    IMPROVEMENT ON FIFO

    PROCESS

  • 7/31/2019 Improvement on FIFO

    2/17

    Current FIFO process is un control due to we dont have the identification of

    earlier production output that can be controlled in the system and in theactual process-( Batch No is not defined and Delivery Note is not stated

    what is the earlier out put that have to be delivered first)

    IF Batch No is stated in the Delivery Note, Warehouse will have difficulty to

    locate the stock with the mentioned batch No

    BREAKING

    FIFO RULE

    DEAD STOCK

    CUSTOMER COMPLAINT

    HIGH INVENTORY LEVEL

  • 7/31/2019 Improvement on FIFO

    3/17

    FLOW OF DELIVERY FIFO PROCESS MAP

    CUSTOMER CSR PRODUCTION LOGISTIC

    NO

    YES

    Purchase

    Order

    Sales

    Order

    Production

    Process

    stock

    ready?

    Finish

    Good c/w

    batch

    number

    Start

    Delivery Plan based

    on PO details

    Delivery Note

    creation with batch

    No

    Delivery to customerEnd

    pick pack load follow the

    batch no in the Delivery

    Note

  • 7/31/2019 Improvement on FIFO

    4/17

    CTQ:CONTROLABLE FIFO PROCESSGOALS SCOPE

    DELIVERY NOTE WITH

    BATCH NO. FOLLOW

    FIFO

    LAMIPAK SDA

    TEAM MEMBER

    Project Leader : YUNI

    Member : IT TEAM

    LOGISTIC TEAM

    PPIC TEAM

    MANUFACTURING TEAM

    QC/QA TEAM

  • 7/31/2019 Improvement on FIFO

    5/17

    SIPOC PROCESS MAP

    DELIVERYPLAN

    PICK PACK LOADING AT

    SUPPLIER INPUT PROCESS

    DELIVERYNOTE FIRST

    IN FIRST OUT

    CSR

    CUSTOMERSWAREHOUSE

    WAREHOUSE

    CUSTOMER OUTPUT

  • 7/31/2019 Improvement on FIFO

    6/17

    First In First Out

    Identify the earlier production output Locating the earlier production output

  • 7/31/2019 Improvement on FIFO

    7/17

    Identify the earlier production out put

    Set up the batch number

    - by shift

    - Identification need : date/machine no/shift no

    - Create the secondary batch no if rework is needed, asrework is part of our production process, but this batch Nowill be able to be traced in the system

    Implementation batch No- System will produce Batch No automatically when

    production issued POV on the pass on/hold/reject and alsowhen POVR is issued

    - Warehouse will posting the FG with batch No.- Identification on the box by stated in the Label

    - If rework is needed, than the previous label is replaced bythe new one after rework is done

  • 7/31/2019 Improvement on FIFO

    8/17

    XX X XX XXX X X 09A01AMS11

    This Date is Production Schedule Date

    YEAR : 09

    MONTH : A

    A Jan

    B Feb

    C Mar

    D Apr

    E May

    F June

    Batch Numbering Sequence Without Rework

    G July

    H August

    J Sept

    K Oct

    L Nov

    M Dec

    DATE : 01

    MACHINE CODE : AMS

    MACHINE NO. 1

    SHIFT : 1

  • 7/31/2019 Improvement on FIFO

    9/17

    XX X XX XXX X X X 09A15AMS11A

    This Date is Rework Date

    YEAR : 09

    MONTH : A

    A Jan

    B Feb

    C Mar

    D Apr

    E May

    F June

    Batch Numbering Sequence With Rework

    G July

    H August

    J Sept

    K Oct

    L Nov

    M Dec

    DATE : 01 -30

    MACHINE CODE : AMS

    MACHINE NO. 1

    SHIFT : 1 Identified Rework process : A, B,C etc

  • 7/31/2019 Improvement on FIFO

    10/17

    Identify the Storage Location and BIN in the warehouse

    - Warehouse optimization lay out , number of SLOC andBIN

    - Re-arrange W/H : identify dead stock,slow moving andfast moving product

    - New W/H for dead stock and slow moving

    Locating the Earlier production output

    - Identify each product in each SLOC/BIN ?- Numbering the racking by SLOC and BIN

    Manage warehouse management in the system

    - Adding SLOC and BIN once W/H do posting F/G

    - Blocking the each SLOC and BIN capacity in the system

  • 7/31/2019 Improvement on FIFO

    11/17

    Control FIFO Process

    1. Delivery Note only can be printed after stock is ready in

    the warehouse

    2. Eliminating DN1, agreed by all function, Urgency of the

    Delivery is controlled by having a better OrderManagement,Inventory Report and PPC Control on the

    Production output

    3. Batch No must be stated in the Delivery Note4. No option for batch No selection

  • 7/31/2019 Improvement on FIFO

    12/17

    Support need

    Speed up the process on the pick pack load ,

    - Forklift - maintenance

    - Hand pallet availability- W/H capacity is only enough for the Fast Moving Product

    Rework Process

    - Due to second label have to be done after Rework, so QCshould have the Box Label stock

    - Rework process will be reviewed on the separate project

  • 7/31/2019 Improvement on FIFO

    13/17

  • 7/31/2019 Improvement on FIFO

    14/17

    INVENTORY STATUS

    PLANT :RM/FG/GIT :

    PRODUCT CODE

    Product Name

    date details Unrestricted restricted Total

    Stock 23-Jun 5000forecast order

    Safety Stock

    Process order 1-Jul 5000

    lannin order 1-Au 20000

    Sales Order 1-Jul SO No. -10000STP0 -20000

    Delivery

    QC

    and each will be link to each batch No

    New Inventory Report will update how many we have in the production Line, or how many demand we have from

    customer, better planning process

  • 7/31/2019 Improvement on FIFO

    15/17

    PPIC PRODUCTION QC LOGISTIC

    PASS ON

    Production

    Process

    Finish

    Good c/w

    batch

    number

    planning process

    schedule

    produksi

    reject

    machine

    QC Inspection

    processPOV

    labelling

    batch no auto

    generated from

    system QC

    result

    REJECT

    Qty sched

    prod will

    be reduce

    auto once

    FG is

    posting in

    W/H

    Improvement on Controlling the Production Schedule Result to Eliminate the DN 1

    process

    rework process

    POVR

    labelling

    process

    batch no auto

    generated from

    system

  • 7/31/2019 Improvement on FIFO

    16/17

    PROJECT MILESTONE

    PIC 6/22 6/29 7/6 7/13 7/20 7/27 8/3 8/10 8/17 8/24 8/31 9/7 9/14 9/21 9/28

    Define the problem statement and CTQ Nenden

    Define the batch numbering order ALL

    New Process flow of DN creation Nenden

    New Process flow of DN creation Nenden

    Identify batch No in the Box Label ALL

    Process batch No in the system

    Beny/Gunawa

    n

    Process New Delivery Note Creation in

    the system

    Beny/Gunawa

    n

    Identify SLOC and BIN based on W/H

    layout Yuni/Udin

    Identify SLOC and BIN based on W/H

    layout in the System

    Beny/Gunawa

    n

    Transfer of Dead stock and Slow Moving

    to new place Include define new W/Hplace Yuni/Udin

    Re-arrange W/H with identify Dead

    stock,Slow Moving, fast Moving Yuni/Udin

    Racking numbering with SLOC and BIN Yuni/Udin

    Blocking SLOC /BIN Capacity

    Beny/Gunawa

    n

    Eliminating DN1 process All

    Warehouse Total Cost (New W/H,

    Rearrange, Hand pallets etc to improve

    process pick pack load Yuni/Udin

    IT Total Cost ( Infrastructure or others?)

    eny unawa

    n

    Training and socialitation of FIFO

    Process

    Yuni/

    Gunawan

  • 7/31/2019 Improvement on FIFO

    17/17

    Outstanding item

    Costing IT

    IT Time line to support this new process, Batch no and DN creation

    and SLOC/BIN

    Costing warehouse

    Warehouse Lay out and optimization capacity

    W/H details on Dead Stock,SMI, and Fast Moving product

    c e u e o rearrangemen

    Socialitation and training of this new project