specific Economic Zone 5 Longthanh Specific Economic Zone 6 Xaysettha Specific Economic Zone 7 Vita Park Special Economic Zone 8 Dongphosy Specific Economic Zone 9 Thakhek Specific Economic Zone 10 Poukiao Specific Economic Zone 11 Savan-Seno Special Economic Zone 12 Pakxe-Japan SME Specific Economic Zone

1

2

3

4

5 6

7

8

9 10

11

12

37

General Business

Concession Business

Business related to

SEZs

Procedure of Investment in Lao PDR

The investment approval procedure varies depending upon type of investment However all foreign investors must go through enterprise registration tax identification number registration and application for capital importation certificate

Apply at Ministry of Planning and

Investment

For developer apply at National Committee for Special Economic Zone

For investor apply at One-Stop Service Unit in

each SEZ

Get Concession

License

Get SEZ Concession

License

For controlled businesses apply for

approval at relevant Ministries

Get Approval License

Apply at Ministry of

Industry and Commerce

For non-controlled businesses

Get Enterprise

Registration Certificate

(ERC)

Apply for Tax

Identification Number TIN

at Tax Department Ministry of

Finance

Apply for Capital

Importation Certificate at Bank of Lao

PDR

Data source JETRO Compiled by World Business Advisory Center

38

Investment Tax Incentives ndash General Zone

Data source JETRO Compiled by World Business Advisory Center

Investment Tax Incentives in Lao PDR

Profit Tax Exemption Period

Level 1 High Promotion

Level 2 Moderate Promotion

Level 3 Low Promotion

Zone 1 10 years 6 years 4 years

Zone 2 6 years 4 years 2 years

Zone 3 4 years 2 years 1 years

Profit Tax Exemption Period by Promotion Sector and Zone

Promoted sectors Agriculture Industrial Handicrafts and Services

Type of Tax Exemption

General Zone Promotion Sector and Zone based Incentives 1 Special amp Specific Economic Zone

Tailor Made Incentives 2

Profit tax in next accounting year in case net profit is used for reinvestment (business

expansion)

Import duties for import of raw material equipment spare parts and

vehicles directly used for production

Export duties for general goods and

products (resource-based products should follow

associated laws)

Permission to carry forward losses to

three consecutive accounting years

39

Sector Period of

Profit Tax Exemption

Profit Tax Rate

After Tax Exemption Period

Hi-Tech Manufacturing 10 year 8

Manufacturing that exports at least 70 of production 10 year 8

Manufacturing that exports 30 - 60 of production 7 year 8

Manufacturing that exports 0 - 29 of production 5 year 8

Other 5 year 8

Investment amount of USD 2 million or more 10 year 8

Investment amount of USD 500000 - USD 2 million 8 year 8

Investment amount of USD 300000 - USD 500000 6 year 10

Investment amount of USD 150000 - USD 300000 4 year 10

Investment amount of USD 50000 - USD 150000 2 year 10

Export Laos products 5 year 10

International trade company 3 year 10

General trade company 2 year 10

a) Manufacturing

b) Service

c) Commerce

Personal Income Tax 5

Dividend Tax after Profit Tax Exemption Period

5

Import Duty Exemption for import of raw material equipment spare parts and

vehicles directly used for production

VAT Exemption for import products

Investment Tax Incentives ndash Special and Specific Economic Zone

Data source JETRO

Investment Tax Incentives in Lao PDR

General Zone Promotion Sector and Zone based Incentives 1 Special amp Specific Economic Zone

Tailor Made Incentives 2 Example of Tax Incentives in Savan-Seno SEZ

Other Tax Incentives

40

Non-Tax Incentives amp Trade Privileges

Data source JETRO

Non-Tax Incentives

Permission

Foreign nationals can undertake feasibility studies

Bring in foreign technicians experts and managers if qualified Lao nationals are not available

Lease land

General business up to 30 years from Lao citizen and up to 50 years from the government (renewable)

Investment in SEZ up to 75 years

Concession business upon negotiation with the government (at present there is an example of 99 years land lease)

Transfer leasehold interests and build on or make improvements or structures to a leased land

Guarantee against nationalization expropriation and requisition without compensation

Protection

Trade Privileges

ASEAN WTO GSP Bilateral trade agreement (over 18 countries)

o Argentina o Belarus o Bulgaria o Cambodia o China o Indonesia o India o Korea DPR o Kuwait

o Malaysia o Mongolia o Myanmar o Philippines o Russian

Federation o Thailand o Turkey o USA o Vietnam

41

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

42

Foreign Currency Exchange

Data source Bank of the Lao PDR

Laos Currency Kip (LAK)

Latest FX Rate (as of August 22 2018)

Remark THB and USD are widely accepted especially in the border trade area

USD 1 ~ LAK 8507

EUR 1 ~ LAK 9851

THB 1 ~ LAK 262

JPY 1 ~ LAK 77

CNY 1 ~ LAK 1193

43

KASIKORNTHAIBANK Service in Lao PDR

Retail Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Current deposit

Lending

Working capital loan

Long term loan

Bank guarantee

Project Financing

FX Services

Corporate Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Remittance

Remittance

Trade Finance Letter of Credit (LC) Standby Letter of Credit (SBLC)

44

KASIKORNTHAI BANK Limited

With establishment KASIKORNTHAIBANK

the first full-scale locally incorporated institution from Thailand is fully committed to support our clientsrsquo cross-border financing and transaction for their trade and investment activities in Lao PDR

45

KASIKORNTHAIBANK in Lao PDR Contacts

bull HEAD OFFICE Unit 12 Lane Xang Avenue Xiangngeun Village Chanthaboury District Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88905 Fax +856 21 253 336 wwwkasikornbankcomla

KASIKORNTHAI BANK Limited

bull PONESINUAN BRANCH

Ban Ponesinuan Unit 14 Sysattanak Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88826 Fax +856 21 410 889

Ms Piyanoot Sangsan Branch Manager KASIKORNTHAI BANK LIMITED Lane Xang Head Office E-mail piyanootskasikornbankcom

Mr Chatuporn Boozaya-Angool Branch Manager Ponesinuan Branch E-mail chatupornbkasikornbankcom

46

About AEC+ Business Advisory The AEC+ Business Advisory is set up by KASIKORNBANK to support businesses in their regional expansion across the ASEAN+3 market by providing local market intelligence and strategic business advice

What we do bull Offer customized and tailor-made advisory services bull Publish investment guides and industry reports bull Deliver in-depth insights via seminars bull Organize business trips to bring first-hand experience

Follow Us Visit our website at

AEC+ BUSINESS ADVISORY

Prepared by Mr Anoot Charoenkiattikul World Business Intelligence Specialist E-mail anootckasikornbankcom

httpswwwkasikornbankcominternational-businessenPagesHomeaspx

47

Page 32: LAO PDR - Facilitiesfuangfah.econ.cmu.ac.th/teacher/nisit/files/201808_LaoPDR_Investm… · • On August 7, the government of Laos announced the suspension of new hydropower project

32

Tax System

Monthly Income (LAK) Tax Rate

0 ndash 1000000 0

1000001 - 3000000 5

3000001 - 6000000 10

6000001 - 12000000 12

12000001 - 24000000 15

24000001 - 40000000 20

Above 40000000 24

Types of Tax Tax rate

Profit Tax 24

Value Added Tax (VAT) 10

Withholding Tax Dividends 10

(non-residents) Transfer of shares 10

Transfer of assets 5

China

Luxembourg

Malaysia

Singapore

South Korea

Thailand

Vietnam

Income tax treaties for avoidance of double taxation

Note There is no definition of residence for tax purposes in Laos All companies registered under Lao law (including foreign law) are subject to Lao profit tax

Personal Income Tax Corporate Taxes

Data source DFDL

33

Foreign Investment Regulations

Data source JETRO Compiled by World Business Advisory Center

Not Permitted to Foreigner Only for Joint Venture with Local Company 100 Foreign Ownership Allowed

Wholesale and Retail Businesses

100 Foreign Ownership bull If registered capital is 20 billion Lao Kip

(USD 25 million) or more

Maximum 70 Foreign Ownership bull If registered capital is 10 - 20 billion Lao Kip

(USD 125 ndash 25 million)

Maximum 50 Foreign Ownership bull If registered capital is 4 - 10 billion Lao Kip

(USD 05 ndash 125 million)

bull If registered capital is less than 4 billion Lao Kip (USD 05 million)

Hotel and Restaurants Maximum 60 Foreign Ownership bull 3-5 stars hotel with minimum registered capital of

1 billion Lao Kip (USD 125000)

bull Less than 3 stars hotel 100 Foreign Ownership bull NOT ALLOWED

Logistics

100 Foreign Ownership bull Domestic goods transport with minimum

registered capital of 3 billion Lao Kip (USD 375000)

Maximum 49 Foreign Ownership bull Cross border goods transport with minimum

registered capital of 5 billion Lao Kip (USD 625000)

bull Cross border goods transport with less than 5 billion Lao Kip of registered capital

bull Domestic goods transport with less than 3 billion Lao Kip of registered capital

Examples of Foreign Investment Regulations

Foreign enterprises are subject to foreign investment regulations in several business activities Generally small businesses are preserved for Lao enterprises whereas large businesses with certain investment conditions are opened for foreign investors

34

Types of Investment ndash (1) General Business

Data source JETRO Compiled by World Business Advisory Center

Besides foreign investment regulation foreign enterprises are also subject to the investment promotion law which classifies investment into 3 types

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Investment in General Business

Types of Investment in Lao PDR

Description

o An investment in general economic activities

o Activities including controlled businesses ndash businesses that require additional approval from relevant ministries

o Activities excluding concession business

Register Capital

Requirements

o At least 1 billion Lao Kip (USD 125000)

o At the day of establishment must pay 40 (agriculture business) 60 (production and processing) 80 (services) The remainder must be paid within 1 year

Examples of Controlled Businesses 1 Agriculture plantation agriculture fishery 2 Manufacturing petroleum products leathers textile amp clothing papers

printing pesticides pharmaceutical products 3 Businesses related to environment eg wastewater treatment 4 Wholesale and retails of gasoline and petroleum products 5 Transportation 6 Hotel and Restaurant 7 Media and Publication 8 Finance and insurance 9 Legal accounting and tax services 10 Tourism 11 Education 12 Hospital clinic and medical services 13 Recreation (museum and amusement park)

35

Types of Investment ndash (2) Concession Business

Data source JETRO Compiled by World Business Advisory Center

Investment in Concession Business

Description

o An investment that requires a concession or specific authorization from the government to use the governmentrsquos property

o Some concession businesses requires authorization from the central government whereas the other requires only provincial government level of authorization for example

bull At least 5MW electricity generation project requires the central government authorization

bull Less than 5MW electricity generation projects requires only provincial government authorization

Examples of Concession Business

1 Mining 2 Electricity generation 3 Infrastructure

bull Telecommunication bull TV and radio station bull Road railway airport seaport waste disposal site

4 Businesses that use the government land bull Shopping center bull Tourist attraction bull Public park bull Hotel bull Forestry and Logging bull Plantation and Livestock

Register Capital

Requirements

o Must pay at least 20 of registered capital while remaining should be paid within 2 years

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Types of Investment in Lao PDR

36

Types of Investment ndash (3) Business Related to SEZ

Data source JETRO Compiled by World Business Advisory Center

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Types of Investment in Lao PDR

Investment in Business Related to SEZ

Description

o Business related to Special Economic Zone -gt an investment in building infrastructure for a new town

o Business related to Specific Economic Zone -gt an investment in infrastructure development for specific purpose projects such as industrial zone export zone tourist development zone etc

High Potential SEZs in Laos

o Vita Park Special Economic Zone (Vientiane)

o Savan-Seno Special Economic Zone (Savannakhet)

o Pakxe-Japan SME Specific Economic Zone (Champasak)

Special and Specific Economic Zones

1 Boten-Daenkham Specific Economic Zone 2 Luang Prabang Special Economic Zone 3 Golden Triangle Special Economic Zone 4 Thatluang Lake Specific Economic Zone 5 Longthanh Specific Economic Zone 6 Xaysettha Specific Economic Zone 7 Vita Park Special Economic Zone 8 Dongphosy Specific Economic Zone 9 Thakhek Specific Economic Zone 10 Poukiao Specific Economic Zone 11 Savan-Seno Special Economic Zone 12 Pakxe-Japan SME Specific Economic Zone

1

2

3

4

5 6

7

8

9 10

11

12

37

General Business

Concession Business

Business related to

SEZs

Procedure of Investment in Lao PDR

The investment approval procedure varies depending upon type of investment However all foreign investors must go through enterprise registration tax identification number registration and application for capital importation certificate

Apply at Ministry of Planning and

Investment

For developer apply at National Committee for Special Economic Zone

For investor apply at One-Stop Service Unit in

each SEZ

Get Concession

License

Get SEZ Concession

License

For controlled businesses apply for

approval at relevant Ministries

Get Approval License

Apply at Ministry of

Industry and Commerce

For non-controlled businesses

Get Enterprise

Registration Certificate

(ERC)

Apply for Tax

Identification Number TIN

at Tax Department Ministry of

Finance

Apply for Capital

Importation Certificate at Bank of Lao

PDR

Data source JETRO Compiled by World Business Advisory Center

38

Investment Tax Incentives ndash General Zone

Data source JETRO Compiled by World Business Advisory Center

Investment Tax Incentives in Lao PDR

Profit Tax Exemption Period

Level 1 High Promotion

Level 2 Moderate Promotion

Level 3 Low Promotion

Zone 1 10 years 6 years 4 years

Zone 2 6 years 4 years 2 years

Zone 3 4 years 2 years 1 years

Profit Tax Exemption Period by Promotion Sector and Zone

Promoted sectors Agriculture Industrial Handicrafts and Services

Type of Tax Exemption

General Zone Promotion Sector and Zone based Incentives 1 Special amp Specific Economic Zone

Tailor Made Incentives 2

Profit tax in next accounting year in case net profit is used for reinvestment (business

expansion)

Import duties for import of raw material equipment spare parts and

vehicles directly used for production

Export duties for general goods and

products (resource-based products should follow

associated laws)

Permission to carry forward losses to

three consecutive accounting years

39

Sector Period of

Profit Tax Exemption

Profit Tax Rate

After Tax Exemption Period

Hi-Tech Manufacturing 10 year 8

Manufacturing that exports at least 70 of production 10 year 8

Manufacturing that exports 30 - 60 of production 7 year 8

Manufacturing that exports 0 - 29 of production 5 year 8

Other 5 year 8

Investment amount of USD 2 million or more 10 year 8

Investment amount of USD 500000 - USD 2 million 8 year 8

Investment amount of USD 300000 - USD 500000 6 year 10

Investment amount of USD 150000 - USD 300000 4 year 10

Investment amount of USD 50000 - USD 150000 2 year 10

Export Laos products 5 year 10

International trade company 3 year 10

General trade company 2 year 10

a) Manufacturing

b) Service

c) Commerce

Personal Income Tax 5

Dividend Tax after Profit Tax Exemption Period

5

Import Duty Exemption for import of raw material equipment spare parts and

vehicles directly used for production

VAT Exemption for import products

Investment Tax Incentives ndash Special and Specific Economic Zone

Data source JETRO

Investment Tax Incentives in Lao PDR

General Zone Promotion Sector and Zone based Incentives 1 Special amp Specific Economic Zone

Tailor Made Incentives 2 Example of Tax Incentives in Savan-Seno SEZ

Other Tax Incentives

40

Non-Tax Incentives amp Trade Privileges

Data source JETRO

Non-Tax Incentives

Permission

Foreign nationals can undertake feasibility studies

Bring in foreign technicians experts and managers if qualified Lao nationals are not available

Lease land

General business up to 30 years from Lao citizen and up to 50 years from the government (renewable)

Investment in SEZ up to 75 years

Concession business upon negotiation with the government (at present there is an example of 99 years land lease)

Transfer leasehold interests and build on or make improvements or structures to a leased land

Guarantee against nationalization expropriation and requisition without compensation

Protection

Trade Privileges

ASEAN WTO GSP Bilateral trade agreement (over 18 countries)

o Argentina o Belarus o Bulgaria o Cambodia o China o Indonesia o India o Korea DPR o Kuwait

o Malaysia o Mongolia o Myanmar o Philippines o Russian

Federation o Thailand o Turkey o USA o Vietnam

41

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

42

Foreign Currency Exchange

Data source Bank of the Lao PDR

Laos Currency Kip (LAK)

Latest FX Rate (as of August 22 2018)

Remark THB and USD are widely accepted especially in the border trade area

USD 1 ~ LAK 8507

EUR 1 ~ LAK 9851

THB 1 ~ LAK 262

JPY 1 ~ LAK 77

CNY 1 ~ LAK 1193

43

KASIKORNTHAIBANK Service in Lao PDR

Retail Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Current deposit

Lending

Working capital loan

Long term loan

Bank guarantee

Project Financing

FX Services

Corporate Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Remittance

Remittance

Trade Finance Letter of Credit (LC) Standby Letter of Credit (SBLC)

44

KASIKORNTHAI BANK Limited

With establishment KASIKORNTHAIBANK

the first full-scale locally incorporated institution from Thailand is fully committed to support our clientsrsquo cross-border financing and transaction for their trade and investment activities in Lao PDR

45

KASIKORNTHAIBANK in Lao PDR Contacts

bull HEAD OFFICE Unit 12 Lane Xang Avenue Xiangngeun Village Chanthaboury District Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88905 Fax +856 21 253 336 wwwkasikornbankcomla

KASIKORNTHAI BANK Limited

bull PONESINUAN BRANCH

Ban Ponesinuan Unit 14 Sysattanak Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88826 Fax +856 21 410 889

Ms Piyanoot Sangsan Branch Manager KASIKORNTHAI BANK LIMITED Lane Xang Head Office E-mail piyanootskasikornbankcom

Mr Chatuporn Boozaya-Angool Branch Manager Ponesinuan Branch E-mail chatupornbkasikornbankcom

46

About AEC+ Business Advisory The AEC+ Business Advisory is set up by KASIKORNBANK to support businesses in their regional expansion across the ASEAN+3 market by providing local market intelligence and strategic business advice

What we do bull Offer customized and tailor-made advisory services bull Publish investment guides and industry reports bull Deliver in-depth insights via seminars bull Organize business trips to bring first-hand experience

Follow Us Visit our website at

AEC+ BUSINESS ADVISORY

Prepared by Mr Anoot Charoenkiattikul World Business Intelligence Specialist E-mail anootckasikornbankcom

httpswwwkasikornbankcominternational-businessenPagesHomeaspx

47

Page 33: LAO PDR - Facilitiesfuangfah.econ.cmu.ac.th/teacher/nisit/files/201808_LaoPDR_Investm… · • On August 7, the government of Laos announced the suspension of new hydropower project

33

Foreign Investment Regulations

Data source JETRO Compiled by World Business Advisory Center

Not Permitted to Foreigner Only for Joint Venture with Local Company 100 Foreign Ownership Allowed

Wholesale and Retail Businesses

100 Foreign Ownership bull If registered capital is 20 billion Lao Kip

(USD 25 million) or more

Maximum 70 Foreign Ownership bull If registered capital is 10 - 20 billion Lao Kip

(USD 125 ndash 25 million)

Maximum 50 Foreign Ownership bull If registered capital is 4 - 10 billion Lao Kip

(USD 05 ndash 125 million)

bull If registered capital is less than 4 billion Lao Kip (USD 05 million)

Hotel and Restaurants Maximum 60 Foreign Ownership bull 3-5 stars hotel with minimum registered capital of

1 billion Lao Kip (USD 125000)

bull Less than 3 stars hotel 100 Foreign Ownership bull NOT ALLOWED

Logistics

100 Foreign Ownership bull Domestic goods transport with minimum

registered capital of 3 billion Lao Kip (USD 375000)

Maximum 49 Foreign Ownership bull Cross border goods transport with minimum

registered capital of 5 billion Lao Kip (USD 625000)

bull Cross border goods transport with less than 5 billion Lao Kip of registered capital

bull Domestic goods transport with less than 3 billion Lao Kip of registered capital

Examples of Foreign Investment Regulations

Foreign enterprises are subject to foreign investment regulations in several business activities Generally small businesses are preserved for Lao enterprises whereas large businesses with certain investment conditions are opened for foreign investors

34

Types of Investment ndash (1) General Business

Data source JETRO Compiled by World Business Advisory Center

Besides foreign investment regulation foreign enterprises are also subject to the investment promotion law which classifies investment into 3 types

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Investment in General Business

Types of Investment in Lao PDR

Description

o An investment in general economic activities

o Activities including controlled businesses ndash businesses that require additional approval from relevant ministries

o Activities excluding concession business

Register Capital

Requirements

o At least 1 billion Lao Kip (USD 125000)

o At the day of establishment must pay 40 (agriculture business) 60 (production and processing) 80 (services) The remainder must be paid within 1 year

Examples of Controlled Businesses 1 Agriculture plantation agriculture fishery 2 Manufacturing petroleum products leathers textile amp clothing papers

printing pesticides pharmaceutical products 3 Businesses related to environment eg wastewater treatment 4 Wholesale and retails of gasoline and petroleum products 5 Transportation 6 Hotel and Restaurant 7 Media and Publication 8 Finance and insurance 9 Legal accounting and tax services 10 Tourism 11 Education 12 Hospital clinic and medical services 13 Recreation (museum and amusement park)

35

Types of Investment ndash (2) Concession Business

Data source JETRO Compiled by World Business Advisory Center

Investment in Concession Business

Description

o An investment that requires a concession or specific authorization from the government to use the governmentrsquos property

o Some concession businesses requires authorization from the central government whereas the other requires only provincial government level of authorization for example

bull At least 5MW electricity generation project requires the central government authorization

bull Less than 5MW electricity generation projects requires only provincial government authorization

Examples of Concession Business

1 Mining 2 Electricity generation 3 Infrastructure

bull Telecommunication bull TV and radio station bull Road railway airport seaport waste disposal site

4 Businesses that use the government land bull Shopping center bull Tourist attraction bull Public park bull Hotel bull Forestry and Logging bull Plantation and Livestock

Register Capital

Requirements

o Must pay at least 20 of registered capital while remaining should be paid within 2 years

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Types of Investment in Lao PDR

36

Types of Investment ndash (3) Business Related to SEZ

Data source JETRO Compiled by World Business Advisory Center

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Types of Investment in Lao PDR

Investment in Business Related to SEZ

Description

o Business related to Special Economic Zone -gt an investment in building infrastructure for a new town

o Business related to Specific Economic Zone -gt an investment in infrastructure development for specific purpose projects such as industrial zone export zone tourist development zone etc

High Potential SEZs in Laos

o Vita Park Special Economic Zone (Vientiane)

o Savan-Seno Special Economic Zone (Savannakhet)

o Pakxe-Japan SME Specific Economic Zone (Champasak)

Special and Specific Economic Zones

1 Boten-Daenkham Specific Economic Zone 2 Luang Prabang Special Economic Zone 3 Golden Triangle Special Economic Zone 4 Thatluang Lake Specific Economic Zone 5 Longthanh Specific Economic Zone 6 Xaysettha Specific Economic Zone 7 Vita Park Special Economic Zone 8 Dongphosy Specific Economic Zone 9 Thakhek Specific Economic Zone 10 Poukiao Specific Economic Zone 11 Savan-Seno Special Economic Zone 12 Pakxe-Japan SME Specific Economic Zone

1

2

3

4

5 6

7

8

9 10

11

12

37

General Business

Concession Business

Business related to

SEZs

Procedure of Investment in Lao PDR

The investment approval procedure varies depending upon type of investment However all foreign investors must go through enterprise registration tax identification number registration and application for capital importation certificate

Apply at Ministry of Planning and

Investment

For developer apply at National Committee for Special Economic Zone

For investor apply at One-Stop Service Unit in

each SEZ

Get Concession

License

Get SEZ Concession

License

For controlled businesses apply for

approval at relevant Ministries

Get Approval License

Apply at Ministry of

Industry and Commerce

For non-controlled businesses

Get Enterprise

Registration Certificate

(ERC)

Apply for Tax

Identification Number TIN

at Tax Department Ministry of

Finance

Apply for Capital

Importation Certificate at Bank of Lao

PDR

Data source JETRO Compiled by World Business Advisory Center

38

Investment Tax Incentives ndash General Zone

Data source JETRO Compiled by World Business Advisory Center

Investment Tax Incentives in Lao PDR

Profit Tax Exemption Period

Level 1 High Promotion

Level 2 Moderate Promotion

Level 3 Low Promotion

Zone 1 10 years 6 years 4 years

Zone 2 6 years 4 years 2 years

Zone 3 4 years 2 years 1 years

Profit Tax Exemption Period by Promotion Sector and Zone

Promoted sectors Agriculture Industrial Handicrafts and Services

Type of Tax Exemption

General Zone Promotion Sector and Zone based Incentives 1 Special amp Specific Economic Zone

Tailor Made Incentives 2

Profit tax in next accounting year in case net profit is used for reinvestment (business

expansion)

Import duties for import of raw material equipment spare parts and

vehicles directly used for production

Export duties for general goods and

products (resource-based products should follow

associated laws)

Permission to carry forward losses to

three consecutive accounting years

39

Sector Period of

Profit Tax Exemption

Profit Tax Rate

After Tax Exemption Period

Hi-Tech Manufacturing 10 year 8

Manufacturing that exports at least 70 of production 10 year 8

Manufacturing that exports 30 - 60 of production 7 year 8

Manufacturing that exports 0 - 29 of production 5 year 8

Other 5 year 8

Investment amount of USD 2 million or more 10 year 8

Investment amount of USD 500000 - USD 2 million 8 year 8

Investment amount of USD 300000 - USD 500000 6 year 10

Investment amount of USD 150000 - USD 300000 4 year 10

Investment amount of USD 50000 - USD 150000 2 year 10

Export Laos products 5 year 10

International trade company 3 year 10

General trade company 2 year 10

a) Manufacturing

b) Service

c) Commerce

Personal Income Tax 5

Dividend Tax after Profit Tax Exemption Period

5

Import Duty Exemption for import of raw material equipment spare parts and

vehicles directly used for production

VAT Exemption for import products

Investment Tax Incentives ndash Special and Specific Economic Zone

Data source JETRO

Investment Tax Incentives in Lao PDR

General Zone Promotion Sector and Zone based Incentives 1 Special amp Specific Economic Zone

Tailor Made Incentives 2 Example of Tax Incentives in Savan-Seno SEZ

Other Tax Incentives

40

Non-Tax Incentives amp Trade Privileges

Data source JETRO

Non-Tax Incentives

Permission

Foreign nationals can undertake feasibility studies

Bring in foreign technicians experts and managers if qualified Lao nationals are not available

Lease land

General business up to 30 years from Lao citizen and up to 50 years from the government (renewable)

Investment in SEZ up to 75 years

Concession business upon negotiation with the government (at present there is an example of 99 years land lease)

Transfer leasehold interests and build on or make improvements or structures to a leased land

Guarantee against nationalization expropriation and requisition without compensation

Protection

Trade Privileges

ASEAN WTO GSP Bilateral trade agreement (over 18 countries)

o Argentina o Belarus o Bulgaria o Cambodia o China o Indonesia o India o Korea DPR o Kuwait

o Malaysia o Mongolia o Myanmar o Philippines o Russian

Federation o Thailand o Turkey o USA o Vietnam

41

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

42

Foreign Currency Exchange

Data source Bank of the Lao PDR

Laos Currency Kip (LAK)

Latest FX Rate (as of August 22 2018)

Remark THB and USD are widely accepted especially in the border trade area

USD 1 ~ LAK 8507

EUR 1 ~ LAK 9851

THB 1 ~ LAK 262

JPY 1 ~ LAK 77

CNY 1 ~ LAK 1193

43

KASIKORNTHAIBANK Service in Lao PDR

Retail Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Current deposit

Lending

Working capital loan

Long term loan

Bank guarantee

Project Financing

FX Services

Corporate Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Remittance

Remittance

Trade Finance Letter of Credit (LC) Standby Letter of Credit (SBLC)

44

KASIKORNTHAI BANK Limited

With establishment KASIKORNTHAIBANK

the first full-scale locally incorporated institution from Thailand is fully committed to support our clientsrsquo cross-border financing and transaction for their trade and investment activities in Lao PDR

45

KASIKORNTHAIBANK in Lao PDR Contacts

bull HEAD OFFICE Unit 12 Lane Xang Avenue Xiangngeun Village Chanthaboury District Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88905 Fax +856 21 253 336 wwwkasikornbankcomla

KASIKORNTHAI BANK Limited

bull PONESINUAN BRANCH

Ban Ponesinuan Unit 14 Sysattanak Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88826 Fax +856 21 410 889

Ms Piyanoot Sangsan Branch Manager KASIKORNTHAI BANK LIMITED Lane Xang Head Office E-mail piyanootskasikornbankcom

Mr Chatuporn Boozaya-Angool Branch Manager Ponesinuan Branch E-mail chatupornbkasikornbankcom

46

About AEC+ Business Advisory The AEC+ Business Advisory is set up by KASIKORNBANK to support businesses in their regional expansion across the ASEAN+3 market by providing local market intelligence and strategic business advice

What we do bull Offer customized and tailor-made advisory services bull Publish investment guides and industry reports bull Deliver in-depth insights via seminars bull Organize business trips to bring first-hand experience

Follow Us Visit our website at

AEC+ BUSINESS ADVISORY

Prepared by Mr Anoot Charoenkiattikul World Business Intelligence Specialist E-mail anootckasikornbankcom

httpswwwkasikornbankcominternational-businessenPagesHomeaspx

47

Page 34: LAO PDR - Facilitiesfuangfah.econ.cmu.ac.th/teacher/nisit/files/201808_LaoPDR_Investm… · • On August 7, the government of Laos announced the suspension of new hydropower project

34

Types of Investment ndash (1) General Business

Data source JETRO Compiled by World Business Advisory Center

Besides foreign investment regulation foreign enterprises are also subject to the investment promotion law which classifies investment into 3 types

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Investment in General Business

Types of Investment in Lao PDR

Description

o An investment in general economic activities

o Activities including controlled businesses ndash businesses that require additional approval from relevant ministries

o Activities excluding concession business

Register Capital

Requirements

o At least 1 billion Lao Kip (USD 125000)

o At the day of establishment must pay 40 (agriculture business) 60 (production and processing) 80 (services) The remainder must be paid within 1 year

Examples of Controlled Businesses 1 Agriculture plantation agriculture fishery 2 Manufacturing petroleum products leathers textile amp clothing papers

printing pesticides pharmaceutical products 3 Businesses related to environment eg wastewater treatment 4 Wholesale and retails of gasoline and petroleum products 5 Transportation 6 Hotel and Restaurant 7 Media and Publication 8 Finance and insurance 9 Legal accounting and tax services 10 Tourism 11 Education 12 Hospital clinic and medical services 13 Recreation (museum and amusement park)

35

Types of Investment ndash (2) Concession Business

Data source JETRO Compiled by World Business Advisory Center

Investment in Concession Business

Description

o An investment that requires a concession or specific authorization from the government to use the governmentrsquos property

o Some concession businesses requires authorization from the central government whereas the other requires only provincial government level of authorization for example

bull At least 5MW electricity generation project requires the central government authorization

bull Less than 5MW electricity generation projects requires only provincial government authorization

Examples of Concession Business

1 Mining 2 Electricity generation 3 Infrastructure

bull Telecommunication bull TV and radio station bull Road railway airport seaport waste disposal site

4 Businesses that use the government land bull Shopping center bull Tourist attraction bull Public park bull Hotel bull Forestry and Logging bull Plantation and Livestock

Register Capital

Requirements

o Must pay at least 20 of registered capital while remaining should be paid within 2 years

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Types of Investment in Lao PDR

36

Types of Investment ndash (3) Business Related to SEZ

Data source JETRO Compiled by World Business Advisory Center

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Types of Investment in Lao PDR

Investment in Business Related to SEZ

Description

o Business related to Special Economic Zone -gt an investment in building infrastructure for a new town

o Business related to Specific Economic Zone -gt an investment in infrastructure development for specific purpose projects such as industrial zone export zone tourist development zone etc

High Potential SEZs in Laos

o Vita Park Special Economic Zone (Vientiane)

o Savan-Seno Special Economic Zone (Savannakhet)

o Pakxe-Japan SME Specific Economic Zone (Champasak)

Special and Specific Economic Zones

1 Boten-Daenkham Specific Economic Zone 2 Luang Prabang Special Economic Zone 3 Golden Triangle Special Economic Zone 4 Thatluang Lake Specific Economic Zone 5 Longthanh Specific Economic Zone 6 Xaysettha Specific Economic Zone 7 Vita Park Special Economic Zone 8 Dongphosy Specific Economic Zone 9 Thakhek Specific Economic Zone 10 Poukiao Specific Economic Zone 11 Savan-Seno Special Economic Zone 12 Pakxe-Japan SME Specific Economic Zone

1

2

3

4

5 6

7

8

9 10

11

12

37

General Business

Concession Business

Business related to

SEZs

Procedure of Investment in Lao PDR

The investment approval procedure varies depending upon type of investment However all foreign investors must go through enterprise registration tax identification number registration and application for capital importation certificate

Apply at Ministry of Planning and

Investment

For developer apply at National Committee for Special Economic Zone

For investor apply at One-Stop Service Unit in

each SEZ

Get Concession

License

Get SEZ Concession

License

For controlled businesses apply for

approval at relevant Ministries

Get Approval License

Apply at Ministry of

Industry and Commerce

For non-controlled businesses

Get Enterprise

Registration Certificate

(ERC)

Apply for Tax

Identification Number TIN

at Tax Department Ministry of

Finance

Apply for Capital

Importation Certificate at Bank of Lao

PDR

Data source JETRO Compiled by World Business Advisory Center

38

Investment Tax Incentives ndash General Zone

Data source JETRO Compiled by World Business Advisory Center

Investment Tax Incentives in Lao PDR

Profit Tax Exemption Period

Level 1 High Promotion

Level 2 Moderate Promotion

Level 3 Low Promotion

Zone 1 10 years 6 years 4 years

Zone 2 6 years 4 years 2 years

Zone 3 4 years 2 years 1 years

Profit Tax Exemption Period by Promotion Sector and Zone

Promoted sectors Agriculture Industrial Handicrafts and Services

Type of Tax Exemption

General Zone Promotion Sector and Zone based Incentives 1 Special amp Specific Economic Zone

Tailor Made Incentives 2

Profit tax in next accounting year in case net profit is used for reinvestment (business

expansion)

Import duties for import of raw material equipment spare parts and

vehicles directly used for production

Export duties for general goods and

products (resource-based products should follow

associated laws)

Permission to carry forward losses to

three consecutive accounting years

39

Sector Period of

Profit Tax Exemption

Profit Tax Rate

After Tax Exemption Period

Hi-Tech Manufacturing 10 year 8

Manufacturing that exports at least 70 of production 10 year 8

Manufacturing that exports 30 - 60 of production 7 year 8

Manufacturing that exports 0 - 29 of production 5 year 8

Other 5 year 8

Investment amount of USD 2 million or more 10 year 8

Investment amount of USD 500000 - USD 2 million 8 year 8

Investment amount of USD 300000 - USD 500000 6 year 10

Investment amount of USD 150000 - USD 300000 4 year 10

Investment amount of USD 50000 - USD 150000 2 year 10

Export Laos products 5 year 10

International trade company 3 year 10

General trade company 2 year 10

a) Manufacturing

b) Service

c) Commerce

Personal Income Tax 5

Dividend Tax after Profit Tax Exemption Period

5

Import Duty Exemption for import of raw material equipment spare parts and

vehicles directly used for production

VAT Exemption for import products

Investment Tax Incentives ndash Special and Specific Economic Zone

Data source JETRO

Investment Tax Incentives in Lao PDR

General Zone Promotion Sector and Zone based Incentives 1 Special amp Specific Economic Zone

Tailor Made Incentives 2 Example of Tax Incentives in Savan-Seno SEZ

Other Tax Incentives

40

Non-Tax Incentives amp Trade Privileges

Data source JETRO

Non-Tax Incentives

Permission

Foreign nationals can undertake feasibility studies

Bring in foreign technicians experts and managers if qualified Lao nationals are not available

Lease land

General business up to 30 years from Lao citizen and up to 50 years from the government (renewable)

Investment in SEZ up to 75 years

Concession business upon negotiation with the government (at present there is an example of 99 years land lease)

Transfer leasehold interests and build on or make improvements or structures to a leased land

Guarantee against nationalization expropriation and requisition without compensation

Protection

Trade Privileges

ASEAN WTO GSP Bilateral trade agreement (over 18 countries)

o Argentina o Belarus o Bulgaria o Cambodia o China o Indonesia o India o Korea DPR o Kuwait

o Malaysia o Mongolia o Myanmar o Philippines o Russian

Federation o Thailand o Turkey o USA o Vietnam

41

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

42

Foreign Currency Exchange

Data source Bank of the Lao PDR

Laos Currency Kip (LAK)

Latest FX Rate (as of August 22 2018)

Remark THB and USD are widely accepted especially in the border trade area

USD 1 ~ LAK 8507

EUR 1 ~ LAK 9851

THB 1 ~ LAK 262

JPY 1 ~ LAK 77

CNY 1 ~ LAK 1193

43

KASIKORNTHAIBANK Service in Lao PDR

Retail Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Current deposit

Lending

Working capital loan

Long term loan

Bank guarantee

Project Financing

FX Services

Corporate Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Remittance

Remittance

Trade Finance Letter of Credit (LC) Standby Letter of Credit (SBLC)

44

KASIKORNTHAI BANK Limited

With establishment KASIKORNTHAIBANK

the first full-scale locally incorporated institution from Thailand is fully committed to support our clientsrsquo cross-border financing and transaction for their trade and investment activities in Lao PDR

45

KASIKORNTHAIBANK in Lao PDR Contacts

bull HEAD OFFICE Unit 12 Lane Xang Avenue Xiangngeun Village Chanthaboury District Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88905 Fax +856 21 253 336 wwwkasikornbankcomla

KASIKORNTHAI BANK Limited

bull PONESINUAN BRANCH

Ban Ponesinuan Unit 14 Sysattanak Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88826 Fax +856 21 410 889

Ms Piyanoot Sangsan Branch Manager KASIKORNTHAI BANK LIMITED Lane Xang Head Office E-mail piyanootskasikornbankcom

Mr Chatuporn Boozaya-Angool Branch Manager Ponesinuan Branch E-mail chatupornbkasikornbankcom

46

About AEC+ Business Advisory The AEC+ Business Advisory is set up by KASIKORNBANK to support businesses in their regional expansion across the ASEAN+3 market by providing local market intelligence and strategic business advice

What we do bull Offer customized and tailor-made advisory services bull Publish investment guides and industry reports bull Deliver in-depth insights via seminars bull Organize business trips to bring first-hand experience

Follow Us Visit our website at

AEC+ BUSINESS ADVISORY

Prepared by Mr Anoot Charoenkiattikul World Business Intelligence Specialist E-mail anootckasikornbankcom

httpswwwkasikornbankcominternational-businessenPagesHomeaspx

47

Page 35: LAO PDR - Facilitiesfuangfah.econ.cmu.ac.th/teacher/nisit/files/201808_LaoPDR_Investm… · • On August 7, the government of Laos announced the suspension of new hydropower project

35

Types of Investment ndash (2) Concession Business

Data source JETRO Compiled by World Business Advisory Center

Investment in Concession Business

Description

o An investment that requires a concession or specific authorization from the government to use the governmentrsquos property

o Some concession businesses requires authorization from the central government whereas the other requires only provincial government level of authorization for example

bull At least 5MW electricity generation project requires the central government authorization

bull Less than 5MW electricity generation projects requires only provincial government authorization

Examples of Concession Business

1 Mining 2 Electricity generation 3 Infrastructure

bull Telecommunication bull TV and radio station bull Road railway airport seaport waste disposal site

4 Businesses that use the government land bull Shopping center bull Tourist attraction bull Public park bull Hotel bull Forestry and Logging bull Plantation and Livestock

Register Capital

Requirements

o Must pay at least 20 of registered capital while remaining should be paid within 2 years

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Types of Investment in Lao PDR

36

Types of Investment ndash (3) Business Related to SEZ

Data source JETRO Compiled by World Business Advisory Center

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Types of Investment in Lao PDR

Investment in Business Related to SEZ

Description

o Business related to Special Economic Zone -gt an investment in building infrastructure for a new town

o Business related to Specific Economic Zone -gt an investment in infrastructure development for specific purpose projects such as industrial zone export zone tourist development zone etc

High Potential SEZs in Laos

o Vita Park Special Economic Zone (Vientiane)

o Savan-Seno Special Economic Zone (Savannakhet)

o Pakxe-Japan SME Specific Economic Zone (Champasak)

Special and Specific Economic Zones

1 Boten-Daenkham Specific Economic Zone 2 Luang Prabang Special Economic Zone 3 Golden Triangle Special Economic Zone 4 Thatluang Lake Specific Economic Zone 5 Longthanh Specific Economic Zone 6 Xaysettha Specific Economic Zone 7 Vita Park Special Economic Zone 8 Dongphosy Specific Economic Zone 9 Thakhek Specific Economic Zone 10 Poukiao Specific Economic Zone 11 Savan-Seno Special Economic Zone 12 Pakxe-Japan SME Specific Economic Zone

1

2

3

4

5 6

7

8

9 10

11

12

37

General Business

Concession Business

Business related to

SEZs

Procedure of Investment in Lao PDR

The investment approval procedure varies depending upon type of investment However all foreign investors must go through enterprise registration tax identification number registration and application for capital importation certificate

Apply at Ministry of Planning and

Investment

For developer apply at National Committee for Special Economic Zone

For investor apply at One-Stop Service Unit in

each SEZ

Get Concession

License

Get SEZ Concession

License

For controlled businesses apply for

approval at relevant Ministries

Get Approval License

Apply at Ministry of

Industry and Commerce

For non-controlled businesses

Get Enterprise

Registration Certificate

(ERC)

Apply for Tax

Identification Number TIN

at Tax Department Ministry of

Finance

Apply for Capital

Importation Certificate at Bank of Lao

PDR

Data source JETRO Compiled by World Business Advisory Center

38

Investment Tax Incentives ndash General Zone

Data source JETRO Compiled by World Business Advisory Center

Investment Tax Incentives in Lao PDR

Profit Tax Exemption Period

Level 1 High Promotion

Level 2 Moderate Promotion

Level 3 Low Promotion

Zone 1 10 years 6 years 4 years

Zone 2 6 years 4 years 2 years

Zone 3 4 years 2 years 1 years

Profit Tax Exemption Period by Promotion Sector and Zone

Promoted sectors Agriculture Industrial Handicrafts and Services

Type of Tax Exemption

General Zone Promotion Sector and Zone based Incentives 1 Special amp Specific Economic Zone

Tailor Made Incentives 2

Profit tax in next accounting year in case net profit is used for reinvestment (business

expansion)

Import duties for import of raw material equipment spare parts and

vehicles directly used for production

Export duties for general goods and

products (resource-based products should follow

associated laws)

Permission to carry forward losses to

three consecutive accounting years

39

Sector Period of

Profit Tax Exemption

Profit Tax Rate

After Tax Exemption Period

Hi-Tech Manufacturing 10 year 8

Manufacturing that exports at least 70 of production 10 year 8

Manufacturing that exports 30 - 60 of production 7 year 8

Manufacturing that exports 0 - 29 of production 5 year 8

Other 5 year 8

Investment amount of USD 2 million or more 10 year 8

Investment amount of USD 500000 - USD 2 million 8 year 8

Investment amount of USD 300000 - USD 500000 6 year 10

Investment amount of USD 150000 - USD 300000 4 year 10

Investment amount of USD 50000 - USD 150000 2 year 10

Export Laos products 5 year 10

International trade company 3 year 10

General trade company 2 year 10

a) Manufacturing

b) Service

c) Commerce

Personal Income Tax 5

Dividend Tax after Profit Tax Exemption Period

5

Import Duty Exemption for import of raw material equipment spare parts and

vehicles directly used for production

VAT Exemption for import products

Investment Tax Incentives ndash Special and Specific Economic Zone

Data source JETRO

Investment Tax Incentives in Lao PDR

General Zone Promotion Sector and Zone based Incentives 1 Special amp Specific Economic Zone

Tailor Made Incentives 2 Example of Tax Incentives in Savan-Seno SEZ

Other Tax Incentives

40

Non-Tax Incentives amp Trade Privileges

Data source JETRO

Non-Tax Incentives

Permission

Foreign nationals can undertake feasibility studies

Bring in foreign technicians experts and managers if qualified Lao nationals are not available

Lease land

General business up to 30 years from Lao citizen and up to 50 years from the government (renewable)

Investment in SEZ up to 75 years

Concession business upon negotiation with the government (at present there is an example of 99 years land lease)

Transfer leasehold interests and build on or make improvements or structures to a leased land

Guarantee against nationalization expropriation and requisition without compensation

Protection

Trade Privileges

ASEAN WTO GSP Bilateral trade agreement (over 18 countries)

o Argentina o Belarus o Bulgaria o Cambodia o China o Indonesia o India o Korea DPR o Kuwait

o Malaysia o Mongolia o Myanmar o Philippines o Russian

Federation o Thailand o Turkey o USA o Vietnam

41

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

42

Foreign Currency Exchange

Data source Bank of the Lao PDR

Laos Currency Kip (LAK)

Latest FX Rate (as of August 22 2018)

Remark THB and USD are widely accepted especially in the border trade area

USD 1 ~ LAK 8507

EUR 1 ~ LAK 9851

THB 1 ~ LAK 262

JPY 1 ~ LAK 77

CNY 1 ~ LAK 1193

43

KASIKORNTHAIBANK Service in Lao PDR

Retail Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Current deposit

Lending

Working capital loan

Long term loan

Bank guarantee

Project Financing

FX Services

Corporate Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Remittance

Remittance

Trade Finance Letter of Credit (LC) Standby Letter of Credit (SBLC)

44

KASIKORNTHAI BANK Limited

With establishment KASIKORNTHAIBANK

the first full-scale locally incorporated institution from Thailand is fully committed to support our clientsrsquo cross-border financing and transaction for their trade and investment activities in Lao PDR

45

KASIKORNTHAIBANK in Lao PDR Contacts

bull HEAD OFFICE Unit 12 Lane Xang Avenue Xiangngeun Village Chanthaboury District Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88905 Fax +856 21 253 336 wwwkasikornbankcomla

KASIKORNTHAI BANK Limited

bull PONESINUAN BRANCH

Ban Ponesinuan Unit 14 Sysattanak Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88826 Fax +856 21 410 889

Ms Piyanoot Sangsan Branch Manager KASIKORNTHAI BANK LIMITED Lane Xang Head Office E-mail piyanootskasikornbankcom

Mr Chatuporn Boozaya-Angool Branch Manager Ponesinuan Branch E-mail chatupornbkasikornbankcom

46

About AEC+ Business Advisory The AEC+ Business Advisory is set up by KASIKORNBANK to support businesses in their regional expansion across the ASEAN+3 market by providing local market intelligence and strategic business advice

What we do bull Offer customized and tailor-made advisory services bull Publish investment guides and industry reports bull Deliver in-depth insights via seminars bull Organize business trips to bring first-hand experience

Follow Us Visit our website at

AEC+ BUSINESS ADVISORY

Prepared by Mr Anoot Charoenkiattikul World Business Intelligence Specialist E-mail anootckasikornbankcom

httpswwwkasikornbankcominternational-businessenPagesHomeaspx

47

Page 36: LAO PDR - Facilitiesfuangfah.econ.cmu.ac.th/teacher/nisit/files/201808_LaoPDR_Investm… · • On August 7, the government of Laos announced the suspension of new hydropower project

36

Types of Investment ndash (3) Business Related to SEZ

Data source JETRO Compiled by World Business Advisory Center

General Business 1 Concession

Business 2 Business

Related to SEZ 3 Types of Investment in Lao PDR

Investment in Business Related to SEZ

Description

o Business related to Special Economic Zone -gt an investment in building infrastructure for a new town

o Business related to Specific Economic Zone -gt an investment in infrastructure development for specific purpose projects such as industrial zone export zone tourist development zone etc

High Potential SEZs in Laos

o Vita Park Special Economic Zone (Vientiane)

o Savan-Seno Special Economic Zone (Savannakhet)

o Pakxe-Japan SME Specific Economic Zone (Champasak)

Special and Specific Economic Zones

1 Boten-Daenkham Specific Economic Zone 2 Luang Prabang Special Economic Zone 3 Golden Triangle Special Economic Zone 4 Thatluang Lake Specific Economic Zone 5 Longthanh Specific Economic Zone 6 Xaysettha Specific Economic Zone 7 Vita Park Special Economic Zone 8 Dongphosy Specific Economic Zone 9 Thakhek Specific Economic Zone 10 Poukiao Specific Economic Zone 11 Savan-Seno Special Economic Zone 12 Pakxe-Japan SME Specific Economic Zone

1

2

3

4

5 6

7

8

9 10

11

12

37

General Business

Concession Business

Business related to

SEZs

Procedure of Investment in Lao PDR

The investment approval procedure varies depending upon type of investment However all foreign investors must go through enterprise registration tax identification number registration and application for capital importation certificate

Apply at Ministry of Planning and

Investment

For developer apply at National Committee for Special Economic Zone

For investor apply at One-Stop Service Unit in

each SEZ

Get Concession

License

Get SEZ Concession

License

For controlled businesses apply for

approval at relevant Ministries

Get Approval License

Apply at Ministry of

Industry and Commerce

For non-controlled businesses

Get Enterprise

Registration Certificate

(ERC)

Apply for Tax

Identification Number TIN

at Tax Department Ministry of

Finance

Apply for Capital

Importation Certificate at Bank of Lao

PDR

Data source JETRO Compiled by World Business Advisory Center

38

Investment Tax Incentives ndash General Zone

Data source JETRO Compiled by World Business Advisory Center

Investment Tax Incentives in Lao PDR

Profit Tax Exemption Period

Level 1 High Promotion

Level 2 Moderate Promotion

Level 3 Low Promotion

Zone 1 10 years 6 years 4 years

Zone 2 6 years 4 years 2 years

Zone 3 4 years 2 years 1 years

Profit Tax Exemption Period by Promotion Sector and Zone

Promoted sectors Agriculture Industrial Handicrafts and Services

Type of Tax Exemption

General Zone Promotion Sector and Zone based Incentives 1 Special amp Specific Economic Zone

Tailor Made Incentives 2

Profit tax in next accounting year in case net profit is used for reinvestment (business

expansion)

Import duties for import of raw material equipment spare parts and

vehicles directly used for production

Export duties for general goods and

products (resource-based products should follow

associated laws)

Permission to carry forward losses to

three consecutive accounting years

39

Sector Period of

Profit Tax Exemption

Profit Tax Rate

After Tax Exemption Period

Hi-Tech Manufacturing 10 year 8

Manufacturing that exports at least 70 of production 10 year 8

Manufacturing that exports 30 - 60 of production 7 year 8

Manufacturing that exports 0 - 29 of production 5 year 8

Other 5 year 8

Investment amount of USD 2 million or more 10 year 8

Investment amount of USD 500000 - USD 2 million 8 year 8

Investment amount of USD 300000 - USD 500000 6 year 10

Investment amount of USD 150000 - USD 300000 4 year 10

Investment amount of USD 50000 - USD 150000 2 year 10

Export Laos products 5 year 10

International trade company 3 year 10

General trade company 2 year 10

a) Manufacturing

b) Service

c) Commerce

Personal Income Tax 5

Dividend Tax after Profit Tax Exemption Period

5

Import Duty Exemption for import of raw material equipment spare parts and

vehicles directly used for production

VAT Exemption for import products

Investment Tax Incentives ndash Special and Specific Economic Zone

Data source JETRO

Investment Tax Incentives in Lao PDR

General Zone Promotion Sector and Zone based Incentives 1 Special amp Specific Economic Zone

Tailor Made Incentives 2 Example of Tax Incentives in Savan-Seno SEZ

Other Tax Incentives

40

Non-Tax Incentives amp Trade Privileges

Data source JETRO

Non-Tax Incentives

Permission

Foreign nationals can undertake feasibility studies

Bring in foreign technicians experts and managers if qualified Lao nationals are not available

Lease land

General business up to 30 years from Lao citizen and up to 50 years from the government (renewable)

Investment in SEZ up to 75 years

Concession business upon negotiation with the government (at present there is an example of 99 years land lease)

Transfer leasehold interests and build on or make improvements or structures to a leased land

Guarantee against nationalization expropriation and requisition without compensation

Protection

Trade Privileges

ASEAN WTO GSP Bilateral trade agreement (over 18 countries)

o Argentina o Belarus o Bulgaria o Cambodia o China o Indonesia o India o Korea DPR o Kuwait

o Malaysia o Mongolia o Myanmar o Philippines o Russian

Federation o Thailand o Turkey o USA o Vietnam

41

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

42

Foreign Currency Exchange

Data source Bank of the Lao PDR

Laos Currency Kip (LAK)

Latest FX Rate (as of August 22 2018)

Remark THB and USD are widely accepted especially in the border trade area

USD 1 ~ LAK 8507

EUR 1 ~ LAK 9851

THB 1 ~ LAK 262

JPY 1 ~ LAK 77

CNY 1 ~ LAK 1193

43

KASIKORNTHAIBANK Service in Lao PDR

Retail Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Current deposit

Lending

Working capital loan

Long term loan

Bank guarantee

Project Financing

FX Services

Corporate Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Remittance

Remittance

Trade Finance Letter of Credit (LC) Standby Letter of Credit (SBLC)

44

KASIKORNTHAI BANK Limited

With establishment KASIKORNTHAIBANK

the first full-scale locally incorporated institution from Thailand is fully committed to support our clientsrsquo cross-border financing and transaction for their trade and investment activities in Lao PDR

45

KASIKORNTHAIBANK in Lao PDR Contacts

bull HEAD OFFICE Unit 12 Lane Xang Avenue Xiangngeun Village Chanthaboury District Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88905 Fax +856 21 253 336 wwwkasikornbankcomla

KASIKORNTHAI BANK Limited

bull PONESINUAN BRANCH

Ban Ponesinuan Unit 14 Sysattanak Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88826 Fax +856 21 410 889

Ms Piyanoot Sangsan Branch Manager KASIKORNTHAI BANK LIMITED Lane Xang Head Office E-mail piyanootskasikornbankcom

Mr Chatuporn Boozaya-Angool Branch Manager Ponesinuan Branch E-mail chatupornbkasikornbankcom

46

About AEC+ Business Advisory The AEC+ Business Advisory is set up by KASIKORNBANK to support businesses in their regional expansion across the ASEAN+3 market by providing local market intelligence and strategic business advice

What we do bull Offer customized and tailor-made advisory services bull Publish investment guides and industry reports bull Deliver in-depth insights via seminars bull Organize business trips to bring first-hand experience

Follow Us Visit our website at

AEC+ BUSINESS ADVISORY

Prepared by Mr Anoot Charoenkiattikul World Business Intelligence Specialist E-mail anootckasikornbankcom

httpswwwkasikornbankcominternational-businessenPagesHomeaspx

47

Page 37: LAO PDR - Facilitiesfuangfah.econ.cmu.ac.th/teacher/nisit/files/201808_LaoPDR_Investm… · • On August 7, the government of Laos announced the suspension of new hydropower project

37

General Business

Concession Business

Business related to

SEZs

Procedure of Investment in Lao PDR

The investment approval procedure varies depending upon type of investment However all foreign investors must go through enterprise registration tax identification number registration and application for capital importation certificate

Apply at Ministry of Planning and

Investment

For developer apply at National Committee for Special Economic Zone

For investor apply at One-Stop Service Unit in

each SEZ

Get Concession

License

Get SEZ Concession

License

For controlled businesses apply for

approval at relevant Ministries

Get Approval License

Apply at Ministry of

Industry and Commerce

For non-controlled businesses

Get Enterprise

Registration Certificate

(ERC)

Apply for Tax

Identification Number TIN

at Tax Department Ministry of

Finance

Apply for Capital

Importation Certificate at Bank of Lao

PDR

Data source JETRO Compiled by World Business Advisory Center

38

Investment Tax Incentives ndash General Zone

Data source JETRO Compiled by World Business Advisory Center

Investment Tax Incentives in Lao PDR

Profit Tax Exemption Period

Level 1 High Promotion

Level 2 Moderate Promotion

Level 3 Low Promotion

Zone 1 10 years 6 years 4 years

Zone 2 6 years 4 years 2 years

Zone 3 4 years 2 years 1 years

Profit Tax Exemption Period by Promotion Sector and Zone

Promoted sectors Agriculture Industrial Handicrafts and Services

Type of Tax Exemption

General Zone Promotion Sector and Zone based Incentives 1 Special amp Specific Economic Zone

Tailor Made Incentives 2

Profit tax in next accounting year in case net profit is used for reinvestment (business

expansion)

Import duties for import of raw material equipment spare parts and

vehicles directly used for production

Export duties for general goods and

products (resource-based products should follow

associated laws)

Permission to carry forward losses to

three consecutive accounting years

39

Sector Period of

Profit Tax Exemption

Profit Tax Rate

After Tax Exemption Period

Hi-Tech Manufacturing 10 year 8

Manufacturing that exports at least 70 of production 10 year 8

Manufacturing that exports 30 - 60 of production 7 year 8

Manufacturing that exports 0 - 29 of production 5 year 8

Other 5 year 8

Investment amount of USD 2 million or more 10 year 8

Investment amount of USD 500000 - USD 2 million 8 year 8

Investment amount of USD 300000 - USD 500000 6 year 10

Investment amount of USD 150000 - USD 300000 4 year 10

Investment amount of USD 50000 - USD 150000 2 year 10

Export Laos products 5 year 10

International trade company 3 year 10

General trade company 2 year 10

a) Manufacturing

b) Service

c) Commerce

Personal Income Tax 5

Dividend Tax after Profit Tax Exemption Period

5

Import Duty Exemption for import of raw material equipment spare parts and

vehicles directly used for production

VAT Exemption for import products

Investment Tax Incentives ndash Special and Specific Economic Zone

Data source JETRO

Investment Tax Incentives in Lao PDR

General Zone Promotion Sector and Zone based Incentives 1 Special amp Specific Economic Zone

Tailor Made Incentives 2 Example of Tax Incentives in Savan-Seno SEZ

Other Tax Incentives

40

Non-Tax Incentives amp Trade Privileges

Data source JETRO

Non-Tax Incentives

Permission

Foreign nationals can undertake feasibility studies

Bring in foreign technicians experts and managers if qualified Lao nationals are not available

Lease land

General business up to 30 years from Lao citizen and up to 50 years from the government (renewable)

Investment in SEZ up to 75 years

Concession business upon negotiation with the government (at present there is an example of 99 years land lease)

Transfer leasehold interests and build on or make improvements or structures to a leased land

Guarantee against nationalization expropriation and requisition without compensation

Protection

Trade Privileges

ASEAN WTO GSP Bilateral trade agreement (over 18 countries)

o Argentina o Belarus o Bulgaria o Cambodia o China o Indonesia o India o Korea DPR o Kuwait

o Malaysia o Mongolia o Myanmar o Philippines o Russian

Federation o Thailand o Turkey o USA o Vietnam

41

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

42

Foreign Currency Exchange

Data source Bank of the Lao PDR

Laos Currency Kip (LAK)

Latest FX Rate (as of August 22 2018)

Remark THB and USD are widely accepted especially in the border trade area

USD 1 ~ LAK 8507

EUR 1 ~ LAK 9851

THB 1 ~ LAK 262

JPY 1 ~ LAK 77

CNY 1 ~ LAK 1193

43

KASIKORNTHAIBANK Service in Lao PDR

Retail Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Current deposit

Lending

Working capital loan

Long term loan

Bank guarantee

Project Financing

FX Services

Corporate Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Remittance

Remittance

Trade Finance Letter of Credit (LC) Standby Letter of Credit (SBLC)

44

KASIKORNTHAI BANK Limited

With establishment KASIKORNTHAIBANK

the first full-scale locally incorporated institution from Thailand is fully committed to support our clientsrsquo cross-border financing and transaction for their trade and investment activities in Lao PDR

45

KASIKORNTHAIBANK in Lao PDR Contacts

bull HEAD OFFICE Unit 12 Lane Xang Avenue Xiangngeun Village Chanthaboury District Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88905 Fax +856 21 253 336 wwwkasikornbankcomla

KASIKORNTHAI BANK Limited

bull PONESINUAN BRANCH

Ban Ponesinuan Unit 14 Sysattanak Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88826 Fax +856 21 410 889

Ms Piyanoot Sangsan Branch Manager KASIKORNTHAI BANK LIMITED Lane Xang Head Office E-mail piyanootskasikornbankcom

Mr Chatuporn Boozaya-Angool Branch Manager Ponesinuan Branch E-mail chatupornbkasikornbankcom

46

About AEC+ Business Advisory The AEC+ Business Advisory is set up by KASIKORNBANK to support businesses in their regional expansion across the ASEAN+3 market by providing local market intelligence and strategic business advice

What we do bull Offer customized and tailor-made advisory services bull Publish investment guides and industry reports bull Deliver in-depth insights via seminars bull Organize business trips to bring first-hand experience

Follow Us Visit our website at

AEC+ BUSINESS ADVISORY

Prepared by Mr Anoot Charoenkiattikul World Business Intelligence Specialist E-mail anootckasikornbankcom

httpswwwkasikornbankcominternational-businessenPagesHomeaspx

47

Page 38: LAO PDR - Facilitiesfuangfah.econ.cmu.ac.th/teacher/nisit/files/201808_LaoPDR_Investm… · • On August 7, the government of Laos announced the suspension of new hydropower project

38

Investment Tax Incentives ndash General Zone

Data source JETRO Compiled by World Business Advisory Center

Investment Tax Incentives in Lao PDR

Profit Tax Exemption Period

Level 1 High Promotion

Level 2 Moderate Promotion

Level 3 Low Promotion

Zone 1 10 years 6 years 4 years

Zone 2 6 years 4 years 2 years

Zone 3 4 years 2 years 1 years

Profit Tax Exemption Period by Promotion Sector and Zone

Promoted sectors Agriculture Industrial Handicrafts and Services

Type of Tax Exemption

General Zone Promotion Sector and Zone based Incentives 1 Special amp Specific Economic Zone

Tailor Made Incentives 2

Profit tax in next accounting year in case net profit is used for reinvestment (business

expansion)

Import duties for import of raw material equipment spare parts and

vehicles directly used for production

Export duties for general goods and

products (resource-based products should follow

associated laws)

Permission to carry forward losses to

three consecutive accounting years

39

Sector Period of

Profit Tax Exemption

Profit Tax Rate

After Tax Exemption Period

Hi-Tech Manufacturing 10 year 8

Manufacturing that exports at least 70 of production 10 year 8

Manufacturing that exports 30 - 60 of production 7 year 8

Manufacturing that exports 0 - 29 of production 5 year 8

Other 5 year 8

Investment amount of USD 2 million or more 10 year 8

Investment amount of USD 500000 - USD 2 million 8 year 8

Investment amount of USD 300000 - USD 500000 6 year 10

Investment amount of USD 150000 - USD 300000 4 year 10

Investment amount of USD 50000 - USD 150000 2 year 10

Export Laos products 5 year 10

International trade company 3 year 10

General trade company 2 year 10

a) Manufacturing

b) Service

c) Commerce

Personal Income Tax 5

Dividend Tax after Profit Tax Exemption Period

5

Import Duty Exemption for import of raw material equipment spare parts and

vehicles directly used for production

VAT Exemption for import products

Investment Tax Incentives ndash Special and Specific Economic Zone

Data source JETRO

Investment Tax Incentives in Lao PDR

General Zone Promotion Sector and Zone based Incentives 1 Special amp Specific Economic Zone

Tailor Made Incentives 2 Example of Tax Incentives in Savan-Seno SEZ

Other Tax Incentives

40

Non-Tax Incentives amp Trade Privileges

Data source JETRO

Non-Tax Incentives

Permission

Foreign nationals can undertake feasibility studies

Bring in foreign technicians experts and managers if qualified Lao nationals are not available

Lease land

General business up to 30 years from Lao citizen and up to 50 years from the government (renewable)

Investment in SEZ up to 75 years

Concession business upon negotiation with the government (at present there is an example of 99 years land lease)

Transfer leasehold interests and build on or make improvements or structures to a leased land

Guarantee against nationalization expropriation and requisition without compensation

Protection

Trade Privileges

ASEAN WTO GSP Bilateral trade agreement (over 18 countries)

o Argentina o Belarus o Bulgaria o Cambodia o China o Indonesia o India o Korea DPR o Kuwait

o Malaysia o Mongolia o Myanmar o Philippines o Russian

Federation o Thailand o Turkey o USA o Vietnam

41

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

42

Foreign Currency Exchange

Data source Bank of the Lao PDR

Laos Currency Kip (LAK)

Latest FX Rate (as of August 22 2018)

Remark THB and USD are widely accepted especially in the border trade area

USD 1 ~ LAK 8507

EUR 1 ~ LAK 9851

THB 1 ~ LAK 262

JPY 1 ~ LAK 77

CNY 1 ~ LAK 1193

43

KASIKORNTHAIBANK Service in Lao PDR

Retail Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Current deposit

Lending

Working capital loan

Long term loan

Bank guarantee

Project Financing

FX Services

Corporate Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Remittance

Remittance

Trade Finance Letter of Credit (LC) Standby Letter of Credit (SBLC)

44

KASIKORNTHAI BANK Limited

With establishment KASIKORNTHAIBANK

the first full-scale locally incorporated institution from Thailand is fully committed to support our clientsrsquo cross-border financing and transaction for their trade and investment activities in Lao PDR

45

KASIKORNTHAIBANK in Lao PDR Contacts

bull HEAD OFFICE Unit 12 Lane Xang Avenue Xiangngeun Village Chanthaboury District Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88905 Fax +856 21 253 336 wwwkasikornbankcomla

KASIKORNTHAI BANK Limited

bull PONESINUAN BRANCH

Ban Ponesinuan Unit 14 Sysattanak Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88826 Fax +856 21 410 889

Ms Piyanoot Sangsan Branch Manager KASIKORNTHAI BANK LIMITED Lane Xang Head Office E-mail piyanootskasikornbankcom

Mr Chatuporn Boozaya-Angool Branch Manager Ponesinuan Branch E-mail chatupornbkasikornbankcom

46

About AEC+ Business Advisory The AEC+ Business Advisory is set up by KASIKORNBANK to support businesses in their regional expansion across the ASEAN+3 market by providing local market intelligence and strategic business advice

What we do bull Offer customized and tailor-made advisory services bull Publish investment guides and industry reports bull Deliver in-depth insights via seminars bull Organize business trips to bring first-hand experience

Follow Us Visit our website at

AEC+ BUSINESS ADVISORY

Prepared by Mr Anoot Charoenkiattikul World Business Intelligence Specialist E-mail anootckasikornbankcom

httpswwwkasikornbankcominternational-businessenPagesHomeaspx

47

Page 39: LAO PDR - Facilitiesfuangfah.econ.cmu.ac.th/teacher/nisit/files/201808_LaoPDR_Investm… · • On August 7, the government of Laos announced the suspension of new hydropower project

39

Sector Period of

Profit Tax Exemption

Profit Tax Rate

After Tax Exemption Period

Hi-Tech Manufacturing 10 year 8

Manufacturing that exports at least 70 of production 10 year 8

Manufacturing that exports 30 - 60 of production 7 year 8

Manufacturing that exports 0 - 29 of production 5 year 8

Other 5 year 8

Investment amount of USD 2 million or more 10 year 8

Investment amount of USD 500000 - USD 2 million 8 year 8

Investment amount of USD 300000 - USD 500000 6 year 10

Investment amount of USD 150000 - USD 300000 4 year 10

Investment amount of USD 50000 - USD 150000 2 year 10

Export Laos products 5 year 10

International trade company 3 year 10

General trade company 2 year 10

a) Manufacturing

b) Service

c) Commerce

Personal Income Tax 5

Dividend Tax after Profit Tax Exemption Period

5

Import Duty Exemption for import of raw material equipment spare parts and

vehicles directly used for production

VAT Exemption for import products

Investment Tax Incentives ndash Special and Specific Economic Zone

Data source JETRO

Investment Tax Incentives in Lao PDR

General Zone Promotion Sector and Zone based Incentives 1 Special amp Specific Economic Zone

Tailor Made Incentives 2 Example of Tax Incentives in Savan-Seno SEZ

Other Tax Incentives

40

Non-Tax Incentives amp Trade Privileges

Data source JETRO

Non-Tax Incentives

Permission

Foreign nationals can undertake feasibility studies

Bring in foreign technicians experts and managers if qualified Lao nationals are not available

Lease land

General business up to 30 years from Lao citizen and up to 50 years from the government (renewable)

Investment in SEZ up to 75 years

Concession business upon negotiation with the government (at present there is an example of 99 years land lease)

Transfer leasehold interests and build on or make improvements or structures to a leased land

Guarantee against nationalization expropriation and requisition without compensation

Protection

Trade Privileges

ASEAN WTO GSP Bilateral trade agreement (over 18 countries)

o Argentina o Belarus o Bulgaria o Cambodia o China o Indonesia o India o Korea DPR o Kuwait

o Malaysia o Mongolia o Myanmar o Philippines o Russian

Federation o Thailand o Turkey o USA o Vietnam

41

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

42

Foreign Currency Exchange

Data source Bank of the Lao PDR

Laos Currency Kip (LAK)

Latest FX Rate (as of August 22 2018)

Remark THB and USD are widely accepted especially in the border trade area

USD 1 ~ LAK 8507

EUR 1 ~ LAK 9851

THB 1 ~ LAK 262

JPY 1 ~ LAK 77

CNY 1 ~ LAK 1193

43

KASIKORNTHAIBANK Service in Lao PDR

Retail Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Current deposit

Lending

Working capital loan

Long term loan

Bank guarantee

Project Financing

FX Services

Corporate Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Remittance

Remittance

Trade Finance Letter of Credit (LC) Standby Letter of Credit (SBLC)

44

KASIKORNTHAI BANK Limited

With establishment KASIKORNTHAIBANK

the first full-scale locally incorporated institution from Thailand is fully committed to support our clientsrsquo cross-border financing and transaction for their trade and investment activities in Lao PDR

45

KASIKORNTHAIBANK in Lao PDR Contacts

bull HEAD OFFICE Unit 12 Lane Xang Avenue Xiangngeun Village Chanthaboury District Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88905 Fax +856 21 253 336 wwwkasikornbankcomla

KASIKORNTHAI BANK Limited

bull PONESINUAN BRANCH

Ban Ponesinuan Unit 14 Sysattanak Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88826 Fax +856 21 410 889

Ms Piyanoot Sangsan Branch Manager KASIKORNTHAI BANK LIMITED Lane Xang Head Office E-mail piyanootskasikornbankcom

Mr Chatuporn Boozaya-Angool Branch Manager Ponesinuan Branch E-mail chatupornbkasikornbankcom

46

About AEC+ Business Advisory The AEC+ Business Advisory is set up by KASIKORNBANK to support businesses in their regional expansion across the ASEAN+3 market by providing local market intelligence and strategic business advice

What we do bull Offer customized and tailor-made advisory services bull Publish investment guides and industry reports bull Deliver in-depth insights via seminars bull Organize business trips to bring first-hand experience

Follow Us Visit our website at

AEC+ BUSINESS ADVISORY

Prepared by Mr Anoot Charoenkiattikul World Business Intelligence Specialist E-mail anootckasikornbankcom

httpswwwkasikornbankcominternational-businessenPagesHomeaspx

47

Page 40: LAO PDR - Facilitiesfuangfah.econ.cmu.ac.th/teacher/nisit/files/201808_LaoPDR_Investm… · • On August 7, the government of Laos announced the suspension of new hydropower project

40

Non-Tax Incentives amp Trade Privileges

Data source JETRO

Non-Tax Incentives

Permission

Foreign nationals can undertake feasibility studies

Bring in foreign technicians experts and managers if qualified Lao nationals are not available

Lease land

General business up to 30 years from Lao citizen and up to 50 years from the government (renewable)

Investment in SEZ up to 75 years

Concession business upon negotiation with the government (at present there is an example of 99 years land lease)

Transfer leasehold interests and build on or make improvements or structures to a leased land

Guarantee against nationalization expropriation and requisition without compensation

Protection

Trade Privileges

ASEAN WTO GSP Bilateral trade agreement (over 18 countries)

o Argentina o Belarus o Bulgaria o Cambodia o China o Indonesia o India o Korea DPR o Kuwait

o Malaysia o Mongolia o Myanmar o Philippines o Russian

Federation o Thailand o Turkey o USA o Vietnam

41

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

42

Foreign Currency Exchange

Data source Bank of the Lao PDR

Laos Currency Kip (LAK)

Latest FX Rate (as of August 22 2018)

Remark THB and USD are widely accepted especially in the border trade area

USD 1 ~ LAK 8507

EUR 1 ~ LAK 9851

THB 1 ~ LAK 262

JPY 1 ~ LAK 77

CNY 1 ~ LAK 1193

43

KASIKORNTHAIBANK Service in Lao PDR

Retail Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Current deposit

Lending

Working capital loan

Long term loan

Bank guarantee

Project Financing

FX Services

Corporate Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Remittance

Remittance

Trade Finance Letter of Credit (LC) Standby Letter of Credit (SBLC)

44

KASIKORNTHAI BANK Limited

With establishment KASIKORNTHAIBANK

the first full-scale locally incorporated institution from Thailand is fully committed to support our clientsrsquo cross-border financing and transaction for their trade and investment activities in Lao PDR

45

KASIKORNTHAIBANK in Lao PDR Contacts

bull HEAD OFFICE Unit 12 Lane Xang Avenue Xiangngeun Village Chanthaboury District Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88905 Fax +856 21 253 336 wwwkasikornbankcomla

KASIKORNTHAI BANK Limited

bull PONESINUAN BRANCH

Ban Ponesinuan Unit 14 Sysattanak Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88826 Fax +856 21 410 889

Ms Piyanoot Sangsan Branch Manager KASIKORNTHAI BANK LIMITED Lane Xang Head Office E-mail piyanootskasikornbankcom

Mr Chatuporn Boozaya-Angool Branch Manager Ponesinuan Branch E-mail chatupornbkasikornbankcom

46

About AEC+ Business Advisory The AEC+ Business Advisory is set up by KASIKORNBANK to support businesses in their regional expansion across the ASEAN+3 market by providing local market intelligence and strategic business advice

What we do bull Offer customized and tailor-made advisory services bull Publish investment guides and industry reports bull Deliver in-depth insights via seminars bull Organize business trips to bring first-hand experience

Follow Us Visit our website at

AEC+ BUSINESS ADVISORY

Prepared by Mr Anoot Charoenkiattikul World Business Intelligence Specialist E-mail anootckasikornbankcom

httpswwwkasikornbankcominternational-businessenPagesHomeaspx

47

Page 41: LAO PDR - Facilitiesfuangfah.econ.cmu.ac.th/teacher/nisit/files/201808_LaoPDR_Investm… · • On August 7, the government of Laos announced the suspension of new hydropower project

41

Country amp Economic Overview

Key Industries amp Opportunities

Doing Business in Lao PDR

KASIKORNBANKrsquos Support

Table of Contents

42

Foreign Currency Exchange

Data source Bank of the Lao PDR

Laos Currency Kip (LAK)

Latest FX Rate (as of August 22 2018)

Remark THB and USD are widely accepted especially in the border trade area

USD 1 ~ LAK 8507

EUR 1 ~ LAK 9851

THB 1 ~ LAK 262

JPY 1 ~ LAK 77

CNY 1 ~ LAK 1193

43

KASIKORNTHAIBANK Service in Lao PDR

Retail Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Current deposit

Lending

Working capital loan

Long term loan

Bank guarantee

Project Financing

FX Services

Corporate Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Remittance

Remittance

Trade Finance Letter of Credit (LC) Standby Letter of Credit (SBLC)

44

KASIKORNTHAI BANK Limited

With establishment KASIKORNTHAIBANK

the first full-scale locally incorporated institution from Thailand is fully committed to support our clientsrsquo cross-border financing and transaction for their trade and investment activities in Lao PDR

45

KASIKORNTHAIBANK in Lao PDR Contacts

bull HEAD OFFICE Unit 12 Lane Xang Avenue Xiangngeun Village Chanthaboury District Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88905 Fax +856 21 253 336 wwwkasikornbankcomla

KASIKORNTHAI BANK Limited

bull PONESINUAN BRANCH

Ban Ponesinuan Unit 14 Sysattanak Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88826 Fax +856 21 410 889

Ms Piyanoot Sangsan Branch Manager KASIKORNTHAI BANK LIMITED Lane Xang Head Office E-mail piyanootskasikornbankcom

Mr Chatuporn Boozaya-Angool Branch Manager Ponesinuan Branch E-mail chatupornbkasikornbankcom

46

About AEC+ Business Advisory The AEC+ Business Advisory is set up by KASIKORNBANK to support businesses in their regional expansion across the ASEAN+3 market by providing local market intelligence and strategic business advice

What we do bull Offer customized and tailor-made advisory services bull Publish investment guides and industry reports bull Deliver in-depth insights via seminars bull Organize business trips to bring first-hand experience

Follow Us Visit our website at

AEC+ BUSINESS ADVISORY

Prepared by Mr Anoot Charoenkiattikul World Business Intelligence Specialist E-mail anootckasikornbankcom

httpswwwkasikornbankcominternational-businessenPagesHomeaspx

47

Page 42: LAO PDR - Facilitiesfuangfah.econ.cmu.ac.th/teacher/nisit/files/201808_LaoPDR_Investm… · • On August 7, the government of Laos announced the suspension of new hydropower project

42

Foreign Currency Exchange

Data source Bank of the Lao PDR

Laos Currency Kip (LAK)

Latest FX Rate (as of August 22 2018)

Remark THB and USD are widely accepted especially in the border trade area

USD 1 ~ LAK 8507

EUR 1 ~ LAK 9851

THB 1 ~ LAK 262

JPY 1 ~ LAK 77

CNY 1 ~ LAK 1193

43

KASIKORNTHAIBANK Service in Lao PDR

Retail Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Current deposit

Lending

Working capital loan

Long term loan

Bank guarantee

Project Financing

FX Services

Corporate Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Remittance

Remittance

Trade Finance Letter of Credit (LC) Standby Letter of Credit (SBLC)

44

KASIKORNTHAI BANK Limited

With establishment KASIKORNTHAIBANK

the first full-scale locally incorporated institution from Thailand is fully committed to support our clientsrsquo cross-border financing and transaction for their trade and investment activities in Lao PDR

45

KASIKORNTHAIBANK in Lao PDR Contacts

bull HEAD OFFICE Unit 12 Lane Xang Avenue Xiangngeun Village Chanthaboury District Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88905 Fax +856 21 253 336 wwwkasikornbankcomla

KASIKORNTHAI BANK Limited

bull PONESINUAN BRANCH

Ban Ponesinuan Unit 14 Sysattanak Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88826 Fax +856 21 410 889

Ms Piyanoot Sangsan Branch Manager KASIKORNTHAI BANK LIMITED Lane Xang Head Office E-mail piyanootskasikornbankcom

Mr Chatuporn Boozaya-Angool Branch Manager Ponesinuan Branch E-mail chatupornbkasikornbankcom

46

About AEC+ Business Advisory The AEC+ Business Advisory is set up by KASIKORNBANK to support businesses in their regional expansion across the ASEAN+3 market by providing local market intelligence and strategic business advice

What we do bull Offer customized and tailor-made advisory services bull Publish investment guides and industry reports bull Deliver in-depth insights via seminars bull Organize business trips to bring first-hand experience

Follow Us Visit our website at

AEC+ BUSINESS ADVISORY

Prepared by Mr Anoot Charoenkiattikul World Business Intelligence Specialist E-mail anootckasikornbankcom

httpswwwkasikornbankcominternational-businessenPagesHomeaspx

47

Page 43: LAO PDR - Facilitiesfuangfah.econ.cmu.ac.th/teacher/nisit/files/201808_LaoPDR_Investm… · • On August 7, the government of Laos announced the suspension of new hydropower project

43

KASIKORNTHAIBANK Service in Lao PDR

Retail Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Current deposit

Lending

Working capital loan

Long term loan

Bank guarantee

Project Financing

FX Services

Corporate Banking

Bank Accounts (LAK THB USD)

Savings account

Term deposit

Remittance

Remittance

Trade Finance Letter of Credit (LC) Standby Letter of Credit (SBLC)

44

KASIKORNTHAI BANK Limited

With establishment KASIKORNTHAIBANK

the first full-scale locally incorporated institution from Thailand is fully committed to support our clientsrsquo cross-border financing and transaction for their trade and investment activities in Lao PDR

45

KASIKORNTHAIBANK in Lao PDR Contacts

bull HEAD OFFICE Unit 12 Lane Xang Avenue Xiangngeun Village Chanthaboury District Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88905 Fax +856 21 253 336 wwwkasikornbankcomla

KASIKORNTHAI BANK Limited

bull PONESINUAN BRANCH

Ban Ponesinuan Unit 14 Sysattanak Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88826 Fax +856 21 410 889

Ms Piyanoot Sangsan Branch Manager KASIKORNTHAI BANK LIMITED Lane Xang Head Office E-mail piyanootskasikornbankcom

Mr Chatuporn Boozaya-Angool Branch Manager Ponesinuan Branch E-mail chatupornbkasikornbankcom

46

About AEC+ Business Advisory The AEC+ Business Advisory is set up by KASIKORNBANK to support businesses in their regional expansion across the ASEAN+3 market by providing local market intelligence and strategic business advice

What we do bull Offer customized and tailor-made advisory services bull Publish investment guides and industry reports bull Deliver in-depth insights via seminars bull Organize business trips to bring first-hand experience

Follow Us Visit our website at

AEC+ BUSINESS ADVISORY

Prepared by Mr Anoot Charoenkiattikul World Business Intelligence Specialist E-mail anootckasikornbankcom

httpswwwkasikornbankcominternational-businessenPagesHomeaspx

47

Page 44: LAO PDR - Facilitiesfuangfah.econ.cmu.ac.th/teacher/nisit/files/201808_LaoPDR_Investm… · • On August 7, the government of Laos announced the suspension of new hydropower project

44

KASIKORNTHAI BANK Limited

With establishment KASIKORNTHAIBANK

the first full-scale locally incorporated institution from Thailand is fully committed to support our clientsrsquo cross-border financing and transaction for their trade and investment activities in Lao PDR

45

KASIKORNTHAIBANK in Lao PDR Contacts

bull HEAD OFFICE Unit 12 Lane Xang Avenue Xiangngeun Village Chanthaboury District Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88905 Fax +856 21 253 336 wwwkasikornbankcomla

KASIKORNTHAI BANK Limited

bull PONESINUAN BRANCH

Ban Ponesinuan Unit 14 Sysattanak Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88826 Fax +856 21 410 889

Ms Piyanoot Sangsan Branch Manager KASIKORNTHAI BANK LIMITED Lane Xang Head Office E-mail piyanootskasikornbankcom

Mr Chatuporn Boozaya-Angool Branch Manager Ponesinuan Branch E-mail chatupornbkasikornbankcom

46

About AEC+ Business Advisory The AEC+ Business Advisory is set up by KASIKORNBANK to support businesses in their regional expansion across the ASEAN+3 market by providing local market intelligence and strategic business advice

What we do bull Offer customized and tailor-made advisory services bull Publish investment guides and industry reports bull Deliver in-depth insights via seminars bull Organize business trips to bring first-hand experience

Follow Us Visit our website at

AEC+ BUSINESS ADVISORY

Prepared by Mr Anoot Charoenkiattikul World Business Intelligence Specialist E-mail anootckasikornbankcom

httpswwwkasikornbankcominternational-businessenPagesHomeaspx

47

Page 45: LAO PDR - Facilitiesfuangfah.econ.cmu.ac.th/teacher/nisit/files/201808_LaoPDR_Investm… · • On August 7, the government of Laos announced the suspension of new hydropower project

45

KASIKORNTHAIBANK in Lao PDR Contacts

bull HEAD OFFICE Unit 12 Lane Xang Avenue Xiangngeun Village Chanthaboury District Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88905 Fax +856 21 253 336 wwwkasikornbankcomla

KASIKORNTHAI BANK Limited

bull PONESINUAN BRANCH

Ban Ponesinuan Unit 14 Sysattanak Vientiane Capital Lao PDR Tel +856 21 410 888 +856 20 598 88826 Fax +856 21 410 889

Ms Piyanoot Sangsan Branch Manager KASIKORNTHAI BANK LIMITED Lane Xang Head Office E-mail piyanootskasikornbankcom

Mr Chatuporn Boozaya-Angool Branch Manager Ponesinuan Branch E-mail chatupornbkasikornbankcom

46

About AEC+ Business Advisory The AEC+ Business Advisory is set up by KASIKORNBANK to support businesses in their regional expansion across the ASEAN+3 market by providing local market intelligence and strategic business advice

What we do bull Offer customized and tailor-made advisory services bull Publish investment guides and industry reports bull Deliver in-depth insights via seminars bull Organize business trips to bring first-hand experience

Follow Us Visit our website at

AEC+ BUSINESS ADVISORY

Prepared by Mr Anoot Charoenkiattikul World Business Intelligence Specialist E-mail anootckasikornbankcom

httpswwwkasikornbankcominternational-businessenPagesHomeaspx

47

Page 46: LAO PDR - Facilitiesfuangfah.econ.cmu.ac.th/teacher/nisit/files/201808_LaoPDR_Investm… · • On August 7, the government of Laos announced the suspension of new hydropower project

46

About AEC+ Business Advisory The AEC+ Business Advisory is set up by KASIKORNBANK to support businesses in their regional expansion across the ASEAN+3 market by providing local market intelligence and strategic business advice

What we do bull Offer customized and tailor-made advisory services bull Publish investment guides and industry reports bull Deliver in-depth insights via seminars bull Organize business trips to bring first-hand experience

Follow Us Visit our website at

AEC+ BUSINESS ADVISORY

Prepared by Mr Anoot Charoenkiattikul World Business Intelligence Specialist E-mail anootckasikornbankcom

httpswwwkasikornbankcominternational-businessenPagesHomeaspx

47

Page 47: LAO PDR - Facilitiesfuangfah.econ.cmu.ac.th/teacher/nisit/files/201808_LaoPDR_Investm… · • On August 7, the government of Laos announced the suspension of new hydropower project

47