Foundation in Natural and Built Environment APRIL 2014 INTAKE INTRODUCTION TO CONSTRUCTION INDUSTRY (QSB 30105) (FINAL PROJECT) NAME: WELSON LUM WEI JIUNN & YONG SING YEW STUDENT ID: 0319514 & 0318766 TUTOR: PUAN HASMANIRA MOKHTAR
26

Introduction to construction industry final project (project brief)

Nov 29, 2014

Download

Career

WelsonJiunn

ICI
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Introduction to construction industry final project (project brief)

Foundation in Natural and Built Environment

APRIL 2014 INTAKE

INTRODUCTION TO CONSTRUCTION INDUSTRY

(QSB 30105)

(FINAL PROJECT)

NAME: WELSON LUM WEI JIUNN & YONG SING YEW

STUDENT ID: 0319514 & 0318766

TUTOR: PUAN HASMANIRA MOKHTAR

Page 2: Introduction to construction industry final project (project brief)

CONTENTS

1. INTRODUCTION

2. SUGGESTION AND PROPOSAL

3. INTRODUCTION TO THE SITE

4. SITE ANALYSIS

5. THE PLAN AND PROPOSAL

6. ZONING

7. THE CONCEPT

8. LAYOUT AND PERSPECTIVES

9. THE PURPOSES AND BENEFITS OF THE SITE

9. COSTING

Page 3: Introduction to construction industry final project (project brief)

INTRODUCTION

In this introduction to construction industry’s final project, we are required to form in a group of 2 students to find a specific land in Taylor’s University Lakeside Campus area to initiate a small construction. The site we need to select for our construction site should not be more than 30mx30m. We should propose a project that serves one of the following purposes which is:

1. Recreation area 2. Study Enhancement Area 3. Rest area 4. Food and beverage (dining area) 5. Commercial area (exclude food and beverage)

We have decided to construct our site into a recreation area. We have selected the site 30mx30m which is free car park spaces beside Taylor’s University Lakeside Campus’s Syopz’s Mall. Our 30mx30m site also connected with part of lake.

Page 4: Introduction to construction industry final project (project brief)

SUGGESTION AND PROPOSAL

For this project, we decided to propose a recreational area. This recreational area can be visit by students during day and night times. It is cover with a lot of greens example like trees, flowers and grass. This recreational area also for student to hang out and chill just like another example of Syopz’s Mall.

Page 5: Introduction to construction industry final project (project brief)

INTRODUCTION TO THE SITE

Basically our site is an area located in Taylor’s University Lakeside Campus. The location of Taylor’s University Lakeside Campus is No.1 Jalan Taylor’s 47500 Subang Jaya Selangor Darul Ehsan.

These are the closer views of our site. As you can see the cars are parking on the muddy and rocky roads.

This is the view of the site from library.

The site is a parking spaces which need

to pay for entry.

Page 6: Introduction to construction industry final project (project brief)

THE KEY PLAN

THE LOCATION PLAN

Taylor’s University Lakeside Campus

Site

30mx 30m

Page 7: Introduction to construction industry final project (project brief)

THE SITE PLAN

Car park spaces

Syopz’s Mall

30m x 30mLake

Wooden Fences

Selected site

Page 8: Introduction to construction industry final project (project brief)

Our site is an area beside Taylor’s University Lakeside Campus’s Syopz Mall. Our site is include the free car park spaces and some parts of the 5.5 hectares man-made lake. The approximate measurement of the car park area only is 500mx800m. 1/3 of our site will be the parts of lake and 2/3 will be the car park spaces.

SITE ANALYSIS

We had observed that our site conditions is always under a hot sunny sun which cause the students sweat a lot when they going up or off from their cars to the campus. This is because the site has a very less amount of trees and plants to cold the weather or as a shelter to cover the area.

The wind strength at our site is average because it does have a lot of tress and only an empty spaces. Sometimes the wind will be strong when the sign of rain is coming.

Page 9: Introduction to construction industry final project (project brief)

The road in our site is not in a good condition because it full of rocks and sand which have a rough and uneven surface and it may damage the vehicles tires. The worst feeling happen when the strong wind blew and the sand on the site fly and cause students eyes uncomfortable.

There is no places example like shelter for students to rest under a hot sun.

THE PLAN OF THE PROPOSAL

Platform for fishing Grass floor Wood bench

Gazebo

Stone bench

Garden LED light

Page 10: Introduction to construction industry final project (project brief)

ZONING

30x30M

Ixora flower

Toilet

Stone walkway

Bench under a big treeShelter walkway

Page 11: Introduction to construction industry final project (project brief)

Fishing Area Barbeque Area

Rest Area Study and Rest Area

Recreational Area

Flowering Area Toilet

Concept

The concept of the recreational area is part of the lake and part of the ground. The part of the lake allowed students to have fishing activities. The recreational area will create a platform there.

Page 12: Introduction to construction industry final project (project brief)

The ground of the recreational area is made in grass floor which allowed students to sit on it for resting or having some activities on the grass floor. It also a place for students to relax.

Gazebo is the most common structure you can see in every park but in this recreational area you can see a shelter provided BBQ equipment for students to have BBQ there.

THE OVERALL CONCEPT

Page 13: Introduction to construction industry final project (project brief)

Before this it was a car park spaces but after the recreational park is done it will only allowed bicycles to enter the park.

LAYOUT AND PERSPECTIVES

These are the image how our element or structure will look like in the recreational area.

This is how the platform for fishing look like people can fishing there.

The wood bench in our recreational area people can rest here.

Page 14: Introduction to construction industry final project (project brief)

This is how the stone bench will look like it is nicer and people can rest here.

Page 15: Introduction to construction industry final project (project brief)

The gazebo will look like this people can rest inside when hot weather or raining.

This is the Ixora flowers surrounding beside the area.

This is the garden LED light in the area so that when night people can also visit here.

Page 16: Introduction to construction industry final project (project brief)

This is the gazebo that people can barbeque inside here.

This is how the bench under a big tree look like. People can rest and study here.

Page 17: Introduction to construction industry final project (project brief)

This is how the shelter walkway look like.

This is how the water fountain in the middle of the shelter walkway.

Page 18: Introduction to construction industry final project (project brief)

This is the stone walkway in the recreational area.

Page 19: Introduction to construction industry final project (project brief)

This is the example of toilet in the recreational park.

This is the example of grass will be plant at the recreational park as a grass floor for people to sit. It looks kind of clean and smooth.

Page 20: Introduction to construction industry final project (project brief)

THE PURPOSE AND BENEFITS OF THE SITE

The purpose and benefits to create this recreational park is to make the area more greenish instead of it just like an unprotected area become a car park spaces before this. Since Taylor’s University Lakeside Campus have a large amount of students and the study or revision areas are limited so this recreational area is create for students to have their discussions or works at here. This also a good place for students to enjoy and relax. Here also can release their stress with the good environment and fresher air which surround with a lot of greens. Students also can have some activities in this recreational area. They can sit on the grass floor which is a new life style to have their revision and study. The most interesting activity in this recreational park is there is a lake for fishing. There is also

These are the wooden fences will be used to surround the platform and lake area.

Page 21: Introduction to construction industry final project (project brief)

barbeque stuff inside the each shelter for students to have their barbeque after their fishing.

COSTING

Item Description Quantity Amount (RM)1 Platform for fishing 2 4000.002 Grass Floor 1000.003 LED garden light 17 3500.004 Wood bench 2 300.005 Water fountain 1 2500.006 Gazebo 2 2000.007 Gazebo with barbeque

stuff1 1500.00

8 Shelter walkway 1000.009 Toilet 2 2000.00

10 Ixora flower 600.0011 Big tree with bench 2 800.0012 Wooden Fences 300.0013 Stone walkway 800.00

Total : 20,300.00

Page 22: Introduction to construction industry final project (project brief)

CONCLUSION

In a conclusion, we know to build a recreation area within Taylor's Lakeside University is not that easy, because we have think a lot and plan a lot before we start the construction. For example the air pollution, the sound pollution will affect the students studying and etc. Meanwhile, we built a recreation area which can provide a better place for students to enjoy themselves while studying. We also provide some activity inside the recreational area. We hope student will like and enjoy it. Lastly, we hope that this construction will get approve by Taylor’s University Lakeside Campus as soon as possible. This will be a recreational area which might not be appeared in others Universities or Colleges.

Page 23: Introduction to construction industry final project (project brief)