INVESTMENT PLAN

Steven DicksonDirector of Facilities18 May 2011

Page 2: INVESTMENT PLAN Steven Dickson Director of Facilities 18 May 2011.

Aims of Presentation

Update on Investment plan Status of approved projects Campus Phase 2 feasibility studies Residences Strategy

Questions

Page 3: INVESTMENT PLAN Steven Dickson Director of Facilities 18 May 2011.

University Estate Investment

• Headlines– Council approval in principal to £600m combined

Investment across Academic and Residential Estate– Investment assumptions revisited through planning

process against Strategic Plan deliverables– Capital funding cut by 68% by HEFCE– Financial planning/affordability modelling ongoing– Carbon Reduction increased to 36% by 2020

Page 4: INVESTMENT PLAN Steven Dickson Director of Facilities 18 May 2011.

Investment Plan Status Update • Phase 1 Approved

– Total Investment £110m (excludes Vine Ct)– EIP, CTL, APEX, Building Infrastructure, Student Experience ,CBB, Campus

Enhancements/Public Realm, Student experience and Research Excellence – Projects procured 10% below PTE– Spend to date £50m

• Phase 2 (£140m)– Planning round captured additional £17m – Plan reprioritised in consultation with Faculties– Affordability

• Phase 3 2015-2010– £100m earmarked

Page 5: INVESTMENT PLAN Steven Dickson Director of Facilities 18 May 2011.

Apex Phase 1

Phase 1 £30m budget estimate, £27m approved mandate

Provide state-of-art bio sciences support Unit, containment labs and specialised laboratories (6000m² GFA)

Building completion October 2011 Relocation phase 6 months On time/budget Phase 2 delivery subject to

financial closure with PFI consortia Allows relocation of all UoL

research activity from RLUH once PFI reaches financial close

Phase 1Phase 2

Page 6: INVESTMENT PLAN Steven Dickson Director of Facilities 18 May 2011.

Central Teaching Laboratories

Project Summary

£25 budget estimate, £23m approved mandate

Provides three floors of state of the art highly serviced laboratories (8000m²)

Guaranteed Maximum Price negotiated 1000 student capacity Utilisation of 50%+ Full lab occupation 2nd semester 2012 Public realm improvements, art work

agreed, Dalwood sculpture secured and improved

Page 7: INVESTMENT PLAN Steven Dickson Director of Facilities 18 May 2011.

Public Realm

Page 8: INVESTMENT PLAN Steven Dickson Director of Facilities 18 May 2011.

Leahurst

• Refurbish post mortem facilities • £1m Equine Intensive Care Unit - First phase of new

Equine Development • Project Feasibility Group established

Page 9: INVESTMENT PLAN Steven Dickson Director of Facilities 18 May 2011.

2010/2011 Completed Minor Projects • Total c £15m investment• Student Experience - £5.5m

– External Fabric Improvements• Roof works Abercrombie Sq, Sherrington, Thomson Yates, EEE• Window replacement Thomson Yates• Central bookable rooms, toilets , south campus, teaching labs

life sciences• Research - £1m (energy institute, veterinary science)• DDA - £500k• Sustainability -£3.5m• Wyncote Sports Facilities – £500k• At Risk Infrastructure - £1.5m

Page 10: INVESTMENT PLAN Steven Dickson Director of Facilities 18 May 2011.

2011/12 Phase 1 Investment• Total Expenditure Identified £60m• Student Experience

– PGR Reading Room Senate Drum– Sports Facilities– Improve Teaching Facilities– Student Social Space – Public Realm

• Research Excellence– CFBB – Clinical Trials – Stevenson Institute

• Business Continuity– At risk Infrastructure– Energy Security– Sustainability

• South Campus Phase 1

Page 11: INVESTMENT PLAN Steven Dickson Director of Facilities 18 May 2011.

• 94% of South Campus built pre-1970

• 18 out of 36 buildings (50%) in poor condition (RICS Grade C & D)

• 16 buildings (44%) have no disabled access

• 23 buildings (64%) are Grade II listed with limited scope to remodel

• 9% of usable space (4,250 sqm) is vacant

• Teaching space significantly under-utilised (Frequency 39%, Occupancy

47%)

• School staff numbers projected to increase by c.16% (2014/15)

• Student numbers projected to increase by c.20% (2014/15)

South Campus

Page 12: INVESTMENT PLAN Steven Dickson Director of Facilities 18 May 2011.

• Enhance the student experience

• Upgrade 80% of retained estate to Grade A/B condition (building fabric)

• Upgrade the quality of teaching, learning and research facilities

• Improve utilisation of teaching space

• Co-locate Departments within their Schools as much as possible

• Align corporate space policies with the Academic Faculty Plan

• Ensure that office space is both efficient and effective

• Reduce overall space (GIA) by c.10% in line with Estates Strategy and Space targets

• Improve disabled access (DDA)

• Reduce building occupancy costs

• Improve Sustainability and reduce ‘carbon footprint’

Aims & Objectives

Page 13: INVESTMENT PLAN Steven Dickson Director of Facilities 18 May 2011.

to79

MYRTLE STREET

MEL

VILL

E P

LAC

E

70to67

58to55

ElSub Sta

34to31

47 to

54

46to43

38to

35

Senate House

CAMBRIDGE STREET

El Sub Sta

37

32

27

21

20

38 40

41 43

44 45

12

11

81

4647

48 49

1

6

7

J OH

N M

OO

RES

CLO

SE

1

2

FB

Van-

de-

Gra

affG

ener

ator

OXFORD STREET

Oxf

ord

(PH

)

GRO

VE S

TREE

T

67

Day Nursery

1

Staff

House503

Art

Gal.

406143

142

141

444

Bed

ford H

ouse505

443

442

441

440

439

438

437

436

MulberryC

ourt670

Sports C

entre511

140 - 1 to 7a Abercrom

by Square

116115

Sir A

lastair Pilking

ton Building

152

Latin Am

ericanStud

ies111

Music

104

Civic D

esign109

Eleanor R

athboneB

uilding

106

Rend

all Building

432

Abercrom

by Square G

arden521

Law120

Cyp

ress108

Roxb

y Building

107

Melly H

ouse147

SAC

OS

146

Econom

ics &Social

History145

History144

Managem

ent School

Sid

ney Jones Library433

Senate H

ouse423

Senate C

hamber

423

Oliver Lod

ge208

Rob

ert Robinson Laboratories

213

Day N

ursery

Tudor

Close675

126 Mount

Pleasant114

Melville G

rove679

Octagon112

426

Surface S

ciences210

19-23 Abercromby Square148

School of A

rchitecture149

The Green

521

Philharm

onic Court

655

Chatham

Build

ing425

10

Walnut House

Vine House

ChestnutHouse128 M

ountPleasant776

Cyp

ressH

ouse

PortersLodge

CAMBRIDGE STREET

22

2a

59 to 85

Evna House

Liverpool Community College

The Arts Centre

The Varsity(PH)

9

1 to 1214 to 68

69 to

108

114

Mul

berry

Cou

rt

El Sub Sta

GRO

VE S

TREE

T

117123

90to87

71 to

78

82

Bank

ARRA

D STR

EET

CAMBRIDGE STREET

Nat West BankHSBC Bank

Tudor Close

129

4 1

75

3022

14

13 to 15

OXFORD STREET

126

13 15

BED

FORD

STR

EET

NO

RTH

ABERC

RO

MB

Y SQ

UARE

MU

LLB

ERR

Y ST

REET

31

19

20 to 23

24 to 27

ABERCROMBY SQUARE

CHESTNUT STREET

1 to 5

Nicholas House

PH

El Sub Sta

PC

J ohn Moores University

Faculty of Art and Design

BAC

K M

ULB

ER

RY

STR

EET

PO

Rodney

YouthCentre

12

113109 111

2a

412

106

MYRTLE STREET

PH

CH

ATH

AM

STR

EET

MYRTLE PARADE

140

2422

1

5

MU

LBERR

Y ST

REET

BED

FORD

STR

EET

SOU

TH

MULBERRY PLACE

BAC

K B

ED

FOR

D S

TREET

University of Liverpool

88

El Sub Sta

Raphael House

Nurses' HomeNicholas House

Nur

ses' H

ome

FB

PH

45

7 6

7a

76

78

51 to 57

2 4

CAMBRIDGE STREET

Shelter

1413 12

11

89

23

1

Space saving: 9.3%

School of the Arts

School of Histories, Languages & Cultures

School of Environmental Sciences

School of Law & Social Justice

UoL Management School

School of Psychology

General teaching Randal Building

Student Support Office

Building disposed of

5,667 sqm

2,367 sqm (half of Eleanor R.)

2,873 sqm (+ extension)

Usable Areas indicated

14

147A

Initial Proposals

8,326 sqm (excludes Reading Room)

Page 14: INVESTMENT PLAN Steven Dickson Director of Facilities 18 May 2011.

Phase 2 Priorities - Feasibility Studies £500,000 approved mandate

Feasibility Studieso PFG establishedo South Campuso Refurbishment of Guild & Reilly buildingo Management School extensiono Veterinary Sciences relocation

Develop design to RIBA Stage C to achieve greater design and cost certainty

Page 15: INVESTMENT PLAN Steven Dickson Director of Facilities 18 May 2011.

Next Steps

To complete Phase 2 feasibility studies To continue to review financial and affordability

model on project by project basis Further consultations with Faculties on capital

investment priorities Return to P&R and Council for detailed approval of

individual investments Ongoing consultation with Faculties on capital

investment priorities

Page 16: INVESTMENT PLAN Steven Dickson Director of Facilities 18 May 2011.

Residences Strategy

Page 17: INVESTMENT PLAN Steven Dickson Director of Facilities 18 May 2011.

Background

• A report in 2007 concluded that quality student accommodation is essential to ensure that UoL maintains its competitiveness

• The University has always offered accommodation to 1st year under graduates and a limited number, PGT and PGR students

• Student residences remain integral to UoL offering

• Decliners survey

• Browne review impact – students will expect more

• Updated review commissioned in 2010

Page 18: INVESTMENT PLAN Steven Dickson Director of Facilities 18 May 2011.

Scope Of Review• Assess the condition of the current accommodation;

• Undertake a demand assessment including mix and quality of accommodation and projected increase in students (UK & International)

• Identify the investment required to lift the standard of UoL accommodation to that of other Russell Group Universities

• Assess and realign the balance of “on” and “off” campus accommodation

• Undertake Supply/Demand analysis

• Identify optimum development sites

• Undertake detailed investment appraisal

• Provide Flexible approach

Page 19: INVESTMENT PLAN Steven Dickson Director of Facilities 18 May 2011.

Current Position

• The University has 3481 residential beds (2421 off campus and 1060 on campus

• Condition Survey – conclusion estate has exceeded its design life

• En-suite 9% UoL v 60% Russell Group• £2.70m per annum is only just keeping the ageing estate

operational• Without urgent intervention much of the stock will require

to be withdrawn within the next 3-5 years• Do nothing is NOT an option

Page 20: INVESTMENT PLAN Steven Dickson Director of Facilities 18 May 2011.
Page 21: INVESTMENT PLAN Steven Dickson Director of Facilities 18 May 2011.

Strategy Ambition• Deliver high quality, affordable fit-for purpose competitively priced

accommodation• Quality

• Pastoral Care Not a private sector experience• Offering expected of a Russell Group University• Student community• Broad range of accommodation type an pricing from non-en suite to loft

apartments• Meet PGR and PGT requirements in a village environment• Cater for our International students

• Sustainability• Whole life Cost• Repay finance and service debt• Institutionally affordable• Delivers positive cash flow• Influence rental levels to mitigate pricing risk

Page 22: INVESTMENT PLAN Steven Dickson Director of Facilities 18 May 2011.

Strategy Ambition

Page 23: INVESTMENT PLAN Steven Dickson Director of Facilities 18 May 2011.

Key Strategy - Outputs• Rebalance student accommodation with greater provision on Campus

• Undertake a phased new build (3577 Inc. of Vine Court / refurbishment (690)

• Mitigate risk using private sector to deliver 900 beds

• Meet increased demand requirement by an additional 1100 student lets (Direct for UOL)

• Deliver suitable accommodation (95 lets) to deliver pastoral care

• Phase 1 Off campus provision at Greenbank delivering a Student Village with ancillary sporting, catering and social facilities

• Phase 2 Carnatic - care and maintain existing bed numbers to be reviewed in 2017

• Deliver new financially viable residential estate at a total cost of £233m (inc Vine Ct)

Page 24: INVESTMENT PLAN Steven Dickson Director of Facilities 18 May 2011.

Phase 1 Vine Court Eco - Residences

Project Summary

£44m Investment approved Sets new standards in Quality and Sustainability West Block designed to hotel standard Provides a mix 749 en-suite study bedroom

rooms, studio apartments and 2 bed loft duplex apartments

250 seat restaurant, cafe and retail space Building completion June 2012 On programme

Page 25: INVESTMENT PLAN Steven Dickson Director of Facilities 18 May 2011.

Strategy – On Campus• Total 1400 new beds on campus

• Brownlow Hill/ Crown Street will deliver circa 1,000 beds plus other uses inc. small hotel.

• Mulberry Court rebuild will deliver 350 beds plus retail (Target 237 beds (150 lets).

• Alsop will deliver circa 1,000 beds plus other uses inc. small hotel (Target of 1061 beds (1039 lets).

Page 26: INVESTMENT PLAN Steven Dickson Director of Facilities 18 May 2011.

Phase 1 - Off Campus

• Total 1870 beds• 1633 New beds • 166 refurbished • Village Environment• Enhanced Sporting and

Ancillary Facilities

Page 27: INVESTMENT PLAN Steven Dickson Director of Facilities 18 May 2011.

Financial

• The strategy is estimated to cost £191.5m - £233.5m (inc Vine Ct over 5 years)

• Strategy proposed to be fully funded by bank debt (mortgage over 40 years)

• Detailed investment appraisal undertaken incorporating construction phasing, development and funding costs and recurring income and expenditure

• Investment self funding over life of asset

• Additional benefits

• Includes £12m of additional sports and student experience facilities

• Includes £6m of non - income generating accommodation for Tutor and Wardens