Top Banner
6

Healthcare Construction & Renovation - Atlanta, Georgia

Nov 28, 2014

Download

Business

McKenney’s updated the HVAC system controls and Building Management System (BMS) floor plan amid renovations at a Georgia hospital. For more info visit http://www.mckenneys.com.
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 2: Healthcare Construction & Renovation - Atlanta, Georgia

Project NameHospital Infusion Suite

Project Location

Atlanta, Georgia

Project TeamOwner: Hospital

Specializations

MarketsHealthcare

Engineer: McKenney’s, Inc.

Energy Management

General Contractor:Segars Group, LLCArchitect: Perkins+Will

Design/Build

Sheet Metal Shop Prefab

Page 3: Healthcare Construction & Renovation - Atlanta, Georgia

McKenney’s updated the HVAC system controls and BuildingManagement System (BMS) floor plan amid renovations at a Georgia hospital.

Page 4: Healthcare Construction & Renovation - Atlanta, Georgia

The ChallengeThe McKenney’s team needed to change out antiquated HVAC dampers while simultaneously maintaining a tidy workspace during hospital construction. The team also had to develop the best solution for integrating the newly renovated area into the hospital’s existing BMS.

The SolutionThe Automation & Control Solutions team collaborated with the McKenney’s Healthcare & Research experts to replace the older air dampers with new airflow valves and actuators. They also selected and implemented Tridium’s newest network controller (J-603) to integrate into the hospital’s older BMS. The Tridium controller allows future expansion to the next floor of devices and can accommodate newer software versions as they’re released.

The content of this document is not intended as an endorsement.

Page 5: Healthcare Construction & Renovation - Atlanta, Georgia

The ResultsThe hospital’s entire infusion suite is now a direct-digital controlled system, and future upgrades can be completed without any new network controller hardware. Building engineers also have better control of the facility’s space and energy savings.

Page 6: Healthcare Construction & Renovation - Atlanta, Georgia

1056 Moreland Industrial BoulevardAtlanta, Georgia 30316P: 404-622-5000

[email protected]

3601 Performance RoadCharlotte, North Carolina 28214P: 704-357-1200

Atlanta Office:

Charlotte Office:

www.mckenneys.com