Top Banner
2004 Gas-Lift Wo rkshop Joe Dunn Clegg 1 Historical Review of Dual and Multiple Completions By Joe Dunn Clegg
24

Historical Review of Dual and Multiple Completions

Jan 14, 2016

Download

Documents

adanna

Historical Review of Dual and Multiple Completions. By Joe Dunn Clegg. History. Early Days (1859 to 1900) Spindletop & East Texas: RRC & Proration After WW II: Commingling & Dual Approval The 1950’s & 60’s: Hard times : Duals + The 1960’s: Computers and Offshore - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Historical Review of Dual and Multiple Completions

2004 Gas-Lift Workshop

Joe Dunn Clegg 1

Historical Review of Dual and Multiple Completions

By

Joe Dunn Clegg

Page 2: Historical Review of Dual and Multiple Completions

2004 Gas-Lift Workshop

Joe Dunn Clegg 2

History Early Days (1859 to 1900) Spindletop & East Texas: RRC & Proration After WW II: Commingling & Dual Approval The 1950’s & 60’s: Hard times : Duals + The 1960’s: Computers and Offshore The Good Years: 1970 to 1984 Reality and Profitability Using the Best Technology

Page 3: Historical Review of Dual and Multiple Completions

2004 Gas-Lift Workshop

Joe Dunn Clegg 3

Multiple Zones

One zone: Only single possible Two or more zones: Development Plan

Needed--How best to produce reserves. Aggie approach: Singles & Plug-Back Well for each zone (expensive) Mix of singles, duals, multiples and

…..recompletions.

Page 4: Historical Review of Dual and Multiple Completions

2004 Gas-Lift Workshop

Joe Dunn Clegg 4

Multiple Zones Objective: to make more production with less initial

costs & less operating expenditures .…make more money

Applicable for only limited rates in certain environments….. 2”x 2” for < 1000 bpd x 1000 bpd

Avoid large mismatches in depth and pressure ….… depths < 10%; gradients < 10%

Review potential operating problems/costs Key often a long flowing life Dual artificial lift & workovers usually a problem

$

Page 5: Historical Review of Dual and Multiple Completions

2004 Gas-Lift Workshop

Joe Dunn Clegg 5

Annulus-TubingDualforflowing wells

PackerLeakageTests?

Page 6: Historical Review of Dual and Multiple Completions

2004 Gas-Lift Workshop

Joe Dunn Clegg 6

Flow CouplingCross-over

Packer

Tubing

Flow CouplingLanding Nipple

Blast JointPolished Nipple

Packer

No-Go Nipple

Perforations

Annulus-TubingDual withCross-Over

Page 7: Historical Review of Dual and Multiple Completions

2004 Gas-Lift Workshop

Joe Dunn Clegg 7

Fad in the 1960’s

Work-Overs?

Secondary Recovery?

Unitization?

Little OperatingCost Data Available

CourtesyOtis

Page 8: Historical Review of Dual and Multiple Completions

2004 Gas-Lift Workshop

Joe Dunn Clegg 8

Multiple“Tubingless”Completion

Exxon Special

Page 9: Historical Review of Dual and Multiple Completions

2004 Gas-Lift Workshop

Joe Dunn Clegg 9

ConcentricDualCompletionTubing

UpperZone

LowerZones

OK forFlowingZonesi.e. Gas Wells

Page 10: Historical Review of Dual and Multiple Completions

2004 Gas-Lift Workshop

Joe Dunn Clegg 10

DualParallelGas-Lift

Survivedthe testof time

11

Page 11: Historical Review of Dual and Multiple Completions

2004 Gas-Lift Workshop

Joe Dunn Clegg 11

DualParallelGas-Liftw/concentrictbg. string

x Lift Gas

Lower ZoneProduction

o

Upper Zone ProductionNormal gas injection

12

Page 12: Historical Review of Dual and Multiple Completions

2004 Gas-Lift Workshop

Joe Dunn Clegg 12

W/GasInjection

String&

SpecialCrossover

9 5/8”Csg

3 1/2” OD Tbg w/

1.9” OD Tbg

(Hydraulic)

(Permanent)

x

X XProposed DualParallelGas-Lift

13

Page 13: Historical Review of Dual and Multiple Completions

2004 Gas-Lift Workshop

Joe Dunn Clegg 13

ThreeTubing StringDual Gas-Lift

Rigid<90’

(Hydraulic)

(Hydraulic)

(Permanent)

Outz & Osmus

Casing Size?

Page 14: Historical Review of Dual and Multiple Completions

2004 Gas-Lift Workshop

Joe Dunn Clegg 14

Circulating SleeveUpper PumpSealLower Pump

Sucker-rod string

Upper Zone ProductionUpper Zone GasLower Zone Production

Liquid & Gas

Upper Zone

Lower Zone

Dual Rod Pumping: One Beam Unit

o

Schematic

Page 15: Historical Review of Dual and Multiple Completions

2004 Gas-Lift Workshop

Joe Dunn Clegg 15

Head to HeadDual BeamRod Pumps

Page 16: Historical Review of Dual and Multiple Completions

2004 Gas-Lift Workshop

Joe Dunn Clegg 16

Triple Beam Rod Pumps

Page 17: Historical Review of Dual and Multiple Completions

2004 Gas-Lift Workshop

Joe Dunn Clegg 17

Head to Head Dual For Triple Units Single Dual Head

Page 18: Historical Review of Dual and Multiple Completions

2004 Gas-Lift Workshop

Joe Dunn Clegg 18

9 5/8” Csg

Lower Zone Power Fluid

All Production +Power Fluid

Upper ZonePower Fluid

Dual Hydraulic

Lower Zone

Upper Zone

CommingledProduction

Page 19: Historical Review of Dual and Multiple Completions

2004 Gas-Lift Workshop

Joe Dunn Clegg 19

Dual Hydraulic Pumping: No vents

Production lower pump +all power fluid

Production upper zone

Power fluid for upper pump

Power fluid for lower pump

LP

UP

Page 20: Historical Review of Dual and Multiple Completions

2004 Gas-Lift Workshop

Joe Dunn Clegg 20oo

oo

Upper ZonePump

Perforations

Packer

Lower Zone PumpLower Zone

HypotheticalDual ESPInstallation

UpperZone

Feasible but notPractical

Page 21: Historical Review of Dual and Multiple Completions

2004 Gas-Lift Workshop

Joe Dunn Clegg 21

Multilateral Dual

Upper Zone Lateral

Lower Zone OpposedMultilateral

Page 22: Historical Review of Dual and Multiple Completions

2004 Gas-Lift Workshop

Joe Dunn Clegg 22

MultipleCompletion:

CommingledZones OneTubing String

Page 23: Historical Review of Dual and Multiple Completions

2004 Gas-Lift Workshop

Joe Dunn Clegg 23

My Conclusions Singles or Commingling Preferred Duals are profitable for selected cases Multiples (>2) are seldom justified over well life

except for flowing wells Most successful high rate (> 200 BPD) artificial

lift: ...Gas Lift Savings on drilling costs are often lost due to

higher operating costs, higher workover costs and lost reserves

Multiple completions increase stress

Page 24: Historical Review of Dual and Multiple Completions

2004 Gas-Lift Workshop

Joe Dunn Clegg 24

Duals Singles Multiples

The Winner

Special Cases Flowing Wells