Introduction Project Management. Projects A unique process, consisting of a set of coordinated and controlled activities with start and finish dates,

Mar 29, 2015

Download

Documents

Andy Walker
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Introduction Project Management. Projects A unique process, consisting of a set of coordinated and controlled activities with start and finish dates,

Introduction

Project Management

Page 2: Introduction Project Management. Projects A unique process, consisting of a set of coordinated and controlled activities with start and finish dates,

Projects

A unique process, consisting of a set of coordinated and controlled activities with start and finish dates, undertaken to achieve an objective conforming to specific requirements including constraints of time, cost and resources.

(1)(1) uniqueunique

(2)(2) specific objectives (the project product)specific objectives (the project product)

(3)(3) constraints (especially: limited time frame)constraints (especially: limited time frame)

Page 3: Introduction Project Management. Projects A unique process, consisting of a set of coordinated and controlled activities with start and finish dates,

Notes

1. Projects may form parts of a larger project

2. Project objectives and scope are updated and defined progressively as the project proceeds.

3. Project product: it is defined in the project scope. One or more units, tangible or intangible.

4. The project’s organisation is normally temporary.

5. Complexity and interactions among project activities.

Page 4: Introduction Project Management. Projects A unique process, consisting of a set of coordinated and controlled activities with start and finish dates,

Projects are connected to change management

Usual business of the firm

Projects

Changes(uncertainty)

Routines &regular tasks

Page 5: Introduction Project Management. Projects A unique process, consisting of a set of coordinated and controlled activities with start and finish dates,

Common project elements

• Product specification

• Project plan

• Time frame

• Budget

• Cost plan

• Statemet of quality required

• Identification of areas of uncertainty

• Risk management: evaluation & responses

Page 6: Introduction Project Management. Projects A unique process, consisting of a set of coordinated and controlled activities with start and finish dates,

Collecting information

• Real time

• Facilities needed to analyse the collected data

Page 7: Introduction Project Management. Projects A unique process, consisting of a set of coordinated and controlled activities with start and finish dates,

The project triangle

+ customer focus

Page 8: Introduction Project Management. Projects A unique process, consisting of a set of coordinated and controlled activities with start and finish dates,

Project management

• Project management is the discipline of planning, organizing, and managing resources to bring about the successful completion of specific project goals and objectives.

• It is possible (and sometimes very efficient) to manage non-project processes as projects.

Page 9: Introduction Project Management. Projects A unique process, consisting of a set of coordinated and controlled activities with start and finish dates,

The project cycle

4 phases:

• Conception (definition)

• Development (planning)

• Realisation (implementation)

• Termination (closing)

Page 10: Introduction Project Management. Projects A unique process, consisting of a set of coordinated and controlled activities with start and finish dates,

Conception phase

• Idea of a new project– Internal– External

• Desirability (Does it fit the strategy and the mission?)

• Feasibility (costs, resources, schedule)

• Documentation: project (work) statement

• End of phase: formal authorization

Page 11: Introduction Project Management. Projects A unique process, consisting of a set of coordinated and controlled activities with start and finish dates,

Conception phase:Feasibility evalutaion

• Capability to deliver the project product in time• Final price of the product• Project budget• Specification of the product• Ability to support the capital outlay• Availability of the items and services needed• Acceptability of geographical and ecological • Acceptability of any further contract conditions

Page 12: Introduction Project Management. Projects A unique process, consisting of a set of coordinated and controlled activities with start and finish dates,

Development phase

• Appointment of the project manager and the project management team. From now on the project manager is in control.

• A first phase Project Management Plan (PMP). It contains all plans for the project, but it is continuously changing.

Page 13: Introduction Project Management. Projects A unique process, consisting of a set of coordinated and controlled activities with start and finish dates,

Realisation phase

• Turning the plans into reality.

• The project development and an appropriate reporting (monitoring) system are running simultaneously with the implementation process. A project log is needed.

Page 14: Introduction Project Management. Projects A unique process, consisting of a set of coordinated and controlled activities with start and finish dates,

The project termination

• Closing the project and its activities

• Knowledge management tasks:– Success of methods used– Project team performence– Reliability of suppliers

• Disposing the residual capital and equipment.

Page 15: Introduction Project Management. Projects A unique process, consisting of a set of coordinated and controlled activities with start and finish dates,

Project management maturity

• Project management development is an evolutionary process: every firm goes through nearly the same, step-by-step development process in their use of PM techniques.

• Different organizations are on different levels of sophistication in their best practices for managing projects.

Page 16: Introduction Project Management. Projects A unique process, consisting of a set of coordinated and controlled activities with start and finish dates,

PMP (Project Management Professional) sample questions (Pinto 2010)

Page 17: Introduction Project Management. Projects A unique process, consisting of a set of coordinated and controlled activities with start and finish dates,

PMP sample questions (Pinto 2010)

Page 18: Introduction Project Management. Projects A unique process, consisting of a set of coordinated and controlled activities with start and finish dates,

Discussion questions

Page 19: Introduction Project Management. Projects A unique process, consisting of a set of coordinated and controlled activities with start and finish dates,

Simplified case study• There is a family owned manufacturing company that produces spare parts for

motorcycles in great volumes and built customised motorcycles, too, for order only, in a small number per year.

• Some of the produced spare parts are manufactured in nearly the same form for years and no significant change is estimated in the future.

• However, there are some goods, that are demanded only for shorter periods. In these cases the firm configures the manufacturing equipment, creates the wanted volume and disassembel the machinery after the market demand (and so the profitability) drops below a given level.

• The custombike building is organized in a form of job shops, because these are built one by one.

• The company has now the organizational design of a typical small enterprise with only one managerial unit for every function and problem. Because of the increasing production volumes (and revenues) they need to change the structure sooner or later. The plan is to separate the sparepart-making activities from the custombike building via creating two divisions with autonomous divisional heads. It is a great reorganization with many possible difficulties, that is why the owners hesitate when to start it.

• Are there a (reasonal) place for projects and project management in this company?

Page 20: Introduction Project Management. Projects A unique process, consisting of a set of coordinated and controlled activities with start and finish dates,

Case studies

• http://oktato.econ.unideb.hu/kunandras/BAINMBA/SlidesPM2013/Cases_1.1_1.2.doc

Page 21: Introduction Project Management. Projects A unique process, consisting of a set of coordinated and controlled activities with start and finish dates,

Thanks for the attention!