Slide 1 Information Society and Media Directorate-General - Unit Grid Technologies Call5 Information Day FP6 instruments: purposes and FP6 instruments: purposes and modalities in the IST context modalities in the IST context Annalisa Bogliolo DG Information Society Grid Technologies Grid Technologies http://www.cordis.lu/ist/grids/ Call5 Information Call5 Information Day Day 30 May 2005 Brussels Architecture, of the next generation Grid Enabling application technologies Design and Development
32

Information Society and Media Directorate-General - Unit Grid Technologies Call5 Information Day Slide 1 FP6 instruments: purposes and modalities in the.

Mar 27, 2015

Download

Documents

Ethan Keith
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Information Society and Media Directorate-General - Unit Grid Technologies Call5 Information Day Slide 1 FP6 instruments: purposes and modalities in the.

Slide 1

Information Society and Media Directorate-General - Unit Grid TechnologiesCall5 Information Day

FP6 instruments: purposes and FP6 instruments: purposes and modalities in the IST context modalities in the IST context

Annalisa Bogliolo

DG Information Society

Grid TechnologiesGrid Technologieshttp://www.cordis.lu/ist/grids/

Call5 Information DayCall5 Information Day30 May 2005

Brussels

Architecture,

of the next generation Grid

Enabling

application

technologies

Design and

Development

Page 2: Information Society and Media Directorate-General - Unit Grid Technologies Call5 Information Day Slide 1 FP6 instruments: purposes and modalities in the.

Slide 2

Information Society and Media Directorate-General - Unit Grid TechnologiesCall5 Information Day

A range of better differentiated A range of better differentiated instrumentsinstruments

• New instrumentsNew instrumentsIntegrated projects (IP) - objective drivenNetworks of excellence (NoE) - exploratory

researchArticle 169 (joint implementation of national

programmes)

• Traditional instrumentsTraditional instrumentsSpecific targeted research projects (STREPs)Co-ordination actions (CAs)Specific Support Actions (SSAs)

Page 3: Information Society and Media Directorate-General - Unit Grid Technologies Call5 Information Day Slide 1 FP6 instruments: purposes and modalities in the.

Slide 3

Information Society and Media Directorate-General - Unit Grid TechnologiesCall5 Information Day

Classification of the instrumentsClassification of the instruments

Instrument Purpose Primarydeliverable

Scale

IP

NoE

Art. 169

STREP

CA

SSA

objective-driven research

tacklefragmentation

joint MSprogrammes

research

coordination

support

knowledge

structuring

knowledge and/or

structuring

knowledge

coordination

support

med-high

med-high

high

low-med

low-med

low-med

Page 4: Information Society and Media Directorate-General - Unit Grid Technologies Call5 Information Day Slide 1 FP6 instruments: purposes and modalities in the.

Slide 4

Information Society and Media Directorate-General - Unit Grid TechnologiesCall5 Information Day

Networks of ExcellenceNetworks of Excellence

Industrial exploitation

Current Industrial strength / presence

Fundamental research

Basicresearch

Industry-driven research

Targeted Research ProjectsTargeted Research Projects

Example of implementation in ISTExample of implementation in IST

« Monolitihic »Incremental

Integrated ProjectsIntegrated Projects

Integrated ProjectsIntegrated Projects

Page 5: Information Society and Media Directorate-General - Unit Grid Technologies Call5 Information Day Slide 1 FP6 instruments: purposes and modalities in the.

Slide 5

Information Society and Media Directorate-General - Unit Grid TechnologiesCall5 Information Day

FP6 Instruments in call5 for the S.O. 2.5.4FP6 Instruments in call5 for the S.O. 2.5.4Advanced Grid Technologies, Systems and ServicesAdvanced Grid Technologies, Systems and Services

• New instrumentsNew instrumentsIntegrated projects (IP) - objective drivenNetworks of excellence (NoE) - exploratory

researchArticle 169 (joint implementation of national

programmes)

• Traditional instrumentsTraditional instrumentsSpecific targeted research projects (STREPs)Co-ordination actions (CAs)Specific Support Actions (SSAs)

Page 6: Information Society and Media Directorate-General - Unit Grid Technologies Call5 Information Day Slide 1 FP6 instruments: purposes and modalities in the.

Slide 6

Information Society and Media Directorate-General - Unit Grid TechnologiesCall5 Information Day

Integrated ProjectsIntegrated Projects

Page 7: Information Society and Media Directorate-General - Unit Grid Technologies Call5 Information Day Slide 1 FP6 instruments: purposes and modalities in the.

Slide 7

Information Society and Media Directorate-General - Unit Grid TechnologiesCall5 Information Day

Integrated projectsIntegrated projects

• designed to designed to generate the knowledgegenerate the knowledge required to required to implement the priority thematic areas of FP6implement the priority thematic areas of FP6 by integrating the critical mass of activities and resources

needed to achieve ambitious, clearly defined scientific and

technological objectives of a European dimension

• each IP should each IP should integrate the types of activities needed to obtain the goals integrate the critical mass of resources needed to obtain the

goals integrate elements of the development chain to attain high-

impact goals support industry-academia collaboration including SMEs

Page 8: Information Society and Media Directorate-General - Unit Grid Technologies Call5 Information Day Slide 1 FP6 instruments: purposes and modalities in the.

Slide 8

Information Society and Media Directorate-General - Unit Grid TechnologiesCall5 Information Day

Integrated Projects - activitiesIntegrated Projects - activities

• Activities in a Integrated Project may cover a broad Activities in a Integrated Project may cover a broad spectrum e.g.:spectrum e.g.:research and technology development activitiesdemonstration activitiestechnology transfer or take-up activitiestraining activitiesdissemination activitiesknowledge management and exploitation

• An Integrated Project should compriseAn Integrated Project should comprisea coherent set of activitieswith an appropriate management structure

Page 9: Information Society and Media Directorate-General - Unit Grid Technologies Call5 Information Day Slide 1 FP6 instruments: purposes and modalities in the.

Slide 9

Information Society and Media Directorate-General - Unit Grid TechnologiesCall5 Information Day

Time

Integration along the innovation cycleIntegration along the innovation cycle

Best practice

Take-up, trials

Industry driven research

AdoptionIP

Basic research

Page 10: Information Society and Media Directorate-General - Unit Grid Technologies Call5 Information Day Slide 1 FP6 instruments: purposes and modalities in the.

Slide 10

Information Society and Media Directorate-General - Unit Grid TechnologiesCall5 Information Day

Integrated ProjectIntegrated Projectwhat is critical mass?what is critical mass?

• ResourcesResources: each IP must assemble the critical : each IP must assemble the critical mass of resources needed to achieve its mass of resources needed to achieve its ambitious objectivesambitious objectivesactivities integrated may range up to several

millions € (no minimum threshold, provided necessary ambition and critical mass is achieved)

• DurationDuration: typically three to five years: typically three to five yearsbut more if necessary to deliver the objectives

Page 11: Information Society and Media Directorate-General - Unit Grid Technologies Call5 Information Day Slide 1 FP6 instruments: purposes and modalities in the.

Slide 11

Information Society and Media Directorate-General - Unit Grid TechnologiesCall5 Information Day

Integrated ProjectIntegrated Projectwhat is critical mass? (cont’d)what is critical mass? (cont’d)

• PartnershipPartnership: minimum of three participants from : minimum of three participants from three different Member States or Associated three different Member States or Associated States, of which at least two should be Member States, of which at least two should be Member States or Associated candidate countriesStates or Associated candidate countriesbut in practice likely to be substantially moreSME participation is strongly encouraged‘Third country’ participants may be included, with

a possibility of Community financial support for certain groups of countries

Page 12: Information Society and Media Directorate-General - Unit Grid Technologies Call5 Information Day Slide 1 FP6 instruments: purposes and modalities in the.

Slide 12

Information Society and Media Directorate-General - Unit Grid TechnologiesCall5 Information Day

Integrated Project - evaluation processIntegrated Project - evaluation process

• Evaluation by a strengthened peer-review systemEvaluation by a strengthened peer-review systeminvolving one step written submission. 5 individual

evaluators, panel sessions with hearings of proposals that pass all thresholds

• Key issues to be addressed during evaluation:Key issues to be addressed during evaluation:relevance to the objectives of the specific programmescale of ambition and potential impactS&T excellencequality of the consortiumquality of the project and ‘knowledge’ managementcritical mass in terms of activities and resources

Page 13: Information Society and Media Directorate-General - Unit Grid Technologies Call5 Information Day Slide 1 FP6 instruments: purposes and modalities in the.

Slide 13

Information Society and Media Directorate-General - Unit Grid TechnologiesCall5 Information Day

Integrated ProjectsIntegrated ProjectsReporting and Payment scheduleReporting and Payment schedule

• Annual report containing:Annual report containing:outline of previous 12 months’ activitiesfinancial documents on the costs incurred detailed implementation plan and associated

financial plan for the following 18 months

• Upon acceptance of above by the Commission: Upon acceptance of above by the Commission: final settlement of payment for period concernedoutstanding advance supplemented up to 85% of

the anticipated Community contribution for following 18 months

Page 14: Information Society and Media Directorate-General - Unit Grid Technologies Call5 Information Day Slide 1 FP6 instruments: purposes and modalities in the.

Slide 14

Information Society and Media Directorate-General - Unit Grid TechnologiesCall5 Information Day

0 6 12 18 24 30 36 42 48 Months

Reporting

Accepted costs

Reporting Detailed work plan

Accepted costs Adjusted advance

Reporting

Detailed work planAccepted costs

Adjusted advance

Reporting

Accepted costs Detailed work plan

Adjusted advance

Detailed work plan

Initial advance

Integrated ProjectsIntegrated Projectspayment & report schedule (cont’d)payment & report schedule (cont’d)

Example of 4 year contract

Page 15: Information Society and Media Directorate-General - Unit Grid Technologies Call5 Information Day Slide 1 FP6 instruments: purposes and modalities in the.

Slide 15

Information Society and Media Directorate-General - Unit Grid TechnologiesCall5 Information Day

Integrated ProjectsIntegrated Projectsflexibility & autonomyflexibility & autonomy

• For the implementation plan, each year, the For the implementation plan, each year, the consortiumconsortiumproposes a detailed plan for the coming 18 monthsand may propose to update the overall plan

• For changes in the consortiumFor changes in the consortiumthe consortium may itself decide to take in new

participants (without additional funding)the Commission may decide to launch calls to add

activities and participants (with additional funding)

Page 16: Information Society and Media Directorate-General - Unit Grid Technologies Call5 Information Day Slide 1 FP6 instruments: purposes and modalities in the.

Slide 16

Information Society and Media Directorate-General - Unit Grid TechnologiesCall5 Information Day

“Monolithic”

• Partners known at outset• Tasks identified• budget known

“Incremental” participation •Tasks identified• budget known• not all participants are in

“Incremental” funding• objectives known• technology roadmap known• tasks to be completed• budget to be changed• Participants as well

Integrated ProjectsIntegrated Projectsthree possible implementationsthree possible implementations

Page 17: Information Society and Media Directorate-General - Unit Grid Technologies Call5 Information Day Slide 1 FP6 instruments: purposes and modalities in the.

Slide 17

Information Society and Media Directorate-General - Unit Grid TechnologiesCall5 Information Day

STREPsSTREPs

Page 18: Information Society and Media Directorate-General - Unit Grid Technologies Call5 Information Day Slide 1 FP6 instruments: purposes and modalities in the.

Slide 18

Information Society and Media Directorate-General - Unit Grid TechnologiesCall5 Information Day

STREPSTREP

• designed to designed to generate the knowledge required to improve

European competitiveness meet the needs of society or Community policies:

by improving existing or developing new products, processes or services and/or

by proving the viability of new technologies offering potential economic advantage

Page 19: Information Society and Media Directorate-General - Unit Grid Technologies Call5 Information Day Slide 1 FP6 instruments: purposes and modalities in the.

Slide 19

Information Society and Media Directorate-General - Unit Grid TechnologiesCall5 Information Day

STREP - ActivitiesSTREP - Activities

• May combine any of the following types of May combine any of the following types of activities:activities:Targeted, well defined and precisely focused

research and technological developmentDemonstration component(s) as appropriateProject management

Page 20: Information Society and Media Directorate-General - Unit Grid Technologies Call5 Information Day Slide 1 FP6 instruments: purposes and modalities in the.

Slide 20

Information Society and Media Directorate-General - Unit Grid TechnologiesCall5 Information Day

STREP - main characteristicsSTREP - main characteristics

• STREPs compared to IPs:STREPs compared to IPs:scale of ambition is much more limited Different: Value of activities, Duration, Size of the consortium,

Types of activities, Evaluation process/key issues (partly), Negotiation, Consortium agreement, implementation (partly), Follow-up (partly)

• STREPs compared to FP5 RTD projects :STREPs compared to FP5 RTD projects :Similar: Objectives, Scale of ambition, Value, Duration, Size of

consortium, Types of participants, Calls, Evaluation, Negotiation, Follow-up, Audits

Different: Financial regime, Simplified Proposals, Contractual aspects, Consortium agreement, Collective responsibility, Implementation, IPR

Page 21: Information Society and Media Directorate-General - Unit Grid Technologies Call5 Information Day Slide 1 FP6 instruments: purposes and modalities in the.

Slide 21

Information Society and Media Directorate-General - Unit Grid TechnologiesCall5 Information Day

Strategic Support ActionsStrategic Support Actions

Page 22: Information Society and Media Directorate-General - Unit Grid Technologies Call5 Information Day Slide 1 FP6 instruments: purposes and modalities in the.

Slide 22

Information Society and Media Directorate-General - Unit Grid TechnologiesCall5 Information Day

Strategic Support Actions (SSA)Strategic Support Actions (SSA)

designed todesigned tounderpin the implementation of the programmecomplement the other FP6 instrumentshelp in preparations for future Community research and

technological development policy activitiesstimulate, encourage and facilitate participation to

the activities of the priority thematic areas of:SMEs, small research teams, newly developed and remote research centres, organisations from NMS / AC

may combine the following two types of activities may combine the following two types of activities Support activitiesProject management activities

Page 23: Information Society and Media Directorate-General - Unit Grid Technologies Call5 Information Day Slide 1 FP6 instruments: purposes and modalities in the.

Slide 23

Information Society and Media Directorate-General - Unit Grid TechnologiesCall5 Information Day

SSA - main characteristicsSSA - main characteristics

• SSAs:SSAs:support the implementation of the programme,

priority or research objective - in most cases - stand alone events (meetings, conferences, studies etc.)

future oriented activities: research roadmaps, identification of future research objectives

dissemination and uptake of programme results

• SSA is NOT an instrument to fund research SSA is NOT an instrument to fund research activitiesactivities

Page 24: Information Society and Media Directorate-General - Unit Grid Technologies Call5 Information Day Slide 1 FP6 instruments: purposes and modalities in the.

Slide 24

Information Society and Media Directorate-General - Unit Grid TechnologiesCall5 Information Day

SSA - activitiesSSA - activities

• may consist of one or more of the following may consist of one or more of the following activities:activities:Conferences, seminars, working groups and

expert groupsStudies, analysisFact findings and monitoringTrans-national technology transfer and take-up

related servicesDevelopment of research or innovation strategiesHigh level scientific awards and competitionsOperational support and dissemination,

information and communication activities

Page 25: Information Society and Media Directorate-General - Unit Grid Technologies Call5 Information Day Slide 1 FP6 instruments: purposes and modalities in the.

Slide 25

Information Society and Media Directorate-General - Unit Grid TechnologiesCall5 Information Day

Coordination ActionsCoordination Actions

Page 26: Information Society and Media Directorate-General - Unit Grid Technologies Call5 Information Day Slide 1 FP6 instruments: purposes and modalities in the.

Slide 26

Information Society and Media Directorate-General - Unit Grid TechnologiesCall5 Information Day

Coordination ActionsCoordination Actions

• designed to promote and support the networking designed to promote and support the networking and co-ordination of research and innovation and co-ordination of research and innovation activities at national, regional and European level activities at national, regional and European level over a fixed periodover a fixed periodby establishing in a coherent way coordinated

initiatives of a range of research and innovation operators, in order to achieve improved integration of the European research

• May combine the following two types of activities May combine the following two types of activities Co-ordination activitiesConsortium management activities

Page 27: Information Society and Media Directorate-General - Unit Grid Technologies Call5 Information Day Slide 1 FP6 instruments: purposes and modalities in the.

Slide 27

Information Society and Media Directorate-General - Unit Grid TechnologiesCall5 Information Day

CA - activitiesCA - activities

• may consist of one or more of the following types may consist of one or more of the following types of mid/long term collaborative activities:of mid/long term collaborative activities:Organisation of conferences, or meetingsPerformance of studies, analysisExchanges of personnelExchange and dissemination of good practiceSetting up of common information systemsSetting up of expert groupsDefinition, organisation, management of joint or

common initiatives

• CA is NOT an instrument to fund research activitiesCA is NOT an instrument to fund research activities

Page 28: Information Society and Media Directorate-General - Unit Grid Technologies Call5 Information Day Slide 1 FP6 instruments: purposes and modalities in the.

Slide 28

Information Society and Media Directorate-General - Unit Grid TechnologiesCall5 Information Day

Expected scale for STREPs, SSAs, CAsExpected scale for STREPs, SSAs, CAs

• Resources: each project must assemble the resources Resources: each project must assemble the resources needed to achieve its objectivesneeded to achieve its objectives activities included may range up to several millions of €

but no minimum threshold

• Partnership: minimum of three participants from three Partnership: minimum of three participants from three different countries (for an SSA different countries (for an SSA a single one is eligible)a single one is eligible) but in practice likely to be more

SME participation is strongly encouraged

‘Third country’ participants may be included, with a possibility of Community financial support for certain groups of countries

• Duration: typically two to three yearsDuration: typically two to three years but exceptionally more if duly justified as necessary to

deliver the objectives

Page 29: Information Society and Media Directorate-General - Unit Grid Technologies Call5 Information Day Slide 1 FP6 instruments: purposes and modalities in the.

Slide 29

Information Society and Media Directorate-General - Unit Grid TechnologiesCall5 Information Day

Payments and reporting schedulePayments and reporting schedule

Final activity report

Reported costs + audit certificate (mandatory)

Final payment

Periodic activity report (mid-term review : optional)

Reported costs+ (audit certificate if required)

Intermediate payment/

settlement

Detailed work plan

Initial advance

0 6 12 14 18 20 24 26 30 36 38

Months

Example of a three year STREP, CA or SSA project

Page 30: Information Society and Media Directorate-General - Unit Grid Technologies Call5 Information Day Slide 1 FP6 instruments: purposes and modalities in the.

Slide 30

Information Society and Media Directorate-General - Unit Grid TechnologiesCall5 Information Day

Costs reporting, advance payments, Costs reporting, advance payments, allocationallocation

• No cost categories but list of ineligible costsNo cost categories but list of ineligible costs

• Participants’ own accounting rulesParticipants’ own accounting rules

• Periodical cost certificates by external auditorPeriodical cost certificates by external auditor

• Periodical advances and settlementsPeriodical advances and settlementsyearly for IP and NoEperiodicity of settlements to be specified in the

contract for other instruments

• No pre-allocation of the EC contribution No pre-allocation of the EC contribution between participants (funding is granted to the between participants (funding is granted to the consortium as a whole)consortium as a whole)

new!new!new!new!new!new!

new!new!

new!new!

Page 31: Information Society and Media Directorate-General - Unit Grid Technologies Call5 Information Day Slide 1 FP6 instruments: purposes and modalities in the.

Slide 31

Information Society and Media Directorate-General - Unit Grid TechnologiesCall5 Information Day

Financing per instrumentFinancing per instrument

Page 32: Information Society and Media Directorate-General - Unit Grid Technologies Call5 Information Day Slide 1 FP6 instruments: purposes and modalities in the.

Slide 32

Information Society and Media Directorate-General - Unit Grid TechnologiesCall5 Information Day

For further informationFor further information

IST infodeskIST infodeskE-Mail : [email protected] : [email protected] : +32 2 296 83 88Fax : +32 2 296 83 88

General FP6:General FP6:

http://europa.eu.int/comm/research/fp6/index_en.htmlhttp://europa.eu.int/comm/research/fp6/index_en.html

http://www.cordis.lu/rtd2002http://www.cordis.lu/rtd2002

IST:IST:

http://www.cordis.lu/isthttp://www.cordis.lu/ist

http://www.cordis.lu/ist/fp6/fp6.htmhttp://www.cordis.lu/ist/fp6/fp6.htm

http://fp6.cordis.lu/fp6/call_details.cfm?CALL_ID=5#http://fp6.cordis.lu/fp6/call_details.cfm?CALL_ID=5#