Human Exploration & Operations Mission Directorate Updates Bill Gerstenmaier | July 24, 2012
14

Human Exploration & Operations Mission Directorate Updates - 20120724... · 24/07/2012  · sls top level milestone schedule (3/3) 8 . fy11 fy12 fy13 fy14 fy15 fy16 fy17 fy18 fy19

Oct 11, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Human Exploration & Operations Mission Directorate Updates - 20120724... · 24/07/2012  · sls top level milestone schedule (3/3) 8 . fy11 fy12 fy13 fy14 fy15 fy16 fy17 fy18 fy19

Human Exploration & Operations

Mission Directorate Updates

Bill Gerstenmaier | July 24, 2012

Page 2: Human Exploration & Operations Mission Directorate Updates - 20120724... · 24/07/2012  · sls top level milestone schedule (3/3) 8 . fy11 fy12 fy13 fy14 fy15 fy16 fy17 fy18 fy19

SpaceX Demonstration

2

Page 3: Human Exploration & Operations Mission Directorate Updates - 20120724... · 24/07/2012  · sls top level milestone schedule (3/3) 8 . fy11 fy12 fy13 fy14 fy15 fy16 fy17 fy18 fy19

J-2X Engine Tests

NASA conducted a 260-second J-2X engine test at NASA’s Stennis Space Center on June 13, 2012

Page 4: Human Exploration & Operations Mission Directorate Updates - 20120724... · 24/07/2012  · sls top level milestone schedule (3/3) 8 . fy11 fy12 fy13 fy14 fy15 fy16 fy17 fy18 fy19

Soyuz TMA-05M Launch

4

Page 5: Human Exploration & Operations Mission Directorate Updates - 20120724... · 24/07/2012  · sls top level milestone schedule (3/3) 8 . fy11 fy12 fy13 fy14 fy15 fy16 fy17 fy18 fy19

Orion EFT-1 Updates

5

Orion EFT-1 in route to NASA’s

Kennedy Space Center

Page 6: Human Exploration & Operations Mission Directorate Updates - 20120724... · 24/07/2012  · sls top level milestone schedule (3/3) 8 . fy11 fy12 fy13 fy14 fy15 fy16 fy17 fy18 fy19

SLS Top Level Milestone Schedule (1/3)

6

FY11 FY12 FY13 FY14 FY15 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25

Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2

Element

Flight Manifest

HEO / ESD Milestones

SLS Major Milestones

SE&I

Integrated Avionics & SW

Booster

New Booster

Core Stage

EFT-1 AA-2 EM-1 Uncrewed EM-2 Crewed EM-3 Crewed EM-4 Crewed

C-SRR

C-SRR KDP

C-SDR

C-SDR KDP

Checkpoint Checkpoint

Checkpoint

Checkpoint

Checkpoint

Checkpoint

Checkpoint

Checkpoint

Checkpoint

Checkpoint

Checkpoint

MCR

ASM

PSM

SRR Ckpt

KDP-A

SRR/SDR

KDP-B

Board

Reconvene

KDP-C

PDR CDR

KDP-D

DCR

SRR

Data DropSDR Data

Drop

QTA GSE

PDR

PDR Data

Drop

QTA GSE

CDR

FA GSE

PDR

FA GSE

CDRCDR Data

Drop

DCR Data Drop

SIL

Proto Models Fin Flt Models SIL Cert

STIF

SIM SW AV SITF Cert

SITF Re-Cert

SDF

SDF Cert

SDF Re-Cert

SIM SW Blds

Rel. 6.6 7.2 8.0 8.2 9.0 9.110.0

FLT SW

Rel. 5.2 6 7 8 9 10 11 12 13 14

DM-3 QRR'S

BRR

PDR

QM-1

CDR QM-2 DCR Flt-1 Flt-2

NRA New Booster Demonstration DDT&E PDR

Production

CDR

Flt-3 Flt-4

ATP SRR/SDR PDRPDR CDR DCR

Flt-1 H/W Flt-2 H/W Flt-3 H/W Flt-4 H/W

Pre-decisional. NASA Internal Use Only.

Page 7: Human Exploration & Operations Mission Directorate Updates - 20120724... · 24/07/2012  · sls top level milestone schedule (3/3) 8 . fy11 fy12 fy13 fy14 fy15 fy16 fy17 fy18 fy19

SLS Top Level Milestone Schedule (2/3)

7

FY11 FY12 FY13 FY14 FY15 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25

Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2

Element

Flight Manifest

HEO / ESD Milestones

SLS Major Milestones

Engines

Core Stage Engine

- Common Engine Controller Development

- A-1 Test

- RS-25d

J-2X DDT&E

- Component Dev

- J-2X Engine Testing

EFT-1 AA-2 EM-1Uncrewed

EM-2Crewed

EM-3Crewed

EM-4Crewed

C-SRR

C-SRR KDP

C-SDR

C-SDR KDP

Checkpoint

Checkpoint

Checkpoint

Checkpoint

Checkpoint

Checkpoint

Checkpoint

Checkpoint

Checkpoint

Checkpoint

Checkpoint

Checkpoint

MCR

ASM

PSM

SRR Ckpt

KDP-A

SRR/SDR

KDP-B

SRB

Reconvene

KDP-C

PDR CDR

KDP-D

DCR

J-2X TestingStart UCA ATP

J-2X

Capability

Certification

RS-25 Engine Delivery Flt #1 [L-21M]

RS-25 Engine DeliveryFlt #2 (L-18M)

RS-25 Engine DeliveryFlt #3 (L-12M)

RS-25 Engine Delivery

#4 (3)L-13M

Controller

SDR/CoDR

Controller

PDR

Controller

CDR DCR#1 (4 Engines)Contingency Delivery

#2 (4 Engines)Contingency Delivery

#3 (4 Engines)Contingency Delivery

#4 (4 Engines)Contingency Delivery

Repair/Recycle/ObsolescenceIPSR

Engines Assembly>

PSR

Engines Assembly>

Procure

A-1 Test Stand Mods A-1 Test Stand Mods

J-2X Capability

Certification

< E10001 (A-2)< E10001 (A-2)

<E10003 (A-2)

<E10004 (A-2)< PPA-2 (A-1)

<E10002 (A-1) <E10005 (A-2)

Pre-decisional. NASA Internal Use Only.

Page 8: Human Exploration & Operations Mission Directorate Updates - 20120724... · 24/07/2012  · sls top level milestone schedule (3/3) 8 . fy11 fy12 fy13 fy14 fy15 fy16 fy17 fy18 fy19

SLS Top Level Milestone Schedule (3/3)

8

FY11 FY12 FY13 FY14 FY15 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25

Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2

Element

Flight Manifest

HEO / ESD Milestones

SLS Major Milestones

SPIO Major Milestones

Launch Vehicle/Stage Adapter (LVSA)

MPCV/Stage Adapter (MSA)

Interim Cryogenic Propulsion

Fairing

Cargo / Payload Adapter (CPA)

EFT-1 AA-2 EM-1Uncrewed

EM-2Crewed

EM-3Crewed

EM-4Crewed

C-SRR

C-SRR KDP

C-SDR

C-SDR KDP

Checkpoint

Checkpoint

Checkpoint

Checkpoint

Checkpoint

Checkpoint

Checkpoint

Checkpoint

Checkpoint

Checkpoint

Checkpoint

Checkpoint

MCR

ASM

PSM

SRR Ckpt

KDP-A

SRR/SDR

KDP-B

SRBReconvene

KDP-C

PDR CDR

KDP-D

DCR

SRRSDR PDR CDR DCR

MSFC Design/Dev Compl

StartDesign

@ Prime

StartSTAMFG

STAMFGCompl

STATest

Compl

MSFCDesign/DevCompl

FinishSTA MFG

MSA Ring Fit Check@ ULA

MSA Delivery to Orion @ KSC

Flt. Unit 1 Flt. Unit 2 Flt. Unit 3

Start

TradeStudies

Start

Prod

Initiate Design@ Prime Flt-1 HW Flt-2 H/W Flt-3 H/W Flt 4 HW

MSFC Trade Studies

StartFairingStudies

TPS TestFinished

Sep SysTest

Finish

ShroudTesting

Complete

QualCompl

Flt. Unit 1

Start

Design

@ Prime

7/27/2012 Pre-decisional. NASA Internal Use Only.

Page 9: Human Exploration & Operations Mission Directorate Updates - 20120724... · 24/07/2012  · sls top level milestone schedule (3/3) 8 . fy11 fy12 fy13 fy14 fy15 fy16 fy17 fy18 fy19

SLS Program Life Cycle

• We are Following NPR 7120.5

NASA Life

Cycle

Phases

Program Life

Cycle Gates

and

Major Events

Agency

Reviews

Program

Life Cycle

Phases

Human Space

Flight Project

Reviews

FORMULATION

Approval for

Formulation

Pre-Phase A:

Concept

Studies

Phase A:

Concept & Technology

Development

Phase B:

Preliminary Design &

Technology Completion

Phase C:

Final Design &

Fabrication

Phase D:

System Assembly, Int. &

Test, Launch &

Checkout

Phase E:

Operations &

Sustainment

Phase F:

Closeout

Approval for

Implementation IMPLEMENTATION

KDP A ✔

FAD ✔

Draft Project

Requirements

✔ Preliminary

Program

Plan

KDP B

Baseline

Program Plan

KDP C KDP D KDP E

Launch

ASM ✔

MCR ✔ PDR CDR SIR PLAR FRR DR DRR

KDP F

End of

Missions Final

Archival

of Data

SRR/SDR

Steps 1 & 2

Draft

PCA

Final

PCA

July 25

In Review

Standing by for signature

01_T.May_SRR SDR Board Reconvene.9

Page 10: Human Exploration & Operations Mission Directorate Updates - 20120724... · 24/07/2012  · sls top level milestone schedule (3/3) 8 . fy11 fy12 fy13 fy14 fy15 fy16 fy17 fy18 fy19

10

Page 11: Human Exploration & Operations Mission Directorate Updates - 20120724... · 24/07/2012  · sls top level milestone schedule (3/3) 8 . fy11 fy12 fy13 fy14 fy15 fy16 fy17 fy18 fy19

NeuroSpat investigates

the ways in which crew

members' three-

dimensional visual and

space perception is

affected by long-duration

stay in weightlessness.

ISS Research

Page 12: Human Exploration & Operations Mission Directorate Updates - 20120724... · 24/07/2012  · sls top level milestone schedule (3/3) 8 . fy11 fy12 fy13 fy14 fy15 fy16 fy17 fy18 fy19

TDRS-K Updates

12

Page 13: Human Exploration & Operations Mission Directorate Updates - 20120724... · 24/07/2012  · sls top level milestone schedule (3/3) 8 . fy11 fy12 fy13 fy14 fy15 fy16 fy17 fy18 fy19

Launch Services Program - CY 2012 Highlights

6/13/2012 8/23/2012 12/6/2012

June 13, 2012 - Complete August 23, 2012 December 6, 2012

Page 14: Human Exploration & Operations Mission Directorate Updates - 20120724... · 24/07/2012  · sls top level milestone schedule (3/3) 8 . fy11 fy12 fy13 fy14 fy15 fy16 fy17 fy18 fy19

Launch Services Program

• Safely fly the launches planned this fiscal year (i.e., CY2012) – June 13, 2012 successful launch of Nuclear Spectroscopic Telescope Array (NuSTAR) on Pegasus XL from

Reagan Test Site in Kwajalein, Marshall Islands

– In launch flow for Radiation Belt Storm Probes (RBSP)

• ILC August 23, 2012, Atlas V 401 from Cape Canaveral Air Force Station (CCAFS), FL

– Tracking and Data Relay Satellite (TDRS)-K, Atlas V 401 launch from CCAFS, FL planned for December 6, 2012

• Establish a plan with the Science Mission Directorate (SMD) for launching several

medium-class missions in the future – Multi-Mission RLSP for two intermediate-class SMD/NOAA missions (i.e., Geostationary Operational Environmental

Satellite (GOES) R and S) awarded on April 5, 2012 to United Launch Services, LLC

• The spacecraft will launch in October 2015 and February 2017, respectively, aboard Atlas V 541 rockets from

Space Launch Complex-41 at CCAFS, FL

– Multi-Mission RLSP for three medium-class SMD missions (i.e., Soil Moisture Active-Passive (SMAP) & Orbiting

Carbon Observatory-2 (OCO-2)) along with a National Oceanic & Atmospheric Administration (NOAA) mission (i.e.,

Joint Polar Satellite System (JPSS-1)) awarded on July 16, 2012 to United Launch Services, LLC

• The spacecraft will launch in October 2014, July 2014 and November 2016, respectively, aboard Delta II rockets

from Complex 2 at Vandenberg Air Force Base (VAFB), CA

– RLSP for one medium-class SMD/NOAA mission (i.e., Jason-3)) awarded on 7/16/12 to Space Exploration

Technologies (SpaceX)

• The spacecraft will launch in December 2014 aboard a Falcon 9 v1.0 rocket from Complex 4 at VAFB, CA

– Conducting proposal evaluations for 1 SMD small-class mission (i.e., Gravity and Extreme Magnetism Small Explorer

(GEMS))

– Supporting SMD to select a launch service for the Ice, Cloud, and land Elevation Satellite-2 (ICESat-2) mission