Invited Talk Iraq Energy Forum Hosted by IRAQ Energy Institute(IEI) Al Rasheed Hotel Baghdad April 2-3, 2017 The Gas challenge for Iraq’s Electricity Generation Plenary Session-8: Gas & Power Session Dr. Jafar D. Jafar Uruk Engineering & Contracting Company (LLC)
21

Invited Talk Iraq Energy Forumiraqener/sites/default/files/iei_files/URUK... · 10. Experienced in installation of GE Frame 6B, Frame 9E and Alstom 13E2 GTGs Page # 4 E S ER. Page

Aug 20, 2018

Download

Documents

vokhue
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Invited Talk Iraq Energy Forumiraqener/sites/default/files/iei_files/URUK... · 10. Experienced in installation of GE Frame 6B, Frame 9E and Alstom 13E2 GTGs Page # 4 E S ER. Page

Invited Talk

Iraq Energy Forum Hosted by IRAQ Energy Institute(IEI)

Al Rasheed Hotel Baghdad April 2-3, 2017

The Gas challenge for Iraq’s Electricity

Generation

Plenary Session-8: Gas & Power Session

Dr. Jafar D. Jafar

Uruk Engineering & Contracting Company (LLC)

Page 2: Invited Talk Iraq Energy Forumiraqener/sites/default/files/iei_files/URUK... · 10. Experienced in installation of GE Frame 6B, Frame 9E and Alstom 13E2 GTGs Page # 4 E S ER. Page

1. Commercials

2. Iraq’s Power Sector

‒ Electricity Generation

‒ National Grid Transmission at 400kV and 132kV

‒ Electricity Tariff

3. Fuel Supply

‒ Light Distillate Oil (LDO)

‒ Crude Oil (CO)

‒ Heavy Fuel Oil (HFO)

‒ Natural Gas (NG)

4. Natural Gas As Fuel for Power Generation

Highlights of This Talk

Page 3: Invited Talk Iraq Energy Forumiraqener/sites/default/files/iei_files/URUK... · 10. Experienced in installation of GE Frame 6B, Frame 9E and Alstom 13E2 GTGs Page # 4 E S ER. Page

Page # 3

OUR MISSION “ We will rebuild Iraq’s power and energy sector through leadership,

innovation, and excellence; Completing projects on time, within

budget and to the best global standards possible.”

Uruk Engineering & Contracting specializes in Iraq’s energy sector. It Completed the

country’s first “Fast Track” project according to plan; and its Environment, Health &

Safety (EHS) includes over 6 million man-hours logged in the construction of 3 power

plants without a major incident. Uruk is a fully integrated Engineering, Procurement

and Construction (EPC) company providing turnkey solutions with single source

responsibility in the areas of power, infrastructure, oil & gas, petrochemicals, and

wastewater management.

Page 4: Invited Talk Iraq Energy Forumiraqener/sites/default/files/iei_files/URUK... · 10. Experienced in installation of GE Frame 6B, Frame 9E and Alstom 13E2 GTGs Page # 4 E S ER. Page

1. EPC Contractor

2. Established in the U.A.E /Dubai since 2004

3. Certified ISO 9001:2015

4. Excellent Quality Credentials

5. Excellent EHS Credentials

6. Al Mansuriya Power Plant Project Completed

7. More than 4 million man hours without Loss of Time Incident (LTI)

8. Recently selected as best EHS site by Alstom worldwide

9. Constructed 1150 MW (ISO) so far in Iraq

10. Experienced in installation of GE Frame 6B, Frame 9E and Alstom 13E2 GTGs

Page # 4

INFR

ASTR

UC

TUR

E

OIL

& G

AS

PO

WER

Page 5: Invited Talk Iraq Energy Forumiraqener/sites/default/files/iei_files/URUK... · 10. Experienced in installation of GE Frame 6B, Frame 9E and Alstom 13E2 GTGs Page # 4 E S ER. Page

Page # 5

ACHIEVEMENTS ISO Certified 9001:2015 2004: Private company established to address Iraq's energy and infrastructure rebuilding needs.

2004: Baiji steam plant rehabilitation project completed for Bechtel.

2004: UAE operations established as regional headquarters.

2009: Quds project completed for USGRD/MoE (2x125 MW GE frame 9E)

2012: Taji project completed for MoE (4x42 MW GE frame 6b)

2013: Mansuriya JV with Alstom completed but no fuel (4x182 Alstom 13e2)

In Bid Evaluation Stage :

Diwaniya O&M Open Cycle (4 x 125 MW) plus IPP Add-on EPC and O&M

Mansuriya O&M Open Cycle (4 x 182 MW) Complete Rehabilitation IPP plus Add-on O&M

Duara (4 x 160 MW) Complete Rehabilitation IPP plus O&M

Page 6: Invited Talk Iraq Energy Forumiraqener/sites/default/files/iei_files/URUK... · 10. Experienced in installation of GE Frame 6B, Frame 9E and Alstom 13E2 GTGs Page # 4 E S ER. Page

QUDS POWER PLANT PROJECT

• 250 Megawatts • USD170,000,000

Uruk – Baghdad Company JV

Page 7: Invited Talk Iraq Energy Forumiraqener/sites/default/files/iei_files/URUK... · 10. Experienced in installation of GE Frame 6B, Frame 9E and Alstom 13E2 GTGs Page # 4 E S ER. Page

TAJI POWER PLANT PROJECT

• 168 Megawatts • USD85,000,000 • 4 x GE Frame 6B Free Issued by MOE

Page 8: Invited Talk Iraq Energy Forumiraqener/sites/default/files/iei_files/URUK... · 10. Experienced in installation of GE Frame 6B, Frame 9E and Alstom 13E2 GTGs Page # 4 E S ER. Page

MANSURIYA POWER PLANT PROJECT

• 724 Megawatts • USD539,463,000

Uruk – Alstom JV

Page 9: Invited Talk Iraq Energy Forumiraqener/sites/default/files/iei_files/URUK... · 10. Experienced in installation of GE Frame 6B, Frame 9E and Alstom 13E2 GTGs Page # 4 E S ER. Page

Page # 9

IRAQ’S POWER SECTOR

Networks for the Distribution of Electricity

Types of Consumers

• Government Entities

• Households

• Industrial

• Commercial

• Agricultural

Losses of Electrical Energy Within Distribution Networks was ~50-60%.

Ministry of Electricity Has Privatized Tariff Collection Plus Maintenance of

Distribution Networks. Underground Networks and SMART METERS Are

Being Adapted.

Average Tariff Over All Types of Consumers Should Be At Least

8¢ US/kWh or 100 IQD/kWh If Government Subsidies Are to Be Mostly

Eliminated.

MOE Produced 92.1 x 106MWh During 2016.

At This Price Then 2016 Total Revenue Would Have Reached ~7.4 BUSD.

Page 10: Invited Talk Iraq Energy Forumiraqener/sites/default/files/iei_files/URUK... · 10. Experienced in installation of GE Frame 6B, Frame 9E and Alstom 13E2 GTGs Page # 4 E S ER. Page

Page # 10

IRAQ’S POWER SECTOR

National Grid Transmission at 400 kV and 132 kV

To Remove Transmission Bottlenecks the following Projects Should be

Implemented During the Next 5 Years

Three 400 kV Sub-Stations Every Year

Twelve 132 kV Sub-Stations Every Year

At Least 500 km of 400 kV Transmission Lines

At Least 1000 km of 132 kV Transmission Lines

Page 11: Invited Talk Iraq Energy Forumiraqener/sites/default/files/iei_files/URUK... · 10. Experienced in installation of GE Frame 6B, Frame 9E and Alstom 13E2 GTGs Page # 4 E S ER. Page

Page # 11

Steam

Hydro

GTG(ISO)

Pre 2003 4840 1500 2000

Added by US Period (2003-2011) 0 0 2500

GE Mega Deal + Fast Track (2008) 0 0 7670

Siemens Deal (2009) 0 0 3400

Al-Zubaidiya (Shanghai) 2540 0 0

Al-Mansuriya (Alstom – GE/Uruk) - - 730

Besmaya Phase 1 (Investment) - - 1500

Sub Total 7380 1500 17800

IRAQ’S POWER SECTOR

TOTAL: 26680 MW

Iraq’s Electricity Generating Capacity (2017) (Excluding KRG)

Power Plant Design Capacity (MW)

Page 12: Invited Talk Iraq Energy Forumiraqener/sites/default/files/iei_files/URUK... · 10. Experienced in installation of GE Frame 6B, Frame 9E and Alstom 13E2 GTGs Page # 4 E S ER. Page

Page # 12

IRAQ’S POWER SECTOR

Loss of Iraq’s Generating Capacity Due to

Intervention of Daesh (June 2014)

Baiji Steam 6 x 200 1200

Baiji Old Gas Turbine 4 x 160 640

Baiji Gas Turbine 6 x 165 990

Gayara Gas Turbine 6 x 125 750

Mosul Gas Turbine 12 x 25 300

Almost All Hydro Power Plants 1800

Total (MW) 5680

Therefore, Only Approximately 21000 MW of Electricity

Generation Capacity Remains After June 2014

(MW)

Page 13: Invited Talk Iraq Energy Forumiraqener/sites/default/files/iei_files/URUK... · 10. Experienced in installation of GE Frame 6B, Frame 9E and Alstom 13E2 GTGs Page # 4 E S ER. Page

Page # 13

IRAQ’S POWER SECTOR

Iraq’s Annual Electrical Energy Generation (Except KRG)

(2013-2016)

71.9 80.2 81.6

92.1

0

20

40

60

80

100

120

140

2013 2014 2015 2016

An

nu

al E

lect

rici

ty P

rod

uct

ion

x1

06

MW

h

Year

AVERAGE ANNUAL INCREASE 7.0%

8200 MW

9160 MW

10510 MW

Daily Average Power

9320 MW

Conclusion: Annual Increase in Generation capacity of 7% is insufficient

to close theSupply/Demand gap! Annual increase should be ~15% for a

few years to reduce the short fall significantly.

Demand

15000 MW

2016

Page 14: Invited Talk Iraq Energy Forumiraqener/sites/default/files/iei_files/URUK... · 10. Experienced in installation of GE Frame 6B, Frame 9E and Alstom 13E2 GTGs Page # 4 E S ER. Page

Page # 14

IRAQ’S POWER SECTOR

Environmental Impact (EI)

1 Ton of Fossil Fuel Burnt Amount of CO2 Produced (Ton)

NG 2.75

HFO, Crude Oil, Diesel 3.7

Coal 4.0

- CO2 a by-product of fossil fuel burning is the main cause

of Global Warming (Greenhouse Effect).

- NG as a fuel has the least EI. Flammability limits in air are 5-15%

- For equal heat ( Calorific Value) output

- Burning of Processed Gas Produces no SOx and very low NOx

Reduces CO2 emissions by 35%.

- Using Gas as fuel for thermal power plants reduces maintenance

costs by a factor of 3. Down times are also reduced thus providing a

significant increase in availability.

- Gas as Fuel for Gas Turbines will increase Output by 20% When

Compared With Crude Oil or Heavy Fuel Oil.

Page 15: Invited Talk Iraq Energy Forumiraqener/sites/default/files/iei_files/URUK... · 10. Experienced in installation of GE Frame 6B, Frame 9E and Alstom 13E2 GTGs Page # 4 E S ER. Page

Page # 15

IRAQ’S POWER SECTOR

Iraq’s Natural Gas (NG)

Proven recoverable reserves 2.7 TCM (11th worldwide).

70% from associated gas, 20% from non-associated gas; i.e. from gas fields, 10% from

gas caps or dome gas.

Proven reserves could increase to 8.5 TCM if exploration is extended to many new areas

not yet explored. Iraq could then be fourth or fifth worldwide in proven gas reserves.

Available Raw Associated Gas in Iraq Today ~ 1900 mmscfd.

Iraq’s Current Gas Processing Capacity ~ 1000 mmscfd

North Gas Company(NGC) Capacity 400 mmscfd (2 x 200 mmscfd trains) South Gas Company(SGC) Capacity 700 mmscfd

Processed Gas Currently Available and Utilized for Various Industries Including

Power Generation ~ 750 mmscfd (150 mmscfd from NGC and 600 from SGC).

Processing Capacity of 200 mmscfd in NGC Not Utilized!

Flared Gas ~ 1000 mmscfd.

Price of Iran Supplied NG per 1mmBtu is 11% of Brent Price/bbl.

Assume Brent Price = 50 USD/bbl. Then Current Value of Flared Gas at Iranian

Price is 5.4 MUSD/d ~ 2.0 BUSD/year.

Page 16: Invited Talk Iraq Energy Forumiraqener/sites/default/files/iei_files/URUK... · 10. Experienced in installation of GE Frame 6B, Frame 9E and Alstom 13E2 GTGs Page # 4 E S ER. Page

Page # 16

IRAQ’S POWER SECTOR

Estimate of Fuel Needs for Electricity Generation

Iraq’s total electricity production during 2016 was 92 x 106MWh.

Assume Average Efficiency For The Conversion of Chemical Energy In The

Fuel To Electrical Energy is 34%.

Remember 1 BOE = 5650scf = 5.69 mmbtu = 6000 MJ = 1.667 MWh.

To Produce 92 x 106MWh of Electrical Energy During 2016 Then MOE Needed

To Burn

750 mmscfd of Gas Was Burnt = 133,000 BOE/day.

Then 445,000 – 133,000 = 312,000 BOE/day of Liquid Fuel Was Burned

During 2016.

Probably 200,000 BOE/day of Crude Oil Was Burned During 2016.

Remaining 112,000 BOE/day of HFO and Diesel Fuel Was Burned

During 2016.

92 x 106

1.667 x 0.34 x 365 = 445,000 BOE/day

Page 17: Invited Talk Iraq Energy Forumiraqener/sites/default/files/iei_files/URUK... · 10. Experienced in installation of GE Frame 6B, Frame 9E and Alstom 13E2 GTGs Page # 4 E S ER. Page

Page # 17

IRAQ’S POWER SECTOR

Price of Iranian Gas

Iranian Gas Is Priced per mmbtu at 11% of Brent Price/bbl.

Assume Brent Price Today At 50 USD/bbl.

With 1 BOE = 5.69 mmbtu, Then Price of Iranian Gas = 31 USD/BOE.

Therefore, IT IS CHEAPER TO BURN IRANIAN GAS THAN TO BURN CRUDE OIL.

SAVINGS FOR 200,000 bbl/day OF CRUDE OIL WOULD BE:

OPEC’s Decision For Ceiling On Crude Oil Production Reduced Iraq’s Crude

Oil Production By 200,000 bbl/day.

If Iraq Shifts From Burning Crude Oil To Gas Then It Can Export An Extra

200,000 bbl/day. Without Increasing Crude Oil Production Capacity And

Maintaining OPEC’s Restriction on Total Crude Production.

2.4 MUSD/day or 876 MUSD/year

Page 18: Invited Talk Iraq Energy Forumiraqener/sites/default/files/iei_files/URUK... · 10. Experienced in installation of GE Frame 6B, Frame 9E and Alstom 13E2 GTGs Page # 4 E S ER. Page

Page # 18

IRAQ’S POWER SECTOR

In Conclusion My Messages Are As Follows-

1) Reduce Losses In the Electrical Distribution Networks.

2) Reduce Bottlenecks In Electricity Transmission.

3) Convert All Open Cycle Gas Turbine Power Plants to Combined

Cycle. This Would Increase Power to the Grid By At Least 3000 MW At

No Additional Fuel Cost.

4) Processed Dry Gas is the best fuel for power generation

economically, environmentally and technically. Therefore, All Fuel

Burning Power Plants Must Be Supplied With Gas.

5) The Use of Gas Would Increase Output of Existing Gas Turbine Power

Plants by at least 20% or 1200MW.

6) All Flared Gas MUST BE PROCESSED ASAP. Annual Savings of 2 BUSD

Are Foreseen.

Page 19: Invited Talk Iraq Energy Forumiraqener/sites/default/files/iei_files/URUK... · 10. Experienced in installation of GE Frame 6B, Frame 9E and Alstom 13E2 GTGs Page # 4 E S ER. Page

Page # 19

IRAQ’S POWER SECTOR

In Conclusion My Messages Are As Follows-

7) Import Iranian Gas And Substitute All Crude Oil Burning For Power

Production By Iranian Gas Thereby Saving 876 MUSD/year.

8) Increase Crude Oil Export By 200,000 bbl/day Without Affecting

OPEC’s Agreed Crude Oil Production Ceiling. Thereby, Increasing

Iraq’s Crude Oil Revenue by 10 MUSD/day or 3.65 Billion USD/year.

9) Develop All Available Free Gas Fields To Enhance Gas Availability

In Addition to Processing of Associated Gas.

10)Construct A New 150 km Pipeline to Link Taza With Mansuriya so

that Available Gas from NGC of circa 200 mmscfd could be used

for Power Generation. Also, this Pipeline will Provide an Alternative

Route to Central Iraq.

Page 20: Invited Talk Iraq Energy Forumiraqener/sites/default/files/iei_files/URUK... · 10. Experienced in installation of GE Frame 6B, Frame 9E and Alstom 13E2 GTGs Page # 4 E S ER. Page

Page # 20

IRAQ’S POWER SECTOR

Suggested New 150km 24-inch Gas Pipeline Taza-Mansuriya

New 160 km 24 inch Pipeline

Mansuriya Power Plant

Mansuriya Spur 32-inch Pipeline

Iran-Iraq 48-inch Pipeline

Original Figure From Shell Draft Document “ Iraq Gas Master Plan II 7 May 2015”

Page 21: Invited Talk Iraq Energy Forumiraqener/sites/default/files/iei_files/URUK... · 10. Experienced in installation of GE Frame 6B, Frame 9E and Alstom 13E2 GTGs Page # 4 E S ER. Page

Thank You For Your Attention

The Gas Challenge for Iraq’s Electricity

Generation

Dr. Jafar D. Jafar Uruk Engineering & Contracting Company (LLC)

Iraq Energy Forum

Hosted by IRAQ Energy Institute(IEI)

Al Rasheed Hotel Baghdad

April 2-3, 2017