Investment Opportunities in public infrastructure and ...€¦ · Huancayo –Huancavelica Railroad Purpose: Comprehensive rehabilitation of the Huancayo-Huancavelica railroad. Competent

Oct 14, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Investment Opportunities in public infrastructure and ...€¦ · Huancayo –Huancavelica Railroad Purpose: Comprehensive rehabilitation of the Huancayo-Huancavelica railroad. Competent

Investment Opportunities in public

infrastructure and public services –

ProInversión(State Initiatives and Unsolicited proposals projects)

2017- 2018

June 27, 2017. revised

Page 2: Investment Opportunities in public infrastructure and ...€¦ · Huancayo –Huancavelica Railroad Purpose: Comprehensive rehabilitation of the Huancayo-Huancavelica railroad. Competent
Page 3: Investment Opportunities in public infrastructure and ...€¦ · Huancayo –Huancavelica Railroad Purpose: Comprehensive rehabilitation of the Huancayo-Huancavelica railroad. Competent

Longitudinal de la Sierra Road – section 4

Purpose This project consists on the execution ofimprovement and rehabilitation works (117km) initialperiod maintenance (503 km) and operation andmaintenance of approximately 970 km of theLongitudinal de la Sierra Road, an important nationalroad connecting 12 departments and go over theAndean region from top to bottom.

Competent Government Authority: Ministry ofTransport and Communication

Modality: Co-financed State Initiative

Investment amount (w/o VAT): USD 464 million

Term: 25 years

Areas of influence Junín, Huancavelica, Ayacucho andApurímac, and Ica.

Estimated award date: Second half of 2017

CALLED

Page 4: Investment Opportunities in public infrastructure and ...€¦ · Huancayo –Huancavelica Railroad Purpose: Comprehensive rehabilitation of the Huancayo-Huancavelica railroad. Competent

Amazon Waterway (Second Call)

Purpose Seaworthy improving and maintenancethrough dredging works, level measurements andmonitoring the Huallaga, Marañon Ucayali, andAmazonas rivers to guarantee the goods trafficand passengers , all year around.

Competent Government Authority: Ministry ofTransport and Communication

Modality: Co-financed State Initiative

Investment amount (w/o VAT): USD 95 million

Term: 20 years

Areas of influence :Loreto and Ucayali

Estimated award date: First half of 2017

CALLED

Page 5: Investment Opportunities in public infrastructure and ...€¦ · Huancayo –Huancavelica Railroad Purpose: Comprehensive rehabilitation of the Huancayo-Huancavelica railroad. Competent

Huancayo – Huancavelica Railroad

Purpose: Comprehensive rehabilitation of the Huancayo-Huancavelica railroad.

Competent Government Authority: Ministry ofTransport and Communication

Modality: Co- financed State Initiative

Investment amount (w/o VAT): USD 204 million

Term: 30 years

Areas of influence :Junín and Huancavelica

Estimated award date: Second half of 2017

CALLED

Page 6: Investment Opportunities in public infrastructure and ...€¦ · Huancayo –Huancavelica Railroad Purpose: Comprehensive rehabilitation of the Huancayo-Huancavelica railroad. Competent

Modernization and Development of the Multipurpose Salaverry Port Terminal (PT)

Purpose: Design, financing, construction,preservation, exploitation and transfer of theport infrastructure of Salaverry PT.

Competent Government Authority: Ministryof Transport and Communication – NationalPort Authority (NPA)

Modality: Self-financed Unsolicited proposal

Investment amount (w/o VAT): USD 215million

Term: 30 years

Areas of influence : La Libertad, Cajamarcaand Ancash.

Estimated award date: Second half of 2017

UNDER EVALUATION

Page 7: Investment Opportunities in public infrastructure and ...€¦ · Huancayo –Huancavelica Railroad Purpose: Comprehensive rehabilitation of the Huancayo-Huancavelica railroad. Competent

Sierra Road Concession

Pativilca

Conococha

Huaraz

LlanganucoCaraz

Pativilca

Conococha

Huaraz

LlanganucoCaraz

Purpose: Operation, maintenance anddevelopment of 264km of DTR Conococha –Conococha and Conococha – Huaraz – Carazhighway, and rehabilitation, operation andmaintenance of 25 km between Yungay andthe Llanganuco lake. It is part of theLongitudinal de la Sierra Road.

Competent Government Authority: Ministryof Transport and Communication.

Modality: Self-financed unsolicited proposal.

Investment amount (w/o VAT): UnderEvaluation.

Term: 25 years.

Areas of influence: Huaraz-Caraz- Pativilca.

Estimated award date: Second half of 2018.

UNDER EVALUATION

Page 8: Investment Opportunities in public infrastructure and ...€¦ · Huancayo –Huancavelica Railroad Purpose: Comprehensive rehabilitation of the Huancayo-Huancavelica railroad. Competent

Lima-Callao Metro Line 3

Line 1 : in operation

Line 2 : under construction

Línea 3

Lima and Callao

Purpose: Purpose: Line 3 (North- South axis)will be an approximately 38km length. Theproject shall consist in the concession ofdesign, financing, construction, provision ofelectromechanical equipment, acquisition ofrolling stock, operation, and maintenance.

Competent Government Authority: Ministryof Transport and Communication

Modality: Co-financed State Initiative

Investment amount (w/o VAT): USD 5 600million

Term: 30 years

Areas of influence : Lima and Callao

Estimated award date: 2018-2019

TO BE CALLED

Page 9: Investment Opportunities in public infrastructure and ...€¦ · Huancayo –Huancavelica Railroad Purpose: Comprehensive rehabilitation of the Huancayo-Huancavelica railroad. Competent

Line of road ring

Lima and Callao

Peripheral Ring Road

Purpose: To implement a highway of33.2km in length, from Óvalo 200 Millas toCircunvalación avenue.

Competent Government Authority:Ministry of Transport and Construction.

Modality: Co-financed unsolicited proposal.

Investment Amount (w/o VAT): USD 2 047million.

Term: 30 years.

Area of influence: Lima and Callao

Estimated award date: 2018.

UNDER EVALUATION

Page 10: Investment Opportunities in public infrastructure and ...€¦ · Huancayo –Huancavelica Railroad Purpose: Comprehensive rehabilitation of the Huancayo-Huancavelica railroad. Competent
Page 11: Investment Opportunities in public infrastructure and ...€¦ · Huancayo –Huancavelica Railroad Purpose: Comprehensive rehabilitation of the Huancayo-Huancavelica railroad. Competent

* EPC: Engineering, Procurement and Construction

Repowering up to 1000 MVA of LT 500 kV Carabayllo-Chimbote-Trujillo and Variable Reactive Compensator +400/-150 MVAR in 500 kV Northern Trujillo Structural System

Purpose: Concession for the design, financing,construction, operation and maintenance of asection repowering of the transmission line in 500kV in the middle north of the country and a variablereactive compensation equipment in TrujilloStructural System. These investments will strengththe transmission system in 500 kV of the NationalInterconnected System (SEIN)

Competent Government Authority: Ministry ofEnergy and Mines.

Modality: Self-financed State initiative

Investment amount (w/o VAT): USD 64 million(EPC*)

Term: 30 years plus the construction period (33months).

Area of influence: Ancash, La Libertad and Lima

Estimated award date: Second half of 2017

TO BE CALLED

Page 12: Investment Opportunities in public infrastructure and ...€¦ · Huancayo –Huancavelica Railroad Purpose: Comprehensive rehabilitation of the Huancayo-Huancavelica railroad. Competent

220 kV Tintaya – Azangaro Transmission Line

* EPC: Engineering, Procurement and Construction

Purpose: Concession for the design,financing, construction, operation andmaintenance of a transmission line in220kV of 128 km approximately with acapacity of 450 MVA. This transmission linewill strengthen the energy transport in thesouth of the country.

Competent Government Authority:Ministry of Energy and Mines.

Modality: Self-financed State initiative

Investment Amount (w/o VAT): USD 59million (EPC *)

Term: 30 years plus the construction period(36 months).

Area of influence: Cusco and Puno

Estimated award date: Second half of 2017

CALLED

Page 13: Investment Opportunities in public infrastructure and ...€¦ · Huancayo –Huancavelica Railroad Purpose: Comprehensive rehabilitation of the Huancayo-Huancavelica railroad. Competent

“500 kV Mantaro - Nueva Yanango -Carapongo Connection andassociated sub stations" , and "500 kV Nueva Yanango - NuevaHuanuco connection and associated sub stations"

Purpose: Concession for the design, financing,construction, operation and maintenance of twotransmission lines in 500 kV of 390 and 184 kmapproximately with capacities of 1400 MVA and600 MVA respectively, to strength the energytransport in the area of Mantaro and provideenergy coming from new hydroelectricdevelopments of the area.

Competent Government Authority: Ministry ofEnergy and Mines.

Modality: Self-financed State initiative

Investment amount (w/o VAT): USD 509 million

Term: 30 years plus the construction period (38 y40 months).

Area of influence: Huancavelica, Junín and Lima

Estimated award date: Second half of 2017

CALLED

Page 14: Investment Opportunities in public infrastructure and ...€¦ · Huancayo –Huancavelica Railroad Purpose: Comprehensive rehabilitation of the Huancayo-Huancavelica railroad. Competent

Variable Reactive Compensator +400/-100 MVAR in La Planicie Structural System

Purpose: The project is intended to allow a greater reliability on the energy supply in the region of Lima.

Competent Government Authority: Ministry of Energy and Mines

Modality: Self-financed State initiative

Investment Amount (w/o VAT): USD 25 million

Term: 30 years plus the construction period (24 months)

Area of influence: Lima

Estimated award date: First half of 2018

TO BE CALLED

Page 15: Investment Opportunities in public infrastructure and ...€¦ · Huancayo –Huancavelica Railroad Purpose: Comprehensive rehabilitation of the Huancayo-Huancavelica railroad. Competent

* EPC: Engineering, Procurement and Construction

New 220 kV Carhuaquero Power Substation

Purpose: Concession for the design, financing,construction, operation and maintenance of astructural system (valve yard) that will facilitatethe fieldwork of the lines in the area of Chiclayoand Cajamarca in the north of the country.

Competent Government Authority: Ministry of Energy and Mines.

Modality: Self-financed State initiative.

Investment Amount (w/o VAT): USD 10 million(EPC*)

Term: 30 years plus the construction period (30months).

Area of influence: Cajamarca

Estimated award date: First half of 2018

TO BE CALLED

Page 16: Investment Opportunities in public infrastructure and ...€¦ · Huancayo –Huancavelica Railroad Purpose: Comprehensive rehabilitation of the Huancayo-Huancavelica railroad. Competent

New power substation: La Planicie 500/200 kv

Purpose: The project New Power Substation La Planicie aims to cover the power energy demand in the urban area of the Lima city

Competent Government Authority: Ministry of Energy and Mines.

Modality: Self-financed State initiative

Investment Amount (w/o VAT): To be determined

Term: To be determined

Area of influence: Lima

Estimated award date: First half of 2018

TO BE CALLED

Page 17: Investment Opportunities in public infrastructure and ...€¦ · Huancayo –Huancavelica Railroad Purpose: Comprehensive rehabilitation of the Huancayo-Huancavelica railroad. Competent
Page 18: Investment Opportunities in public infrastructure and ...€¦ · Huancayo –Huancavelica Railroad Purpose: Comprehensive rehabilitation of the Huancayo-Huancavelica railroad. Competent

Michiquillay Mining Project

Purpose: Michiquillay is a copper andmolybdenum porphyritic deposit. Theestimated Resources exceed the 1 000millions of TM, with 0.63% of Cu and0.014% of Mo, for a production of 80Thousand TPD of ore.

Competent Government Authority:Ministry of Energy and Mines.

Modality: Self-financed State Initiative

Investment amount (w/o VAT): USD 2016million.

Area of influence: Cajamarca, District of LaEncañada, at 3 950 masl.

Estimated award date: 2017.

TO BE CALLED

Page 19: Investment Opportunities in public infrastructure and ...€¦ · Huancayo –Huancavelica Railroad Purpose: Comprehensive rehabilitation of the Huancayo-Huancavelica railroad. Competent

Jalaoca Mining Project

Purpose: According to geologic, mineralogy characteristicsand alterations, along with geophysics anomalies, themine zone offers conditions to be explored for Copper,Gold and Molybdenum, considering interestingpossibilities in two out of four identified targets: atPucasalla, a porphyry-skarn Cu-Au deposit, and at Llamoja,a porphyry Cu-Mo deposit. The deposit potential and sizeshall be defined with drilling works.

Competent Government Authority: Ministry of Energyand Mines.

Modality: Self-financed State Initiative, Option ortransference Contract is awarded by Public Bid.

Investment Amount (w/o VAT): Under Evaluation.

Term: Under Evaluation.

Area of influence: Jalaoca is located in the department ofApurimac, between Aymaraes and Antabamba provinces(4 500 msnm).

Estimated award date: 2018

TO BE CALLED

Page 20: Investment Opportunities in public infrastructure and ...€¦ · Huancayo –Huancavelica Railroad Purpose: Comprehensive rehabilitation of the Huancayo-Huancavelica railroad. Competent

Colca Mining Project

Mining zone of Colca Project

Location

Purpose: Is a mining area comprising a superficial extension of14,100 hectares, in which the Peruvian state has develop basicgeological studies and has identified investment possibilities forexploration. Two important mineralized zones have beenidentifies, these are surrounded by other significant miningproperties with defined potential. Favorable geophysicalinformation and lab results point the possibility to find apossible Copper-Gold porphyry. With drilling works, the depositpotential and size would be defined

Competent Government Authority: Ministry of Energy andMines

Modality: Self-financed State initiative, option or transferenceContract is awarded by Public Bid.

Investment amount (w/o VAT): To be defined.

Term: Under Evaluation.

Area of influence: Districts of Cotabambas and Tambobamba,province of Cotabambas, department of Apurímac.

Estimated award date: 2018

TO BE CALLED

Page 21: Investment Opportunities in public infrastructure and ...€¦ · Huancayo –Huancavelica Railroad Purpose: Comprehensive rehabilitation of the Huancayo-Huancavelica railroad. Competent
Page 22: Investment Opportunities in public infrastructure and ...€¦ · Huancayo –Huancavelica Railroad Purpose: Comprehensive rehabilitation of the Huancayo-Huancavelica railroad. Competent

Broadband Installation for Amazonas, Ica and

Lima

Lima

Amazonas

Ica

Purpose: Provide telecommunication services inBroadband, including regional optical fiber networkinstallation.

Competent Government Authority: Ministry ofTransport and Communications

Modality: Asset Based Projects

Investment amount in Amazonas (w/o VAT): USD 57million

Investment amount in Ica (w/o VAT): USD 24 million

Investment amount in Lima (w/o VAT): USD 61 million

Area of influence: Lima, Ica and Amazonas

Estimated award date: Second half of 2017.

TO BE CALLED

Page 23: Investment Opportunities in public infrastructure and ...€¦ · Huancayo –Huancavelica Railroad Purpose: Comprehensive rehabilitation of the Huancayo-Huancavelica railroad. Competent

Access Networks of Broadband Projects for comprehensive connectivity and social development of the Puno and Junin regions

TO BE CALLED

Objective: Provide telecommunications services inBroadband. It does not include the installation ofregional fiber optic networks that will soon beentrusted to ProInversión under the PPP modality(Public Private Partnership) or projects in assets.

Competent Entity: Ministry of Transport andCommunications

Modality: Asset Projects

Investment amount in Puno (w/o VAT): USD 77 million

Investment amount in Junín (w/o VAT): USD 65 million

Area of influence: Puno and Junin

Estimated award date: Second half of 2017

Junín

Puno

Page 24: Investment Opportunities in public infrastructure and ...€¦ · Huancayo –Huancavelica Railroad Purpose: Comprehensive rehabilitation of the Huancayo-Huancavelica railroad. Competent
Page 25: Investment Opportunities in public infrastructure and ...€¦ · Huancayo –Huancavelica Railroad Purpose: Comprehensive rehabilitation of the Huancayo-Huancavelica railroad. Competent

Mass use of Natural Gas for Center and Southern Peru

Purpose: The Project consists on the design,financing, construction, operation, maintenance pfnatural gas distribution systems by pipe network inseven (7) center-southern regions of the country,and transference of these systems to the PeruvianGovernment after the concession period.

Competent Government Authority: Ministry ofEnergy and Mines

Modality: Self-financed State Initiative.

Investment Amount (w/o VAT): USD 350 million

Term: 32 years

Area of influence: Ucayali, Junín, HuancavelicaAyacucho, Apurímac, Cusco and Puno

Estimated award date: First half of 2018

CALLED

Page 26: Investment Opportunities in public infrastructure and ...€¦ · Huancayo –Huancavelica Railroad Purpose: Comprehensive rehabilitation of the Huancayo-Huancavelica railroad. Competent

SANITATION AND

HEALTH

Page 27: Investment Opportunities in public infrastructure and ...€¦ · Huancayo –Huancavelica Railroad Purpose: Comprehensive rehabilitation of the Huancayo-Huancavelica railroad. Competent

Three new High-Complexity Hospital Centers (ESSALUD)

Ubicación Purpose: Projects include design, construction,

equipment, operation and maintenance ofsupplementary services (APP) in High-Complexityhospitals for the Social Security System of Peru(ESSALUD), one will be located in the city of Lima(Nuevo Instituto de Salud del Niño y Adolescente),and 2 in the provinces at the north of the country(Piura and Ancash).

Competent Government Authority: ESSALUD

Modality: Co-financed State Initiative

Investment Amount (w/o VAT): USD 424 million

Term: 20 years (3 years of construction andequipment) and 17 years of operation andmaintenance)

Areas of influence: Chimbote, Piura and Lima

Estimated award date: Second half of 2018

TO BE CALLED

Page 28: Investment Opportunities in public infrastructure and ...€¦ · Huancayo –Huancavelica Railroad Purpose: Comprehensive rehabilitation of the Huancayo-Huancavelica railroad. Competent

Wastewater treatment system of the Lake Titicaca Basin

Puno

Purpose: Development of solution fortreatment and final disposal of municipalwastewater in the Lake Titicaca Basin inPuno.

Competent Government Authority:Ministry of Housing, Construction andSanitation.

Modality: Co-financed unsolicitedproposal.

Investment Amount: USD 300 million.

Term: 30 years

Area of Influence: Puno

Estimated award date: First half of 2018.

TO BE CALLED

Page 29: Investment Opportunities in public infrastructure and ...€¦ · Huancayo –Huancavelica Railroad Purpose: Comprehensive rehabilitation of the Huancayo-Huancavelica railroad. Competent

Improvement and extension of the Sewerage and Wastewater Treatment System at the Locations of Huancayo, el Tambo and Chilca

Purpose: The project includes the design,financing, construction and operation of 6new collectors, 4 wastewater pumpingstations and 1 Plant of WastewaterTreatment of 80,700 m3/d.

Competent Government Authority:Ministry of Housing, Construction andSanitation.

Modality: Co-financed Unsolicitedproposal.

Investment Amount (w/o VAT): USD 89.1million

Term: 20 years.

Area of influence: Junín

Estimated award date: Second half of2018.

UNDER EVALUATION

Page 30: Investment Opportunities in public infrastructure and ...€¦ · Huancayo –Huancavelica Railroad Purpose: Comprehensive rehabilitation of the Huancayo-Huancavelica railroad. Competent
Page 31: Investment Opportunities in public infrastructure and ...€¦ · Huancayo –Huancavelica Railroad Purpose: Comprehensive rehabilitation of the Huancayo-Huancavelica railroad. Competent

Public Auction of properties owned by FCR*

Purpose: Auction of the property called«Nicolas de Piero» located at Av. Nicolas dePiérola N°508 to 540 and Av. Garcilaso de laVega N°711 to 795 district of Lima and, theproperty called «Lord Nelson» located atstreet Almirante Lord Nelson N°236, 240and 244, district of Miraflores, province anddepartment of Lima.

Competent Government Authority : FondoConsolidado de Reservas Previsionales (FCR).

Modality: Public Auction.

Sale price:

Property Nicolas de Piérola_ Lima

US$ 4’950,000.

Property Lord Nelson_Miraflores

US$ 5’615,000.

Auction sale date: Second half of 2017

Building "Nicolás de Piérola

Buildind“Lord Nelson”

CALLED

*FCR – Fondo Consolidado de Reservas Previsionales – Consolidated Reserve Fund

Page 32: Investment Opportunities in public infrastructure and ...€¦ · Huancayo –Huancavelica Railroad Purpose: Comprehensive rehabilitation of the Huancayo-Huancavelica railroad. Competent

Auction of nonagricultural plots -CHAVIMOCHIC

Purpose: Recover the public fund invested in irrigation worksin the valleys of La Libertad.

Competent Entity : Regional government of La Libertad.

Sale price: To be defined

Modality: Public auction.

Plots of nonagricultural use:

Provinces of Virú:

Reserve area of Chao Bajo 3 81 Ha

Reserve area Chao Bajo 4 55 Ha

Province of Trujillo:

Plot Salaverry-Uripe 365 Ha

Reserve area GRLL-2 17 Ha

Reserve area GRLL-3 49 Ha

Urban reserve area -El Tablazo1 71 Ha

Auction date: Second half of 2017

CALLED

Page 33: Investment Opportunities in public infrastructure and ...€¦ · Huancayo –Huancavelica Railroad Purpose: Comprehensive rehabilitation of the Huancayo-Huancavelica railroad. Competent

Ancón Industrial Park

Purpose: It consists on creating a modernspace for industrial companies of differentsizes in Lima Metropolitan Area. Thisspace must operate under internationalstandards.

Competent Government Authority:Ministry of Production.

Modality: State Initiative - Asset BasedProjects (Transfer of Assets withInvestment Commitment).

Investment Amount (w/o VAT): USD 500million approximately).

Term: 15 years

Area of Influence: Lima

Estimated award date: First half of 2018.

TO BE CALLED

Page 34: Investment Opportunities in public infrastructure and ...€¦ · Huancayo –Huancavelica Railroad Purpose: Comprehensive rehabilitation of the Huancayo-Huancavelica railroad. Competent