Top Banner
188

Government of Karnataka Public Works, Ports & Inland Water ...

Jan 10, 2023

Download

Documents

Khang Minh
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Government of Karnataka Public Works, Ports & Inland Water ...
Page 2: Government of Karnataka Public Works, Ports & Inland Water ...
Page 3: Government of Karnataka Public Works, Ports & Inland Water ...

Government of KarnatakaPublic Works, Ports & Inland Water

Transport Department(PWP&IWTD)

Management Information System

MARCH 2020

Page 4: Government of Karnataka Public Works, Ports & Inland Water ...
Page 5: Government of Karnataka Public Works, Ports & Inland Water ...

ii

FOREWORD

Public Works, Ports and Inland Water Transport Department has the responsibility for development and maintenance of National Highways, State Highways and Major District Roads, Construction and Maintenance of Government Buildings, Development and activities related to Ports and Inland Water Transportation.

TheroadnetworkinKarnataka,ason31-03-2020,comprisesof7589KmsofNationalHighways,19470KmsofStateHighwaysand49520KmsofMajorDistrictRoadsandthetotalroadlengthintheStatebeing76579Kms.InKarnatakatheroadlengthperlakhofpopulation(asper2011census)isabout125kmandtheroadlengthpersq.kmofareaisabout40kms.Theproposal of upgradation of roads from village roads to Major District Roads and Major District RoadstoStateHighwaysisbeingexaminedforapproval.

One of themain objectives ofKarnataka StateRoad Policy launched in 2009was tostrengthentheinstitutionsintheroadsectorfororderly,efficientandregulateddevelopmentofthe sector and maintenance of its assets for the years. Government of Karnataka has initiated various programmes with assistance from ADB and WB to develop, improve and maintain the transportation infrastructure as roads play a vital role in the public transport system and in turn in the economic and social development of the society.

Itisafactthattimelyflowofinformationhasassumedagreatimportanceinrecenttimes.Suchbeingthecase,ManagementInformationSystem(MIS)hasbeenintroducedbyOfficeofthe Chief Minister. The Department of Public Works has its commitment towards transparent administration.HenceforeasyflowofinformationthefirstManagementInformationSystempublication was done in the year 1999-2000. Thereafter MIS has been published by theDepartment everyyear. Thepresentpublication is20th in the series, for thefinancialyear2019-20providingtheinformationpertainingtoroads,bridgesandbuildingsconstructedandmaintained by the department along with the administrative set up of the department.

The information pertaining to all the zones of Communication and Buildings, National Highways,KRDCL,KSHIP,PRAMC,SHDP,ChiefArchitect’sOfficeandtheDirectorateofPorts and Inland Water Transport have been collected and processed to bring out the present publication.

I hope that the information contained in this publication will be helpful to the various officersoftheGovernmentandthegeneralpublicatlarge.

Suggestions to improve this publication are welcome.

Date:18.02.2021Bangalore.

Sd/-(Dr. K. S. Krishna Reddy)Secretary to Government,Public Works Department

Page 6: Government of Karnataka Public Works, Ports & Inland Water ...
Page 7: Government of Karnataka Public Works, Ports & Inland Water ...

iii

PREFACE

Roads and buildings have been constructed in India since ancient times. This tradition is reflected in theGrandTrunkRoad stretching today fromKolkatta to thePakistanborderpassingthroughNewDelhi.Karnatakaisnoexceptiontothistraditionofroadbuilding.RoadsexistedconnectingtheVijaynagarEmpiretothePortsinthewestcoastofKarnatakaservingtheEmpire.By1856alldistrictHeadQuarterswereconnectedtoBangalorebyRoad.Between1834and1861theroadsinthethenMysorestatewereclassifiedintoImperial,Provincial&Villageroads.Atthetimeofre-organizationoftheStatein1956,theNationalHighwayslengthwas864Kms,StateHighwayslengthwas5983KmsandMajorDistrictRoadslengthwas7006Kms.

InKarnataka (the thenMysore State) prior to 1834,RevenueOfficerswere in chargeofPublicWorks. In1834, aSuperintendentofMaramatwas in chargeunder theRevenueDepartmentforpublicworks.AseparatePublicWorksDepartmentwascreatedin1856headedbyChiefEngineerwithanAssistantChiefEngineer,fourAssistantEngineers,elevenUpperSubordinatesandnineteenLowerSubordinates.ThefirstChiefEngineerwasCol.C.BowenR.E.andthefirstChiefEngineerfromMysoreStatewasMr.Y.SrinivasaRaoB.A.in1909.In 1922 the salary of Engineers inMysorewasRs. 500 for aChief Engineer, Rs. 250 foranAssistantChiefEngineer andRs. 80 for anUpperSubordinate. During 1856-1876, thePWDexpenditurewasRs.99lakhsonoriginalworksandRs.89lakhsonrepairworksorinotherwords,thePlanandNon-Planexpenditureswerealmostequal.In1897,twoCircles,theWesternandEasternwerecreatedeachheadedbySuperintendingEngineer.

Someoftheearliestbuildingsarestillinuse,In1867theBangaloreCentralJailbuiltatacostofRs.46,047.In1868theBowringHospital,BangalorebuiltatacostofRs.2,16,454and in 1879 theGovernmentMuseumwasbuilt at a cost ofRs. 48, 335. The traditionofconstructing monumental public buildings has continued in Karnataka as a testimony of which standsthemagnificent“VidhanaSoudha”constructedin1956.ThistraditioniskeptalivebyConstructing“VikasSoudha”nexttotheVidhanaSoudhaandcompletedintheyear2006and“SuvarnaSoudha”inBelgaumcompletedintheyear2009atacostof432.04crores.

In themodernmanagement, timely informationflowhas assumed a great importance.ManagementInformationSystemintroducedbytheOfficeoftheChiefMinisterofKarnataka,the Public Works Department with its commitment towards a transparent administration and aneasyflowofinformationbroughtoutthefirstManagementInformationSystempublication

Page 8: Government of Karnataka Public Works, Ports & Inland Water ...

iv

Date:16.02.2021Bangalore.

Sd/-(N.S.Ramesh)Engineer-in-Chief,

Planning and Road Asset Management Centre,Bangalore

for theyear1999-2000.Thereafter theDepartment is regularlypublishing theManagementInformationSystemeveryyear.ThepresentPublicationisthusthe20thinthisseriesprovidinginformationforthefinancialyear2019-20.

Sri.U.R.Subramanya,JointDirector(Statistics)wastheNodalOfficerwhoexpeditiouslycollected the information pertaining to the Communication & Buildings South, North &NorthEastzones,NationalHighways,KRDCL,KSHIP,PRAMC,SHDP,Architecture&theDirectorate of Ports and processed the same to bring out the present Publication with the help ofAssistantStatisticalOfficer.

ThePublicationispresentedasareferencedocumentfortheactivitiesofPWP&IWTD.

Page 9: Government of Karnataka Public Works, Ports & Inland Water ...

v

TABLE OF CONTENTS

No. Title Page No.

CHAPTERS

Chapter 1 Administrative Set Up 1

Chapter 21.State’sRoadNetwork2.Roads&Bridges–PlanAllocation

4

Chapter 3 National Highways 12

Chapter 4 KarnatakaRoadDevelopmentCorporationLimited(KRDCL) 18

Chapter 5 KarnatakaStateHighwaysImprovementsProject(KSHIP) 35

Chapter 6 Planning&RoadAssetManagementCentre(PRAMC) 58

Chapter 7 StateHighwaysDevelopmentProject(SHDP) 64

Chapter 8 InstitutionalDevelopmentinPWP&IWTD 67

Chapter 9 Department of Architecture 71

Chapter 10 Buildings 74

Chapter 11 Ports&InlandWaterTransport 83

Chapter 12 QualityAssuranceZone 97

ANNEXURES

Annexure I Progress of NABARD Works 100

Annexure IIMajor Government Buildings Maintained bytheCE,C&B(North)

102

Annexure IIIMajor Government Buildings Maintained bytheCE,C&B(NorthEast)

103

Annexure IVMajor Government Buildings Maintained bytheCE,C&B(South)

104

Annexure VList of Architectural Drawings of buildings costing more than one Crore

106

Page 10: Government of Karnataka Public Works, Ports & Inland Water ...

vi

No. Title Page No.

APPENDICES

Appendix - 1 District-wiseRoadlengthinKarnataka:ason31.3.2020 115

Appendix - 2 State Highways, District-wise: Surface Feature and Carriagewaywidthason31.3.2020 116

Appendix - 3 Major District roads, District-wise : Surface Feature and Carriagewaywidthason31.3.2020 117

Appendix - 4 Length&LaneWidthofNationalHighwaysinKarnataka 118

Appendix - 5 Division wise length of National Highways 127

Appendix - 6 StateHighwaysNomenclatureandLengthason31.3.2020 140

Appendix - 7 Talukwise Road length of National Highways, State Highway andMajorDistrictRoadsason31.3.2020 150

Appendix - 8 Import&ExportofCargohandledatvariousPortsduringtheyear2019-20 158

Appendix - 9 Constituency wise Road length of State Highways and Major DistrictRoadsason31.3.2020 159

Page 11: Government of Karnataka Public Works, Ports & Inland Water ...

vii

PWP&IWTD’s Vision

A sustainable road network for the socio-economic growthofthestate;efficientandhighqualitypublicbuildingsandminorports;andneedbasedinlandwatertransport.

PWP&IWTD’s Mission

1. Plan,Design, Construct andMaintain a safe, technically soundand cost effective core road network.

2. Enhanceconnectivitytoremoteandisolatedareas.

3. Constructandmaintainbridges.

4. Evolve Policies for the development ofHighways through PPPwith toll collection.

5. PlanandconstructGovernmentbuildingsthatarefunctionalandenergyefficient.

6. Adoptinnovativemeasurestoimprovequalityandreducecostinconstruction and maintenance.

7. Enhancecapacity&efficiencyofminorportsinthestate.

8. EnsuresafetyofInlandwaterwaysoperations.

9. Modernisethemaritimeadministration.

Page 12: Government of Karnataka Public Works, Ports & Inland Water ...
Page 13: Government of Karnataka Public Works, Ports & Inland Water ...

CHAPTER - 1

ADMINISTRATIVE SETUP

1.1 Public Works Ports and Inland Water Transport Department is responsible for the development and maintenance of National Highways, State Highways, and Major District Roads and construction and maintenance of Government Buildings. The Department also undertakes construction on behalf of other department on Deposit Contribution. At the Secretariat the Department is headed by a Additional Chief Secretary and a Secretary.

AtfieldleveltheDepartmenthasfiveZonesnamely,CommunicationandBuildings(C&B)SouthZone,(C&B)NorthZone,(C&B)NorthEast Zone,(C&B)CentralZoneandNationalHighways.EachZoneisheadedbyaChiefEngineer.TheZonesconsistofCircles,Divisionsand Sub-Divisions. The Sub-Divisions are under the control of Divisions, Divisions are under thecontrolofCircles,andCirclesareunderthecontrolofZones.EachCircleisheadedbya Superintending Engineer. The Divisions are headed by Executive Engineers. The Sub-Divisions are headed byAssistant Executive Engineer. The Communication & Buildings,SouthZoneconsistsof4Circlesand17Divisions.TheCommunication&Buildings,NorthZone consists of 2Circles and 9Divisions.TheCommunication&Buildings,NorthEastZoneconsistsof2Circlesand 8Divisions,TheCommunication&Buildings,CentralZoneconsistsof2Circlesand7Divisions.

The Chief Engineer, National Highway is primarily responsible for the development andmaintenance of National Highways under the Ministry of Road Transport & Highways(MoRT&H). The major portion of funds operated is from the Government of India. TheNationalHighwaysZonehastwoCirclesandnineDivisions.

KarnatakaRoadDevelopmentCorporationLimited(KRDCL)wasestablishedon21stJuly1999, as a wholly owned Government of Karnataka enterprise for development of roadinfrastructure in the State headed by the Managing Director.

KarnatakaStateHighwaysImprovementProject(KSHIP)isaninitiativeofthePublicWorksPorts and Inland Water Transport Department, Government of Karnataka for the improvement ofcoreroadnetworkintheStateundertakingExternallyAidedProjects.ChiefProjectOfficerheads this Project Implementation Unit.

State Highway Development Project (SHDP) was established on 4th November 2011 fordevelopment/improvementofCoreRoadNetworkin2Phases.ChiefProjectOfficerheadsthis Project Implementation.

1

Page 14: Government of Karnataka Public Works, Ports & Inland Water ...

1.2 Cadre strength of engineers in the Department:-

Table – 1 .1

Cadre strength in PWP&IWTD (as on March 2020)

Post Sanctioned Filled up Vacant

Additional Chief Secretary 1 0 1

Engineer in Chief (Secretary) 1 1 0

Chief Engineer 11 11 0

Superintending Engineer 34 26 8

Executive Engineer 132 123 9

Assistant Executive Engineer 570 375 195

Assistant Engineer 1275 772 503

Junior Engineer 1116 663 453

Total 3140 1971 1169

1.3 TotalnumberofCircles,Divisions,andcategoriesofroadsundereachzoneasattheEndofMarch2020

Table 1.2

Number of Circles, Divisions and Road Length(RoadlengthinKm)

SlNo

ZoneCircles(In No.)

Divisions (In No.)

StateHighways

Major Dis-trict Roads

NationalHighways

Total

1 National Highways 2 9 - - 7588.67 7588.67

2 NorthEastZone 2 8 4980.27 8397.12 - 13377.39

3 NorthZone 2 9 8555.50 18868.96 - 27424.46

4 SouthZone 4 17 5934.11 22253.84 - 28187.95

5 CentralZone 2 7

6 Quality AssuranceZone 7 - - - -

Total 12 57 19469.88 49519.92 7588.67 76578.47Road Length per lakh Population (2011 Census)

31.86 81.06 12.42 125.34

Road Length per 100 sqkm 10.15 25.82 3.96 39.93

PopulationofKarnatakaStateis611Lakhsasper2011Census

GeographicalareaofKarnatakaStateis191791Sq.Km.

2

Page 15: Government of Karnataka Public Works, Ports & Inland Water ...

3

Page 16: Government of Karnataka Public Works, Ports & Inland Water ...
Page 17: Government of Karnataka Public Works, Ports & Inland Water ...

CHAPTER - 2

2.1 State’s Road Network:-

PublicWorksPorts&InlandWaterTransportDepartmentisresponsibleforthedevelopmentand maintenance of National Highways, State Highways and Major District Roads, adding to76578.47Km.ApartfromNationalHighways,theStateHighwayslengthis19469.88KmandMajorDistrictRoadslengthis 49519.92Km.

From the viewpoint of infrastructure capabilities, two characteristics of roads are relevant, namelySurfacequalityandCarriagewaywidth.Carriagewaywidthisclassifiedunderfourcategories

(a) SingleLane:3.75metre

(b) IntermediateLane:5.5metre

(c) TwoLanes:7.0to7.5metre

(d) FourLanes:14to15metre

Road surface can be of cement concrete (CC), black top (BT) or water boundmacadam(WBM).Therearesomeunsurfacedroadsalsoi.e–earthenroadwithcarriagewaycomposingofnaturalsoil.Unsurfacedroadsarefurtherclassifiedintomotorableandnon-motorable.

The share of the Road length of National Highways, State Highways and Major District roads according to these two features is presented in the charts below:

Carriageway Width

National Highways ( in km)

Single Lane 121.540

Intermediate Lane 1268.505

Two Lane 3930.045

Four Lane 2022.147

Six Lane 246.435

Total 7588.672

4

Page 18: Government of Karnataka Public Works, Ports & Inland Water ...

Surface Type State

Highways (in km)

Cement Concrete 234.63

Black top 19191.61

WBM 21.52

Un surfaced 22.12

Total 19469.88

Carriageway Width

State Highways ( in km)

Single Lane 3041.70

Intermediate 10083.28

Two Lane 5871.64

Four Lane 473.26

Total 19469.88

Surface TypeMajor District Roads( in km)

Cement Concrete 801.15

Black top 47207.45

WBM 860.25

Un surfaced 651.07

Total 49519.92

5

Page 19: Government of Karnataka Public Works, Ports & Inland Water ...

Carriageway Width

Major DistrictRoads (in km)

Single Lane 35126.14

Intermediate 12933.17

Two Lane 1246.71

Four Lane 214.31

Total 49519.92

2.2 ROADS & BRIDGES – PLAN ALLOCATION

In this Chapter, the budgeted Road and bridge works under Communication and Buildings ofNorthEast,North,CentralandSouthzonesarepresented,includingtheadditionalgrantsreleased from the Finance Department. Programme relating to National Highways is presented inChapter3.

Thebudgetedfundsareusedforstrengthening / improving the ridingqualityof roadsandconverting single lane roads into intermediate Lane / two lane / four lane roads.

Table 2.1showsPWP&IWTDbudgetincrorefortheyear19-20.

Table – 2.1

Allocation under State’s Budget: 2019-20(InCrore)

Category State C.S.S* Total % of State

Communication and Buildings (North+NorthEast+Central+SouthZones)

4320.55 - 4320.55 65.59

National Highways 0.00 378.70 378.70 0.00

KRDCL 414.50 - 414.50 6.29Karnataka State Highways ImprovementProject(KSHIP)

1101.95 - 1101.95 16.73

State Highway Development Project(SHDP)

750.00 - 750.00 11.39

Total 6587.00 378.70 6965.70 100.00

* C.S.S-Central Sector Scheme.

6

Page 20: Government of Karnataka Public Works, Ports & Inland Water ...

Thetotalbudgetfor2019-20isRs.6965.70Crore.However,NABARDworksandaprovisionfor the World Bank Assisted State Highway Improvement Project, State Highway Development ProjectandKRDCLtakesmajorshareoffundstothetuneofRs.2266.45 crore.The remainingRs.4699.25 crore is available for regular road andbridgeworks.TheshareofRs.4699.25crore among the four zones is in the following manner

Table 2.2

Amount shared by three zones Rs. Crore

National Highways 378.70

NorthZone,NorthEastZone&SouthZone 4320.55

TOTAL 4699.25

Table2.3presentsallocationforRoadsandBridgesin2019-20budgetsubheadwise(includingRs.37870.00 lakhofcentralassistance).

Thephysicalandfinancialprogressachieved during 2019-20 against the target of3254Kmofroadlengthis7070Kmofroadlength.Thefinancialprogressofroads&bridgesshowsthatallthethreezoneshasutilizedbudgetgrantswithrespecttotheworksshownintable2.4.

2.3 RIDF Scheme:-

The State has been receiving NABARD assistance for roads and bridges under RIDF scheme since1996-97.ThefocusofNABARDassistanceisonimprovementstoruralroadsintermsofconnectivityand quality. Since inception and upto 2019-20,30791.88Kmroadlengthand1381bridgesworkshavebeen takenupunder thisscheme.Theachievementasat theendofMarch2020 shows that 30046.81Km of road length and1312bridges havebeencompleted. The progress details of NABARD RIDF scheme are presented in Annexure I.

7

Page 21: Government of Karnataka Public Works, Ports & Inland Water ...

Table 2.3

Plan Schemes for Roads & Bridges: 2019-20(Rs. In Lakh)

Sl.No.

Head of Account Scheme Name and Zone State PlanCentral

PlanTotal

1 2 3 4 5 6

IC & B North+North

East+South+Central (Zones)1 5054-04-337-0-01 District&OtherRoads

133 SpecialDevelopmentPlan(SDP) 18270.00 0 18270.00135 SpecialDevelopmentPlan(SCSP) 12400.00 12400.00136 SpecialDevelopmentPlan(TSP) 6400.00 6400.00154 Improvements 165530.00 0 165530.00160 Renewals 6900.00 0 6900.00422 ScheduledCasteSubPlan(SCSP) 86900.00 0 86900.00423 TribalSubPlan(TSP) 40000.00 0 40000.00

2 5054-04-337-0-06 Unspentbalanceamount(2016-17)ofSCSP&TSPspentasperAct

422 ScheduledCasteSubPlan(SCSP) 6261.49 6261.49423 TribalSubPlan(TSP) 0.00 0.00

2 5054-04-337-0-02-436 MDRworksfinanced fromNABARD

33837.00 0 33837.00

3 5054-03-337-0-17 State Highway Road Works154 Improvements 35472.62 0 35472.62160 Renewals 3720.00 0 3720.00

4 5054-03-337-0-16 State Highway Bridges154 Improvement 4284.11 0 4284.11

5 5054-03-101-0-02-132 MDRBridgesCapitalExpenses 12080.00 0 12080.00Total C & B North+North East+South (Zones) 432055.22 0.00 432055.22

II National Highways Zone6 5054-05-337-1-01-172 Road works of Inter-State Importance

(CSS)0 0 0.00

7 5054-05-337-2-01-172 RoadworksofEconomicImportance(CSS)

0 0 0.00

8 5054-04-337-0-05-172 CentralRoadFund(CRF) 0 37870.00 37870.00Total National Highways 0 37870.00 37870.00

III World Bank Assisted Projects9 5054-03-337-0-84-172 KSHIP-II EAPRoads 70330.12 0 70330.1210 5054-03-337-0-86-172 KSHIP-II EAPRoads(ADB) 39864.88 0 39864.88

Total KSHIP 110195.00 0.00 110195.00IV KRDCL

11 5054-80-190-0-01-132 CapitalExpenses 40000.00 0 40000.0012 5054-80-190-0-01-240 Debt Services 1450.00 0 1450.00

Total KRDCL 41450.00 0.00 41450.00V SHDP

12 5054-03-337-0-18-154 Improvements 75000.00 0.00 75000.00Total SHDP 75000.00 0.00 75000.00

Grand Total (I + II + III+IV+V ) 658700.22 37870.00 696570.22

8

Page 22: Government of Karnataka Public Works, Ports & Inland Water ...

Tabl

e 2.

4Ph

ysic

al a

nd F

inan

cial

Pro

gres

s for

the

year

, 201

9-20

(C

&B

Sou

th, N

orth

& N

orth

Eas

t Zon

es)

(Rs.i

n L

akh)

Hea

d of

Acc

ount

Sche

me

Nam

ePh

ysic

al P

rogr

ess

Perc

enta

ge

Ach

ieve

men

t to

the T

arge

t

Fina

ncia

l Pro

gres

sPe

rcen

tage

A

chie

vem

ent

to th

e Tar

get

Targ

etA

chie

ve-

men

tTa

rget

Ach

ieve

men

t (E

xpen

ditu

re)

12

34

56

78

5054-04-337-0-01-422

MajorDistrict&OtherRoads(S

CP)

919

1287

140.04

86900.00

84906.75

97.71

5054-04-337-0-06-422

UnspentSCSPamountasp

erAct-2013

7333

45.21

6261.49

4792.97

76.55

5054-04-337-0-01-423

MajorDistrict&OtherRoads(T

SP)

409

556

135.94

40000.00

39242.08

98.11

5054-04-337-0-06-423

UnspentTSPamountasp

erAct-2013

00

0.00

0.00

0.00

-5054-04-337-0-01-133

MajorDistrict&OtherRoads(S

DP)

325

341

104.92

18270.00

17946.64

98.23

5054-04-337-0-01-135

MajorDistrict&OtherRoads(S

DP-SC

SP)

152

214

140.79

12400.00

12169.27

98.14

5054-04-337-0-01-136

MajorDistrict&OtherRoads(S

DP-TS

P)77

115

149.35

6400.00

6250.45

97.66

5054-03-337-0-17-154

SH ro

ad w

orks

Im

prov

emen

ts368

346

94.02

35472.62

32461.18

91.51

5054-03-337-0-17-160

SH ro

ad w

orks

Ren

ewal

s79

98124.05

3720.00

2708.41

72.81

5054-03-337-0-01-154

MajorDistrict&OtherRoads

Im

prov

emen

ts3413

3602

105.54

165530.00

164776.18

99.54

5054-04-337-0-01-160

MajorDistrict&OtherRoadsRenew

als

178

172

96.63

6900.00

5528.46

80.12

5054-03-337-0-16-154

SH b

ridge

s Im

prov

emen

ts27

1555.56

4284.11

4170.16

97.34

5054-03-101-0-02-132

MDRbridgesC

apitalE

xpenses

155

142

91.61

12080.00

10722.99

88.77

Tota

lR

oads

(in

Km

)59

9367

6411

2.87

3818

54.1

137

0782

.39

97.1

0B

ridg

es (i

n N

os)

182

157

86.2

616

364.

1114

893.

1591

.01

IIN

AB

AR

D W

orks

5054-04-337-0-02-436

Impr

ovem

ents

261

306

117.24

33837

33794

97.34

Brid

ges

5841

70.69

Gra

nd T

otal

Roa

ds (i

n K

m) (

Tota

l (I +

II))

6254

7070

113.

0543

2055

.22

4194

69.5

497

.09

Bri

dges

(in

Nos

) (To

tal (

I+II

))24

019

882

.50

9

Page 23: Government of Karnataka Public Works, Ports & Inland Water ...

Phys

ical

and

Fin

anci

al P

rogr

ess f

or th

e ye

ar, 2

019-

20

(SH

DP,

NH

, KSH

IP, K

RD

CL

, Por

ts)

(Rs.i

n L

akh)

Hea

d of

Acc

ount

Sche

me

Nam

ePh

ysic

al P

rogr

ess

Perc

enta

ge

Ach

ieve

men

t to

the T

arge

t

Fina

ncia

l Pro

gres

sPe

rcen

tage

A

chie

vem

ent

to th

e Tar

get

Targ

etA

chie

ve-

men

tTa

rget

Ach

ieve

men

t (E

xpen

ditu

re)

12

34

56

78

Bud

get W

orks

5054-03-337-0-18-154

SHD

P-Im

prov

emen

ts317

664

209.46

75000.00

75000.00

100.00

5054-05-337-1-01-172

InterS

tateConnectivityRoads(N

H)

00

-0.00

0.00

-5054-05-337-2-01-172

Econom

icIm

portanceRoads(N

H)

00

-0.00

0.00

-5054-04-337-0-05-172

CentralR

oadFund(C

RF)(N

H)

400

247

61.75

37870.00

37869.35

100.00

5054-03-337-0-84-172

KSH

IP-II(WorldBank)

5245

86.54

70330.12

70156.86

99.75

5054-03-337-0-86-172

KSH

IP-II(ADB)

861

1.16

39864.88

20780.54

52.13

5054-80-190-0-01-132

KR

DC

L R

oads

3131

100.00

40000.00

40000.00

100.00

KR

DC

L B

ridge

s80

90112.50

5051-02-201-0-01to09

&5051-02-211-0-01-059

Ports&Lights(CapitalO

utlay)

2624

92.31

3460.99

1308.59

37.81

5051-80-052-0-01-059&

5051-80-800-0-01-059

Inla

nd W

ater

Tra

nspo

rt3

266.67

21.00

20.97

99.86

5051-80-800-0-80-132

SustainableCostalProtection&

Managem

entProgram

(EAP)

35Groynes,15

Igroynes,9T

groy

nes,

4.10Kmlengthof

seaw

all&

planting

ofsaplingsfor1.50

Km

leng

th

35Groynes,15

Igroynes,9T

groy

nes,

4.10Kmlengthof

seaw

all&

planting

ofsaplingsfor1.44

Km

leng

th

-19700.00

16276.13

82.62

4711-02-103-0-00-139

AntiSeaErossionworks

900Mts

Seaw

all

975Mts

Seaw

all

108.33

2940.00

976.27

33.21

Gra

nd T

otal

Roa

ds (i

n K

m)

--

-28

9186

.99

2623

88.7

190

.73

Bri

dges

(in

Nos

)-

--

10

Page 24: Government of Karnataka Public Works, Ports & Inland Water ...

2.4 Allocation of Funds under the H/A 3054:

The allocation under the Mukhya Mantri Grameena Raste Abivrudhi Yojane is earmarked for themaintenanceofMajorDistrictRoadsandbridges.Chart2.7indicatesthecategoriesandpercentage of funds aportioned for the maintenance.

Annual Repairs andOrdinary Repairs comprise of pothole filling, jungle clearance, bermcutting etc. Rechipcarpeting / resurfacing are done under renewals Works of any urgent nature are carried out under Special Repairs. Maintenance of bridge involves cleaning the vents, removal of vegetation, repairs to Piers, abutments, parapets, painting etc.

Table2.5presentstotalfundsprovidedunderHoA:3054headfor2019-20

Table -2.5

Allocation and expenditure of funds for maintenance of Roads & Bridges during 2019-20(Rs. In lakhs)

Sl No

Head of AccountC & B (North+North East+South Zones) Amount

Rs. in LakhExpenditure

Scheme Name1 3054-03-102-0-01-200 State Highways - Bridges 4000.00 3900.642 3054-03-337-0-05-200 State Highways - Maintenance 35517.00 34603.54

33054-04-337-1-09-172 Mukhyamantri Grameena Raste

Abivriudhi Yojane 27342.00 26815.344 3054-04-105-0-01-200 District&OtherRoadsbridges 3500.00 3316.665 3054-04-337-1-10-200 District&OtherRoads 37136.44 35686.99

6 3054-03-337-0-07-200State Highway road safety works maingtenance

11250.00 11250.00

73054-04-337-1-13-200

DistrictandOtherroads,roadsafetyworksmaintenance

9375.00 9338.73

Total: {C & B (North+North East +South Zones)} 128120.44 124911.90

11

Chart 2.7 Percentages of Funds for Repair Works

Special Repairs

15%

Annual Repairs

35%

Renewals 50%

Annual Repairs Special Repairs Renewals

Page 25: Government of Karnataka Public Works, Ports & Inland Water ...

CHAPTER- 3

NATIONAL HIGHWAYS (N H ZONE)

India, in the recent years has witnessed remarkable growth in economy due to mainly development of world-class road network across the country. The development of road network started in the late 90’s under variousnationalHighwaydevelopment programme.Any country or region to alleviate poverty needs good infrastructures that enhance the living standard of its citizen. The development of infrastructures has brought and changed the entire life style of citizens in many developed countries.

In recent decades the country has realized the importance of good road network and other infrastructure. Focused attempts are being made to create world class infrastructure, In order to have rapid development of the country.

Hence,action isbeing taken to improve theexistingNationalHighwaysbyStrengthening,Renewal and Reconstruction wherever necessary. Further, based onthe traffic intensity/TrafficVolume(PCU),manyStateHighwaysarebeingupgradedasNationalHighwaysandDetailedProjectReport for executionof upgradedNationalHighwaysPhysicallyarealsobeing carried out.

TotalLengthofNationalHighwaysUp toend theofMarch-2020 is7588.612Kms in theStateofKarnataka.Further,72NosofvariousStateHighwaysareinprincipallyupgradedasNationalHighwayswhosetotallengthisaround6038Kms.Who’spreparationofDPRsareunder progress and National Highways will be declared on outcome of DPRs.

Length of National Highway:

A. LengthofexistingNationalHighway:

With State PWD 4142.387Kms.

With NHAI 3446.285Kms.Total 7588.672Km.

B. Length of In principal declared National Highways 6038 Km.

12

Page 26: Government of Karnataka Public Works, Ports & Inland Water ...

Allo

catio

n &

Exp

endi

ture

from

201

5-16

to 2

019-

20(R

s in

Cr.)

Sl No

Hea

d of

Acc

ount

2015

-16

2016

-17

2017

-18

2018

-19

2019

-20

Allo

tm en

tE

xpen

- di

ture

Allo

tm en

tE

xpen

- di

ture

Allo

tm en

tE

xpen

- di

ture

Allo

tm en

tE

xpen

- di

ture

Allo

tm en

tE

xpen

- di

ture

1NH(o)&

IRQP

works-5054

275.00

282.01

608.14

604.70

899.00

1047.88

1500.00

1499.93

1283

1283

2Pe

rman

ent B

ridge

Feefund-5054

2.84

1.55

7.67

7.50

0.16

0.16

0.02

0.00

0.00

0.00

3W

orld

Ban

k Lo

an

Assistance(NHIIP)

35.00

58.23

108.00

107.61

179.00

140.70

80.00

43.37

45.00

EAP

(NHIIP

)

5.15

EAP

(NHIIP

)

4PR

(SRP)-3054

85.98

85.89

175.00

161.61

95.00

88.91

7.00

5.18

14.20

14.20

5FD

R(N),3054

4.80

5.38

1.50

0.50

2.50

2.50

6.66

6.66

5.00

0.00

6FD

R(C), 3054

4.30

0.82

2.40

2.40

1.76

1.76

0.70

0.00

2.10

2.11

7OR3054

24.55

24.23

25.63

25.60

25.41

25.41

51.85

34.68

41.48

14.56

8ISC&EI

30.00

34.75

50.00

33.93

15.00

10.50

5.00

2.56

2.00

0.00

9NHDPIV

320.00

297.86

155.00

152.16

30.00

13.90

85.00

17.59

50.00

4.65

TOTA

L78

2.47

790.

7211

33.3

410

96.0

112

47.8

313

31.7

217

36.2

316

09.9

714

42.7

813

23.6

7

13

Page 27: Government of Karnataka Public Works, Ports & Inland Water ...

Targets & Achievement for the year 2019-20

Under NH(O) (Cumulative length in Km)

Target for Construction (km) Target for award (Km)Month Target Achievement Month Target Achievement

Apr’19 23.00 23.00 Apr’19 0 0

May’19 14.10 7.00 May’19 0 0

June’19 21.30 34.00 June’19 0 0

July’19 28.90 23.00 July’19 6 6

Aug’19 29.00 6.35 Aug’19 0 0

Sep’19 39.50 23.01 Sep’19 0 0

Oct’19 43.40 5.88 Oct’19 0 0

Nov’19 48.20 15.67 Nov’19 0 0

Dec’19 41.80 28.03 Dec’19 0 0

Jan’20 28.20 25.03 Jan’20 0 0

Feb’20 14.00 17.57 Feb’20 0 0

Mar’20 14.80 11.85 Mar’20 0 0

TOTAL 346.20 220.39 TOTAL 6 6

Under NHDP - IV

Target for Construction (km) Target for award (Km)

Month Total Target Achievement Month Total Target AchievementUpto

March-200 0 0 0

Under NHIIP

Target for Construction (km) Target for award (Km)

Month Total Target Achievement Month Total Target AchievementUp to

March-204.32 0 0 0

TOTAL 4.32 0 0 0

14

Page 28: Government of Karnataka Public Works, Ports & Inland Water ...

1. Consultancy works (in principally declared NHs):

No of estimates

No of estimates

Sanctioned

No of estimates, Submitted to

MoRT&H

No of estimates

from KSHIP

No of estimates dropped

Balance to be submitted

72Nos (6038Kms) 39 21 2 7 3

AlltheworksareunderTenderprocessforcarryingoutDPR.Outof72works,for39worksareunderprogressatvariousstagesofDPRpreparationhavingalengthof4770KmcostingRs.149.00Cr.

10. Black spots:

No of Black spots in Karnataka. 234 Nos

Black spots on NHs entrusted with State PWD. 234Nos

Black spots on NHs entrusted with NHAI. -

Blackspotswithlocalbodies&StateGovt. -

15

Page 29: Government of Karnataka Public Works, Ports & Inland Water ...

Tabl

e 3.

1Pr

ogre

ss o

f Roa

ds &

Bri

dges

wor

ks to

the

end

of y

ear

31-0

3-20

20(R

s. in

lakh

s)

Hea

d of

Acc

ount

Hea

d of

Dev

elop

men

t

No.

of w

orks

Gra

nt

2019

-20

Est

imat

ed

Cos

t

Exp

endi

ture

Sanc

tione

dco

mpl

eted

Prog

ress

Not

st

arte

dU

pto

3/20

19D

urin

g 20

19-2

0C

umul

ativ

e

12

34

56

78

910

11I

Stat

e H

ead

- Pla

n I

00

00

00

00

0

5054-05-337-1-01

Roa

d w

orks

of I

nter

Sta

te C

onne

ctiv

ity

(ISC

)0

00

00

00

00

5054-05-337-2-01

RoadworksofE

conomicIm

portance(EI)

00

00

00

00

0I T

otal

Pla

n0

00

00

00

00

IISt

ate

Hea

d - N

on P

lan

3054-01-052

NationalH

ighw

ays-Machinery&

Equipm

ent

00

00

170

00

168.29

0

5054-04-800

District&OtherRoads-Otherexpenditure

(CentralRoadFund-NH)

607

375

194

3850800

391900.00

6496.90

33757.8

26768.13

II T

otal

Non

Pla

n60

737

519

438

5097

039

1900

6496

.90

3392

6.09

2676

8.13

Gra

nd T

otal

(I+I

I)60

737

519

438

5097

039

1900

6496

.90

3392

6.09

2676

8.13

IC

entr

al H

ead

- Pla

n5054

Roads&BridgesO

riginalworks

493

442

0434065.33

4916.38

33037.36

38061.02

5054

Impr

ovem

ents

of R

idin

g Q

ualit

y Programme(IRQP)

00

00

00

00

0

PermanentB

ridgeFeeFund(PBFF)

00

00

00

00

0Sp

ecia

l Pro

ject

00

00

00

00

0To

tal P

lan

I49

344

20

4340

65.3

349

16.3

833

037.

3638

061.

02II

II C

entr

al H

ead

- Non

Pla

n3054

Roads&BridgesM

aintenace&Repairs

--

--

--

--

-A)O

rdinary

197

197

00

2171.68

5.09

2177.26

2184.35

B)PeriodicalR

enew

als

213

108

14221.06

23.29

2720.922

3155.212

C)SpecialRepairs

2929

00

398.00

0.00

3.98

3.98

D)FloodDam

ages

2321

20

905.48

0.00

348.06

342.75

Tota

l Non

Pla

n II

270

250

128

0.00

1769

6.22

28.3

852

50.2

2256

86.2

92To

tal

Plan

49.0

03.

0044

.00

2.00

0.00

4340

65.3

349

16.3

833

037.

3638

061.

02To

tal N

on P

lan

877

625

206

4650

970.

0040

9596

.22

6525

.28

3917

6.31

232

454.

422

Tota

l Pl

an +

Non

Pla

n92

6.00

628.

0025

0.00

48.0

050

970.

0084

3661

.55

1144

1.66

7221

3.67

7051

5.44

16

Page 30: Government of Karnataka Public Works, Ports & Inland Water ...

Tabl

e 3.

2A

bstr

act o

f Phy

sica

l and

Fin

anci

al P

rogr

ess o

f Wor

ks fo

r th

e m

onth

Mar

ch-2

020

Sl.

No.

Part

icul

ars

Tota

l N

o. o

f w

orks

No.

of

wor

ks

com

plet

ed

No.

of

wor

ks

for

whi

ch

tend

er in

pr

oces

s

No.

of

wor

ks in

pr

ogre

ss

Est

imat

ed

cost

(R

s. In

C

rore

s)

Gra

nts f

or

the

year

20

19-2

0 (R

s. In

cr

ores

)

Exp

endi

ture

du

ring

the

year

(201

9-20

12

34

56

78

9

15054OriginalWorks(including

PBFFandSpecialProjects)

493

244

5348.583

00

2Pe

riodi

cal R

enew

als

213

108

183.22

59.18

33.16

3W

orld

Ban

k A

ssis

tanc

e0

00

00

00

4NHDPIV-AProjects(DBFO

T)0

00

00

00

5H

ighw

ay A

dmiis

tratio

n0

00

00

00

63054SpecialRepairs

2929

00

03.98

3.98

7OrdinaryRepairs

197

197

00

23.86

41.48

25.21

8Fl

ood

Dam

age

Rep

airs

2321

02

8.45

5.00

0.00

9In

ter S

tate

Con

nect

ivity

Sch

eme

00

00

00.00

0.00

10Econom

icIm

portanceScheme

00

00

00.00

0.00

11C

entra

l Roa

d Fu

nd W

orks

607

375

38194

3651.20

508.00

337.57

12PB

FF0

00

00

0.00

0.00

TO

TAL

926

628

5024

892

15.3

161

7.64

399.

92

17

Page 31: Government of Karnataka Public Works, Ports & Inland Water ...

18

CHAPTER- 4

KARNATAKA ROAD DEVELOPMENT CORPORATION LIMITED

The Government has constituted “Karnataka Road Development Corporation Ltd” vide GovernmentorderNo.PWD172CRM97dated01-06-1999andthiswasestablishedon21stJuly1999asawhollyownedGovernmentofKarnatakaEnterprises.

4.1 The structure and role of the Corporation is as detailed below:

a. TheCorporationisestablishedunderCompaniesAct,1956[Sl.No.of196(56)]asaPublicLimited Company wholly owned by Government of Karnataka under the administrative control of the Public Works Department.

b. The Company established as a nodal agency to promote surface transport infrastructure to improve:

i. Construction of Roads

ii. Construction of structures like Major / Minor Bridges, Flyovers, Grade Separators

iii. ConstructionofRoadprojectsonPublicPrivatePartnership(PPP)basis.

iv. Collection of User fee on the roads developed by KSHIP/KRDCL and utilizing the accruedamountfordevelopment&maintenanceofroads

c. TheCorporationhasitsRegisteredOfficeatBangalore.

d. TheCorporationhasaninitialAuthorizedShareCapitalofRs.510.00Crore.

e. The Corporation functions under the supervision and control of the Board of Directors.

Completed Projects of KRDCL from Inception.

4.2 ROAD WORKS:

● 7327 km of State Highway Maintenance at an amount of Rs.225 Crore during 2001-04

● 14500 km of State Highway Maintenance an amount of Rs.503 Crore during 2005-08

● Development and Improvement of 1160 km length of 45 Roads under EngineeringProcurement Contract to the tune of Rs. 2040 Crore).

4.3 PPP-ANNUITY PROJECTS:

● Three State Highway Projects of 131.17 km have been completed under Annuity mode with total Annuity Amount of Rs. 1069 Crore. The roads are put to public use. The Annuity period for these projects is 12-13 years.

Page 32: Government of Karnataka Public Works, Ports & Inland Water ...

19

4.4 PPP-VGF (Toll) PROJECTS:

● Three projects of 197.60 km at a total project cost of Rs. 666.34 Crore have been completed and put on commercial operation and one project of 74.35 km at a project cost of Rs. 380.85 Crore is in progress.

4.5 PHASE BRIDGE WORKS:

Construction of 642 Bridges in Four Phases have been completed at an estimated cost of Rs. 680 Crore.

● 1stphase-147BridgesforanamountofRs.110Crore

● 2ndPhase-255BridgesforanamountofRs.248Crore

● 3rdPhase-169BridgesforanamountofRs.230Crore

● 4thPhase-71BridgesforanamountofRs.92Crore

MAJOR BRIDGE WORKS:

● 37 Major bridges at an estimated cost of Rs. 647.34 Crore are completed.

4.6 ONGOING PROJECTS:

I. Road works (Budget):

EightRoadworksof132.07 km at a cost of Rs.544.49 Crore are in different stages of progress and three road works are nearing completion.

1) Improvements to Jath - Jamboti road from km 0.00 to km 101.00 and km 101.00 to km 137.50 in selected reaches under E.P.C basis

TheworkisawardedtoRs.322.35CrandrevisedtoRs.350.14Cr.Workcommencedon08-08-2016andduedateofcompletionis07-08-2019.Timeextensiongrantedup to31-10-2019.BC97.17kmiscompletedandbalanceworks inprogress.ThefinancialprogressachievedasonMarch2020isRs.312.73Cr.

2) Improvements to road from Ch. 38+340 to 39.140 and 39+730 to 40+230 in Chikkerur town limit in Hirekeruru taluk, Haveri District on SH-62 (Haveri Sagar road) (1.30 km).

TheworkisawardedtoRs.5.29Cr.Workcommencedon28-05-2016andduedateofcompletionis27-09-2019.Roadworkiscompleted.ThefinancialprogressachievedasonMarch2020isRs.3.74Cr.

Page 33: Government of Karnataka Public Works, Ports & Inland Water ...

20

3) Construction of road from Ch. 78+400 to 81+660 on SH-21 (Halebidu - Anechoukur road) in Arakalagud Taluk, Hassan District (3.26 km).

TheworkisawardedtoRs.11.57Cr.Workcommencedon06-04-2018andduedateofcompletionis06-10-2018.Workiscompletion.ThefinancialprogressachievedasonMarch2020isRs.11.78Cr.

4) Improvements to road from Ilavala to K.R Nagar via Sagarakatte (SH-117) from km 11.140 and 15.60 in K. R. Nagar Taluk, Mysore District (4.46 km)

TheworkisawardedtoRs.4.70Cr(revisedtoRs.5.79Cr.)Workcommencedon 20-06-2018 and due date of completion is 19-12-2018, work completed on 30-04-2020.Workiscompleted.ThefinancialprogressachievedasonMarch2020isRs.3.79Cr.

5) Development to road from km 14.500 to km 15.700 near Kodihalli Village (SH-121) in Hassan District (1.20 km).

The work is awarded to Rs.2.35 Cr. Work commenced on 28-02-2019. LandAcquisitionworkisinprogress.

6) Balance work Improvements of SH-8 from Km 47.715 to Km 48.660 of Hirisave-Shravanabelagola –C.R Patana Holenarasipura – Shanivarasanthe road in Holanarasipura Taluk Hassan District.

TheworkisawardedtoRs.4.40Cr.Workcommencedon08-03-2019andduedateofcompletionis07-09-2019.Workisinprogress(workimplementedbyPWDunderKRDCLgrants).

7) Balance work of Construction of Minor bridge and approaches @ Km 48.660 of Hirisave-Shravanabelagola–C.R Patana Holenarasipura – Shanivarasanthe road SH-8 in Holenarasipura Taluk, Hassan District.

TheworkisawardedtoRs.4.53Cr.Workcommencedon08-03-2019andduedateofcompletionis07-09-2019.Bridgeworkiscompleted,protectiveworksinprogress(workimplementedbyPWDunderKRDCLgrants).ThefinancialprogressachievedasonMarch2020isRs.2.00Cr.

8) Development of Outer Ring Road for Hassan Town Connecting Nelamangala - Mangalore Road NH-75 via Arasikere road SH-68 Halebeedu road & 121) in Hassan District (on EPC mode)

Thework is awarded toRs.190.65Cr.Agreement executedon23-07-2019.Workcommenced on 31-01-2020 and due date of completion is 30-07-2023. Landacquisition,Preliminaryworksareinprogress.ThefinancialprogressachievedasonMarch2020isRs.9.79Cr.

Page 34: Government of Karnataka Public Works, Ports & Inland Water ...

21

II. BANGALORE SURROUNDING ROAD WORKS:

Developmentoffourroadsforalengthof155kmaroundBengaluruataprojectcostofRs.2095Crorehasbeentakenandimplementedunder10PackageswhichincludesRoadworks,ROB,RUB,GradeSeparatorsandElevatedRoads.

1) Package–1: Development of road from Hoskote -Budigere cross (NH-4) to Kempegowda International Airport road via Budigere- Singahalli and Mylanahalli in (from km 0+00 to 21+500) Bangalore urban/rural District (20 km).

TheworkisawardedtoRs.154.01Cr.Workcommencedon01-07-2019andduedateofcompletionis30-12-2021.Landacquisition,treecuttingandshiftingofutilitiesarein progress. Minor bridges and culvert works are in progress. The financial progress achievedasonMarch2020isRs.25.73Cr.

2) Package–2A: Development of road from Nelamangala from NH-4 to Madhure on SH 74 via Chikkamadhure from 0+00 to 15+250) in Bangalore urban/rural District (15.25 km)

TheworkisawardedtoRs.174.37Cr.Workcommencedon29-04-2019andduedateofcompletionis28-10-2021.1.30kmRetainingwallatMadhreTankBund,2No'sMinorBridgeexcavationwork,1.00kmdrainwork&Electricalpoleshiftingworkisinprogress.LandAcquisition,treecuttingandutilityshiftingworksareinprogress.ThefinancialprogressachievedasonMarch2020isRs.7.78Cr.

3) Package–2B: Development of road from Madhure on SH 74 to Devanahalli road (EMM VEE Solars on NH 7) via Rajanukunte and Thimmasandra (from km 15+250 to 39+240) in Bangalore urban/rural District (23.99 km)

TheworkisawardedtoRs.190.19Cr.Workcommencedon08-03-2019andduedateofcompletionis07-09-2021.600mRetainingwallconstructionworkisinprogress.2MinorBridgefoundationwork,drainworkandBoxculvertworksareinprogress.LandAcquisition,treecuttingandutilityshiftingworksareinprogress.ThefinancialprogressachievedasonMarch2020isRs.8.00Cr.

4) Package–2C: Construction of RUB at Basavanahalli railway crossing near Nelamangala railway station (km 0+800) on SH 74 and rob at Gollahalli railway crossing (km 6+300) on SH 74 in Bangalore urban/rural district (1 ROB and 1 RUB)

TheworkisawardedtoRs.53.64Cr.Workcommencedon05-05-2019andduedateofcompletionis05-11-2021.Workisinprogress.ThefinancialprogressachievedasonMarch2020isRs.2.39Cr.

Page 35: Government of Karnataka Public Works, Ports & Inland Water ...

22

5) Package–2D: Construction of ROB at Rajanakunte for crossing railway line & SH 9 (km 32+185) and ROB at railway crossing at Narayanapura (km 36+840) on MDR in Bengaluru (2 ROB)

TheworkisawardedtoRs.61.02Cr.Workcommencedon04-04-2019andduedateofcompletion is03-10-2021. Initialworksare inprogress.The financialprogressachievedasonMarch2020isRs.1.59Cr.

6) Package–3A: Development of road from Kanchugaranahalli to Jigani via Harohalli and Urgandoddi (km 0+000 to km 33+200) and section of road from BM road junction to Coca cola factory (km 0+000 to km 3+000) of Bidadi-Harohalli road in Bengaluru (33.00 km).

TheworkisawardedtoRs.151.29Cr.Workcommencedon21-06-2019andduedateofcompletionis20-12-2021.ConstructionofPipeculvertsandBoxculvertsareinprogress.Landacquisition,UtilityShiftingand treecuttingworksare inprogress.ThefinancialprogressachievedasonMarch2020isRs.7.10Cr.

7) Package–3B: Development of road from Bannerghatta on SH-87 to Besthamanahalli on SH-35 (including Anekal bypass, Grade separator across Chandapura road and ROB across railway line) via Jigani, Haragadde and Indalwadi (km 0+000 to km 22+980) in Bengaluru (22.98 km, 1 Grade Separator & 1 ROB).

Thework is awarded toRs.145.48Cr.Work commencedon06-05-2019 andduedateofcompletionis05-11-2021.Roadworkisinprogress.Landacquisition,UtilityShifting and tree cutting works are in progress. The financial progress achieved as on March2020isRs.6.75Cr.

8) Package–4A: Development of road from Besthamanahalli (Anekal) on SH-35 to Hoskote road (NH-04) via Attibele-Sarjapura and Whitefield (km 0+000 to km 42+600) (excluding elevated corridor, Grade separator and ROB) in Bengaluru (39.28 km).

Thework is awarded toRs.204.10Cr.Work commencedon15-06-2019 andduedateofcompletionis14-12-2021.Roadworkisinprogress.Landacquisition,UtilityShifting and tree cutting works are in progress. The financial progress achieved as on March2020isRs.1.18Cr.

9) Package–4B: Construction of elevated road at Varthur village (1.300 km) in Bengaluru (1.30 km Elevated Corridor).

TheworkisawardedtoRs.182.76Cr.Workcommencedon20-05-2019andduedateof completion is19-11-2021. Initialworksare inprogress.The financialprogressachievedasonMarch2020isRs.8.15Cr.

Page 36: Government of Karnataka Public Works, Ports & Inland Water ...

23

10) Package–4C: Construction of grade separators at Tally junction, Dommasandra junction, Varthur kodi junction and ROB at Kadugodi in Bangalore (3 Grade separator 1 ROB)

TheworkisawardedtoRs.72.99Cr.Workcommencedon20-05-2019andduedateofcompletionis19-11-2021.Worksareinprogress.

III. DEPOSIT CONTRIBUTION WORKS:

ThreeprojectshavebeentakenupunderDepositContribution(DULT)atanestimatedamountofRs.230Cr.Oneprojectiscompletedandtwoprojectsarenearingcompletion.

Sl.No

Name of workNos / km

Contract Amt

(Rs. In Cr)

Financial Progress as on March

2020(Rs. In Cr)

Remarks

1

Construction of 3 - grade separatorsat km 240+808, km 244+640and km 245+375 on Mangasuli -Lakshmeswhar (SH-73)b/wDharwad-Hublifromkm229+15tokm247+99(BRTLane),inlieuofproposedVUP'sofexisting4-lanigworks.- DC work.

3Nos 37.64 36.81Work is

completed

2

Construction of Road Over Bridges(ROBs) on Mixed Traffic Lanes atCh:13+480(Km:234+510)oneithersideoftheexistingROBonMangsuli-Lakshmeshwar (SH-73) roadbetweenDharwad-Hubballi near Navalur under BRTS Project. - DC work.

2Nos 47.94 40.28OneROBis

completed and oneROBworkis in progress

3

Construction of mixed traffic laneson Mangasuli - Lakshmeshwar (SH-73) between Dharwad - Hubli fromkm229+15tokm247+99adjacenttoexisting4-laningwork.- DC work.

18.84 182.23 149.60 Work is completed

Page 37: Government of Karnataka Public Works, Ports & Inland Water ...

24

IV. Status of PPP-VGF (Toll) Projects:

Sl. No

SH No. Name of workLength in

km

Total Project Cost

(TPC) Rs.Length in km

1 SH-34

Widening&ImptstoDharwad-Alnavar-Ramnagar(SH-34)roadonBOT-VGF(Toll)basis

61.75 237.60

ProjectisunderO&Mperiod2+28years(02-12-2040-endofConcessionperiod)

2 SH-10

Widening&ImptstoWhagdhari-Ribbanpalli (SH-10)roadonBOT-VGF(Toll)basis

135.85 242.75

ProjectisunderO&Mperiod2+28years(02-12-2040-endofConcessionperiod)

3 SH-23

Development of road from NH-63nearGinigere-Gangavathi to Sindhanoor underPPP-DBFOT-VGF(Toll)basis

83.00 190.16

ProjectisunderO&Mperiod2+22years(09-02-2038-endofConcessionperiod)

4 SH-9

Improvements to Yelahanka - A.P Border road from km 13.80kmtokm89.417ofSH-09underPPP-DBFOT-VGF(Toll)basis

74.35 380.85

PCODdeclaredon 19-09-2018.89.77%work completed. Balance works in progress2+21years(03-03-2039- end of Concession period)

V. DBFOMT (Hybrid Annuity) World Bank Co-Finance Projects:

Six projects for a length of 361 km have been developed under World Bank assisted co-financing scheme. Details are as follows:

Sl. No

SH/NH

Name of Project

Total Project

Cost (TPC) Rs.

Length in km

Concession Agreement

dateStatus of work

11,31&73

Development of Bagewadi - Bailahongal - Saundatti road (WCP-1)

235.95 63.29 09-12-2015

Provisionalcertificateof completion is issued. The date of issue of CODis01-10-2018.Punch list works are in progress

Page 38: Government of Karnataka Public Works, Ports & Inland Water ...

2 15

Development of road from Bidar to Chincholi in Bidar&KalburgiDistrict (WCP-2)

226.20 60.04 24-10-2016

Provisionalcertificateof completion is issued. The date of issue of CODis03-08-2019.Punch list works are in progress

3 21

Development of Hassan - Arakalagud - Ramanathapura - Piriyapatna road (WCP-3)

277.41 73.69 16-12-2015

Provisionalcertificateof completion is issued. The date of issue of CODis28-02-2018.Punch list works are in progress

462,76&57

Development of Hirekerur - Ranebennur road (WCP-5)

219.93 55.68 16-12-2015

Provisionalcertificateof completion is issued. The date of issue of CODis24-02-2018.Punch list works are in progress

545&47

Development of Mundaragi - Hadagali - Harapanahalli road (WCP-6)

205.16 51.21 16-12-2015

Provisionalcertificateof completion is issued. The date of issue of CODis05-02-2018.Punch list works are in progress

641&60

Development of Hungund - Muddebihal - Talikote road (WCP-7)

204.93 56.99 03-12-2015

Provisionalcertificateof completion is issued. The date of issue of CODis01-10-2018.Punch list works are in progress

Total 1369.58 360.90

VI. Bridge works:

1) Construction of Bridge across Kapila River near Goddanapura village and at Bilugali village in Nanjangud Taluk in Mysore District under one package (2 Bridges).

The work was awarded for a contract amount of Rs. 47.80 Cr and revised to Rs.60.00Cr.Workcommencedon16-01-2016withstipulatedcompletiondateas15-01-2018.BridgenearGoddanapuraiscompletedandBridgeproperfortheBridgenear Bilugali is completed, retaining wall towards Bilugali is in progress. Financial progressasonMarch2020isRs.49.59Cr.

25

Page 39: Government of Karnataka Public Works, Ports & Inland Water ...

26

2) Construction of Bridge across Bennethorahalla in the middle of SH-126 & SH-149 roads in Chittapura taluk, Kalburgi district.

ThisbridgeworkisawardedtoRs.15.128Cr.Commencementdate is13-10-2015andBridgeworkcompletedduringMarch2019andtrafficallowed,balance60mapproach road and construction of concrete drain works are in progress. Financial progressasonMarch2020isRs.13.55Cr.

3) Construction of Bridge across Krishna River between Chandurtek and Sainiktek villages in Belgaum District.

ThisbridgeisawardedtoRs.18.96Cr.Commencementdateis10-12-2014andduedateofcompletionis31-03-2018.Workisinprogress.Workisdelayedduetolandacquisition,heavy rainsand frequent flooddischarge fromMaharashtra.FinancialprogressasonMarch2020isRs.8.33Cr.

4) Construction of Approach road and protective works to the existing bridge across Arkavathi river at Rampura village on Rampura – Guddadahalli – Kakamaranahalli (Bidadi – Mudavadi) road in Ramanagaram Taluk.

The work is awarded to Rs.6.81 Cr. Commencement date is 20-03-2018. Workis completed during December 2018. Financial progress as on March 2020 is Rs.6.88Cr.

5) Construction of 217 Bridges in different parts of Karnataka has been taken up and the works are in different stages of progress:

a) Major Bridges of 5 Packges – (Each bridge costing more than Rs. 10 Cr)

i) Package-I: Construction of 7 Bridges in Kalaburgi, Vijayapura and Bagalakote Districts:

The work is awarded to Rs.189.23 Cr. Commencement date is 19-03-2018.Worksareindifferentstagesofprogress.FinancialprogressasonMarch2020isRs.35.18Cr.

ii) Package-II: Construction of 8 Bridges in Belagavi Districts:

The work is awarded to Rs.197.58 Cr. Commencement date is 19-03-2018.Worksareindifferentstagesofprogress.FinancialprogressasonMarch2020isRs.6.97Cr.

Page 40: Government of Karnataka Public Works, Ports & Inland Water ...

27

iii) Package-III: Construction of 11 Bridges in Dharawada, Haveri, Shivamogga, Dakshina Kannada & Udupi Districts:

The work is awarded to Rs.249.67 Cr. Commencement date is 19-03-2018.Worksareindifferentstagesofprogress.FinancialprogressasonMarch2020isRs.54.88Cr.

iv) Package-IV: Construction of 7 Bridges in Uttara Kannada Districts:

The work is awarded to Rs.189.95 Cr. Commencement date is 19-03-2018.Worksareindifferentstagesofprogress.FinancialprogressasonMarch2020isRs.39.28Cr.

v) Package-V: Construction of 8 Bridges in Hassan, Chikkamagalur, Mandya & Bagalakote Districts:

The work is awarded to Rs.177.62 Cr. Commencement date is 19-03-2018.Worksareindifferentstagesofprogress.FinancialprogressasonMarch2020isRs.21.50Cr.

b) Minor Bridges of 10 Packages – (Each Bridge costing less than Rs. 10 Cr)

i) Package-I: Construction of 28 Bridges in Kalaburgi, Yadagiri, Vijayapura, Bagalakote & Belagavi Districts:

The work is awarded to Rs.133.93 Cr. Commencement date is 19-03-2018.Worksareindifferentstagesofprogress.FinancialprogressasonMarch2020isRs.46.52Cr.

ii) Package-II: Construction of 5 Bridges in Raichur, Koppala & Ballari Districts:

The work is awarded to Rs.33.00 Cr. Commencement date is 19-03-2018.Worksareindifferentstagesofprogress.FinancialprogressasonMarch2020isRs.12.22Cr.

iii) Package-III: Construction of 37 Bridges in Dharawada, Haveri & Gadaga Districts:

The work is awarded to Rs.105.70 Cr. Commencement date is 19-03-2018.Worksareindifferentstagesofprogress.FinancialprogressasonMarch2020isRs.36.97Cr.

Page 41: Government of Karnataka Public Works, Ports & Inland Water ...

iv) Package-IV: Construction of 9 Bridges in Honnavara & Joida Districts:

TheworkisawardedtoRs.27.64Cr.Commencementdateis19-03-2018.Worksare in different stages of progress. Financial progress as on March 2020 is Rs.3.77Cr.

v) Package-V: Construction of 18 Bridges in Haliyala, Yallapura & Mundagodu Taluks in Uttara Kannada Districts:

TheworkisawardedtoRs.42.89Cr.Commencementdateis19-03-2018.Worksare in different stages of progress. Financial progress as on March 2020 is Rs.4.11Cr.

vi) Package-VI: Construction of 21 Bridges in Chitradurga, Davanagere & Shivamogga Districts:

The work is awarded to Rs.53.81 Cr. Commencement date is 19-03-2018.Worksareindifferentstagesofprogress.FinancialprogressasonMarch2020isRs.12.42Cr.

vii) Package-VII: Construction of 8 Bridges in Kakshina Kannada & Madikere Districts:

The work is awarded to Rs.45.96 Cr. Commencement date is 19-03-2018.Worksareindifferentstagesofprogress.FinancialprogressasonMarch2020isRs.17.94Cr.

viii) Package-VIII: Construction of 9 Bridges in Chitradurga, Udupi & Bhatkala Districts:

The work is awarded to Rs.42.57 Cr. Commencement date is 19-03-2018.Worksareindifferentstagesofprogress.FinancialprogressasonMarch2020isRs.18.32Cr.

ix) Package-IX: Construction of 22 Bridges in Chamarajanagara, Chikkamagaluru, Hassan & Mysuru Districts:

The work is awarded to Rs.123.01 Cr. Commencement date is 19-03-2018.Worksareindifferentstagesofprogress.FinancialprogressasonMarch2020isRs.64.09Cr.

x) Package-X: Construction of 21 Bridges in Tumkur, Ramanagara, Mandya & Kolar Districts:

The work is awarded to Rs.101.12 Cr. Commencement date is 19-03-2018.Worksareindifferentstagesofprogress.FinancialprogressasonMarch2020isRs.71.71Cr.

28

Page 42: Government of Karnataka Public Works, Ports & Inland Water ...

VII. HUDCO Loan works (Self – Finance Scheme) :

Sl.No.

Name of workLength

(km)

Contract Amount

(Rs in Cr.)

Financial Progress

(Rs. In Cr)Remarks

1.

Construction of By-pass(Re-alignment)to Toranagal town on Kudligi-Toranagal road

6.44 33.39 6.39

Work in progress. RUB GAD drawings submitted to SW Railways for approval

2.Development of road fromKudligi–Sandur–Toranagalroad(SH-40)

39.60 133.40 120.27Work completed. Tender to be recalled

3.Development of road from Hosapete to Sandur (SH-49)

27.17 70.61 74.07Work complete. Toll collection in progress

VIII. Collection of Road User Fee:

Collection of user fee on selected three roads have been started. Details are as below:

Sl. No

Name of the StretchLength in Km

Toll Contractor

Agreed Annual remittance

amount Rs in Crore

TOLLING COMMENCED

1Bagewadi-Bailhongal-Saundatti

63.29KMJyothiPrakash,Davangere

2.04

2Hassan - Periyapatna Road

73.69M/s Mitra Infra Solutions, Mysore

3.15

3Hirekerur-Ranibennur road

55.69KMJyothiPrakash,Davangere

1.10

4Mundargi-Hadagali–Harapanahalli road

51.21 KVHanchinal 2.03

5Hungund-Muddebihal-Talikot Road

56.99KMJyothiPrakash,Davangere

1.07

6Dharwad–Karadigudda-Saundatti Road.

36.00 M/sVinayladEnterprises 2.58

7 Hoskote to Chintamani Bypass road

52.46 M/s KCIC 10.85

8Haveri-Akkialur-Hangal Road.

31.78Vijayramegowda (M/sMitraInfraSolutions)

2.07

9Mudhol–Chikkodi–Nippani - Road.

107.94 M/sVinayladEnterprises 7.26

10Shelwadi - Mundargi Road.

64.21M/s Kesar Investment and Securities

2.78

29

Page 43: Government of Karnataka Public Works, Ports & Inland Water ...

11Hubli-Kundagol-Lakshmeshwar Road.

42.96Vijayramegowda (M/sMitraInfraSolutions)

2.20

632.22 Total 37.17

AGREEMENTS EXECUTED & TOLLING YET TO BE COMMENCED

12Mudgal - Tavaregere - Gangawathi Road.

74.10M/s Mitra Infra Solutions

1.65

13Magadi-Pavagada-AP Border Road

149.50M/s Mitra Infra Solutions

7.20

14Malavalli-Maddur-Koratagere Road.

135.34 M/sVinayladEnterprises 8.75

15Sindhanur - Tavaregere - Kushtagi Road.

64.30M/s Kesar Investment and Securities

2.95

423.24 Total 20.55

CONTRACTS AWAITING APPROVAL FROM BOARD FOR ISSUING LETTER OF AWARD

16 Bidar-Chincholi(TCP-2) 60.02 M/sJKLStoneApproved in KRDCL Board.LOAissued.

17Kudlagi - Sandur - Thorangalu road

39.20 M/sJKLStone

Negotiations completed and Approval for award to be obtained in the forthcoming Board Meeting

18 Hospet - Sandur road 27.10 M/sJKLStone

Negotiations completed and Approval for award to be obtained in the forthcoming Board Meeting

126.32

BIDS EVALUATION IN PROGRESS

19Padubidri–Belman-Karkala Road.

27.80 Re-Tenders Invited since there is no response.

20Soundatti–Ramadurga–Badami–KamatagiRoad.

127.26Bids invited to engage agency, bids opened on18-01-2020andbeingplacedbeforeKRDCL Board for Approval.

21Thintini-Devadurga–Kalmala Road.

73.80Bids invited to engage agency, bids opened on18-01-2020andbeingplacedbeforeKRDCL Board for Approval.

22Davanegere-Santhabennur-Birur Road .

105.63Bids invited to engage agency, bids opened on18-01-2020andbeingplacedbeforeKRDCL Board for Approval.

334.49

30

Page 44: Government of Karnataka Public Works, Ports & Inland Water ...

31

Bagewadi – Bailahongala – Soundatti Road

Page 45: Government of Karnataka Public Works, Ports & Inland Water ...

32

Hirekerur – Ranibennur Road

Page 46: Government of Karnataka Public Works, Ports & Inland Water ...

33

Yelahanka – AP Border (Public Private Partnership)

Bridge across Degganahalli in K.R. Pete Taluk

Page 47: Government of Karnataka Public Works, Ports & Inland Water ...

34

Bridge across Tungabhadra river on Hosapete – Shivamogga road km 153.00

Page 48: Government of Karnataka Public Works, Ports & Inland Water ...
Page 49: Government of Karnataka Public Works, Ports & Inland Water ...

CHAPTER- 5

KARNATAKA STATE HIGHWAYS IMPROVEMENT PROJECT (KSHIP)Overview of Karnataka State Highways Improvement Project

The PIU, KSHIP is a Unit of PWD set up in 1999-2000 which is responsible for theimplementationofallExternally-aidedSHProjectsinKarnataka.It isheadedbytheChiefProjectOfficerrankofIAS/EICandtheProjectDirectoroftherankofChiefEngineerwhoreport administratively to the Principal Secretary / ACS, PWD through Secretary, PWD.

5.1 Karnataka State Highways Improvement Project –I

TheKarnatakaStateHighwaysImprovementProject–I(KSHIP-1)isthefirstmajorinitiativeofthePublicWorksDepartment(PWD)ofGovernmentofKarnataka(GOK)forimprovementofRoadnetworkofthestatewithexternalassistanceduring1999.ThePWDcarriedoutStrategic Option Study (SOS) on a road network of 13,362 kms through an IndependentConsultantduring1996andstudyidentified2888kmscomprisingofStateHighways(SH)andMajorDistrictRoads(MDR)roadsforprioritisedimprovements.

The Karnataka Highways Improvement Project, KSHIP-I was launched by Karnataka Governmentintheyearduring1999-2000videG.O.No.PWD21CRM96,dated01.07.1999.TheKarnatakaStateHighwayImprovementProject-1hasbeenimplementedwiththefinancialassistanceoftheIBRD(TheWorldBank)inlinewiththeProject&LoanAgreementno4606INdated21-07-2001.TheoriginalcostoftheprojectwasRs.2030.27Crore,whichincludesWorldBankloanofRs.1635.21crore(US$360.00million)being80%oftheprojectcost.TheProjectcosthasbeenrevisedfromRs.2030.27croretoRs.2390.00crore.TheProjectCompletionDatewasalsoextendedfrom30-06-2006to31-08-2011andthatofloanclosingdateextendedfrom31-12-2006to31-01-2008.

Aftercarryingoutfeasibilitystudyabout2414Kmswereimplementedduringtheperiodof2001-2008.TheImprovementiscarriedoutintwocategory:

● Upgradation-901 kms:involvedReconstructionofexistingcarriagewaytothespecifiednewwidthof7.00mcarriagewaywith1.00mwidepavedshouldersand1.5mtearthenshouldersonbothsideswithatotalformationwidthof12.00mts.

● Rehabilitation-1513 kms: involvedImprovementfortheexistingwidthofcarriagewayor5.50meters,whicheverishigherwithoutgeometricalimprovementsandreconstructingthe widened portion of carriageway

35

Page 50: Government of Karnataka Public Works, Ports & Inland Water ...

Thetotalprojectlengthof2414Kmswastakenupforimprovementspreadover50contractpackages.Atotallengthof2385kmsof49contractsiscompletedexcluding29kmspassingin forest areas due to court interventions. The Contract of construction of Bridge across the Bennithorariver(U3Br)nearGulbargawasterminatedforthepoorperformanceofcontractorand is handed over to NH for complete the balance work.

TheLoanAgreementclosedon31-01-2008with100%utilizationoftheWorldBankloan.AnexpenditureofRs.2381.04 crorehasbeenincurreduptoendofMarch,2020.

The physical targets and achievements from the commencement of the project are as under.

Table 5.1

Year Physical in Kms Financial (Rs. in crore)2001-02 - 69.852002-03 191 161.232003-04 366 231.532004-05 510 480.262005-06 666 541.352006-07 449 524.622007-08 132 194.802008-09 40 73.142009-10 30 66.902010-11 - 15.522011-12 Nil 2.892012-13 1 4.562013-14 - 2.532014-15 - 1.692015-16 - 2.562016-17 - 0.832017-18 - 1.612018-19 0.662019-20 4.51

Cumulative 2385 2381.04

*inclusiveoffrontendfeeof16.35cr

TheperformanceofKSHIP-1 received theappreciationof theWorldBank in itsPortfolioReviewofKarnatakainJune2005.TheWBhasassessedprogressofKSHIPasfarhigherthanNationalAverageandonparwiththeBank’sworldwideaverage.TheKSHIPhasalsobaggedtheIndia-TechExcellenceAward-2010asthe2ndBestImplementedInfrastructureProjectinIndiaandtheawardwaspresentedbythePresidentofIndiaon27thOct2010.

36

Page 51: Government of Karnataka Public Works, Ports & Inland Water ...

5.2 Karnataka State Highway Improvement Project - II

AftersuccessfulcompletionofKSHIP-1andaspertheGovernmentordernoPWD61EAP2006 dated 25-11-2006 the improvement of 3411kms of StateHighways of the core roadnetworkoftheStatewasinitiatedunderKSHIP-II.AlltheroadsunderKSHIP-2aretakenupforupgradingtoamin.2Lanecarriagewaywithgeometricimprovements.Thelistofroadsprioritized for improvement under KSHIP-II is provided below:

GO No. PWD 61 EAP 2006 Bangalore Dated: 25-11-2006

List of Selected Roads For Improvement Under KSHIP-IISl No Name of the Roads km

1 Tinthni-Devadurga-Kalmala 742 Kushtagi(NH-13)-Tawargera-Sindhanur 643 Managoli-Talikota-Devapur 1104 Mudgal-Kudithini(NH-63) 1155 Konannanur-Hunsur-HD Kote 89

6 Sira-AP Border via Madhugiri-Gowribidanur-Chikaballapura-Chintamani-Srinivasapura-Mulbagal 210

7 Haliyal-Kudalasangama via Dharwad-Soundatti-Ramdurga-Badami-Pattadakal-Kamatgi-NH13 243

8 Hassan-Periyapatna via Arakalagud-Ramanathpura 779 Hirekerur-Ranebennur(onNH-4) 5810 Kudachi-Kabbur-Ghataprabha 5011 Shikariura-Anandapuram(onNH-206) 3212 Kotumachigi-Gajendragarh 3213 Goa Border-Soundatti via Khnapur-Bagewadi-Bailhongal 13314 Mudhol-Nippani vial Mahalingapur-kabbur 10415 Belur-Kodlipet via Bikkodu-vatehole-Alur-Magge 7216 Davenagere-Birur via Channagiri 10417 Gangamula-Kottigehara 6318 Hangal-Haveri(NH-4) 32

19 TNBorder(Hunasanahalli)-APBorderviaKanakapura-Ramanagara-Magadi-Dobbespet-Koratagee-Madhugiri-Pavagada 220

20 Hole Narsipura to K.R.Nagar via Saligaram 4621 Shelavadi-Harapanahalli via Gadag-Mundarigi 11222 Indi-Zalaki(onNH-13) 2023 MaharastraBorder–GulbargaviaAfzalpur 9924 Hungund-Talikot via Muddebihal 5825 Gubbi-Mandya via Yediyur-Kowdle 10926 Jagalur-NH-13 1027 Hoskote-AP Border via Chintamani 88

37

Page 52: Government of Karnataka Public Works, Ports & Inland Water ...

28 BelthangaditoBantwal(onNH-48) 35

29 Ramangaram-Saligramma via Thalavadi-Choulnankuppe-Huliyurdurga-Nagamangala-K.R.Pet Akkihebbal -Berya 142

30 Malavalli-Koratagere via Maddur-Kunigal-Tumkur 135

31 Shimga-TadasaonNH-4viaSavalangaviaShikaripura-Shiralakoppa-TogarsiAnvatti-Gondi-Hangal 171

32 Jamkhandi-MaharastraBorderviaTerdal-Kudachi-Managsuli 79

33 Horanadu-Subramananya via Kalasa-Kottigehara-Mudigere-Sakaleshpura Junction-Vanagur 164

34 MolkalmurtoSH19(KSHIP1Road) 635 Bidar-ChincholiviaEkhelli(NH9) 6136 Padubidri-Karkala 2837 Kollegala-Tamilnadu Border via Hanur-MM Hills 9738 Virajpet-SomawarpetviaMadikere 71

Total Length (Kms) 3,411

KSHIP-IIwastakenupintwostages.TheStage-1wastakenupin2011withtheWorldBankfinanceandStage-2in2012withtheADBfinance.

5.2.1 KSHIP-II – STAGE – I – World Bank Project:

Initially theWorldBank sanctioned a loan assistance ofUS$ 300millionwith an overallproject sizeofRs.2545crore.Following theLoanNegotiationsheldwith theWorldBankandDEA,GOIinFebruary2011theProjectcostunderwentasignificantrevision.Withtheconcurrenceof theDEA,GOI theLoanwas enhanced fromUS$300million toUS$350million and further the World Bank also enhanced the component size under the “Highway financingModernisation”fromRs.50crore(US$10million)toRs.1682crore(US$374million)whichwasaimedatassistingKRDCLinimplementingtheconceptofCo-financing(Privatefinancial institutions) todevelopabout400kmofhighwaysundereitherItem-ratecontractsorPPPconcessions.TheProjectCostwasrevisedfromtheinitialRs.2545crore(US$565million)toRs4522crore(US$1005million).

The details of the Loan agreement with the World Bank are:

1. Loanno:8022-IN 2. LoanSigneddate:30-05-2011 3. LoanEffectivenessdate:19-07-2011 4. ProjectCost:US$1005million(Rs.4522Cr) 5. WorldBankShare:US$350million(UtilisedUS$295.21million) 6. GOKShare:US$155million(Rs.697Cr) 7. PrivateSector/Developer/KRDCLShare:US$500million(Rs.2250Cr) 8. LoanClosingdate:31-12-2016(Extendedupto28thDec,2018) 9. LoanAmortizationSchedule:15-06-2016to15-03-2029.

38

Page 53: Government of Karnataka Public Works, Ports & Inland Water ...

TheimplementationofWorldBankassistedKSHIP-2underStage-1andthelistofroadsof834kmsreceivedtheapprovaloftheGovernmentvideGOno.PWD13EAP2010dated:28-06-2010andGOno.PWD121EAP2011dated:04-02-2012.

A total of 1195 kmsofroadlength(KSHIP834kms+KRDCL361kms)wastakenupforimprovementatatotalprojectcostofRs4522croresunderKSHIP-2,outofwhichWorldBankloanassistanceisRs1575Crores.TheProjectisbeingimplementedinfollowingcontracts;

EPC contracts (269 kms):

TheEPC contracts are ItemRate contractswith a defect notification period of one year and theWorldBankwould fund80%of thecontractcost.Thecontracts for thefiveEPCpackageswereprocuredobservingICBproceduresandcommencedinJuly/August,2011.ThecontractWEP2fromHaveri-Hangal-Tadas(75kms)entrustedtoM/sRomanTarmat,MumbaiwasterminatedduetononperformanceinNov,2012andretenderedbysplittingthecontractintotwoNCBcontractsWEP2A&WEP2B.The contract forWEP2AandWEP2Bwerewas signed inFeb, 2013 and June 2013respectively.TheimprovementwastakenupatacontractamountofRs596Crinsixcontractshavingdurationof18to36months.

Subsequently,apartoftheroadofContractWEP3UpgradationofRoadfromDharwadtoSaundattiforalengthof2.50KmsinDharwadtownlimitswasconvertedfromUpgradationtoTenderSuremodelasaseparatepackage(WEP-3A)inOct2017.

The details of the contracts are as under:

Contract No.

Contract NameLength (km)

ContractorContract Price in

Rs. Crore

Present status

WEP-1Upgradation of the Road from Hoskote to Chintamani

52.40M/s Lanco Infratech Ltd, Gurgoan

98.22Completed30-05-2015

WEP2AUpgradation of the Road from Haveri(NH-4)toHanagal

31.78M/s DRN Infrastructure, Hubli

92.53Completed27-06-2016

WEP2BUpgradation of the Road from Hanagal to Tadas

43.50M/s DRN Infrastructure, Hubli

97.87Completed31-01-2017

WEP-3Upgradation of the Road from Dharwad to Saundatti

36.00M/sRVCPL-RIDL(JV),Bangalore.

84.44Completed31-01-2016

WEP-4Upgradation of the Road from Tinthini to Kalmala

73.80M/sPatelEngineeringLtd, Hyderabad.

160.68 Completed24-06-2015

WEP-5Upgradation of the Road from Chowdapur to Gulbarga

28.63M/sSRK-KCL(JV),Hyderabad.

61.55 Completed25-04-2014

WEP-3A

Upgradation of Road length of2.50KmsofDharwadtoSaundatti in Dharwad town limits Tender sure

2.50M/s The Trinity Group, Hubli

18.40 In Progress

268.57 609.26

39

Page 54: Government of Karnataka Public Works, Ports & Inland Water ...

TheEntireroadlengthof266kmsin6contractswascompletedduringtheperiodof2014-2017atarevisedprojectcostofRs.643cr.TheroadworkinDharwadtownlimitsofContractWEP3Aisinprogress and is nearing completion.

Annuity contracts (301 kms):

TheAnnuityContractsareof10yearsdurationwithmax.of2 to21/2yearsofconstructionand8to71/2 years of maintenance. Under Annuity Contracts, the World Bank assistance is utilised for an upfrontpaymentof50%oftheconstructioncostoncompletionoftheconstructionandtheremainingpaymentsof50%tobefundedbyGOKduringthemaintenanceperiodof71/2 years on annuity basis. The details of the roads taken up under Annuity mode are as below:

Package Name of the roadLength

kmsConcessionaire

Constn.Cost

(Rs in Cr)

Contract Cost

(Rs in Cr)

WAP-1

Malavalli–Maddur–Huliyurdurga- Kunigal- Tumkur- Koratagere- Madhugiri- Pavagada

193.36

M/s Mysore Bellary Pvt Ltd (M/sSadbhav-GKC(JV))

576 1306*

WAP-2Mudhol–Mahalingapura-Kabbur-Chikodi-(NH-4cross)Nippani.

107.94M/s Ashok Buildcon-GVR(JV)

331 768**

301.30 907 2074

* 239 cr lumpsum during construction + 15 Annuity instalments of Rs. 71.15 cr

** 136 cr lumpsum during construction + 16 Annuity instalments of Rs. 39.49 cr

TheAgreementsweresignedin24-03-2014forWAP1and14-03-2014forWAP2.Theworkswerecommencedon12-12-2014afterachievingfinancialclosureandfulfillingtheconditionsprecedent.

The Project work ofWAP1 was completed on 20-09-2018 and the Project work ofWAP2 wascompletedon12-12-2017.TheroadworksarepresentlyinOperationandMaintenaceperiod.TheO&Mperiodwillbeupto2024-25.

Annuity contracts converted to Item rate Contracts: (264 kms):

TheTwocontractsofWAP3andWAP4withatotallengthof264kmshadbeeninitiallyproposedtobe taken up under Annuity model. As the annuity bids did not yield value for money, the bids were cancelled. The contracts were re-procured and implemented under three Item Rate contracts.

40

Page 55: Government of Karnataka Public Works, Ports & Inland Water ...

The brief details of the contract works are as under:

Package Name of the road

Lengthkms Contractor

Contract Cost

(Rs in Cr)

Contract duration

in months

Contract agreement

Commence- ment/ com-

pletion dates

WAEP3A

Shimoga - Shikaripura - Anandapuram

82.00M/s Patel EngineeringLtd,

264.73 3228-04-2015

12/08/201530/11/2018

WAEP3B

Shikaripura –Anvatti-Hangal

71.63M/s RNS Infrastructure Ltd

224.70 2906-07-2015

01/10/201524/12/2018

WAEP4

Managuli to Devapura

109.95M/s. Sadbhav EngineeringLimited,

317.05 3330-04-2015

27/07/201520/07/2018

263.58 806.48

Aroadlengthof255kmshasbeencompleteduptoendofMarch,2020.TheroadworkforWAEP4hasbeencompleteddeletingareachof7.453kmsfromthescopewhich isaffectedbyLAQ.ThefinancialexpenditureisRs.863croreuptoMarch,2020.

KRDCL - (Co financing PPP Contracts) (361 kms):

Aroadlengthof361kmsfromoutof3411kmsistakenupforimprovementthroughPPPcontractsunderCo-financingthroughKRDCLunderHighwaymodernisationcomponentoftheProject.TheconstructioncostwillbesharedbetweenWB,KRDCL&Developerintheratioof20:20:60.Thelistof roads is given below:

Contract Package

Name of packageLength in

km

Estimated Constn. cost

Rs croreWCP-1 Bagewadi(NH-4)-Bailhongal-Saundatti 63.29 189

WCP-2 Bidar-NH-9(Ekhelli)-Chincholi 60.04 181

WCP-3 Hassan-Ramanatpura-Periyapatna 73.69 222

WCP-5 Hirekerur - Ranibennur 55.69 176

WCP-6 Mundaragi - Hadagali - Harapanahalli 51.21 164

WCP-7 Hungund - Muddebihal -Talikot 56.98 164

360.90 1096

KRDCL is designated as the Implementing Agency for this project component. The original DPR was revisedfortheselectedroadstosuitthefundingagencyterms.BasedontheValueforMoney(VfM)analysis,theroadsaretakenupforimprovementunderHybridAnnuitymodel.TheLOAwasissued

41

Page 56: Government of Karnataka Public Works, Ports & Inland Water ...

forfivepackageson10-09-2015.TheAppointeddateforWCP-1&7wasdeclaredon03.10.2016.TheAppointeddateforWCP-3,5&6wasdeclaredon29.09.2016.Forpackage(WCP-2),theconcessionagreementwassignedon24thOct2016andtheAppointeddatewasdeclaredon4thAug2017.

Outof361kms,aroadlengthof356kms(98.60%)hasbeencompleteduptoendofMarch,2020.ThePCODisissuedforContractWCP3,WCP5&WCP6.TheroadworkinWCP1andWCP7is100%completed.TheroadworkinWCP2is97%completed.

Overall Budget and Expenditure (World Bank):Rs in Cr

Project KSHIP-II World

Bank funded

Expenditure up to 31-03-2019

Revised Budget for

the year 2019-20

ExpenditureDuring year

2019-20(uptoMar,20)

Cumulative Expenditure

since inception

4522 3447.79 701.95 701.57 4149.36

Asian Development Bank loan Assistance.

The brief details of the loan are as under:

1. Loanno:2705-IND

2. LoanSigneddate:20-07-2011

3. LoanEffectivenessdate:12-09-2011

4. ProjectCost:US$462.75million(Rs.2150Cr)

5. ADBShare:US$315million(Revised:US$265million,utilized:US$263.2million)

6. GOKShare:US$147.75million(Rs.687Cr)

7. LoanClosingdate:30-06-2015.(Rev1date31-12-2016,Rev2date30-06-2018, Rev3-31.10.2018)

A total of 616 kmsofroadlengthand4ROBsintheprojectroadsatatotalprojectcostofRs.2150croreswastakenupwithAsianDevelopmentBank(ADB)loanassistanceofUS$315million.Withcancellationofsurplusloan,theassistanceisrevisedtoUS$265million.TheimprovementwastakenupinnineEPCpackagesatatotalcontractcostofRs1151cr.Thecontractdurationvariesfromof15to36months.TheworkswerecommencedinMarch,2012.Duringexecution,threecontractsvizAEP3,AEP6andAEP9wereterminated.Thepackagewisedetailsarebelow:

42

Page 57: Government of Karnataka Public Works, Ports & Inland Water ...

Contract No.

Name of workApprox Length (km)

Contract Period

(months)

Contract amount in Rs. Crore

Status

AEP1RoadfromMagadiNH-48(Km.0+000)toKoratagere(Km68+200)ofSH-3

68.20 33 116.78Completed31-12-2016

AEP2RoadfromPavagada(Km.0+000)toAPBorder(Km23+210)ofSH-3

23.21 18 43.30Completed28-06-2014

AEP3RoadfromGubbi(Km.0+000)toMandya(Km108+620)ofSH-84

108.62 33 196.90Terminated

on 24.07.2014

AEP4

RoadfromJaglurtoNH-13ofSH-45(Approxlength=9.25Kms)Roadofabout5KmsfromSH-19of KSHIP Road to Molakalmuru of SH-2

14.38 15 31.25Completed15-03-2015

AEP5RoadfromPadubidri(Km.0+000)toKarkala(Km27+800)ofSH-1

27.80 18 61.48Completed22-05-2015

AEP6RoadfromDavangere(Km.0+000)viaChannagiritoBirur(Km105+630)ofSH-76

105.63 33 202.57Terminated

on 17.07.2014

AEP7RoadfromShelvadi(Km.0+000)toMundargi(Km63+440)ofSH-45

63.44 33 121.25Completed19-03-2016

AEP8RoadfromMudgal(Km0+000)toGangawathi(Km74+200)ofSH-29

74.20 36 152.63Completed25-02-2015

AEP9Road from Soundatti - Hulikatti –Ramdurg--NH218–Badami-Pattadakal-Kamatagi

130.13 36 225.50Terminated

on 30.10.2014

615.61 1151.66

ThethreeterminatedcontractsofAEP3,AEP6&AEP9werere-procuredsplittingtheroadworkintosevenNCBPackagesofAEP3A,AEP3B,AEP6A,AEP6B,AEP9A,AEP9BandAEP9Cwithlesserdurationof21months.Thedetailsareasunder:

New Package

RoadLength in kms

Contract signed on

ContractorContract

price (Rs in Cr)

AEP-3ARoad from Gubbi to Beerangonahalli near YediyurofSH84

49.03 05-11-2015

M/s DRN Infrastructure Engineers&Contractors, Hubli.

122.38

43

Page 58: Government of Karnataka Public Works, Ports & Inland Water ...

New Package

RoadLength in kms

Contract signed on

ContractorContract

price (Rs in Cr)

AEP-3B

Road from Beerangonahalli near Yediyur to Mandya of SH84

59.59 18-06-2015M/sDPJain&Co,Nagpur

198.27

AEP-6ARoad from Davangere to ChannagiriofSH76

53.65 14-09-2015 M/sJMC,Bangalore 181.45

AEP-6BRoad from Channagiri toBirurofSH76

51.98 31-08-2015M/sD.P.Jain&co.Infrastructure Pvt. Ltd.,Nagpur

136.79

AEP-9ARoad from Savadatti toRamdurga(HalgattiJunction)

42.00 28-07-2015M/sD.P.Jain&co.Infrastructure Pvt. Ltd.,Nagpur

138.24

AEP-9BRoad from Ramdurga (HalgattiJunction)toBadami Bypass

45.00 23-06-2015M/s RNS Infra structure Ltd., Bangalore

146.05

AEP-9CRoad from Badami Bypass to Pattadakal- Kamatagi

43.13 07-07-2015M/s Ashoka Buildcon Ltd,Nashik

110.90

344.38 1034.08

Outof616kms,theImprovementof614 km(99.67%)hasbeencompleted.Theexpenditureincurredto civil works is Rs. 1811 croreuptoendofMarch,2020.

ROB Packages;

The following4ROBswhichareapartof theUpgradationPackageAEP6,AEP7&AEP9havebeen taken up for construction under ADB loan assistance in separate contracts. The contracts have durationof24months.Thedetailsareasunder:

Pkg Link Name of ROBContract

Price (Rs in cr)

Contractor Agreement Status

AEP-6ROB-1

42A

AtChainage7.691,RailwayKm.316/200-300,TholahonseVillageonDavangere Channagiri route

39.79M/s KNR Constn Ltd, Hyderabad

17-09-2014Completed 31-10-2019

AEP-6ROB-2

42B

AtChainage44.830,RLYKm219/900-220/000NearBiruronChannagiri–Birur route

36.10

M/s. K. VenkataRajuEngineers&Contractors, Vijayawada.

19-09-2014Completed 31-10-2018

44

Page 59: Government of Karnataka Public Works, Ports & Inland Water ...

Pkg Link Name of ROBContract

Price (Rs in cr)

Contractor Agreement Status

AEP-7ROB-3

27A

Atchainage25.339,RLY.KM.55/200-300onGadagBypassonShelavadi–Gadag Route

22.66M/s KNR Constn Ltd, Hyderabad

26-12-2013

Completed 31-10-2016

AEP-9ROB-4

21D

AtChainage42.214,RailwayKm.60/600-700Near Badami on Ramdurga –Badamiroute

28.58M/s KNR Constn Ltd, Hyderabad

17-09-2014Completed 30-04-2017

Total 127.13

AllthefourROBsarecompleted.TheexpenditureincurredforROBworksisRs. 140 crore upto end ofMarch,2020.

SUMMARY OF THE PROJECT WORKS of KSHIP2:

Funding AgencyTotal length (Km)

Contract cost

(Rs. Cr)

Progress upto March, 2019

(Kms)

Progress2019-20 (Kms)

Progress Since

inception (Kms)

KSHIP2-World BankEPCcontracts(6) 269.00 609.00 267.33 0.64 267.97Annuitycontracts(2) 301.00 2,074.00 301.03 0.26 301.29Annuity converted to EPCcontracts(3)

264.00 807.00 251.21 3.18 254.39

KRDCLCofinancingcontracts(6)

361.00 2,905.00 315.42 40.41 355.83

Total for World Bank 1,195.00 6,395.00 1,134.99 44.49 1,179.48

KSHIP2-ADBRegularcontracts(6) 271 527 270.43 - 270.437contractsprocuredafterterminationof3contracts.

339.27 1034 337.56 0.50 338.06

ROBcontracts(4) 5.75 127 5.54 - 5.75Total for ADB 615.45 1688 613.53 0.50 614.24

Karnataka State Highway Improvement Project - III:

KSHIP-IIIhasreceivedADBloanassistanceofUS$346milliontodeveloptheCoreRoadNetwork.TheLoanagreementwithADBwassignedon30.08.2018andtheLoanhasbeendeclaredeffectivefrom14.11.2018.

45

Page 60: Government of Karnataka Public Works, Ports & Inland Water ...

TheProjectcostisRs.5334CroreincludingLAQandothercosts.Inordertoleveragethefundsanddrawtheprivatesectorefficiency,theGOKhasshiftedtheimplementationstrategytoPPPmode.TheContractshaveconcessionperiodof9years.Theprojectentails75%constructiongrantfromADBandthecosttowardstheAnnuity,O&M,LAQ,UtilityshiftingetcisbornebyGOK.TheRoadworksarebeingimplementedwith2yearsofconstructionperiodand7yearsofO&M.Aroadlengthof418kmshasbeentakenupforimprovementunderHybridAnnuityModelinthreepackages.

The details of the roads and the contract packages to be implemented are as below:

Package Project DetailsLength in

Kms.Package1 a) TwoLaningwithPavedShoulderofKollegal toHannurTwo

LaningwithPavedShoulderofKollegaltoHannur,length4.9KmandMadhuvanhallyBy-passfromKm.66.888toKm.85.770ofSH-79,length23.8Kms.

b) TwoLaningwithPavedShoulderofChintamanitoAPBorder,SH-82,Length39.8Kms;and

c) FourLaningofBengaluru(NICERoad)toMagadiofSH-85andTwo Laning with Paved Shoulder of connector from Magadi to NH 75 via Chikkamudigere and Iyandahalli ofMDR, length50.8Kms.

114.4

Package2 Two Laning with Paved Shoulder of Magadi to near Somwarpeth of SH85,excluding the followingcommonsectionswithHuliyurdurgabypassKm76.520 to78.410, commonportionwithSH84betweenKm.88,700 to Km.90.380 and common portion with NH 150A inNagmangalaKm.111.960toKm.113.260.

166

Package3 TwoLaningwithPavedShoulderofGadagtoHonnali(Km105.500toKm.205.290ofSH57andKm.215.335toKm.253.713ofSH26)

138.2

Total 418.6

TheRoadswillbeimprovedtomin.Twolanecarriagewaywith1.5mPavedshoulderand1.0mearthenshoulder on either side with provision for four lane in urban settlement. The reach from Bangalore (NiceRoad)Magadiforalengthof35Kms.willbedevelopedtodividedfourlanecarriageway.Theroadsaredesignedforadesignlifeof20yearswithallgeometriccorrectionsandroadsafetyfeatures.

TheConcessionairesandtheIndependentEngineershavebeenprocured.TheConcessionAgreementfor Package I was signed on 20.02.2019 and agreement for Package II and III were signed on18.01.2019.

TheAppointed date for Package II and Package-III is declared on 12th Feb 2020& 12th March 2020 respectively after fulfilment of conditions precedent and achieving financial closure. The

46

Page 61: Government of Karnataka Public Works, Ports & Inland Water ...

ConcessionaireforPackageIisintheprocessofachievingthefinancialclosureandtheAppointeddateisexpectedtobedeclaredshortly.

Overall Budget and Expenditure (ADB KSHIP II & III)

Rs in Cr

Project Expenditure up to 31-03-2019

Revised Budget for the year

2019-20 (KSHIP II & III)

Expenditure During year

2019-20 (uptoMar,20

Cumulative Expenditure

since inception

KSHIP-II- Rs.2150 cr. 2524.29

398.65*62.61 2586.9

KSHIP-III- Rs.5334 cr. 452.09 145.19 597.28

Total 2976.38 398.65 207.80 3184.18

*Rs.188.66crsurrendered.

Innovative Initiatives under Institutional Development Strategy Action Plan

Apart from improvement of roads, a wide range of reforms have been instituted within the PWD, which aretiedtotheexternalfundingwiththeobjectiveofensuringcapacitybuildingintheDepartmentunder InstitutionalDevelopmentStrategyActionPlan (IDSAP)componentof theProject.This issupported substantially by WB funded KSHIP-II inputs as well as technical assistance from ADB-funded components.

Some of the innovative initiatives introduced through KSHIP are:

1. Revision of Departmental Code,

2. IdentificationofCoreRoadNetwork(CRN)about25,000km

3. CapacityBuildinginRoadSafetyManagement(RSM)andRoadSafetyCell.

4. Safe Corridor Demonstration Program

5. ISO9001:2000andISO14001CertificationforPWDoffices.

6. EstablishmentofPlanningandRoadAssetManagementCentre(PRAMC).

7. Governance&AccountabilityActionPlan(GAAP)andComplainthandlingMechanismand24x7x365PublicResponseCentre

8. StrategicstudyofIT-ICT-MISArchitecture,Facilities&CapacityforPWD

9. Quality Management and Quality Control Capacity enhancement

10. ProjectManagementSoftware(PMS).

11. HRD,E-learningandTraining.

12. Hybrid Annuity Model Contracts.

47

Page 62: Government of Karnataka Public Works, Ports & Inland Water ...

Revised D code for PWD:

ThePublicWorksDepartmentCode (DCode),Volumes I and II, sets out guidelines for officersof the department in respect of administrative and executive functions.The diversified activitiesover the years and the new concepts and innovative approaches have necessitated revision of the DepartmentalCodetoaccommodatethenewdevelopments&inkeepingwiththemanifoldactivitiesof thedepartment.The revisionofDepartmentCode (DCode) isoneof the institutional reformsundertakenthroughtheWorldBankfinancedKarnatakaStateHighwaysImprovementProject-I&II.TherevisedD-CodeisfinalizedinconsultationwithFinanceDepartment,IrrigationDepartment,NationalHighwaysandPublicWorks,Ports&InlandWaterTransportDepartmentSeniorOfficersand issued with the approval of Government. .

Identification of Core Road Network (CRN)

GovernmentofKarnatakahasformulatedtheconceptofaCoreRoadNetwork(CRN)thatencompassesroad links considered important for the economic and social development of the State. The long-term goalofCRNconceptistoimprove40,000km,themostvital20%oftheentireroadnetworkcateringto80%ofthecommercialtraffic.Themedium-termgoalistoimprovea25,000kmofNationalandState Highways.

UnderADBTAgrantforCapacityDevelopmentTechnicalAssistance-1(TA-7324-IND)astudywascarried out to identify the CRN through a set of criteria which include Population centres, transport infrastructure, Industrial parks, development corridors, mining, tourism, agricultural centres and connectivity to taluks and districts.

ThelengthofCoreroadnetworkidentifiedintheStateisasfollows;

Classification Length (km) Category CRN extent

National Highways 4,490.70 NH

24,225.60 km ‘A’Class 9,078.16 SH

‘B’Class 10,656.74SH-9392kmsMDR-2165kms

‘C’Class 50,560.10 MDR -

‘D’Class 147,212.00 VR -

221,997.70

TheproposedCRNhasreceivedtheapprovaloftheGovernmentvideGOdated10-07-2014.

48

Page 63: Government of Karnataka Public Works, Ports & Inland Water ...

Strengthening safety management capacity of PWD:

The major focus of strengthening road safety management capacity of PWD includes advisory support instrengtheningandequippingPWDforeffectiveoperation,maintenanceandprotectionofexistingroads, establishing practices incorporating safety into lifecycle of state roads in a sustainable manner.

Under ADB TA funding program (TASF-Others) a study was undertaken by an internationalconsulting firm with expertise in transport planning, asset management, road safety and trafficmanagement, institutional strengthening of transport sector agencies, and private sector participation. The Consultants have submitted the Final Report.

As part of the recommendations of the Study, the Road Safety Cell has been established under TransportDepartmentvideGovt.Order23-10-2013.TheCellisheadedbyJointCommissionerofTransportandcomprisesofkeystaffvizExecutiveengineer,PWDDept,DeputySuperintendentofPolice,PoliceDept&DeputyDirector,HealthandFamilyWelfareDeptsupportedbyroadsafetyandenforcement specialists.

The Road Safety Cell is coordinating with different stake holding department of the state viz., Transport, Police, PWD, Health, Education, Urban Development, Directorate of MunicipalAdministration,BBMP,RD&PRtoimplementtheroadsafetyinstatewide.

Safe Corridor Demonstration Program (SCDP)

AsapartofRoadSafetyComponentoftheWBfinancedproject,implementationofSafeCorridorDemonstrationProgram(SCDP)hasbeentakenupforSH-20BelgaumtoYeragatti(61.85kms).Thecorridor would serve as demonstration corridor and set as a model road for implementing road safety features on other roads of the State. Under this Program, the following are the activities included:

(a) Improvingtheengineeringconditionsofthecorridors.

(b) Strengtheningtheenforcementalongthecorridorsbyprovidingnecessaryconsultingservicesandequipmentstotrafficpoliceunits.

(c) Enhancingroadsafetyeducation,awarenessfortheroadusers.

(d) Improvingtheemergencymedicalresponsetime.

ISO 9001 and 14001 for PWD offices:

UnderKSHIP1,21officesofPWDhavebeencertifiedtoISO9001-2008.PresentlyGovernmentofKarnatakaisseekingcertificationunderQMSISO9001-2008to60PWP&IWTDepartmentoffices.The Consultancy Services are in advanced stage of progress.

Under theKSHIP-II, theKarnatakaPublicWorksDepartment (KPWD) has obtained ISO14001certificationfor14officesintheState.TheConsultancyserviceiscompletedandthecertificateswereissuedonOctober,2015.

49

Page 64: Government of Karnataka Public Works, Ports & Inland Water ...

Establishment of Planning and Road Asset Management Centre (PRAMC).

The PRAMC is envisaged to be a core planning center for road sector operations of PWD. The Planning and Road Asset Management Centre was established at the PWD Secretariat, by merging the erstwhile IDSCellandITCell.TheUnitWasestablishedvideGONo:PWD:11EAP2011Dated:23-08-2012having51sanctionedpostsheadedbyChiefEngineer.

The PRAMC will take lead responsibility within PWD for roads planning, development and managementaswellasfor‘corporate’PWDwideoperationsandmanagementinthefieldsofIT-ICT-MIS,QualityandTraining/HRD.TheconsultantsM/sEgisInternationalS.A.,France have been mobilized inDec,2012 to lead theprocessof implementationandoperationalisationofPRAMCunderADBfundingoveraperiodofthreeyearsataconsultancycostofRs.25.33crore.TheserviceshavecommencedinFeb,2013andcontinueduptoMarch2019.

Presently,RoaddatacollectionequipmentshavebeenprocuredanddatacollectionforCRNroadsis on going for preparation of Annual works Program and budget for maintenance works through KarnatakaRoadAssetManagementSystem(KRAMS)andHDM4software.

Governance and Accountability Action Plan (GAAP):

Under WB funded project, KSHIP has taken several initiatives as part of GAAP, to improve its governance structure and ability to implement the project effectively and transparently especially in the areas of Disclosure and Complaint Handling System. The GAAP is designed to improve procedures and capacity for better governance and create a forum for public participation during the implementationoftheproject.Aspartofthisexercise,KSHIPhasundertakensuomotodisclosureof theprojectdocuments inKSHIPwebsiteofwww.kship.inas requiredunderRTIActandhasestablished a Complaint Handling Cell to handle and oversee all the complaints.

Strategic study of IT-ICT-MIS Architecture, Facilities & Capacity for PWD:

OverallobjectiveoftheconsultancyservicesistohelptheKPWDtodevelopandbeginimplementinga comprehensive and viable medium-to-longer term IT-ICT-MIS Strategy, inclusive of phased roll-out plan(s) covering all design, development and commissioning / implementation stages undertheproposedStrategy.Theconsultantsareexpectedtoidentifyinitiativesandinvestmentswhich-buildingontheachievementsandbenefitsofthestate-wideinitiationofe-governancearecompatiblewithcurrentGOKpolicyontheroleofITinGOKagenciesandfacilitateanIT-ICTorientedwork-culture within KPWD. The consultancy services is awarded to M/s Wipro Ltd. The Consultant has submitted the As-Is Report, Strategy Report, RFP and Change Management Plan. The Govt has issuedaGOdated22-09-2017forPRAMCtocontinuethefurtherimplementationoftheITICTMISservices to PWD.

50

Page 65: Government of Karnataka Public Works, Ports & Inland Water ...

Quality Management and Quality Control Capacity enhancement:

TheoverallobjectiveisachievingeffectiveandsustainableKPWP&IWTDcapacityforperformanceoftheQualityprocessesrequiredtoensureconformanceofworksandresultingassestswithapplicablerequirements.This shall include advisingon and facilitatingQM/QCplanning, assisting in stafftraining, on the job guidance and support, providing supervision, monitoring and review of selected QC activities, and establishing/ updating policy and technical documentation and user manuals for theKPWP&IWTD'svariousQM/QCrequirements.

The consultancy services has been procured and is in progress.

Along with this process, action was initiated for procurement of Quality Assurance and Quality Control equipments(549nos.)forthevariousQualitycontrolDivisionsandsubdivisionsofKPWDatanestimatedcostofRs.12crore.Theequipmentshavebeenprocuredandinstallationissubstantiallycompleted.

Project Management Software (PMS):

In the World Bank Project Agreement Document, it is agreed to have an web based project activity monitoring and reporting system on pilot basis in PWD Department. The software has been procured under permanent ownership basis and can be used for the future projects of KSHIP, KRDCL and PWD.

The ProjectManagement Software (PMS) enables project stakeholders to view andmonitor theprojectprogressonlineatanytimeduringexecutionoftheprojectthroughDashboardintermsoftime,money,quality,constraint,compliance,projectvisualsandgeneratetherespectivereports.Theclient is able to monitor the progress, mile stone wise, area wise, activity wise with details about financialprogressandqualityparameterscontributingtobettermanagementoftheproject.

HRD, E-learning and Training:

KPWP&IWTDrecognizestheneedforitspersonneltoconstantlyincreasetheirskillstostayahead.AspartoftheLoanAgreementwithWorldBank,ithasbeenagreedforEnhancingtheCapabilityoftheKPWP&IWTDpersonnelbyprovidingHighImpactTrainingProgrammes.Aspartofthis,aproposaltosetuptheElectronicLearning(E–Learning)andHigh-ImpacttrainingprogrammesforKPWD&IWTDpersonnelhasbeeninadvancedstage.PRAMCisleadingthisinitiativeandsuitabletraining modules are being worked out.

51

Page 66: Government of Karnataka Public Works, Ports & Inland Water ...

52

Page 67: Government of Karnataka Public Works, Ports & Inland Water ...

53

KSHIP II WORLD BANK PROJECT ROADS

WAP1: Malavalli to Pavagada

WAP2: Mudhol to Nippani

WAP1: Malavalli to Pavagada

WAP2: Mudhol to Nippani

Page 68: Government of Karnataka Public Works, Ports & Inland Water ...

54

WEP-1: Hoskote to Chintamani

WEP-2B: Hangal to Tadasa

WEP-4: Tinthini to Devadurga

WEP-2A: Haveri to Hangal

WEP-3: Dharwad to Saundatti

WEAP-3A: Shimoga – Shikaripura-Anandapuram

Page 69: Government of Karnataka Public Works, Ports & Inland Water ...

55

AEP-1: Up gradation of Road from Magadi - Koratagere

AEP-5: Padubidri (Km.0+000) to Karkala (Km.27+800)

AEP-8: Upgradation of Road from Mudgal to Gangavathi

AEP-2: Pavagada (Km.0+000) to AP Border (Km.23+210)

AEP 7: Up gradation of Road from Shelavadi to Mundargi

AEP-9 B: Ramdurga to Badami

KSHIP II ASIAN DEVELOPMENT BANK PROJECT ROADS

Page 70: Government of Karnataka Public Works, Ports & Inland Water ...

56

AEP-9 C: Badami Bypas junction to Pattadakallu

ROB-3: with approaches On Gadag bypass

AEP-3A: Gubbi to Beeragondanahalli near Yediyur

Page 71: Government of Karnataka Public Works, Ports & Inland Water ...

ROB-4: with approaches on Ramdurga - Badami road

SCDP : Yarazaravi Junction

57

Page 72: Government of Karnataka Public Works, Ports & Inland Water ...
Page 73: Government of Karnataka Public Works, Ports & Inland Water ...

CHAPTER- 6

PLANNING AND ROAD ASSET MANGEMENT CENTER (PRAMC)

6.1 Overview of PRAMC:

A joint mission ofADB andWorld Bank in June 2010 held extensive discussions withPWDandagreeduponanInstitutionalDevelopmentandStrategyActionPlan(IDSAP)asthe basic framework to be complied with one of the principal features of the IDSAP is the establishmentofaPlanningandRoadAssetManagementCentre(PRAMC)inPWDthatwillbe responsible for all planning and programming functions related to road sector development and maintenance of road assets.

ThePlanningandRoadAssetManagementCentre(PRAMC)isestablishedatPWDleveltofunction as ‘Sector Apex Body’ for Road Sector Policy Development, Planning, Programming, RoadSafetyEngineering,InformationTechnologySupportandTrainingSupportacrosswholeofPWD,PlanningandAssetManagementmattersanddefiningtherevisedroleofKarnatakaStateHighways,TrafficandTransportAuthority(KSHTTA) as the nodal agency is one of theactionsrequiredfortheloanAppraisalasperthedraftAidMemoireoftheWorldBankpreparationmission(October10-22,2010).

Morespecifically,thefollowingaretheprinciplefunctionsofthePRAMC:

■ To work as a nodal unit for the Planning, Budgeting and Programming of Roads in Karnataka under the jurisdiction of PWD.

■ Improve planning and decision-making processes of the PWD.

■ Make efficient and effective use of Information Technology, and ensure integration of IT systems across PWD

■ Improve the Human resource capacity by training and capacity development in the Department through training.

■ Implementation of the Pavement Management System

■ To constantly update and maintain Road Information System, Progress Monitoring SystemandOtherInformationSystem

■ And any other task delegated from time to time.

The main task of the PRAMC is the preparation of the Annual Works Programme for the Core RoadNetwork(CRN).ThePRAMChassubmittedtheAnnualworksprogramfortheyear2016-17,2017-18,2018-19and2019-20basedonthedatacollectedfromRCDCV,FWDandBIVandprocessingthedatathroughKRAMSandHDM-4.

58

Page 74: Government of Karnataka Public Works, Ports & Inland Water ...

M/s SATRA Infrastructure Management Services Pvt. Ltd., has been selected as the Consultants to provide consultancy services to support the PRAMC in processing the data through KRAMS andHDM-4.M/sSATRAInfrastructureManagementServicesPvt.Ltd.,havemobilizedtheirteamofexpertsandcommencedtheconsultancywork.

Sub Units of PRAMC

I. Policy Planning Unit

II. Programming Unit

III. Road Safety Unit

IV. InformationTechnologyUnit

V. TrainingUnit.

The procurement of the equipments and Software required for the operationalization iscompleted and handed over to the consultants for the data collection. A brief description of the equipmentsprocuredisexplainedinthefollowingparas.

1. The Road Condition Data Collection Vehicle (RCDCV):-

TheRCDCVknownas“ROMDAS”(RoadMeasurementandDataAcquisitionSystem) isdeployed by the department to collect theRoad condition in a scientificmanner, to assistthe planning process to provide an increased level of service to the road users. The laser technologybasedequipmentwillbeusedtocollecttheroadconditionanddistresssuchasInternationalRoughnessIndex(IRI),Rutting,Ravelling,Potholingandotherparameterstoassist in the planning process. The collection of the data for the entire Core Road Network and establish a Road Asset Management System to undertake a systematic process of maintaining and upgrading RoadAssets, by adopting the best Engineering practices, sound businessprinciplesandtoolstofacilitatedecisionmakingtoachievethepublic’sexpectations.

59

Page 75: Government of Karnataka Public Works, Ports & Inland Water ...

2. Falling Weight Deflectometer (FWD):-

FallingWeightDeflectometer (FWD) isanon-destructive testing (NDT)andnon-intrusivedevice. FWD generates a load pulse by dropping a weight and is a device designed to simulate deflectionofapavementsurfacecausedsimulates traffic loading.This typedofequipmentis one of its kinds in India. The equipment will be used to evaluate pavement structuralcapacity, layer condition assessment for designing the overlays and rehabilitation designs for improvementoftheroadsbasedontherelevantIRCCodes.TheFallingWeightDeflectometeris the world standard dynamic plate bearing test for the non-destructive testing of the structural capacityofflexiblepavement.

3. Ground Penetration Radar (GPR):-

GroundPenetratingRadar(GPR)isaGeophysicalInstrumentthatusesradarpulsestoimagethesub-surfaceanddetectsthereflectedsignalsfromsubsurfacestructureswithoutmodifyingthephysicalproperties.GroundPenetratingRadar isaquick,non-destructiveandeffectiveway to determine pavement layer thickness. GPR can evaluate base and sub-base layers with data collection densities not obtainable by traditional labour-intensive methods, such as coring. Itsmainadvantageisthatitprovidescontinuousprofileoftheroadstructure.UsingtheGPRthe underground utilities can also be detected.

60

Page 76: Government of Karnataka Public Works, Ports & Inland Water ...

ThedatacollectionfortheCRNRoadsusingtheseequipmentswillbeutilizedinthepreparationoftheAnnualWorksProgram(AWP)throughtheKarnatakaRoadAssetManagementSystem(KRAMS)andHDM-4, software. TheAnnualWorksProgramme for theyear2019-20 issubmitted to the Government and the respective zones for considering to propose works in the budgetfor2020-21.

Road Safety Unit:

The Karnataka state is witnessing an increase in the fatalities due to the Road accidents over the years. The Accident statistics in the state of Karnataka in the previous years is as shown below.

Sl. No

Year Accidents Deaths Injuries

1 2010 46,250 9,590 61,7742 2011 44,731 8,971 59,5913 2012 44,448 9,448 58,6594 2013 44,020 10,046 56,7815 2014 43,713 10,452 56,8316 2015 44,011 10,856 56,9717 2016 44,403 11,133 54,5568 2017 42,542 10,609 52,9619 2018 41,707 10,093 51,56210 2019 40,658 10,958 50,447

TheHon’bleSupremeCourthasconstitutedacommitteei.e.“SupremeCourtCommitteeonRoadSafety(SCCRS)”tooverseetheRoadSafetyrelatedaspectsinthecountryvideG.O.dated30-5-2014.ThisCommitteewillmonitortheRoadSafetyactivitiesacrossthecountry.The Committee on Road Safety has directed the State Government to take up measures to improve accident prone locations in the State and also directed that, a time bound programme maybepreparedtorectifyalltheblackspotsidentified.TheCommitteehasbeenconstantlydirecting the State to prepare Annual Calendar/Protocol for treating black spots.

As per the directions of the Supreme Court Committee on Road Safety the Government ofKarnataka has formulated “KarnatakaRoadSafetyPolicy” videOrder no. SARIE/103/SAEPA/2015dated21/09/2015,whichwillactasaguidetotheconcernedstakeholdersandtothepublicwiththe(a)Vision to provide safe road network for all road users, with priority topedestriansandcyclists,toachievezeroroadaccidentsinthelongrunand(b)Mission to reduceaccidentsby25%andfatalitiesby30%by2020.

61

Page 77: Government of Karnataka Public Works, Ports & Inland Water ...

As per the directions and recommendations of SCCRS, the Government of Karnataka framed aStandardOperatingProcedure(SOP)andhasdesignedaprotocolforidentificationofblackspot,preparationoftimeboundActionPlanforimplementingtherectificationmeasure,VideG.O. No. PWD:42:EAP:2017, Bengaluru, dt:4-4-2017.As per the protocol issued by theGovernment, PRAMC shall collect the data of blackspots from Road Safety Cell and shall scrutinize all the data, assign unique codes to the black spots and shall initiate long-termremedial measures for mitigating the blackspots.

The Government of Karnataka has constituted Road Safety Authority under ‘The Karnataka State Road Safety Authority Act, 2017’ vide Notification No. SAMVYASHAE:35:SHASANA:2017,Bengaluru,dt:7-12-2017fortheimplementationofRoadSafetyProgrammesand the establishment of road Safety fund in the State of Karnataka and for matters connected therewith and incidental thereto.

Further, as per the directions of SCCRS, in order to control the road accidents and fatalities occurring on State Highways and major District Roads of the State and to mitigate the accident Blackspots,Govt. ofKarnataka videG.O.No. PWD:190:EAP:2018,BengaluruDt:12-10-2018, has directed ‘Planning and RoadAssetManagement Centre (PRAMC)’ to work as‘PermanentRoadSafetyCell’underPWD.AsperthisG.O,theRoadSafetycellshallfunctionunderthechairmanshipoftheEngineer-in-Chief,PRAMC.

Road Safety Activities under PRAMC:

RoadSafetyCellhasgiventhelistof942blackspotsinKarnatakastate,outofwhich216black spots belong to Public Works Department.

NumberofBlackspotsRectified - 38

NumberofBlackspotsinprogress - 54

NumberofBlackspotsforwhich - 48 tenders are being processed

Numberofblackspotsyettoberectified - 76

The PWP&IWTD, Govt. of Karnataka has created a separate Head of Account for therectification of blackspotsi.e., “3054-03-337-0-07-200” for “State Highway- RoadsafetyMaintenanceExpenditure” and“3054-04-337-1-13-200” for “MajorDistrictRoads -RoadsafetyMaintenance Expenditure”.Also, a separate Head ofAccount for the Road Safetyworks andBarricading forTankbunds is 5054-05-334-4-02-154 in the year 2019-20.TheRoadSafetyworksforrectificationofblackspotsareidentifiedbasedontheblackspotdatacollected by the Police Department and the Karnataka State Road Safety Authority.

62

Page 78: Government of Karnataka Public Works, Ports & Inland Water ...

During theyear2019-20, theGovernmenthas allocated agrant ofRs.325.00Croresunderwhich208RoadSafetyWorkshavebeentakenupbyRoadSafetyUnitofPRAMCwhichhasbeenexclusivelycreatedfortakinguptheRoadSafetyactivitiesinascientificmanner.

Table6.1presentsfundsprovidedforSH,MDRroadsunder3054headandRoadsafetyworksandBarricadingforTankBundsunder5054headduring2019-20,

Table - 6.1

Financial Progress of SH, MDR road sand Tank Bund sunder Road Safety Programme during 2019-20

Sl. No

Head of AccountScheme Name

Grant Allocated (in lakhs)

Expenditure (in lakhs)

1 3054-03-337-0-07-200 SH 15000.00 11249.99

2 3054-04-337-1-13-200 MDR 12500.00 9364.00

3 5054-05-334-4-02-154 Tank Bund 5000.00 0.00

Total 32500.00 20613.99

63

Page 79: Government of Karnataka Public Works, Ports & Inland Water ...

CHAPTER- 7

STATE HIGHWAY DEVELOPMENT PROJECT (SHDP)Overview of State Highway Development Project

7.1 Scheme:

TheStateGovernmenthasapprovedaschemetoimprovetheexisting10500kmlengthofStateRoad.ThisisaMajorInitiativeofGovernmentofKarnataka(GoK)forimprovementsofRoadnetworkwhollyfinancedbytheStateGovernmenttobecompletedintwoyears.Formonitoring of the Project, a Project Implementation unit has been created in state Government OrderNo:PWD45EAP2011Bangaloredated:04.11.2011.

The project Implementation unit-State Highway Development Project in the Karnataka Public Works,Ports&InlandWaterTransportDepartmenthasenvisagedaprogramtocompletethescheme within the stipulated period.

7.2 Highlights:

1. TheEmpower committeeunder the chairmanshipof the chiefSecretarywill lookafter the selection of roads, Administrative approval and Finalization of tenders.

2. TheStateHighwayDevelopmentworksareimplementedonProjectmode.

3. FormonitoringoftheProjectaProjectImplementationunithasbeencreatedinstateGovernmentOrderNo:PWD45EAP2011Bangaloredated:04.11.2011.

4. Improvement/ Renewalworks for Roads connectingDistrict to District, Taluk toTaluk on Priority is being taken up

5. ForpropermonitoringoftheProject

(i) ProjectManagementConsultantsareengaged.

(ii) TechnicalCommitteeunderthechairmanshipofSecretary,PWDisformed.

(iii) Tender Approving Authority under the chairmanship of Additional ChiefSecretary,Publicwork,Ports&InlandWaterTransportDepartmentandProjectSteering committee is formed.

7.3 Details of the Scheme:

1. Approval has been accorded to take up 7254 km length of road at a cost ofRs.2797.00crore(Improvementsof4132.64kmatacostofRs.2192.66croreandrenewalsof3121.76kmatacostofRs.604.61crore)by theEmpowercommitteeinthemeetingheldon16.11.2011&workshavebeenimplementedintwophases (Phase1&Phase2).

64

Page 80: Government of Karnataka Public Works, Ports & Inland Water ...

2. Furtherinthestatecabinetmeetingheldon28-12-2015approvalhasbeenaccordedtotakeuproadlengthof4315.00KmunderPhase3atacostofRs.3500Crorein127Packages(2795KmStateHighwayatacostofRs2710Crore&1520KmMDR'satacostofRs.790.00Crore).

3. SHDPPhasew4Workshavebeenapproved fora lengthof 3692Km(1460KmSH&2232KmMDR)atacostofRs.4500CrorevideGovernmentordernoPWDEAP(p1)Bangalore,Dated:16-02-2019.

Phase-I

1. Theworksaretakenupin66Packages.AdministrativeApprovalhasbeenaccordedin State Government order No.PWD 45 EAP 2012, Bangalore, Dt: 09.05.2012andNo.PWD121EAP2012Dt:19-11-2012.Alengthof3567kmisplannedtobedevelopedatacostofRs.1439.00croreunderthese66Packages(Improvementsto2110kmandRenewalsinalengthof1457km).

2. Allthepackagesareentrustedontenderbasisand100%oftheworksarecompleted.

3. Totally3403.66kmofroadlengthhasbeenimprovedatacostof1684.09crore

Phase-II

1. Theworksaretakenupin70Packages.AdministrativeApprovalhasbeenaccordedinStateGovernmentorderNo.PWD107EAP2012,Bangalore,Dt:19.05.2013Alengthof3745isplannedtobedevelopedatacostofRs.1498.90croreunderthese70Packages(Improvementsworksto2188kmandRenewalsworksto1557km).

2. Tendersforallpackageshavebeenapprovedand100%oftheworksarecompleted.

3. Totally3136.06kmofroadlengthhasbeenimprovedatacostof1859.92crore

Phase-III

1. Fortheyear2015-16alengthof4315.00KmatacostofRs.3500of127Packages(2795KmStateHighwayatacostofRs2710Crore&1520KmMDR'satacostofRs.790.00Crore)hasbeenAdministrativelySanctionedvideGovtOrderPWD183EAP/2014Dated:30-12-2015.Outofall127Packages123Packagesarecompleted,remaining04PackagesareunderProgress.

2. Remaining44.38KmofRoadLengthwillbeCompletedbyJanuary2020.

Phase-IV

SHDPPhasew4Workshavebeenapprovedforalengthof3692Km(1460KmSH&2232KmMDR)atacostofRs.4500CrorevideGovernmentordernoPWDEAP(p1)Bangalore,Dated:16-02-2019.

DuringtheYear2019-20alengthof867.97KmisCompletedandtheremainingWorksareUnder Progress.

65

Page 81: Government of Karnataka Public Works, Ports & Inland Water ...

Table: 7.1

SHDP Physical & Financial Achievements

Year

Physical Progress (in Kms) Financial Progress (in Crores)Ph-I Ph-II Ph-III Ph-IV Total Ph-I Ph-II Ph-III Ph-IV Total

2012-13upto31-03-2013

1438 0 0.00 0.00 1438.00 519.56 0 0.00 0.00 519.56

2013-14upto31-03-2014

1391 805 0.00 0.00 2196.00 770.58 329.42 0.00 0.00 1100.00

2014-15upto31-03-2015

425.85 1526.02 0.00 0.00 1951.87 219 799.34 0.00 0.00 1018.34

2015-16upto31-03-2016

145.77 788.31 0.00 0.00 934.08 156.97 693.03 0.00 0.00 850.00

2016-17upto31-03-2017

3.05 16.93 1975.36 0.00 1995.34 7.23 26.91 1193.79 0.00 1227.93

2017-18upto31-03-2018

0.00 0.00 1394.45 0.00 1394.45 0.58 3.66 1725.76 0.00 1730.00

2018-19upto31.03.2019

0.00 0.00 297.11 0.00 297.11 9.07 3.62 687.3 0.00 699.99

2019-20upto31.03.2020

0.00 0.00 108.32 867.97 976.29 0.00 4.57 213.23 282.20 500.00

TOTAL:- 3403.7 3136.3 3775.2 867.97 11183 1683 1860.6 3820.1 282.20 7645.8

7.4 Project Management System Software (PMS)

For comprehensive monitoring of the Project Monitoring System, software has been developed and installed in the department. The software is developed on dotnet frame work and installed in the Project Monitoring Server. In this Project Management System, Monitoring, Quality control and Contract administration are the main Modules and through these modules, the Project activities, daily activities and photographs, Quality control tests can be uploaded through mobile application. The Project Monitoring System being adopted has won National Awardforimplementationofe-Governanceintitiativesfortheyear2013-14bytheDepartmentofAdministrativeReforms&PublicGrievances,GovernmentofIndia.

Achievements:

1. TheGovernmentofIndiahasconferredGOLD National Award under e-Governance to the State Highway Development Project for "Cat-VII-Innovative use of Mobile Technology in e-Governance" on 30-01-2015 in Gandhinagar, Gujarat by the Hon’bleChiefMinister,GovtofGujarat.

2. India’sBestGovernanceProjectforMinimumGovernment,MaximumGovernancehas conferred to the State Highway Development Project for SKOTCH ORDER OF MERIT AWARD.

66

Page 82: Government of Karnataka Public Works, Ports & Inland Water ...
Page 83: Government of Karnataka Public Works, Ports & Inland Water ...

CHAPTER- 8

INSTITUTIONAL DEVELOPMENT IN PWP&IWTD

8.1 Background:

InstitutionalDevelopment inPWP&IWTDwasgivenamajor impetuswith theoncomingof theKarnatakaStateHighways ImprovementProject (KSHIP); as apre-cursor towhichan InstitutionalDevelopmentStrategyStudywasundertaken in2000-01.TheGovernmenton15-03-2001approvedtherecommendationsoftheStudy.TheDepartmenthassincethenbeen undergoing major Institutional Development. The Institutional Strengthening of the Departmentconsistsoffollowing6components:

■ RegulatoryContext

■ Organization&Management

■ Financial Mechanisms

■ Core Processes

■ Information Systems

■ Human Resources

8.2 Road Safety:

KPWP&IWTDmandateduseof“ManualforSafetyinRoadDesignson15-03-2004.TwoTrafficCellswerecreatedon24-10-2002intheOfficesoftheChiefEngineers,C&B(South&Northzones)withawiderangeofdutiespertainingtotraffic&roadsafety.BlackspotsonPWP&IWTDroadswere improvedaspartofKSHIP roadsafetycomponent.ThiswasthefirstsuchspecificblackspotimprovementworkinPWP&IWTD.Furthersuchworksareenvisaged. A road safety Unit is established in PRAMC which is looking after the Road Safety issues in the state.

8.3 Information Technology:

AnInformationTechnologyCellwasestablishedinPWP&IWTDwhichisnowbroughtunderthe PRAMC. The GIS based RIS is continuing to be updated with the latest information. PWP&IWTDwascomputerizeduptotheDivisionlevel.Manynewapplicationshavebeeninitialized such as Project / Progress Monitoring System, Karnataka Road Information System to have a database of the history of the roads in the State.

8.4 E-Procurement

All theworkscostingmorethanRs.5.00lakharebeingundertakenthroughe-procurementprocessaspernotificationNo.DPAR2e-proc2009,dated:09.10.2012andinaccordancewith

67

Page 84: Government of Karnataka Public Works, Ports & Inland Water ...

the Karnataka Transparency in Public Procurement Act and Rules. This being a complete onlineprocess,alltheprocesseslikereceiptoftender,preparationofworks,approvalrequiredaspernecessity,receiptofEarnestMoneyDepositetc.,shallbedonethroughtheonline.

8.5 Uploading the progress and achievement report of the department in the website of the department

In the website of the department, all information about the department, important documents, government orders and progress reports have been uploaded after computerization. Moreover, organizational set-up details of the department, plans, road network, right to information act, tenders, appointment, communication details, information of allotted residential houses of the PublicWorksDepartmentcanbeseeninwebsite(www.kpwd.co.in).

8.6 Web based progress monitoring system

Awebbasedprogressmonitoringsystemisadopted in thedepartment. All theofficersofPWD are given log-in to the system. Details of works taken up by the department are uploaded inthesystem.Thephysicalprogressandfinancialprogressareuploadedregularlyandthesystemisefficientlybeingusedasamonitoringtool.

8.7 Road Condition Survey

Since2001,theRoadConditionSurveyisbeingconductedannuallybyusingthesystemofROMDAS(RoadMeasurementandDataAcquisitionSystem).Throughthissurvey,kilometerwise IRI value of the roads is collected, so that the information of surface roughness, real condition and visual inspection of the roads is being adopted in the Road information system.

8.8 Road Information System(RIS)

Road Information System is developed on the basis of Geographical Information System. Road Information System provides information on roads communication and condition of the roads. The details of length of the roads, width and surface etc., of the roads, cause way drainagesandbridgesdetailsareavailable.Thedetailsoftheroadsupgradedandthefinancialdetails on development of roads under various schemes during the past four years are being updated.

8.9 Toll Policy

Karnataka Toll rules are implemented in the state and approval habe been accorded to collect the toll feeon19StateHighways covering a lengthof1530KmsdevelopedbyKRDCL/KSHIPvideG.O.No.PWD118EAP2016dated31.03.2017.

68

Page 85: Government of Karnataka Public Works, Ports & Inland Water ...

8.10 Road user’s survey & opinion

ForthefirsttimedetailedsurveyonRoaduser’sopinionwasconductedduringtheyear2002andlikewisesecondtimewasconductedduringJanuary2001&thirdtimeduringOctober2007andopinionoftheusershasbeenstudied.

8.11 Vehicles Traffic Census

Since1956modelTrafficVehiclesurveyoftwodaysisbeingconductedeveryyearandfullfledgedTrafficVehiclecensusofsevendaysisbeingconductedonceineveryfiveyear.Basedon thisVehicleTrafficSurvey/Census, the road improvementworkswillbeundertakenonprioritybasis. AsevendaysTrafficCensuswasconductedduring2014-15andintheyear2019-20.VehicleTrafficSurveywillbeconductedeveryyearbetweenthecensusyear.Closecircuit cameras were installed and used in few count posts as a pilot project.

8.12 No splitting up of Tender works

Government Circular issued prohibiting the splitting of one work into piece works vide PWD 243EAP2011,dated14.03.2011andNo.PWDIFA2013dated:16.01.2013andincaseofmore works to be taken in different chainages in the same road, instructions were issued to call for the tender in package.

8.13 Road Upgradation proposal approving committee

CommitteeheadedbytheSecretary,PublicWorksDepartmentalongwiththeChiefEngineersandRepresentativesfromFinanceDepartmentaspertheG.O.No.PWD374CRM2007,dated:26.05.2009wasformedtoimplementthesystematicappraisalofupgradationofRuralRoadsand Major District Roads and make decisions of upgradations.

8.14 Public works Vigilance Force:

Work Monitoring Cell headed by Executive Engineer at Secretariat was established foreffective utilization of funds provided to the department and to avoid misappropriations. This cellhasbeenmergedwithnewlycreatedVigilanceCell. VigilanceCell isnowheadedbyExecutiveEngineerandrequiredpostshavebeencreatedandtiisdirectlyfunctioningunderGovernmentforverificationofcomplaintsatGovernment.

8.15 Department Code (D-code)

TherevisionofDepartmentCode(DCode)isoneoftheinstitutionalreformsundertakenasdesired by the world bank in its country procurement report. The D-Code has been revised keeping in line with the latest development in technology and procurement procedure. The revisedcodehascomeintoforcew.e.f16.10.2014.

69

Page 86: Government of Karnataka Public Works, Ports & Inland Water ...

8.16 Revision of Department Accounts Code (A-Code)

Since the Department Code has been revised, there is a necessity to revise ‘A-Code’incorporatingtheprovisionsasperrevisedD-Codeandinviewoflatestdelegationoffinancialpower, e-procurement and e-tender. This task has been entrusted to Karnataka Institute of Public Auditors.

8.17 Training Activities

Duringtheyear2019-20,485EngineersandOfficers/staffoftheDepartmentaretrainedinvarious disciplines at reputed institutions.

8.18 Ease of doing Business

Underthe“MakeinIndia”programmesponsored“EaseofdoingBusiness”,theservicesforpermission for Road Cutting on State Highways and Major District Roads and permission in Right of Way are made online.

8.19 Sakala

AsperthecommitmentofthedepartmentintheCitizenCharter,34publicservicesareincludeduder Sakala.

i. TheprovisionmadetogiveclearancetotheRoadcuttingpermissionwithin7daysforroads coming under Public Works Department.

ii. The provision made to give clearance to the Buildings Construction permission and advertisementboardpermissionalongNH,SH&MDRroadscomingunderPublicWorksDepartment.

iii. Issue of Building condition/fitness certificate after receipt of application in completemanner–Timelimitfordisposalbythedesignatedofficer–20workingdays.

iv. PrivateBuildingrentfixationafterreceiptofapplicationincompletemanner–Timelimitdisposalbythedesignatedofficer–15workingdays.

v. Government / Private building valuation after receipt of application in complete manner –Timelimitfordisposalbythedesignatedofficer–15workingdays.

Action is being taken to make provision for uploading Sakala application online in the Department website.

8.20 Major Stake Holders of PWP&IWTD roads in Karnataka

Truck operators, Bus operators and other Transport vehicle operators are the Stake holders. Cement, Bitumen andSteelmanufacturers,BuildingsofallPublicOffices,Forestdepartmentfor providing wood, Quarey owners, manufacturers of other construction materials, manufacturersofbridgebearingsandconstructionequipmentmanufacturersandlabourworkforce.

70

Page 87: Government of Karnataka Public Works, Ports & Inland Water ...

CHAPTER- 9

DEPARTMENT OF ARCHITECTURE

9.1 INTRODUCTION:

TheDepartmentofArchitectureisfunctioningasanindependentDepartmentsince30.10.1986.The main objective of the Department is to furnish Architectural Design Drawings for buildings of various Government Departments through out the State of Karnataka. Architectural Design Drawings are prepared based on the requirements furnished by the userDepartments, sitecondition and other prescribed standards and norms.

TheDepartmentalsofurnishesArchitecturalDrawingstoQuasi-GovernmentOrganisations,Autonomous Bodies, Boards, Development Authorities, like Bangalore Development Authority,Corporations,Municipalitiesetc.,onrequestaftercollectingArchitectsFeeasperGovernment order.

Whenever a request forArchitectural design is received from the user department or anEngineeringDepartment,theconcernedteamofArchitectsmakesathoroughstudyofalltheaspects of building design. The approach to any project is highly professional and creative in nature.All requests, whether they are new proposals / alterations and additions to theexistingbuilding/ongoingworks,arealldealtwithequalimportance,givingutmostprioritytobudgetedworks.ThisofficeiscommittedinissuingthenecessaryArchitecturaldrawingsin time, based on the stage of the project. For e.g. schematic drawings for Administrative sanctionordetaileddrawingsfortechnicalsanctionorworkingdrawingsforexecution.TheDepartment undertakes periodical inspections of building projects which are under constructionatvariousplacesinordertosolvetheproblemsencounteredbythesiteEngineersatthetimeofexecutionandtoseethattheworksareexecutedinaccordancewiththedrawingsfurnished by this Department.

In addition to Architectural Design Drawings, the Department also furnishes detailed working drawings,joinerydetails,InteriorsandserviceslikeElectrical,plumbingandSanitaryetc.,whichareessentialforexecutingthebuildingprojects.

ListofProjectscostingmorethanRs.OnecroreforwhichArchitecturaldrawingshavebeenprepared and furnished during the year under report is enclosed.

71

Page 88: Government of Karnataka Public Works, Ports & Inland Water ...

9.2 ADMINISTRATION:

CentralofficeoftheDepartmentofArchitectureisfunctioningatBangalore.SmtK.N.SavithrihasworkedasChiefArchitectfrom01.11.2016to31.05.2019.From01.06.2019to21.09.2019Sri.K.Mohan was under additional charge of the post of Chief Architect and transferred on 21.09.2019.Thenfrom21.09.201931.03.2020SmtB.Lakhmiwasunderadditionalchargeof the post of Chief Architect. Presently Sri.Hemanthkumar is under additional charge of the post of Chief Architect and under his guidance Deputy Chief Architects, Deputy Architects, Senior Assistant Architects and other Technical staff have prepared Architectural drawings. ChiefArchitectandotherOfficersoftheDepartmenthaveundertakensitevisitstomostoftheprojects during construction at various stages.

This Department has a Computer Wing and Computers are being used for preparing Architectural Design Drawings and also for Administration purpose.

9.3 FINANCIAL:

No Architects fee is collected for designing Government buildings. However, Architects fee asperGovernmentordercollectedincaseofQuasi-GovernmentOrganisations,Corporations,andZ.P.Works,etc.,

9.4 PROGRAMME/PROGRESS:

ThemainaimofthisDepartmentistoprovideveryefficient,economicalanduser-friendlydesignsbasedontherequirementsoftheUserDepartments.

There is need for reviewing Cadre and Recruitment Rules of this Department and necessary steps have already been initiated in this regard.

During the year under report, the Department has prepared and furnished about 704Architectural Design Drawings to various Government building projects estimated around Rs. 1039 .00 Crores.

SUMMARY/ CONCLUSION:

With better coordination from user Departments and the Public Works Department, this Department can function more efficiently and provide better designs in terms of usage,economy and aesthetics and necessary working drawings and detailed drawings for services etc., can also is given in time.

72

Page 89: Government of Karnataka Public Works, Ports & Inland Water ...

73

Page 90: Government of Karnataka Public Works, Ports & Inland Water ...
Page 91: Government of Karnataka Public Works, Ports & Inland Water ...

CHAPTER - 10

BUILDINGS

10.1 PublicWorks, Ports& InlandWaterTransportDepartment is responsible for constructionand maintenance of government buildings. While it has its own budget for construction and maintenance of buildings. It also undertakes construction on behalf of other Departments/local bodies under the Deposit Contribution Works.

Broadly,buildingsunderPWP&IWTDfallundertwocategoriesviz.,Nonresidentialbuildingsandresidentialbuildings.Thefirstcategorycoversofficebuildings,commercialcomplexes,colleges,hospitals,libraries,etc.Residentialbuildingsincludequartersandhostels.

Whileminorworksareundertakenunderthebudgetheads2059and2216,majorassetcreationworksaretakenupunderthebudgetheads4059and4216capitaloutlay.Inaddition,thereare building programmes under the budget heads of other government Departments, for which budget provision is made under the respective budget heads.

PWP&IWTDundertakes twokinds of repairs formaintenance of buildings, viz., ordinaryrepairsandspecialrepairs.Ordinaryrepairsarecarriedoutannuallyandincludeactivitieslikewhite washing, colour washing, repairs of patches, replacement of small broken parts, painting ofdoors,etc.Specialrepairsarelessfrequentandincluderepairstothedamagedportionsofthebuilding,floors,doorsandwindowsandreplacementofwatersupplyandsanitaryfittings.

MajorbuildingsunderthepurviewofPublicWorksPorts&InlandWaterTransportDepartmentinNorth,NorthEast&SouthZonesarelistedinAnnexuresII,III&IV.

10.2 Budget: 2019-20

Fortheyear2019-20,totalbudgetprovisionforbothcategoriesofbuildings(residentialandinstitutional / commercial) was Rs.770.30 crore. Details of budget provision are given in Table10.1.

74

Page 92: Government of Karnataka Public Works, Ports & Inland Water ...

Table 10.1

Financial Allocation of Building Works under PWP&IWTD Budget for the Year 2019-20

(Rs.inlakh)

Head of Account Head of Development Target Achievement

1 2 3 4

2059-80-053-4-00-200Repair/Maintenanceofland&Buildings of different departments

26730.43 24787.56

2059-80-800-0-06-051 Sand Mining-Administration 500.00 452.25

2059-80-053-1-11-200WorksofVidhanaSoudha,VikasaSoudha,M.Sbuilding,VVtower&Suvarna Soudha buildings

2000.00 1496.06

2059-80-053-1-09-200Works of Legislative Assembly building

250.00 55.93

2059-80-053-1-10-200Works of Legislative Council building

25.00 13.17

2059 Sub Total 29505.43 26804.97

4059-80-051-0-29-386Construction of Departmental Buildings

12200.00 11517.31

4059-80-051-0-32-386 Construction of Court Buildings 14777.47 13666.88

4059 Sub Total 26977.47 25184.19

2216-01-700-3-01-200Maintenance of Residential Buildings

13693.53 11159.60

2216-01-700-4-00-221 Furnishing-Material&Supplies 203.69 61.98

2216 Sub Total 13897.22 11221.58

4216-01-700-2-01-386Construction of Residential Buildings

5350.00 5261.19

4216-01-700-2-24-386Construction of Quarters for JudicialOfficers

1299.89 963.94

4216 Sub Total 6649.89 6225.13

TOTAL - BUILDINGS 77030.01 69435.87

75

Page 93: Government of Karnataka Public Works, Ports & Inland Water ...

Table 10.2Details of Residential and Non-Residential Buildings for the year 2019-20Sl. No. Zone Divisions No. of Buildings

1

South

No1Buldings 3002 No2Buildings 2313 Bangalore 4504 Ramanagara Regular 575 Ramanagara Special 916 Kolar 2467 Chikkaballapur 798 Tumkur 2149 Madhgugiri 13510 Mysore 6011 Hunsur 16912 Mandya 14313 CR Nagar 14714 Hassan 34615 Chikkamagalur 26216 Mangalore 55317 Udupi 21818 Kodagu 410 South Zone Total 411119

North

Dharwad 34420 Gadag 17521 Haveri 28222 Karwar 35723 Sirsi 20624 Shimoga 19625 Shimoga Spl 23426 Davanagere 18427 Chitradurga 20028 Belgaum 55429 Chikkodi 21130 Bijapur 36131 Bagalkote 454 North Zone Total 375832

North East

Bellary 30233 Hadagali 12434 Raichur 24535 Koppal 18936 Gulbarga 49637 Sedam 10638 Yadgir 14839 Bidar 302 North East Zone Total 1912 State Total 9781

The above statement has number of buildings havingCapital cost of aboveRs.1.00 lakh (majorbuildingsandaboveRs.20000andbelowRs.1.00lakh(minorbuildings).

76

Page 94: Government of Karnataka Public Works, Ports & Inland Water ...

Sl.

No.

Div

isio

nsR

esid

entia

l Bui

ldin

gs( Q

uart

ers)

Non

Res

iden

tial B

uild

ings

( G

ovt O

ffice

)

No

of

Bui

ldin

gsC

apita

l cos

t (R

s.in

lakh

s)Pl

inth

Are

a

(in 1

000S

qm)

No

of

Bui

ldin

gsC

apita

l cos

t

(Rs.i

n la

khs)

Plin

th A

rea

(in

100

0Sqm

)1

23

45

67

8

1No1Buldings

7091707.89

23.30

230

79823.51

245.49

2No2Buildings

3949326.32

69.97

192

197853.49

313.99

3B

anga

lore

319

4502.06

62.92

131

13329.36

44.13

4R

aman

agar

a R

egul

ar14

693.02

28.57

439952.15

34.76

5R

aman

agar

a Sp

ecia

l59

524.5

20.29

321893.45

26.57

6K

olar

124

819.31

13.61

122

7816.14

47.31

7C

hikk

abal

lapu

r49

421.08

16.20

305474.39

25.29

8Tu

mku

r87

815.1

10.78

127

5149.32

18.19

9M

adhg

ugiri

70718.02

10.91

653682.95

30.88

10M

ysor

e18

193.42

5.31

425111.61

8.46

11H

unsu

r110

428.52

3.17

593909.80

24.02

12M

andy

a41

299.48

13.35

102

7007.74

114.01

13C

R N

agar

48822.45

22.77

991141.21

16.73

14H

assa

n83

3345.94

24.20

263

29205.64

223.89

15C

hikk

amag

alur

149

1548.94

30.97

113

2766.39

75.95

16M

anga

lore

347

2074.82

71.40

206

12755.53

215.12

17U

dupi

125

1600.55

20.80

934136.76

69.52

18K

odag

u337

333.21

15.44

732742.01

53.02

So

uth

Zon

e To

tal

2089

1601

74.6

346

3.96

2022

3937

51.4

515

87.3

3

77

Page 95: Government of Karnataka Public Works, Ports & Inland Water ...

Sl.

No.

Div

isio

nsR

esid

entia

l Bui

ldin

gs( Q

uart

ers)

Non

Res

iden

tial B

uild

ings

( G

ovt O

ffice

)

No

of

Bui

ldin

gsC

apita

l cos

t (R

s.in

lakh

s)Pl

inth

Are

a

(in 1

000S

qm)

No

of

Bui

ldin

gsC

apita

l cos

t

(Rs.i

n la

khs)

Plin

th A

rea

(in

100

0Sqm

)1

23

45

67

819

Dha

rwad

167

2989.97

192.41

177

21037.24

309.23

20G

adag

81971.96

38.15

943494.08

62.29

21H

aver

i118

2434.85

57.31

164

10399.33

114.87

22K

arw

ar229

1608.67

68.11

128

2647.10

130.66

23Si

rsi

103

1093.07

48.01

103

3231.24

101.97

24Sh

imog

a61

2496.25

30.77

135

9504.42

90.97

25Sh

imog

a Sp

l107

2475.57

36.79

127

9823.16

114.72

26D

avan

ager

e90

1412.02

34.58

944300.11

63.84

27C

hitra

durg

a77

1859.18

29.24

123

8730.37

87.68

28B

elga

um241

1600.25

114.04

313

28642.31

252.70

29C

hikk

odi

80478.99

16.38

131

7771.19

49.77

30B

ijapu

r119

1041.48

72.49

242

4551.82

158.81

31B

agal

kote

215

1933.92

65.33

239

10042.34

162.26

N

orth

Zon

e To

tal

1688

2239

6.18

803.

6120

7012

4174

.71

1699

.77

32B

ella

ry238

6335.12

27503.06

642113.75

21043.55

33H

adag

ali

665718.23

18354.09

581586.85

246417.07

34R

aich

ur143

337.98

9576.86

102

1579.18

32784.66

35K

oppa

l151

39.16

19584.81

3816.95

16907.66

36G

ulba

rga

251

1025.91

155.91

245

4029.09

167.79

37Se

dam

641921.98

125474.00

42971.63

44982.00

38Ya

dgir

60975.43

63811.72

882837.41

88036.21

39B

idar

1100.00

0.70

3380.00

1.37

N

orth

Eas

t Zon

e To

tal

974

1645

3.81

2644

61.1

564

013

514.

8645

0340

.31

78

Page 96: Government of Karnataka Public Works, Ports & Inland Water ...

Sl.

No

Div

isio

ns

Cir

cuit

Hou

seTr

avel

ers B

unga

low

No

No

of

Roo

ms

Cap

ital c

ost

(Rs.

In

lakh

)

Plin

th

Are

a

(in

Sqm

)N

oN

o of

R

oom

s

Cap

ital c

ost

(Rs.

In

lakh

)

Plin

th

Are

a

(in

Sqm

)1

23

45

67

89

10

1No1Buldings

00

0.00

0.00

00

0.00

0.00

2No2Buildings

00

0.00

0.00

00

0.00

0.00

3B

anga

lore

00

0.00

0.00

110

490.00

1500.00

4R

aman

agar

a R

egul

ar0

00.00

0.00

414

13.11

1301.94

5R

aman

agar

a Sp

ecia

l0

00.00

0.00

12

0.24

138.05

6K

olar

12

3.73

200.00

410

16.35

876.46

7C

hikk

abal

lapu

r0

00.00

0.00

416

38.22

1341.38

8Tu

mku

r1

14.50

235.36

310

11.58

498.42

9M

adhg

ugiri

00

0.00

0.00

26

4.00

163.18

10M

ysor

e0

00.00

0.00

28

1.21

1131.21

11H

unsu

r1

215.00

380.00

210

2.68

972.31

12M

andy

a0

00.00

0.00

430

36.48

2838.10

13C

R N

agar

00

0.00

0.00

29

8.18

1031.97

14H

assa

n2

60.33

184.08

845

573.71

4717.09

15C

hikk

amag

alur

00

0.00

0.00

617

75.56

5586.95

16M

anga

lore

00

0.00

0.00

326

315.50

3619.21

17U

dupi

18

400.00

1639.00

15

3.10

755.22

18K

odag

u0

00.00

0.00

36

17.77

615.73

So

uth

Zon

e To

tal

619

423.

5626

38.4

450

224

1607

.69

2708

7.22

79

Page 97: Government of Karnataka Public Works, Ports & Inland Water ...

Sl.

No

Div

isio

ns

Cir

cuit

Hou

seTr

avel

ers B

unga

low

No

No

of

Roo

ms

Cap

ital c

ost

(Rs.

In

lakh

)

Plin

th

Are

a

(in

Sqm

)N

oN

o of

R

oom

s

Cap

ital c

ost

(Rs.

In

lakh

)

Plin

th

Are

a

(in

Sqm

)1

23

45

67

89

1019

Dha

rwad

630

417.15

8041.49

513

52.78

882.73

20G

adag

39

280.00

1220.80

937

497.40

1964.61

21H

aver

i4

16241.83

2347.74

14

50.00

235.00

22K

arw

ar5

19286.50

13396.12

212

6.71

740.00

23Si

rsi

955

667.16

3059.09

832

60.46

1344.46

24Sh

imog

a0

00.00

0.00

841

599.58

5862.11

25Sh

imog

a Sp

l1

47.49

722.62

522

109.63

1447.03

26D

avan

ager

e1

14180.00

755.00

318

181.85

1375.28

27C

hitra

durg

a2

16202.71

1357.00

411

39.95

860.39

28B

elga

um3

20257.52

3022.64

711

41.58

907.59

29C

hikk

odi

313

494.60

2240.00

1357

169.33

4077.00

30B

ijapu

r2

684.00

720.00

1442

468.57

5947.00

31B

agal

kote

13

56.45

3100.00

2779

614.59

9620.92

N

orth

Zon

e To

tal

4020

531

75.4

139

982.

5010

637

928

92.4

335

264.

1232

Bel

lary

230

1701.00

4715.00

825

120.300

13387.900

33H

adag

ali

325

680.00

5858.00

--

--

34R

aich

ur4

29729.99

3216.26

1666

0.300

1164.340

35K

oppa

l5

20810.00

4010.00

825

115.000

9000.000

36G

ulba

rga

310

1.42

3697.00

919

21.590

1866.420

37Se

dam

14

200.00

950.00

35

523.160

1792.000

38Ya

dgir

212

300.00

2612.40

15

23.280

5788.530

39B

idar

00

0.00

0.00

00

0.000

0.000

N

orth

Eas

t Zon

e To

tal

2013

044

22.4

125

058.

6645

145

803.

6332

999.

19

80

Page 98: Government of Karnataka Public Works, Ports & Inland Water ...

Sl.

No

Div

isio

nsC

ircu

it B

unga

low

Gue

st h

ouse

No

No

of

Roo

ms

Cap

ital c

ost

(Rs.

In la

kh)

Plin

th A

rea

(in S

qm)

No

No

of

Roo

ms

Cap

ital c

ost

(Rs.

In la

kh)

Plin

th A

rea

(in S

qm)

12

34

56

78

910

1No1Buldings

00

0.00

0.00

00

0.00

0.00

2No2Buildings

00

0.00

0.00

2128

1810.52

6179.41

3B

anga

lore

731

73.70

2498.87

214

230.00

1148.00

4R

aman

agar

a R

egul

ar0

00.00

0.00

00

0.00

0.00

5R

aman

agar

a Sp

ecia

l3

1026.71

533.45

00

0.00

0.00

6K

olar

310

31.14

1388.42

49

184.16

1769.53

7C

hikk

abal

lapu

r4

30478.73

2757.31

12

5.90

126.00

8Tu

mku

r7

2623.82

2583.93

11

0.58

195.00

9M

adhg

ugiri

728

150.42

2768.42

00

0.00

0.00

10M

ysor

e2

910.51

802.33

418

557.00

2504.65

11H

unsu

r4

12110.21

12138.15

13

24.00

255.97

12M

andy

a5

33165.67

3913.10

517

432.29

2497.54

13C

R N

agar

310

17.04

2630.42

26

50.00

8608.00

14H

assa

n5

1610.86

1940.47

329

18911.72

2786.99

15C

hikk

amag

alur

1640

256.06

6537.99

00

0.00

0.00

16M

anga

lore

942

593.09

3353.06

00

0.00

0.00

17U

dupi

424

675.54

5389.30

00

0.00

0.00

18K

odag

u6

2247.32

1703.76

27

4.59

1683.86

So

uth

Zon

e To

tal

8534

326

70.8

250

938.

9827

234

2221

0.76

2775

4.95

81

Page 99: Government of Karnataka Public Works, Ports & Inland Water ...

Sl.

No

Div

isio

nsC

ircu

it B

unga

low

Gue

st h

ouse

No

No

of

Roo

ms

Cap

ital c

ost

(Rs.

In la

kh)

Plin

th A

rea

(in S

qm)

No

No

of

Roo

ms

Cap

ital c

ost

(Rs.

In la

kh)

Plin

th A

rea

(in S

qm)

12

34

56

78

910

19D

harw

ad7

2196.07

2714.51

23

481.46

780.00

20G

adag

00

0.00

0.00

00

0.00

0.00

21H

aver

i30

89435.10

8299.21

38

56.08

968.12

22K

arw

ar9

27304.82

2503.37

00

0.00

0.00

23Si

rsi

1240

48.30

1605.21

00

0.00

0.00

24Sh

imog

a2

8125.82

1159.38

19

76.06

509.00

25Sh

imog

a Sp

l2

6105.65

720.00

18

500.00

2422.00

26D

avan

ager

e7

26336.60

2568.61

12

35.16

294.14

27C

hitra

durg

a13

41436.18

4835.28

210

27.15

592.04

28B

elga

um17

45256.98

4172.44

00

0.00

0.00

29C

hikk

odi

1353

233.86

6429.16

14

25.62

405.30

30B

ijapu

r6

15102.75

1007.74

00

0.00

0.00

31B

agal

kote

2156

589.51

5895.00

26

140.00

388.04

N

orth

Zon

e To

tal

139

427

3071

.64

4190

9.91

1350

1341

.53

6358

.64

32B

ella

ry-

--

--

--

-33

Had

agal

i13

48387.18

11188.27

16

150.00

380.00

34R

aich

ur5

23133.50

5737.47

14

9.00

0.00

35K

oppa

l-

--

--

--

-36

Gul

barg

a2

12700.00

855.30

--

--

37Se

dam

123

81.54

12236.00

48

48854.00

320.00

38Ya

dgir

24

125.00

853.24

00

0.00

0.00

39B

idar

28

155.00

1044.76

00

0.00

0.00

N

orth

Eas

t Zon

e To

tal

2511

815

82.2

231

915.

046

1849

013.

0070

0.00

82

Page 100: Government of Karnataka Public Works, Ports & Inland Water ...
Page 101: Government of Karnataka Public Works, Ports & Inland Water ...

CHAPTER- 11

PORTS & INLAND WATER TRANSPORT

Introduction Sea ports are important gateways for trading in commodities between countries. The ports

form a major infrastructure in the logistic chain of activities in economic transport of goods. It is an acknowledged fact that, there is a big gap between available capacity of ports in India and the huge demand for port services.

In India,marine transport has the highestmodal share of export-import cargo. Sea routesprovideefficientandcost effectivemodesof transportingbulkquantitiesofgoods.AsperMinistryofShippingestimates,trafficatseaportsislikelytogrowthreetimesby2020-21from the present level.

Karnatakahasamaritimecoastlineof167nauticalmiles(309.59kilometres)andhasoneMajorportatNewMangalorePortand12minorportsi.e.,Karwar,Belekeri,Tadri,PavinaKurve,Honnavar,Manki,Bhatkal,Kundapur,Hangarkatta,Malpe,PadubidriandOldMangalore.

Major Regulatory functions:-

With a view to achieve the various objectives, the Department discharges the following regulatory functions:-

1) RegulationofNavigationattheports. 2) LandingandShippingofgoodsattheports. 3) MaintainingandhiringofmarineFloatingcraftsandcargohandling,equipmentsuch

as Cranes, Tugs, Water Barges, Weigh Bridge etc., 4) DevelopmentandmaintenanceofminorPorts. 5) DredgingatthePortsandchannelsforsafeNavigation; 6) Survey,InspectionandLicensingofHarbourCrafts; 7) Examination and issue of Certificate of competency to Engine,Drivers,Masters,

Sarongs under Karnataka Harbour Craft Rules. 8) Inspection and issue of Certificate of fitness to crafts deployed in Ferries and

Waterways. 9) OperationofFerriesthroughcontractsystem. 10)ConductingHydrographicsurveysofthePorts&Waterways. 11)Conductingenquiryaboutcasualties/wrecks,jettisoning 12)Registration,SurveyandInspectionofsailingvessels. 13)Constructionofjetties,landingramps,ApproachRoadsforFerryServices. 14)ExecutionofCoastalProtectionWorksandfisheryharbour/fishlandingcentresand

Inland Fisheries Development works.

83

Page 102: Government of Karnataka Public Works, Ports & Inland Water ...

Administration:

The Department functions under the administrative control of the Public Works, Ports and Inland Water Transport Department at the Government level. The Director of Ports and Inland WaterTransportwithHead-quartersatKarwaristheHeadoftheDepartmentwhoisassistedin the administration as indicated below.

ThePortOfficers (MasterMariners (F.G.)are functioningwithHeadquartersat importantports in the state i.e., Karwar, Honnavar, Kundapur and Mangalore who are directly responsible for management and operation of the ports in their respective jurisdiction. Licensing of harbourcrafts,conductingexaminationforissueofcertificateofcompetencyasMasterandSerang’s,Inspection/PreliminaryInvestigationintoshippingCasualties,Jettisoningetc.,Portconservator, Deputy Port Conservators and Assistant Port Conservators are stationed at other lesser important ports who work under the direct administration and technical control of the Portofficers.

Table 11.1

Cadre Strength of Ports & Inland Water Transport Department

GroupNo. of Posts sanctioned

No. of Posts Filled

No. of Posts Vacant

Group - A 16 8 8Group–B 40 12 28Group–C 285 75 210Group–D 225 66 159

Total 566 161 405

ThePortEngineeristheTechnicalAssistanttotheDirectorofPorts&InlandWaterTransportandlooksaftertheexecutionofmaintenanceofPortworks,Buildingsetc.,andsupervisesthedredging works in Uttara Kananda District and State Inland Water Transport works assisted by Asst.ExecutiveEngineer,AssistantEngineer&JuniorEngineers.

TheExecutiveEngineerofPortDivisionwithHead-quarters atKarwarand theExecutiveEngineer of Ports & Fisheries Division, with head-quarters at Udupi is working in thedepartment.TheyareassistedbyAssistantExecutiveEngineers,AssistantEngineers/JuniorEngineers.TheExecutiveEngineer,Ports&FisheriesDivision,Udupi is lookingafter thedevelopmental port works, dredging works and maintenance work of Port structures, Fisheries worksandAntiSeaErosionworksofDakshinaKannadaandUdupiDistricts.TheExecutiveEngineer, Ports Division, Karwar look after the Port development works, fisheries worksandAntiSeaErosionworksofUttaraKannadaDistrict.OneMarineEngineer(FirstClassEngineer) with head quarters at Karwar has been working in the department. He is also

84

Page 103: Government of Karnataka Public Works, Ports & Inland Water ...

responsible for operation of the Departmental Mechanized harbour crafts and inspection of mechanizedharbourcraftconductingexaminationfor issueofcertificateofcompetencyasEngineer/EngineDriver.

IMPORTS & EXPORTS:

Karnataka exports a wide variety of goods both agricultural and industrial covering silk,sandalwood oil, handicrafts, readymade garments, coffee, iron ore, sophisticated machine tools, electronic products, computer hardware and software, inter alias. In the last two decades the Statehasemergedasamajorplayerintheexportofengineeringgoods,readymadegarments,leather goods, chemicals, minerals and ores.

Major Commodities in Transaction at Karwar Port

EXPORTS IMPORTS

¾ IronOres,ManganeseOre,Bauxite,Sugar,Alumina, Food grains, Maize, Granite, Horticulture and Agriculture products,

¾ Liquid cargoes like Molasses, phosphoricacid marine products

¾ Coal, Cement, Sugar, Food Grains, Fertilizers, Industrial salt, Rock Phosphate, Raw Sugar

¾ Liquid cargoes like H.S.D, Furnace Oil,Kerosene, Palm Oil, Molasses and otherChemicals.

STATEMENT SHOWING THE CARGO HANDLED DURING 2019-20

(CargoInM.T.&RevenueinRs.lakhs)

Name of Port Import Export Total Revenue earnedKarwar Port 820323 40303 860626 1671.93Belekeri Port - - - 7.74Tadadi Port - - - 3.27Honnavar Port - - - 16.11

Bhatkal Port - - - 0.48

Kundapur Port - - - 31.85

Malpe Port - - - 39.59

Hangarkatta Port - - - 3.20

Padubidri Port - - - -

OldMangalorePort 550 73840 74390 276.79

Total 820873 114143 935016 2050.96

PORT DEVELOPMENT THROUGH PRIVATE INVESTMENT:-

Forfasterdevelopmentofportsanditsefficientandcosteffectiveoperations,thedevelopmentof ports through private investment is envisaged. The development of port based industries and other infrastructural facilities will be integrated with port development.

85

Page 104: Government of Karnataka Public Works, Ports & Inland Water ...

PORT DEVELOPMENT PROJECT PROPOSALS UNDER SAGARMALA PROJECT

¾The Government of Karnataka has taken initiation for Second stage development of Karwar Port under State Government funds and Government of India, Coastal berth scheme.

¾Two projects have been sanctioned for the development of Karwar Port - Construction ofCoastalBerthof250mtrlengthatKarwarPortatanapprovedestimatedcostofRs.61.00CrandExtensionofexistingSouthernbreakwaterby145mandconstructionofnewNorthbreakwaterof1160Mtrs.atKarwarPortatanapprovedestimatedcostofRs.215.00Cr.

¾Two projects have been sanctioned for the development of Old Mangalore Port- Construction of 350Mtr. long coastal cargo berth atOldMangaluru Port at anapprovedestimatedcostofRs.65.00CrandCapitalDredgingatOldPortMangalore(BengreSide)atanapprovedestimatedcostofRs.29.00Cr.

¾The State Government has accorded approval for construction of Northern and extensionofSouthernbreakwateratanestimatedcostofRs.215.00Crores.TheworkwascommencedinthemonthofJanuary2020.However,dueto thestayorderofHon’bleHighCourtofKarnataka,BangaluruvideW.P.No.1332/2020(GM-PIL)filed by Baithkol Bandaru Nirashritara Meenugarara Sahakara Sangha Niyamita, Baithkol, this work has been stopped at present. For the construction of coastal berthatanestimatedcostofRs.61.00Crores,theletterofacceptanceisissuedtothecontractoron21.03.2020.

¾Under Coastal berth Centrally Sponsored Scheme (CSS), for the Construction ofcoastalberthatMangalorePortatanestimatedcostofRs.65.00CroresapprovalofFinancialBidofEmjayConstructions,BangaloreamountingtoRs.5995.88Lakhs(10.95%above)isawaitedandfordeepeningthechannel&berthupto7Mtr.atanestimatedcostofRs.29.00Crores,EIA&CRZclearanceareobtainedandthedetailstender process is as under :

Inthe1st call of tender, the technical bids of two bidders - Yojaka India Pvt. Ltd. and Rock and ReefDredgingPvt.Ltd.,MumbaiwasrejectedbyTechnicalBidEvaluationCommitteeon12-03-2020atDharwad.

Subsequently,2ndcalloftenderwasinvitedon17-03-2020.Butnobidderhadparticipatedinthis tender.

Assuch,3rdcalloftenderwasinvitedandthetechnicalbidwasopenedon05.06.2020.Twobidders–YojakaPvt.Ltd.,MangaloreandRock&Reef,Mumbai-haveparticipatedinthetender.Confirmationofthebiddocumentsisunderprogress.

86

Page 105: Government of Karnataka Public Works, Ports & Inland Water ...

PORT DEVELOPMENT PROJECT PROPOSALS UNDER PPP PROJECT

¾MinistryofShipping(MoS),GovernmentofIndiahasprepared“TechnoEconomicFeasibilityReport”(TEFR)fordevelopmentofBelekeriPortneartoKenivillageasaSatelliteporttoNewMangalorePortTrust(NMPT)with10MTPAcapacityatanestimatedcostofRs.1720.00Cr.GovernmentofKarnatakahasgivenitsconcurrencetoTEFRpreparedbyMinistryofShippingthroughAECOM.

¾The Government has sanctioned 847560 Sqm port land on lease basis to M/sHonnavarPort PrivateLimited (HPPL),Hyderabad atHonnavar port to handle 5MTPAcargo.TheDPRhasbeenpreparedandEIAclearancehasbeenobtainedbythe developer. Designs are approved by the department and the jetty work is under progress.Constructionofbreakwaters&dredgingworksaretobetakenup.

¾M/S.JSWhassubmittedaSuo-Motoproposalfordevelopinganall-weather,multi-cargo, Deepwater green field port at Pavinakurve village, near Honnavar, Uttar-KannadaunderSwissChallengeroutewith14MPTAcapacityatanestimatedcostofRs.1767.00Cr.ThebiddocumentissubmittedtotheGovernmentforapproval.

CREATION OF PORT FACILITIES :-

In view of the fact that ships of large sizes are used in transportation for economies of scale intheinternationaltrade,Portwouldbedevelopedwiththerequireddrafts,berthingfacilitiesandefficientmechanicalhandlingfacilities,soastoreducewaitingperiodofshipsandsavinginthecargohandlingexpenses.Inordertoexpeditecreationofportfacilities,itisproposedtoadopt the following strategies.

Major aim of Port development in Karnataka is to promote regional development. Port based industrial corridors would be encouraged along the coastline to facilitate import of raw material andexportoffinishedgoods.AsmorenumberofMegaprojectsarecomingupintheState,theIndustrial development shall be synchronized with the port development and the infrastructure development.

Development of Support Infrastructure:-

The investment in theport sectorwoulddemandan equal investment in the infrastructurefacilities like roads and railways for faster and efficient handling of the cargomovement.Along the coastline National Highway and Konkan Railway broad gauge line are available. The Hassan-Mangalore broad gauge line would connect the ports in the Southern coast to the adjacent hinterland and similarly the proposed railway linkage from Hubli to Karwar / Ankola would connect all the ports on the Northern coast to the rest of the state. The State Government wouldendeavourtoprovidetherequiredroadnetworkandrailwaylinkagetothehinterland.

87

Page 106: Government of Karnataka Public Works, Ports & Inland Water ...

Maritime Related Industries:-

Maritime related industries would be given priority to be located along Karnataka Coast in the fieldofshipbuilding,shiprepairing,dredging,eco-friendlyshipbreakingandotherflotillaunits like tugs, barges, launches and support crafts. The above manufacturing facilities as well as the traditional boat building activities would be allowed in Karnataka Maritime Waterfront on lease basis to such units. The incentives and concessions to such units would be governed by the industrial incentive package announced by the Government of Karnataka.

Coastal Shipping :-

Private entrepreneurs will be permitted to develop, operate and maintain terminal facilities along the Karnataka Coast. These terminals will be used to transport passenger and cargo to import centers on the Western Coast like Bombay, Goa, Trivandrum, Kanyakumari etc., these facilities will be promote tourism.

By linking places of historical, religious and tourist interests.

By attracting Amusement Parks, Beach Resorts and Water Sports on Karnataka Coast.

PORT FACILITIES OF POWER PROJECTS :-

Thebargemountedpowerprojectswouldbeprovidedwithrequiredportfacilitiesatidentifiedlocations.Similarly,ThermalPowerplantswouldbeprovidedwithexclusiveportfacilitiesforimporting different kinds of power fuels at Harbours

INLAND WATER TRANSPORT ACTIVITIES :-

In Karnataka State, the Inland Water Transport wing has been created under the Department ofPorts in theyear1972on the recommendationsofGokhaleCommitteeandBhagavathiCommittee to look after the administration, maintenance, control and regulation of the Ferries and Waterways by providing Mechanized Boats like LCTs/ Launches, FRP Boats and Steel Boats.

Total 334 ferries are operating in the state, out of which 17 Ferries are operated by the Department and 42 Ferries operated by public auction under the Technical control of the department, remaining 275FerriesareunderthecontrolofZilla/Taluk/GramPanchayat.ThepersonnelworkinginthedepartmentarewelltrainedinthefieldonNavigationandNauticalTechnology. The above Ferry services are mainly provided to cater shore to shore transportation of Men and materials of the remotest rural areas, which are not connected either with road or rail transportation. They are service oriented facilities to the rural commuters for their daily requirements.

88

Page 107: Government of Karnataka Public Works, Ports & Inland Water ...

Detailsofpassengersanddifferentvehiclestransportedduring2019-20throughdepartmentalrun ferries are as follows and revenue earned is Rs. 1.89 Cr.

Table 11.2

Sl. No. Traffic Details 1. Passengers 15,99,887Nos.

2. Cargo(inQntl) 10,124Kg

3. Two wheelers 1,10,580Nos.

4. Animals 162Nos.

5. Bus 12,520Nos.

6. Lorry 610Nos.

7. Jeep,VanandCar 94,240Nos.

ANTI SEA EROSION WORKS :-

The coastline of Karnataka State stretching from Majali in the North to Ullal in the South, passesthroughthreedistrictsi.e.,UttaraKannada,UdupiandDakshinaKannada.Outofthe309.59Kms.longcoastlineofState,about120Kms.longcoastlineissubjectedtoSeaErosionduringmonsooneveryyear.Asmanyas14rivers-Kali,Belekeri,Gangavali,Aghanashini,Sharavathi,Venkatapura, Kollur, Sitanadi, Udyavara, Gurupur, Netravathi etc., drain theircatchments into the Arabian sea and as such, the rivers banks of these rivers in the tidal reaches are subjected to river bank erosion. It is very essential to protect the public property like roads, buildings etc. by construction of long term sea wall and emergent protection works during monsoon wherever severe erosion is taking place.

During theyear2019-20anamountofRs.976.27 lakhshasbeenspentunder theheadofAccount4711and975Mtrs.longRoublemoundseawallhasbeenconstructed.

SUSTAINABLE COASTAL PROTECTION AND MANAGEMENT INVESTMENT PROGRAMME (ADB Assistance)

ULLAL SHORELINE PROTECTION SUB PROJECT

To protect the severe erosion areas of state coast line Government has accorded approval for Rs.911.00Cr.with theassistanceof“AsianDevelopmentBank” (ADB)underSustainableCoastalProtection&ManagementProgramme.

Undertranche-I,thecoastalprotectionworkistakenupatanestimatedcostofRs.223.32croresandatenderpriceofRs.210.57croresatUllalinDakshinaKannadaDistrict.Constructionof8inshoreberms,2offshorereefsandconstructionof975mlengthofbreakwaterworksarecompletedandthetotalexpenditureisRs.246.11Crores.

89

Page 108: Government of Karnataka Public Works, Ports & Inland Water ...

90

Undertranche-II,coastalprotectionworksaretakenupat7placesviz;Mukkacheri,SomeshwarainD.Kannada,ErmalThenka,Udyavara,Kodikanyana,MaravantheandKodibengreinUdupidistrictsatanestimatedamountofRs.585.48croresandatatenderpriceofRs.491.85crores.Theworks areunderprogress and theup todate expenditure isRs.281.76Crores. Theseworks consist of construction of rock groynes, beach nourishment, san redistribution, rock revetment,geotextile revetment,offshore reefsandcommunityawarenessand trainingsonmaintenance of plantations and nurseries.

Page 109: Government of Karnataka Public Works, Ports & Inland Water ...

91

Tabl

e –

11.3

PHY

SIC

AL

AN

D F

INA

CIA

L PR

OG

RE

SS F

OR

TH

E Y

EA

R 2

019-

20 O

F PO

RT

& IW

T D

EPT

. DE

VE

LO

PME

NT

WO

RK

S

(Rs.inlakhs)

Hea

d of

Acc

ount

Sc

hem

e N

ame

Phys

ical

Pro

gres

sFi

nanc

ial P

rogr

ess

Perc

enta

geA

chie

vem

ent

to th

e Ta

rget

Targ

etA

chie

vem

ent

Targ

et(G

rant

201

9-20

)A

chie

vem

ent

(Exp

endi

ture

)

12

34

56

7

5051

Cap

ital O

utla

y on

Por

ts &

Lig

ht H

ouse

s -02

Min

or P

orts

5051-02-201-0-01-

132

Prel

imin

ary

Expenses

- -

BE1.00

RE0.00

0.00

0%

5051-02-201-0-03-

147

LandAqusition&

Bui

ldin

gs4Nos.ofw

orks

4Nos.ofw

orks

BE31.00

RE31.00

17.16

55.35%

5051-02-201-0-04-

059

Con

stru

ctio

ns o

f w

harf

s, je

tties

and

ot

her f

acili

ties

6Nos.ofw

orks

6Nos.ofw

orks

BE250.00

RE452.73

331.23

73.16%

5051-02-201-0-05-

180

Machinery&

Equipm

ents

- -

BE980.00

RE827.26

806.17

97.45%

5051-02-201-0-06-

059

Dredging&

Nav

igat

ion

- -

BE1.00

RE0.00

0.00

0%

5051-02-201-0-09-

051

OtherExpenditure

16Nos.ofw

orks

14Nos.ofw

orks

BE200.00

RE150.00

86.09

57.39%

5051-02-211-0-01-

059

Saga

rmal

a-

-BE3500.00

RE2000.00

67.94

3.39%

Page 110: Government of Karnataka Public Works, Ports & Inland Water ...

Hea

d of

Acc

ount

Sc

hem

e N

ame

Phys

ical

Pro

gres

sFi

nanc

ial P

rogr

ess

Perc

enta

geA

chie

vem

ent

to th

e Ta

rget

Targ

etA

chie

vem

ent

Targ

et(G

rant

201

9-20

)A

chie

vem

ent

(Exp

endi

ture

)

12

34

56

7

Inla

nd W

ater

Tra

nspo

rt

5051-80-052-

0-01-059

Machinery&

Equipm

ents

0Nos.ofw

orks

0Nos.ofw

orks

BE150.00

RE0.00

0.00

0%

5051-80-800-

0-01-059

App

urte

nant

Civ

il w

orks

3Nos.ofw

orks

2Nos.ofw

orks

BE247.00

RE21.00

20.97

99.86%

Sust

aina

ble

Coa

stal

Pro

tect

ion

& M

anag

emen

t Pro

gram

(EA

P)

5051-80-800-

0-80-132

Sust

aina

ble

Coa

stal

Pro

tect

ion

&M

anagem

ent

Program(E

AP)

35Groynes,15I

groynes,9Tgroynes,

4.10Kmlengthof

seaw

all&

plantingof

saplingsfor1.50Km

leng

th

35Groynes,15

Igroynes,9T

groynes,4.10Km

leng

th o

f sea

wal

l &plantingof

saplingsfor1.44

Km

leng

th

BE23200.00

RE19700.00

16276.13

82.62%

4711

Cap

ital O

utla

y on

Flo

od C

ontr

ol P

roje

cts.

-02

Ant

i Sea

Ero

sion

Wor

ks. 1

03 C

ivil

Wor

ks

4711-02-103-

2-00-139

Maj

or w

orks

Constructionof900

mtrs

leng

th se

awal

l

Con

stru

ctio

n of

975mtrslength

seaw

all c

ompl

eted

BE980.00

RE2940.00

976.27

33.21%

92

Page 111: Government of Karnataka Public Works, Ports & Inland Water ...

93

Udyavara sub-project, Udupi Dist: Groynes and Beach Nourishment

Maravanthe sub-project, Udupi Dist: Groynes and sand re-distribution

SCPMIP, ADB Assisted Works

Page 112: Government of Karnataka Public Works, Ports & Inland Water ...

94

Kodi Kanyana, Udupi Dist. - Dune Vegetation

Oil spill equipments at Karwar Port

Page 113: Government of Karnataka Public Works, Ports & Inland Water ...

95

Sea Wall at Kasarkod Tonka in Honnavar Taluk of U.K. Dist

Tug services for Berthing & Unberthing at Karwar Port

Page 114: Government of Karnataka Public Works, Ports & Inland Water ...

96

Departmental Ferry service

Kodi Bengre Sub –project, Seawall, Udupi District

Page 115: Government of Karnataka Public Works, Ports & Inland Water ...

CHAPTER - 12

QUALITY ASSURANCE ZONE

12.1 Overview of Quality Assurance Zone:

TheQualityAssuranceZoneunderPublicWorks,Ports&InlandWaterTransportDepartmenthas been formed videG.ONo: 396.¸ÉøÀJ.2014, Bangalore dated: 04.08.2014.TheQualityAssuranceZoneisheadedbytheChiefEngineerwiththefollowingstaffpattern.

¾4QualityAssurance Circles headed by the cadre of Superintending Engineers atBangalore,Mysore,Dharwad&Kalburgi

¾8 Quality Assurance Divisions headed by the cadre of Executive Engineers atBangalore,Shimoga,Mysore,Hassan,Dharwad,Belgaum,Kalburgi&Bellary.

¾18 QualityAssurance Sub-Divisions headed by the cadre ofAssistant ExecutiveEngineersatBangalore,Ramnagara,Kolar,Chitradurga,Shimoga,Mysore,Madkeri,Chamarajanagara, Hassan, Mangalore, Dharwad, Karwar, Belgavi, Vijaypur,Kalburgi,Yadgir,Bellary&Raichur.

AtPresent1DivisionatShimogaand3Sub-DivisionsatMadkeri,Yadgir&Vijaypurareyettobe opened.

12.2 Functions of Quality Assurance Zone:

The primary duty of Quality Assurance Zone is to ensure quality as per agreed tenderspecification in theworks takenupbyPWP& IWTD.TheSub-DivisionalLevelOfficersaresupposedtoconductperiodicalspot inspectionof theworks toascertain thequality. Inaddition periodical tests on construction materials will be conducted in the laboratories, based on the materials supplied by the construction divisions.

TheQualityAssuranceZonewillalsocheckwhethernecessaryfieldlaboratoriesasmandatedin the tender documents are established by the contractors at the work site. Also necessary technicalguidancelikemixdesignforroadconstructionwillbedeliveredaspertherequirementof constructional divisions.

TheQualityAssuranceZonewilltakeupthequalitytestsoftheworkscarriedoutbyKRDCL,KSHIP&SHDPasperdirectionsoftheGovernmentonrandombasis.ItismandatoryfortheconstructiondivisionalEngineers toobtainquality test reports from the respectiveQualityAssuranceUnitsbeforesubmittingthefinalbilloftheworks.

97

Page 116: Government of Karnataka Public Works, Ports & Inland Water ...

Inordertoensurepropermonitoringandqualityinworksasperspecifications,actionhasbeentaken to address the concerned seeking creation of a separate module under PMS for Quality AssuranceZonetotheexistingPMSmodulecreatedforCommunicationandBuildingszones.ThisfacilitywillalsoenabletheofficersworkinginQualityAssuranceZonetoreceiveon-line,therequestfromconstructiondivisionsseekingconductingqualitycontroltestonvariouscomponents of the work and to upload the test results immediately.

The circle wise details of Quality Assurance tests conducted and Inspections conducted by QualityAssuranceZoneduring2019-20isasunder:-

Sl No Quality Assurance CircleNumber of Tests

conductedNo of Inspection

conducted1. Bengaluru 34519 1519

2. Mysuru 38013 1621

3. Dharwad 34806 1368

4. Kalburgi 12525 1075

Total 119863 5583

98

Page 117: Government of Karnataka Public Works, Ports & Inland Water ...

ANNEXURES

99

Page 118: Government of Karnataka Public Works, Ports & Inland Water ...
Page 119: Government of Karnataka Public Works, Ports & Inland Water ...

Annexure-1Progress of NABARD works (Year Ending 2020)

Scheme

Physical Progress Financial Progress (Rs. in Lakh)

No. of Works Road Length in Km Estimated Cost

ExpenditureUpto 3/2020 CumulativeSanctioned Completed Sanctioned Completed

1 2 3 4 5 6 7

Roads

RIDF II 119 119 1693.00 1693.00 7838.00 7173.00

RIDF III 315 315 2985.00 2985.00 12906.00 12908.00

RIDF IV 257 257 2330.00 2330.00 9571.00 11225.00

RIDF V 315 315 2706.00 2663.00 16735.00 16926.00

RIDF VI 355 355 2863.00 2844.00 21745.00 20652.00

RIDF VII 129 129 1006.00 943.00 8526.00 7561.00

RIDF VIII 45 45 316.00 315.00 2911.00 2719.00

RIDF IX 215 215 1550.00 1527.00 14856.00 14938.00

RIDF X 381 381 2401.00 2343.00 23266.00 22253.00

RIDF XI 439 439 2067.00 1979.00 23624.00 24102.00

RIDF XII 520 520 2165.00 2082.00 28730.00 29968.00

RIDF XIII 539 539 1985.00 1933.00 32611.00 32965.00

RIDF XIV 336 336 1206.00 1180.00 26486.00 24036.00

RIDF XV 257 257 914.00 892.00 19221.00 16889.00

RIDF XVI 265 265 832.00 802.00 18876.00 16962.00

RIDF XVII 333 333 1070.00 975.00 25589.00 27410.00

RIDF XVIII 264 264 730.00 734.00 21275.00 19039.00

RIDF XIX 227 227 530.00 525.00 20864.00 18849.00

RIDF XX 113 113 270.00 270.00 15340.00 14522.00

RIDF XXI 148 147 333.00 318.00 19165.00 17551.00

RIDF XXII 118 116 235.00 216.00 13725.00 11993.00

RIDF XXIII 169 159 323.88 283.81 18731.00 16615.00

RIDF XXIV 196 147 281.00 214.00 19829.00 14110.00

Total 6055 5993 30791.88 30046.81 422420.00 401366.00

100

Page 120: Government of Karnataka Public Works, Ports & Inland Water ...

Progress of NABARD worksBridges

RIDF II 124 123 0 0 5481 5561

RIDF III 58 58 0 0 2739.00 2795.00

RIDF IV 41 41 0 0 1903.00 2153.00

RIDF V 34 34 0 0 1783.00 1821.00

RIDF VI 76 76 0 0 2826.00 2757.00

RIDF VII 46 46 0 0 2230.00 2220.00

RIDF VIII 12 12 0 0 889.00 838.00

RIDF IX 23 23 0 0 1121.00 1125.00

RIDF X 48 48 0 0 2282.00 2348.00

RIDF XI 42 42 0 0 1901.00 1918.00

RIDF XII 41 41 0 0 1928.00 2217.00

RIDF XIII 2 2 0 0 97.00 89.00

RIDF XIV 16 16 0 0 880.00 740.00

RIDF XV 27 27 0 0 1400.00 1270.00

RIDF XVI 180 180 0 0 13386.00 13029.00

RIDF XVII 28 28 0 0 2464.00 2407.00

RIDF XVIII 89 89 0 0 10645.00 10799.00

RIDF XIX 92 92 0 0 6987.00 6551.00

RIDF XX 146 146 0 0 15453.00 14471.00

RIDF XXI 69 69 0 0 6758.00 6140.00

RIDF XXII 58 51 0 0 5766.00 4943.00

RIDF XXIII 65 48 0 0 5563.00 4048.00

RIDF XXIV 64 20 0 0 5566.00 2598.00

Total 1381 1312 0 0 100048.00 92838.00Grand total 7436 7305 30791.88 30046.81 522468.00 494204.00

101

Page 121: Government of Karnataka Public Works, Ports & Inland Water ...

Annexure – IIMAJOR GOVERNMENT BUILDINGS MAINTAINED BY PWP&IWTD.

CHIEF ENGINEER, C & B (NORTH)

Name of the Division Name of the Building

Dharwad CourtComplex,Hubli

GadagCourtComplex,Gadag

JMFCCourt,Ron

HaveriDistrict Court, Haveri

Court Building, Haveri

Sirsi CourtCompelx,Sirsi

ShimogaCourt Building, Shikaripura.

CourtcomplexatSoraba

Shimoga SpecialCourtcomplex,Shimoga.

CourtComplex,Bhadravathi.

ChitradurgaDistrict court at Chitradurga

J.M.F.C.CourtatHiriyur

DavangereCourtcomplexatDavangere

J.M.F.C.atHarappanahalli

BelgaumSuvarna Soudha, Belgaum

NewCourtComplex,Belgaum

ChikkodiCourtcompelx,Athani

CourtComplex,Athani

Vijaypur NewCourtComplex,Vijaypur

BagalkotMunsiff&JMFCCourtatJamkhandi

Courtcomplex,Mudhol

102

Page 122: Government of Karnataka Public Works, Ports & Inland Water ...

Annexure – IIIMAJOR GOVERNMENT BUILDINGS MAINTAINED BY PWP&IWTD

CHIEF ENGINEER, C & B (NORTH EAST)

Name of the Division Name of the Building

Bellary JMFCCount&CentralJail,Bellary

Hadagali Staff Quartes, Hagribomanahalli

Raichur courtComplex,Raichur

Koppal

Courtcomplex,Koppal

Courtcomplex,Gangavathi

Courtcomplex,Kushtagi

Courtcomplex,Yelburga.

PWDDivision,SubDivision&CircuitHouse, Inspection Bungalow

Kalburgi CourtCompelx,Kalburgi

Yadgir JMFCCount,sHAPUR

Bidar CivilCourtComplex,Bidar

103

Page 123: Government of Karnataka Public Works, Ports & Inland Water ...

Annexure – IVMAJOR GOVERNMENT BUILDINGS MAINTAINED BY PWP&IWTD

CHIEF ENGINEER, C & B (SOUTH)

Name of the Division Name of the Building

No.1, Buildings Division, Banglaore

Rajbhavan, Bangalore

VidhanaSoudha

VikasaSoudha,Bangalore

M.SBuildingcomplex

VisveswaraiahTower

L.Hcomplex

KPSCOldandNewBuildings

Karnataka Bhavan I, II, III New Delhi

No.2, Buildings Division, Bangalore

CityCivilComplex,Dr.AmbedkarVeedhi,Bangalore

Ravindra Kalakshetra

Mayo Hall, M.G.Road, Bangalore

JayanagaraGeneralHospital,Bangalore

Minto Hospital and Bangalore Medical College, Bangalore

High Court Building, Bangalore

K.G.I.D., Bangalore

E.S.I.Hospital,Rajajinagar,Bangalore

E.S.I.Hospital,Indiranagar,Bangalore

Ramanagara JMFCCourtBuilding,Ramanagara

Kolar Magistrate court at Kolar

ChickballapurCourtComplexBuilding,Chickballapur.

JMFCCourtcomplex,Gauribidnur.

104

Page 124: Government of Karnataka Public Works, Ports & Inland Water ...

Name of the Division Name of the Building

Tumkur

District Court at Tumkur

JMFCatSiraTaluk,TumkurDist.

JMFCatKunigal

Mysore Chamundi guest house, Mysore

HunsurCourt Building, HD Kote

JMFCCourt,KRnagara

MandyaDistrictCourtcomplex,Mandya.

Court Building, K.R pet.

ChamarajanagarDistrict Court Building, Chamarajnagar

PWDguesthouse(10rooms)atM.Mhills

HassanOfficeoftheSuperintendingEngineer,PWD,Hassan

JMFCcourt,Holenarsipura

Chikmagalur DistrictCourt,AnnexeBuilding,Chikmagalur.

MangaloreDistrictcourtcomplexannexe,Mangalore

DistrictNewCourtComplexatPuttur

UdupiDistrictcourtcomplexatUdupi

ConstructionofCourtComplexatKundapur

KodaguCourt Building, Madkeri

Sudarshan Guest House

105

Page 125: Government of Karnataka Public Works, Ports & Inland Water ...

Annexure - VLIST OF ARCHITECTURAL DRAWINGS OF BUILDINGS COSTING

MORE THAN ONE CRORE

106

Sl. No. Name of the project Plinth Area

(Sq.Mt)Approximate cost

( Rs. in Lakh) 1 2 3 4

1 ProposedGovernmentEngineeringCollegeatArasikere, Hassan District 29025 5224.50

2ProposedGovernmentEngineeringCollegeatMosalehosahalli, Holenarasipura Taluk, Hassan District

28915 5204.70

3 ProposedGroup'A'officersquarters(2ndPhase)atVasanthnagar,Bengaluru 21230 3821.40

4 ProposedDistrictOfficeComplexatDharwad 13070 2352.605 ProposedOfficeComplexatRamanagara 11890 2140.20

6 ProposedHon'bleChiefMinister'sHomeOffice"Krishna" at Kumara Krupa Road, Bengaluru 11020 1983.60

7 ProposedCourtComplexatChitradurga 10800 1944.00

8 ProposedCourtComplexatBannur,PutturTaluk,Dakshina Kannada District 10565 1901.70

9 ProposedP.W.DStaffquarters,3rdInfantryLineatMysuru 10480 1886.40

10 ProposedWorkshopforGovernmentEngineeringCollege at Arasikere, Hassan District 10090 1816.20

11ProposedConstructionofGroup'A'OfficersquartersbydemolishingtheexistingqtrsNo-D-134toD-190atJeevanbhimanagarBengaluru

9975 1795.50

12 ProposedDistrictOfficeComplexatVijayapura 9300 1674.00

13 ProposedCourtComplexatKanakapuraTaluk,Ramangara District 8722 1569.96

14Proposed Government Polytechnic in the premises of GovernmentEngineeringCollegeatMosalehosalli,Hassan

8000 1440.00

15 ProposedMiniVidhanaSoudhaatHosadurgaTalukChitradurga District 7910 1423.80

16 Proposed Hostel and Guest House for NCC at Hosahalli, Yelhanka, Bengaluru. 7380 1328.40

17 ProposedGirlsHostelforArasikereEngineeringCollege, Hassan District 6660 1198.80

18 ProposedBoysHostelforArasikereEngineeringCollege, Hassan District 6625 1192.50

19 Proposed New SIRD Hostel at ANSIRD Campus at Mysuru. 6600 1188.00

20 ProposedCourtComplexatDevanahalliTaluk(12courthalls) 6300 1134.00

(LIST UP TO 31.03.2020)

Page 126: Government of Karnataka Public Works, Ports & Inland Water ...

107

Sl. No. Name of the project Plinth Area

(Sq.Mt)Approximate cost

( Rs. in Lakh) 1 2 3 4

21 ProposedBoysHostelforGovernmentEngineeringCollege at Arasikere, Hassan District 6175 1111.50

22 ProposedGirlsHostelforGovernmentEngineeringCollege at Arasikere, Hassan District 6175 1111.50

23 Proposed Dr.B.R.Ambedkar Spoorthi Soudha at Vikasasoudhapremises,Bengaluru 6152 1107.36

24 Proposed750CapacityRangamandiraforKannadaandCultureBengaluru.(TypeDesign) 5500 990.00

25 ProposedMiniVidhanaSoudhaatKGF,KolarDistrict. 5165 929.70

26 Proposed Court Building at Bhalki Taluk, Bidar District 5118 921.24

27 ProposedMiniVidhanaSoudhaatSindagi,VijayapuraDistrict 5075 913.50

28 ProposedOfficeComplexatHolenarsipuratalukHassan District 4860 874.80

29 ProposedCourtComplexatManviTaluk,RaichurDistrict 4831 869.58

30 Proposed Additions to New Court Building at Ramangara 4750 855.00

31 Proposed Court Building at Channarayaptna, Hassan District(6CourtHalls) 4712 848.16

32 ProposedMiniVidhanaSoudhaatAlnavara,Taluk,Dharwad District. 4680 842.40

33 ProposedJudicialStaffQuartersatMalavagoppaVillage,Shivamogga 4587 825.66

34 ProposedAnnexeto'Krishna'Hon'bleChiefMinister'sHomeOfficeatKumaraKrupaRoad,Bengaluru 4442 799.56

35 Proposed Court Building at Channarayaptna, Hassan District 4400 792.00

36 Proposed Womens Polytechnic College at Holenarasipura, Taluk Hassan district 4395 791.10

37 ProposedCourtComplex&BarAssocoationatMudalagi Taluk, Belagavi District. 4390 790.20

38ProposedGovernmentOfficeComplexinthepremisesofOldTahlsildarOfficeatShiiggaonTaluk,HaveriDistrict.

4340 781.20

39 Proposed First Grade College for IDSG at Chikkamagaluru 4110 739.80

40 ProposedCourtBuilding(6courthalls)atChannarayapatna, Hassan District 4050 729.00

41 ProposedTalukPanchayatOfficeatHolenarasipura,Hassan District. 3905 702.90

42 ProposedMiniVidhanaSoudhaatSagar,ShivamoggaDistrict 3900 702.00

Page 127: Government of Karnataka Public Works, Ports & Inland Water ...

108

Sl. No. Name of the project Plinth Area

(Sq.Mt)Approximate cost

( Rs. in Lakh) 1 2 3 443 ProposedAnnexeCourtBuildingatHassan 3870 696.6044 ProposedMiniVidhanaSoudhaatBelagavi 3850 693.00

45ProposedAdditionsandAlterationstoNGOBhavanandStateGovernmentEmployeesHomeatCubbonPark, Bengaluru

3780 680.40

46 ProposedKalyanaMantapasiteno.1&2forBanashankari temple at Bengaluru 3625 652.50

47 Proposed PG Block for IDSG First Grade College at Chikkamagaluru 3525 634.50

48 ProposedCourtBuildingatJewargi,KalaburagiDistrict 3508 631.44

49 ProposedCourtComplexatSullia,DakshinaKannadaDistrict 3508 631.44

50 Proposed Boys Hostel for Polytechnic at Mosalehosalli, Hassan 3465 623.70

51 Proposed First Grade college at Kadur, Chikkamagaluru Distrist 3375 607.50

52 ProposedQuartersforJudicialOfficers(TypeDesign) 3305 594.90

53 Proposed Dasoha Bhavana for Sri Nimishamba Temple at Sri Rangapatna, Mandya District 3150 567.00

54 Proposed First Grade College at Madikeri 3115 560.70

55 Proposed'C'&'D'typequartersinthepremisesofJudicialAcademy,CresentRoad,Bengaluru 3060 550.80

56 Proposed Government Polytechnic at Bankapura, Haveri District 2968 534.24

57 ProposedMiniVidhanaSoudhaatKunigal,TumakuruDistrict 2700 486.00

58 ProposedResidentialquartersforGroup-C(TypeDesign) 2555 459.90

59 Proposed500CapacityRangamandiraforKannadaandCultureBengaluru.(TypeDesign) 2550 459.00

60 ProposedITIBuilding(9Trades)-Typedesign 2510 451.80

61 ProposedQuartersforJudicialOfficersatGadagTaluk. 2505 450.90

62 Proposed Government Girls College at Channapatna, Ramangara District. 2445 440.10

63 ProposedOfficeBuildinginthepremisesofCEOOffice,Bengaluru. 2438 438.84

64 ProposedMiniVidhanaSoudhaatThikotaTaluk,VijayapuraDistrict 2430 437.40

65 Proposed Government Science College at Hassan 2400 432.00

66 ProposedMiniVidhanaSoudhaatBabaleshwaraTaluk,VijayapuraDistrict 2364 425.52

Page 128: Government of Karnataka Public Works, Ports & Inland Water ...

109

Sl. No. Name of the project Plinth Area

(Sq.Mt)Approximate cost

( Rs. in Lakh) 1 2 3 4

67ProposedResidentialStaffQuartersforGroup'C'&'D'Staff at Sametadaka Kadaba,Puttur Taluk, Dakshina Kannada District

2346 422.28

68Proposed Additional Classrooms and workshops for Government Polytechnic College at K.R.Pete Taluk, Mandya District.

2304 414.72

69 ProposedJudicialQuartersatKalburagi 2280 410.40

70 ProposedCommercialcomplexnearChamrajanagarTemple 2235 402.30

71 Proposed Government First Grade College for women at Ramanagara 2160 388.80

72 Proposed Government P.U College for Women at Ramangara. 2142 385.56

73 Proposed Bar Association Building at Chikkamagaluru 2085 375.3074 Proposed Pravasi Mandira at Tumakuru 2080 374.40

75Proposed Government Higher Primary School at Gowda Thathana Gadda,at Srivnivasapura Taluk, Kolar District

2070 372.60

76 Proposed Workshop for Government Polyetechnic at Mosalehosalli, Hassan 2060 370.80

77 ProposedResidentialquartersforGroup-D(TypeDesign) 2032 365.76

78 ProposedWomen'sFirstGradeCollegeatHassan 1990 358.20

79 Design for District Bar Association Building at Raichur 1989 358.02

80 Proposed Post Metric Girls Hostel at Mulabagilu Taluk, Kolar District. 1928 347.04

81 ProposedIBatHanagal,MolakalmuruTqChitradurga District 1925 346.50

82 Proposed Government Home Science College at Hassan 1922 345.96

83 Proposed'C'&'D'staffquartersandPABlockatJaladharshiniGuestHousepremisesMysuru. 1872 336.96

84 Proposed Law Chambers in the premises of Court Building at Gokak, Belagavi District 1850 333.00

85 ProposedJMFCbuildingatHagaribommanahalli,Ballary District 1832 329.76

86 ProposedValmikiBhavanatBagepalli,Chikkaballapura District. 1825 328.50

87 Proposed500CapacityRangamadira(TypeDesign) 1815 326.70

88 ProposedAdditionstotheexistingFirstGradeCollegeat Tarikere, Chikkamagaluru District 1810 325.80

Page 129: Government of Karnataka Public Works, Ports & Inland Water ...

110

Sl. No. Name of the project Plinth Area

(Sq.Mt)Approximate cost

( Rs. in Lakh) 1 2 3 4

89 Proposed Government Boys College at Channapatna, Ramangara District. 1800 324.00

90 Proposed PWD , IWTD , Sub Division at Raichur 1795 323.1091 ProposedITIBuilding(5Trades)-Typedesign 1750 315.00

92 ProposedResidentialQuartersforGroup'A'Officersat Hassan 1735 312.30

93 Proposed Library and Auditorium for First Grade College at Sringeri Taluk,Chikkamgalur District. 1720 309.60

94ProposedResidentialQuartersforGroupB,C&DStaff in the premises of IB at Puttur Taluk, Dakshina Kannada District.

1648 296.64

95 ProposedValmikiBhavanatGulaganjiKoppa,Dharawad 1630 293.40

96 ProposedCourtcomplexatGajendragadTaluk,Belagavi District 1616 290.88

97 Proposed Dormitory block for Girls at Government Women'sPolytechnicRamangara 1614 290.52

98Proposed Additional Classrooms and Labs for Government Polytechnic College at Turuvekere, Tumakruru District

1611 289.98

99 Proposed Lawyers Chambers in the premises of Court complexatBailhongalTaluk,BelagaviDistrict 1575 283.50

100Proposed improvements to Sri Mallikarjuna Swami temple at Mudukuthore, T.Narasipura taluk, Mysuru District.

1450 261.00

101ProposedCourtComplexinexistingKHBShoppingcumOfficeComplexatYelhankaNew-town,Bengaluru

1446 260.28

102 Proposed Circuit House at Sandur, Ballari District 1425 256.50

103 ProposedSecondFlooroverexistingoldDistrictCourtComplexatTumakuru. 1400 252.00

104 Proposed Post Metric Girls Hostel at Malur, Kolar District. 1389 250.02

105ProposedSub-DivisionOfficeandGroup-'B'.StaffQuarters for Water Supply and Sewage Board, Koppal, Raichur.

1246 224.28

106 Proposed Bar Association Building in the court premises at Arkalgud Taluk, Hassan District 1238 222.84

107 ProposedStaffQuartersforGroup'C'&'D'-Type Design 1190 214.20

108 ProposedValmikiBhavanatVijayapura 1182 212.76

109 Proposed Samudaya Bhavana at Nandini Layout Bengaluru 1180 212.40

Page 130: Government of Karnataka Public Works, Ports & Inland Water ...

Sl. No. Name of the project Plinth Area

(Sq.Mt)Approximate cost

( Rs. in Lakh) 1 2 3 4110 Proposed ITI College at Adur ,Haveri Taluk /District 1175 211.50

111 ProposedVVIPGuestHouseatMuguru,T.NarasipuraTaluk, Mysuru District. 1175 211.50

112 Proposed Samudaya Bhavana at Nandini Layout, Bengaluru 1150 207.00

113 ProposedAdditionstoexistingTherigeBhavanaat Bengaluru 1140 205.20

114ProposedResidentialStaffQuartersforGroup'A'&'B'StaffatHosamataKadaba,PutturTaluk,DakshinaKannada District

1126 202.68

115 Proposed Dr. B.R. Ambedkar Bhavan at Davangere 1120 201.60116 ProposedVVIP,GuestHouseatChitradurga 1116 200.88117 ProposedITIBuilding(2Trades)-Typedesign 1070 192.60118 ProposedI.T.I.Building(2Trades)atBilikere,Mysuru 1070 192.60

119 ProposedITIBuildingatMotebennur(2trades)Byadagi taluk, Haveri District. 1070 192.60

120 ProposedOfficeoftheJointDirector,DivisionOffice,City and Town Planning at Bengaluru 1061 190.98

121 Proposed Guest House at Chikkamagaluru 1060 190.80

122 Proposed Bar Association Building at Arakalagudu Taluk, Hassan District. 1055 189.90

123 Proposed Auditorium for Government First Grade College at Devanahalli, Bengaluru North District. 1042 187.56

124 Proposed Inspection Bungalow at Srirangapatna, Mandya District. 1025 184.50

125 Proposed Bar Association and Law Chambers Building at Khanapura Taluk, Belagavi District 966 173.88

126 Proposed Bar Association building in the court premises at Nanjanagudu, Mysuru District 948 170.64

127 Proposed Pravasi Mandira at Devarayanadurga, Tumakuru 914 164.52

128 Proposed Bar Association Building at Koratagere, Tumakuru District 910 163.80

129 ProposedBarAssociationBuilding(TypeDesign) 910 163.80

130 Proposed Bar Association Building at Mudabidre, Dakshina Kannada District. 910 163.80

131 Proposed Bar Association at Koppa, Chikkamgalur District. 900 162.00

132 ProposedIBatChikkaballapura(Revisedsecondfloor) 870 156.60

133 Proposed Inspection Bungalow at Channapatna, Ramanagara District. 870 156.60

111

Page 131: Government of Karnataka Public Works, Ports & Inland Water ...

Sl. No. Name of the project Plinth Area

(Sq.Mt)Approximate cost

( Rs. in Lakh) 1 2 3 4

134 Proposed Bar Assocation at Honnali Taluk, Davanagere District 850 153.00

135 Proposed Circuit House at Yaragere Grama, Raichur District 850 153.00

136 Proposed Circuit House at Mudhol, Bagalkot District. 850 153.00

137 Proposed Bar Association in the court premises of Kollegala town, Chamarajanagar District 842 151.56

138 Proposed Additional classrooms for PU College at Kakkaragola, Davanagere District 834 150.12

139 ProposedV.I.PGuestHouseatKarwar,Uttara Kannada district 830 149.40

140 ProposedVIPGuestHouseatSakaleshpura,Hassan District. 822 147.96

141 Proposed Bar Association at Manvi, Raichur District 820 147.60

142 Proposed Bar Association at Gajendragad Taluk, Belagavi District 820 147.60

143 Proposed Library and Additionals Classrooms for Government Polytechnic College at Chitradurga 816 146.88

144 Proposed Additional Classrooms to Government Degree College at Channapatna, Ramanagara District. 810 145.80

145 Proposed Bar Association in the premises of Court ComplexatDevadurgaTaluk,RaichurDistrict 805 144.90

146 ProposedExciseofficeatRanebenurTaluk,Haveri District 796 143.28

147 ProposedLocalAuditCircleOfficeatKolar 795 143.10

148Proposed'B'TypeQuartersforGovernmentWomen'sResidential First Grade College at Haradanahalli, Holenarasipura Taluk, Hassan District.

791 142.38

149 ProposedDistrictStatisticsOfficeatMandya 784 141.12

150 ProposedGuestHouseforEngineeringCollegeat Arasikere, Hassan District 750 135.00

151 Proposed IB at Kadaba, Puttur Taluk, Dakshina Kannada District. 744 133.92

152 Proposed Administrative Block for Minor Irrigation at Mysuru 744 133.92

153 ProposedElectionMaterialStorageWarehouseatVijayapura 735 132.30

154 Proposed Pravasi Mandira at Kollur, Udupi District 730 131.40

155ProposedAdditional6Classroomsand2Toiletsfor B.P. Pre-University College at Therakanambi, Gundlupettaluk(UnderRIDF-24)

720 129.60

156 ProposedLokayuktaOfficeatRamangara 685 123.30

112

Page 132: Government of Karnataka Public Works, Ports & Inland Water ...

Sl. No. Name of the project Plinth Area

(Sq.Mt)Approximate cost

( Rs. in Lakh) 1 2 3 4

157 Proposed Bar Association in the premises of Court building at Hosadurga, Chitradurga District 685 123.30

158 Proposed Law Chambers in the premises of Court BuildingatMuddebihal,Vijayapura 674 121.32

159 Proposed Prayer Hall at Bilagi taluk, Bagalkot District 665 119.70

160 ProposedOfficeBuildingforJointDirectorofAgriculture(DistrictLevel)-TypeDesign 640 115.20

161Proposed New Class rooms and Laboratories for Government Womens First Grade College at Tarikere Taluk, Chikkamgaluru District

630 113.40

162 ProposedSub-RegistrarOfficeatPeriyapatnaTaluk,Mysuru District 615 110.70

163 ProposedJudicialQuartersatAdhyapakNagar,Hubbali, Dharwad District 612 110.16

164 ProposedJudicialOfficersQuartersatBhadravathiTaluk, Shivamogga District. 612 110.16

165 DesignforSenior/Junior/Fasttrack/CivilJudgequarters(Northfacing)TypeDesign 612 110.16

166 ProposedJudicialofficersQuartersatNavalgundTaluk, Dharwad District. 612 110.16

167 Proposed Court Building at Shikaripura Taluk, Shivamogga District 612 110.16

168 Proposed Bar Association at Shiggoan Taluk,Haveri district. 600 108.00

169 ProposedJudicialQuartersatSurapura 570 102.60

170 ProposedAdditionalsLabsforexistingGovernmentPolytechnic College at Turuvekere, Tumakruru District 570 102.60

171 ProposedJudicialQuartersatSullia,DakshinaKannada District 570 102.60

172 ProposedExciseOfficeatByadagiTaluk,Haveri District 560 100.80

113

Page 133: Government of Karnataka Public Works, Ports & Inland Water ...

APPENDICES

114

Page 134: Government of Karnataka Public Works, Ports & Inland Water ...
Page 135: Government of Karnataka Public Works, Ports & Inland Water ...

Appendix - 1District wise details of Road length in Karnataka

(As on 31-03-2020) (in Km)

Sl.No Name of the DistrictNational

HighwaysState

Highways

Major District Roads

Total

1 2 3 4 5 61 Bangalore Urban 85.10 158.90 692.64 936.642 Bangalore Rural 242.10 209.65 670.90 1122.653 Ramanagara 123.79 387.65 1434.52 1945.964 Kolar 177.41 305.52 1222.47 1705.405 Chikkaballapur 187.40 263.00 998.18 1448.586 Tumkur 421.37 683.38 3789.75 4894.507 Mysore 354.61 548.61 2551.81 3455.038 Mandya 214.09 427.66 2729.40 3371.159 Chamarajanagar 199.75 314.26 977.25 1491.2610 Hassan 337.65 909.81 3131.35 4378.8111 Chikkamagalur 283.18 535.71 1632.82 2451.7112 Dakshina Kannada 305.36 453.34 775.37 1534.0713 Udupi 252.49 260.31 791.88 1304.6814 Kodagu 95.61 476.31 855.50 1427.42 South Zone Total 3279.91 5934.11 22253.84 31467.8615 Dharwad 196.20 484.41 1404.23 2084.8416 Haveri 132.22 550.01 1848.27 2530.5017 Gadag 110.55 683.42 1179.34 1973.3118 Uttara Kannada 425.50 1173.91 2029.46 3628.8719 Shimogga 430.84 838.21 2003.74 3272.7920 Chitradurga 392.83 437.15 2088.81 2918.7921 Davanagere 111.46 513.74 1285.55 1910.7522 Belgavi 322.85 2351.79 3045.97 5720.6123 Vijayapur 340.13 708.50 2397.39 3446.0224 Bagalkote 203.39 814.36 1586.20 2603.95 North Zone Total 2665.97 8555.50 18868.96 30090.4325 Bellary 268.30 1148.47 2115.84 3532.6126 Raichur 166.12 850.52 1506.45 2523.0927 Koppal 260.07 667.00 1442.93 2370.0028 Kalburgi 320.42 1385.05 1234.30 2939.7729 Yadgir 166.80 423.97 1217.52 1808.2930 Bidar 330.78 505.26 880.08 1716.12 North East Zone Total 1512.49 4980.27 8397.12 14889.88 NH Yet to be allocated 130.30 0.00 0.00 130.30 State Total 7588.67 19469.88 49519.92 76578.47

115

Page 136: Government of Karnataka Public Works, Ports & Inland Water ...

Appendix – 2State Highways, District wise: Surface Feature and Carriageway Width

(As on 31-03-2020) (in Km)

116

Sl. No.

Name of the District

Total Length

Type of SurfaceCarriageway Width wise

road length

C.C. B.T. W.B.M.Un-

SurfacedS.L I.L D.L F.L

1 2 3 4 5 6 7 8 9 10 111 Bangalore Urban 158.90 0.50 158.40 0.00 0.00 3.50 14.10 90.61 50.692 Bangalore Rural 209.65 0.62 209.03 0.00 0.00 0.00 38.08 143.17 28.403 Ramanagara 387.65 0.00 387.65 0.00 0.00 29.10 193.72 161.43 3.404 Kolar 305.52 1.00 303.52 1.00 0.00 6.00 146.03 130.06 23.435 Chikkaballapur 263.00 0.00 263.00 0.00 0.00 41.06 64.54 148.80 8.606 Tumkur 683.38 8.76 674.62 0.00 0.00 89.52 229.35 363.01 1.507 Mysore 548.61 1.43 545.98 1.20 0.00 97.97 123.77 305.30 21.578 Mandya 427.66 1.15 425.39 1.12 0.00 2.02 212.41 207.77 5.469 Chamarajanagar 314.26 0.34 313.92 0.00 0.00 70.23 192.66 49.72 1.6510 Hassan 909.81 38.46 871.35 0.00 0.00 42.41 512.46 335.19 19.7511 Chikkamagalur 535.71 6.85 528.86 0.00 0.00 29.00 327.11 172.00 7.6012 Dakshina Kannada 453.34 2.80 450.54 0.00 0.00 7.80 277.34 164.40 3.8013 Udupi 260.31 3.32 256.99 0.00 0.00 0.00 182.18 69.37 8.7614 Kodagu 476.31 5.17 471.14 0.00 0.00 47.35 348.78 78.68 1.50 South Zone Total 5934.11 70.40 5860.39 3.32 0.00 465.96 2862.53 2419.51 186.1115 Dharwad 484.41 5.51 463.48 0.00 15.42 87.05 278.63 117.43 1.3016 Haveri 550.01 2.51 547.50 0.00 0.00 26.11 335.73 151.37 36.8017 Gadag 683.42 4.76 676.16 0.00 2.50 148.14 403.32 118.54 13.4218 Uttara Kannada 1173.91 6.80 1147.71 15.20 4.20 414.99 718.10 40.82 0.0019 Shimogga 838.21 12.51 823.50 2.20 0.00 87.04 538.88 184.81 27.4820 Chitradurga 437.15 0.93 436.22 0.00 0.00 4.45 274.66 155.89 2.1521 Davanagere 513.74 34.64 479.10 0.00 0.00 7.70 187.80 279.02 39.2222 Belgavi 2351.79 7.94 2343.05 0.80 0.00 501.30 1158.09 658.81 33.5923 Vijayapur 708.50 2.58 705.92 0.00 0.00 53.31 374.76 268.45 11.9824 Bagalkote 814.36 3.75 810.61 0.00 0.00 143.64 288.44 368.75 13.53 North Zone Total 8555.50 81.93 8433.25 18.20 22.12 1473.73 4558.41 2343.89 179.4725 Bellary 1148.47 70.90 1077.57 0.00 0.00 195.81 700.69 211.49 40.4826 Raichur 850.52 0.00 850.52 0.00 0.00 158.65 401.42 283.61 6.8427 Koppal 667.00 2.10 664.90 0.00 0.00 83.69 434.54 145.74 3.0328 Kalburgi 1385.05 9.30 1375.75 0.00 0.00 514.62 579.13 283.59 7.7129 Yadgir 423.97 0.00 423.97 0.00 0.00 16.64 307.59 99.74 0.0030 Bidar 505.26 0.00 505.26 0.00 0.00 132.60 238.97 84.07 49.62

North East Zone Total

4980.27 82.30 4897.97 0.00 0.00 1102.01 2662.34 1108.24 107.68

State Total 19469.88 234.63 19191.61 21.52 22.12 3041.70 10083.28 5871.64 473.26

Page 137: Government of Karnataka Public Works, Ports & Inland Water ...

Appendix – 3Major District Roads, District wise: Surface Feature and Carriageway Width

(As on 31-03-2020) (in Km)

117

Sl. No.

Name of the District

Total Length

Type of SurfaceCarriageway Width wise

road length

C.C. B.T. W.B.M.Un-

SurfacedS.L I.L D.L F.L

1 2 3 4 5 6 7 8 9 10 111 Bangalore Urban 692.64 10.67 681.97 0.00 0.00 196.88 283.17 195.98 16.612 Bangalore Rural 670.90 2.31 668.59 0.00 0.00 295.95 341.65 24.00 9.303 Ramanagara 1434.52 18.06 1370.01 18.10 28.35 877.62 501.70 38.40 16.804 Kolar 1222.47 7.98 1203.79 0.00 10.70 751.33 419.78 30.54 20.825 Chikkaballapur 998.18 3.50 975.85 0.00 18.83 504.17 432.37 47.86 13.786 Tumkur 3789.75 67.29 3560.97 104.74 56.75 2759.59 903.41 115.87 10.887 Mysore 2551.81 11.10 2431.55 109.16 0.00 1831.63 594.76 106.52 18.908 Mandya 2729.40 7.44 2605.08 116.88 0.00 1774.46 879.04 67.55 8.359 Chamarajanagar 977.25 0.00 904.95 72.30 0.00 636.44 340.81 0.00 0.0010 Hassan 3131.35 154.63 2851.49 40.59 84.64 2569.10 495.51 60.96 5.7811 Chikkamagalur 1632.82 19.40 1559.32 54.10 0.00 1318.52 297.59 14.91 1.8012 Dakshina Kannada 775.37 23.90 751.47 0.00 0.00 217.12 529.17 21.13 7.9513 Udupi 791.88 41.17 750.71 0.00 0.00 272.41 472.12 40.25 7.1014 Kodagu 855.50 7.43 812.67 0.00 35.40 599.60 255.40 0.50 0.00 South Zone Total 22253.84 374.88 21128.42 515.87 234.67 14604.82 6746.48 764.47 138.0715 Dharwad 1404.23 45.08 1193.59 42.09 123.47 1140.32 242.86 13.35 7.7016 Haveri 1848.27 37.67 1786.49 20.39 3.72 1351.74 457.89 34.73 3.9117 Gadag 1179.34 22.36 1129.76 2.00 25.22 972.41 188.22 14.09 4.6218 Uttara Kannada 2029.46 43.39 1798.83 21.60 165.64 1876.49 150.97 1.25 0.7519 Shimogga 2003.74 13.02 1975.62 10.29 4.81 1628.53 361.01 3.90 10.3020 Chitradurga 2088.81 16.74 2022.28 10.20 39.59 1555.19 481.16 52.46 0.0021 Davanagere 1285.55 71.98 1180.67 21.30 11.60 922.49 337.64 19.22 6.2022 Belgavi 3045.97 4.62 3035.70 5.40 0.25 2184.04 760.85 84.40 16.6823 Vijayapur 2397.39 8.76 2304.93 75.20 8.50 1745.35 594.99 57.05 0.0024 Bagalkote 1586.20 15.75 1535.49 2.81 32.15 997.05 530.31 58.74 0.10 North Zone Total 18868.96 279.37 17963.36 211.28 414.95 14373.61 4105.90 339.19 50.2625 Bellary 2115.84 82.50 1980.09 51.40 1.85 1399.44 626.76 77.81 11.8326 Raichur 1506.45 6.69 1491.76 8.00 0.00 1175.84 315.19 12.83 2.6027 Koppal 1442.93 9.95 1405.38 27.60 0.00 957.96 467.18 16.04 1.7528 Kalburgi 1234.30 24.58 1188.52 21.20 0.00 1045.38 163.52 21.40 4.0029 Yadgir 1217.52 6.19 1193.33 18.00 0.00 1078.08 133.44 6.00 0.0030 Bidar 880.08 16.99 856.19 6.90 0.00 490.61 374.70 8.97 5.80

North East Zone Total

8397.12 146.90 8115.27 133.10 1.85 6147.31 2080.79 143.05 25.98

State Total 49519.92 801.15 47207.05 860.25 651.47 35125.74 12933.17 1246.71 214.31

Page 138: Government of Karnataka Public Works, Ports & Inland Water ...

App

endi

x - 4

Len

gth

& la

ne w

idth

of N

atio

nal H

ighw

ays i

n K

arna

taka

as o

n 31

-03-

2020

118

Sl

No

NH

No

(Old

)

NH

N

o (N

ew)

Nom

encl

atur

eTo

tal

Len

gth

(in K

m)

Sing

le

Lan

e

Inte

r m

edia

te

Lan

e

Two

Lan

eFo

ur

Lan

eSi

x L

ane

14

48

The h

ighw

ay st

artin

g fro

m it

s jun

ctio

n with

Rao

Tul

a Ram

MarginDelhi(km.14.300ofoldNHNo.8)connecting

Baw

alintheStateofH

aryana,Kotputli,nearJaipur,

KIs

hang

arh,

Bhi

lwar

a, C

hitta

urga

rh, U

daip

ur in

the S

tate

ofRajasthan,A

hmedabad,Vadodara,Ankleshwarinthe

Stat

e of G

ujar

at, M

umba

i, Th

ane,

Pun

e, S

atar

a, K

olha

pur

in t

he S

tate

of

Mah

aras

htra

, B

elga

um,

Chi

tradu

rga,

BangaluruintheStateofKarnataka,K

rishnagiri,Vellor

andterminatingatitsjunctionwithNH-16nearChennai

in th

e St

ate

of T

amiln

adu.

589.000

0.00

0.00

29.48

357.00

202.52

24A

748

Thehighwaystartingfrom

itsjunctionwithNH-48near

Bel

gaum

, Anm

od in

the

Stat

e of

Kar

nata

ka, P

anda

and

terminatingatitsjunctionwithNH-66nearPanajiinthe

Stat

e of

Goa

.

84.120

0.00

0.00

84.12

0.00

0.00

37

44Th

e H

ighw

ay s

tarti

ng f

rom

Dev

anah

alli

conn

ectin

g B

anga

luru

in th

e St

ate

of K

arna

taka

, Hos

ur, K

rishn

agiri

, D

hram

apur

i,143.000

0.00

0.00

0.00

143.00

0.00

Page 139: Government of Karnataka Public Works, Ports & Inland Water ...

119

Sl

No

NH

No

(Old

)

NH

N

o (N

ew)

Nom

encl

atur

eTo

tal

Len

gth

(in K

m)

Sing

le

Lan

e

Inte

r m

edia

te

Lan

e

Two

Lan

eFo

ur

Lan

eSi

x L

ane

49

65

Thehighwaystartingfrom

itsjunctionwithNH-48near

Pune

con

nect

ing

Inda

pur,

Sola

pur,

Um

arga

in th

e St

ate

of M

ahar

asht

ra H

omna

bad

in t

he S

tate

of

Kar

nata

ka

Hyderabad{(excludingfromM

iyapur[km

524/00]to

Assem

bly[km543/00]onPune-HyderabadS

ection

andfrom

Assem

bly0/00to

LBNagar[Km14/00]on

Hyderabad-Vijayw

adaS

ection)},Vijayawada,Vuyyuru,

PamarruandterminatingatitsjunctionwithNH-216at

Mac

hllip

atna

m in

the

Stat

e of

And

hra

Prad

esh.

74.200

0.00

0.00

0.00

74.20

0.00

563,218

&13

52

Thehighwaystartingfrom

itsjunctionwithNH-7near

Sang

rur

in t

he S

tate

of

Punj

ab c

onne

ctin

g N

arw

ana,

HisarintheStateofHaryana,F

atehpur,Jaipur,T

onk,

Kot

a, A

kler

a in

the

Stat

e of

Raj

asth

an, R

ajga

rh, B

iora

, D

ewas

, Ind

ore,

Sen

dhw

a in

the S

tate

of M

adhy

a Pra

desh

, Dhule,A

urangabad,Beed,Osm

anabad,S

olapurin

the

Stat

e of

Mah

aras

htra

, B

ijapu

r, H

ubli

and

term

inat

ing

atitsjunctionwithNH-66nearAnkolaintheStateof

Kar

nata

ka.

402.070

0.00

0.00

320.724

81.346

0.00

617

66Th

e H

ighw

ay S

tarti

ng fr

om P

anaj

i-Mar

gaoi

n th

e st

ate

of

Goa

, Kar

war

a-H

onna

var-U

dupi

-Man

galo

re in

the

stat

e of

KA

to K

asar

agod

in K

L.300.100

0.00

0.00

300.10

0.00

0.00

Page 140: Government of Karnataka Public Works, Ports & Inland Water ...

Sl

No

NH

No

(Old

)

NH

N

o (N

ew)

Nom

encl

atur

eTo

tal

Len

gth

(in K

m)

Sing

le

Lan

e

Inte

r m

edia

te

Lan

e

Two

Lan

eFo

ur

Lan

eSi

x L

ane

748

75

ThehighwaystartingfromitsjunctionwithN

H-73

near

Ban

tval

, Has

san,

Ban

galu

ru, K

olar

in th

e St

ate

of

KarnatakaVenkatagirikotaintheStateofAndhraP

radesh

Pern

ampe

t, G

udiy

atta

m, K

atpa

di a

nd te

rmin

atin

g at

its

junctionwithNH-48nearVelloreintheStateofTam

ilna

du.

397.424

0.000

0.000

49.300

348.124

0.000

850

50

The h

ighw

ay st

artin

g fr

om it

s jun

ctio

n w

ith n

ew N

H N

o.

161atNandedinth

eStateofM

aharashtraconnecting

Udgir,B

idar,Hom

nabad,G

ulbarga,Jevargi,Bijapur,

HospetandterminatingatitsjunctionwithNH-48near

Laks

hmis

agar

a in

the

Stat

e of

Kar

nata

ka.

650.400

0.000

0.800

308.000

341.600

0.000

963

67ThehighwaystartingfromR

amnagaraonNH-748

conn

ectin

g D

harw

ad H

UB

LI a

nd g

adag

, kop

pal,

hosp

et,

bella

ry te

rmin

atin

g at

goo

ty.

394.878

0.00

16.93

70.65

307.30

0.00

1067

181

The

high

way

st

artin

g fr

om

its

junc

tion

with

N

H-

81nearCoimbatoreconnecting

Mettuppalaiyam,

Udagamandalam(Ooty),G

udalurintheStateofTam

ilNaduandterminatingatitsjunctionwithNH-766near

Gun

dulp

et in

the

Stat

e of

Kar

nata

ka.

26.100

0.00

11.84

14.26

0.00

0.00

11150

150

The

highwaystarting

from

Gulberga

onNH-50

Con

nect

ing

Wad

i-Yad

gir-

in th

e st

ate

of K

arna

taka

and

terminatingonN

H-167-inthestateofAP.

118.470

0.00

0.80

109.20

8.47

0.00

120

Page 141: Government of Karnataka Public Works, Ports & Inland Water ...

Sl

No

NH

No

(Old

)

NH

N

o (N

ew)

Nom

encl

atur

eTo

tal

Len

gth

(in K

m)

Sing

le

Lan

e

Inte

r m

edia

te

Lan

e

Two

Lan

eFo

ur

Lan

eSi

x L

ane

12150A

150A

ThehighwaystartingfromitsjunctionwithNH-50at

JevargiconnectingSiriguppa,B

ellary,H

iriyur,Huliyur,

Chi

kkan

ayak

anah

alli,

N

agam

anga

la

Srira

ngap

atna

-M

ysor

e-N

anja

ngud

and

term

inat

ing

at it

s ju

nctio

n w

ith

NH-948atC

hamarajanagarintheStateofKarnataka.

684.770

0.000

150.000

501.210

31.180

2.380

13150E

150E

The

highwayStarting

from

junction

NH-50

near

gulb

arga

con

nect

ing

chow

dapu

r, A

fzal

pur i

n th

e st

ate

of

KA

, du

dhan

i akk

alko

te a

nd te

rmin

atin

g at

its

junc

tion

withNH-52

72.920

0.000

0.000

63.920

9.000

0.000

14167

167

Thehighwaystarting

from

Haggari

onNH-67

in

Kar

nata

ka c

onne

ctin

g A

lur,

adon

i, M

antra

laya

m in

the

stat

e of

And

ra P

rade

sh c

onne

ctin

g R

aich

ur in

Kar

nata

ka

connectingMahbubnagarandterminatingonNH-44in

the

stat

e of

AP

71.400

0.000

0.000

59.280

12.120

0.000

15169A

169A

ThehighwaystartingfromitsjunctionwithN

H-169

near

Thi

rthah

alli

conn

ectin

g A

gum

be,

Heb

bari

and

terminatingatUdupiHarbour(Malpe)intheStateof

Kar

nata

ka

90.000

0.000

50.900

28.400

10.700

0.000

16173

173

ThehighwaystartingfromitsjunctionwithN

H-73

near

M

udig

ere

conn

ectin

g C

hikk

amag

alur

u,

Kad

ur,

Tam

atad

ahal

li, H

osad

urga

and

term

inat

ing

at it

s jun

ctio

n withnew

NHN

o.369nearHolalkereintheStateof

Kar

nata

ka.

153.000

0.000

87.800

62.100

3.100

0.000

121

Page 142: Government of Karnataka Public Works, Ports & Inland Water ...

Sl

No

NH

No

(Old

)

NH

N

o (N

ew)

Nom

encl

atur

eTo

tal

Len

gth

(in K

m)

Sing

le

Lan

e

Inte

r m

edia

te

Lan

e

Two

Lan

eFo

ur

Lan

eSi

x L

ane

17206&

234

69

The

highwayStarting

from

junction

NH-50

near

gulb

arga

con

nect

ing

chow

dapu

r, A

fzal

pur i

n th

e st

ate

of

KA

, du

dhan

i akk

alko

te a

nd te

rmin

atin

g at

its

junc

tion

withNH-52

562.349

0.000

58.245

467.379

36.725

0.000

18207

648

ThehighwaystartingfromitsjunctionwithN

H-48

near

Nel

aman

gla,

Dod

abal

lapu

r, D

even

halli

on

NH

-44,SarajpurintheStateofK

arnataka,Bagalurand

terminatingatitsjunctionwithNH-48nearHosurinthe

Stat

e of

Tam

il N

adu.

122.380

0.000

0.000

122.380

0.000

0.000

19209

948

The

highwaystarting

from

NH-48

junction

near

Kan

akap

ura-

Mal

aval

li-K

olle

gala

-Cha

mar

ajan

agar

a-TerminatingItsJu

nctionWithNh-544AtC

oimbatore.

198.004

0.000

29.450

145.239

23.315

0.000

20212

766

The

Hig

hway

St

artin

g fr

om

Gun

dlup

ete

Mys

ore

terminatingatitsjunctionwithNH-948nearK

ollegalin

the

stat

e of

KA

150.240

0.000

0.000

121.380

28.860

0.000

21766E

766E

The

high

way

star

ting

from

Kum

ta-H

aver

i-Sirs

i128.890

20.000

75.890

33.000

0.000

0.000

22234&

206

73

Thehighwaystartingfrom

itsjunctionwithNH-66near

Man

galu

ru c

onne

ctin

g B

antv

al, B

elta

ngad

i, M

udig

ere,

B

elur

, Ban

avar

, Ars

iker

e an

d te

rmin

atin

g at

its

junc

tion

withNH-48nearTum

kurintheStateofKarnataka

313.555

0.000

103.750

180.255

29.550

0.000

23275

275

Thehighwaystartingfrom

itsjunctonwithNH-75near

Ban

twal

a con

nect

ing

puttu

r-sul

ya-m

adik

eri-p

iriya

patn

a-m

ysur

u-sr

irang

apat

na-M

andy

a-C

hanp

atna

-ram

anag

ara-

andterminatingatirtsjunctionwithnew

NH-75on

beng

alur

u

348.337

0.000

0.000

188.100

160.237

0.000

122

Page 143: Government of Karnataka Public Works, Ports & Inland Water ...

Sl

No

NH

No

(Old

)

NH

N

o (N

ew)

Nom

encl

atur

eTo

tal

Len

gth

(in K

m)

Sing

le

Lan

e

Inte

r m

edia

te

Lan

e

Two

Lan

eFo

ur

Lan

eSi

x L

ane

24367

367

Thehighwaystartingfrom

itsjunctionwithNH-67near

Bha

napu

r con

nect

ing

Kuk

unur

, Yel

burg

a, G

ajen

drag

ad,

Bad

ami,

Gul

edag

uda,

B

agal

kote

, B

agal

kot

and

terminatingatitsjunctionwithnew

NHN

o.52near

Gad

dank

eri i

n th

e St

ate

of K

arna

taka

.

157.800

37.570

50.340

67.270

2.620

0.000

25766C

766C

ThehighwaystartingfromitsjunctionwithN

H66

nearByndur(Baindur)connectingKollur,Hosanagara,

Ana

ndap

ur,

Ana

ntha

pura

, Sh

ikar

pur,

Mas

ur

and

terminatingatitsjunctionwithNH48nearRanibennur

in th

e St

ate

of K

arna

taka

.

203.430

14.970

130.100

57.360

1.000

0.000

26275K

275K

ThehighwaystartingfromitsjunctionwithN

H-275

nearHinkalvillageconnectingNH-275/N

H-150Anear

Colum

biaA

siaH

ospital,NH-766/N

H-150AnearA

PMC

Ban

dipa

lya

and

term

inat

ing

at i

ts o

rigin

atin

g ju

nctio

n withNH-275nearHinkalV

illagearroundMysorecity

inthestateofKarnataka.(MysoreRingRoad)

41.535

0.000

0.000

0.000

0.000

41.535

27948A

948A

ThehighwaystartingfromjunctionofN

H-648and

NH-48

neardobaspet(manne),

Nijagal,

Kengal,

Gud

emar

anah

alli,

Har

thi,

Mel

ahal

li, H

ulik

ereg

unnu

r, R

ayas

andr

a,B

anav

asi,T

hoka

sand

ra i

n th

e st

ate

of K

A

conn

ectin

g A

cche

ttipa

lli

4.265

0.000

4.265

0.000

0.000

0.000

123

Page 144: Government of Karnataka Public Works, Ports & Inland Water ...

Sl

No

NH

No

(Old

)

NH

N

o (N

ew)

Nom

encl

atur

eTo

tal

Len

gth

(in K

m)

Sing

le

Lan

e

Inte

r m

edia

te

Lan

e

Two

Lan

eFo

ur

Lan

eSi

x L

ane

28548B

548B

TheHighw

aystartingfromitsjunctionwithNH-548C

near

Man

tha

conn

ectin

g D

eogo

an F

ata,

Sel

u, P

atha

ri,

Sonpeth,P

araliVaijnath,A

mbajogai,

Renapurphata,

Latur(NH-361),Ausa,Omarga,Yenegur,M

urum

,Alur,

Akk

alko

t, N

agas

ur in

the s

tate

of M

ahar

asht

ra co

nnec

ting

Bijapur(Vijayapura),Tikota,Athani,Kagwad,Chikhodi,

Sankeshw

arandterminatingatitsjunctionwithNH-48

near

Got

ur in

the

stat

e of

Kar

nata

ka.

271.000

0.000

176.000

95.000

0.000

0.000

29373

373

ThehighwaystartingfromitsjunctionwithN

H-73

near

bel

uru

conn

ectin

g H

assa

n ,

Hol

enar

asip

ura

and

terminatingitsjunctionwithNH-275nearBilikerein

the

stat

e of

Kar

nata

ka

126.730

0.000

0.000

126.730

0.000

0.000

30369E

369E

Thehighwaystartingfrom

itsjunctionwithNH-69near

Saga

r C

onne

ctin

g co

nnec

ting

Huv

inah

alli,

Hol

ebag

lu,K

alasavalli,SighanandoorandterminatingatitsJunction

withNH-766CnearM

arakutukainthestateofKA

67.200

28.500

38.700

0.000

0.000

0.000

31160

160

The

Hig

hway

St

artin

g fr

om T

asgo

n, M

iraj c

onne

ctin

g ChikkodiandterminatingitsjunctionwithNH-48inthe

stat

e of

KA

60.000

0.000

2.000

58.000

0.000

0.000

3213

169

Thehighwaystarting

from

NH-69

nearshivmoga

conn

ectin

g t

hirth

ahal

li ko

ppa

Kar

kal

and

term

inat

ing

itsjunctionwithNH-66nearmangalore.

213.800

16.800

114.500

82.500

0.000

0.000

3313

369

ThehighwaystartingfromitsjunctionwithN

H-69

near

Bha

drav

ati c

onne

ctin

g C

hann

agiri

, Hol

alke

re a

nd

terminatingatitsjunctionwithNH-48nearChitradurga

in th

e St

ate

of K

arna

taka

.

105.300

0.400

8.000

89.850

7.050

0.000

124

Page 145: Government of Karnataka Public Works, Ports & Inland Water ...

Sl

No

NH

No

(Old

)

NH

N

o (N

ew)

Nom

encl

atur

eTo

tal

Len

gth

(in K

m)

Sing

le

Lan

e

Inte

r m

edia

te

Lan

e

Two

Lan

eFo

ur

Lan

eSi

x L

ane

34516A

516A

The

Hig

hway

Sta

rting

from

pan

dhar

pur i

,Man

galw

edha

inM

HandterminatingitsjunctionwithNH-52NEA

R

Bija

pur i

n th

e st

ate

o f K

A12.000

0.000

12.000

0.000

0.000

0.000

35752K

752K

TheHighw

ayStartingfromitsjunctionwithNH-752I

nearJinturinth

estateofM

aharashtraandconnecting

toB

ori,Zari,P

arbhani,Gangakhed,Isad,Kingaon,

Dha

nora

, Wad

val,

Nag

nath

, Gha

rani

, Nal

egoa

n, L

atur

, N

itur,

Nila

nga,

Sirs

hi,

Aur

ad S

haja

ni i

n th

e st

ate

of

MaharashtraandterminatingatitsjunctionwithNH-50

near

Bha

lki i

n th

e st

ate

of K

arna

taka

.

48.200

0.000

0.000

45.150

3.050

0.000

36161A

161A

TheHighw

aystartingfromitsjunctionwithNH-548C

Ako

t, Pa

tsul

, Bho

d, A

kola

, Bar

shi T

akli,

She

lu b

azaa

r, M

angr

ulpi

r, M

anor

a, D

igra

s, A

rni,

Dha

noda

, M

ahur

, Sa

rkha

ni,

Kin

vat,

Isla

pur,

Him

ayat

naga

r, B

hoka

r, Mudkhed,Nanded,Osm

anpur,Kautha,Mukhed,Barhali,

Muk

raba

d, L

akhm

apur

, Sa

war

mal

, N

anga

rga,

Waz

zar

in th

e st

ate

of M

ahar

asht

ra c

onne

ctin

g A

urad

, Tul

japu

r, M

usta

pur,

Mar

khal

, N

awad

geri

and

term

inat

ing

at i

ts

junc

tion

with

Bid

ar R

ing

Roa

d in

the

stat

e of

Kar

nata

ka.

46.700

3.300

43.400

0.000

0.000

0.000

37544D

D544D

D

Thehighwaystartingfrom

itsjunctionwithNHNo.44

near

Ana

natp

ur c

onne

ctin

g, R

ayad

urg

in t

he S

tate

of

And

hra

Prad

esh

and

term

inat

ing

at it

s jun

ctio

n w

ith N

H-

150A

nearM

olkalmuruinthestateofKarnataka.

11.000

0.000

5.900

5.100

0.000

0.000

125

Page 146: Government of Karnataka Public Works, Ports & Inland Water ...

Sl

No

NH

No

(Old

)

NH

N

o (N

ew)

Nom

encl

atur

eTo

tal

Len

gth

(in K

m)

Sing

le

Lan

e

Inte

r m

edia

te

Lan

e

Two

Lan

eFo

ur

Lan

eSi

x L

ane

38544E

544E

The

high

way

st

artin

g fr

om

its

junc

tion

with

N

H

No.44nearKodikondacheckpost

connecting

Lepa

kshi

,Hin

dupu

r,Mad

akas

ira,

Rol

la,,A

GA

LI i

n A

P andterminatingitsjunctionwithNH-48nraeSirainKA

16.600

0.000

14.000

0.000

2.600

0.000

39548H

548H

Thehighwaystartingfrom

itsjunctionwithNH-48near

Sank

eshw

ar in

the s

tate

of K

arna

taka

, Gad

hing

laj,

Aja

ra,

Am

boli,

Mad

khol

, Saw

antw

adi,

Insu

li an

d te

rmin

atin

g atitsjunctionwithNH-66nearBandainthestateof

Mah

arsh

tra.

3.300

0.000

0.000

3.300

0.000

0.000

40748A

A748A

A

ThehighwaystartingfromitsjunctionwithN

H-748

near

Mac

hhe

Con

nect

ing

Pira

nvad

i, N

avag

e, K

inay

e,

Kusam

alli,Jamboti,Kalmani,Kankumbi,inthestateof

KarnatakaPoriem,M

atneeandterminatingatSanquelim

(nearS

hriD

attarayaM

andir)intheStateofGoa.

49.840

0.000

33.530

16.310

0.000

0.000

41367A

367A

Thehighwaystartingfrom

itsjunctionwithNH-67near

KoppalandterminatingatitsjunctionwithNHNo.50

near

Met

gal i

n th

e St

ate

of K

arna

taka

.25.100

0.000

25.100

0.000

0.000

0.000

42166E

166E

TheHighw

aystartingfrom

Khanapur-N

agaj-JAT

inthe

sateofM

HandtermintatingatitsJunctionwithNH-52

near

bija

pur i

n th

e st

ate

of K

A25.000

0.000

0.000

25.000

0.000

0.000

43163B

163B

The

high

way

star

ting

from

BID

AR

-Niz

amap

et20.000

0.000

20.000

0.000

0.000

0.000

44766EE

766EE

Thehighwaystartingfrom

itsjunctionwithNH-66near

Hat

tiker

i and

term

inat

ing

at B

elek

eri P

ort i

n th

e St

ate

of

Kar

nata

ka.

4.265

0.000

4.265

0.000

0.000

0.000

To

tal

7588

.672

121.

540

1268

.505

3930

.045

2022

.147

246.

435

126

Page 147: Government of Karnataka Public Works, Ports & Inland Water ...

App

endi

x - 5

Div

isio

n w

ise

leng

th o

f Nat

iona

l Hig

hway

s in

Kar

nata

ka a

s on

31.0

3.20

20

Sl.

No.

NH

N

o.

New

N

H

No.

Nom

encl

atur

e

Bengalore DivisionTumkur Division

Chitrdurga DivisionHassan Division

Manga lore Division

Hubli DivisionKarwar DivisionBijapur DivisionKalburgi DivisionPPP Cell ShivmogaPPP Cell

CPB

NHAI

KRDCL

Yet to Be allocated

Total Length in Km

12

34

56

78

910

1112

1314

1516

1718

19

14

(MKB)NH-48

The

high

way

st

artin

g fr

om

its

junc

tion

with

Rao

Tul

a R

am M

arg

inD

elhi(km

.14.300ofoldNH

No.8)connectingBaw

alinthe

Stat

e of

Har

yana

, K

otpu

tli,

near

Jaipur,

KIshangarh,Bhilwara,

Chi

ttaur

garh

, U

daip

ur

in

the

Stat

e of

Raj

asth

an,

Ahm

edab

ad,

Vadodara,

Ankleshwarinthe

Stat

e of

Guj

arat

, Mum

bai,

Than

e,

Pune

, Sa

tara

, K

olha

pur

in

the

Stat

e of

Mah

aras

htra

, B

elga

um,

Chi

tradu

rga,

B

anga

luru

in

th

e St

ate

of K

arna

taka

, K

rishn

agiri

, Vellor

and

terminating

atits

junctionwithNH-16nearChennai

in th

e St

ate

of T

amiln

adu.

0.00

0.00

0.00

0.00

0.00

29.48

0.00

0.00

0.00

0.00

0.00

559.52

0.00

0.00

589.00

24A

NH

-748

The

high

way

st

artin

g fr

om

itsjunction

withNH-48

near

Bel

gaum

, Anm

od i

n th

e St

ate

of

Kar

nata

ka, P

anda

and

term

inat

ing

atitsjunctionwithN

H-66near

Pana

ji in

the

Stat

e of

Goa

.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

84.12

0.00

0.00

84.12

127

Page 148: Government of Karnataka Public Works, Ports & Inland Water ...

Sl.

No.

NH

N

o.

New

N

H

No.

Nom

encl

atur

e

Bengalore DivisionTumkur Division

Chitrdurga DivisionHassan Division

Manga lore Division

Hubli DivisionKarwar DivisionBijapur DivisionKalburgi DivisionPPP Cell ShivmogaPPP Cell

CPB

NHAI

KRDCL

Yet to Be allocated

Total Length in Km

37

NH-44

The

Hig

hjw

ay

star

ting

from

D

evan

ahal

li co

nnec

ting B

anga

luru

in

the

Stat

e of

Kar

nata

ka, H

osur

, K

rishn

agiri

, Dhr

amap

uri,

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

143.00

0.00

0.00

143.00

49

NH-65

The

high

way

st

artin

g fr

om

itsjunction

withNH-48

near

Pune

co

nnec

ting

Inda

pur,

Sola

pur,

Um

arga

in

the

Stat

e of

M

ahar

asht

ra

Hom

naba

d in

th

e St

ate

of

Kar

nata

ka

Hyd

erab

ad

{(excluding

from

Miyapur

[km5

24/00]toAssem

bly

[km

543/00]

on

Pune-Hyderabad

Sectionandfrom

Assem

bly0/00

toLB

Nagar[Km14/00]on

Hyderabad-V

ijayw

adaSection)},

Vijayawada,Vuyyuru,Pamarru

and

term

inat

ing

at

its

junc

tion

withNH-216atM

achllipatnamin

the

Stat

e of

And

hra

Prad

esh.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

74.20

0.00

0.00

74.20

513

NH

-169

The

high

way

sta

rting

fro

m N

H-

69nearshivmoga

connecting

thirt

haha

lli

kopp

a K

arka

l an

d te

rmin

atin

g its

junc

tion

with

NH

-66nearm

angalore.

0.00

0.00

59.90

0.00

153.90

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

213.80

128

Page 149: Government of Karnataka Public Works, Ports & Inland Water ...

Sl.

No.

NH

N

o.

New

N

H

No.

Nom

encl

atur

e

Bengalore DivisionTumkur Division

Chitrdurga DivisionHassan Division

Manga lore Division

Hubli DivisionKarwar DivisionBijapur DivisionKalburgi DivisionPPP Cell ShivmogaPPP Cell

CPB

NHAI

KRDCL

Yet to Be allocated

Total Length in Km

613

NH

-369

The

high

way

sta

rting

fro

m

its

junctionw

ithNH-69nearBhadravati

conn

ectin

g Ch

anna

giri,

H

olal

kere

an

d te

rmin

atin

g at

its

junc

tion

with

NH-48nearChitradurgaintheS

tate

of K

arna

taka

.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

105.30

0.00

0.00

0.00

0.00

105.30

717

NH-66

The

Hig

hway

St

artin

g fr

om

Pana

ji-M

arga

oin

the

stat

e of

G

oa,

Kar

war

a-H

onna

var-U

dupi

-M

anga

lore

in

the

stat

e of

KA

to

Kas

arag

od in

KL.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

300.10

0.00

0.00

300.10

848

NH-75

The

high

way

st

artin

g fr

om

its

junctionwithNH-73nearBantval,

Has

san,

Ban

galu

ru,

Kol

ar i

n th

e StateofK

arnatakaVenkatagirikota

in t

he S

tate

of

And

hra

Prad

esh

Pern

ampe

t, G

udiy

atta

m,

Kat

padi

an

d te

rmin

atin

g at

its

ju

nctio

n withN

H-48nearVelloreinthe

Stat

e of

Tam

il na

du.

0.00

0.00

0.00

0.00

26.00

0.00

0.00

0.00

0.00

0.00

0.00

371.42

0.00

0.00

397.42

950

NH-50

The

high

way

st

artin

g fr

om

its j

unct

ion

with

new

NH

No.

161atN

andedintheS

tateof

Mah

aras

htra

co

nnec

ting

Udg

ir,

Bid

ar,

Hom

naba

d,

Gul

barg

a,

Jevargi,

Bijapur,

Hospet

and

term

inat

ing

at i

ts j

unct

ion

with

NH-48nearLakshmisagarainthe

Stat

e of

Kar

nata

ka.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

101.40

0.00

0.00

549.00

0.00

0.00

650.40

129

Page 150: Government of Karnataka Public Works, Ports & Inland Water ...

Sl.

No.

NH

N

o.

New

N

H

No.

Nom

encl

atur

e

Bengalore DivisionTumkur Division

Chitrdurga DivisionHassan Division

Manga lore Division

Hubli DivisionKarwar DivisionBijapur DivisionKalburgi DivisionPPP Cell ShivmogaPPP Cell

CPB

NHAI

KRDCL

Yet to Be allocated

Total Length in Km

1063

NH-67

The

high

way

st

artin

g fr

om

Ram

nagaraonNH-748connect-

ing

Dha

rwad

HU

BLI

and

gad

ag,

kopp

al, h

ospe

t, be

llary

term

inat

ing

at g

ooty

.

87.88

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

307.00

0.00

0.00

394.88

1163,218

&13

NH-52

The

high

way

st

artin

g fr

om

itsjunction

withNH-7near

Sang

rur

in t

he S

tate

of

Punj

ab

conn

ectin

g N

arw

ana,

H

isar

in

th

e St

ate

of H

arya

na,

Fate

hpur

, Jaipur,Tonk,Kota,Aklera

in

the

Stat

e of

Raj

asth

an,

Raj

garh

, B

iora

, D

ewas

, In

dore

, Se

ndhw

a in

the

Sta

te o

f M

adhy

a Pr

ades

h,

Dhu

le,

Aur

anga

bad,

B

eed,

Osm

anabad,S

olapurintheState

of

Mah

aras

htra

, B

ijapu

r, H

ubli

and

term

inat

ing

at

its

junc

tion

withN

H-66nearA

nkolainthe

Stat

e of

Kar

nata

ka.

0.00

0.00

0.00

0.00

0.00

171.00106.00

51.60

0.00

0.00

0.00

73.47

0.00

0.00

402.07

1267

NH

-181

The

high

way

st

artin

g fr

om

its

junctionw

ithNH-81n

earC

oimba-

tore

con

nect

ing

Met

tupp

alai

yam

, Udagamandalam(Ooty),G

udalur

in t

he S

tate

of

Tam

il N

adu

and

term

inat

ing

at i

ts j

unct

ion

with

NH-766nearGundulpetinthe

Stat

e of

Kar

nata

ka.

26.10

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

26.10

130

Page 151: Government of Karnataka Public Works, Ports & Inland Water ...

Sl.

No.

NH

N

o.

New

N

H

No.

Nom

encl

atur

e

Bengalore DivisionTumkur Division

Chitrdurga DivisionHassan Division

Manga lore Division

Hubli DivisionKarwar DivisionBijapur DivisionKalburgi DivisionPPP Cell ShivmogaPPP Cell

CPB

NHAI

KRDCL

Yet to Be allocated

Total Length in Km

13150

NH

-150

The

high

way

st

artin

g fr

om

GulbergaonN

H-50Connecting

Wad

i-Yad

gir-

in

the

stat

e of

K

arna

taka

an

d te

rmin

atin

g on

NH-167-inthestateofAP.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

118.47

0.00

0.00

0.00

0.00

0.00

118.47

14150A

NH

-150A

The

high

way

st

artin

g fr

om

itsjunction

withNH-50

at

Jevargi

connecting

Siriguppa,

Bel

lary

, H

iriyu

r, H

uliy

ur,

Chi

kkan

ayak

anah

alli,

N

agam

an

-gal

a Sr

irang

apat

na

- M

ysor

e -

Nan

jang

ud

and

term

inat

ing

atitsjunctionwithN

H-948at

Cha

mar

ajan

agar

in

the

Stat

e of

K

arna

taka

.

77.57158.67

94.88

0.00

0.00

0.00

0.00

110.15

39.30

0.00

0.00

204.20

0.00

0.00

684.77

15150E

NH

-150E

The

high

way

St

artin

g fr

om

junction

NH-50

neargulbarga

conn

ectin

g ch

owda

pur,

Afz

alpu

r in

th

e st

ate

of

KA

,

dudh

ani

akka

lkot

e an

d te

rmin

atin

g at

its

junctionwithNH-52

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

72.92

0.00

0.00

0.00

0.00

0.00

72.92

16167

167

The h

ighw

ay st

artin

g fro

m H

agga

ri onNH-67inK

arnatakaconnecting

Alu

r, ad

oni,

Man

trala

yam

in

the

stat

e of

And

ra P

rade

sh c

onne

ctin

g R

aich

ur i

n K

arna

taka

con

nect

ing

Mah

bubn

agar

and

term

inat

ing

on

NH-44inthestateofAP

0.00

0.00

71.40

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

71.40

131

Page 152: Government of Karnataka Public Works, Ports & Inland Water ...

Sl.

No.

NH

N

o.

New

N

H

No.

Nom

encl

atur

e

Bengalore DivisionTumkur Division

Chitrdurga DivisionHassan Division

Manga lore Division

Hubli DivisionKarwar DivisionBijapur DivisionKalburgi DivisionPPP Cell ShivmogaPPP Cell

CPB

NHAI

KRDCL

Yet to Be allocated

Total Length in Km

17169A

NH

-169A

The

high

way

st

artin

g fr

om

its

junction

with

NH-169

near

Thirt

haha

lli c

onne

ctin

g A

gum

be,

Heb

bari

and

term

inat

ing

at U

dupi

Harbour(Malpe)intheStateof

Kar

nata

ka

0.00

0.00

0.00

0.00

90.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

90.00

18173

NH

-173

The

high

way

st

artin

g fr

om

its

junction

with

NH-73

near

M

udig

ere

conn

ectin

g C

hikk

amag

alur

u,

Kad

ur,

Tam

atad

ahal

li,

Hos

adur

ga

and

term

inat

ing

at i

ts j

unct

ion

with

newNHNo.369nearHolalkere

in th

e St

ate

of K

arna

taka

.

0.00

0.00

78.8572.10

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

153.00

19206&

234

NH-69

The

high

way

st

artin

g fr

om

star

ting

from

jun

ctio

n w

ith N

H-

66nearhonnavara

connecting

shim

oga,

ban

avar

a, h

uliy

ar s

ira

mad

hugi

ri ch

inta

man

i m

ulba

gal

in th

e st

ate

of K

A

21.95100.91

94.4048.65

0.00

0.00

70.90

0.00

0.00

0.00

139.35

86.20

0.00

0.00

562.35

20206&

234

NH-73

The

high

way

st

artin

g fr

om

itsjunction

withNH-66

near

Man

galu

ru

conn

ectin

g B

antv

al,

Bel

tang

adi,

Mud

iger

e,

Bel

ur,

Ban

avar

, Ars

iker

e an

d te

rmin

atin

g atitsjunctionwithN

H-48near

Tum

kur i

n th

e St

ate

of K

arna

taka

0.00

12.30

0.00

108.36

66.40

0.00

0.00

0.00

0.00

0.00

0.00

126.50

0.00

0.00

313.56

132

Page 153: Government of Karnataka Public Works, Ports & Inland Water ...

Sl.

No.

NH

N

o.

New

N

H

No.

Nom

encl

atur

e

Bengalore DivisionTumkur Division

Chitrdurga DivisionHassan Division

Manga lore Division

Hubli DivisionKarwar DivisionBijapur DivisionKalburgi DivisionPPP Cell ShivmogaPPP Cell

CPB

NHAI

KRDCL

Yet to Be allocated

Total Length in Km

21207

NH

-648

The

high

way

st

artin

g fr

om

itsjunction

withNH-48

near

Nel

aman

gla,

D

odab

alla

pur,

DevenhallionNH-44,S

arajpur

in th

e St

ate

of K

arna

taka

, Bag

alur

an

d te

rmin

atin

g at

its

ju

nctio

n withN

H-48nearH

osurinthe

Stat

e of

Tam

il N

adu.

0.00

41.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

81.38

0.00

0.00

122.38

22209

NH

-948

The

high

way

st

artin

g from

NH-48

junction

near

kana

kapu

ra-M

alav

alli-

Kol

lega

la

-Cha

mar

ajan

agar

a-Te

rmin

atin

g ItsJunction

WithNH-544At

Coi

mba

tore

.

63.78

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

134.23

0.00

0.00

198.00

23212

NH

-766

The

H

ighw

ay

Star

ting

from

G

undl

upet

e M

ysor

e te

rmin

atin

g atitsjunctionwithNH-948near

Kol

lega

l in

the

stat

e of

KA

19.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

131.24

0.00

0.00

150.24

24275

NH

-275

The

high

way

st

artin

g fr

om

itsjuncton

withNH-75

near

Ban

twal

a co

nnec

ting

puttu

r-su

lya-

mad

iker

i-pi

riya

patn

a-m

ysur

u-sr

iran

gapa

tna-

Man

dya-

Cha

npat

na-r

aman

agar

a-

and

term

inat

ing

at i

rts j

unct

ion

with

newNH-75onbengaluru

80.69

0.00

0.00

0.00

132.31

0.00

0.00

0.00

0.00

0.00

0.00

135.34

0.00

0.00

348.34

133

Page 154: Government of Karnataka Public Works, Ports & Inland Water ...

Sl.

No.

NH

N

o.

New

N

H

No.

Nom

encl

atur

e

Bengalore DivisionTumkur Division

Chitrdurga DivisionHassan Division

Manga lore Division

Hubli DivisionKarwar DivisionBijapur DivisionKalburgi DivisionPPP Cell ShivmogaPPP Cell

CPB

NHAI

KRDCL

Yet to Be allocated

Total Length in Km

25367

NH

-367

The

high

way

st

artin

g fr

om

itsjunction

withNH-67

near

Bha

napu

r co

nnec

ting

Kuk

unur

, Ye

lbur

ga,

Gaj

endr

agad

, B

adam

i, G

uled

agud

a, B

agal

kote

, Bag

alko

t an

d te

rmin

atin

g at

its j

unct

ion

with

newNHNo.52nearGaddankeri

in th

e St

ate

of K

arna

taka

.

0.00

0.00

0.00

0.00

0.00

104.00

0.00

53.80

0.00

0.00

0.00

0.00

0.00

0.00

157.80

26766C

NH

-766C

The

high

way

st

artin

g fr

om

itsjunction

withNH66near

Byndur

(Baindur)

connecting

Kol

lur,

Hos

anag

ara,

Ana

ndap

ur,

Ana

ntha

pura

, Sh

ikar

pur,

Mas

ur

and

term

inat

ing

at

its

junc

tion

withN

H48nearRanibennurin

the

Stat

e of

Kar

nata

ka.

0.00

0.00

126.50

0.00

38.7038.23

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

203.43

27275K

NH

-275K

The

high

way

st

artin

g fr

om

its

junction

with

NH-275

near

Hin

kal

villa

ge

conn

ectin

g N

H-

275/N

H-150A

nearColum

bia

Asia

Hospital,

NH-766/

NH-

150A

nearAPM

CBandipalya

and

term

inat

ing

at i

ts o

rigin

atin

g junctionwithNH-275nearH

inkal

VillagearroundMysorecityinthe

stateofKarnataka.(MysoreRing

Road)

41.54

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

41.54

134

Page 155: Government of Karnataka Public Works, Ports & Inland Water ...

Sl.

No.

NH

N

o.

New

N

H

No.

Nom

encl

atur

e

Bengalore DivisionTumkur Division

Chitrdurga DivisionHassan Division

Manga lore Division

Hubli DivisionKarwar DivisionBijapur DivisionKalburgi DivisionPPP Cell ShivmogaPPP Cell

CPB

NHAI

KRDCL

Yet to Be allocated

Total Length in Km

28948A

NH

-948A

The

high

way

st

artin

g fr

om

junctionofN

H-648andN

H-48

neardobaspet(manne),

Nijagal

,Ken

gal,G

udem

aran

ahal

li,H

art

hi,

Mel

ahal

li,

Hul

iker

egun

nur,

Ray

asan

dra,

B

anav

asi,

Thok

asan

dra

in t

he s

tate

of

KA

co

nnec

ting

Acc

hetti

palli

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.27

0.00

0.00

4.27

29548B

NH

-548B

The

Hig

hway

sta

rting

fro

m i

ts

junction

withNH-548Cnear

Man

tha

conn

ectin

g D

eogo

an

Fata

, Se

lu,

Path

ari,

Sonp

eth,

Parali

Vaijnath,

Ambajogai,

Renapurphata,Latur(NH-361),

Ausa,Omarga,Y

enegur,M

urum

,A

lur,

Akk

alko

t, N

agas

ur i

n th

e st

ate

of M

ahar

asht

ra c

onne

ctin

g Bijapur

(Vijayapura),

Tikota,

Ath

ani,

Kag

wad

, C

hikh

odi,

Sank

eshw

ar a

nd te

rmin

atin

g at

its

junctionwithN

H-48nearG

otur

in th

e st

ate

of K

arna

taka

.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

271.00

0.00

0.00

0.00

0.00

0.00

0.00

271.00

30373

NH

-373

The

high

way

st

artin

g fr

om

itsjunction

withNH-73

near

belu

ru

conn

ectin

g H

assa

n ,

Hol

enar

asip

ura

and

term

inat

ing

itsjunction

withNH-275near

Bili

kere

in th

e st

ate

of K

arna

taka

0.00

0.00

0.00

126.73

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

126.73

135

Page 156: Government of Karnataka Public Works, Ports & Inland Water ...

Sl.

No.

NH

N

o.

New

N

H

No.

Nom

encl

atur

e

Bengalore DivisionTumkur Division

Chitrdurga DivisionHassan Division

Manga lore Division

Hubli DivisionKarwar DivisionBijapur DivisionKalburgi DivisionPPP Cell ShivmogaPPP Cell

CPB

NHAI

KRDCL

Yet to Be allocated

Total Length in Km

31369E

NH

-369E

The

high

way

st

artin

g fr

om

its

junctionwithN

H-69nearSagar

Con

nect

ing

conn

ectin

g H

uvin

aha

lli,H

oleb

aglu

,Kal

asav

alli

,Si

ghan

ando

or

and

term

inat

ing

at

itsJunctionwithN

H-766Cnear

Mar

akut

uka

in th

e st

ate

of K

A

0.00

0.00

67.20

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

67.20

32516A

NH

-516A

The

Hig

hway

St

artin

g fr

om

pand

harp

ur

i,Man

galw

edha

in

M

H a

nd t

erm

inat

ing

its j

unct

ion

withNH-52NEA

RBijapurinthe

stat

e o

f KA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

12.00

0.00

0.00

0.00

0.00

0.00

0.00

12.00

33166E

NH

-166E

The

Hig

hway

st

artin

g fr

om

Khanapur-N

agaj-JAT

inthesate

of M

H a

nd t

erm

inta

ting

at i

ts

JunctionwithNH-52nearbijapur

in th

e st

ate

of K

A

0.00

0.00

0.00

0.00

0.00

0.00

0.00

25.00

0.00

0.00

0.00

0.00

0.00

0.00

25.00

34544E

NH

-544E

The

high

way

st

artin

g fr

om

its

junctionwithN

HN

o.44near

Kod

ikon

da c

heck

post

con

nect

ing

Lepa

kshi

, Hin

dupu

r, M

adak

asira

, R

olla

, A

GA

LI

in

AP

an

d te

rmin

atin

g its

junc

tion

with

NH

-48nraeSirainKA

0.00

16.60

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

16.60

35160

NH

-160

The

Hig

hway

Star

ting

from

Ta

sgon

, M

iraj

conn

ectin

g C

hik-

kodi

and

ter

min

atin

g its

jun

ctio

n withNH-48inthestateofKA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

60.00

0.00

0.00

0.00

0.00

0.00

0.00

60.00

136

Page 157: Government of Karnataka Public Works, Ports & Inland Water ...

Sl.

No.

NH

N

o.

New

N

H

No.

Nom

encl

atur

e

Bengalore DivisionTumkur Division

Chitrdurga DivisionHassan Division

Manga lore Division

Hubli DivisionKarwar DivisionBijapur DivisionKalburgi DivisionPPP Cell ShivmogaPPP Cell

CPB

NHAI

KRDCL

Yet to Be allocated

Total Length in Km

36752K

NH

-752K

The

Hig

hway

Sta

rting

fro

m i

ts

junctionwithNH-752InearJintur

in t

he s

tate

of

Mah

aras

htra

and

connectingtoBori,Zari,Parbhani,

Gan

gakh

ed,

Isad

, K

inga

on,

Dha

nora

, W

adva

l, N

agna

th,

Gha

rani

, N

aleg

oan,

Lat

ur,

Nitu

r, N

ilang

a,

Sirs

hi,

Aur

ad

Shaj

ani

in t

he s

tate

of

Mah

aras

htra

and

te

rmin

atin

g at

its

jun

ctio

n w

ith

NH-50nearBhalkiinthestateof

Kar

nata

ka.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

48.20

0.00

0.00

0.00

0.00

0.00

48.20

37161A

NH

-161A

The

Hig

hway

sta

rting

fro

m i

ts

junction

withNH-548CAkot,

Pats

ul,

Bho

d,

Ako

la,

Bar

shi

Takl

i, Sh

elu

baza

ar,

Man

grul

pir,

Man

ora,

Dig

ras,

Arn

i, D

hano

da,

Mah

ur, S

arkh

ani,

Kin

vat,

Isla

pur,

Him

ayat

naga

r, B

hoka

r, M

udkh

ed,

Nanded,

Osm

anpur,

Kautha,

Muk

hed,

B

arha

li,

Muk

raba

d,

Lakh

map

ur, S

awar

mal

, Nan

garg

a,

Waz

zar i

n th

e sta

te o

f Mah

aras

htra

co

nnec

ting

Aur

ad,

Tulja

pur,

Mus

tapu

r, M

arkh

al,

Naw

adge

ri an

d te

rmin

atin

g at

its

ju

nctio

n w

ith B

idar

Rin

g R

oad

in th

e st

ate

of K

arna

taka

.

0.00

0.00

0.00

0.00

46.70

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

46.70

137

Page 158: Government of Karnataka Public Works, Ports & Inland Water ...

Sl.

No.

NH

N

o.

New

N

H

No.

Nom

encl

atur

e

Bengalore DivisionTumkur Division

Chitrdurga DivisionHassan Division

Manga lore Division

Hubli DivisionKarwar DivisionBijapur DivisionKalburgi DivisionPPP Cell ShivmogaPPP Cell

CPB

NHAI

KRDCL

Yet to Be allocated

Total Length in Km

38544

DD

NH

-544

DD

The

high

way

st

artin

g fr

om

its

junctionwithN

HN

o.44near

Ana

natp

ur c

onne

ctin

g, R

ayad

urg

in th

e Sta

te o

f And

hra P

rade

sh an

d te

rmin

atin

g at

its

jun

ctio

n w

ith

NH-150AnearM

olkalmuruinthe

stat

e of

Kar

nata

ka.

0.00

0.00

11.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.00

39548H

NH

-548H

The

high

way

st

artin

g fr

om

itsjunction

withNH-48

near

Sank

eshw

ar

in

the

stat

e of

K

arna

taka

, G

adhi

ngla

j, A

jara

, A

mbo

li,

Mad

khol

, Sa

wan

twad

i, In

suli

and

term

inat

ing

at

its

junctionwithNH-66nearBanda

in th

e st

ate

of M

ahar

shtra

.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.30

3.30

40748A

AN

H-

748

AA

The

high

way

st

artin

g fr

om

its

junction

with

NH-748

near

Mac

hhe

Con

nect

ing

Pira

nvad

i, N

avag

e,

Kin

aye,

K

usam

alli,

Jamboti,K

almani,Kankumbi,in

the

stat

e of

Kar

nata

ka P

orie

m,

Mat

nee

and

term

inat

ing

at

Sanquelim

(nearS

hriDattaraya

Mandir)intheStateofGoa.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

49.84

49.84

41367A

NH

-367A

The

high

way

st

artin

g fr

om

its

junctionwithNH-67nearKoppal

and

term

inat

ing

at

its

junc

tion

withNHNo.50nearMetgalinthe

Stat

e of

Kar

nata

ka.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

25.10

0.00

0.00

25.10

138

Page 159: Government of Karnataka Public Works, Ports & Inland Water ...

Sl.

No.

NH

N

o.

New

N

H

No.

Nom

encl

atur

e

Bengalore DivisionTumkur Division

Chitrdurga DivisionHassan Division

Manga lore Division

Hubli DivisionKarwar DivisionBijapur DivisionKalburgi DivisionPPP Cell ShivmogaPPP Cell

CPB

NHAI

KRDCL

Yet to Be allocated

Total Length in Km

42766E

NH

-766E

The h

ighw

ay st

artin

g fr

om K

umta

-H

aver

i-Sirs

i0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

56.00

0.00

72.89128.89

43163B

NH

-163B

The

high

way

st

artin

g fr

om

BID

AR

-Niz

amap

et0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

20.00

0.00

0.00

0.00

0.00

0.00

20.00

44766EE

NH

-766

EE

The

high

way

st

artin

g fr

om

its

junctionw

ithNH-66n

earH

attikeri

and

term

inat

ing

at B

elek

eri P

ort i

n th

e St

ate

of K

arna

taka

.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.27

4.27

To

tal

418.

5032

9.48

604.

1335

5.83

554.

0134

2.71

176.

9058

3.55

400.

2910

5.30

139.

3534

46.2

90.

0013

0.30

7588

.67

139

Page 160: Government of Karnataka Public Works, Ports & Inland Water ...

Appendix – 6State Highways Nomenclature and length as on 31-03-2020

140

Sl. No. SH-No. Nomenclature of State Highways Length

(in Km)1 2 3 4

1 SH-01

Highway connecting Padubedri with Chickalaguda via Karkala, Agumbe, Thirthahalli, Anandapura, Hangal, Thadasa, Kalghatagi, Dharwad,Uppinabetegeri,Belawadi,Bailahongala,Vannuru,Hoskoti,Ankalagi, Basapura, Hidkal Dam and Hosur.

394

2 SH-02 HighwayconnectingEkkumbiwithMolakalmuruviaHaveri,Mylara,Harapanahalli and Kudulgi. 223

3 SH-03Highway connecting Hunasanahalli with Chikkahalli via Kanakapura, Ramanagara, Magadi, Solur, Sompura, Koratagere, Madugiri and Pavagada

252

4 SH-04 Highway connecting Kamalanagar with Gunalli via Halburga and Bidar 14

5 SH-05 Highway connecting Bangarapet with Bagepalli via Kolar and Chintamani 107

6 SH-06Highway connecting Karwar with Ilkal via Kaiga, Yellapura, Mundugodu, Bankapura, Savanur, Gadag, Gajendragada and Hanumasagara.

384

7 SH-07 Highway connecting Srirangapatna with Arasikere via Pandavapura, K.R Pet and Chennarayapatna. 108

8 SH-08

Highway connecting Hirisave with Chattalli via Sravanabelagula, Chennarayapatna, Holenarasipura, Arakalagudu, Sanivarasanthe, Chengadahalli,Vanaguru,Kundali,Santhalli,Thaltarshettahalli,Thakere, Beligere, Kumburu and Suntekoppa.

170

9 SH-09 Highway connecting Yelahanka with Gowribidanur via Kudumalakunte and Doddaballapura. 69

10 SH-10 Highway connecting Sarasamba with Ribbonapalli via Aland, Gulbarga and Sedam. 136

11 SH-11 Highway connecting Hulasur with Mahagao via Balakunda, Basavakalyana and Mudubi. 64

12 SH-12 Highway connecting Bijapur with Sankeshwar via Aland, Gulbarga 170

12 SH-14Highway connecting Ramdurg with Manvi via Badami, Pattadakal, Hulgund, Neeralakeri, Mudagal, Maski, Basapura, Pothanal and Chikalaparvi

221

13 SH-15Highway connecting Wanamarapalli with Raichur via Aurad, Santhapur, Bidar, Chincholi, Sedam, Yadagir, Hathiguduru and Devdurg.

297

14 SH-16 Highway connecting Sindagi with Kodangal via Sahapur, Kanapur, Yadagiri and Gurmitkal. 144

Page 161: Government of Karnataka Public Works, Ports & Inland Water ...

141

Sl. No. SH-No. Nomenclature of State Highways Length

(in Km)1 2 3 415 SH-18 Highway connecting Mudhol with Nippani via Chikkodi. 108

16 SH-20 Highway connecting Raichur with Bachi via Lingasugur, Hungund, Bagalkote, Lokapur, Yeraghatti and Belgaum. 330

17 SH-21 Highway connecting Hallebidu with Anechukur via Hassan, Arakalgudu and Periyapatna. 123

18 SH-22 Highway connecting Gulbarga with Hosur via Afzalpur. 45

20 SH-23 Highway connecting Kalmal with Shiggaon via Manvi, Sindhanur, Gangavathi,Ginigera,Koppal,Mundaragi,LaxmeshwarandGudigere. 296

21 SH-24 Highway connecting Tarikere with Dharmapura via Hosadurga, V.VPuraandHiriyur. 137

22 SH-25 Highway connecting Hospet with Shimoga via Mariammanahalli, Harapanahalli, Harihara and Honnali. 184

23 SH-26 Highway connecting Halageri with Hulikal via Honnali, Ayanur, Arasalu and Hosanagar. 120

24 SH-27HighwayconnectingVirajpetwithByndoorviaMadikeri,Somawarpet,Shakaleshpura,Mudigere,Vastare,Jayapura,Sringeri,Begar and Agumbe.

344

25 SH-28 Highway connecting Supa with Annigeri via Haliyala, Dharwad and Hebsur. 115

26 SH-29 Highway connecting Mudgal with Kudithini via Thavaregere, Gangavathi and Kampli. 98

27 SH-30 Highway connecting Sindhanur with Hemmadaga via Kushtagi, Ron, Saundatti, Belawadi, Bekawadi and Khanapur. 292

28 SH-31 HighwayconnectingJathwithJambotiviaAnanthapura,Athani,Gurlapura, Gokak, Nesargi, Bailahongal and Khanapura. 245

29 SH-32 Highway connecting Umarga with Sulepet via Alandh, Mahagaon and Chincholi. 118

30 SH-33 Highway connecting Koratagere with Bavali via Tumkur, Kunigal, Maddur, Malavalli, Mysore and H.D.Kote. 257

31 SH-34

Highway connecting Aurad with Sadashivagad via Balki, Basavakalyana,Alandh,Afzalpur,Indi,Bijapur,Jamakhandi,Mudhol,Lokapur,Ramdurg,Saundatti,Dharwad,Ramanagara,Supa(Joida)and Anasi.

671

32 SH-35 Highway connecting Sidlaghatta with Anekal via Hoskote and Kadagodi. 77

33 SH-36 Highway connecting Koppal with Kyadhiguppa via Bevur and Kushtagi. 68

34 SH-37 Highway connecting Subramanya with Udupi via Dharmsthala, Belthangadi and Karkala. 129

35 SH-38 Highway connecting Kollegal with Hasanurghat. 53

Page 162: Government of Karnataka Public Works, Ports & Inland Water ...

142

Sl. No. SH-No. Nomenclature of State Highways Length

(in Km)1 2 3 436 SH-39 Highway connecting Bangalore with Hesarghatta. 9

37 SH-40 Highway connecting Mylara with Thoranagallu via Hadagali, Hagaribommanahalli and Kudlagi. 157

38 SH-41 HighwayconnectingShiradonwithLingasugurviaZalki,Indi,Devarahipparagi, Hovinahipparagi, Muddebihal and Narayanapura. 196

39 SH-42 HighwayconnectingAnkolawithJoladharasiinKoppal,MunirabadhTown limits. 30

40 SH-43 Highway connecting Tikota with Kanamadagi. 24

41 SH-44Highway connecting Sankeshwar with Sangam via Hukeri, Ghataprabha, Arabhavi, Lokapura, Kerakalamatti, Agasanakoppa, Guledhagudda, Kamathagi and Gulur.

192

42 SH-45 Highway connecting Arabhavi with Challakere via Gokak, Naragund, Shalavadi,Sirahatti,Mandaragi,Hadagali,Itagi,UjjaniandJagalur. 252

43 SH-46 Highway connecting Mundgodu with Anasi via Kalaghatagi, Haliyala and Dandeli. 136

44 SH-47Highway connecting Mandya with Hadagali via Melukote, Shravanabelagula, Tiptur, Huliyar, Hosadurga, Holalkere, Anagodu and Harapanahalli.

347

45 SH-48Hihgway connecting Kumta with Kadamadagi via Siddapura, Soraba, Shikaripura, Honnali, Basavapatna, Chitradurga, Challakere and Pavagada.

357

46 SH-49 Highway connecting Sandur with Siraguppa via Hosapet and Kampli. 107

47 SH-50 HighwayconnectingBhatkalwithSorabaviaJog,Mavinagundi,Siddapura and Chandragutti. 132

48 SH-51 Highway connecting Basavakalyan with Raichur via Gulbarga, Shahabad, Ravur and Yadhgiri. 69

49 SH-52 Highway connecting Thirthahalli with Kundapur via Nagara, Balabere, Hosanagadi and Konibasur. 86

50 SH-53 Highway connecting Kagawad with Kaladhagi via Shedabal, Kudachi, Theradal,JamakhandiandKatharaki. 128

51 SH-54HighwayconnectingJambootiwithRabakaviviaPeeranawadi,Belgam, Budhihal, Akkathangerhal, Kolavi, Mamadhapur, Davaleshwar and Mahalingapura.

138

52 SH-55 Highway connecting Yeraghatti with Babaleshwar via Yadawad, Mudhol, Manthor and Chickkagalagali. 108

53 SH-56 Highway connecting Bedi with Belavanki via Kittur, Gobbaragumpi, Alagawadi, Navalgund and Shelawadi. 105

Page 163: Government of Karnataka Public Works, Ports & Inland Water ...

143

Sl. No. SH-No. Nomenclature of State Highways Length

(in Km)1 2 3 4

54 SH-57

Highway connecting Bagalakote with Beligeriranganabetta via Badami, Ron, Huyalgola, Gadag, Sirahatti, Guttal, Ranibennur, Masur, Sikaripura, Shimoga, Lakkavalli, Tharikere, Chikamagalur, Belur, Hassan, Holenarasipura, K.R Nagar, Belikere, Nanjangud and Yalandur.

536

55 SH-59 Highway connecting Kustagi with Pattadhakal. 5156 SH-60 Highway connecting Hungund with Surpur via Thalikote and Kembavi 105

57 SH-61Highway connecting Managuli with Bichal via Huvinahipparagi, Basavanabagewadi, Devapura, Devdurga, Siriwara, Neermanvi, Bailmerchad and Rajolibanda.

211

58 SH-62 Highway connecting Haveri with Sagara via Lingapura, Chikerur, Hirekerur and Siralakoppa 107

59 SH-63 Highway connecting Raravi with Belur via Siraguppa, Desanur, Gorebal, Karatagi, Kanakagiri, Yelaburga, Sankallur, Sudi and Rajur. 136

60 SH-64 Highway connecting Kalladka with Kannagad via Bhantwal 22

61 SH-65Highway connecting Malpe with Molakalmur via Udupi, Hebri, Agumbe, Begar, Koppa, Narasimharajapura, Sulageri, Bhadravathi, Chennagiri,Shanthisagar,Davanagere,Jagalur,MusturandB.G.Kere

285

62 SH-66 Highway connecting Gangamula with Kotigehara via Malleshwara, Kalasa and Magundi. 91

63 SH-67Highway connecting Mangalore with Athradi via Bajpe, Kattil, Belmane,KapuandSirava.(includingHospetMangaloreRoadinMangaloreCityandOldN.H48inMangaloreCityLimits)

62

64 SH-68 Highway connecting Tumkur with Honnavar in Badravathi and Shimoga Town Limits. 9

65 SH-69 Highway connecting Kumta with Thadas via Sirsi and Mundagodu. 8266 SH-70 Highway connecting Belthangadi with Mulki via Mudabedri. 58

67 SH-71HighwayconnectingTipturwithHassanviaDudda(additionallengthof8KmfromDairyCircletoDevarayapatna(NH-48inHassantownlimits)

57

68 SH-71E HighwayconnectingDairyCirclewithBusthenahalli(NH-48inHassantownlimits) 2

69 SH-72 HighwayconnectingNippaniwithKothalagiviaNanadhi,Examba,Ugar, Mangasuli, Athani and Inapura 133

70 SH-73

HighwayconnectingMangasuliwithLaxmeshwarviaUgar,Kudachi,Raibag, Kabbur, Belladabagewadi, Ghataprabha, Gudichinamalki, Paschapur, Akkathengarahal, Nesargi, Desanur, Suthaghatti, Matthikoppa, Sampagaon, Neginahal, Nayanagar, Belawadi, Budaraghatti, Thadakoda, Mammighatti, Dharwad, Hubli and Kundagol.(includingOldNH4betweenDharwadandHubli)

266

Page 164: Government of Karnataka Public Works, Ports & Inland Water ...

144

Sl. No. SH-No. Nomenclature of State Highways Length

(in Km)1 2 3 4

71 SH-74 Highway connecting Nelamangala with Chikballapur via Doddaballapur 63

72 SH-75 Highway connecting Balki with Chincholi via Humnabad, Kabirwadi, Chitaguppa and Inapur 83

73 SH-76 Highway connecting Birur Sammasagi via Ajjampura, Sivani, Channagiri, Santhebennur, Davangere, Harihara, Koda and Thilavalli 207

74 SH-77 Highway connecting Sirsi with Hosnagar via Soraba, Masur, Bettamallppa and Anandhapura 99

75 SH-78Highway connecting Shettihalli with Ichalakaranji via Dhaddi, Hatharagi,Hukkeri,Chikodi,Examba,SadalgaHighwayconnectingBorangaon

84

76 SH-79Highway connecting Srirangapatna with Malemahadeshwarabetta via Sosale, T. Narsipura, Madapura, Kollegal, Ramapura, Kowdalli, Hanur and Palar

152

77 SH-80 Highway connecting Nanjangud with Biligiriranganabetta via Chamarajanagar and Kyathadevara Gudi 45

78 SH-81 Highway connecting Yelandur with Gundlupet via Honganur, Chamarajanagar and Terakanambi 45

79 SH-82 Highway connecting Hoskote with Gownipalli via Chintamani 62

80 SH-83 Highway connecting Manuli with Kotamachagi via Kadakola, Gudachi, Salahalli, Konnur, Sirola, Holealur, Ron and Abbigere 61

81 SH-84 Highway connecting Sira with Nanjangud via Gubbi, Kallur, Yadayur, Amruthur, Mandya, Kirugaval, Hosavatti and T. Narsipura 228

82 SH-84A HighwayconnectingNH-212withSH-84viaVarunaHoskoteSuthur 1783 SH-84B HighwayconnectingKupparavallionSH-84withSuthur 4

84 SH-85

HighwayconnectingBangalorewithJalsoorviaMagadi,Huliyurdurga, Kowdle, Nagamangala,KR Pet, Saligrama, Ramanathapura,Somwarpet,VanagurandSubramanya(SaligramaBypasslength-2.50Km)

323

85 SH-86Highway connecting Ramanathapura with Terakanambi via Bachhehalli, Kattemalalavadi, Hunsur, HD Kote, Saragur, Begur and Madapatna

153

86 SH-87 Highway connecting Bangalore with Anekal via Bannurghatta 31

87 SH-89 Highway connecting Madakeri with Kutta via Siddapura, Ghattathala, Chennyanakote, Athur and Gonikoppa 85

88 SH-90 HighwayconnectingHunsurwithTalakaveriviaVirajpet,Napoklu,Nalkanadu and Bhagamandala 117

89 SH-91 Highway connecting Konanur with Makutta via Ramanathapura, Kushalanagar,SiddapuraandVirajpet 85

90 SH-92 Highway connecting Kanakapura with Sangam 30

Page 165: Government of Karnataka Public Works, Ports & Inland Water ...

145

Sl. No. SH-No. Nomenclature of State Highways Length

(in Km)1 2 3 4

91 SH-93 Highway connecting Khanapura with Talaguppa via Haliyal, Yellapura, Sirsi and Siddapura 193

92 SH-94Highway connecting Bagepalli with Halagur via Gudibande, Thondebhavi, Mavathur, Kolala, Uradigere, Kyathasandra, Neralapura, Kudur, Magadi, Ramanagar and Channapatna

233

93 SH-95 HighwayconnectingHoskotewithVenkatagirikoteviaMalur,Tekal,Bangarpet and Budhigere 111

94 SH-96 HighwayconnectingDevanahalliwithKempapuraviaVijayapura,Vemgal,Kolar,GhattakamadanahalliandKGF 96

95 SH-97 Highway connecting Sankeshwar with Sadalga via Kowthalli, Nippani and Badakihal 48

96 SH-98 Highway connecting Bhatnagoor with Boragaonwadi via Barawada, Mangura and Karagad 43

97 SH-99 Highway connecting Kothapalli with Masti via Gownipalli, Rajepalli, Srinivasapura, Kolar and Tekal 99

98 SH-100 Highway connecting Subramanya with Manjeshwar via Puttur, Parladaka and Ukkada 89

99 SH-101 Highway connecting Surathkal with Kabaka via Bajpe, Gurupura, Bhantwal,PanemangaloreandVittal 64

100 SH-102HighwayconnectingHuliyarKeralapuraviaJayachamarajapura,Arasikere,Haranahalli,Shanthigrama,HariharapuraandJakkanahalliof Holenarsipura

126

101 SH-103 HighwayconnectingGokakwithSaundattiviaSH-31toMuragodu,Karimani, Sogalkshetra, Manuli, Malaprabha and Goravanakolla 80

102 SH-104Highway connecting Bangalore with Nandi via Kadugondahalli, Nagavara, Thanisandra, Bellahalli, Kannur, Bagalur, Arisinakunte, Devanahalli , Malligenahalli and Karahalli

50

103 SH-104A

HighwayconnectingNH-4inDevanahalliTaluktoSH-104nearGollarahalli via Budigere. 14

104 SH-106 Highway connecting Horanadu with Balur Handpost via Kalasa 42

105 SH-107 HighwayconnectingJannapurawithVanagurviaHuradiHanabalAnemahal Skaleshpura Byakarahalli Heththur 56

106 SH-108 Highway connecting Holenarsipura with K.R. Nagar via Hallimysore Saligrama Chunchanakatte Kesthur Koppalu Gate Srirampura Hebbalu 42

107 SH-109HighwayconnectingYaraneJunctionwithHolenarsipuraviaBikanahalli Channiganahalli Ankapura Karle Hanumanahalli Paduvalahippe

33

108 SH-110 HighwayconnectingBelurwithKodlipetviaBichoduVateholeKamathikodigi Byrapura Kundur K.Hosakote Mgalu 69

Page 166: Government of Karnataka Public Works, Ports & Inland Water ...

146

Sl. No. SH-No. Nomenclature of State Highways Length

(in Km)1 2 3 4

109 SH-111 Highway connecting Doddagangavadi Gate with Chowdanakuppe via DoddagangavadiVirupasandraTavarekereBandigowdanapalya 25

110 SH-112 Highway connecting Belur with Somvarpet 79

111 SH-112A

HighwayconnectingSH-8withSH-57viaCRPatnaNarsipuraKodlipet 22

112 SH-113 HighwayconnectingUppinangadionNH-48withSH-37(BisleyGhatRoad-MDR)viaBajaththurAlankaruBalyaKadaba 33

113 SH-114 HighwayconnectingGundyaonNH-48withKalkundaonSH-37viaShiribagilu Kombharu Bilinele 16

114 SH-115 Highway connecting Kudligere with Kammaraghattta 36

115 SH-116 HighwayconnectingTumkurHonnavarroad(SH-68)withBirurSammasagiroad(SH-76)viaBhadravathiShivaniroad 34

116 SH-117 Highway connecting Ilavala with K.R Nagar via Hoskote, Sagarakatte, Molepette, Lalam Devnahalli 21

117 SH-118 Highway connecting Guruvayanakere via Upinahangadi 20

118 SH-119 Highway connecting Ilavala, Sagarakatte, K.R. Nagar with Narayanapura Kegere via B.B Road 7

119 SH-120 Highway connecting Hampapura, Saligrama road 17

120 SH-121 Highway connecting B.T road with Kodihalli via Kyatnahalli, Hardanahalli, Shigaranahalli, Hariharapura, Duda Kunchevu road 17

121 SH-122 Highway connecting Maharastra Border with Murki, Aurad, Handarki (SH-15)viaBidar,Chincholi,Sedem 184

122 SH-123 HighwayconnectingAndraPradeshborderwithJamaji,Hulsur(ConnectingSH-11)viaSandpur,Sangama 69

123 SH-124HighwayconnectingBarkedwithBilagi(ConnectingSH-55)viaKachari, Padsavalgi, Afzalpur, Gatarga, Devarnavadaga, Sindagi, Byakodu, Tilagola, Talikote, Minajage, Davalgi, Rodgi, Basavna

278

Bagevadi, Telgi, Kolar, Bilagi

124 SH-125HighwayConnectingFirozabadcross(NH-218)withKamalapuraState Highway connecting via Shabad, Bankur, Peta Shirur, Mudbala, Kudli, Rumanagada, Chengata

92

125 SH-126Highway Connecting Andra Pradesh border with Putpak, Bosaga SH via Guru vitkal, Handarki, Satnur, Chitapura, Tengli, Hebbal, Arankal, Varnal,Mudbe

159

126 SH-127

HighwayConnectingSH10withMudhol,YalagerauptoAndraPradesh border via Madana, Itkala, Gunjanur, Anpur, Madavara, Saidapur,Mangal,Sangvara,Joladadgi,Gugal,Herekudlagi,Savantgera, Gabbur, Siravara, Atanur, Machanur, Kuradi, Aroli, Matavari, Uprala, Gunjali, Malapura

169

Page 167: Government of Karnataka Public Works, Ports & Inland Water ...

147

Sl. No. SH-No. Nomenclature of State Highways Length

(in Km)1 2 3 4

127 SH-128

HighwayConnectingSH-61withDevdurga,Amarapura,Bagvathi,Hirekondakal, Ayanur, Belllary, via Mundargi, Galgi, Chincharki, Budani, Hirehanagi, Hire Kondakal, Adavi Amareshwara, Hosur, Valabellary,Ibrahampur,Kundroli,Kuruvali,Raravi,Darur,Talur,Ropanagudi, Chilagurki

202

128 SH-129

Highway Connecting Chickhosur, Mudgal, Mundargi, via Banigal, Ramatnal, Mudanur, Kustagi, Sankapur, Kansagar, Tumbargude, Yalaburgi, Sungada, Kukanur, Banapur, Halgera, Hire Sindagi, Katarki, Mantur, Keslapura, Hosruru

173

129 SH-130

Highway Connecting Yalburga, Kanakagiri, Gangavati, Munerabad viaVajrabande,Hirevenkalkunte,Talkere,Gundala,Basrehal,Gonal, Honnaval, Hosakere, Hosalii, Hanumanahalli, Singapura (ConnetingNH-13)

106

130 SH-131

Highway Connecting Hampi, Kamalapura, Hagarebomnahalli via Papnayakanahalli,Joga,Tolur,Lingadahalli,Rajapura,Bilgatte,ChickJoganahalli,MBAaikanahalli,Banavikal,Kottur,Dopadahalli,Benalkal

178

131 SH-132 Highway Connecting Kampli, Kuru godu, Kudtenni, Bellary, Moka, Alur 95

132 SH-133HighwayConnectingSoreban,Chitargi,Kodalsangama(ConnectingSH-60)viaKarlekoppa,Gomanakoppa,CholaChaugadda,Hirenasbi,Katapura, Ihole, Amungad, Chitargi, Dhanur

106

133 SH-134Highway Connecting Badami, Godaji, Gokak falls via Karur, Batkurki, Chandargi, Hirekoppa, K.S Bagachikoppa, Malikere, Munikere, Kaujalagi, Gokak

121

134 SH-135 Highway Connecting Banashankari, Mahakota, Almatti Dam via Nandikeshwara, Guledagudda, Shirur, Benekatte, Bhagvathi, Rampura 47

135 SH-136

State Highway Connecting Gajendragad, Sorab via Dindur, Nagendragad, Mushagere, Honegannur, Holemannur, Malvada, Belavneke, Lingadal, Hombala, Hulakotte, Kuntakotte, Anthur, Bemtur, Nelaguda, Mulagunda, Basapura, Shirahatti, Kadakole, Muradi, Bagewadi, Bidaralli, Ballehosur, Kittur, Horiti, Kanvalli, Mottebennur, Byadgi, Hamsabavi, Chickerur, Yalageri, Thogarsi, Udri

264

136 SH-137Highway Connecting Navalgunda, Banavasi, Mugavalli via Annegeri, Bandivadi, Kundagol, Hachinal, Kobihal, Hulgur, Karadgi, Savnur, Bankapur, Masanakatte, Koprasikoppa, Bhadrapura, Mulagi, Basi

138

137 SH-138 Highway Connecting Nagaragali, Kattekol via Nandiga Parishchad, MK Hubli, Tigadi, Inchala, Murugodu 111

138 SH-139 Highway Connecting Yargatti, Mudhol via Kattekol, Turnur, Budne 74

139 SH-140 HighwayConnectingAlanvar,BetigereviaHindasagere,Jodgere,Kuluvalli, Kittur, Sangoli, Hulki, Akkasagara 88

Page 168: Government of Karnataka Public Works, Ports & Inland Water ...

Sl. No. SH-No. Nomenclature of State Highways Length

(in Km)1 2 3 4

140 SH-141 Highway Connecting Maharastra border with Rakasakoppa, Sutugatte (NH-4)viaBelagundi,Kalaholu,Solaga,Hindalga,Handiganur 46

141 SH-142 Highway Connecting Kumta, Kurlekoppa via Aminahalli, Nilakunda, Kol, Sirsi 56

142 SH-143 HighwayConnectingGokarna,Vadi,DevnalliviaSanikatta,Heluru,Chinagara 79

143 SH-144 Highway Connecting Honavar, Munase via Salikod, Dodmane, Vandana 58

144 SH-145 Highway Connecting Songemane, Unchalli falls via Gidamavanakatte, Kansur, Ballekoppa 72

145 SH-146 Highway Connecting Ulavi, Diga to Goa border via Kumbaravada, Kiruvati 60

146 SH-147 HighwayConnectingChennarayapatnawithNugehalliroad(linkroadNH-48joiningtoSH-47) 17

147 SH-148Highway Connecting Kuppali, Kavishaila, Gadikalu, Katehaklu, Hedduru, Mahrshi, Bejavalli, Ayanur, Sudur, Chordi, Gama, Chinchinkoppa, Malenahalli via Hirekerur joining road.

145

148 SH-149Highway Connecting Shapura to Shivrampura to AP border SH via Vadi,Shabad,Gulbarga,Hebal,Kalagi,Mangalgi,NidagundaviaKonchavaram

192

149 SH-150 Highway Connecting Davangere, Holalu SH via Kanchikere-Bendekere 72

150 SH-151 Highway Connecting Itagi-Kanchikere SH via Kenchamanahalli-Maidur-Chegatikere-Nazirnagar-Arasikere 45

151 SH-152 HighwayConnectingNH-206Kadur-Maravanje-BelgurviaSrirampura joining SH 52

152 SH-153 HighwayConnectingNH-206Kadur-Hirenallur-Ajjampura-yaraganahalliviaNH-13joiningHollalkerenearbypassingSH 63

153 SH-154 HighwayConnectingMadras-Cannanoreroad(Paschimavahini-Ilavala) 18

154 SH-155 HighwayConnectingPattancross(SH-10)-NarayanapuraDam(SH-41) 163

155 SH-156 HighwayconnectingNH218nearKattisangavitoSH-16nearYanakanchi via Yangunti, Naribole, Gonwar, Ijeri, Yedrami, Kadakola. 95

156 SH-157 HighwayconnectingSirwalinShahpurTaluktoSH-16nearChamanalviaMaradagi,Varchanahalli,Chikkamudabal,Lakhanpur. 55

157 SH-158 HighwayconnectingNH-234inMadhugiriTaluktoAPBorderviaGondihalli, Chikka Malur and Kodigenahalli. 31

158 SH-159HighwayconnectingNH-4inSiraTaluktoAPBorderinMadhugiriTaluk near Muddenahalli via Kurihalli, Rantavalalu, Hosakere and Dodda Yalkur.

69

148

Page 169: Government of Karnataka Public Works, Ports & Inland Water ...

Sl. No. SH-No. Nomenclature of State Highways Length

(in Km)1 2 3 4

159 SH-160HighwayconnectingSH-3inKoratagereTaluktoAPBorderinMadhugiriTaluknearItakadibbanahalli(IDHalli)viaKodagadala(NH-234),ByalyaandPuravara.

42

160 SH-161 NH-50HosurCrosstoYalagurCrossAalamattiMuddebihalroadconnecting By-pass road 31

161 SH-162 HighwayconnectingSH-124nearMadanahipparagainMuddebihalTaluktoSH-10nearLadachincholiviaBhusnoor. 30

162 " - " Highway connecting Channapatna, Nelamangala 18163 " - " Highway connecting Channapatna, Nidasale 3164 " - " Highway connecting Kestur, Byrapattana 2165 " - " Highway connecting Mandya, Guthalu, Muttathi 52166 " - " HighwayconnectingNH-209andIggalur 11167 " - " Highway connecting Sathanur, Muttathi, Mandya 7168 " - " HighwayconnectingBangalore-Mangalore(ReturnedfromNHAI) 11

149

Page 170: Government of Karnataka Public Works, Ports & Inland Water ...

Appendix – 7Taluk wise road length of NH, SH & MDR as on 31-03-2020 (in Km)

150

Sl. No. Name of the TalukNational Highway

State Highway

Major District Roads

Total

1 2 3 4 5 61 Bangalore North 4.50 28.50 115.77 148.772 Bangalore South 46.17 36.20 245.90 328.273 BangaloreEast 0.00 5.20 106.30 111.504 Yelahanka 0.00 21.20 120.60 141.805 Anekal 34.43 67.80 104.07 730.34 Bangalore Urban District 85.10 158.90 692.64 936.646 Doddaballapur 31.48 66.45 198.50 296.437 Devanahalli 61.00 51.55 107.30 219.858 Hosekote 88.30 55.75 172.35 316.409 Nelamangala 61.32 35.90 192.75 1769.32 Bangalore Rural District 242.10 209.65 670.90 1122.6510 Ramanagara 28.07 63.40 500.60 592.0711 Channapatna 22.16 131.32 269.72 423.2012 Kanakapura 48.16 78.40 502.85 629.4113 Magadi 25.40 114.53 161.35 2767.33 Ramanagara District 123.79 387.65 1434.52 1945.9614 Kolar 74.05 91.32 251.69 417.0615 KGF 0.00 45.96 93.83 139.7916 Malur 7.82 65.55 94.43 167.8017 Bangarapet 0.00 31.09 106.80 137.8918 Mulbagil 70.54 0.00 354.02 2808.5019 Srinivasapura 25.00 71.60 321.70 418.30 Kolar District 177.41 305.52 1222.47 1705.4020 Chikkaballapur 87.17 17.15 202.20 306.5221 Gudibande 10.30 18.73 37.40 66.4322 Siddlaghatta 20.00 58.09 220.10 298.1923 Gouribidanur 23.70 88.60 221.30 333.6024 Chintamani 34.00 58.10 120.70 3128.4425 Bagepalli 12.23 22.33 196.48 231.04

Page 171: Government of Karnataka Public Works, Ports & Inland Water ...

151

Sl. No. Name of the TalukNational Highway

State Highway

Major District Roads

Total

1 2 3 4 5 6 Chikkaballapur District 187.40 263.00 998.18 1448.5826 Tumkur 54.81 92.00 368.50 515.3127 Gubbi 33.38 64.25 501.75 599.3828 Kunigal 28.30 112.06 461.75 602.1129 Turavekere 33.00 10.46 422.95 466.4130 Tiptur 47.46 45.10 276.15 368.7131 Madhugiri 37.80 151.70 380.50 570.0032 Chikkanayakanahalli 95.75 27.46 289.00 412.2133 Koratagere 6.20 69.87 242.35 318.4234 Sira 84.67 30.25 636.20 5532.1735 Pavagada 0.00 80.23 210.60 290.83 Tumkur District 421.37 683.38 3789.75 4894.5036 Mysore 114.22 56.40 457.84 628.4637 T.Narsipura 25.00 74.72 233.09 332.8138 Nanjunagud 40.80 93.45 335.26 469.5139 Krishnarajanagar 29.80 111.58 300.99 442.3740 Hunsur 49.10 43.25 527.37 619.7241 Periyapatna 54.29 45.39 338.11 7678.2042 H.D.Kote 41.40 107.32 198.55 347.2743 Saragur 0.00 16.50 160.60 177.10 Mysore District 354.61 548.61 2551.81 3455.0344 Mandya 26.52 63.64 458.78 548.9445 Maddur 14.85 73.46 501.71 590.0246 Malavalli 54.57 87.13 302.94 444.6447 Nagamangala 73.38 46.20 350.78 470.3648 K.R.Pet 0.00 87.13 550.24 6033.3649 Srirangapatna 19.79 31.90 221.74 273.4350 Pandavapura 24.98 38.20 343.21 406.39 Mandya District 214.09 427.66 2729.40 3371.1551 Chamarajanagar 79.97 71.09 287.07 438.1352 Kollegala 36.84 19.31 93.18 4489.1053 Hanur 0.00 130.19 301.52 431.7154 Gundlupet 64.34 53.07 246.30 363.7155 Yalandur 18.60 40.60 49.18 108.38

Page 172: Government of Karnataka Public Works, Ports & Inland Water ...

152

Sl. No. Name of the TalukNational Highway

State Highway

Major District Roads

Total

1 2 3 4 5 6 Chamarajanagar District 199.75 314.26 977.25 1491.2656 Hassan 56.33 117.65 547.56 721.5457 Arkalgud 0.00 113.69 246.53 360.2258 Alur 0.00 47.80 106.90 154.7059 Belur 58.17 75.84 310.10 444.1160 Sakeleshpura 64.14 188.79 370.93 4075.6361 Channarayapatna 44.20 143.76 670.93 858.8962 Arasikere 79.90 97.90 571.55 749.3563 Holenarsipura 34.91 124.38 306.85 466.14 Hassan District 337.65 909.81 3131.35 4378.8164 Chikamagalur 44.78 78.89 331.97 455.6465 Kadur 77.90 56.00 365.95 499.8566 Mudigere 57.60 160.00 274.70 492.3067 Tarikere 39.60 56.18 150.00 7900.9868 Narasimharajapura 0.00 39.52 163.80 203.3269 Koppa 28.00 43.07 165.00 236.0770 Ajjampura 0.00 74.50 112.50 187.0071 Shringeri 35.30 27.55 68.90 131.75 Chikkamagalur District 283.18 535.71 1632.82 2451.7172 Mangalore 75.62 62.90 279.88 3209.8573 Bhantwal 59.86 91.70 131.92 283.4874 Puttur 47.23 26.20 64.20 137.6375 Sulya 35.30 49.46 86.52 171.2876 Belthangadi 45.20 96.70 104.85 592.3977 Mudubidri 18.00 15.60 61.00 94.6078 Kadaba 24.15 110.78 47.00 181.93 Dakshina Kannada District 305.36 453.34 775.37 1534.0779 Udupi 74.97 4.20 109.50 188.6780 Kundapur 42.88 32.00 99.75 174.6381 Karkala 59.20 88.85 120.28 268.3382 Brahmavara 10.00 0.00 79.20 89.2083 Kapu 16.09 42.16 156.80 215.0584 Byandoor 49.35 71.60 192.05 313.0085 Hebri 0.00 21.50 34.30 55.80

Page 173: Government of Karnataka Public Works, Ports & Inland Water ...

153

Sl. No. Name of the TalukNational Highway

State Highway

Major District Roads

Total

1 2 3 4 5 6 Udupi District 252.49 260.31 791.88 1304.6886 Madakeri 47.90 91.30 263.50 402.7087 Somvarapet 47.71 228.50 251.30 527.5188 Virajpet 0.00 156.51 340.70 497.21 Kodagu District 95.61 476.31 855.50 1427.42 South Zone Total 3279.91 5934.11 22253.84 31467.8689 Dharwad 19.60 165.21 310.58 495.3990 Hubli 92.42 33.06 294.03 419.5191 Kalghatgi 33.00 58.28 214.11 305.3992 Kundhagola 6.80 71.90 170.89 249.5993 Navalgund 44.38 74.27 216.39 335.0494 Annigeri 0.00 39.67 88.03 127.7095 Alnavara 0.00 28.60 41.45 70.0596 Hubali Nagara 0.00 13.42 68.75 82.17 Dharwad District 196.20 484.41 1404.23 2084.8497 Haveri 19.47 113.06 280.46 412.9998 Hangal 0.00 114.48 321.40 435.8899 Shigaon 31.00 99.49 176.50 306.99100 Hirekarur 0.00 58.67 175.60 234.27101 Ranibennur 65.45 66.10 298.21 429.76102 Byadagi 13.30 46.60 188.32 248.22103 Savanur 3.00 34.69 236.01 273.70104 Rattihalli 0.00 16.92 171.77 188.69

Haveri District 132.22 550.01 1848.27 2530.50105 Gadag 46.65 159.73 269.90 476.28106 Mundargi 0.00 97.60 236.48 334.08107 Rona 37.00 164.23 205.97 407.20108 Nargund 26.90 40.93 120.41 188.24109 Sirahatti 0.00 89.12 101.90 191.02110 Gajendragada 0.00 65.69 80.48 146.17111 Lakshimiswara 0.00 66.12 164.20 230.32 Gadag District 110.55 683.42 1179.34 1973.31112 Karwar 30.95 103.98 134.71 269.64113 Ankola 74.22 37.67 146.08 257.97

Page 174: Government of Karnataka Public Works, Ports & Inland Water ...

154

Sl. No. Name of the TalukNational Highway

State Highway

Major District Roads

Total

1 2 3 4 5 6114 Kumta 79.65 42.08 223.85 345.58115 Honnavara 76.42 32.15 153.01 261.58116 Bhatkal 24.64 27.10 157.85 209.59117 Supa 31.30 222.70 138.20 392.20118 Sirsi 33.32 195.92 263.10 492.34119 Yallapura 49.00 91.09 169.95 310.04120 Haliyala 0.00 80.51 108.26 188.77121 Siddapura 26.00 223.33 338.20 587.53122 Mundugodu 0.00 90.32 152.90 243.22123 Dandeli 0.00 27.06 43.35 70.41

Uttara Kannada District 425.50 1173.91 2029.46 3628.87124 Shimoga 104.95 124.85 131.94 361.74125 Bhadravati 30.72 97.25 206.40 334.37126 Sagara 133.57 98.39 425.80 657.76127 Hosanagara 72.90 100.68 250.88 424.46128 Thirthahalli 53.50 109.60 380.30 543.40129 Soraba 0.00 148.84 342.73 491.57130 Shikaripura 35.20 158.60 265.69 459.49

Shimogga District 430.84 838.21 2003.74 3272.79131 Chitradurga 83.18 36.91 448.60 568.69132 Challakere 49.00 100.32 518.97 668.29133 Hiriyur 118.55 54.75 427.03 600.33134 Molkalmur 60.00 58.55 116.85 235.40135 Holalkere 46.45 76.06 364.00 486.51136 Hosadurga 35.65 110.56 213.36 359.57

Chitradurga District 392.83 437.15 2088.81 2918.79137 Davanagere 0.00 127.71 214.45 342.16138 Harihara 7.00 44.55 148.20 199.75139 Channagiri 85.80 150.04 247.60 483.44140 Honnali 0.00 71.85 209.25 281.10141 Jagalur 18.66 76.10 297.70 392.46142 Nyamathi 0.00 43.49 168.35 211.84

Page 175: Government of Karnataka Public Works, Ports & Inland Water ...

155

Sl. No. Name of the TalukNational Highway

State Highway

Major District Roads

Total

1 2 3 4 5 6 Davanagere District 111.46 513.74 1285.55 1910.75143 Belgaum 62.21 141.13 296.98 500.32144 Bailahongala 23.76 221.77 148.92 394.45145 Khanapura 34.50 222.32 176.78 433.60146 Savadatti 0.00 347.83 299.82 647.65147 Ramadurg 0.00 261.14 238.62 499.76148 Kittur 0.00 71.56 153.85 225.41149 Gokak 0.00 199.58 185.68 385.26150 Chikkodi 57.12 182.04 239.92 479.08151 Athani 87.00 143.66 414.38 645.04152 Hukkeri 58.26 145.44 299.35 503.05153 Rayabag 0.00 103.45 287.81 391.26154 Nippani 0.00 94.42 134.50 228.92155 Mudalagi 0.00 115.94 91.71 207.65156 Kagavada 0.00 101.51 77.65 179.16

Belgavi District 322.85 2351.79 3045.97 5720.61157 Vijaypur 128.17 18.08 223.51 369.76158 Basavanabagewadi 22.99 96.03 185.20 304.22159 Indi 57.26 90.71 350.40 498.37160 Muddebihal 0.00 87.01 218.38 305.39161 Sindgi 41.97 144.66 467.51 654.14162 Babaleshwara 8.05 64.68 238.85 311.58163 Nidagundi 23.45 16.80 53.57 93.82164 Trikoota 16.15 56.10 179.00 251.25165 Devarahipparagi 11.13 5.77 25.75 42.65166 Talikote 0.00 84.26 139.08 223.34167 Chadachana 0.00 23.25 222.89 246.14168 Koldhara 30.96 21.15 93.25 145.36

Vijayapur District 340.13 708.50 2397.39 3446.02169 Bagalkote 45.80 70.92 231.30 348.02170 Jamakhandi 0.00 55.48 255.99 311.47171 Bilagi 23.80 46.12 215.50 285.42172 Badami 70.50 166.70 164.45 401.65173 Hungund 39.29 146.03 75.10 260.42

Page 176: Government of Karnataka Public Works, Ports & Inland Water ...

Sl. No. Name of the TalukNational Highway

State Highway

Major District Roads

Total

1 2 3 4 5 6174 Mudhol 0.00 163.53 340.29 503.82175 Guledagudda 24.00 58.98 34.50 117.48176 Rabakavi-Banahatti 0.00 40.16 118.29 158.45177 Ilakal 0.00 66.44 150.78 217.22

Bagalkote District 203.39 814.36 1586.20 2603.95 North Zone 2665.97 8555.50 18868.96 30090.43178 Bellary 89.55 107.19 217.79 414.53179 Hospet 61.00 59.94 118.51 239.45180 Siraguppa 35.03 115.30 144.25 294.58181 Sandur 10.77 124.60 263.65 399.02182 Hadagali 0.00 146.83 248.79 395.62183 Kudligi 51.10 109.65 250.85 411.60184 Hagaribommanahalli 0.00 95.80 228.10 323.90185 Kurukodu 20.85 48.56 133.80 203.21186 Kootturu 0.00 76.85 92.10 168.95187 Kampli 0.00 46.83 104.20 151.03188 Harapanahalli 0.00 216.92 313.80 530.72

Bellary District 268.30 1148.47 2115.84 3532.61189 Raichur 56.50 78.90 339.19 474.59190 Lingusugur 38.20 138.74 264.45 441.39191 Manvi 0.00 133.20 105.97 239.17192 Devadurga 0.00 164.14 236.90 401.04193 Sindhanur 33.92 100.00 211.70 345.62194 Maski 37.50 112.04 229.94 379.48195 Siravara 0.00 123.50 118.30 241.80

Raichur District 166.12 850.52 1506.45 2523.09196 Koppal 162.07 142.84 322.78 627.69197 Gangavathi 0.00 63.94 153.50 217.44198 Yalaburga 78.00 145.00 209.95 432.95199 Kustagi 20.00 190.28 253.26 463.54200 Kukanoor 0.00 0.00 240.14 240.14201 Kanakagiri 0.00 92.16 154.70 246.86202 Karatagi 0.00 32.78 108.60 141.38

156

Page 177: Government of Karnataka Public Works, Ports & Inland Water ...

Sl. No. Name of the TalukNational Highway

State Highway

Major District Roads

Total

1 2 3 4 5 6 Koppal District 260.07 667.00 1442.93 2370.00203 Kalburgi 94.40 81.70 125.59 301.69204 Chitapura 39.00 132.25 148.28 319.53205 Aland 0.00 250.50 95.55 346.05206 Afzalpur 77.22 110.70 135.53 323.45207 Chincholi 0.00 176.28 38.32 214.60208 Jevargi 81.20 98.30 188.12 367.62209 Sedam 0.00 154.70 246.10 400.80210 Kalagi 0.00 138.46 19.00 157.46211 Kamalapura 28.60 81.23 36.00 145.83212 Yadrami 0.00 127.05 85.30 212.35213 Shahabad 0.00 33.88 116.51 150.39

Kalburgi District 320.42 1385.05 1234.30 2939.77214 Yadigiri 66.00 62.22 269.17 397.39215 Shahpur 62.50 75.66 217.59 355.75216 Shorapur 38.30 90.00 230.10 358.40217 Hunasagi 0.00 77.80 182.31 260.11218 Vadageeri 0.00 38.03 151.90 189.93219 Gurumitakal 0.00 80.26 166.45 246.71

Yadgir District 166.80 423.97 1217.52 1808.29220 Bidar 54.88 90.69 260.49 406.06221 Humanabad 69.00 19.10 69.40 157.50222 Aurad 82.70 97.10 122.30 302.10223 Basavakalyana 39.80 158.43 105.89 304.12224 Bhalki 66.40 53.63 115.60 235.63225 Chitaguppa 18.00 43.22 115.00 176.22226 Hulasoor 0.00 18.54 9.60 28.14227 Kamalanagar 0.00 24.55 81.80 106.35

Bidar District 330.78 505.26 880.08 1716.12 North East Zone 1512.49 4980.27 8397.12 14889.88 NH Yet to be allocated 130.30 0.00 0.00 130.30 State Total 7588.67 19469.88 49519.92 76578.47

157

Page 178: Government of Karnataka Public Works, Ports & Inland Water ...

Sl. No.

Name of Port Import Export TotalRevenue earned

1 Karwar Port 820323 40303 860626 1671.93

2 Belekeri Port - - - 7.74

3 Tadadi Port - - - 3.27

4 Honnavar Port - - - 16.11

5 Bhatkal Port - - - 0.48

6 Kundapur Port - - - 31.85

7 Malpe Port - - - 39.59

8 Hangarkatta Port - - - 3.2

9 Padubidri Port - - - -

10 OldMangalorePort 550 73840 74390 276.79

Total 820873 114143 935016 2050.96

Appendix – 8STATEMENT SHOWING THE CARGO HANDLED DURING 2019-20

(In M.T.)

158

Page 179: Government of Karnataka Public Works, Ports & Inland Water ...

Appendix – 9Constituency wise road length SH & MDR as on 31-03-2020 (In km)

159

Sl. No. District Name of the Taluk Sl.

No.Name of the Constituency

State Highway

Major District Roads

Total

1 2 3 4 5 6 7 8

1 Bangalore Urban

Bangalore North, Yelahanka 1 Yelahanka 32.20 193.70 225.90Bangalore North 2 Bytarayanapura 17.50 22.27 39.77Bangalore North, Bangalore South 3 Yeshwanthpura 36.20 243.00 279.20

Bangalore North 4 Dasarahalli 0.00 6.20 6.20Bangalore South, Anekal 5 Bangalore South 31.00 55.23 86.23BangaloreEast 6 Mahadevpura 5.20 106.30 111.50Anekal 7 Anekal 36.80 65.94 102.74

Bangalore Urban District 158.90 692.64 851.54

2 Bangalore Rural

Hosakote 8 Hosakote 55.75 172.35 228.10Devanahalli, Doddaballapura 9 Devanahalli 72.50 151.05 223.55Nelamangala, Magadi 10 Nelamangala 35.90 192.75 228.65Doddaballapura 11 Doddaballapura 45.50 154.75 200.25Bangalore Rural District 209.65 670.90 880.55

3 Ramnagara

Ramanagara, Kanakapura 12 Ramanagara 12.60 422.40 435.00Kanakapura 13 Kanakapura 78.40 314.45 392.85Channapatna 14 Channapatna 131.32 269.72 401.04Magadi, Ramanagara 15 Magadi 147.53 361.25 508.78Magadi Nelamangala 17.80 66.70 84.50

Ramanagara District 387.65 1434.52 1822.17

4 Kolar

Kolar 16 Kolar 57.42 125.20 182.62Bangarpet 17 K.G.F 45.96 93.83 139.79Kolar, Bangarpet 18 Bangarpet 44.59 119.89 164.48Mulabagal 19 Mulabagal 0.00 354.02 354.02Kolar, Srinivasapura 20 Srinivasapura 92.00 435.10 527.10Malur 21 Malur 65.55 94.43 159.98

Kolar District 305.52 1222.47 1527.99

5 Chikballapur

Chickaballapur, Gowribidanur 22 Chickaballapur 29.05 227.45 256.50

Sidlaghatta, Chintamani 23 Sidlaghatta 58.09 237.30 295.39Chintamani 24 Chintamani 58.10 103.50 161.60Gowribidanur 25 Gowribidanur 76.70 196.05 272.75Bagepalli, Gudibande 26 Bagepalli 41.06 233.88 274.94

Chickaballapur District 263.00 998.18 1261.18

Page 180: Government of Karnataka Public Works, Ports & Inland Water ...

160

Sl. No. District Name of the Taluk Sl.

No.Name of the Constituency

State Highway

Major District Roads

Total

1 2 3 4 5 6 7 8

6 Tumkur

Tumkur 27 Tumkur Rural 92.00 317.60 409.60Gubbi 28 Gubbi 48.25 369.10 417.35Kunigal 29 Kunigal 112.06 461.75 573.81Turuvekere, Gubbi 30 Turuvekere 26.46 555.60 582.06Tiptur 31 Tiptur 45.10 276.15 321.25Chikkanayakanahalli, Sira 32 Chikkanayakanahalli 35.21 394.70 429.91Sira 33 Sira 22.50 530.50 553.00Koratagere, Tumkur, Madhugiri 34 Koratagere 77.87 348.65 426.52

Madhugiri 35 Madhugiri 143.70 325.10 468.80Pavagada 36 Pavagada 80.23 210.60 290.83

Tumkur District 683.38 3789.75 4473.13

7 Mysore

Mysore 37 Chamundeshwari 37.57 338.13 375.70Mysore, T.Narasipura, Nanjangud 38 Varuna 78.38 291.46 369.84

T.Narasipura 39 T.Narasipura 67.42 210.04 277.46Nanjangud 40 Nanjangud 41.20 186.56 227.76Hunsur 41 Hunsur 43.25 527.37 570.62K.R.Nagar 42 K.R.Nagar 111.58 300.99 412.57Periyapatna 43 Periyapatna 45.39 338.11 383.50H.D.Kote 44 H.D.Kote 123.82 359.15 482.97

Mysore District 548.61 2551.81 3100.42

8 Chama-rajanagar

Chamarajanagar 45 Chamarajanagar 46.53 172.10 218.63Gundulpet, Chamarajanagar 46 Gundulpet 53.07 297.96 351.03Kollegal, Yelandur, Chamarajanagar 47 Kollegal 74.16 134.87 209.03

Kollegal 48 Hanur 140.50 372.32 512.82Chamarajanagar District 314.26 977.25 1291.51

9 Mandya

Mandya 49 Mandya 32.41 231.40 263.81Maddur 50 Maddur 63.17 376.64 439.81Malavalli 51 Malavalli 87.13 302.94 390.07Nagamangala, Maddur 52 Nagamangala 56.49 475.85 532.34K.R.Pet 53 K.R.Pet 87.13 550.24 637.37Srirangapatna, Mandya 54 Srirangapatna 44.84 341.24 386.08Pandavpura, Mandya 55 Melukote 56.49 451.09 507.58

Mandya District 427.66 2729.40 3157.06

Page 181: Government of Karnataka Public Works, Ports & Inland Water ...

161

Sl. No. District Name of the Taluk Sl.

No.Name of the Constituency

State Highway

Major District Roads

Total

1 2 3 4 5 6 7 8

10 Hassan

Hassan 56 Hassan 43.07 202.87 245.94Channarayapatna, 57 Shravanabelagola 109.81 471.68 581.49Holenarasipur, Hassan, Channarayapatna 58 Holenarasipur 160.43 655.30 815.73

Belur, Arasikere 59 Belur 75.84 416.10 491.94Arasikere 60 Arasikere 97.90 465.55 563.45Arakalgud, Holenarasipura 61 Arakalgud 150.72 388.73 539.45Alur, Sakaleshpura, Hassan 62 Sakaleshpura 272.04 531.12 803.16

Hassan District 909.81 3131.35 4041.16

11 Chikmagalur

Chikmagalur 63 Chikmagalur 35.43 307.10 342.53Tarikere 64 Tarikere 120.38 223.50 343.88Mudigere 65 Mudigere 189.21 394.77 583.98Sringere, Koppa, N.R.Pura 66 Sringere 124.39 432.90 557.29Kadur 67 Kadur 66.30 274.55 340.85

Chikmagalur District 535.71 1632.82 2168.53

12 Dakshina Kannada

Mangalore 68 Mangalore North 6.50 92.90 99.40Mangalore 69 Mulki-Moodabidre 72.00 176.02 248.02Mangalore, Bantwal 70 Mangalore 0.00 96.36 96.36Bantwal 71 Bantwal 52.97 98.52 151.49Puttur, Bantwal 72 Puttur 64.93 73.20 138.13Sullia, Puttur 73 Sullia 160.24 133.52 293.76Belthangady 74 Belthangady 96.70 104.85 201.55

Dakshina Kannada District 453.34 775.37 1228.71

13 Udupi

Udupi 75 Udupi 4.20 109.50 113.70Udupi 76 Kapu 42.16 156.80 198.96Kundapura 77 Kundapura 32.00 178.95 210.95Kundapura 78 Byndoor 71.60 192.05 263.65Karkala 79 Karkala 110.35 154.58 264.93Udupi District 260.31 791.88 1052.19

14 KodaguMadikeri, Somwarpet 80 Madikeri 263.30 335.10 598.40Virajpet 81 Virajpet 213.01 520.40 733.41

Kodagu District 476.31 855.50 1331.81 South Zone Total 5934.11 22253.84 28187.95

Page 182: Government of Karnataka Public Works, Ports & Inland Water ...

162

Sl. No. District Name of the Taluk Sl.

No.Name of the Constituency

State Highway

Major District Roads

Total

1 2 3 4 5 6 7 8

15 Dharwad

Dharwad 82 Dharwad Rural 97.22 197.47 294.69

Hubli 83 Hubli-Dharwad East

4.27 23.55 27.82

Hubli 84 Hubli -Dharwad West

32.26 72.01 104.27

Hubli 85 Hubli Central 7.60 28.11 35.71Kalghatagi, Dharwad 86 Kalghatagi 124.16 339.47 463.63Kundgol, Hubli 87 Kundgol 80.80 296.56 377.36Navalagund, Hubli 88 Navalagund 138.10 447.06 585.16

Dharwad District 484.41 1404.23 1888.64

16 Gadag

Gadag 89 Gadag 159.73 269.90 429.63Ron, Gadag, Mundargi 90 Ron 290.65 409.50 700.15Shirahatti, Mundargi 91 Shirahatti 188.66 338.03 526.69Naragund, Gadag, Ron 92 Naragund 44.38 161.91 206.29

Gadag District 683.42 1179.34 1862.76

17 Haveri

Haveri, Savanur 93 Haveri 103.54 319.07 422.61Hangal 94 Hangal 114.48 321.40 435.88Hirekerur 95 Hirekerur 75.59 347.37 422.96Ranebennur 96 Ranebennur 49.62 222.41 272.03Byadagi, Haveri, Ranebennur 97 Byadagi 80.62 356.59 437.21

Shiggaon, Savanur 98 Shiggaon 126.16 281.43 407.59Haveri District 550.01 1848.27 2398.28

18 Uttara Kannada

Karwar, Ankola 99 Karwar 141.65 280.79 422.44Kumta, Honnavar 100 Kumta 64.43 295.73 360.16Bhatkal 101 Bhatkal 36.90 238.98 275.88Sirsi, Siddapur 102 Sirsi 348.12 531.00 879.12Yellapur, Mundagod, Sirsi 103 Yellapur 252.54 393.15 645.69Haliyal,Joida 104 Haliyal 330.27 289.81 620.08

Uttara Kannada District 1173.91 2029.46 3203.37

19 Shimoga

Thirthahalli, Shimoga, Hosanagar 105 Thirthahalli 165.93 525.86 691.79

Sagara, Hosanagar, Sorab 106 Sagara 153.87 455.20 609.07Shikaripura 107 Shikaripura 158.60 265.69 424.29Soraba 108 Soraba 148.84 435.35 584.19Shimoga 109 Shimoga 14.40 22.45 36.85Shimoga, Bhadravathi 110 Shimoga Rural 129.32 181.19 310.51Bhadravathi 111 Bhadravathi 67.25 118.00 185.25

Shimoga District 838.21 2003.74 2841.95

Page 183: Government of Karnataka Public Works, Ports & Inland Water ...

163

Sl. No. District Name of the Taluk Sl.

No.Name of the Constituency

State Highway

Major District Roads

Total

1 2 3 4 5 6 7 8

20 Chitradurga

Chitradurga 112 Chitradurga 36.91 178.40 215.31

Challakere 113 Challakere 61.12 362.05 423.17

Hiriyuru 114 Hiriyuru 54.75 427.03 481.78

Holalkere 115 Holalkere 76.06 543.65 619.71

Hosadurga 116 Hosadurga 110.56 213.36 323.92

Molkalmur, Challakere 117 Molkalmur 97.75 364.32 462.07

Chitradurga District 437.15 2088.81 2525.96

21 Davangere

Davanagere 118 Davanagere North 32.16 32.65 64.81

Davanagere 119 Davanagere South 19.25 52.10 71.35

Davanagere, Channagiri 120 Mayakonda 103.47 192.50 295.97

Jagalur,Harapanahalli 121 Jagalur 76.10 297.70 373.80

Channagiri 122 Channagiri 122.87 184.80 307.67

Harihara 123 Harihara 44.55 148.20 192.75

Honnali 124 Honnali 115.34 377.60 492.94

Davanagere District 513.74 1285.55 1799.29

22 Belgavi

Belagavi, Hukkeri 126 Yamakanmaradi 88.23 172.33 260.56

Belagavi 127 Belagavi North 20.32 9.06 29.38

Belagavi 128 Belagavi South 12.33 22.60 34.93

Belagavi 129 Belagavi Rural 70.21 196.84 267.05

Khanapur 130 Khanapur 222.32 176.78 399.10

Baihongal, Savadatti 131 Baihongal 199.31 188.57 387.88

Baihongal 132 Kittur 202.45 214.02 416.47

Ramdurg 133 Ramdurg 261.14 238.62 499.76

Saudatti 134 Saudatti 239.40 200.00 439.40

Chikkodi 135 Chikkodi Sadalaga 130.97 130.58 261.55

Chikkodi 136 Nippani 94.42 134.50 228.92

Raibag, Chikkodi 137 Raibag 102.33 267.09 369.42

Raibag 138 Kudachi 52.19 130.06 182.25

Hukkeri 139 Hukkeri 95.48 195.50 290.98

Gokak 140 Gokak 147.70 128.60 276.30

Gokak 141 Arabhavi 167.82 148.79 316.61

Athani 142 Athani 119.66 260.25 379.91

Athani 143 Kagawad 125.51 231.78 357.29

Belgaum District 2351.79 3045.97 5397.76

Page 184: Government of Karnataka Public Works, Ports & Inland Water ...

Sl. No. District Name of the Taluk Sl.

No.Name of the Constituency

State Highway

Major District Roads

Total

1 2 3 4 5 6 7 8

23 Bagalkote

Bagalkote, Hunagund 144 Bagalkote 76.71 197.57 274.28Badami 145 Badami 177.70 150.64 328.34Hunagund 146 Hunagund 182.13 201.98 384.11Bilagi, Bagalkote, Badami 147 Bilagi 118.65 321.44 440.09Mudhol 148 Mudhol 141.57 296.29 437.86Jamakhandi 149 Jamakhandi 55.48 255.99 311.47Mudhol,Jamakhandi 150 Terdal 62.12 162.29 224.41

Bagalkote District 814.36 1586.20 2400.56

24 Vijayapura

Muddebihal 151 Muddebihal 128.87 269.45 398.32B.Bagewadi, Sindagi, Muddebihal 152 D.Hipparagi 140.71 347.17 487.88

B.Bagewadi 153 B.Bagewadi 85.70 260.00 345.70Vijayapura 154 Babaleshwar 108.46 393.85 502.31Vijayapura 155 Vijayapura 8.43 24.00 32.43Vijayapura,Indi 156 Nagathan 45.22 446.40 491.62Indi 157 Indi 83.88 319.40 403.28Sindagi, Indi 158 Sindagi 107.23 337.12 444.35

Bijapur District 708.50 2397.39 3105.89 North Zone Total 8555.50 18868.96 27424.46

25 Ballari

Ballari 159 Ballari Urban 13.30 15.22 28.52Ballari 160 Ballari Rural 73.30 202.67 275.97Ballari, Hospet 161 Kampli 101.03 222.20 323.23Sandur, Ballari 162 Sandur 139.55 279.35 418.90Hospet 163 Vijayanagara 53.94 77.46 131.40Hagaribommanahalli, Hospet, Kudligi 164 Hagaribommanahalli 156.63 244.16 400.79

Siruguppa 165 Siruguppa 115.30 144.25 259.55Hadagali, H.B.Halli 166 Hadagali 155.19 306.78 461.97Kudligi 167 Kudligi 121.67 314.05 435.72Harapanahalli 168 Harapanahalli 185.32 253.20 438.52Harapanahalli - Jagaluru 31.60 60.60 92.20

Bellari District 1146.83 2119.94 3266.77

26 Raichur

Raichur, Manvi 169 Raichur Rural 104.17 253.33 357.50Raichur 170 Raichur 15.60 97.16 112.76Manvi 171 Manvi 216.45 203.67 420.12Devadurga 172 Devadurga 164.14 236.90 401.04Lingasugur 173 Lingasugur 138.74 264.45 403.19Sindhanoor 174 Sindhanoor 99.40 193.28 292.68Maski, Sindhanur, Lingasugur 175 Maski 112.02 257.66 369.68

Raichur District 850.52 1506.45 2356.97

164

Page 185: Government of Karnataka Public Works, Ports & Inland Water ...

Sl. No. District Name of the Taluk Sl.

No.Name of the Constituency

State Highway

Major District Roads

Total

1 2 3 4 5 6 7 8

27 Koppal

Gangavathi, Koppal 176 Gangavathi 48.40 133.80 182.20Gangavathi 177 Kanakagiri 138.76 291.10 429.86Koppal 178 Koppal 144.56 316.28 460.84Kushtagi 179 Kushtagi 190.28 253.26 443.54Yelburgra 180 Yelburgra 145.00 450.09 595.09

Koppal District 667.00 1444.53 2111.53

28 Kalburgi

Kalburgi 181 Kalburgi Rural 167.88 162.99 330.87Kalburgi 182 Kalburgi South 28.50 17.00 45.50Kalburgi 183 Kalburgi North 3.60 0.00 3.60Afzalapur 184 Afzalapur 120.70 143.03 263.73Aland 185 Aland 227.00 73.75 300.75Jewargi,Chittapur 186 Jewargi 225.35 273.42 498.77Sedam, Chincholi 187 Sedam 206.40 236.37 442.77Sedam, Chincholi 188 Chincholi 212.03 127.35 339.38Chittapur,Jewargi 189 Chittapur 193.59 200.39 393.98

Kalburgi District 1385.05 1234.30 2619.35

29 Yadgir

Yadgir, Shahapur 190 Yadgir 132.90 378.32 511.22Yadgir 191 Gurmitkal 85.77 263.35 349.12Shorapur 192 Shorapur 103.00 282.77 385.77Shahapur, Shorapur 193 Shahapur 102.30 293.08 395.38

Yadgir District 423.97 1217.52 1641.49

30 Bidar

B.Kalyan 194 B.Kalyan 176.97 115.49 292.46Aurad 195 Aurad 121.65 204.10 325.75Bidar, Humnabad 196 Bidar south 85.55 220.79 306.34Bidar 197 Bidar 33.67 112.20 145.87Bhalki 198 Bhalki 53.63 115.60 169.23Humanabad, B.Kalyan 199 Humanabad 33.79 111.90 145.69

Bidar District 505.26 880.08 1385.34 North East Zone Total 4978.63 8402.82 13381.45

State Total 19468.24 49525.62 68993.86

165

Page 186: Government of Karnataka Public Works, Ports & Inland Water ...
Page 187: Government of Karnataka Public Works, Ports & Inland Water ...
Page 188: Government of Karnataka Public Works, Ports & Inland Water ...