consulting training project outsourcing products construx.com 2
Precision vs. AccuracyPrecision vs. Accuracy
AccuracyAccuracy Saying PI = 3 is accurate, but not preciseSaying PI = 3 is accurate, but not precise I’m 2 meters tall, which is accurate, I’m 2 meters tall, which is accurate,
but not precisebut not precise
PrecisionPrecision Saying PI = 4.378383 is precise, but not accurateSaying PI = 4.378383 is precise, but not accurate Airline flight times are precise to the minute, Airline flight times are precise to the minute,
but not accuratebut not accurate
Number of significant digits is the keyNumber of significant digits is the key
consulting training project outsourcing products construx.com 3
Precision vs. AccuracyPrecision vs. Accuracy
People make assumptions about accuracy People make assumptions about accuracy based on precisionbased on precision
““365 days” is not the same as “1 year” or 365 days” is not the same as “1 year” or “4 quarters” or even “52 weeks”“4 quarters” or even “52 weeks”
““10,000 staff hours” is not the same as “5 10,000 staff hours” is not the same as “5 staff years”staff years”
Unwarranted precision is the enemy of Unwarranted precision is the enemy of accuracy (e.g., 395.7 days +/- 6 months)accuracy (e.g., 395.7 days +/- 6 months)
consulting training project outsourcing products construx.com 4
IntroductionIntroduction
Good GoalsGood Goals
A goal should be SMARTA goal should be SMART SpecificSpecific Measurable/TestableMeasurable/Testable AttainableAttainable RelevantRelevant Time-boundTime-bound
Can use a Can use a Purpose, Issue, Object Purpose, Issue, Object formatformat
consulting training project outsourcing products construx.com 5
IntroductionIntroduction
GQM HierarchyGQM Hierarchy
Goal 1 Goal 2
Question Question Question Question Question
Measure Measure Measure Measure MeasureMeasure
consulting training project outsourcing products construx.com 6
IntroductionIntroduction
GQM ExampleGQM Example
Current average cycle time * 100Baseline average cycle time
Subjective rating of manager’s satisfaction
Measures
Is the performance of the process improving?Question
Average cycle timeStandard Deviation% cases outside the upper limit
Measures
What is the current change request processing speed?Question
Improve by 10%the timeliness of change request processingfrom the project manager’s viewpoint
Goal Purpose Issue Object (process) Viewpoint
consulting training project outsourcing products construx.com 7
Test Planning and ResourcesTest Planning and Resources
Do we have enough testing resources?Do we have enough testing resources? How many tests do we need to run (estimated)?How many tests do we need to run (estimated)? How long does each test case take to design and write?How long does each test case take to design and write? How long does each test take, on average?How long does each test take, on average? How many full testing cycles do we expect? (more than How many full testing cycles do we expect? (more than
one especially for early test cycles)one especially for early test cycles) How many person-days do we need (# tests * time per How many person-days do we need (# tests * time per
test * # of cycles)? test * # of cycles)? How many testing staff do we have?How many testing staff do we have? How long will the testing phase take, with our current How long will the testing phase take, with our current
staff?staff? Is the testing phase too long (i.e. our current staff is not Is the testing phase too long (i.e. our current staff is not
sufficient)? Do we have to test less or can we add staff?sufficient)? Do we have to test less or can we add staff?
consulting training project outsourcing products construx.com 8
Statistics on Effort per DefectStatistics on Effort per Defect
Data on time required to fix defects, categorized Data on time required to fix defects, categorized by type of defect, provides a basis for estimating by type of defect, provides a basis for estimating remaining defect correction workremaining defect correction work
Need to collect data on fix time in defect tracking Need to collect data on fix time in defect tracking systemsystem
Data on phases in which defects are injected and Data on phases in which defects are injected and later detected gives you a measure of the later detected gives you a measure of the efficiency of the development process. If 95% of efficiency of the development process. If 95% of the defects are detected in the same phase they the defects are detected in the same phase they were created, the project has an efficient processwere created, the project has an efficient process
consulting training project outsourcing products construx.com 12
Defects are one of the most often used Defects are one of the most often used measures of qualitymeasures of quality
Definitions of defects differDefinitions of defects differ Only items found by customers? Testers?Only items found by customers? Testers? Items found during upstream reviews?Items found during upstream reviews? Only non-trivial items?Only non-trivial items? Small enhancements?Small enhancements?
Timing of “defect” detection an important part Timing of “defect” detection an important part of defect characterizationof defect characterization
A “product defect” may be different than a “process A “product defect” may be different than a “process defect”defect”
consulting training project outsourcing products construx.com 14
consulting training project outsourcing products construx.com 19
Product PredictionProduct Prediction
Defect Density PredictionDefect Density Prediction
To judge whether we’ve found all the defects for an To judge whether we’ve found all the defects for an application, estimate its defect densityapplication, estimate its defect density
Need statistics on defect density of past similar projectsNeed statistics on defect density of past similar projects Use this data to predict expected density on this projectUse this data to predict expected density on this project For example, if our prior projects had a defect density For example, if our prior projects had a defect density
between 7 and 9.5 defects/KLOC, we expect a similar between 7 and 9.5 defects/KLOC, we expect a similar density on our new projectdensity on our new project
If our new project has 100,000 lines of code, we expect to find If our new project has 100,000 lines of code, we expect to find between 700 and 950 defects totalbetween 700 and 950 defects total
If we’ve found 600 defects so farIf we’ve found 600 defects so far We’re not done: we expect to find between 100 and 350 more We’re not done: we expect to find between 100 and 350 more
defectsdefects
consulting training project outsourcing products construx.com 20
Product PredictionProduct Prediction
Distribution of Software Defect Distribution of Software Defect Origins and SeveritiesOrigins and Severities
Highest severity faults come from Highest severity faults come from requirements and designrequirements and design
Sev
erit
y L
evel
Minor
Mod
Major
Critical
Requirements
Design
Coding
Documentation
Bad Fixes
consulting training project outsourcing products construx.com 21
Product PredictionProduct Prediction
Defect ModelingDefect Modeling
Model the number of defects expected Model the number of defects expected based on past experiencebased on past experience
Model the number of defects in Model the number of defects in requirements, design, construction, etc. requirements, design, construction, etc.
Two approaches:Two approaches: Model defects based on effort hours, i.e X Model defects based on effort hours, i.e X
defects will be introduced per hour workeddefects will be introduced per hour worked Model defects per KSLOC (or other size unit) Model defects per KSLOC (or other size unit)
based on past experience and code growth based on past experience and code growth curve curve
consulting training project outsourcing products construx.com 22
Approach 1: SEI data, based on PSP data:Approach 1: SEI data, based on PSP data: DesignDesign Injected/hour = 1.76Injected/hour = 1.76 CodingCoding Injected/hour = 4.20 Injected/hour = 4.20
Approach 2:Approach 2: Defects / KSLOC total are about 40 (30-85)Defects / KSLOC total are about 40 (30-85)
10% requirements (4/KLOC) 25% design (10/KLOC) 40% coding (16/KLOC) 15% user documentation (6/KLOC) 10% bad fixes (4/KLOC)
consulting training project outsourcing products construx.com 23
Product PredictionProduct Prediction
Predicted and Actual Defects Predicted and Actual Defects FoundFound
0
100
200
300
400
500
600
700
800
Def
ects
Phase injectionestimate
Phase actual removal
Phase expectedremoval
Cumulative actualremoval
Cumulative injectionestimate
Cumulative expectedRemoval
Cumulative injectionreestimate
Development PhaseFrom Edward F. Weller, Practical Applications of Statistical Process Control, IEEE Software May/June 2000
Size reestimate
consulting training project outsourcing products construx.com 24
Product PredictionProduct Prediction
Defect Profile by Type - Defect Profile by Type - ExampleExample
Sources of defects
consulting training project outsourcing products construx.com 25
Release MeasuresRelease Measures
Defect CountsDefect Counts
Defect counts give a quantitative handle Defect counts give a quantitative handle on how much work the project team still on how much work the project team still has to do before it can release the has to do before it can release the softwaresoftware
Graph the cumulative reported defects, Graph the cumulative reported defects, open defects and fixed defectsopen defects and fixed defects
When the software is nearing release, the When the software is nearing release, the number of open defects should trend number of open defects should trend downward, and the fixed defects should downward, and the fixed defects should be approaching the reported defects linebe approaching the reported defects line
consulting training project outsourcing products construx.com 26
Release MeasuresRelease Measures
Defect Trends – Near ReleaseDefect Trends – Near ReleaseAll DefectsAll Defects
Number of defect reports
(in thousands)
0
1.0
Weeks of testing5 10 15 20 25 30 35 40
0.2
0.4
0.8
0.6
Found
Open
Fixed
Target
consulting training project outsourcing products construx.com 27
Release MeasuresRelease Measures
Defect Trends – Near ReleaseDefect Trends – Near ReleaseSeverity 1 and 2Severity 1 and 2
Number of defect reports
(in thousands)
0
1.0
Weeks of testing5 10 15 20 25 30 35 40
0.2
0.4
0.8
0.6
Found
Open
Fixed
Target
consulting training project outsourcing products construx.com 28
Acceptance testing successfully completedAcceptance testing successfully completed All open change requests dispositionedAll open change requests dispositioned System testing successfully completedSystem testing successfully completed All requirements implemented, based on the specAll requirements implemented, based on the spec All review goals have been metAll review goals have been met Declining defect rates are seenDeclining defect rates are seen Declining change rates are seenDeclining change rates are seen No open Priority A defects exist in the databaseNo open Priority A defects exist in the database Code growth has stabilizedCode growth has stabilized
consulting training project outsourcing products construx.com 29
Release MeasuresRelease Measures
HP Measurable Release HP Measurable Release CriteriaCriteria
Breadth – testing coverage of user Breadth – testing coverage of user accessible and internal functionsaccessible and internal functions
under stress; stability; ability to recover under stress; stability; ability to recover gracefully from defect conditionsgracefully from defect conditions
Remaining defect density at releaseRemaining defect density at release
From Robert B Grady, Practical Software Metrics for Project Management and Process Improvement, 1992
consulting training project outsourcing products construx.com 30
Release MeasuresRelease Measures
Post Release Defect Density by Post Release Defect Density by Whether Met Release CriteriaWhether Met Release Criteria
Postrelease incoming defects submitted by customers (3 month moving average)
MR 1 2 3 4 5 6 7 8 9 10 11 12
Months
Defects submitted
(normalized by KLOC)
Did NotMeet
Worst ProductThat Met
Average ofProductsThat Met
From Practical Software Metrics for Project Management and Process Improvement, by Robert B. Grady 1992
consulting training project outsourcing products construx.com 31
Prerelease Defect DensityPrerelease Defect Density Question: How can we predict software quality based on Question: How can we predict software quality based on
early development processes?early development processes?
0
10
20
30
40
50
60
70
80
Oct-80 Feb-82 Jul-83 Nov-84 Mar-86 Aug-87 Dec-88
Project Release Date
De
fec
ts i
n T
es
t/K
LO
C Defects inTest/KLOC
Linear(Defects inTest/KLOC)
From Practical Software Metrics for Project Management and Process Improvement, by Robert B. Grady 1992
consulting training project outsourcing products construx.com 37
Defect Repair EfficiencyDefect Repair EfficiencyQuestion: How efficient are defect-fixing activities? Are we Question: How efficient are defect-fixing activities? Are we improving?improving?
0
0.5
1
1.5
2
2.5
3
3.5
4
4.5
5
1987 1988 1989 1990 1991
Def
ects
Fix
ed/E
ng
r. M
on
th
DefectsFixed /EngrMonth
From Practical Software Metrics for Project Management and Process Improvement, by Robert B. Grady 1992
consulting training project outsourcing products construx.com 38
Mean Time to Fix Critical and Mean Time to Fix Critical and Serious DefectsSerious DefectsQuestion: How long does it take to fix a problem?Question: How long does it take to fix a problem?
0
50
100
150
200
250
7/1
8/1
99
0
8/1
8/1
99
0
9/1
8/1
99
0
10
/18
/19
90
11
/18
/19
90
12
/18
/19
90
1/1
8/1
99
1
2/1
8/1
99
1
3/1
8/1
99
1
4/1
8/1
99
1
5/1
8/1
99
1
6/1
8/1
99
1
7/1
8/1
99
1
8/1
8/1
99
1
Days
AR
QA
KP+AD
LC
MR
From Practical Software Metrics for Project Management and Process Improvement, by Robert B. Grady 1992
AR = Awaiting release
QA = Final QA testing
KP = known problem
AD = awaiting data
LC = lab classification
MR = marketing review
consulting training project outsourcing products construx.com 39
Pamela PerrottPamela Perrott
23+ years in IT23+ years in IT Application programmer, systems Application programmer, systems
programmer, programmer supportprogrammer, programmer support At two insurance companiesAt two insurance companies
Several years at BoeingSeveral years at Boeing In re-engineering group and repository groupIn re-engineering group and repository group
Several years in wireless (stints in QA and SEPG Several years in wireless (stints in QA and SEPG groups)groups)
Currently instructor/consultant at Construx SoftwareCurrently instructor/consultant at Construx Software
consulting training project outsourcing products construx.com 40
Project Survival Guide, Professional Software Project Survival Guide, Professional Software DevelopmentDevelopment
Founded in 1996Founded in 1996 Staff of around 15, mostly software engineersStaff of around 15, mostly software engineers Located in the Pacific NorthwestLocated in the Pacific Northwest Two primary lines of business: Training and Two primary lines of business: Training and
ConsultingConsulting
consulting training project outsourcing products construx.com 41