IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016 GREEN: A DESIGNER’S PERSPECTIVE IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016 2 ESSTEAM Over 350 completed project in 15 years Over 350 completed project in 15 years Team strength of 60+ persons Team strength of 60+ persons Over 60,00,000 sq ft of completed projects Over 60,00,000 sq ft of completed projects 5 Completed Certified Green Buildings 5 Completed Certified Green Buildings 15 Zonal & National Design Awards 15 Zonal & National Design Awards 12 IGBC Accredited Professionals 12 IGBC Accredited Professionals
89

GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

Jul 04, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

GREEN: A DESIGNER’S PERSPECTIVE

IGBC GREEN BUILDING CONGRESS 2016

AR. SNEHAL SHAH / SURAT / 08.10.2016

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016 2

ESSTEAM

��Over 350 completed project in 15 yearsOver 350 completed project in 15 years

��Team strength of 60+ personsTeam strength of 60+ persons

��Over 60,00,000 sq ft of completed projectsOver 60,00,000 sq ft of completed projects

��5 Completed Certified Green Buildings5 Completed Certified Green Buildings

��15 Zonal & National Design Awards15 Zonal & National Design Awards

��12 IGBC Accredited Professionals12 IGBC Accredited Professionals

Page 2: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016 3

Urban

Initiatives

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

PROFESSIONAL ACHIEVEMENTS AND AWARDS

2002: IIA-Kaff Young Architects’ Award for Excellence in the field of Interior Architecture in the category of Office Spaces.

2003: 4th Place Winner in Development of Memorial Complex for the Gas Tragedy Victims in Bhopal

2005: National Commendation Award instituted by IIA for interiors of a diamond processing factory at Surat ‘K. G. House’.

2006: IIIDMK Award for Western Region in the Office Interiors category for the year 2006 for design of a showroom ‘Absolute Sound’ at Surat

2007: IIID MK Award for Design Excellence, 2007 in two categories – ‘Residential Design’ and ‘Green Interior Design’ for the project

‘69Infinite – Residence for a Graphic Artist at Surat’.

2008: IIIDMK Award for the Western Region in the Institution Category for the year 2008 for the project ‘Fountainhead School’

2008: IIID MK National Award (Commendation) in the Institution Category for the year 2008 for the project ‘Fountainhead School’

2008: IAD Award for Excellence in Interiors & Architecture Design – Category: Best Innovation Award

2009: IIIDMK Award for the Western Region in the Public Spaces Category for the year 2009 for the project ‘SVP Museum at Science Centre,

Surat’

2009: IIID MK National Award (Commendation) in the Institution Category for the year 2008 for the project ‘SVP Museum at Science Centre,

Surat’

2011: IIID Copper Award 2011 (To sister company Oblique)

2012: IIID Anchor Award (Winner) for Western Region in the Public Spaces Category for the year 2012 for the project ‘Kotyark Mandir, Surat’

2012: IIID Anchor Award (Runner up) for Western Region in the Retail Spaces Category for the year 2012 for the project ‘Saga Lifestyles,

Surat’.

2012: IIID Anchor National Award (Runner up) in the Public Spaces Category for the year 2012 for the project ‘Kotyark Mandir, Surat’

2013: : IIID Anchor Award (Runner up) for Western Region in the Retail Spaces Category for the year 2013 for the project ‘Shobhan’, Surat’.

2013: IIID Anchor Award (Winner) for Western Region in the Commercial Spaces (Large) Category for the year 2013 for the project ‘Office for

EssTeam, Surat’.

2014: IGBC LEED Certified Gold Rating obtained for the project ‘Diamond Factory for M/s Shairu Gems, Surat’ in New Building Category.

2014: IGBC Certified Platinum Rating obtained for the project ‘Diamond Factory for M/s K. Girdharlal, Surat’ in Existing Building Category.

2015: USGBC LEED Certified Gold Rating obtained for the project ‘Diamond Factory for M/s Shree Ram Krishna Exports, Surat’ in Existing

Building Category.

Page 3: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

PROFESSIONAL ACHIEVEMENTS AND AWARDS

2015: IGBC Certified Platinum Rating obtained for the project ‘Fountainhead School, Surat’ in Existing Building Category.

2016: IGBC Certified Platinum Rating obtained for the project ‘Office for M/s. Essteam, Surat’ in Existing Interior Category.

2016: IGBC Certified Platinum Rating obtained for the project ‘Society for Larsen & Toubro Magdalla Housing Complex, Surat’ in Green

Residential Society Category.

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016 6

As Space Designers / Architects / Interior Designers, how

can we play our role in making this planet Greener?

Page 4: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016 7

K G HOUSE (2004) Construction Area: 1,60,000 sq ft

IGBC Certified Platinum Rating - Existing Building (2014)EssTeam’s Scope of Work: Interior Design, Landscape Design & MEP Design Co-ordination

•Innovative HVAC using Thermal Storage Tank o f 5 Lakh Litres

•Minimum use of Paint

•Efficient and Water Conserving Plumbing Systems

•Energy Efficient Electrification Systems and Lighting

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016 8

K G HOUSE (2004)

Page 5: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016 9

SHAIRU GEMS (2014) Construction Area: 80,000 sq ft

IGBC LEED Certified Gold Rating - New Building Category (2014)EssTeam’s Scope of Work: Architecture, Interiors, Landscape Design & MEP Design Co-ordination

•Extensive Reuse of Existing Furniture from Old Factory

•A Green skin on the building to reduce direct solar heating

•Electricity generation through Solar Panels

•Efficient STP recycling total water consumed by the building and existing factory

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016 10

SHAIRU GEMS (2014)

Page 6: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016 11

SRK EMPIRE (2012) Construction Area: 2.20,000 sq ft

USGBC LEED Certified Gold Rating - Existing Building Category (2015)EssTeam’s Scope of Work: Architecture, Interiors, Landscape Design & MEP Design Co-ordination

•Energy Efficient HVAC using Thermal Storage Tank

•Very good use of Daylighting

•Efficient and Water Conserving Plumbing Systems

•Energy Efficient Electrification Systems and Lighting

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016 12

SRK EMPIRE (2012)

Page 7: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016 13

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016 14

Beyond Engineering, what can the Designers do to help

making buildings Greener?

Page 8: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016 15

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016 16

69 INIFINITY – RESIDENCE FOR GRAPHIC DESIGNERClient: Mr. Jabir Kureshi

Project: Interior Design for the Residence, Surat

Site Area: 69 sq mtr / 743 sq ft

2007: WINNER: IIID MK Award for Design Excellence / Category: ‘Green Interior Design’

Page 9: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016 17

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016 18

Page 10: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016 19

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016 20

Page 11: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016 21

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016 22

Page 12: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016 23

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016 24

Page 13: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016 25

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016 26

Page 14: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016 27

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016 28

SAMANVAY: ARCHITECT’S OWN OFFICEClient: M/s EssTeam

Project: Architecture & Interiors for an Architect’s Office, Surat

Site Area: 502 sq mtr / 600 sq yards / Construction Area: 20,000 sq ft

2013: WINNER: IIID Anchor Award for Western Region in the Commercial Spaces (Large)

Page 15: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016 29

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016 30

Page 16: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016 31

4th FL

Terrace

FL

5th FL

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016 32

Page 17: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016 33

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016 34

Page 18: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016 35

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016 36

Page 19: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016 37

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016 38

Page 20: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016 39

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016 40

Page 21: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016 41

EXPERIMENTS IN GREEN ART

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016 42

EXPERIMENTS IN GREEN ART‘THE TUG OF WAR’

SHAIRU GEMS, SURAT

Page 22: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016 43

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016 44

EXPERIMENTS IN GREEN ART‘AUTOJUMBLE’

RESIDENCE FOR MR JABIR KURESHI, SURAT

Page 23: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016 45

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016 46

EXPERIMENTS IN GREEN ART‘BACK TO NATURE’

OLIVE ORIENTATION GALLERY, SURAT

Page 24: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

CASE STUDY FOR IGBC GREEN

EXISTING INTERIORS FOR M/s. ESSTEAM,

SURAT

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

Sr. No Credits Points

1 Eco Design Approach 08

2 Water Conservation 12

3 Energy Efficiency 21

4 Interior Material 06

5 Indoor Environmental 23

6 Innovative in Interior Design 05

Total Points 75

IGBC Green Interiors Rating Systems - Existing Interior Checklist

Page 25: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

Certification Level Existing Interior Recognition

Certified 22-31 Best Practices

Silver 32-41 Outstanding Performance

Gold 42-51 National Excellence

Platinum 52-75 Global Leadership

The various levels of rating awarded are:

Certification Level :

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

ECO DESIGN APPROACH

Page 26: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

M/S ESSTEAM - EXISTING GREEN INTERIOR Existing Interior

Points

Available

Essteam Points

Achieved

EDA CREDIT 1 ECO VISION FOR INTERIOR DESIGN 2 2

EDA CREDIT 2 OPTIMISE CIRCULATION SPACES 2 2

EDA CREDIT 3 PUBLIC TRANSPORTATION PROXIMITY 1 1

EDA CREDIT 4 OCCUPANCY IN GREEN FACILITY 1 0

EDA CREDIT 5 COMMERCIAL LEASE TERM / OWNERSHIP 2 2

TOTAL 08 07

ECO DESIGN APPROACH

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

EDA CREDIT 1 - ECO VISION FOR INTERIOR DESIGN.

Preliminary Review:

1.The office project is designed with sensibility, sustainability and sensitivity

as a theme right from concept stage.

2. The proposed office is in 4, 5 & terrace floors with occupancy of 55.

3.The proposed envisaged using un-plastered concrete and natural materials

(concrete walls, concrete floor, concrete ceiling, mild steel, kudappah stone,

wood, no paint for all surfaces and kept their natural form.

4.The office is designed with good daylight both at top & bottom on every

floor, the central part is used for storage taking care of health & wellbeing of

the occupants.

5. All the wastage from shuttering are used for partitions & doors. The

unusable reinforcement steel is welded into a artistic mesh for stair railing.

6.Creativity of using empty paint cans are used as mail box for staff, GI pipes

are used for lighting as per office function requirements and space efficiency

is given paramount importance.

This meets the credit requirement and 2 points are awarded.

Page 27: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

EDA CREDIT 1 - ECO VISION FOR INTERIOR DESIGN.

Health and wellbeing of occupants.

1.Use of Daylight:Though its a feature of the architecture to provide the ribbon windows at the top and bottom on every floor,the interiors tries to respect it and tries to draw maximum day light in most of the areas through out the day.

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

EDA CREDIT 1 - ECO VISION FOR INTERIOR DESIGN

1.Use of Daylight:

Page 28: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

EDA CREDIT 1 - ECO VISION FOR INTERIOR DESIGN.

Health and wellbeing of occupants.

2.Use of indoor plants:Indoor plants like snake plant , money plant and Areca Palm has been placed at an regular interval of every regularly occupiedspaces which helps in absorption of toxins such as nitrogen oxides , formaldehyde and cleans air bone toxins.

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

EDA CREDIT 1 - ECO VISION FOR INTERIOR DESIGN.

Health and wellbeing of occupants.

3. Tobacco free campus:

No space in the campus promotes the use of tobacco based substances and strict actions are taken against it.

Page 29: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

a. Shuttering Plywood and Wood: In an exposed concrete building, the biggest wastage is the shuttering material. The shutteringplywood pieces were consumed in creating the storages in the peripheral concrete strips, where as the pine wood strips became lining for all the internal partitions.

d

EDA CREDIT 1 - ECO VISION FOR INTERIOR DESIGN.

Materials and Resources.

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

b. Reinforcement Steel: The unusable pieces of reinforcement steel were welded into an artistic mesh to become the staircase railing and the entrance door to the office.

EDA CREDIT 1 - ECO VISION FOR INTERIOR DESIGN.

Materials and Resources.

Page 30: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

c. Empty Containers from PU Polish Material: Non-toxic water based PU was sprayed over the wooden partitions and MS storage doors for weather protection. The empty tins of the same were painted in vibrant colours and became personal mail box for various team members of the office.

EDA CREDIT 1 - ECO VISION FOR INTERIOR DESIGN.

Materials and Resources.

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

d. Scaffolding: The bamboos from the scaffolding were cleaned and tied together all along the terrace periphery to create a parapet, privacy screen from the surrounding buildings and also shading device for the terrace.

EDA CREDIT 1 - ECO VISION FOR INTERIOR DESIGN.

Materials and Resources.

Page 31: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

Other Design Aspect.

a. Use of Daylight: Though its a feature of the architecture to provide the ribbon windows at the top and bottom on every floor, the interiors tries to respect it and tries to draw maximum day light in most of the areas through out the day.

b. Equipment Selection: Adequate care was taken in selection of pumps, elevators (machine room less) and AC (inverter based) so as to make the building energy efficient.

c. Terrace Garden: Its not rocket science to know that the maximum heat is transferred to the building through the roof of the building. Hence, the terrace has been developed as a terrace garden by filling of 9 inches thick layer of the natural soil. This keeps the slab cool and has a considerable impact on the fifth floor AC energy consumptions.

EDA CREDIT 1 - ECO VISION FOR INTERIOR DESIGN.

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

Space Efficiency

EDA CREDIT 1 - ECO VISION FOR INTERIOR DESIGN.

Page 32: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

EDA CREDIT 1 - ECO VISION FOR INTERIOR DESIGN.

Space Efficiency

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

EDA CREDIT 1 - ECO VISION FOR INTERIOR DESIGN.

Space Efficiency

Page 33: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

EDA CREDIT 2 - Optimize Circulation Spaces

Preliminary Review:

1. The narrative indicates that project is having more than 30% circulation

spaces in open office, meeting rooms.

2. The project has 464 sq.m carpet area, furniture & storage area is 224 sq.m,

hence circulation area is more than 51%.

3. The submittal includes furniture interior layout indicating the area breakup.

4. The submittal includes photographs taken at different locations.

This meets the credit requirement and 2 points are awarded.

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

EDA CREDIT 2 - Optimize Circulation Spaces

Page 34: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

EDA CREDIT 2 - Optimize Circulation Spaces

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

EDA CREDIT 2 - Optimize Circulation Spaces

Page 35: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

FLOOR CARPET AREA

SQ MT

FURNITURE,

EQUIPMENT,

STORAGE AREAS

SQ MT

CIRCULATION

SPACES

SQ MT

FOUTH FLOOR 184.20 98.08 86.12

FIFHTH FLOOR 184.34 110.58 73.76

TERRACE FLOOR 96.36 15.59 80.77

TOTAL 464.90 224.25 240.65

THE TOTAL CIRCULATION SPACE IS 51.8 % OF TOTAL CARP ET AREA WHICH IS GREATER THAN 30%

EDA CREDIT 2 - Optimize Circulation Spaces

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

EDA CREDIT 3- Public Transportation Proximity

Preliminary Review:

1.The project has pedestrian access to bus stop within a walking

distance of 800 meters from the entrance.

2.The project has submitted the goggle map indicating the

location of bus stop with distance.

This meets the credit requirement and 1 point are awarded.

Page 36: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

TOTAL DISTANCE TO CITY BUS STAND: 523 MTS , 1716 F T

EDA CREDIT 3- Public Transportation Proximity

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

TOTAL DISTANCE TO BRTS BUS STAND : 660 MTS , 2165 FT

EDA CREDIT 3- Public Transportation Proximity

Page 37: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

EDA CREDIT 5 - COMMERCIAL LEASE TERM

Preliminary Review:

1.The project is taken lease for the entire office on 4, 5 and terrace

floors for more than 5 years.

2.The project has occupied the premises in 2013.

This meets the credit requirement and 2 points are awarded.

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

EDA CREDIT 5 - COMMERCIAL LEASE TERM

Tenant occupied 4th, 5th floor and terrace is taken on long tern occupancy to reduce the materials consumption, there by minimising environmental impacts.

Page 38: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

WATER CONSERVATION

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

M/S ESSTEAM - EXISTING GREEN INTERIOR Existing Interior

Points Available

Essteam Points

Achieved

WC CREDIT 1 WATER CONSERVATION 12 10

TOTAL 12 10

WATER CONSERVATION

Page 39: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

WC CREDIT 1 - Use of efficient Water fixtures

Preliminary Review:

1.The Green Interiors Template & filled in template indicates that project is able

to meet 34% water savings through efficient plumbing fixtures.

2.The flow rate of flush fixtures like water closet is 5 /2 litres against 6 / 3liters

per flush, flow rate of flow fixtures like faucets is 4 litres, health faucet is 2.5

litres against 6 litres baseline and shower head is 8 litres per minute Vs 10 litres

per minute.

3.The project cumulatively achieving 34.2% over baseline.

4.The submittal includes photographs of the fixtures and cutsheet from Grohe.

This meets the credit and 10 points are awarded.

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

Water Reduction calculation to demonstrate savings achieved

The total percentage of reduction in water consumption is 34.2%.

Fixture Type Duration (Mins) Estimated Daily uses per

FTE**

No. of Occupants

Baseline Proposed

Flow Rate/ Capacity

(LPF/ LPM)

Total Daily Water Use

Flow Rate/ Capacity(LPF/ LPM)

Total Daily Water Use

Water Closets(Full-flush)

1 1 28 6 168 5 140

1 1 11 6 66 5 55

Water Closets(Smalll-flush)

1 2 11 3 66 2 44

Urinals 1 2 28 4 224 2 112

Faucets /Taps

0.15 4 39 6 140.4 4 93.6

HealthFaucet

0.15 1 39 6 35.1 2.5 14.625

Showerhead /Handheld Spray

8 0.1 1 10 8 8 6.4

Daily Volume from Flush Fixtures ( Black Water) Liters 524 351

Daily Volume from Flush Fixtures ( Grey Water) Liters 183.5 114.625

Total Liters 707.5 465.625

Percentage (%) 34.2%

WC CREDIT 1 - Use of efficient Water fixtures

Page 40: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

Make CODE ITEM/SERIES

GROHE 32819 Single-lever

basin mixer

GROHE 26088 Head

Shower-

Baucurve

GROHE 23094 Single-lever

basin mixer

high spout

GROHE 38505 Skate Air

Wall plate

for dual

flush

Make CODE ITEM/SERIES

GROHE 27513 Trigger Spray

30

GROHE 20281 Bib tap 2 in 1

•All these fixtures are at 3 bar pressure.

•Maximum Flow Rate is 6 LPF/LPM

•Showerhead – Maximum flow rate is 10 LPM

Use of efficient Water fixtures

WC CREDIT 1 - Use of efficient Water fixtures

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

Water fixtures - Photographs

WC CREDIT 1 - Use of efficient Water fixtures

Page 41: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

Water Reduction – Certificate by Shreenath Sales, Surat.

WC CREDIT 1 - Use of efficient Water fixtures

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

Water Reduction – Bills by Shreenath Sales, Surat.

WC CREDIT 1 - Use of efficient Water fixtures

Page 42: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

ENERGY EFFICIENCY

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

M/S ESSTEAM - EXISTING GREEN INTERIOR Existing Interior

Points Available

Essteam Points

Achieved

EC CREDIT 1 ECO FRIENDLY REFRIGRENTS/HALONS 1 1

ECCREDIT 2 ENERGY EFFICIENT INTERIORS 10 8

EC CREDIT 3 ENERGY METERING AND MANAGEMENT 4 2

EC CREDIT 4 ONSITE / OFF-SITE RENEWABLE ENERGY 6 0

TOTAL 21 11

ENERGY CONSERVATION

Page 43: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

EC CREDIT 1 - ECO-FRIENDLY REFRIGERANTS AND HALONS

Preliminary Review:

1.The project has installed 5 Star Rated VRV systems with

Refrigerant R 410A.

2.The refrigerant is free from CFC, HCFC. The fire suppression

systems are free from halons.

This meets the requirement and 1 point are awarded.

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

EC CREDIT 1 - ECO-FRIENDLY REFRIGERANTS AND HALONS

REFRIGERANTS

The A.C installed in the office are Maximum CFC fre e in all the regularly occupied areas and the remaining A.C are 5 Star rated .

Page 44: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

EC CREDIT 1 - ECO-FRIENDLY REFRIGERANTS AND HALONS

HALONS

All the fire extinguisher installed in the office a re halon free and free from Ozone depleting gases there by reducing environmental impacts, according to NBC Norms.

Thus, 1 points can be achieved.

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

EC CREDIT 2 – ENERGY EFFICIENT INTERIORS

Preliminary Review:

Air-Conditioning System:

The project has installed efficient unitary air-conditioners in the conditioned

zone. The unitary air conditioners are BEE 5 star & inverter based air-

conditioners.

The project has provided the breakup of regularly occupied areas & conditioned

areas. The meets the threshold of 70%, hence 6 points are awarded.

Lighting Power Density:

The project has unique lighting design. light is travelled through GI piping across

the office areas, indirect line is used in most the spaces.

Daylight is helping throughout the day in saving the energy. Different types of

light fittings are used 7 W, 9W LED, 28 W T5 lamps, 14 W T5, 5W spot light

fixtures combination is used in the entire office.

The carpet areas is (196+197+111 )sq.m area and wattage is (971+1203+142),

net lighting power density is 36%, hence 2 points are awarded.

Page 45: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

OPTIMISING ENERGY CONSUMPTION

Use of Bureau Of Energy Efficiency (BEE) 5 Star rated and inverter based Air-Conditioners in all the Air-Conditioned Spaces, which complies with the base-line criteria of IGBC which is maximum 3 Star rated Air-conditioners .

EC CREDIT 2 – ENERGY EFFICIENT INTERIORS

1.Conditioned Spaces

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

EC CREDIT 2 – ENERGY EFFICIENT INTERIORS

1.Conditioned Spaces

Page 46: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

EC CREDIT 2 – ENERGY EFFICIENT INTERIORS

1.Conditioned Spaces

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

EC CREDIT 2 – ENERGY EFFICIENT INTERIORS

1.Conditioned Spaces

Page 47: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

4TH FLOOR

AC NO MODEL NO. TR. TYPE RATING CFM

4F/01 TOSHIBA A/C.13N3KPX 1.1 HIGH WALL INVERTER 5 STAR 352

4F/02 TOSHIBA A/C.13N3KPX 1.1 HIGH WALL INVERTER 5 STAR 352

4F/03 TOSHIBA A/C.18N3KPX 1.5 HIGH WALL INVERTER 5 STAR 647

4F/04 TOSHIBA A/C.18 SKCV 1.5 HIGH WALL INVERTER INVERTER BASED 647

4F/05 TOSHIBA A/C.13N3KPX 1.1 HIGH WALL INVERTER 5 STAR 352

4F/06 TOSHIBA A/C.13N3KPX 1.1 HIGH WALL INVERTER 5 STAR 352

4F/07 TOSHIBA A/C SM562XATE 1.5 CONSOLE UNIT INVERTER BASED 647

4F/08 TOSHIBA A/C SM562XATE 2 CONSOLE UNIT INVERTER BASED 647

5TH FLOOR

AC NO MODEL NO. TR. TYPE RATING CFM

5F/01 TOSHIBA A/C 22 SKVC 2 HIGH WALL INVERTER INVERTER BASED 647

5F/02 TOSHIBA A/C 22 SKVC 2 HIGH WALL INVERTER INVERTER BASED 647

5F/03 TOSHIBA A/C 18 SKCV 1.5 HIGH WALL INVERTER INVERTER BASED 647

5F/04 TOSHIBA A/C 22 SKVC 2 HIGH WALL INVERTER INVERTER BASED 647

5F/05 TOSHIBA A/C 18 SKCV 1.5 HIGH WALL INVERTER INVERTER BASED 647

5F/06 TOSHIBA A/C 22 SKVC 2 HIGH WALL INVERTER INVERTER BASED 647

5F/07 TOSHIBA A/C 22 SKVC 2 HIGH WALL INVERTER INVERTER BASED 647

5F/08 TOSHIBA A/C 22 SKVC 2 HIGH WALL INVERTER INVERTER BASED 647

TERRACE FLOOR

AC NO MODEL NO. TR. TYPE RATING CFM

6F/01 O.G. Heavy duty A/C .4.0 4 DUCTABLE 1500

EC CREDIT 2 – ENERGY EFFICIENT INTERIORS

1.Conditioned Spaces

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

Lighting Power Density (LPD) of the interior spaces should be reduced by at least 20% over baselines specified in ECBC.

Basic lighting fixtures with minimum watts have been used which reduces the LPD. Moreover the fixtures are operated seperately to use efficient lights whenever needed.

EC CREDIT 2 – ENERGY EFFICIENT INTERIORS

2. LIGHTING

Page 48: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

EC CREDIT 2 – ENERGY EFFICIENT INTERIORS

2. LIGHTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

EC CREDIT 2 – ENERGY EFFICIENT INTERIORS

2. LIGHTING

Page 49: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

EC CREDIT 2 – ENERGY EFFICIENT INTERIORS

2. LIGHTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

EC CREDIT 2 – ENERGY EFFICIENT INTERIORS

2. LIGHTING

Page 50: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

4TH FLOOR 5TH FLOOR TERRACE FLOOR

LIGHT FIXTURES NOS WATT NOS WATT NOS WATT

CFL 11W x 5 NOS 6 330 4 220 0 0

CFL 11W x 1 NOS 15 165 5 55 1 11

CFL 11W x 2 NOS 7 154 4 88 0 0

7W LED BULB 2 14 2 14 3 21

9W LED LIGHT 3 27 0 0 0 0

CFL 11W x 23 NOS 1 253 0 0 0 0

28W TS-4FT 1 28 1 28 0 0

14W-T5 LIGHTS 0 0 57 798 0 0

5W SPOT LIGHTS 0 0 0 0 16 80

10W SURFACE LIGHT 0 0 0 0 3 30

TOTAL WATT 971 1203 142

EC CREDIT 2 – ENERGY EFFICIENT INTERIORS

2. LIGHTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

4th Floor Sr. No. Description Wattage Qty Total Wattage

1 CFL Light 11 82 9022 LED Light 9 3 273 T-5 light 4Ft. 28 1 28

4 Bulb 7 2 14Total Wattage 971

Total Area in mtrs 196.92LPD W/Sq.m 4.93

Baseline LPD W/Sq.m 10.8

Percentage over baseline 54.34%

5th Floor Sr. No. Description Wattage Qty Total Wattage

1 T-5 light - 2 Ft 14 57 7982 CFL Light 11 33 3633 Led Bulb 7 2 144 T-5 light - 4 Ft 28 1 28

Total Wattage 1203Total Area in mtrs 197.06

LPD W/Sq.m 6.10Baseline LPD W/Sq.m 10.8

Percentage over baseline 43.47%

EC CREDIT 2 – ENERGY EFFICIENT INTERIORS

2. LIGHTING

Page 51: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

TOTAL REDUCED LPD:

The total LPD value reduced is 36.821% including all the floors which is more than 25%.

Terrace Floor Sr. No. Description Wattage Qty Total Wattage

1 Spot Light 5 16 802 Surface Light 10 3 303 CFL Bulb 11 1 114 Led Bulb 7 3 21

Total Wattage 142Total Area in mtrs 111.1

LPD W/Sq.m 1.28Baseline LPD W/Sq.m 10.8

Percentage over baseline 88.17%

EC CREDIT 2 – ENERGY EFFICIENT INTERIORS

2. LIGHTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

EC CREDIT 3 – ENERGY METERING & MANAGEMENT

Preliminary Review:

1.The project has installed energy meters for lighting & air-

conditioning.

2. The submittal includes cutsheet of the energy meters, schematic

of SLD and on-site photographs of the energy meters.

This meets the requirement and 2 points are awarded.

Page 52: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

EC CREDIT 3 – ENERGY METERING & MANAGEMENT

1. Sub- Metering

Photographs of Installed Meters for Lighting & A.C’ s

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

EC CREDIT 3 – ENERGY METERING & MANAGEMENT

1. Sub- Metering – Plan showing meter installed

Page 53: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

EC CREDIT 3 – ENERGY METERING & MANAGEMENT

1. Sub- Metering – Single line Diagram (SLD) Schemati c

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

EC CREDIT 3 – ENERGY METERING & MANAGEMENT

1. Sub- Metering – Single line Diagram (SLD) Schemati c

Page 54: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

INTERIOR MATERIALS

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

M/S ESSTEAM - EXISTING GREEN INTERIOR Existing Interior

Points Available

Essteam Points

Achieved

MANDATORY

REQUITREMENT

SEGREGATION OF WASTE / POST OCCUPANCY REQUIRED ACHIEVED

EC CREDIT 6 ECO CERTIFIED INTERIOR FURNITURE 4 0

EC CREDIT 7 PURCHASE OF GREEN CONSUMABLES 2 2

TOTAL 06 02

INTERIOR MATERIAL

Page 55: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

SEGREGATION OF WASTE, POST OCCUPANCY

IM MANDATORY REQUIREMENT

Preliminary Review:

1.The Green Interiors Template & filled in template indicates that

project has installed waste segregation bins for dry, wet and e-waste.

This meets the mandatory requirement

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

SEGREGATION OF WASTE, POST OCCUPANCY

Segregation of waste generation.

The office has adopted the strategy of segregating three type of waste generated in

separate waste bins, vis E-Waste, Dry waste and Wet waste.

These bins are placed as various places in the premise as per the location where the

type of waste is generated. The dry waste is generated majorly from the working

studios and cabins on 4th and 5th floor, the E-Waste bin is place in the Printer room

on 5th floor and the Wet Waste bin in the pantry area.

Over and above this the housekeeping team checks and replaces the waste if

wrongly placed in the waste bins to ensure the need of segregation of waste that

goes out of the premises to the Municipal local waste collecting team at the end.

IM MANDATORY REQUIREMENT

Page 56: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

SEGREGATION OF WASTE, POST OCCUPANCY

FACILITATION IS DONE BY SEGREGATION OF WASTE AT SOURCE SO AS TO PREVENT SUCH WASTE BEING SENT TO LAND-FILLS

IM MANDATORY REQUIREMENT

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

IM MANDATORY REQUIREMENT

SEGREGATION OF WASTE, POST OCCUPANCY

Page 57: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

IM MANDATORY REQUIREMENT

SEGREGATION OF WASTE, POST OCCUPANCY

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

SEGREGATION OF WASTE, POST OCCUPANCY

IM MANDATORY REQUIREMENT

Page 58: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

IM CREDIT 7 – PURCHASE OF GREEN CONSUMABLES

Preliminary Review:

1. Project owner declared that project will procure only green house

keeping chemicals (1 point awarded).

2.Project owner declared that project will not use plastics in Interior-outs

for consumables. ( 1point awarded).

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

IM CREDIT 7 – PURCHASE OF GREEN CONSUMABLES

Green consumables.

The office has a developed that health and well being is more important. So Office Manager takes the corrective actions as follows.

Any product when purchased for cleaning the premises interiors it is ensured that only green seal products like Green Pro- Certified or Green seal GS 35 standard are purchased. This becomes the checkpoint and eliminated any chance of using non certified products.

Any Interior fit out when purchased it is ensured that the product is not harmful to the occupants working or visiting the premise.

Page 59: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

GREEN CONSUMABLES

•The use of green consumables in the interior space that have low impacts on human health and the environment.•There is no use of plastics in Interior fit-outs.

IM CREDIT 7 – PURCHASE OF GREEN CONSUMABLES

Stride Neutral – Green Seal Product

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

INDOOR ENVIORNMENT

Page 60: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

M/S ESSTEAM - EXISTING GREEN INTERIOR Existing Interior

Points

Available

Essteam Points

Achieved

MANDATORY

REQUIREMENT 1

TOBACCO SMOKE CONTROL REQUIRED ACHIEVED

MANDATORY

REQUIREMENT 2

FREASH AIR REQUIREMENTS REQUIRED ACHIEVED

IE CREDIT 1 ENHANCED FREASH AIR VENTILATION 2 2

IE CREDIT 2 DAYLIGHTING 4 4

IE CREDIT 3 THERMAL COMFORT 1 1

IE CREDIT 4 ERGONOMIC DESIGN 2 2

IE CREDIT 5 CO2 MONITORING 2 0

IE CREDIT 6 INDOOR PLANTS 2 2

IE CREDIT 7 OUTDOOR VIEWS 4 4

IE CREDIT 8 MINIMISE INDOOR POLLUTANT CONTAMINATION 3 3

IE CREDIT 9 OCCUPANT WELL-BEING FACILITIES 2 2

IE CREDIT 10 DEDICATED DINING SPACES 1 1

TOTAL 23 21

INDOOR ENVIORNMENT

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

TOBACCO SMOKE POLLUTION

IE MANDATORY REQUIREMENT 1

Preliminary Review:

1.The project has provided declaration that entire interior office is No

Smoking.

2.The project has installed No Smoking Policy & signages.

This meets the mandatory requirement.

Page 61: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

TOBACCO SMOKE POLLUTION

The Entire campus is NO –SMOKING Zone , in accordance with the regulations of Ministry of Health and Family welfare, Government of India

IE MANDATORY REQUIREMENT 1

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

TOBACCO SMOKE POLLUTION

Declaration Letter from M/s. Essteam

IE MANDATORY REQUIREMENT 1

Page 62: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

TOBACCO SMOKE POLLUTION

Plan layout.

IE MANDATORY REQUIREMENT 1

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

IE MANDATORY REQUIREMENT 2 – FRESH AIR VENTILATION &IE CREDIT 1- ENHANCED FRESH AIR VENTILATION

Preliminary Review:

1.The project has attempted prescriptive method approach to meet the

fresh air ventilation compilation.

2.The project has floor area in excess of 100 sq.m.

3.The fresh air ventilation calculations indicate that 4th floor has carpet

area of 196 sq.m, openable area is 38.7 sq.m, which is 20%. 5th floor carpet

area is 197 sq.m, openable area is 34.8%, which is 18%. Terrace has board

room with a carpet area of 111 sq.m, openable area is 19.77 sq.m, which is

18%.

This meets the mandatory & enhanced fresh air ventilation.

Page 63: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

IE MANDATORY REQUIREMENT 2 – FRESH AIR VENTILATION &IE CREDIT 1- ENHANCED FRESH AIR VENTILATION

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

IE MANDATORY REQUIREMENT 2 – FRESH AIR VENTILATION &IE CREDIT 1- ENHANCED FRESH AIR VENTILATION

Page 64: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

IE MANDATORY REQUIREMENT 2 – FRESH AIR VENTILATION &IE CREDIT 1- ENHANCED FRESH AIR VENTILATION

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

Category Space

Required

Percentage of

Openable

Area to the

Total Carpet

Area

Floor Area

(sq.m)

Openable

Window

Area

Openable

Door Area

Total

Openable

Area

Actual

Openable

Area as a

Percentage

of Total

Carpet Area

Meeting

Criteria

(Yes/No)

Regularly

Occupied Area

(> 100 sq.m)

4th Floor 8% 196.92 12.3 26.4 38.7 20% Yes

Regularly

Occupied Area

(> 100 sq.m)

5th Floor 8% 197.06 12.84 22 34.84 18% Yes

Regularly

Occupied Area

(> 100 sq.m)

Terrace Floor 8% 111.1 3.6 16.17 19.77 18% Yes

IE MANDATORY REQUIREMENT 2 – FRESH AIR VENTILATION &IE CREDIT 1- ENHANCED FRESH AIR VENTILATION

Page 65: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

IE CREDIT 2 – DAYLIGHTING

Preliminary Review:

1.The project as 196 sq.m area in 4 floor, 197 sq.m in 5th floor, 111 sq.m in

terrace.

2.Project has excellent daylight penetration throughout the day.

3.The interiors has a unique daylight design which gives opportunity from top

& bottom has glass which brings light continuously.

This is a commendable effort & meets 100% of the requirement.

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

DAYLIGHTING

IE CREDIT 2 – DAYLIGHTING

Connectivity is obtained between the interior and exterior spaces, to achieve visual delight to occupants.

Page 66: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

DAYLIGHTING

IE CREDIT 2 – DAYLIGHTING

Measurement Approach – With thee help of Lux Meter application .Connectivity is obtained between the interior and exterior spaces, to achieve visual delight to occupants.

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

IE CREDIT 3 – THERMAL COMFORT

Preliminary Review:

1.The Green Interiors Template & filled in template indicates that

project has installed thermostat and temperature sensors to

maintain the temperature 24+/- 2 deg C and also Relative

humidity between 50-60%.

This meets the credit requirement and one point is awarded.

Page 67: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

IE CREDIT 3 – THERMAL COMFORT

Balaji Refrigeration has visit on 30th July 2016.

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

IE CREDIT 4 – ERGONOMIC DESIGN

Preliminary Review:

1.The project interior fit out furniture has been ergonomically design right from

concept stage.

2.The workstations, chairs are designed for the comfort of the occupants. The

furniture has right proportion, dimensions to make it ideal for a person to work

on a daily basis.

3.The chair has height adjustments, inclination adjustments. The storage are

designed at convenient heights & positioned between 750mm-1725mm from

the floor level.

4.The submittal includes workplace photographs.

This is a excellent achievement.

Page 68: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

IE CREDIT 4 – ERGONOMIC DESIGN

Ergonomic Design.

The Interior fit out like workstations and chairs are as per the design standards for the comfort of health and well-being.

The workstations are specifically designed and the right proportion and dimensions are considered in its making which is ideal for a person to work on daily basis.

Chair had height and back inclination adjustments along with cushion at base and back which allows the person to adjust as per the need.

The storage unit are made between 750mm – 1725mm from the floor which is the ideal height of storage for accessing it. This also avoids any blockage in opening the storage shutter due to furniture on the floor near it.

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

IE CREDIT 4 – ERGONOMIC DESIGN

To encourage ergonomic design to address occupants health and wellbeing, work stations have been designed accordingly.

Page 69: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

IE CREDIT 4 – ERGONOMIC DESIGN

Section

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

IE CREDIT 6 – INDOOR PLANTS

Preliminary Review:

1.The project has procured indoor plants 57 plants in the project.

2. The project also wants to increase the number of indoor plants.

3.The indoor plants selected include snake plant, areca palm, money plant

which are used to absorb the formaldehydes, air purifiers.

4.This helps in occupant health & well being on a continuous basis.

This is a commendable effort and 2 points are awarded.

Page 70: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

Use of Indoor Plants to enhance indoor air quality, thereby improving the health and wellbeing of occupants.

Plants like Areca Palm and snake Plant have been placed at every 100 sq ft of carpet area of regularly occupied office spaces.

IE CREDIT 6 – INDOOR PLANTS

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

IE CREDIT 6 – INDOOR PLANTS

Floor Plan

Page 71: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

IE CREDIT 6 – INDOOR PLANTS

Floor Plan

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

IE CREDIT 6 – INDOOR PLANTS

Floor Plan

Page 72: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

FLOOR Money Plant

(Epiremnum aureum)

(Nos.)

Snake Plant

(Sansevieria trifasciata)

(Nos.)

Areca Palm

(Dypsis lutescens)

(Nos.)

Total Plants

(Nos.)

FOURTH 2 2 11 15

FIFTH 14 14 08 36

TERRACE 0 0 06 06

57

Total Plants installed in Office Premises

IE CREDIT 6 – INDOOR PLANTS

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

IE CREDIT 8 – OUTDOOR VIEWS

Preliminary Review:

1.The project has glazing on all sides and most importantly glazing is designed

to get maximum views for the occupant at any point to sky as well as

greenery.

2.All the occupants are getting direct line to exterior views.

This meets 100% of the requirement.

Page 73: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

IE CREDIT 8 – OUTDOOR VIEWS

The openings are designed in such a way that a clear vision to the sky and flora can be achieved from any regularly occupied space.

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

IE CREDIT 8 – OUTDOOR VIEWS

Page 74: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

Clear view from the meetings room on Fourth floor.

IE CREDIT 8 – OUTDOOR VIEWS

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

Connectivity between interior and exterior spaces.

IE CREDIT 8 – OUTDOOR VIEWS

Page 75: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

Clear view from the conference room on Terrace floor

IE CREDIT 8 – OUTDOOR VIEWS

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

IE CREDIT 9 – MINIMIZE INDOOR POLLUTANT CONTAMINATION

Preliminary Review:

The Green Interiors Template & filled in template indicates that project has

implemented the following practices:

1.1. Full length entry way systems rollout mats for easy allowing for cleaning

at main entrance which is more than 10 feet. (1 point awarded)

2.2. Project owner declared that there is a annual maintenance with the air-

conditioning vendor for cleaning of AC ducts once in a year. (1 point awarded)

3. Printer rooms are isolated from the main office space with a separate

exhaust system. (1 point awarded)

Page 76: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

IE CREDIT 9 – MINIMIZE INDOOR POLLUTANT CONTAMINATION

Minimise the Indoor Pollutant in the Office Premises.

To avoid all the dust coming in to office premises through the footwear of the occupants, rollout mats are placed at the Lift entry to the premise on 4th Floor, 5th

Floor and Terrace floor. By this the dirt and pollutant through footwear is controlled and cleaned at the entrance itself.

Since this is an Architect’s office, and in their working process there is lot of paper printing required. For this there are a few printers and plotter which are places in a separate printing room to avoid carbon pollutants to spread in the working studio. By doing this the chances of the occupants getting any adverse effect of the carbon pollutant from printing is avoided to a great extent.

All AC units are maintained and checked frequently by the service agency to ensure its efficient working. Like cleaning it filter, de-dusting, repairing, etc.

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

IE CREDIT 9 – MINIMIZE INDOOR POLLUTANT CONTAMINATION

Printer room has been assigned a designated spaces so as to isolate areas exposed to hazardous gases and chemicals at 5th floor.

Page 77: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

IE CREDIT 9 – MINIMIZE INDOOR POLLUTANT CONTAMINATION

Printer Room

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

Rollout mats are spread of 9.48 ft in length to main entrance , avoiding dust and makes easy to clean at 4th Floor , 5th floor and Terrace Floor.

IE CREDIT 9 – MINIMIZE INDOOR POLLUTANT CONTAMINATION

Page 78: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

IE CREDIT 9 – MINIMIZE INDOOR POLLUTANT CONTAMINATION

Photographs

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

IE CREDIT 13 – OCCUPANT WELL BEING FACILITIES

Preliminary Review:

1.The project has dedicated occupant well-being facilities such as yoga

room / multi purpose hall meeting more than 10% of the occupants

requirement.

This meets the requirement and 2 points are awarded.

Page 79: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

YOGA AND MEDITATION SPACES ARE RESERVED ON THE TERRACE LAWN FOR OCCUPANTS HEALTH AND REFRESHMENT

IE CREDIT 13 – OCCUPANT WELL BEING FACILITIES

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

IE CREDIT 14 – DEDICATED DINING SPACES

Preliminary Review:

1.The project this dedicated dining space within the office premises,

which is connected to wash rooms and pantry on the terrace floor.

This meets the credit requirement and one point are awarded.

Page 80: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

DESIGNATED DINING SPACES IS GIVEN TO OCCUPANTS SO AS TO AVOID CONTAMINATION OF INDOOR SPACES AND ENHANCING HEALTH AND HYGIENE.

IE CREDIT 14 – DEDICATED DINING SPACES

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

IE CREDIT 14 – DEDICATED DINING SPACES

Photographs

Page 81: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

INNOVATION IN INTERIOR DESIGN

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

INNOVATION IN DESIGN

M/S ESSTEAM - EXISTING GREEN INTERIOR Existing

Interior Points

Available

Essteam Points

Achieved

ID CREDIT 1.1 INNOVATION IN DESIGN (EASY TO MAINTAIN) 1 1

ID CREDIT 1.2 INNOVATION IN DESIGN (NO PAINTS) 1 1

ID CREDIT 1.3 INNOVATION IN DESIGN (LIGHT FOR DEEPER

PENETRATION)

1 1

ID CREDIT 1.4 INNOVATION IN DESIGN (SERVICE PLANING FOR ANY

MAJOR CHANGES IN FUTURE )

1 1

ID CREDIT 2 IGBC AP 1 1

TOTAL 05 05

Page 82: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

ID CREDIT 1.1

Preliminary Review:

1.The project has attempted innovation for easy maintenance office fit

out, innovative door closer which operates on counter weight and simple

thread, studio partitions are screw less partitions, which can be adjusted

as per need, also services run behind them, easy for maintenance.

This meets the innovation and one point is awarded.

Innovation in Interior Design

a. Easy maintenance

b. Innovative door closer

c. Studio partitions

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

1.1. EASY TO MAINTAIN

a. Material Palette: The entire material palette is weded to the philosophy of honesty, and hence all the materials are very basic and in their natural form. The walls and ceiling are form finished cement concrete, the flooring is vds cement floor, the furniture is made up of rusted mild steel, kudappah stone, black granite and pine wood. All these materials are time tested and not expected to need any maintenance in near future. Paint has altogether been avoided in the entire project by and large and hence there is freedom from periodical painting of the premises.

GRANITE CONCRETE MILD STEEL

PINE WOOD KUDAPPA STONE GALVANIZED IRON

ID CREDIT 1.1

Page 83: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

b. Innovative Door Closer:

In an office, the maximum number of complaints that we have received till date is about the high degree of maintenance required in the door closers. This led us to the creation of a door closer which works on gravity and we assure a performance guarantee of life time. It works on a counter weight suitable for the weight of the door and a couple of pulleys to put the weight in its right location.

ID CREDIT 1.1

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

c. The Studio Partition Design:

The 5th floor is the studio floor and the partitions and workstations are made in mild steel fabrication. The most interesting fact about this screw less partitions system is that all panels are fixed on magnet and the entire structure can be bared within minutes to relay or modify any kind of wiring or cabling.The Openable MS panels are fixed using multiple Magnets and the entire partition can be bared in 10 minutes.

ID CREDIT 1.1

Page 84: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

ID CREDIT 1.2

Innovation in Interior Design - No Paints

Preliminary Review:

1.The project is so unique that both exterior & interiors do not have any

paints. The architect envisaged using un-plastered concrete and natural

materials ( concrete walls, concrete floor, concrete ceiling, mild steel,

kudappah stone, wood, no paint for all surfaces and kept their natural

form.

This is a commendable feat, deemed an innovation and one point is

awarded.

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

1.2 No PaintsThe office premises are free from any paints both internal & external by this we are saving huge impact on environment and saving in terms of money also.

ID CREDIT 1.2

Page 85: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

1.2 No PaintsThe office premises are free from any paints both internal & external by this we are saving huge impact on environment and saving in terms of money also.

ID CREDIT 1.2

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

1.2 No PaintsThe office premises are free from any paints both internal & external by this we are saving huge impact on environment and saving in terms of money also.

ID CREDIT 1.2

Page 86: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

ID CREDIT 1.3

Innovation in Interior Design - Ribbon Windows / Outdoor Views

Preliminary Review:

1.The designer used windows at top level for deeper penetration of light

and also gives great views to occupants.

2.100% of the occupants gets views to outside, which is excellent inline

with health & well being of the occupants.

This meets the innovation and one point is awarded.

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

Though it's a feature of the architecture

to provide the ribbon windows at the top

and bottom on every floor, the interiors

tries to respect it and tries to draw

maximum day light in most of the areas

through out the day.

By this, we are getting natural light to

occupants and they feel fresh always.

The building is entirely finished in form

finished RCC from inside as well as

outside and for allowing daylight, there is

a 450 mm ribbon window on the bottom

and 900 mm ribbon window on the top of

each floor level, running all around on the

3 sides of the building. Between these

two ribbon windows, a 1200 mm C -

shaped architectural projection created

possibilities of storage all along the

periphery.

ID CREDIT 1.3

Window at top level for deeper penetration of light

Page 87: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

ID CREDIT 1.4

Innovation in Interior Design- Operable Service plan for future

Preliminary Review:

1.The project has envisaged in zero maintenance and designed a operable

service plan for all major changes in future.

2.The service lines are running behind the workstations, furniture which has

option of removable partitions and accessing them at any point is very easy

operation.

This is verified on the site and one point is awarded.

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

Operable space for Service planning incase of any major changes in future.

ID CREDIT 1.4

Service Plan for Major change in future:

All of the service lines in the interiors are within

the storage on the periphery of the floor giving

possibility of accessing them at any point since

storage unit is operable.

This is demonstrated in the section from given

image.

Page 88: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

ID CREDIT 2 – IGBC ACCREDITED PROFFESIONAL

Preliminary Review:

1.The Green Interiors Template & filled in template indicates that project has one of

the principal participant is a IGBC AP.

2. The project has submitted IGBC AP certificate of Gaurav D Jain.

This meets the requirement and one point is awarded.

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

2 . IGBC – AP

Name – Gaurav D Jain – M/s. Essteam, Surat

ID CREDIT 2 – IGBC ACCREDITED PROFFESIONAL

Page 89: GREEN : A DESIGNER’S PERSPECTIVE - Green … › site › mmbase › attachments › ...IGBC GREEN BUILDING CONGRESS 2016 AR. SNEHAL SHAH / SURAT / 08.10.2016 IGBC –GREEN EXISTING

IGBC – GREEN EXISTING INTERIOR / ESSTEAM / OCTOBER , 2016

M/S ESSTEAM - EXISTING GREEN INTERIOR Existing Interior

Points Available

Essteam Points

Achieved

1 Eco Design Approach 08 07

2 Water Conservation 12 10

3 Energy Efficiency 21 11

4 Interior Material 06 02

5 Indoor Environmental 23 21

6 Innovative in Interior Design 05 05

Total Points 75 56

M/s. Essteam is the First Office in Gujarat to Achieve Platinum rating award from Indian Green Building Council under Green Existing Interior

Category : August 2016