Top Banner
Hose Pulls Hose Pulls Shoulder Load 100’ 2 ½” Shoulder Load 100’ 2 ½”
22

Hose Pulls Shoulder Load 100 2 ½. 1)Firefighter receives order for shoulder load 100 of 2 ½ with a desired nozzle and repeats it back to the Captain 2)Firefighter.

Mar 26, 2015

Download

Documents

Jonathan Moore
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Hose Pulls Shoulder Load 100 2 ½. 1)Firefighter receives order for shoulder load 100 of 2 ½ with a desired nozzle and repeats it back to the Captain 2)Firefighter.

Hose PullsHose Pulls

Shoulder Load 100’ 2 ½”Shoulder Load 100’ 2 ½”

Page 2: Hose Pulls Shoulder Load 100 2 ½. 1)Firefighter receives order for shoulder load 100 of 2 ½ with a desired nozzle and repeats it back to the Captain 2)Firefighter.

1)Firefighter 1)Firefighter receives order for receives order for shoulder load 100’ of shoulder load 100’ of 2 ½” with a desired 2 ½” with a desired nozzle and repeats it nozzle and repeats it back to the Captainback to the Captain

2)Firefighter then 2)Firefighter then takes position on takes position on tailboard facing hose tailboard facing hose bedbed

Page 3: Hose Pulls Shoulder Load 100 2 ½. 1)Firefighter receives order for shoulder load 100 of 2 ½ with a desired nozzle and repeats it back to the Captain 2)Firefighter.

1)Grasp female coupling 1)Grasp female coupling

2)Check for gasket and swivel2)Check for gasket and swivel

Page 4: Hose Pulls Shoulder Load 100 2 ½. 1)Firefighter receives order for shoulder load 100 of 2 ½ with a desired nozzle and repeats it back to the Captain 2)Firefighter.

1)1)Grasp hose with pinkie to couplingGrasp hose with pinkie to coupling

2)2)Pivot 180 degreesPivot 180 degrees

3)3)Hold hose at waist heightHold hose at waist height

Page 5: Hose Pulls Shoulder Load 100 2 ½. 1)Firefighter receives order for shoulder load 100 of 2 ½ with a desired nozzle and repeats it back to the Captain 2)Firefighter.

Check ground for uneven terrain, Check ground for uneven terrain, obstacles, and trafficobstacles, and traffic

Page 6: Hose Pulls Shoulder Load 100 2 ½. 1)Firefighter receives order for shoulder load 100 of 2 ½ with a desired nozzle and repeats it back to the Captain 2)Firefighter.

1)1)State clearly “Left, Right, Down, Clear”State clearly “Left, Right, Down, Clear”

2)2)Step off of tailboard facing forwardStep off of tailboard facing forward

Page 7: Hose Pulls Shoulder Load 100 2 ½. 1)Firefighter receives order for shoulder load 100 of 2 ½ with a desired nozzle and repeats it back to the Captain 2)Firefighter.

Do not step off of tailboard Do not step off of tailboard backwardsbackwards

Page 8: Hose Pulls Shoulder Load 100 2 ½. 1)Firefighter receives order for shoulder load 100 of 2 ½ with a desired nozzle and repeats it back to the Captain 2)Firefighter.

Ground coupling on tailboardGround coupling on tailboard

Page 9: Hose Pulls Shoulder Load 100 2 ½. 1)Firefighter receives order for shoulder load 100 of 2 ½ with a desired nozzle and repeats it back to the Captain 2)Firefighter.

Firefighter then retrieves necessary Firefighter then retrieves necessary equipmentequipment

Page 10: Hose Pulls Shoulder Load 100 2 ½. 1)Firefighter receives order for shoulder load 100 of 2 ½ with a desired nozzle and repeats it back to the Captain 2)Firefighter.

1)2 ½” Fog or Smooth bore tip1)2 ½” Fog or Smooth bore tip

2)2 ½” Double male2)2 ½” Double male

Page 11: Hose Pulls Shoulder Load 100 2 ½. 1)Firefighter receives order for shoulder load 100 of 2 ½ with a desired nozzle and repeats it back to the Captain 2)Firefighter.

Be sure to close compartment door Be sure to close compartment door when finishedwhen finished

Page 12: Hose Pulls Shoulder Load 100 2 ½. 1)Firefighter receives order for shoulder load 100 of 2 ½ with a desired nozzle and repeats it back to the Captain 2)Firefighter.

1)Check for gasket in nozzle1)Check for gasket in nozzle

2)Connect nozzle and double male2)Connect nozzle and double male

Page 13: Hose Pulls Shoulder Load 100 2 ½. 1)Firefighter receives order for shoulder load 100 of 2 ½ with a desired nozzle and repeats it back to the Captain 2)Firefighter.

Ground coupling behind apparatusGround coupling behind apparatus

Page 14: Hose Pulls Shoulder Load 100 2 ½. 1)Firefighter receives order for shoulder load 100 of 2 ½ with a desired nozzle and repeats it back to the Captain 2)Firefighter.

1)Attach double male 1)Attach double male and nozzle with and nozzle with approved methodapproved method

2)Coupling tilt, 2)Coupling tilt, between the feet, or between the feet, or over the hipover the hip

Page 15: Hose Pulls Shoulder Load 100 2 ½. 1)Firefighter receives order for shoulder load 100 of 2 ½ with a desired nozzle and repeats it back to the Captain 2)Firefighter.

1)1) Take position behind apparatus facing tailboardTake position behind apparatus facing tailboard

2)2) Place nozzle on chestPlace nozzle on chest

3)3) Begin loading hose on shoulderBegin loading hose on shoulder

Page 16: Hose Pulls Shoulder Load 100 2 ½. 1)Firefighter receives order for shoulder load 100 of 2 ½ with a desired nozzle and repeats it back to the Captain 2)Firefighter.

Continue to load hose onto shoulder Continue to load hose onto shoulder evenly until hose reaches the kneeevenly until hose reaches the knee

Page 17: Hose Pulls Shoulder Load 100 2 ½. 1)Firefighter receives order for shoulder load 100 of 2 ½ with a desired nozzle and repeats it back to the Captain 2)Firefighter.

Once 50’ of hose has been loaded onto shoulder,Once 50’ of hose has been loaded onto shoulder,

1)Place coupling overhead and behind back1)Place coupling overhead and behind back

2)Begin loading hose on opposite shoulder2)Begin loading hose on opposite shoulder

Page 18: Hose Pulls Shoulder Load 100 2 ½. 1)Firefighter receives order for shoulder load 100 of 2 ½ with a desired nozzle and repeats it back to the Captain 2)Firefighter.

1)Load hose toward the front of the body first1)Load hose toward the front of the body first

2)Continue loading hose from knee to knee2)Continue loading hose from knee to knee

Page 19: Hose Pulls Shoulder Load 100 2 ½. 1)Firefighter receives order for shoulder load 100 of 2 ½ with a desired nozzle and repeats it back to the Captain 2)Firefighter.

When 100’ of hose has been loaded, break When 100’ of hose has been loaded, break couplingcoupling

Page 20: Hose Pulls Shoulder Load 100 2 ½. 1)Firefighter receives order for shoulder load 100 of 2 ½ with a desired nozzle and repeats it back to the Captain 2)Firefighter.

1)1)Return female hose coupling to hose bedReturn female hose coupling to hose bed

2)2)Hose left on the ground will become a trip Hose left on the ground will become a trip hazardhazard

Page 21: Hose Pulls Shoulder Load 100 2 ½. 1)Firefighter receives order for shoulder load 100 of 2 ½ with a desired nozzle and repeats it back to the Captain 2)Firefighter.

When completed end coupling should be When completed end coupling should be held at front chestheld at front chest

Page 22: Hose Pulls Shoulder Load 100 2 ½. 1)Firefighter receives order for shoulder load 100 of 2 ½ with a desired nozzle and repeats it back to the Captain 2)Firefighter.

Hose is shoulder loaded so it may pay off the Hose is shoulder loaded so it may pay off the rear while walking forwardrear while walking forward