Lars Tore Haug 2012-12-06 Draft 2012-11-20 DRAFT Guideline for Structural Well Integrity Status JIP and ongoing development work
Lars Tore Haug2012-12-06
Dra
ft 20
12-1
1-20
DRAFT
Guideline for Structural Well Integrity
Status JIP and ongoing development work
© Det Norske Veritas AS. All rights reserved.
Guideline for Structural Well Integrity
2012-12-06 DRAFT
Presentation Outline
Subsea wellhead system overview and industry experience
- wellhead integrity, complexity
- current industry approaches, main areas of uncertainty
JIP – Structural integrity of drilling and well systems
JIP phase 2 plans
2
© Det Norske Veritas AS. All rights reserved.
Guideline for Structural Well Integrity
2012-12-06 DRAFT
System Overview MODU Motions
Riser Movements and BOP motion
Well Construction, - WH relative movement / non-pre-loaded,
and pre-loaded designs
Seabed Support
Environmental Conditions
Stakeholders- Operator- Rig owner- Subsea manufacturer
3
© Det Norske Veritas AS. All rights reserved.
Guideline for Structural Well Integrity
2012-12-06 DRAFT
Background – wellhead function
- wellhead including conductor constitutes a crucial structural element within the entire drilling and well system.
- provides a safe well barrier during drilling of intermediate sections.
4
Well Head
Conductor Housing
The function of the wellhead system.
© Det Norske Veritas AS. All rights reserved.
Guideline for Structural Well Integrity
2012-12-06 DRAFT
Typically the hotspots consists of:
Welds- On conductor and wellhead housings
- Shown in the two red dots higher up
Connectors- On conductor and wellhead housings
- Shown in the two red dots lower down
Base Material Transitions
30” conductor20” casing
13 3/8”9 5/8”
Background – Hotspots
5
18 ¾” Subsea
wellhead
© Det Norske Veritas AS. All rights reserved.
Guideline for Structural Well Integrity
2012-12-06 DRAFT
Background - incidents
Few incidents experienced or reported:
West of Shetland 1983: A fatigue failure of a high pressure wellhead housing due to VIV west of Shetland [1]
North Sea 2005. Abnormal BOP movements were explained by a parted conductor casing extension weld, caused by fatigue [2]
6
[1] Hopper, C.T., “Vortex Induced Oscillations of Long Marine Drilling Risers”, Proc.Deep Offshore Technology Conf., Malta, 1983.[2] Reinås, L., Sæther, M., Hørte, T., and Grytøyr, G., “Wellhead Fatigue Analysis Method,” Proc. of the International Offshore Mechanics and Arctic Engineering Conference Rotterdam, Netherlands, 2011.
© Det Norske Veritas AS. All rights reserved.
Guideline for Structural Well Integrity
2012-12-06 DRAFT
Lack of standards for wellhead There is no industry-wide standard or guideline available for subsea
wellhead calculation.- API 6a / ISO 10423 – Specification for Wellhead and Christmas Tree Equipment
(section 4.3.3.1):
- API 17d / ISO 13628-4 – Specification for Subsea Wellhead and Christmas Tree Equipment: (section 5.1.2.1.1):
7
“Fatigue analysis and localized bearing stress values are beyond the scope of this International Standard”
“The effects of external loads (i.e. bending moments, tension), ambient hydrostatic loads and fatigue shall be considered.”
© Det Norske Veritas AS. All rights reserved.
Guideline for Structural Well Integrity
2012-12-06 DRAFT
Challenges – areas of uncertainty
Old subsea wells: Main driver for methodology developed in the Method Statement.- Issue in the North Sea: Template wells. Non-preloaded WH with 45° load shoulder (rocking
WH). Shallow water, harsh conditions.
Lack of design-, fabrication records and load history. - Change in industry required; new approach to handling contracts from early phase to finish;
operators, drilling contractors, wellhead manufacturers.
New subsea wells: Design basis, roles and boundary conditions- Challenging to quantify load early in the project.
8
© Det Norske Veritas AS. All rights reserved.
Guideline for Structural Well Integrity
2012-12-06 DRAFT
Challenges in fatigue assessment Critical hotspots are not accessible for inspection
Riser loads can be monitored, but there are still uncertainties on the resulting stresses in the hot-spots.
Strains or stresses in wellheads are not monitored
The logging results of cement between the high pressure housing and the low pressure housing are uncertain and provide little guidance to the analyst. - For new wells : It is possible to log through the surface casing
before installing intermediate casings, but there is a cost issue and uncertain results. Half a day of rig time.
9
© Det Norske Veritas AS. All rights reserved.
Guideline for Structural Well Integrity
2012-12-06 DRAFT
Joint Industry Project (JIP), Phase 1 - 2010 to 2012
Triggered by industry needs- Challenges in documenting integrity margins for both
static and dynamic loading
Demand for guidelines related to loading and capacity of the well system - in particular with respect to fatigue
Ensure a consistent approach for integrity of entire drilling and well systems
10
© Det Norske Veritas AS. All rights reserved.
Guideline for Structural Well Integrity
2012-12-06 DRAFT
JIP Participants Norwegian
Oil and Gas Association (observer)
Statoil (chair)
BG Group
BP
Det Norske
Eni
ExxonMobil
11
Lundin
Marathon
Shell
Talisman
Total
Woodside
Nexen
GDF Suez
Chevron
© Det Norske Veritas AS. All rights reserved.
Guideline for Structural Well Integrity
2012-12-06 DRAFT
Scope & Deliverables, Phase 1
12
Act 1 - State of the Art Review
Act 2 - Uniform Structural Design Philosophy
Act 3 – Fatigue Design and Calculations
Act 4 & 5 – Integrity and Information Management
Act 6 – Well Foundation
Act 7 – Work Group Contribution
Act 8 – Ultimate & Accidental Limit State Design
Act 9 – Fatigue Design, Alternative Analysis Method
Act 10 – Houston Work Group
TR1 – Structural Integrity Philosophy of Well System
TR2 – Capacity Design and Analysis of Well Systems
TR3 – Fatigue Design and Analysis of Well Systems
TR4 – Integrity and Information Management for Well Systems
DNV Guideline
Scope Intermediate deliverables Final deliverable
Objective to address the well systems’ structural integrity as a complete system.
© Det Norske Veritas AS. All rights reserved.
Guideline for Structural Well Integrity
2012-12-06 DRAFT
Part 1 – Safety Philosophy
Overall structural integrity philosophy- Based on overall safety principles as outlined in
existing DNV Offshore Standards- Adopting a safety class methodology (low,
medium, high)
Roles and responsibilities- Roles and responsibilities should be defined in
early phase- Normally operator’s responsibility to define
overall safety performance- Closely related to information and integrity
management
13
TR 1
TR 2 TR 3
TR 4
© Det Norske Veritas AS. All rights reserved.
Guideline for Structural Well Integrity
2012-12-06 DRAFT
Part 2 – Structural Strength design and analysis Main objective to establish a uniform
method for assessing strength capacity of well systems.
Currently there are multiple methods presented in a range of international codes and standards.
The method will provide: - A bridge between established standards- A consistent safety level for overall system
To be handled in JIP phase 2
14
TR 1
TR 2 TR 3
TR 4
Wellhead/XT:API 6aAPI 17dISO 10423ISO 13628-4
BOPISO 13628-7NORSOK D-001NORSOK D-010API Spec 6AAPI Spec 16AAPI RP 16EAPI RP 53API 16dAPI Spec 16C
Casing Tubing, DownholeISO 11960API 5ct(2)(3)API 14a(b)(h)(j)ISO 10426-1 (cement)
Drilling Equip.API 7KAPI RP 64API 4FAPI 8CDNV-OS-E101
GeneralISO 13628-1NORSOK D-001NORSOK D-010NORSOK U-001OLF Guideline 070PSA NorwayDNV-OS-C101
Riser/UmbilicalsISO 13628-2ISO 13628-3ISO 13628-5ISO 13628-7API RP 16QAPI Spec 16R DNV-OSS-302DNV-OS-F201DNV-RP-F206ISO 13624-2
Control SystemsISO 13628-6API Spec 16D
Well FoundationAPI RP 2A
© Det Norske Veritas AS. All rights reserved.
Guideline for Structural Well Integrity
2012-12-06 DRAFT
Part 3 – Fatigue analysis
15
Describing important issues related to local and global analysis including: Mechanical behavior of wellheads
BOP dynamics
Tensioning systems
Flex joints
Soil
Main challenge: Sensitive to input parameters
Hydrodynamic properties of BOP and riser uncertain
Different analysis methodologies give incomparable results
TR 1
TR 2 TR 3
TR 4
© Det Norske Veritas AS. All rights reserved.
Guideline for Structural Well Integrity
2012-12-06 DRAFT
Part 4 - Information Management
Information management
Input information for analyses
Information flow
Structural well integrity process description
16
TR 1
TR 2 TR 3
TR 4
© Det Norske Veritas AS. All rights reserved.
Guideline for Structural Well Integrity
2012-12-06 DRAFT
Adequacy of analysisPrevious calculation methods:
Insufficient fundamental description of the mechanical problem raised doubt, could be too simplified or wrong
Guideline focus on calculation methods:
Addresses complex mechanical behavior
opens for alternative methods, ref benchmark study
Recognizes following as key topics for future consideration- insufficient understanding of effect of important parameters- absence of properly calibrated wellhead strain/stress monitoring results
17
© Det Norske Veritas AS. All rights reserved.
Guideline for Structural Well Integrity
2012-12-06 DRAFT
Benchmark Study 2H Offshore, Stress Engineering Services and Statoil are performing analyses of a
test case
Purpose : - Assess and compare various methodologies for WH fatigue analyses
18
© Det Norske Veritas AS. All rights reserved.
Guideline for Structural Well Integrity
2012-12-06 DRAFT
New JIP phase 2, propose launch 2013 - Objective Further develop and revise/improve fatigue calculation methodology;
- Increased accuracy, increased flexibility (different approaches), benefit of monitoring
Systematic approach to analysis of ultimate and accidental load and capacity of the wellhead system.
19
Improved fatigue calculation
methodology
Structural strength calculation
methodology
© Det Norske Veritas AS. All rights reserved.
Guideline for Structural Well Integrity
2012-12-06 DRAFT
JIP phase 2 - Scope1. Fatigue Analysis Methodology
Bench marking of fatigue analysis methods, case studies
Monitoring, guidance on implementation
Improvement, of fatigue methodology (fracture mech., strain life, global analysis ..)
Structural Reliability Analysis, Fatigue
Vortex Induced Vibrations (VIV)
20
Riser load time series
© Det Norske Veritas AS. All rights reserved.
Guideline for Structural Well Integrity
2012-12-06 DRAFT
JIP phase 2 - Scope2. Structural strength; ( i.e. pressure, load, ultimate, extreme, accidental)
Identify industry best practices, identify risk and limitations and interfaces in present codes
Provide a Guideline to:- Numerical validation and handling of interfaces from a
systems perspective..- How to use existing codes for subsea applications- Guideline for common understanding of operating
envelopes of equipment
Supplement to ISO/API codes
21
© Det Norske Veritas AS. All rights reserved.
Guideline for Structural Well Integrity
2012-12-06 DRAFT
Summary The industry has not agreed on a unified approach to
how to address the challenges. Different methods exists.
JIP phase 2 is planned with kick off in January 2013
The Guideline is still “work in progress” and has not yet been approved for industry release by the Steering Committee.
22
© Det Norske Veritas AS. All rights reserved.
Guideline for Structural Well Integrity
2012-12-06 DRAFT
Safeguarding life, property and the environment
www.dnv.com
23