TAYLOR’S UNIVERSITY Foundation in Natural & Built Environments

APRIL 2014

CHRISTINA NG SUE LI MOREIRARICCO SOH ZHENG WEI

MR. FARIZ HILMI

Page 2: Ici final 2

PERSPECTIVE

PERSPECTIVE

Page 3: Ici final 2
Page 4: Ici final 2

INTRODUCTION

In our subject Introduction to Construction Industry, we were given an assignment that require us select a site in Taylor’s University that create a certain purpose of it. Our site is located in block A, ground floor on the left side of Taylor’s University entrance.

We are going to create a recreational area consisting an elevated garden that will attract students to rest there and have a breath of fresh air from the hustle of college.

Page 5: Ici final 2

PURPOSE

The purpose of this project is for Taylor’s Lakeside University students for them to have a better place to rest. We would like to also bring the students closer to nature.

This area is also to create fresh air for the students from all the carbon dioxide air coming from all the car at the main entrance of the campus.

This project will also make the school compound more greener because of its green implantation to the site.

Page 6: Ici final 2

CONCEPT

We choose that area because Taylor’s Lakeside University is not putting use to that area. It’s a wasted area. The site size is 10m x 7m. The reason why we chose this site is because this site was not really appreciated and also not put to use

The concept of this project is to give the students a rest/ waiting area. We are going to provide an area for the students to wait for their parents at a more comfortable way and also more convenient for them.

The materials we are going to use are wooden planks, beams, columns and etc.

This new concept for this project will increase the population in that area and it will increase the usage in that area.

OUR SITE LOCATION

Page 7: Ici final 2
Page 8: Ici final 2

I. Front view

Page 9: Ici final 2

II. Main Entrance

III. Back View

Page 10: Ici final 2

SITE ANALYSIS

INTRODUCTION TO OUR SITE

In our site its an open space and its also an open area. Our site is also shady and its also a big space area. Our site is also right at the entrance which is good for the students to chill and hang out or socialize around to wait for their parents to pick them up to go home.

ADVANTAGE

- Open space- Shady- At the entrance

Page 11: Ici final 2

- Big space- Open air

DISADVANTAGE

- No water drainage - Wasted area- Dead space- Not Lively- Empty land- No greenery

IMPROVEMENTS

- Make that area interesting - Attracts people - Rest area for students- Provide more shade- Make the area useful - Make it a green area- A place for students to relax and study

CURRENT EXISTING SITUATION

Page 12: Ici final 2

Existing plant having in the site we choose. Our site is located right beside the admin block, which is Block A

TYPES OF PLANTS

Bucida Buceras

Botanical name: Bucida buceras Height: 40 - 50 feet Canopy Width: 35 - 50 feet USDA Hardiness Zones: 10 - 11 Water Needs: Well Drained Soil Exposure: Full Sun to Partial Shade Growth Rate: 12 to 36 Inches per Season

Page 13: Ici final 2

Red Trumpet Vines

Botanical name: Distictis buccinatoriaCategory: VineFamily: Bignoniaceae (Bignonias)Origin: Mexico (North America)Evergreen: YesFlower Color: Orange RedBloomtime: Spring/SummerHeight: Climbing (Vine)Width: SpreadingExposure: Sun or Shade

Green velvet boxwood

Page 14: Ici final 2

Botanical name: Buxus 'Green Velvet'Best Soil: Moist, well-drained soilLight: Sun dappled shade to full sunGrowth Rate: ModerateFoilage: GreenFall Color: Green with a bronze castBloom: Tiny pale yellow flowers in the spring are almost unnoticeable except for the fragrance that attracts beesMature Size and Shape: Can grow to 3 to 4 feet tall and wide; round growth habitHardiness Zone: 4 – 9

Plant Spacing: Place plants 2.5 to 3 feet apart for hedges

Lawn grass

Page 15: Ici final 2

Common Name: Bermuda grassType: TurfgrassFamily: PoaceaeZone: 7 to 10Height: 0.25 to 0.25 feetSpread: 0.25 to 0.50 feetBloom Time: Non-floweringBloom Description: GreenSun: Full sunWater: Dry to mediumMaintenance: MediumTolerate: Drought

Conclusion

From this assignment, we were able to learn and understand the building team, their duties and inter-relation within which we will seek employment, career progression or further study.

We will also be able to develop an awareness of the building teams professional responsibilities and to appreciate their profession in the construction industry.

In conclusion, this report will help us to understand the research and procedures required when doing a project that serves a certain purpose.

Page 16: Ici final 2

Elements

Tables and chairs

Page 17: Ici final 2

Teak Garden Dining Set DS-04

FOB Price: RM 560/ set

Min.Order Quantity: 5 Set/Sets

Supply Ability: 200 Set/Sets per Month

Port: Port Klang / Port Semarang

Payment Terms: T/T,Western Union,MoneyGram

Stone Pathway

Unit Price: $8.3 - $20.0/ Square Meter Min. Order: 500 Square Meters Trade Terms: FOB, CFR, CIFnatural Granite Paving Stone for garden or landscape wall price 1. Advantage: Lowest Prices, Fast Delivery and Friendly

Page 18: Ici final 2

Customer Service 2. Product Keyword: Granite stone, paving stone

Benches

Stock: 6ft FSC Solid Name: Teak Kingston Garden BenchReference No: 5726£749.99£349.99Bench Package: Bench Only, £349.99

Procedures

Procedure Time to Complete Associated Costs1 Submit and obtain Development Approval through OSC

Builders can now apply for construction permits through OSC 1Submission (single entry). OSC will then refer the submissions to the Planning Department, Building Department, Engineering Department, Fire Department, Sewerage Agency, Water Agency and the Telecommunication Operators. OSC will issue the development approval (Planning aprrovals, Building approvals, Engineering approvals, Fire safety plan endorsements, water approvals, sewerage works approvals and Telecommunications approvals) to the builder.

Builder will submit and obtain approval through OSC for the following documents: • Planning plan• Building plan

Page 19: Ici final 2

• Engineering plan (earthwork, road & drainage plan, road excavation permit & street lighting plan)• Landscape plan • Water supply plan • Sewerage plan • Infrastructure communication plan• Fire safety plan

Estimated Processing Costs1. Planning plan = MYR 500.002. Building plan= MYR 1,300.3. Engineering plan = MYR 100.004. Water supply plan = MYR 1,000.001. Submission to Local Authority through OSC2. Obtain Development Order (DO) from Planning Department3. Obtain Water Approval4. Obtain Sewerage Approval5. Obtain Fire Safety (Arch) Comment6. Obtain Earthwork Approval

7. Obtain Road and Drainage Approval8. Obtain Landscape Approval9. Obtain Street Lighting Approval10. Obtain MSMA and SPAH Approvals11. Obtain Building Plan Approval12. Obtain Fire Safety (M&E) ApprovalAgency: Kuala Lumpur City Hall’s One Stop Centre (OSC) 61 days MYR 2,900

2 Submit pre-construction notifications to OSC Under OSC 1Submission, all notifications are submitted via OSC. OSC will then distribute notifications to the relevant agencies such as: • Building Department (B Form - notification to start building work)• Engineering Department (B Form - notification to start earthwork)

Page 20: Ici final 2

• Sewerage Certifying Agency (IWK) (PDC 6 Form - notification to start sewerage work)Agency: Kuala Lumpur City Hall’s One Stop Centre (OSC) 1 day no charge

3 Request final utilities inspections through OSC Under OSC 1Submission, the builder has to request for inspections via OSC. OSC will arrange and coordinate inspections and connections schedule with relevant agencies

1. TELCO connection = MYR495.002. Water connection = MYR 30.003. Fire safety inspection = MYR 111.00Agency: Kuala Lumpur City Hall’s One Stop Centre (OSC) 1 day MYR 636

4 Receive Road and Drainage Final Inspection Once the road and drainage works has been completed, the builder will request the Road and Drainage clearance letter from the Engineering Department of CHKL. The builder has to submit a construction report notification and by signing form G 17, the Engineer certifies that all works were carried out according to regulations. Form G17 will be filed along with Form F (Certificate of Completion and Compliance (CCC) via OSC to the Engineering Department. Agency: Sewerage Certifying Agency (IWK) 1 day no charge

5 Obtain Road and Drainage Clearance Letter A date for the inspection will be set-up prior to the issuance of clearance letter for the road and drainage work Agency: Sewerage Certifying Agency (IWK) 12 days no charge

6 Receive Sewage Final Inspection

Page 21: Ici final 2

The Sewerage Certifying Agency (IWK) will carry out an inspection of the sewerage system and issue to the builder a clearance letter for sewerage. Agency: Sewerage Certifying Agency (IWK) 1 day no charge

7 Obtain Sewage Clearance Letter Once the inspection has been carried out, a clearance letter is issued to the Builder. This clearance letter will allow the Engineer to issue the Certificate of Completion and compliance (CCC). Agency: Sewerage Certifying Agency (IWK) 12 days no charge

8 Receive Fire Safety Final Inspection Fire and Rescue Department will carry out fire safety inspection Agency: Fire and Rescue Department 1 day no charge

9 Obtain Fire Safety Final Letter Fire and Rescue Department will issue to the builder the clearance letter for fire safety Agency: Fire Department 12 days no charge

10 Receive Water Inspection Water Authority SYABAS will conduct an onsite inspection of the works and makethe connection to the public pipe. Agency: Water Authority SYABAS 1 day no charge

11 Submit Water Test and Commissioning (T&C) Report Water Authority SYABAS will conduct an onsite inspection of the works and make the connection to the public pipe. Agency: Water Authority SYABAS 11 days no charge

12 Obtain Water Clearance Letter The Water Authority SYABAS will issue a clearance letter to the builder and install the water meter at the same time for water connection. Agency: Water Authority SYABAS 1 day MYR 1,000

Page 22: Ici final 2

13 Builder’s Principal Submitting Person files the Certificate of Completion and compliance (CCC) The Builder’s Principal Submitting Person (professional architect) will issue Certificate of Completion and compliance (Form F - CCC) to the Builder/Owner and 2 copies of the CCC will be filed at the OSC for the Building Department (JRBB) and the Board of Architects/Engineers (LAM/LJM). Agency: Building Department and Board of Architect via OSC. 1 day no charge14 Obtain Water Connection Agency: Water Authority SYABAS 1 day no charge

15 Obtain Telco Connection Agency: Telekom Malaysia (Telco) 15 days no charge