Page 1: H. Hayano, KEK, 10072014 New SRF Facility at KEK @LCWS14 Belgrade SRF-WG.

H. Hayano, KEK, 10072014

New SRF Facility at KEK

@LCWS14 Belgrade SRF-WG

Page 2: H. Hayano, KEK, 10072014 New SRF Facility at KEK @LCWS14 Belgrade SRF-WG.

Outline of proposed Program2012 supplementary budget,Industry-University cooperation, Center Of Innovetion (COI) program

Targeting 10-20 years future social needs, innovative technology development center based on Industry-University cooperation is to be facilitated.

KEK and industries proposed: (1) Pollution removal with electricity generation technology, (2) International electricity network, (3) New alternative resource material generation, (4) Ozone layer generator,In the futer. To make innovation to solve above subject,Seeds technologies are; (a) superconducting accelerator technologies (b) technologies of quantum-beam utilization (c) cryo-technologies

EnergyEnvironmentResource

SC accelerator

Industrialization of, compact sized of, SC accelerator = ILC

Page 3: H. Hayano, KEK, 10072014 New SRF Facility at KEK @LCWS14 Belgrade SRF-WG.

Earth Cleaner International Energy Network

Ozone layer generator Compact material analyzerfor new resource material

Laboratoryuniversity

project project

project project

Overall view of proposal

Page 4: H. Hayano, KEK, 10072014 New SRF Facility at KEK @LCWS14 Belgrade SRF-WG.

4

New SRF facility : promotion of superconducting accelerator utilization

New building (80m x 30m) is under construction at North of STF

SC cavity inspection & process, vertical test, cryomodule assembly, cryomodule test

Page 5: H. Hayano, KEK, 10072014 New SRF Facility at KEK @LCWS14 Belgrade SRF-WG.

Satellite View of new building location

Page 6: H. Hayano, KEK, 10072014 New SRF Facility at KEK @LCWS14 Belgrade SRF-WG.

Building location detail

New SRF building

STF building

Page 7: H. Hayano, KEK, 10072014 New SRF Facility at KEK @LCWS14 Belgrade SRF-WG.

Construction status of new building

Construction compeletion will be end of Jan. 2015

Page 8: H. Hayano, KEK, 10072014 New SRF Facility at KEK @LCWS14 Belgrade SRF-WG.

List of new device to be installed

(1) A large size clean room for ILC cryomodule assembly(2) EP facility to develop industrial EP(3) 4-cavities Vertical test stand(4) ILC Cryomodule assembly tools(5) Helium Cryogenics(6) Cryomodule test stand (to be installed later )

with (1) Center control room(2) KEK researcher room(3) Industry room(4) Small meeting room(5) Exhibition space

Page 9: H. Hayano, KEK, 10072014 New SRF Facility at KEK @LCWS14 Belgrade SRF-WG.

ISO-4, ISO-6 clean rooms, with dual cavity rail

ISO4 & ISO6 Clean Rooms for ILC cryomodule assembly

Page 10: H. Hayano, KEK, 10072014 New SRF Facility at KEK @LCWS14 Belgrade SRF-WG.

Flat-floor Clean Room, ventilating to side wallFor easy floor cleaning, easy rail dip cleaning

Cavity outside wash roomHPR

Page 11: H. Hayano, KEK, 10072014 New SRF Facility at KEK @LCWS14 Belgrade SRF-WG.

Block diagram of vertical EP system (VEP)

HPR

Scrubber

Wast water tank

EP system

EP tank

Page 12: H. Hayano, KEK, 10072014 New SRF Facility at KEK @LCWS14 Belgrade SRF-WG.

Vertical EP (VEP)Cavity mount stage

vertical

horizontal

Mounting at horizontal,Electrode insertion in vertical,EP at vertical.

Cavity:fixedElectrode: rotationEP acid flow:verticalH2 gas flow:suction from top

Motor driven

Page 13: H. Hayano, KEK, 10072014 New SRF Facility at KEK @LCWS14 Belgrade SRF-WG.

VEPCavity vertical position during electrode insertion and EP

Cavity horizontal position during cavity and EP header installation

Use as a horizontal EP is also possible.

Page 14: H. Hayano, KEK, 10072014 New SRF Facility at KEK @LCWS14 Belgrade SRF-WG.

VEP Electrode Insertion HPR (Nozzle rotation type)VEP

Page 15: H. Hayano, KEK, 10072014 New SRF Facility at KEK @LCWS14 Belgrade SRF-WG.

HPR (High Pressure water Rinsing)

Top view

Side view

Front view from EP floor

CleanRoomside

CleanRoomside

EPfloorSide(2F)

Take-outToClean room

MountFromEP room

HPR

Cavity: no rotation, but up and downWater nozzle: rotation

Page 16: H. Hayano, KEK, 10072014 New SRF Facility at KEK @LCWS14 Belgrade SRF-WG.

DESY AMTF

Under Building 4-cavity Vertical Test Stand, following DESY AMTF

KEK new vertical test cryostatVertical Test

Page 17: H. Hayano, KEK, 10072014 New SRF Facility at KEK @LCWS14 Belgrade SRF-WG.

Hanging 4 cavities with jacket and pipeVertical Test

TESLA cavity with jacket TESLA cavity w/o jacket

Page 18: H. Hayano, KEK, 10072014 New SRF Facility at KEK @LCWS14 Belgrade SRF-WG.

Cryomodule assembly tool

Cryomodule Assembly tools, following to DESY/Saclay XFEL facility

Page 19: H. Hayano, KEK, 10072014 New SRF Facility at KEK @LCWS14 Belgrade SRF-WG.

Cryomodule assembly tool

Cryomodule Assembly tools, following to DESY/Saclay XFEL facility

Page 20: H. Hayano, KEK, 10072014 New SRF Facility at KEK @LCWS14 Belgrade SRF-WG.

Cryomodule Assembly tools, following to DESY/Saclay XFEL facility

Page 21: H. Hayano, KEK, 10072014 New SRF Facility at KEK @LCWS14 Belgrade SRF-WG.

Experiment Hall

South half-side7t crane

North half-side15t crane

View from control room

View from east to west

Page 22: H. Hayano, KEK, 10072014 New SRF Facility at KEK @LCWS14 Belgrade SRF-WG.

Resident space

1st floor, exhbition space and stairs,view from entrance

2nd floor, open space and control room

Page 23: H. Hayano, KEK, 10072014 New SRF Facility at KEK @LCWS14 Belgrade SRF-WG.

Plan of Start-up schedule

JFY2013 JFY2014 JFY2015 JFY2016

building

facility

ModuleTest facility

COIproject

Design and construction

Design and fabrication Kept in ATF Installation and commissioning

Design and fabrication

COI project startOrganizing industry-university cooporationAnd project planning

We are here

Budget came here

Page 24: H. Hayano, KEK, 10072014 New SRF Facility at KEK @LCWS14 Belgrade SRF-WG.