Top Banner
25
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Kombat copper feb 2014 corporate
Page 2: Kombat copper feb 2014 corporate

2

Page 3: Kombat copper feb 2014 corporate

3

Page 4: Kombat copper feb 2014 corporate

4

EPL-3943

EPL-3941 EPL-3942

EPL-3979

EPL-3944

Grootfontein Otavi

Otjituuo

Harasib

Gross Otavi

Kombat

Copper Smelter

Mined -12 Mt @ 2.3% Cu, 1.9% Pb, 18 g/t Ag Historic Resource 2.2 Mt @ 2.2% Cu, 22 g/t Ag

Tsumeb Mine – 30Mt at 4.3% Cu, 13.9% Pb/Zn, 95g/t Ag

Tschudi Project Reserve 22.7 Mt @ 0.95% Cu

Page 5: Kombat copper feb 2014 corporate

5

Page 6: Kombat copper feb 2014 corporate

6

Historic Resource of 2.2Mt @ 2.2% Cu and 22g/t Ag.

Page 7: Kombat copper feb 2014 corporate

7

Page 8: Kombat copper feb 2014 corporate

8

Page 9: Kombat copper feb 2014 corporate

9

Rod and Ball Crushers Flotation and Filtration Circuits Shaft Hoist

Page 10: Kombat copper feb 2014 corporate

10

*A qualified person has not done sufficient work to classify this historical estimate as current mineral resources or mineral reserves. Kombat Copper is not treating the historical estimate as current mineral resources or mineral reserves and the historical estimate should not be relied upon.

Page 11: Kombat copper feb 2014 corporate

11

11

Kombat East Shaft Kombat West Shaft Asis Far West Shaft

Explore

Potential Open Pit Area

Limited underground Development and production

6km

Page 12: Kombat copper feb 2014 corporate

12

Year 1 Year 2 Year 3 Year 4

Page 13: Kombat copper feb 2014 corporate

*A qualified person has not done sufficient work to classify

this historical estimate as current mineral resources or mineral reserves. Kombat Copper is not treating the historical estimate as current mineral resources or mineral reserves and the

historical estimate should not be relied upon.

Page 14: Kombat copper feb 2014 corporate

14

Sabre Resources Guchab Deposit GCDD0001 - 107.75m @ 1.15% Cu, 6.93g/t Ag GCDD0005 - 22.20m @ 3.45% Cu, 29.67g/t Ag GCDD0006 - 14.10m @ 1.31% Cu, 10.50g/t Ag GCDD0011 - 18.85m @ 1.06% Cu, 15.05g/t Ag GCDD0014 - 53.10m @ 1.23% Cu, 11.20g/t Ag GCDD0015 - 51.85m @ 1.35% Cu, 15.45g/t Ag GCDD0019 - 45.65m @ 1.04% Cu, 12.27g/t Ag GCDD0039 - 23.15m @ 1.29% Cu, 4.5g/t Ag GCDD0045 - 21.86m @ 2.22% Cu, 44.6g/t Ag GCDD0046 - 26.40m @ 2.44% Cu, 43.6g/t Ag

*Full technical details of Sabre’s drilling results can be found in the presentation titled Exploring the Kombat Copper Trend Otavi Mountain Land, Northern Namibia, Africa Down Under Conference, Perth, Western Australia. Copies of this report and related presentations can be found on Sabre’s website.

Category Tonnes Cu % Pb % Ag g/t

Inferred 157,549 1.54 5.85 15.43

Page 15: Kombat copper feb 2014 corporate

15

Page 16: Kombat copper feb 2014 corporate

16

Angola

Botswana

South Africa

Zambia

Kombat Mine

Page 17: Kombat copper feb 2014 corporate

17

Page 18: Kombat copper feb 2014 corporate

18 *Full technical details of Weatherly’s Tschudi Deposit can be found in the report titled Tschudi Copper Deposit Geological Modelling and Mineral Resource Estimate by Coffey Mining (SA), November 13, 2009. Copies of this report and related presentations can be found on Weatherly’s website.

Page 19: Kombat copper feb 2014 corporate

19

Kombat Copper EPL 3941

Weatherly ML

2km

Page 20: Kombat copper feb 2014 corporate

20

EPL-3943

EPL-3941 EPL-3942

EPL-3979

EPL-3944

Grootfontein

Otavi Otjituuo

Harasib

Gross Otavi

Kombat

Copper Smelter

Mined -12 Mt @ 2.3% Cu, 1.9% Pb, 18 g/t Ag Historic Resource 2.2 Mt @ 2.2% Cu, 22 g/t Ag

Tsumeb Mine – 30Mt at 4.3% Cu, 13.9% Pb/Zn, 95g/t Ag

Tschudi Project Reserve 22.7 Mt @ 0.95% Cu

Otjikoto Mine 29MT @ 1.4g/t

Base Metals Base Metals

Base Metals and Gold

Page 21: Kombat copper feb 2014 corporate

22

$0.00

$0.05

$0.10

$0.15

$0.20

$0.25

52 Week Price Performance

Page 22: Kombat copper feb 2014 corporate

23

Page 23: Kombat copper feb 2014 corporate

24

Page 24: Kombat copper feb 2014 corporate

25

Page 25: Kombat copper feb 2014 corporate

26