Page 1: Kolín. Industrial zone Kolín – Ovčáry Subject locality.

Kolín

Page 2: Kolín. Industrial zone Kolín – Ovčáry Subject locality.

Industrial zone Kolín – Ovčáry

Page 3: Kolín. Industrial zone Kolín – Ovčáry Subject locality.

Subject locality

Page 4: Kolín. Industrial zone Kolín – Ovčáry Subject locality.

I. The preparation of strategic industrial zone

PZ Kolín – Ovčáry 3 government decrees were accepted for the support of this industrial zone for a

strategic investor (decrees No. 708/2001, 66/2002, 421/2002)

PZ Kolín – Ovčáry is located in the municipality of Kolín, estate location Sendražice by

Kolín and the municipality of Ovčáry, estate location Ovčáry by Kolín

The area of total of 370 ha was specified within the plan of territory for this industrial

zone

Total area of approximately 293 ha was prepared for the realization of individual

investment intentions (the remaining zone area is used for road corridors, engineering

nets, sewage plant , retentive tank, …)

the connection to railway was finished in 2004 and the necessary amount of water was

prepared in 2005

Page 5: Kolín. Industrial zone Kolín – Ovčáry Subject locality.

II. The preparation of strategic industrial zone PZ Kolín – Ovčáry

In 2003 general construction plan for technical and traffic infrastructure

was created within the area of the industrial zone – it ensured the

induction of complete infrastructure to each plot

in the industrial zone, the sewage plant, railroad spur and servicing

roads were built

Individual occupied sectors are connected to water pipes and sewage

system

In case of sectors for sale, there is a possibility of further building and

connecting to current infrastructure

In case of free sectors D, there is a possibility of further building and

connecting to railroad spur

Page 6: Kolín. Industrial zone Kolín – Ovčáry Subject locality.

TPCA realizes its activity in sector A on 124 ha

the production started in February 2005

3 226 employees

investment to 31.12.2010 reached the amount of 18 700 millions Kč

Activities within Kolín region:

- grant program TPCA Partnerství pro Kolínsko (Partnership for Kolín) (since

2005) aimed at systematic contribution to development of Kolín region

- it sponsors the most significant cultural and social events such as

Kmochův Kolín, event OREGON dětem (Oregon for children) and it is the

partner of the first league basketball club in Kolín

- TPCA has already donated more than 80 million Kč for the support of Kolín

Page 7: Kolín. Industrial zone Kolín – Ovčáry Subject locality.

LEAR CORPORATION

realizes its activity in sector C1

makes child car seats intended for

TPCA

number of employees is 241

investment to 31.12.2010: 339 mil.Kč

Page 8: Kolín. Industrial zone Kolín – Ovčáry Subject locality.

GEFCO

realizes its activity in sector B

runs a logistic centre used for in-process storing and

distribution of Peugeot, Citroen cars from European

PCA plants and cars from the TPCA production

plant

total store capacity of the area is approx. 7 000 cars

number of employees is 187

investment to 31.12.2010: 492 mil.Kč

Page 9: Kolín. Industrial zone Kolín – Ovčáry Subject locality.

TOYOTA TSUSHO EUROPE S.A.

realizes its activity in sector D3

gathers, sorts, processes waste produced

in PZ Kolín - Ovčáry

number of employees 71

investment to 31.12.2010: 172 mil.Kč

Page 10: Kolín. Industrial zone Kolín – Ovčáry Subject locality.

NYK LOGISTIC realizes its intention in sectors C3 and C4

the logistic centre is used for storing and distribution

of empty containers (crates, pallets) and production

parts of suppliers. It also ensures fluent supply for

TPCA car production, including parking of trucks

and trailers

number of employees is 420

investment to 31.12.2010: 426 mil.Kč

Page 11: Kolín. Industrial zone Kolín – Ovčáry Subject locality.

Basic information about the zone

data value

total area (ha): 370

year of starting the construction: 2002

number of employees in the zone to: 31.12.2010: 4 145

number of companies in the zone to 31.12.2010 5

structure of companies according to country of origin:

ČR – 0

foreign countries – 5

structure of foreign companies according to country of origin:

USA - 1

Japan - 3

France - 1

Page 12: Kolín. Industrial zone Kolín – Ovčáry Subject locality.

PZ Kolín – Ovčárydata value

region of industrial zone: Středočeský kraj (central-bohemian)

total area 370 ha

investors occupy: 171,54 ha

free sectors for sale: 122,13 ha

other areas: 76,33ha

Occupancy: OKEČ (industrial branches)

Area in ha

TPCA 34 124,00

Lear Corporation Czech 34 4,90

Gefco Česká republika 34 24,74

Toyota Tsusho Europe 34 7,50

NYK Logistics 34 10,40

Total 171,54

Page 13: Kolín. Industrial zone Kolín – Ovčáry Subject locality.

Company Job vacancies: to 31.12.2010

TPCA 3 226

Lear Corporation Czech 241

Gefco Česká republika 187

Toyota Tsusho Europe 71

NYK Logistics 420

Total 4 145

Company Investment in mil.Kč to 31.12.2010

TPCA 18 700

Lear Corporation Czech 339

Gefco Česká republika 492

Toyota Tsusho Europe 172

NYK Logistics 426

Total 20 129

Page 14: Kolín. Industrial zone Kolín – Ovčáry Subject locality.

Exclusion from Agricultural Soil Fund (ASF)

• plots which are not excluded – the investor asks for permanent exclusion of the plot from ASF and takes all necessary measures, at their own expenses and responsibility

• plots which have already been excluded – the investors will pay the city the costs connected with the exclusion of these plots

total free plots: 122 ha

excluded from ASF: 87 ha

remains to exclude: 35 ha

Page 15: Kolín. Industrial zone Kolín – Ovčáry Subject locality.

The decision about the participation of state budget in funding the program:„PZ Kolín – Ovčáry“

• the grant recipient must not rent or place a charge or lien on bought

plots without previous agreement of Defined organisation. This

cannot be done for the period of 5 years since the finishing of the

Purchase .

• the ownership change of purchased plots is during the Purchase

realization period (up to the period of 5 years since the finishing of

Purchase) possible only after previous agreement of Defined

organisation, regardless if resources of state budget were used for

financing and to which extent.

Page 16: Kolín. Industrial zone Kolín – Ovčáry Subject locality.

Rules of Program for support of development of industrial real properties

• The grant receiver must not (for the period of 5 years since the finish of the last stage of construction part of the project) use the real estate for any other purposes than conducting business in the field of manufacturing industry

• The strategic investor is evaluated by two criteria: amount of investment and creation of number of working positions

• Strategic investor means:

-supported company which showed the intention to spend (for the purpose of doing business in fields of manufacturing industry OKEČ 15-37) investment funds for obtaining tangible and intangible property of long-term nature at least 4.000.000.000 Kč and simultaneously to form more than 1.000 new working positions

- supported company which showed the intention to spend (for the purpose of doing business in fields of strategic services or technological centres) investment funds for obtaining tangible and intangible property of long-term nature at least 1.000.000.000 Kč and simultaneously to form more than 500 new working positions;

- supported company doing business in research and development area which showed the intention to spend investment funds for obtaining tangible and intangible property of long-term nature at least 100.000.000 Kč and simultaneously to form more than 50 new working positions;

- supported company which is specified by the government of Czech Republic as strategic

Page 17: Kolín. Industrial zone Kolín – Ovčáry Subject locality.

I. Plan of territory & PZ Kolín-Ovčáry

Main use

- industrial production of bulk, manufacture and mass-produced character

- area defined for the location of industrial production plants and their supporting services

- it represents monofunctional area restricted for big investors

Acceptable use of the area, activities and construction

- business activities

- accommodation for housekeeper or owner, temporary accommodation of employees

- parking of cars of employees and visitors

- supporting, servicing and logistic areas

- mass-productive, productive, industrial activity

- servicing areas of citizen facilities of public interest

- purpose and local roads

Page 18: Kolín. Industrial zone Kolín – Ovčáry Subject locality.

II. Plan of territory& PZ Kolín-Ovčáry

Non-acceptable use of the area, activity and construction

- living in block of flats

- living in family houses

- recreation in buildings for family holiday

- retail facility over 500 m2 of selling area

Rules of space layout

- specified according to the exact intention in the area management

- necessary to arrange unpaved grass areas with bushes and trees

- one part of the project is formed by documents solving parking of customers´ and employees´ cars and solving the draining of rainwater from the area

- setting the capacity for transport to the plant will be a part of the business plan

Page 19: Kolín. Industrial zone Kolín – Ovčáry Subject locality.

Plan of territory for OvčáryBasic functional use

- industrial production of big investors- industrial production of bulk, manufacture and mass-produced character

and business activity

- area defined for the location of industrial production plants and their supporting service

- marginal parts of the area divided by infrastructure development can be divided into plots for minor investment plans

Suitable and dominant activities:

- business activity

- supporting, servicing and logistic areas

- buildings of industrial production and service

- storing buildings

- relevant roads and parking places

- garages for lorries and other vehicles

- relevant technical equipment

Page 20: Kolín. Industrial zone Kolín – Ovčáry Subject locality.

PZ Kolín - Ovčáry

Page 21: Kolín. Industrial zone Kolín – Ovčáry Subject locality.

Scheme of electricity supply

Page 22: Kolín. Industrial zone Kolín – Ovčáry Subject locality.

Scheme of water supply

Page 23: Kolín. Industrial zone Kolín – Ovčáry Subject locality.

Scheme of gas supply

Page 24: Kolín. Industrial zone Kolín – Ovčáry Subject locality.

Scheme of railroad spur

Page 25: Kolín. Industrial zone Kolín – Ovčáry Subject locality.

Scheme of telecommunications connection

Page 26: Kolín. Industrial zone Kolín – Ovčáry Subject locality.

INFORMATION

• For more information contact:

Ing. Iveta Horáková, tel.č. 321 748 256,

e-mail: [email protected]