Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Infrastructure Issues for Electric Vehicle Deployment in Ireland - ESB Networks

Infrastructure Issues for Electric Vehicle Deployment in Ireland

Conor GarriganESB Networks

Page 2: Infrastructure Issues for Electric Vehicle Deployment in Ireland - ESB Networks

Regulatory Background

•Generation :ESB PG plus independent generators•Transmission TSO: – Eirgrid•Distribution DSO: – ESB Networks•Supply : ESB Customer Supply ( PES) plus independent Suppliers

Page 3: Infrastructure Issues for Electric Vehicle Deployment in Ireland - ESB Networks

What does this mean for the consumer?

• Consumers have a direct relationship with both ESB Networks and their chosen supplier

ESB Networks Supplier

Consumer

•Market Systems

•Work Processes•Commercial arrangements

Page 4: Infrastructure Issues for Electric Vehicle Deployment in Ireland - ESB Networks

Focusing on the first element – Network connection

• Where do we expect to have charging points

– Domestic– On Street– Car Parks

• Shopping Centres, Offices, Apartment blocks

Page 5: Infrastructure Issues for Electric Vehicle Deployment in Ireland - ESB Networks

What are the expected charging requirements.

Charge Functional Need Power (kW)Standard 100% 3

6-8 hours

Emergency 24km 25in 10mins

Fast 80% 120in 10mins

Page 6: Infrastructure Issues for Electric Vehicle Deployment in Ireland - ESB Networks

EV infrastructure what do we need

Network connection Charging Equipment ICT Platform

Page 7: Infrastructure Issues for Electric Vehicle Deployment in Ireland - ESB Networks

Can I charge my EV at home ?• We already have 2M connections

nationwide

• Typical charge rate available 3kwh

• This should be sufficient for most batteries on an overnight charge.

• So the answer is Yes…but with limitations

• Battery Technology rapidly improving

– Higher capacity batteries with shorter charging times

– Increased demand for three phase charging

Battery Capacity kWh

0

5

10

15

20

25

30

35

40

ToyotaPHEV

G Wiz SMARTFor two

Volt BYD F6 A classEV

Mini E

Battery Capacity kWh

Page 8: Infrastructure Issues for Electric Vehicle Deployment in Ireland - ESB Networks

So what’s the impact of home charging on the Network

• As EV penetration increases , we could find that the Low Voltage network and potentially the supply levels to houses will need to be reinforced and increased.

• Typical system peak is between 5-7 pm, an appropriate mechanism for managing EV charging over this period would be required.

• But that’s all part of the normal management of the network.

Page 9: Infrastructure Issues for Electric Vehicle Deployment in Ireland - ESB Networks

I forgot to charge my car at home –On street

• Expected to be used during day time by commuters.

• Existing LV cables in the streets of many urban areas.

• Easier to provide higher capacity charging than domestic situation– 3 phase supplies available.

• Metered connection of up to 45kVA to be distributed to individual charge points.

• Opportunity for a flexible arrangement for options of single/three phase and varying capacities .

Page 10: Infrastructure Issues for Electric Vehicle Deployment in Ireland - ESB Networks

How would Networks do this

Network Pillar

LV cable in street

Charge pointsCharge points

Page 11: Infrastructure Issues for Electric Vehicle Deployment in Ireland - ESB Networks

Technical Implications to considerLow penetration of on street chargers do not pose significant risks to the Network stability.

As infrastructure proliferates and especially with the demand for larger and faster charge points this could give rise to system issue such as ,

– Harmonics generated by battery chargers – Voltage disturbances– Capacity problems

These are not new electrical issues and with a planned development of any network they can be overcome.

Page 12: Infrastructure Issues for Electric Vehicle Deployment in Ireland - ESB Networks

Some general issues Networks need to consider for on street charging

• Access control to charge points

• Safety of charge points for users and the general public

• Location of pillars and charge points

• Vandalism

• But once again these are consideration we already deal with in providing electricity infrastructure.

Page 13: Infrastructure Issues for Electric Vehicle Deployment in Ireland - ESB Networks

Car parks• Typically third party environments

• Retrofitting charge points would be dependant on available capacity on existing supply.

– Depending on volume it could drive supply upgrades– Local substation upgrades – Additional circuits within complex.

• New builds could design EV charging into their electrical infrastructure – link in with Electrical contractors/consultants

• Again high density of high capacity charge points could pose Network disturbance issues

Page 14: Infrastructure Issues for Electric Vehicle Deployment in Ireland - ESB Networks

What does the consumer want ?

• Plentiful and unrestricted charge points

• Flexibility– Charging regimes– Payment options

• Choice of suppliers• Associated with their domestic account• Pre-payment offering• Mechanism to pay third parties e.g battery supplier

Page 15: Infrastructure Issues for Electric Vehicle Deployment in Ireland - ESB Networks

How do we integrate this??

• Networks already provide metering and data services to retail market participants.

• The EV proposition has some additional subtleties –– The charge point is not exclusive to consumers– Needs to accommodate multiple suppliers and flexible payment options.– Has to be appropriate for our Regulated environment

So it would need,

• IT platform to link these elements along with the network imperatives of providing a safe and reliable infrastructure to consumers

Page 16: Infrastructure Issues for Electric Vehicle Deployment in Ireland - ESB Networks

There are still some unknowns

• Diversity of battery technologies

• Would like to see clarity on standardisation of – Equipment– Charging regimes– Communication protocols

• Government policies in relation to EV.

Page 17: Infrastructure Issues for Electric Vehicle Deployment in Ireland - ESB Networks

Networks Summary• We already have the infrastructure for low level charging

at the domestic level

• We can provide on street charge point connections in a controlled and planned manner

• There are some technical implications for the network and these will need to be analysed and assessed.

Page 18: Infrastructure Issues for Electric Vehicle Deployment in Ireland - ESB Networks

Thank you

Page 19: Infrastructure Issues for Electric Vehicle Deployment in Ireland - ESB Networks

Backup slides

Page 20: Infrastructure Issues for Electric Vehicle Deployment in Ireland - ESB Networks

What range does this give me,• This depends on size , usage and battery

tech but typically,

– Peugeot Expert Van 4km/kwh – Sedan/Mini E 6km/kwh– Mit. MIEV 10km/kwh

Page 21: Infrastructure Issues for Electric Vehicle Deployment in Ireland - ESB Networks

Pictures• Equipment

– Installed minipillar– Charge points

• Typical locations– Fitzwilliam – Merrion Sq South

• Car– Tesla