1 iCAN – SNP Ͳ Claim Processing Manual SNP ( NSLP, SBP, SMP) (02/23/15) Enter your User ID and Password. Click on the "Log One" button In order to process a claim the sponsor must have an approved agreement.
37

iCAN – SNP - Claim Processing Manual SNP ( NSLP, SBP, SMP)

Jan 19, 2017

Download

Documents

lycong
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: iCAN – SNP - Claim Processing Manual SNP ( NSLP, SBP, SMP)

1

iCAN – SNP Claim Processing ManualSNP ( NSLP, SBP, SMP)

(02/23/15)

Enter your User ID andPassword.

Click on the "LogOne" button

In order to process a claim the sponsor must have an approved agreement.

depr13456
Text Box
Click on the "Log On" button
Page 2: iCAN – SNP - Claim Processing Manual SNP ( NSLP, SBP, SMP)

2

Click on the "SchoolNutritionPrograms" (SNP) button

To exit the systemclick on the "LogOut" tab.

Page 3: iCAN – SNP - Claim Processing Manual SNP ( NSLP, SBP, SMP)

3

Click on the "Claims"

NOTE: It is recommended that you view this screen periodicallybecause it is the message center.

depr13456
Text Box
NOTE: This is a sample of the messages that may appear. It is recommended that you view this screen periodically because it is the message center.
Page 4: iCAN – SNP - Claim Processing Manual SNP ( NSLP, SBP, SMP)

4

Click on "Claim - SNP"

Page 5: iCAN – SNP - Claim Processing Manual SNP ( NSLP, SBP, SMP)

5

To retrieve your file enter your AgreementNumber or Sponsor Name

Your Sponsor Name willshow up here. Click on it.

Page 6: iCAN – SNP - Claim Processing Manual SNP ( NSLP, SBP, SMP)

6

Click on the claim month that you wouldlike to enter.

Your sponsor agreement number, nameand address will appear here.

depr13456
Text Box
Page 7: iCAN – SNP - Claim Processing Manual SNP ( NSLP, SBP, SMP)

7

Click on "Add Original Claim" button

depr13456
Text Box
Page 8: iCAN – SNP - Claim Processing Manual SNP ( NSLP, SBP, SMP)

8

Verify this is the claim month you want.

Find the Site that you would like to enter theclaim and click on the "Add" tab.

depr13456
Text Box
depr13456
Text Box
Verify this is the claim for the month you want to enter.
Page 9: iCAN – SNP - Claim Processing Manual SNP ( NSLP, SBP, SMP)

9

Enter each line of the site claiminformation the same as youwould have on the paperclaims. ( This is the sameprocess as the old paper claimwith the exception that theinformation is being enteredinto iCANS. You do not need toFAX, email or mail your claimin.

Click on the "Save" button

If for some reason you do not want to save theinformation you entered click on the "Cancel" button.

The site number andname and address willappear here.

depr13456
Text Box
Enter each line of the site claim information the same as you would have on the paper claims. Note: All fields must be completed. The dollar reimbursement amount will not show on this screen. You will see that on the Summary which we will address later in this manual. (This is the same process as the old paper claim with the exception that the information is being entered into iCANS. You do not need to FAX, email or mail your claim to DOE Finance.
depr13456
Text Box
depr13456
Text Box
Page 10: iCAN – SNP - Claim Processing Manual SNP ( NSLP, SBP, SMP)

10

A claim may be saved if it has errors but it may not pay. It is stronglyrecommended that you click on the "Correct Now" button and make thenecessary corrections. If you choose "Correct Later" be sure you make thenecessary corrections or the claim will not be paid.

depr13456
Text Box
A claim may be saved if it has errors will not be processed for payment. It is strongly recommended that you click on the "Correct Now" button and make the necessary corrections. If you choose "Correct Later" be sure you make the necessary corrections or the claim will not be paid.
depr13456
Text Box
depr13456
Text Box
Page 11: iCAN – SNP - Claim Processing Manual SNP ( NSLP, SBP, SMP)

11

Above are samples of errors messages or warnings that you may receive due toentry errors.

depr13456
Text Box
depr13456
Text Box
Page 12: iCAN – SNP - Claim Processing Manual SNP ( NSLP, SBP, SMP)

12

The status of the Dec 2014 claim forsite 0001 is now in "validated" status.

When a claim is in"validated status" you maymake changes to it byclicking the Modify tab.Make the changes and clicksave.

To enter the claiminformation for anothersite, click on the "Add"tab for each site youwant to add. Continuethis process until all thesites have been added.

If you would like to look at theclaim click on the "View" tab.

After the information for eachsite has been added, click onthe "Continue" button whichwill take you to the totalclaim summary for all sitesthat have been entered.

depr13456
Text Box
Page 13: iCAN – SNP - Claim Processing Manual SNP ( NSLP, SBP, SMP)

13

This is the actual claim total for all of the sites entered. It indicates mealcounts, rate of reimbursement and dollar amount to be reimbursed.

To complete the claim, check the "Certification"box and click on the "Submit for Payment" button.At this point the claim has been submitted to DOE-CANS.

depr13456
Text Box
NOTE: If you would like a printed copy of the claim summary page, click on your print icon.
depr13456
Text Box
This is the actual claim summary total for all of the sites entered. The summary indicates meal counts, rate of reimbursement and total dollar amount to be reimbursed. If you choose to retain a paper copy of the claim, you may want to print the claim summary at this time. To print it, click on your computer print icon.
depr13456
Text Box
Page 14: iCAN – SNP - Claim Processing Manual SNP ( NSLP, SBP, SMP)

14

This screen will appear after you have clicked the "Submit for Payment"button in the previous step. An email confirmation will be sent to theindividual who was designated in the application process. Note the datereceived, date accepted by DOE and a confirmation number is indicated.If you do not receive this screen or the confirmation, the claim was notsubmitted to DOE. Contact the DOE- 605-773-3456 or [email protected] immediately.

depr13456
Text Box
Page 15: iCAN – SNP - Claim Processing Manual SNP ( NSLP, SBP, SMP)

15

Note the status has changedfrom "validated" to "accepted".You may modify a claim whichis in "accepted" status.

depr13456
Text Box
Note the status has changed from "validated" to "accepted". You may modify a claim when it is in "accepted" status.
depr13456
Text Box
Page 16: iCAN – SNP - Claim Processing Manual SNP ( NSLP, SBP, SMP)

16

This is a sample of a claims screen summary which has two accepted claims andone pending claim. The pending claim was not completed. The sponsor need toclick on Jan 2015 to pull up the claim, click modify enter the information and savethe claim. It is recommended that each time you submit a claim, you check thisClaim Summary screen to verify that the claim that you entered and save is in"Accepted" status.

depr13456
Text Box
This is a sample of a claims screen summary which has two accepted claims and one pending claim. The pending claim was not completed. The sponsor needs to click on Jan 2015 to pull up the claim, click modify, enter the information and save the claim. It is recommended that each time you submit a claim, you check this Claim Summary screen to verify that the claim that you entered and saved is in "Accepted" status.
depr13456
Text Box
Page 17: iCAN – SNP - Claim Processing Manual SNP ( NSLP, SBP, SMP)

17

If you need to modify

To modify the Feb 2015 claim which is in"Accepted" status, click on the claim.

depr13456
Text Box
Page 18: iCAN – SNP - Claim Processing Manual SNP ( NSLP, SBP, SMP)

18

Click on the "Modify" tab.

depr13456
Text Box
Page 19: iCAN – SNP - Claim Processing Manual SNP ( NSLP, SBP, SMP)

19

Click on the "Modify" tab for the site youwant to modify.

depr13456
Text Box
Page 20: iCAN – SNP - Claim Processing Manual SNP ( NSLP, SBP, SMP)

20

The original claiminformation screenwill come up foryou to make thenecessarychanges. Whendone click save.

depr13456
Text Box
The original claim information screen will come up. Enter the necessary changes. When done click the "Save" button.
Page 21: iCAN – SNP - Claim Processing Manual SNP ( NSLP, SBP, SMP)

21

Review any errors or warnings byclicking the "Review" tab and makecorrections. In this case there were nowarnings or errors regarding themodification.

Click the "Continue" tab.

depr13456
Text Box
Review any errors or warnings by clicking the "Review" tab and make corrections. In this case the claim was saved with warnings. When the warnings have been correct, click the "Save" button.
depr13456
Text Box
Click the "Continue" tab if you choose to continue without addressing the warnings at this time. Be sure you go back in and make the necessary corrections or the claim will not be paid.
depr13456
Text Box
depr13456
Text Box
Page 22: iCAN – SNP - Claim Processing Manual SNP ( NSLP, SBP, SMP)

22

When the claimmodification iscomplete, click the"Continue" button.

depr13456
Text Box
Page 23: iCAN – SNP - Claim Processing Manual SNP ( NSLP, SBP, SMP)

23

Check the "Certify" box and click the"Submit for Payment" button.

depr13456
Text Box
Page 24: iCAN – SNP - Claim Processing Manual SNP ( NSLP, SBP, SMP)

24

Click the "Finished" button. You willreceive an email indicating thereceipt confirmation for themodification. Same as page 14.

depr13456
Text Box
Page 25: iCAN – SNP - Claim Processing Manual SNP ( NSLP, SBP, SMP)

25

The modification that was entered changed the Earned Amount from$6.08 to $3.04. You may refer back to page 17 to view the EarnedAmount prior to the modification.

depr13456
Text Box
Page 26: iCAN – SNP - Claim Processing Manual SNP ( NSLP, SBP, SMP)

26

The claim status for Dec 2014 and Feb 2015 has changed from "accepted" to"processed" which means the claims have been pulled into a batch forpayment by DOE.The only change that may be made to a claim in "Processed" claim status isby submitting a revision.Note that the "Pending" claim status was not changed. The sponsor must goin and complete and submit the claim prior to the 60 day date deadline.

depr13456
Text Box
The claim status for Dec 2014 and Feb 2015 has changed from "accepted" to "processed" which means the claims have been pulled into a batch for payment by DOE-Finance. (The claims will normally be pulled into a batch on the morning of the 11th of each month. If the 10th of the month falls on a weekend the claim would be due the following business day with the batch being pulled the next day.) If a claim is in "Processed" claim status and a change is needed to the claim information, a revision must be submitted. In this example note that the Jan. 2015 claim is in "Pending" claim status. the sponsor must complete and submit the claim prior to the 60 day date deadline if it is an increase in the reimbursement. It is VERY important that you view this screen each time you submit a claim to assure that the claim status is not "Pending". Reminder: When a claim is submitted you will receive an email indicating the confirmation number etc.
depr13456
Text Box
Page 27: iCAN – SNP - Claim Processing Manual SNP ( NSLP, SBP, SMP)

27

To enter a revision on a claim which hasa Processed status, click on the claimmonth. In this case we will process arevison for the Dec 2014 claim.

depr13456
Text Box
Page 28: iCAN – SNP - Claim Processing Manual SNP ( NSLP, SBP, SMP)

28

Verify that youhave the rightclaim month.

Click on the "AddRevision" button.

depr13456
Text Box
Verify that you have the claim month that you want to revise.
depr13456
Text Box
Page 29: iCAN – SNP - Claim Processing Manual SNP ( NSLP, SBP, SMP)

29

The adjustment number will indicatethe revision number. If it was the 2ndrevision the number would be 2.

Click on the "Revise" tab.

depr13456
Text Box
Page 30: iCAN – SNP - Claim Processing Manual SNP ( NSLP, SBP, SMP)

30

The original site claim willcome display for you toenter the revision(s).

After you have completedthe revision(s) click on the"Save" button.

depr13456
Text Box
The original site claim will display for you to enter the revision(s).
Page 31: iCAN – SNP - Claim Processing Manual SNP ( NSLP, SBP, SMP)

31

The revision is inthe "validated"status.

If you have completed allthe revisions that areneeded, click on the"Continue" tab.

depr13456
Text Box
Page 32: iCAN – SNP - Claim Processing Manual SNP ( NSLP, SBP, SMP)

32

The new summary total for theDec 2014 claim for all sites is$6.08. Previously it was$3.04. Refer to page 27 toreview the original claim total.

Check the "Certification"box and click on the"Submit for Payment"button.

depr13456
Text Box
The revised summary total for the Dec 2014 claim for all sites is $6.08. Previously it was $3.04. Refer to page 27 to review the original claim total.
depr13456
Text Box
Page 33: iCAN – SNP - Claim Processing Manual SNP ( NSLP, SBP, SMP)

33

The system checksto assume that therevision is a timelyadjustment.

You will receive anemail notification thesame as discussed

Click on the"Finished" button.

depr13456
Text Box
You will receive an email notification the same as discussed previously.
depr13456
Text Box
The system checks to confirm that the revision is a timely adjustment within the 90 day rule.
depr13456
Text Box
Page 34: iCAN – SNP - Claim Processing Manual SNP ( NSLP, SBP, SMP)

34

The revised $3.04 is now in "Accepted" status. Note theoriginal claim in the amount of $3.04 indicated "Processed"status which means it has been paid. The paid date was2/23/2015. The total claim earned was $6.08 which iscompiled of the $3.04 original claim plus the revision #1 of$3.04.

depr13456
Text Box
Page 35: iCAN – SNP - Claim Processing Manual SNP ( NSLP, SBP, SMP)

35

The Claim Summary screenindicates "Adj Number 1" is inAccepted Claim Status. Note thetotal "Earned Amount" indicated isthe total of the original claim plusthe revision.

The Claim Summary screen indicates "Adj Number 1" which is in "Accepted" Claim Status. Note the total "Earned Amount" indicated is the total of the original claim plus the revision. The revision will be processed in the same manner as the original payment which will change the revision to "Processed" status.

depr13456
Text Box
Page 36: iCAN – SNP - Claim Processing Manual SNP ( NSLP, SBP, SMP)

36

To view a claim of at anytime, click on the"Summary" tab.

depr13456
Text Box
depr13456
Text Box
To view a claim at any time, click on the "Summary" tab.
Page 37: iCAN – SNP - Claim Processing Manual SNP ( NSLP, SBP, SMP)

37

The claim summary indicates the confirmation,received, accepted and processed date;reimbursement for each meal type; the totalreimbursement for all sites; and the reasoncode. You may print a screen at anytime viaclicking on your print icon. To exit the system always

click on the "Log Out" tab.

depr13456
Text Box
The claim summary indicates the confirmation, received, accepted and processed dates; reimbursement for each meal type; the total reimbursement for all sites; and the reason code. You may print a screen at anytime via clicking on your print icon.