Government of KarnatakaPublic Works, Ports & Inland Water
Transport Department(PWP&IWTD)
Management Information System
MARCH 2020
ii
FOREWORD
Public Works, Ports and Inland Water Transport Department has the responsibility for development and maintenance of National Highways, State Highways and Major District Roads, Construction and Maintenance of Government Buildings, Development and activities related to Ports and Inland Water Transportation.
TheroadnetworkinKarnataka,ason31-03-2020,comprisesof7589KmsofNationalHighways,19470KmsofStateHighwaysand49520KmsofMajorDistrictRoadsandthetotalroadlengthintheStatebeing76579Kms.InKarnatakatheroadlengthperlakhofpopulation(asper2011census)isabout125kmandtheroadlengthpersq.kmofareaisabout40kms.Theproposal of upgradation of roads from village roads to Major District Roads and Major District RoadstoStateHighwaysisbeingexaminedforapproval.
One of themain objectives ofKarnataka StateRoad Policy launched in 2009was tostrengthentheinstitutionsintheroadsectorfororderly,efficientandregulateddevelopmentofthe sector and maintenance of its assets for the years. Government of Karnataka has initiated various programmes with assistance from ADB and WB to develop, improve and maintain the transportation infrastructure as roads play a vital role in the public transport system and in turn in the economic and social development of the society.
Itisafactthattimelyflowofinformationhasassumedagreatimportanceinrecenttimes.Suchbeingthecase,ManagementInformationSystem(MIS)hasbeenintroducedbyOfficeofthe Chief Minister. The Department of Public Works has its commitment towards transparent administration.HenceforeasyflowofinformationthefirstManagementInformationSystempublication was done in the year 1999-2000. Thereafter MIS has been published by theDepartment everyyear. Thepresentpublication is20th in the series, for thefinancialyear2019-20providingtheinformationpertainingtoroads,bridgesandbuildingsconstructedandmaintained by the department along with the administrative set up of the department.
The information pertaining to all the zones of Communication and Buildings, National Highways,KRDCL,KSHIP,PRAMC,SHDP,ChiefArchitect’sOfficeandtheDirectorateofPorts and Inland Water Transport have been collected and processed to bring out the present publication.
I hope that the information contained in this publication will be helpful to the various officersoftheGovernmentandthegeneralpublicatlarge.
Suggestions to improve this publication are welcome.
Date:18.02.2021Bangalore.
Sd/-(Dr. K. S. Krishna Reddy)Secretary to Government,Public Works Department
iii
PREFACE
Roads and buildings have been constructed in India since ancient times. This tradition is reflected in theGrandTrunkRoad stretching today fromKolkatta to thePakistanborderpassingthroughNewDelhi.Karnatakaisnoexceptiontothistraditionofroadbuilding.RoadsexistedconnectingtheVijaynagarEmpiretothePortsinthewestcoastofKarnatakaservingtheEmpire.By1856alldistrictHeadQuarterswereconnectedtoBangalorebyRoad.Between1834and1861theroadsinthethenMysorestatewereclassifiedintoImperial,Provincial&Villageroads.Atthetimeofre-organizationoftheStatein1956,theNationalHighwayslengthwas864Kms,StateHighwayslengthwas5983KmsandMajorDistrictRoadslengthwas7006Kms.
InKarnataka (the thenMysore State) prior to 1834,RevenueOfficerswere in chargeofPublicWorks. In1834, aSuperintendentofMaramatwas in chargeunder theRevenueDepartmentforpublicworks.AseparatePublicWorksDepartmentwascreatedin1856headedbyChiefEngineerwithanAssistantChiefEngineer,fourAssistantEngineers,elevenUpperSubordinatesandnineteenLowerSubordinates.ThefirstChiefEngineerwasCol.C.BowenR.E.andthefirstChiefEngineerfromMysoreStatewasMr.Y.SrinivasaRaoB.A.in1909.In 1922 the salary of Engineers inMysorewasRs. 500 for aChief Engineer, Rs. 250 foranAssistantChiefEngineer andRs. 80 for anUpperSubordinate. During 1856-1876, thePWDexpenditurewasRs.99lakhsonoriginalworksandRs.89lakhsonrepairworksorinotherwords,thePlanandNon-Planexpenditureswerealmostequal.In1897,twoCircles,theWesternandEasternwerecreatedeachheadedbySuperintendingEngineer.
Someoftheearliestbuildingsarestillinuse,In1867theBangaloreCentralJailbuiltatacostofRs.46,047.In1868theBowringHospital,BangalorebuiltatacostofRs.2,16,454and in 1879 theGovernmentMuseumwasbuilt at a cost ofRs. 48, 335. The traditionofconstructing monumental public buildings has continued in Karnataka as a testimony of which standsthemagnificent“VidhanaSoudha”constructedin1956.ThistraditioniskeptalivebyConstructing“VikasSoudha”nexttotheVidhanaSoudhaandcompletedintheyear2006and“SuvarnaSoudha”inBelgaumcompletedintheyear2009atacostof432.04crores.
In themodernmanagement, timely informationflowhas assumed a great importance.ManagementInformationSystemintroducedbytheOfficeoftheChiefMinisterofKarnataka,the Public Works Department with its commitment towards a transparent administration and aneasyflowofinformationbroughtoutthefirstManagementInformationSystempublication
iv
Date:16.02.2021Bangalore.
Sd/-(N.S.Ramesh)Engineer-in-Chief,
Planning and Road Asset Management Centre,Bangalore
for theyear1999-2000.Thereafter theDepartment is regularlypublishing theManagementInformationSystemeveryyear.ThepresentPublicationisthusthe20thinthisseriesprovidinginformationforthefinancialyear2019-20.
Sri.U.R.Subramanya,JointDirector(Statistics)wastheNodalOfficerwhoexpeditiouslycollected the information pertaining to the Communication & Buildings South, North &NorthEastzones,NationalHighways,KRDCL,KSHIP,PRAMC,SHDP,Architecture&theDirectorate of Ports and processed the same to bring out the present Publication with the help ofAssistantStatisticalOfficer.
ThePublicationispresentedasareferencedocumentfortheactivitiesofPWP&IWTD.
v
TABLE OF CONTENTS
No. Title Page No.
CHAPTERS
Chapter 1 Administrative Set Up 1
Chapter 21.State’sRoadNetwork2.Roads&Bridges–PlanAllocation
4
Chapter 3 National Highways 12
Chapter 4 KarnatakaRoadDevelopmentCorporationLimited(KRDCL) 18
Chapter 5 KarnatakaStateHighwaysImprovementsProject(KSHIP) 35
Chapter 6 Planning&RoadAssetManagementCentre(PRAMC) 58
Chapter 7 StateHighwaysDevelopmentProject(SHDP) 64
Chapter 8 InstitutionalDevelopmentinPWP&IWTD 67
Chapter 9 Department of Architecture 71
Chapter 10 Buildings 74
Chapter 11 Ports&InlandWaterTransport 83
Chapter 12 QualityAssuranceZone 97
ANNEXURES
Annexure I Progress of NABARD Works 100
Annexure IIMajor Government Buildings Maintained bytheCE,C&B(North)
102
Annexure IIIMajor Government Buildings Maintained bytheCE,C&B(NorthEast)
103
Annexure IVMajor Government Buildings Maintained bytheCE,C&B(South)
104
Annexure VList of Architectural Drawings of buildings costing more than one Crore
106
vi
No. Title Page No.
APPENDICES
Appendix - 1 District-wiseRoadlengthinKarnataka:ason31.3.2020 115
Appendix - 2 State Highways, District-wise: Surface Feature and Carriagewaywidthason31.3.2020 116
Appendix - 3 Major District roads, District-wise : Surface Feature and Carriagewaywidthason31.3.2020 117
Appendix - 4 Length&LaneWidthofNationalHighwaysinKarnataka 118
Appendix - 5 Division wise length of National Highways 127
Appendix - 6 StateHighwaysNomenclatureandLengthason31.3.2020 140
Appendix - 7 Talukwise Road length of National Highways, State Highway andMajorDistrictRoadsason31.3.2020 150
Appendix - 8 Import&ExportofCargohandledatvariousPortsduringtheyear2019-20 158
Appendix - 9 Constituency wise Road length of State Highways and Major DistrictRoadsason31.3.2020 159
vii
PWP&IWTD’s Vision
A sustainable road network for the socio-economic growthofthestate;efficientandhighqualitypublicbuildingsandminorports;andneedbasedinlandwatertransport.
PWP&IWTD’s Mission
1. Plan,Design, Construct andMaintain a safe, technically soundand cost effective core road network.
2. Enhanceconnectivitytoremoteandisolatedareas.
3. Constructandmaintainbridges.
4. Evolve Policies for the development ofHighways through PPPwith toll collection.
5. PlanandconstructGovernmentbuildingsthatarefunctionalandenergyefficient.
6. Adoptinnovativemeasurestoimprovequalityandreducecostinconstruction and maintenance.
7. Enhancecapacity&efficiencyofminorportsinthestate.
8. EnsuresafetyofInlandwaterwaysoperations.
9. Modernisethemaritimeadministration.
CHAPTER - 1
ADMINISTRATIVE SETUP
1.1 Public Works Ports and Inland Water Transport Department is responsible for the development and maintenance of National Highways, State Highways, and Major District Roads and construction and maintenance of Government Buildings. The Department also undertakes construction on behalf of other department on Deposit Contribution. At the Secretariat the Department is headed by a Additional Chief Secretary and a Secretary.
AtfieldleveltheDepartmenthasfiveZonesnamely,CommunicationandBuildings(C&B)SouthZone,(C&B)NorthZone,(C&B)NorthEast Zone,(C&B)CentralZoneandNationalHighways.EachZoneisheadedbyaChiefEngineer.TheZonesconsistofCircles,Divisionsand Sub-Divisions. The Sub-Divisions are under the control of Divisions, Divisions are under thecontrolofCircles,andCirclesareunderthecontrolofZones.EachCircleisheadedbya Superintending Engineer. The Divisions are headed by Executive Engineers. The Sub-Divisions are headed byAssistant Executive Engineer. The Communication & Buildings,SouthZoneconsistsof4Circlesand17Divisions.TheCommunication&Buildings,NorthZone consists of 2Circles and 9Divisions.TheCommunication&Buildings,NorthEastZoneconsistsof2Circlesand 8Divisions,TheCommunication&Buildings,CentralZoneconsistsof2Circlesand7Divisions.
The Chief Engineer, National Highway is primarily responsible for the development andmaintenance of National Highways under the Ministry of Road Transport & Highways(MoRT&H). The major portion of funds operated is from the Government of India. TheNationalHighwaysZonehastwoCirclesandnineDivisions.
KarnatakaRoadDevelopmentCorporationLimited(KRDCL)wasestablishedon21stJuly1999, as a wholly owned Government of Karnataka enterprise for development of roadinfrastructure in the State headed by the Managing Director.
KarnatakaStateHighwaysImprovementProject(KSHIP)isaninitiativeofthePublicWorksPorts and Inland Water Transport Department, Government of Karnataka for the improvement ofcoreroadnetworkintheStateundertakingExternallyAidedProjects.ChiefProjectOfficerheads this Project Implementation Unit.
State Highway Development Project (SHDP) was established on 4th November 2011 fordevelopment/improvementofCoreRoadNetworkin2Phases.ChiefProjectOfficerheadsthis Project Implementation.
1
1.2 Cadre strength of engineers in the Department:-
Table – 1 .1
Cadre strength in PWP&IWTD (as on March 2020)
Post Sanctioned Filled up Vacant
Additional Chief Secretary 1 0 1
Engineer in Chief (Secretary) 1 1 0
Chief Engineer 11 11 0
Superintending Engineer 34 26 8
Executive Engineer 132 123 9
Assistant Executive Engineer 570 375 195
Assistant Engineer 1275 772 503
Junior Engineer 1116 663 453
Total 3140 1971 1169
1.3 TotalnumberofCircles,Divisions,andcategoriesofroadsundereachzoneasattheEndofMarch2020
Table 1.2
Number of Circles, Divisions and Road Length(RoadlengthinKm)
SlNo
ZoneCircles(In No.)
Divisions (In No.)
StateHighways
Major Dis-trict Roads
NationalHighways
Total
1 National Highways 2 9 - - 7588.67 7588.67
2 NorthEastZone 2 8 4980.27 8397.12 - 13377.39
3 NorthZone 2 9 8555.50 18868.96 - 27424.46
4 SouthZone 4 17 5934.11 22253.84 - 28187.95
5 CentralZone 2 7
6 Quality AssuranceZone 7 - - - -
Total 12 57 19469.88 49519.92 7588.67 76578.47Road Length per lakh Population (2011 Census)
31.86 81.06 12.42 125.34
Road Length per 100 sqkm 10.15 25.82 3.96 39.93
PopulationofKarnatakaStateis611Lakhsasper2011Census
GeographicalareaofKarnatakaStateis191791Sq.Km.
2
CHAPTER - 2
2.1 State’s Road Network:-
PublicWorksPorts&InlandWaterTransportDepartmentisresponsibleforthedevelopmentand maintenance of National Highways, State Highways and Major District Roads, adding to76578.47Km.ApartfromNationalHighways,theStateHighwayslengthis19469.88KmandMajorDistrictRoadslengthis 49519.92Km.
From the viewpoint of infrastructure capabilities, two characteristics of roads are relevant, namelySurfacequalityandCarriagewaywidth.Carriagewaywidthisclassifiedunderfourcategories
(a) SingleLane:3.75metre
(b) IntermediateLane:5.5metre
(c) TwoLanes:7.0to7.5metre
(d) FourLanes:14to15metre
Road surface can be of cement concrete (CC), black top (BT) or water boundmacadam(WBM).Therearesomeunsurfacedroadsalsoi.e–earthenroadwithcarriagewaycomposingofnaturalsoil.Unsurfacedroadsarefurtherclassifiedintomotorableandnon-motorable.
The share of the Road length of National Highways, State Highways and Major District roads according to these two features is presented in the charts below:
Carriageway Width
National Highways ( in km)
Single Lane 121.540
Intermediate Lane 1268.505
Two Lane 3930.045
Four Lane 2022.147
Six Lane 246.435
Total 7588.672
4
Surface Type State
Highways (in km)
Cement Concrete 234.63
Black top 19191.61
WBM 21.52
Un surfaced 22.12
Total 19469.88
Carriageway Width
State Highways ( in km)
Single Lane 3041.70
Intermediate 10083.28
Two Lane 5871.64
Four Lane 473.26
Total 19469.88
Surface TypeMajor District Roads( in km)
Cement Concrete 801.15
Black top 47207.45
WBM 860.25
Un surfaced 651.07
Total 49519.92
5
Carriageway Width
Major DistrictRoads (in km)
Single Lane 35126.14
Intermediate 12933.17
Two Lane 1246.71
Four Lane 214.31
Total 49519.92
2.2 ROADS & BRIDGES – PLAN ALLOCATION
In this Chapter, the budgeted Road and bridge works under Communication and Buildings ofNorthEast,North,CentralandSouthzonesarepresented,includingtheadditionalgrantsreleased from the Finance Department. Programme relating to National Highways is presented inChapter3.
Thebudgetedfundsareusedforstrengthening / improving the ridingqualityof roadsandconverting single lane roads into intermediate Lane / two lane / four lane roads.
Table 2.1showsPWP&IWTDbudgetincrorefortheyear19-20.
Table – 2.1
Allocation under State’s Budget: 2019-20(InCrore)
Category State C.S.S* Total % of State
Communication and Buildings (North+NorthEast+Central+SouthZones)
4320.55 - 4320.55 65.59
National Highways 0.00 378.70 378.70 0.00
KRDCL 414.50 - 414.50 6.29Karnataka State Highways ImprovementProject(KSHIP)
1101.95 - 1101.95 16.73
State Highway Development Project(SHDP)
750.00 - 750.00 11.39
Total 6587.00 378.70 6965.70 100.00
* C.S.S-Central Sector Scheme.
6
Thetotalbudgetfor2019-20isRs.6965.70Crore.However,NABARDworksandaprovisionfor the World Bank Assisted State Highway Improvement Project, State Highway Development ProjectandKRDCLtakesmajorshareoffundstothetuneofRs.2266.45 crore.The remainingRs.4699.25 crore is available for regular road andbridgeworks.TheshareofRs.4699.25crore among the four zones is in the following manner
Table 2.2
Amount shared by three zones Rs. Crore
National Highways 378.70
NorthZone,NorthEastZone&SouthZone 4320.55
TOTAL 4699.25
Table2.3presentsallocationforRoadsandBridgesin2019-20budgetsubheadwise(includingRs.37870.00 lakhofcentralassistance).
Thephysicalandfinancialprogressachieved during 2019-20 against the target of3254Kmofroadlengthis7070Kmofroadlength.Thefinancialprogressofroads&bridgesshowsthatallthethreezoneshasutilizedbudgetgrantswithrespecttotheworksshownintable2.4.
2.3 RIDF Scheme:-
The State has been receiving NABARD assistance for roads and bridges under RIDF scheme since1996-97.ThefocusofNABARDassistanceisonimprovementstoruralroadsintermsofconnectivityand quality. Since inception and upto 2019-20,30791.88Kmroadlengthand1381bridgesworkshavebeen takenupunder thisscheme.Theachievementasat theendofMarch2020 shows that 30046.81Km of road length and1312bridges havebeencompleted. The progress details of NABARD RIDF scheme are presented in Annexure I.
7
Table 2.3
Plan Schemes for Roads & Bridges: 2019-20(Rs. In Lakh)
Sl.No.
Head of Account Scheme Name and Zone State PlanCentral
PlanTotal
1 2 3 4 5 6
IC & B North+North
East+South+Central (Zones)1 5054-04-337-0-01 District&OtherRoads
133 SpecialDevelopmentPlan(SDP) 18270.00 0 18270.00135 SpecialDevelopmentPlan(SCSP) 12400.00 12400.00136 SpecialDevelopmentPlan(TSP) 6400.00 6400.00154 Improvements 165530.00 0 165530.00160 Renewals 6900.00 0 6900.00422 ScheduledCasteSubPlan(SCSP) 86900.00 0 86900.00423 TribalSubPlan(TSP) 40000.00 0 40000.00
2 5054-04-337-0-06 Unspentbalanceamount(2016-17)ofSCSP&TSPspentasperAct
422 ScheduledCasteSubPlan(SCSP) 6261.49 6261.49423 TribalSubPlan(TSP) 0.00 0.00
2 5054-04-337-0-02-436 MDRworksfinanced fromNABARD
33837.00 0 33837.00
3 5054-03-337-0-17 State Highway Road Works154 Improvements 35472.62 0 35472.62160 Renewals 3720.00 0 3720.00
4 5054-03-337-0-16 State Highway Bridges154 Improvement 4284.11 0 4284.11
5 5054-03-101-0-02-132 MDRBridgesCapitalExpenses 12080.00 0 12080.00Total C & B North+North East+South (Zones) 432055.22 0.00 432055.22
II National Highways Zone6 5054-05-337-1-01-172 Road works of Inter-State Importance
(CSS)0 0 0.00
7 5054-05-337-2-01-172 RoadworksofEconomicImportance(CSS)
0 0 0.00
8 5054-04-337-0-05-172 CentralRoadFund(CRF) 0 37870.00 37870.00Total National Highways 0 37870.00 37870.00
III World Bank Assisted Projects9 5054-03-337-0-84-172 KSHIP-II EAPRoads 70330.12 0 70330.1210 5054-03-337-0-86-172 KSHIP-II EAPRoads(ADB) 39864.88 0 39864.88
Total KSHIP 110195.00 0.00 110195.00IV KRDCL
11 5054-80-190-0-01-132 CapitalExpenses 40000.00 0 40000.0012 5054-80-190-0-01-240 Debt Services 1450.00 0 1450.00
Total KRDCL 41450.00 0.00 41450.00V SHDP
12 5054-03-337-0-18-154 Improvements 75000.00 0.00 75000.00Total SHDP 75000.00 0.00 75000.00
Grand Total (I + II + III+IV+V ) 658700.22 37870.00 696570.22
8
Tabl
e 2.
4Ph
ysic
al a
nd F
inan
cial
Pro
gres
s for
the
year
, 201
9-20
(C
&B
Sou
th, N
orth
& N
orth
Eas
t Zon
es)
(Rs.i
n L
akh)
Hea
d of
Acc
ount
Sche
me
Nam
ePh
ysic
al P
rogr
ess
Perc
enta
ge
Ach
ieve
men
t to
the T
arge
t
Fina
ncia
l Pro
gres
sPe
rcen
tage
A
chie
vem
ent
to th
e Tar
get
Targ
etA
chie
ve-
men
tTa
rget
Ach
ieve
men
t (E
xpen
ditu
re)
12
34
56
78
5054-04-337-0-01-422
MajorDistrict&OtherRoads(S
CP)
919
1287
140.04
86900.00
84906.75
97.71
5054-04-337-0-06-422
UnspentSCSPamountasp
erAct-2013
7333
45.21
6261.49
4792.97
76.55
5054-04-337-0-01-423
MajorDistrict&OtherRoads(T
SP)
409
556
135.94
40000.00
39242.08
98.11
5054-04-337-0-06-423
UnspentTSPamountasp
erAct-2013
00
0.00
0.00
0.00
-5054-04-337-0-01-133
MajorDistrict&OtherRoads(S
DP)
325
341
104.92
18270.00
17946.64
98.23
5054-04-337-0-01-135
MajorDistrict&OtherRoads(S
DP-SC
SP)
152
214
140.79
12400.00
12169.27
98.14
5054-04-337-0-01-136
MajorDistrict&OtherRoads(S
DP-TS
P)77
115
149.35
6400.00
6250.45
97.66
5054-03-337-0-17-154
SH ro
ad w
orks
Im
prov
emen
ts368
346
94.02
35472.62
32461.18
91.51
5054-03-337-0-17-160
SH ro
ad w
orks
Ren
ewal
s79
98124.05
3720.00
2708.41
72.81
5054-03-337-0-01-154
MajorDistrict&OtherRoads
Im
prov
emen
ts3413
3602
105.54
165530.00
164776.18
99.54
5054-04-337-0-01-160
MajorDistrict&OtherRoadsRenew
als
178
172
96.63
6900.00
5528.46
80.12
5054-03-337-0-16-154
SH b
ridge
s Im
prov
emen
ts27
1555.56
4284.11
4170.16
97.34
5054-03-101-0-02-132
MDRbridgesC
apitalE
xpenses
155
142
91.61
12080.00
10722.99
88.77
Tota
lR
oads
(in
Km
)59
9367
6411
2.87
3818
54.1
137
0782
.39
97.1
0B
ridg
es (i
n N
os)
182
157
86.2
616
364.
1114
893.
1591
.01
IIN
AB
AR
D W
orks
5054-04-337-0-02-436
Impr
ovem
ents
261
306
117.24
33837
33794
97.34
Brid
ges
5841
70.69
Gra
nd T
otal
Roa
ds (i
n K
m) (
Tota
l (I +
II))
6254
7070
113.
0543
2055
.22
4194
69.5
497
.09
Bri
dges
(in
Nos
) (To
tal (
I+II
))24
019
882
.50
9
Phys
ical
and
Fin
anci
al P
rogr
ess f
or th
e ye
ar, 2
019-
20
(SH
DP,
NH
, KSH
IP, K
RD
CL
, Por
ts)
(Rs.i
n L
akh)
Hea
d of
Acc
ount
Sche
me
Nam
ePh
ysic
al P
rogr
ess
Perc
enta
ge
Ach
ieve
men
t to
the T
arge
t
Fina
ncia
l Pro
gres
sPe
rcen
tage
A
chie
vem
ent
to th
e Tar
get
Targ
etA
chie
ve-
men
tTa
rget
Ach
ieve
men
t (E
xpen
ditu
re)
12
34
56
78
Bud
get W
orks
5054-03-337-0-18-154
SHD
P-Im
prov
emen
ts317
664
209.46
75000.00
75000.00
100.00
5054-05-337-1-01-172
InterS
tateConnectivityRoads(N
H)
00
-0.00
0.00
-5054-05-337-2-01-172
Econom
icIm
portanceRoads(N
H)
00
-0.00
0.00
-5054-04-337-0-05-172
CentralR
oadFund(C
RF)(N
H)
400
247
61.75
37870.00
37869.35
100.00
5054-03-337-0-84-172
KSH
IP-II(WorldBank)
5245
86.54
70330.12
70156.86
99.75
5054-03-337-0-86-172
KSH
IP-II(ADB)
861
1.16
39864.88
20780.54
52.13
5054-80-190-0-01-132
KR
DC
L R
oads
3131
100.00
40000.00
40000.00
100.00
KR
DC
L B
ridge
s80
90112.50
5051-02-201-0-01to09
&5051-02-211-0-01-059
Ports&Lights(CapitalO
utlay)
2624
92.31
3460.99
1308.59
37.81
5051-80-052-0-01-059&
5051-80-800-0-01-059
Inla
nd W
ater
Tra
nspo
rt3
266.67
21.00
20.97
99.86
5051-80-800-0-80-132
SustainableCostalProtection&
Managem
entProgram
(EAP)
35Groynes,15
Igroynes,9T
groy
nes,
4.10Kmlengthof
seaw
all&
planting
ofsaplingsfor1.50
Km
leng
th
35Groynes,15
Igroynes,9T
groy
nes,
4.10Kmlengthof
seaw
all&
planting
ofsaplingsfor1.44
Km
leng
th
-19700.00
16276.13
82.62
4711-02-103-0-00-139
AntiSeaErossionworks
900Mts
Seaw
all
975Mts
Seaw
all
108.33
2940.00
976.27
33.21
Gra
nd T
otal
Roa
ds (i
n K
m)
--
-28
9186
.99
2623
88.7
190
.73
Bri
dges
(in
Nos
)-
--
10
2.4 Allocation of Funds under the H/A 3054:
The allocation under the Mukhya Mantri Grameena Raste Abivrudhi Yojane is earmarked for themaintenanceofMajorDistrictRoadsandbridges.Chart2.7indicatesthecategoriesandpercentage of funds aportioned for the maintenance.
Annual Repairs andOrdinary Repairs comprise of pothole filling, jungle clearance, bermcutting etc. Rechipcarpeting / resurfacing are done under renewals Works of any urgent nature are carried out under Special Repairs. Maintenance of bridge involves cleaning the vents, removal of vegetation, repairs to Piers, abutments, parapets, painting etc.
Table2.5presentstotalfundsprovidedunderHoA:3054headfor2019-20
Table -2.5
Allocation and expenditure of funds for maintenance of Roads & Bridges during 2019-20(Rs. In lakhs)
Sl No
Head of AccountC & B (North+North East+South Zones) Amount
Rs. in LakhExpenditure
Scheme Name1 3054-03-102-0-01-200 State Highways - Bridges 4000.00 3900.642 3054-03-337-0-05-200 State Highways - Maintenance 35517.00 34603.54
33054-04-337-1-09-172 Mukhyamantri Grameena Raste
Abivriudhi Yojane 27342.00 26815.344 3054-04-105-0-01-200 District&OtherRoadsbridges 3500.00 3316.665 3054-04-337-1-10-200 District&OtherRoads 37136.44 35686.99
6 3054-03-337-0-07-200State Highway road safety works maingtenance
11250.00 11250.00
73054-04-337-1-13-200
DistrictandOtherroads,roadsafetyworksmaintenance
9375.00 9338.73
Total: {C & B (North+North East +South Zones)} 128120.44 124911.90
11
Chart 2.7 Percentages of Funds for Repair Works
Special Repairs
15%
Annual Repairs
35%
Renewals 50%
Annual Repairs Special Repairs Renewals
CHAPTER- 3
NATIONAL HIGHWAYS (N H ZONE)
India, in the recent years has witnessed remarkable growth in economy due to mainly development of world-class road network across the country. The development of road network started in the late 90’s under variousnationalHighwaydevelopment programme.Any country or region to alleviate poverty needs good infrastructures that enhance the living standard of its citizen. The development of infrastructures has brought and changed the entire life style of citizens in many developed countries.
In recent decades the country has realized the importance of good road network and other infrastructure. Focused attempts are being made to create world class infrastructure, In order to have rapid development of the country.
Hence,action isbeing taken to improve theexistingNationalHighwaysbyStrengthening,Renewal and Reconstruction wherever necessary. Further, based onthe traffic intensity/TrafficVolume(PCU),manyStateHighwaysarebeingupgradedasNationalHighwaysandDetailedProjectReport for executionof upgradedNationalHighwaysPhysicallyarealsobeing carried out.
TotalLengthofNationalHighwaysUp toend theofMarch-2020 is7588.612Kms in theStateofKarnataka.Further,72NosofvariousStateHighwaysareinprincipallyupgradedasNationalHighwayswhosetotallengthisaround6038Kms.Who’spreparationofDPRsareunder progress and National Highways will be declared on outcome of DPRs.
Length of National Highway:
A. LengthofexistingNationalHighway:
With State PWD 4142.387Kms.
With NHAI 3446.285Kms.Total 7588.672Km.
B. Length of In principal declared National Highways 6038 Km.
12
Allo
catio
n &
Exp
endi
ture
from
201
5-16
to 2
019-
20(R
s in
Cr.)
Sl No
Hea
d of
Acc
ount
2015
-16
2016
-17
2017
-18
2018
-19
2019
-20
Allo
tm en
tE
xpen
- di
ture
Allo
tm en
tE
xpen
- di
ture
Allo
tm en
tE
xpen
- di
ture
Allo
tm en
tE
xpen
- di
ture
Allo
tm en
tE
xpen
- di
ture
1NH(o)&
IRQP
works-5054
275.00
282.01
608.14
604.70
899.00
1047.88
1500.00
1499.93
1283
1283
2Pe
rman
ent B
ridge
Feefund-5054
2.84
1.55
7.67
7.50
0.16
0.16
0.02
0.00
0.00
0.00
3W
orld
Ban
k Lo
an
Assistance(NHIIP)
35.00
58.23
108.00
107.61
179.00
140.70
80.00
43.37
45.00
EAP
(NHIIP
)
5.15
EAP
(NHIIP
)
4PR
(SRP)-3054
85.98
85.89
175.00
161.61
95.00
88.91
7.00
5.18
14.20
14.20
5FD
R(N),3054
4.80
5.38
1.50
0.50
2.50
2.50
6.66
6.66
5.00
0.00
6FD
R(C), 3054
4.30
0.82
2.40
2.40
1.76
1.76
0.70
0.00
2.10
2.11
7OR3054
24.55
24.23
25.63
25.60
25.41
25.41
51.85
34.68
41.48
14.56
8ISC&EI
30.00
34.75
50.00
33.93
15.00
10.50
5.00
2.56
2.00
0.00
9NHDPIV
320.00
297.86
155.00
152.16
30.00
13.90
85.00
17.59
50.00
4.65
TOTA
L78
2.47
790.
7211
33.3
410
96.0
112
47.8
313
31.7
217
36.2
316
09.9
714
42.7
813
23.6
7
13
Targets & Achievement for the year 2019-20
Under NH(O) (Cumulative length in Km)
Target for Construction (km) Target for award (Km)Month Target Achievement Month Target Achievement
Apr’19 23.00 23.00 Apr’19 0 0
May’19 14.10 7.00 May’19 0 0
June’19 21.30 34.00 June’19 0 0
July’19 28.90 23.00 July’19 6 6
Aug’19 29.00 6.35 Aug’19 0 0
Sep’19 39.50 23.01 Sep’19 0 0
Oct’19 43.40 5.88 Oct’19 0 0
Nov’19 48.20 15.67 Nov’19 0 0
Dec’19 41.80 28.03 Dec’19 0 0
Jan’20 28.20 25.03 Jan’20 0 0
Feb’20 14.00 17.57 Feb’20 0 0
Mar’20 14.80 11.85 Mar’20 0 0
TOTAL 346.20 220.39 TOTAL 6 6
Under NHDP - IV
Target for Construction (km) Target for award (Km)
Month Total Target Achievement Month Total Target AchievementUpto
March-200 0 0 0
Under NHIIP
Target for Construction (km) Target for award (Km)
Month Total Target Achievement Month Total Target AchievementUp to
March-204.32 0 0 0
TOTAL 4.32 0 0 0
14
1. Consultancy works (in principally declared NHs):
No of estimates
No of estimates
Sanctioned
No of estimates, Submitted to
MoRT&H
No of estimates
from KSHIP
No of estimates dropped
Balance to be submitted
72Nos (6038Kms) 39 21 2 7 3
AlltheworksareunderTenderprocessforcarryingoutDPR.Outof72works,for39worksareunderprogressatvariousstagesofDPRpreparationhavingalengthof4770KmcostingRs.149.00Cr.
10. Black spots:
No of Black spots in Karnataka. 234 Nos
Black spots on NHs entrusted with State PWD. 234Nos
Black spots on NHs entrusted with NHAI. -
Blackspotswithlocalbodies&StateGovt. -
15
Tabl
e 3.
1Pr
ogre
ss o
f Roa
ds &
Bri
dges
wor
ks to
the
end
of y
ear
31-0
3-20
20(R
s. in
lakh
s)
Hea
d of
Acc
ount
Hea
d of
Dev
elop
men
t
No.
of w
orks
Gra
nt
2019
-20
Est
imat
ed
Cos
t
Exp
endi
ture
Sanc
tione
dco
mpl
eted
Prog
ress
Not
st
arte
dU
pto
3/20
19D
urin
g 20
19-2
0C
umul
ativ
e
12
34
56
78
910
11I
Stat
e H
ead
- Pla
n I
00
00
00
00
0
5054-05-337-1-01
Roa
d w
orks
of I
nter
Sta
te C
onne
ctiv
ity
(ISC
)0
00
00
00
00
5054-05-337-2-01
RoadworksofE
conomicIm
portance(EI)
00
00
00
00
0I T
otal
Pla
n0
00
00
00
00
IISt
ate
Hea
d - N
on P
lan
3054-01-052
NationalH
ighw
ays-Machinery&
Equipm
ent
00
00
170
00
168.29
0
5054-04-800
District&OtherRoads-Otherexpenditure
(CentralRoadFund-NH)
607
375
194
3850800
391900.00
6496.90
33757.8
26768.13
II T
otal
Non
Pla
n60
737
519
438
5097
039
1900
6496
.90
3392
6.09
2676
8.13
Gra
nd T
otal
(I+I
I)60
737
519
438
5097
039
1900
6496
.90
3392
6.09
2676
8.13
IC
entr
al H
ead
- Pla
n5054
Roads&BridgesO
riginalworks
493
442
0434065.33
4916.38
33037.36
38061.02
5054
Impr
ovem
ents
of R
idin
g Q
ualit
y Programme(IRQP)
00
00
00
00
0
PermanentB
ridgeFeeFund(PBFF)
00
00
00
00
0Sp
ecia
l Pro
ject
00
00
00
00
0To
tal P
lan
I49
344
20
4340
65.3
349
16.3
833
037.
3638
061.
02II
II C
entr
al H
ead
- Non
Pla
n3054
Roads&BridgesM
aintenace&Repairs
--
--
--
--
-A)O
rdinary
197
197
00
2171.68
5.09
2177.26
2184.35
B)PeriodicalR
enew
als
213
108
14221.06
23.29
2720.922
3155.212
C)SpecialRepairs
2929
00
398.00
0.00
3.98
3.98
D)FloodDam
ages
2321
20
905.48
0.00
348.06
342.75
Tota
l Non
Pla
n II
270
250
128
0.00
1769
6.22
28.3
852
50.2
2256
86.2
92To
tal
Plan
49.0
03.
0044
.00
2.00
0.00
4340
65.3
349
16.3
833
037.
3638
061.
02To
tal N
on P
lan
877
625
206
4650
970.
0040
9596
.22
6525
.28
3917
6.31
232
454.
422
Tota
l Pl
an +
Non
Pla
n92
6.00
628.
0025
0.00
48.0
050
970.
0084
3661
.55
1144
1.66
7221
3.67
7051
5.44
16
Tabl
e 3.
2A
bstr
act o
f Phy
sica
l and
Fin
anci
al P
rogr
ess o
f Wor
ks fo
r th
e m
onth
Mar
ch-2
020
Sl.
No.
Part
icul
ars
Tota
l N
o. o
f w
orks
No.
of
wor
ks
com
plet
ed
No.
of
wor
ks
for
whi
ch
tend
er in
pr
oces
s
No.
of
wor
ks in
pr
ogre
ss
Est
imat
ed
cost
(R
s. In
C
rore
s)
Gra
nts f
or
the
year
20
19-2
0 (R
s. In
cr
ores
)
Exp
endi
ture
du
ring
the
year
(201
9-20
12
34
56
78
9
15054OriginalWorks(including
PBFFandSpecialProjects)
493
244
5348.583
00
2Pe
riodi
cal R
enew
als
213
108
183.22
59.18
33.16
3W
orld
Ban
k A
ssis
tanc
e0
00
00
00
4NHDPIV-AProjects(DBFO
T)0
00
00
00
5H
ighw
ay A
dmiis
tratio
n0
00
00
00
63054SpecialRepairs
2929
00
03.98
3.98
7OrdinaryRepairs
197
197
00
23.86
41.48
25.21
8Fl
ood
Dam
age
Rep
airs
2321
02
8.45
5.00
0.00
9In
ter S
tate
Con
nect
ivity
Sch
eme
00
00
00.00
0.00
10Econom
icIm
portanceScheme
00
00
00.00
0.00
11C
entra
l Roa
d Fu
nd W
orks
607
375
38194
3651.20
508.00
337.57
12PB
FF0
00
00
0.00
0.00
TO
TAL
926
628
5024
892
15.3
161
7.64
399.
92
17
18
CHAPTER- 4
KARNATAKA ROAD DEVELOPMENT CORPORATION LIMITED
The Government has constituted “Karnataka Road Development Corporation Ltd” vide GovernmentorderNo.PWD172CRM97dated01-06-1999andthiswasestablishedon21stJuly1999asawhollyownedGovernmentofKarnatakaEnterprises.
4.1 The structure and role of the Corporation is as detailed below:
a. TheCorporationisestablishedunderCompaniesAct,1956[Sl.No.of196(56)]asaPublicLimited Company wholly owned by Government of Karnataka under the administrative control of the Public Works Department.
b. The Company established as a nodal agency to promote surface transport infrastructure to improve:
i. Construction of Roads
ii. Construction of structures like Major / Minor Bridges, Flyovers, Grade Separators
iii. ConstructionofRoadprojectsonPublicPrivatePartnership(PPP)basis.
iv. Collection of User fee on the roads developed by KSHIP/KRDCL and utilizing the accruedamountfordevelopment&maintenanceofroads
c. TheCorporationhasitsRegisteredOfficeatBangalore.
d. TheCorporationhasaninitialAuthorizedShareCapitalofRs.510.00Crore.
e. The Corporation functions under the supervision and control of the Board of Directors.
Completed Projects of KRDCL from Inception.
4.2 ROAD WORKS:
● 7327 km of State Highway Maintenance at an amount of Rs.225 Crore during 2001-04
● 14500 km of State Highway Maintenance an amount of Rs.503 Crore during 2005-08
● Development and Improvement of 1160 km length of 45 Roads under EngineeringProcurement Contract to the tune of Rs. 2040 Crore).
4.3 PPP-ANNUITY PROJECTS:
● Three State Highway Projects of 131.17 km have been completed under Annuity mode with total Annuity Amount of Rs. 1069 Crore. The roads are put to public use. The Annuity period for these projects is 12-13 years.
19
4.4 PPP-VGF (Toll) PROJECTS:
● Three projects of 197.60 km at a total project cost of Rs. 666.34 Crore have been completed and put on commercial operation and one project of 74.35 km at a project cost of Rs. 380.85 Crore is in progress.
4.5 PHASE BRIDGE WORKS:
Construction of 642 Bridges in Four Phases have been completed at an estimated cost of Rs. 680 Crore.
● 1stphase-147BridgesforanamountofRs.110Crore
● 2ndPhase-255BridgesforanamountofRs.248Crore
● 3rdPhase-169BridgesforanamountofRs.230Crore
● 4thPhase-71BridgesforanamountofRs.92Crore
MAJOR BRIDGE WORKS:
● 37 Major bridges at an estimated cost of Rs. 647.34 Crore are completed.
4.6 ONGOING PROJECTS:
I. Road works (Budget):
EightRoadworksof132.07 km at a cost of Rs.544.49 Crore are in different stages of progress and three road works are nearing completion.
1) Improvements to Jath - Jamboti road from km 0.00 to km 101.00 and km 101.00 to km 137.50 in selected reaches under E.P.C basis
TheworkisawardedtoRs.322.35CrandrevisedtoRs.350.14Cr.Workcommencedon08-08-2016andduedateofcompletionis07-08-2019.Timeextensiongrantedup to31-10-2019.BC97.17kmiscompletedandbalanceworks inprogress.ThefinancialprogressachievedasonMarch2020isRs.312.73Cr.
2) Improvements to road from Ch. 38+340 to 39.140 and 39+730 to 40+230 in Chikkerur town limit in Hirekeruru taluk, Haveri District on SH-62 (Haveri Sagar road) (1.30 km).
TheworkisawardedtoRs.5.29Cr.Workcommencedon28-05-2016andduedateofcompletionis27-09-2019.Roadworkiscompleted.ThefinancialprogressachievedasonMarch2020isRs.3.74Cr.
20
3) Construction of road from Ch. 78+400 to 81+660 on SH-21 (Halebidu - Anechoukur road) in Arakalagud Taluk, Hassan District (3.26 km).
TheworkisawardedtoRs.11.57Cr.Workcommencedon06-04-2018andduedateofcompletionis06-10-2018.Workiscompletion.ThefinancialprogressachievedasonMarch2020isRs.11.78Cr.
4) Improvements to road from Ilavala to K.R Nagar via Sagarakatte (SH-117) from km 11.140 and 15.60 in K. R. Nagar Taluk, Mysore District (4.46 km)
TheworkisawardedtoRs.4.70Cr(revisedtoRs.5.79Cr.)Workcommencedon 20-06-2018 and due date of completion is 19-12-2018, work completed on 30-04-2020.Workiscompleted.ThefinancialprogressachievedasonMarch2020isRs.3.79Cr.
5) Development to road from km 14.500 to km 15.700 near Kodihalli Village (SH-121) in Hassan District (1.20 km).
The work is awarded to Rs.2.35 Cr. Work commenced on 28-02-2019. LandAcquisitionworkisinprogress.
6) Balance work Improvements of SH-8 from Km 47.715 to Km 48.660 of Hirisave-Shravanabelagola –C.R Patana Holenarasipura – Shanivarasanthe road in Holanarasipura Taluk Hassan District.
TheworkisawardedtoRs.4.40Cr.Workcommencedon08-03-2019andduedateofcompletionis07-09-2019.Workisinprogress(workimplementedbyPWDunderKRDCLgrants).
7) Balance work of Construction of Minor bridge and approaches @ Km 48.660 of Hirisave-Shravanabelagola–C.R Patana Holenarasipura – Shanivarasanthe road SH-8 in Holenarasipura Taluk, Hassan District.
TheworkisawardedtoRs.4.53Cr.Workcommencedon08-03-2019andduedateofcompletionis07-09-2019.Bridgeworkiscompleted,protectiveworksinprogress(workimplementedbyPWDunderKRDCLgrants).ThefinancialprogressachievedasonMarch2020isRs.2.00Cr.
8) Development of Outer Ring Road for Hassan Town Connecting Nelamangala - Mangalore Road NH-75 via Arasikere road SH-68 Halebeedu road & 121) in Hassan District (on EPC mode)
Thework is awarded toRs.190.65Cr.Agreement executedon23-07-2019.Workcommenced on 31-01-2020 and due date of completion is 30-07-2023. Landacquisition,Preliminaryworksareinprogress.ThefinancialprogressachievedasonMarch2020isRs.9.79Cr.
21
II. BANGALORE SURROUNDING ROAD WORKS:
Developmentoffourroadsforalengthof155kmaroundBengaluruataprojectcostofRs.2095Crorehasbeentakenandimplementedunder10PackageswhichincludesRoadworks,ROB,RUB,GradeSeparatorsandElevatedRoads.
1) Package–1: Development of road from Hoskote -Budigere cross (NH-4) to Kempegowda International Airport road via Budigere- Singahalli and Mylanahalli in (from km 0+00 to 21+500) Bangalore urban/rural District (20 km).
TheworkisawardedtoRs.154.01Cr.Workcommencedon01-07-2019andduedateofcompletionis30-12-2021.Landacquisition,treecuttingandshiftingofutilitiesarein progress. Minor bridges and culvert works are in progress. The financial progress achievedasonMarch2020isRs.25.73Cr.
2) Package–2A: Development of road from Nelamangala from NH-4 to Madhure on SH 74 via Chikkamadhure from 0+00 to 15+250) in Bangalore urban/rural District (15.25 km)
TheworkisawardedtoRs.174.37Cr.Workcommencedon29-04-2019andduedateofcompletionis28-10-2021.1.30kmRetainingwallatMadhreTankBund,2No'sMinorBridgeexcavationwork,1.00kmdrainwork&Electricalpoleshiftingworkisinprogress.LandAcquisition,treecuttingandutilityshiftingworksareinprogress.ThefinancialprogressachievedasonMarch2020isRs.7.78Cr.
3) Package–2B: Development of road from Madhure on SH 74 to Devanahalli road (EMM VEE Solars on NH 7) via Rajanukunte and Thimmasandra (from km 15+250 to 39+240) in Bangalore urban/rural District (23.99 km)
TheworkisawardedtoRs.190.19Cr.Workcommencedon08-03-2019andduedateofcompletionis07-09-2021.600mRetainingwallconstructionworkisinprogress.2MinorBridgefoundationwork,drainworkandBoxculvertworksareinprogress.LandAcquisition,treecuttingandutilityshiftingworksareinprogress.ThefinancialprogressachievedasonMarch2020isRs.8.00Cr.
4) Package–2C: Construction of RUB at Basavanahalli railway crossing near Nelamangala railway station (km 0+800) on SH 74 and rob at Gollahalli railway crossing (km 6+300) on SH 74 in Bangalore urban/rural district (1 ROB and 1 RUB)
TheworkisawardedtoRs.53.64Cr.Workcommencedon05-05-2019andduedateofcompletionis05-11-2021.Workisinprogress.ThefinancialprogressachievedasonMarch2020isRs.2.39Cr.
22
5) Package–2D: Construction of ROB at Rajanakunte for crossing railway line & SH 9 (km 32+185) and ROB at railway crossing at Narayanapura (km 36+840) on MDR in Bengaluru (2 ROB)
TheworkisawardedtoRs.61.02Cr.Workcommencedon04-04-2019andduedateofcompletion is03-10-2021. Initialworksare inprogress.The financialprogressachievedasonMarch2020isRs.1.59Cr.
6) Package–3A: Development of road from Kanchugaranahalli to Jigani via Harohalli and Urgandoddi (km 0+000 to km 33+200) and section of road from BM road junction to Coca cola factory (km 0+000 to km 3+000) of Bidadi-Harohalli road in Bengaluru (33.00 km).
TheworkisawardedtoRs.151.29Cr.Workcommencedon21-06-2019andduedateofcompletionis20-12-2021.ConstructionofPipeculvertsandBoxculvertsareinprogress.Landacquisition,UtilityShiftingand treecuttingworksare inprogress.ThefinancialprogressachievedasonMarch2020isRs.7.10Cr.
7) Package–3B: Development of road from Bannerghatta on SH-87 to Besthamanahalli on SH-35 (including Anekal bypass, Grade separator across Chandapura road and ROB across railway line) via Jigani, Haragadde and Indalwadi (km 0+000 to km 22+980) in Bengaluru (22.98 km, 1 Grade Separator & 1 ROB).
Thework is awarded toRs.145.48Cr.Work commencedon06-05-2019 andduedateofcompletionis05-11-2021.Roadworkisinprogress.Landacquisition,UtilityShifting and tree cutting works are in progress. The financial progress achieved as on March2020isRs.6.75Cr.
8) Package–4A: Development of road from Besthamanahalli (Anekal) on SH-35 to Hoskote road (NH-04) via Attibele-Sarjapura and Whitefield (km 0+000 to km 42+600) (excluding elevated corridor, Grade separator and ROB) in Bengaluru (39.28 km).
Thework is awarded toRs.204.10Cr.Work commencedon15-06-2019 andduedateofcompletionis14-12-2021.Roadworkisinprogress.Landacquisition,UtilityShifting and tree cutting works are in progress. The financial progress achieved as on March2020isRs.1.18Cr.
9) Package–4B: Construction of elevated road at Varthur village (1.300 km) in Bengaluru (1.30 km Elevated Corridor).
TheworkisawardedtoRs.182.76Cr.Workcommencedon20-05-2019andduedateof completion is19-11-2021. Initialworksare inprogress.The financialprogressachievedasonMarch2020isRs.8.15Cr.
23
10) Package–4C: Construction of grade separators at Tally junction, Dommasandra junction, Varthur kodi junction and ROB at Kadugodi in Bangalore (3 Grade separator 1 ROB)
TheworkisawardedtoRs.72.99Cr.Workcommencedon20-05-2019andduedateofcompletionis19-11-2021.Worksareinprogress.
III. DEPOSIT CONTRIBUTION WORKS:
ThreeprojectshavebeentakenupunderDepositContribution(DULT)atanestimatedamountofRs.230Cr.Oneprojectiscompletedandtwoprojectsarenearingcompletion.
Sl.No
Name of workNos / km
Contract Amt
(Rs. In Cr)
Financial Progress as on March
2020(Rs. In Cr)
Remarks
1
Construction of 3 - grade separatorsat km 240+808, km 244+640and km 245+375 on Mangasuli -Lakshmeswhar (SH-73)b/wDharwad-Hublifromkm229+15tokm247+99(BRTLane),inlieuofproposedVUP'sofexisting4-lanigworks.- DC work.
3Nos 37.64 36.81Work is
completed
2
Construction of Road Over Bridges(ROBs) on Mixed Traffic Lanes atCh:13+480(Km:234+510)oneithersideoftheexistingROBonMangsuli-Lakshmeshwar (SH-73) roadbetweenDharwad-Hubballi near Navalur under BRTS Project. - DC work.
2Nos 47.94 40.28OneROBis
completed and oneROBworkis in progress
3
Construction of mixed traffic laneson Mangasuli - Lakshmeshwar (SH-73) between Dharwad - Hubli fromkm229+15tokm247+99adjacenttoexisting4-laningwork.- DC work.
18.84 182.23 149.60 Work is completed
24
IV. Status of PPP-VGF (Toll) Projects:
Sl. No
SH No. Name of workLength in
km
Total Project Cost
(TPC) Rs.Length in km
1 SH-34
Widening&ImptstoDharwad-Alnavar-Ramnagar(SH-34)roadonBOT-VGF(Toll)basis
61.75 237.60
ProjectisunderO&Mperiod2+28years(02-12-2040-endofConcessionperiod)
2 SH-10
Widening&ImptstoWhagdhari-Ribbanpalli (SH-10)roadonBOT-VGF(Toll)basis
135.85 242.75
ProjectisunderO&Mperiod2+28years(02-12-2040-endofConcessionperiod)
3 SH-23
Development of road from NH-63nearGinigere-Gangavathi to Sindhanoor underPPP-DBFOT-VGF(Toll)basis
83.00 190.16
ProjectisunderO&Mperiod2+22years(09-02-2038-endofConcessionperiod)
4 SH-9
Improvements to Yelahanka - A.P Border road from km 13.80kmtokm89.417ofSH-09underPPP-DBFOT-VGF(Toll)basis
74.35 380.85
PCODdeclaredon 19-09-2018.89.77%work completed. Balance works in progress2+21years(03-03-2039- end of Concession period)
V. DBFOMT (Hybrid Annuity) World Bank Co-Finance Projects:
Six projects for a length of 361 km have been developed under World Bank assisted co-financing scheme. Details are as follows:
Sl. No
SH/NH
Name of Project
Total Project
Cost (TPC) Rs.
Length in km
Concession Agreement
dateStatus of work
11,31&73
Development of Bagewadi - Bailahongal - Saundatti road (WCP-1)
235.95 63.29 09-12-2015
Provisionalcertificateof completion is issued. The date of issue of CODis01-10-2018.Punch list works are in progress
2 15
Development of road from Bidar to Chincholi in Bidar&KalburgiDistrict (WCP-2)
226.20 60.04 24-10-2016
Provisionalcertificateof completion is issued. The date of issue of CODis03-08-2019.Punch list works are in progress
3 21
Development of Hassan - Arakalagud - Ramanathapura - Piriyapatna road (WCP-3)
277.41 73.69 16-12-2015
Provisionalcertificateof completion is issued. The date of issue of CODis28-02-2018.Punch list works are in progress
462,76&57
Development of Hirekerur - Ranebennur road (WCP-5)
219.93 55.68 16-12-2015
Provisionalcertificateof completion is issued. The date of issue of CODis24-02-2018.Punch list works are in progress
545&47
Development of Mundaragi - Hadagali - Harapanahalli road (WCP-6)
205.16 51.21 16-12-2015
Provisionalcertificateof completion is issued. The date of issue of CODis05-02-2018.Punch list works are in progress
641&60
Development of Hungund - Muddebihal - Talikote road (WCP-7)
204.93 56.99 03-12-2015
Provisionalcertificateof completion is issued. The date of issue of CODis01-10-2018.Punch list works are in progress
Total 1369.58 360.90
VI. Bridge works:
1) Construction of Bridge across Kapila River near Goddanapura village and at Bilugali village in Nanjangud Taluk in Mysore District under one package (2 Bridges).
The work was awarded for a contract amount of Rs. 47.80 Cr and revised to Rs.60.00Cr.Workcommencedon16-01-2016withstipulatedcompletiondateas15-01-2018.BridgenearGoddanapuraiscompletedandBridgeproperfortheBridgenear Bilugali is completed, retaining wall towards Bilugali is in progress. Financial progressasonMarch2020isRs.49.59Cr.
25
26
2) Construction of Bridge across Bennethorahalla in the middle of SH-126 & SH-149 roads in Chittapura taluk, Kalburgi district.
ThisbridgeworkisawardedtoRs.15.128Cr.Commencementdate is13-10-2015andBridgeworkcompletedduringMarch2019andtrafficallowed,balance60mapproach road and construction of concrete drain works are in progress. Financial progressasonMarch2020isRs.13.55Cr.
3) Construction of Bridge across Krishna River between Chandurtek and Sainiktek villages in Belgaum District.
ThisbridgeisawardedtoRs.18.96Cr.Commencementdateis10-12-2014andduedateofcompletionis31-03-2018.Workisinprogress.Workisdelayedduetolandacquisition,heavy rainsand frequent flooddischarge fromMaharashtra.FinancialprogressasonMarch2020isRs.8.33Cr.
4) Construction of Approach road and protective works to the existing bridge across Arkavathi river at Rampura village on Rampura – Guddadahalli – Kakamaranahalli (Bidadi – Mudavadi) road in Ramanagaram Taluk.
The work is awarded to Rs.6.81 Cr. Commencement date is 20-03-2018. Workis completed during December 2018. Financial progress as on March 2020 is Rs.6.88Cr.
5) Construction of 217 Bridges in different parts of Karnataka has been taken up and the works are in different stages of progress:
a) Major Bridges of 5 Packges – (Each bridge costing more than Rs. 10 Cr)
i) Package-I: Construction of 7 Bridges in Kalaburgi, Vijayapura and Bagalakote Districts:
The work is awarded to Rs.189.23 Cr. Commencement date is 19-03-2018.Worksareindifferentstagesofprogress.FinancialprogressasonMarch2020isRs.35.18Cr.
ii) Package-II: Construction of 8 Bridges in Belagavi Districts:
The work is awarded to Rs.197.58 Cr. Commencement date is 19-03-2018.Worksareindifferentstagesofprogress.FinancialprogressasonMarch2020isRs.6.97Cr.
27
iii) Package-III: Construction of 11 Bridges in Dharawada, Haveri, Shivamogga, Dakshina Kannada & Udupi Districts:
The work is awarded to Rs.249.67 Cr. Commencement date is 19-03-2018.Worksareindifferentstagesofprogress.FinancialprogressasonMarch2020isRs.54.88Cr.
iv) Package-IV: Construction of 7 Bridges in Uttara Kannada Districts:
The work is awarded to Rs.189.95 Cr. Commencement date is 19-03-2018.Worksareindifferentstagesofprogress.FinancialprogressasonMarch2020isRs.39.28Cr.
v) Package-V: Construction of 8 Bridges in Hassan, Chikkamagalur, Mandya & Bagalakote Districts:
The work is awarded to Rs.177.62 Cr. Commencement date is 19-03-2018.Worksareindifferentstagesofprogress.FinancialprogressasonMarch2020isRs.21.50Cr.
b) Minor Bridges of 10 Packages – (Each Bridge costing less than Rs. 10 Cr)
i) Package-I: Construction of 28 Bridges in Kalaburgi, Yadagiri, Vijayapura, Bagalakote & Belagavi Districts:
The work is awarded to Rs.133.93 Cr. Commencement date is 19-03-2018.Worksareindifferentstagesofprogress.FinancialprogressasonMarch2020isRs.46.52Cr.
ii) Package-II: Construction of 5 Bridges in Raichur, Koppala & Ballari Districts:
The work is awarded to Rs.33.00 Cr. Commencement date is 19-03-2018.Worksareindifferentstagesofprogress.FinancialprogressasonMarch2020isRs.12.22Cr.
iii) Package-III: Construction of 37 Bridges in Dharawada, Haveri & Gadaga Districts:
The work is awarded to Rs.105.70 Cr. Commencement date is 19-03-2018.Worksareindifferentstagesofprogress.FinancialprogressasonMarch2020isRs.36.97Cr.
iv) Package-IV: Construction of 9 Bridges in Honnavara & Joida Districts:
TheworkisawardedtoRs.27.64Cr.Commencementdateis19-03-2018.Worksare in different stages of progress. Financial progress as on March 2020 is Rs.3.77Cr.
v) Package-V: Construction of 18 Bridges in Haliyala, Yallapura & Mundagodu Taluks in Uttara Kannada Districts:
TheworkisawardedtoRs.42.89Cr.Commencementdateis19-03-2018.Worksare in different stages of progress. Financial progress as on March 2020 is Rs.4.11Cr.
vi) Package-VI: Construction of 21 Bridges in Chitradurga, Davanagere & Shivamogga Districts:
The work is awarded to Rs.53.81 Cr. Commencement date is 19-03-2018.Worksareindifferentstagesofprogress.FinancialprogressasonMarch2020isRs.12.42Cr.
vii) Package-VII: Construction of 8 Bridges in Kakshina Kannada & Madikere Districts:
The work is awarded to Rs.45.96 Cr. Commencement date is 19-03-2018.Worksareindifferentstagesofprogress.FinancialprogressasonMarch2020isRs.17.94Cr.
viii) Package-VIII: Construction of 9 Bridges in Chitradurga, Udupi & Bhatkala Districts:
The work is awarded to Rs.42.57 Cr. Commencement date is 19-03-2018.Worksareindifferentstagesofprogress.FinancialprogressasonMarch2020isRs.18.32Cr.
ix) Package-IX: Construction of 22 Bridges in Chamarajanagara, Chikkamagaluru, Hassan & Mysuru Districts:
The work is awarded to Rs.123.01 Cr. Commencement date is 19-03-2018.Worksareindifferentstagesofprogress.FinancialprogressasonMarch2020isRs.64.09Cr.
x) Package-X: Construction of 21 Bridges in Tumkur, Ramanagara, Mandya & Kolar Districts:
The work is awarded to Rs.101.12 Cr. Commencement date is 19-03-2018.Worksareindifferentstagesofprogress.FinancialprogressasonMarch2020isRs.71.71Cr.
28
VII. HUDCO Loan works (Self – Finance Scheme) :
Sl.No.
Name of workLength
(km)
Contract Amount
(Rs in Cr.)
Financial Progress
(Rs. In Cr)Remarks
1.
Construction of By-pass(Re-alignment)to Toranagal town on Kudligi-Toranagal road
6.44 33.39 6.39
Work in progress. RUB GAD drawings submitted to SW Railways for approval
2.Development of road fromKudligi–Sandur–Toranagalroad(SH-40)
39.60 133.40 120.27Work completed. Tender to be recalled
3.Development of road from Hosapete to Sandur (SH-49)
27.17 70.61 74.07Work complete. Toll collection in progress
VIII. Collection of Road User Fee:
Collection of user fee on selected three roads have been started. Details are as below:
Sl. No
Name of the StretchLength in Km
Toll Contractor
Agreed Annual remittance
amount Rs in Crore
TOLLING COMMENCED
1Bagewadi-Bailhongal-Saundatti
63.29KMJyothiPrakash,Davangere
2.04
2Hassan - Periyapatna Road
73.69M/s Mitra Infra Solutions, Mysore
3.15
3Hirekerur-Ranibennur road
55.69KMJyothiPrakash,Davangere
1.10
4Mundargi-Hadagali–Harapanahalli road
51.21 KVHanchinal 2.03
5Hungund-Muddebihal-Talikot Road
56.99KMJyothiPrakash,Davangere
1.07
6Dharwad–Karadigudda-Saundatti Road.
36.00 M/sVinayladEnterprises 2.58
7 Hoskote to Chintamani Bypass road
52.46 M/s KCIC 10.85
8Haveri-Akkialur-Hangal Road.
31.78Vijayramegowda (M/sMitraInfraSolutions)
2.07
9Mudhol–Chikkodi–Nippani - Road.
107.94 M/sVinayladEnterprises 7.26
10Shelwadi - Mundargi Road.
64.21M/s Kesar Investment and Securities
2.78
29
11Hubli-Kundagol-Lakshmeshwar Road.
42.96Vijayramegowda (M/sMitraInfraSolutions)
2.20
632.22 Total 37.17
AGREEMENTS EXECUTED & TOLLING YET TO BE COMMENCED
12Mudgal - Tavaregere - Gangawathi Road.
74.10M/s Mitra Infra Solutions
1.65
13Magadi-Pavagada-AP Border Road
149.50M/s Mitra Infra Solutions
7.20
14Malavalli-Maddur-Koratagere Road.
135.34 M/sVinayladEnterprises 8.75
15Sindhanur - Tavaregere - Kushtagi Road.
64.30M/s Kesar Investment and Securities
2.95
423.24 Total 20.55
CONTRACTS AWAITING APPROVAL FROM BOARD FOR ISSUING LETTER OF AWARD
16 Bidar-Chincholi(TCP-2) 60.02 M/sJKLStoneApproved in KRDCL Board.LOAissued.
17Kudlagi - Sandur - Thorangalu road
39.20 M/sJKLStone
Negotiations completed and Approval for award to be obtained in the forthcoming Board Meeting
18 Hospet - Sandur road 27.10 M/sJKLStone
Negotiations completed and Approval for award to be obtained in the forthcoming Board Meeting
126.32
BIDS EVALUATION IN PROGRESS
19Padubidri–Belman-Karkala Road.
27.80 Re-Tenders Invited since there is no response.
20Soundatti–Ramadurga–Badami–KamatagiRoad.
127.26Bids invited to engage agency, bids opened on18-01-2020andbeingplacedbeforeKRDCL Board for Approval.
21Thintini-Devadurga–Kalmala Road.
73.80Bids invited to engage agency, bids opened on18-01-2020andbeingplacedbeforeKRDCL Board for Approval.
22Davanegere-Santhabennur-Birur Road .
105.63Bids invited to engage agency, bids opened on18-01-2020andbeingplacedbeforeKRDCL Board for Approval.
334.49
30
CHAPTER- 5
KARNATAKA STATE HIGHWAYS IMPROVEMENT PROJECT (KSHIP)Overview of Karnataka State Highways Improvement Project
The PIU, KSHIP is a Unit of PWD set up in 1999-2000 which is responsible for theimplementationofallExternally-aidedSHProjectsinKarnataka.It isheadedbytheChiefProjectOfficerrankofIAS/EICandtheProjectDirectoroftherankofChiefEngineerwhoreport administratively to the Principal Secretary / ACS, PWD through Secretary, PWD.
5.1 Karnataka State Highways Improvement Project –I
TheKarnatakaStateHighwaysImprovementProject–I(KSHIP-1)isthefirstmajorinitiativeofthePublicWorksDepartment(PWD)ofGovernmentofKarnataka(GOK)forimprovementofRoadnetworkofthestatewithexternalassistanceduring1999.ThePWDcarriedoutStrategic Option Study (SOS) on a road network of 13,362 kms through an IndependentConsultantduring1996andstudyidentified2888kmscomprisingofStateHighways(SH)andMajorDistrictRoads(MDR)roadsforprioritisedimprovements.
The Karnataka Highways Improvement Project, KSHIP-I was launched by Karnataka Governmentintheyearduring1999-2000videG.O.No.PWD21CRM96,dated01.07.1999.TheKarnatakaStateHighwayImprovementProject-1hasbeenimplementedwiththefinancialassistanceoftheIBRD(TheWorldBank)inlinewiththeProject&LoanAgreementno4606INdated21-07-2001.TheoriginalcostoftheprojectwasRs.2030.27Crore,whichincludesWorldBankloanofRs.1635.21crore(US$360.00million)being80%oftheprojectcost.TheProjectcosthasbeenrevisedfromRs.2030.27croretoRs.2390.00crore.TheProjectCompletionDatewasalsoextendedfrom30-06-2006to31-08-2011andthatofloanclosingdateextendedfrom31-12-2006to31-01-2008.
Aftercarryingoutfeasibilitystudyabout2414Kmswereimplementedduringtheperiodof2001-2008.TheImprovementiscarriedoutintwocategory:
● Upgradation-901 kms:involvedReconstructionofexistingcarriagewaytothespecifiednewwidthof7.00mcarriagewaywith1.00mwidepavedshouldersand1.5mtearthenshouldersonbothsideswithatotalformationwidthof12.00mts.
● Rehabilitation-1513 kms: involvedImprovementfortheexistingwidthofcarriagewayor5.50meters,whicheverishigherwithoutgeometricalimprovementsandreconstructingthe widened portion of carriageway
35
Thetotalprojectlengthof2414Kmswastakenupforimprovementspreadover50contractpackages.Atotallengthof2385kmsof49contractsiscompletedexcluding29kmspassingin forest areas due to court interventions. The Contract of construction of Bridge across the Bennithorariver(U3Br)nearGulbargawasterminatedforthepoorperformanceofcontractorand is handed over to NH for complete the balance work.
TheLoanAgreementclosedon31-01-2008with100%utilizationoftheWorldBankloan.AnexpenditureofRs.2381.04 crorehasbeenincurreduptoendofMarch,2020.
The physical targets and achievements from the commencement of the project are as under.
Table 5.1
Year Physical in Kms Financial (Rs. in crore)2001-02 - 69.852002-03 191 161.232003-04 366 231.532004-05 510 480.262005-06 666 541.352006-07 449 524.622007-08 132 194.802008-09 40 73.142009-10 30 66.902010-11 - 15.522011-12 Nil 2.892012-13 1 4.562013-14 - 2.532014-15 - 1.692015-16 - 2.562016-17 - 0.832017-18 - 1.612018-19 0.662019-20 4.51
Cumulative 2385 2381.04
*inclusiveoffrontendfeeof16.35cr
TheperformanceofKSHIP-1 received theappreciationof theWorldBank in itsPortfolioReviewofKarnatakainJune2005.TheWBhasassessedprogressofKSHIPasfarhigherthanNationalAverageandonparwiththeBank’sworldwideaverage.TheKSHIPhasalsobaggedtheIndia-TechExcellenceAward-2010asthe2ndBestImplementedInfrastructureProjectinIndiaandtheawardwaspresentedbythePresidentofIndiaon27thOct2010.
36
5.2 Karnataka State Highway Improvement Project - II
AftersuccessfulcompletionofKSHIP-1andaspertheGovernmentordernoPWD61EAP2006 dated 25-11-2006 the improvement of 3411kms of StateHighways of the core roadnetworkoftheStatewasinitiatedunderKSHIP-II.AlltheroadsunderKSHIP-2aretakenupforupgradingtoamin.2Lanecarriagewaywithgeometricimprovements.Thelistofroadsprioritized for improvement under KSHIP-II is provided below:
GO No. PWD 61 EAP 2006 Bangalore Dated: 25-11-2006
List of Selected Roads For Improvement Under KSHIP-IISl No Name of the Roads km
1 Tinthni-Devadurga-Kalmala 742 Kushtagi(NH-13)-Tawargera-Sindhanur 643 Managoli-Talikota-Devapur 1104 Mudgal-Kudithini(NH-63) 1155 Konannanur-Hunsur-HD Kote 89
6 Sira-AP Border via Madhugiri-Gowribidanur-Chikaballapura-Chintamani-Srinivasapura-Mulbagal 210
7 Haliyal-Kudalasangama via Dharwad-Soundatti-Ramdurga-Badami-Pattadakal-Kamatgi-NH13 243
8 Hassan-Periyapatna via Arakalagud-Ramanathpura 779 Hirekerur-Ranebennur(onNH-4) 5810 Kudachi-Kabbur-Ghataprabha 5011 Shikariura-Anandapuram(onNH-206) 3212 Kotumachigi-Gajendragarh 3213 Goa Border-Soundatti via Khnapur-Bagewadi-Bailhongal 13314 Mudhol-Nippani vial Mahalingapur-kabbur 10415 Belur-Kodlipet via Bikkodu-vatehole-Alur-Magge 7216 Davenagere-Birur via Channagiri 10417 Gangamula-Kottigehara 6318 Hangal-Haveri(NH-4) 32
19 TNBorder(Hunasanahalli)-APBorderviaKanakapura-Ramanagara-Magadi-Dobbespet-Koratagee-Madhugiri-Pavagada 220
20 Hole Narsipura to K.R.Nagar via Saligaram 4621 Shelavadi-Harapanahalli via Gadag-Mundarigi 11222 Indi-Zalaki(onNH-13) 2023 MaharastraBorder–GulbargaviaAfzalpur 9924 Hungund-Talikot via Muddebihal 5825 Gubbi-Mandya via Yediyur-Kowdle 10926 Jagalur-NH-13 1027 Hoskote-AP Border via Chintamani 88
37
28 BelthangaditoBantwal(onNH-48) 35
29 Ramangaram-Saligramma via Thalavadi-Choulnankuppe-Huliyurdurga-Nagamangala-K.R.Pet Akkihebbal -Berya 142
30 Malavalli-Koratagere via Maddur-Kunigal-Tumkur 135
31 Shimga-TadasaonNH-4viaSavalangaviaShikaripura-Shiralakoppa-TogarsiAnvatti-Gondi-Hangal 171
32 Jamkhandi-MaharastraBorderviaTerdal-Kudachi-Managsuli 79
33 Horanadu-Subramananya via Kalasa-Kottigehara-Mudigere-Sakaleshpura Junction-Vanagur 164
34 MolkalmurtoSH19(KSHIP1Road) 635 Bidar-ChincholiviaEkhelli(NH9) 6136 Padubidri-Karkala 2837 Kollegala-Tamilnadu Border via Hanur-MM Hills 9738 Virajpet-SomawarpetviaMadikere 71
Total Length (Kms) 3,411
KSHIP-IIwastakenupintwostages.TheStage-1wastakenupin2011withtheWorldBankfinanceandStage-2in2012withtheADBfinance.
5.2.1 KSHIP-II – STAGE – I – World Bank Project:
Initially theWorldBank sanctioned a loan assistance ofUS$ 300millionwith an overallproject sizeofRs.2545crore.Following theLoanNegotiationsheldwith theWorldBankandDEA,GOIinFebruary2011theProjectcostunderwentasignificantrevision.Withtheconcurrenceof theDEA,GOI theLoanwas enhanced fromUS$300million toUS$350million and further the World Bank also enhanced the component size under the “Highway financingModernisation”fromRs.50crore(US$10million)toRs.1682crore(US$374million)whichwasaimedatassistingKRDCLinimplementingtheconceptofCo-financing(Privatefinancial institutions) todevelopabout400kmofhighwaysundereitherItem-ratecontractsorPPPconcessions.TheProjectCostwasrevisedfromtheinitialRs.2545crore(US$565million)toRs4522crore(US$1005million).
The details of the Loan agreement with the World Bank are:
1. Loanno:8022-IN 2. LoanSigneddate:30-05-2011 3. LoanEffectivenessdate:19-07-2011 4. ProjectCost:US$1005million(Rs.4522Cr) 5. WorldBankShare:US$350million(UtilisedUS$295.21million) 6. GOKShare:US$155million(Rs.697Cr) 7. PrivateSector/Developer/KRDCLShare:US$500million(Rs.2250Cr) 8. LoanClosingdate:31-12-2016(Extendedupto28thDec,2018) 9. LoanAmortizationSchedule:15-06-2016to15-03-2029.
38
TheimplementationofWorldBankassistedKSHIP-2underStage-1andthelistofroadsof834kmsreceivedtheapprovaloftheGovernmentvideGOno.PWD13EAP2010dated:28-06-2010andGOno.PWD121EAP2011dated:04-02-2012.
A total of 1195 kmsofroadlength(KSHIP834kms+KRDCL361kms)wastakenupforimprovementatatotalprojectcostofRs4522croresunderKSHIP-2,outofwhichWorldBankloanassistanceisRs1575Crores.TheProjectisbeingimplementedinfollowingcontracts;
EPC contracts (269 kms):
TheEPC contracts are ItemRate contractswith a defect notification period of one year and theWorldBankwould fund80%of thecontractcost.Thecontracts for thefiveEPCpackageswereprocuredobservingICBproceduresandcommencedinJuly/August,2011.ThecontractWEP2fromHaveri-Hangal-Tadas(75kms)entrustedtoM/sRomanTarmat,MumbaiwasterminatedduetononperformanceinNov,2012andretenderedbysplittingthecontractintotwoNCBcontractsWEP2A&WEP2B.The contract forWEP2AandWEP2Bwerewas signed inFeb, 2013 and June 2013respectively.TheimprovementwastakenupatacontractamountofRs596Crinsixcontractshavingdurationof18to36months.
Subsequently,apartoftheroadofContractWEP3UpgradationofRoadfromDharwadtoSaundattiforalengthof2.50KmsinDharwadtownlimitswasconvertedfromUpgradationtoTenderSuremodelasaseparatepackage(WEP-3A)inOct2017.
The details of the contracts are as under:
Contract No.
Contract NameLength (km)
ContractorContract Price in
Rs. Crore
Present status
WEP-1Upgradation of the Road from Hoskote to Chintamani
52.40M/s Lanco Infratech Ltd, Gurgoan
98.22Completed30-05-2015
WEP2AUpgradation of the Road from Haveri(NH-4)toHanagal
31.78M/s DRN Infrastructure, Hubli
92.53Completed27-06-2016
WEP2BUpgradation of the Road from Hanagal to Tadas
43.50M/s DRN Infrastructure, Hubli
97.87Completed31-01-2017
WEP-3Upgradation of the Road from Dharwad to Saundatti
36.00M/sRVCPL-RIDL(JV),Bangalore.
84.44Completed31-01-2016
WEP-4Upgradation of the Road from Tinthini to Kalmala
73.80M/sPatelEngineeringLtd, Hyderabad.
160.68 Completed24-06-2015
WEP-5Upgradation of the Road from Chowdapur to Gulbarga
28.63M/sSRK-KCL(JV),Hyderabad.
61.55 Completed25-04-2014
WEP-3A
Upgradation of Road length of2.50KmsofDharwadtoSaundatti in Dharwad town limits Tender sure
2.50M/s The Trinity Group, Hubli
18.40 In Progress
268.57 609.26
39
TheEntireroadlengthof266kmsin6contractswascompletedduringtheperiodof2014-2017atarevisedprojectcostofRs.643cr.TheroadworkinDharwadtownlimitsofContractWEP3Aisinprogress and is nearing completion.
Annuity contracts (301 kms):
TheAnnuityContractsareof10yearsdurationwithmax.of2 to21/2yearsofconstructionand8to71/2 years of maintenance. Under Annuity Contracts, the World Bank assistance is utilised for an upfrontpaymentof50%oftheconstructioncostoncompletionoftheconstructionandtheremainingpaymentsof50%tobefundedbyGOKduringthemaintenanceperiodof71/2 years on annuity basis. The details of the roads taken up under Annuity mode are as below:
Package Name of the roadLength
kmsConcessionaire
Constn.Cost
(Rs in Cr)
Contract Cost
(Rs in Cr)
WAP-1
Malavalli–Maddur–Huliyurdurga- Kunigal- Tumkur- Koratagere- Madhugiri- Pavagada
193.36
M/s Mysore Bellary Pvt Ltd (M/sSadbhav-GKC(JV))
576 1306*
WAP-2Mudhol–Mahalingapura-Kabbur-Chikodi-(NH-4cross)Nippani.
107.94M/s Ashok Buildcon-GVR(JV)
331 768**
301.30 907 2074
* 239 cr lumpsum during construction + 15 Annuity instalments of Rs. 71.15 cr
** 136 cr lumpsum during construction + 16 Annuity instalments of Rs. 39.49 cr
TheAgreementsweresignedin24-03-2014forWAP1and14-03-2014forWAP2.Theworkswerecommencedon12-12-2014afterachievingfinancialclosureandfulfillingtheconditionsprecedent.
The Project work ofWAP1 was completed on 20-09-2018 and the Project work ofWAP2 wascompletedon12-12-2017.TheroadworksarepresentlyinOperationandMaintenaceperiod.TheO&Mperiodwillbeupto2024-25.
Annuity contracts converted to Item rate Contracts: (264 kms):
TheTwocontractsofWAP3andWAP4withatotallengthof264kmshadbeeninitiallyproposedtobe taken up under Annuity model. As the annuity bids did not yield value for money, the bids were cancelled. The contracts were re-procured and implemented under three Item Rate contracts.
40
The brief details of the contract works are as under:
Package Name of the road
Lengthkms Contractor
Contract Cost
(Rs in Cr)
Contract duration
in months
Contract agreement
Commence- ment/ com-
pletion dates
WAEP3A
Shimoga - Shikaripura - Anandapuram
82.00M/s Patel EngineeringLtd,
264.73 3228-04-2015
12/08/201530/11/2018
WAEP3B
Shikaripura –Anvatti-Hangal
71.63M/s RNS Infrastructure Ltd
224.70 2906-07-2015
01/10/201524/12/2018
WAEP4
Managuli to Devapura
109.95M/s. Sadbhav EngineeringLimited,
317.05 3330-04-2015
27/07/201520/07/2018
263.58 806.48
Aroadlengthof255kmshasbeencompleteduptoendofMarch,2020.TheroadworkforWAEP4hasbeencompleteddeletingareachof7.453kmsfromthescopewhich isaffectedbyLAQ.ThefinancialexpenditureisRs.863croreuptoMarch,2020.
KRDCL - (Co financing PPP Contracts) (361 kms):
Aroadlengthof361kmsfromoutof3411kmsistakenupforimprovementthroughPPPcontractsunderCo-financingthroughKRDCLunderHighwaymodernisationcomponentoftheProject.TheconstructioncostwillbesharedbetweenWB,KRDCL&Developerintheratioof20:20:60.Thelistof roads is given below:
Contract Package
Name of packageLength in
km
Estimated Constn. cost
Rs croreWCP-1 Bagewadi(NH-4)-Bailhongal-Saundatti 63.29 189
WCP-2 Bidar-NH-9(Ekhelli)-Chincholi 60.04 181
WCP-3 Hassan-Ramanatpura-Periyapatna 73.69 222
WCP-5 Hirekerur - Ranibennur 55.69 176
WCP-6 Mundaragi - Hadagali - Harapanahalli 51.21 164
WCP-7 Hungund - Muddebihal -Talikot 56.98 164
360.90 1096
KRDCL is designated as the Implementing Agency for this project component. The original DPR was revisedfortheselectedroadstosuitthefundingagencyterms.BasedontheValueforMoney(VfM)analysis,theroadsaretakenupforimprovementunderHybridAnnuitymodel.TheLOAwasissued
41
forfivepackageson10-09-2015.TheAppointeddateforWCP-1&7wasdeclaredon03.10.2016.TheAppointeddateforWCP-3,5&6wasdeclaredon29.09.2016.Forpackage(WCP-2),theconcessionagreementwassignedon24thOct2016andtheAppointeddatewasdeclaredon4thAug2017.
Outof361kms,aroadlengthof356kms(98.60%)hasbeencompleteduptoendofMarch,2020.ThePCODisissuedforContractWCP3,WCP5&WCP6.TheroadworkinWCP1andWCP7is100%completed.TheroadworkinWCP2is97%completed.
Overall Budget and Expenditure (World Bank):Rs in Cr
Project KSHIP-II World
Bank funded
Expenditure up to 31-03-2019
Revised Budget for
the year 2019-20
ExpenditureDuring year
2019-20(uptoMar,20)
Cumulative Expenditure
since inception
4522 3447.79 701.95 701.57 4149.36
Asian Development Bank loan Assistance.
The brief details of the loan are as under:
1. Loanno:2705-IND
2. LoanSigneddate:20-07-2011
3. LoanEffectivenessdate:12-09-2011
4. ProjectCost:US$462.75million(Rs.2150Cr)
5. ADBShare:US$315million(Revised:US$265million,utilized:US$263.2million)
6. GOKShare:US$147.75million(Rs.687Cr)
7. LoanClosingdate:30-06-2015.(Rev1date31-12-2016,Rev2date30-06-2018, Rev3-31.10.2018)
A total of 616 kmsofroadlengthand4ROBsintheprojectroadsatatotalprojectcostofRs.2150croreswastakenupwithAsianDevelopmentBank(ADB)loanassistanceofUS$315million.Withcancellationofsurplusloan,theassistanceisrevisedtoUS$265million.TheimprovementwastakenupinnineEPCpackagesatatotalcontractcostofRs1151cr.Thecontractdurationvariesfromof15to36months.TheworkswerecommencedinMarch,2012.Duringexecution,threecontractsvizAEP3,AEP6andAEP9wereterminated.Thepackagewisedetailsarebelow:
42
Contract No.
Name of workApprox Length (km)
Contract Period
(months)
Contract amount in Rs. Crore
Status
AEP1RoadfromMagadiNH-48(Km.0+000)toKoratagere(Km68+200)ofSH-3
68.20 33 116.78Completed31-12-2016
AEP2RoadfromPavagada(Km.0+000)toAPBorder(Km23+210)ofSH-3
23.21 18 43.30Completed28-06-2014
AEP3RoadfromGubbi(Km.0+000)toMandya(Km108+620)ofSH-84
108.62 33 196.90Terminated
on 24.07.2014
AEP4
RoadfromJaglurtoNH-13ofSH-45(Approxlength=9.25Kms)Roadofabout5KmsfromSH-19of KSHIP Road to Molakalmuru of SH-2
14.38 15 31.25Completed15-03-2015
AEP5RoadfromPadubidri(Km.0+000)toKarkala(Km27+800)ofSH-1
27.80 18 61.48Completed22-05-2015
AEP6RoadfromDavangere(Km.0+000)viaChannagiritoBirur(Km105+630)ofSH-76
105.63 33 202.57Terminated
on 17.07.2014
AEP7RoadfromShelvadi(Km.0+000)toMundargi(Km63+440)ofSH-45
63.44 33 121.25Completed19-03-2016
AEP8RoadfromMudgal(Km0+000)toGangawathi(Km74+200)ofSH-29
74.20 36 152.63Completed25-02-2015
AEP9Road from Soundatti - Hulikatti –Ramdurg--NH218–Badami-Pattadakal-Kamatagi
130.13 36 225.50Terminated
on 30.10.2014
615.61 1151.66
ThethreeterminatedcontractsofAEP3,AEP6&AEP9werere-procuredsplittingtheroadworkintosevenNCBPackagesofAEP3A,AEP3B,AEP6A,AEP6B,AEP9A,AEP9BandAEP9Cwithlesserdurationof21months.Thedetailsareasunder:
New Package
RoadLength in kms
Contract signed on
ContractorContract
price (Rs in Cr)
AEP-3ARoad from Gubbi to Beerangonahalli near YediyurofSH84
49.03 05-11-2015
M/s DRN Infrastructure Engineers&Contractors, Hubli.
122.38
43
New Package
RoadLength in kms
Contract signed on
ContractorContract
price (Rs in Cr)
AEP-3B
Road from Beerangonahalli near Yediyur to Mandya of SH84
59.59 18-06-2015M/sDPJain&Co,Nagpur
198.27
AEP-6ARoad from Davangere to ChannagiriofSH76
53.65 14-09-2015 M/sJMC,Bangalore 181.45
AEP-6BRoad from Channagiri toBirurofSH76
51.98 31-08-2015M/sD.P.Jain&co.Infrastructure Pvt. Ltd.,Nagpur
136.79
AEP-9ARoad from Savadatti toRamdurga(HalgattiJunction)
42.00 28-07-2015M/sD.P.Jain&co.Infrastructure Pvt. Ltd.,Nagpur
138.24
AEP-9BRoad from Ramdurga (HalgattiJunction)toBadami Bypass
45.00 23-06-2015M/s RNS Infra structure Ltd., Bangalore
146.05
AEP-9CRoad from Badami Bypass to Pattadakal- Kamatagi
43.13 07-07-2015M/s Ashoka Buildcon Ltd,Nashik
110.90
344.38 1034.08
Outof616kms,theImprovementof614 km(99.67%)hasbeencompleted.Theexpenditureincurredto civil works is Rs. 1811 croreuptoendofMarch,2020.
ROB Packages;
The following4ROBswhichareapartof theUpgradationPackageAEP6,AEP7&AEP9havebeen taken up for construction under ADB loan assistance in separate contracts. The contracts have durationof24months.Thedetailsareasunder:
Pkg Link Name of ROBContract
Price (Rs in cr)
Contractor Agreement Status
AEP-6ROB-1
42A
AtChainage7.691,RailwayKm.316/200-300,TholahonseVillageonDavangere Channagiri route
39.79M/s KNR Constn Ltd, Hyderabad
17-09-2014Completed 31-10-2019
AEP-6ROB-2
42B
AtChainage44.830,RLYKm219/900-220/000NearBiruronChannagiri–Birur route
36.10
M/s. K. VenkataRajuEngineers&Contractors, Vijayawada.
19-09-2014Completed 31-10-2018
44
Pkg Link Name of ROBContract
Price (Rs in cr)
Contractor Agreement Status
AEP-7ROB-3
27A
Atchainage25.339,RLY.KM.55/200-300onGadagBypassonShelavadi–Gadag Route
22.66M/s KNR Constn Ltd, Hyderabad
26-12-2013
Completed 31-10-2016
AEP-9ROB-4
21D
AtChainage42.214,RailwayKm.60/600-700Near Badami on Ramdurga –Badamiroute
28.58M/s KNR Constn Ltd, Hyderabad
17-09-2014Completed 30-04-2017
Total 127.13
AllthefourROBsarecompleted.TheexpenditureincurredforROBworksisRs. 140 crore upto end ofMarch,2020.
SUMMARY OF THE PROJECT WORKS of KSHIP2:
Funding AgencyTotal length (Km)
Contract cost
(Rs. Cr)
Progress upto March, 2019
(Kms)
Progress2019-20 (Kms)
Progress Since
inception (Kms)
KSHIP2-World BankEPCcontracts(6) 269.00 609.00 267.33 0.64 267.97Annuitycontracts(2) 301.00 2,074.00 301.03 0.26 301.29Annuity converted to EPCcontracts(3)
264.00 807.00 251.21 3.18 254.39
KRDCLCofinancingcontracts(6)
361.00 2,905.00 315.42 40.41 355.83
Total for World Bank 1,195.00 6,395.00 1,134.99 44.49 1,179.48
KSHIP2-ADBRegularcontracts(6) 271 527 270.43 - 270.437contractsprocuredafterterminationof3contracts.
339.27 1034 337.56 0.50 338.06
ROBcontracts(4) 5.75 127 5.54 - 5.75Total for ADB 615.45 1688 613.53 0.50 614.24
Karnataka State Highway Improvement Project - III:
KSHIP-IIIhasreceivedADBloanassistanceofUS$346milliontodeveloptheCoreRoadNetwork.TheLoanagreementwithADBwassignedon30.08.2018andtheLoanhasbeendeclaredeffectivefrom14.11.2018.
45
TheProjectcostisRs.5334CroreincludingLAQandothercosts.Inordertoleveragethefundsanddrawtheprivatesectorefficiency,theGOKhasshiftedtheimplementationstrategytoPPPmode.TheContractshaveconcessionperiodof9years.Theprojectentails75%constructiongrantfromADBandthecosttowardstheAnnuity,O&M,LAQ,UtilityshiftingetcisbornebyGOK.TheRoadworksarebeingimplementedwith2yearsofconstructionperiodand7yearsofO&M.Aroadlengthof418kmshasbeentakenupforimprovementunderHybridAnnuityModelinthreepackages.
The details of the roads and the contract packages to be implemented are as below:
Package Project DetailsLength in
Kms.Package1 a) TwoLaningwithPavedShoulderofKollegal toHannurTwo
LaningwithPavedShoulderofKollegaltoHannur,length4.9KmandMadhuvanhallyBy-passfromKm.66.888toKm.85.770ofSH-79,length23.8Kms.
b) TwoLaningwithPavedShoulderofChintamanitoAPBorder,SH-82,Length39.8Kms;and
c) FourLaningofBengaluru(NICERoad)toMagadiofSH-85andTwo Laning with Paved Shoulder of connector from Magadi to NH 75 via Chikkamudigere and Iyandahalli ofMDR, length50.8Kms.
114.4
Package2 Two Laning with Paved Shoulder of Magadi to near Somwarpeth of SH85,excluding the followingcommonsectionswithHuliyurdurgabypassKm76.520 to78.410, commonportionwithSH84betweenKm.88,700 to Km.90.380 and common portion with NH 150A inNagmangalaKm.111.960toKm.113.260.
166
Package3 TwoLaningwithPavedShoulderofGadagtoHonnali(Km105.500toKm.205.290ofSH57andKm.215.335toKm.253.713ofSH26)
138.2
Total 418.6
TheRoadswillbeimprovedtomin.Twolanecarriagewaywith1.5mPavedshoulderand1.0mearthenshoulder on either side with provision for four lane in urban settlement. The reach from Bangalore (NiceRoad)Magadiforalengthof35Kms.willbedevelopedtodividedfourlanecarriageway.Theroadsaredesignedforadesignlifeof20yearswithallgeometriccorrectionsandroadsafetyfeatures.
TheConcessionairesandtheIndependentEngineershavebeenprocured.TheConcessionAgreementfor Package I was signed on 20.02.2019 and agreement for Package II and III were signed on18.01.2019.
TheAppointed date for Package II and Package-III is declared on 12th Feb 2020& 12th March 2020 respectively after fulfilment of conditions precedent and achieving financial closure. The
46
ConcessionaireforPackageIisintheprocessofachievingthefinancialclosureandtheAppointeddateisexpectedtobedeclaredshortly.
Overall Budget and Expenditure (ADB KSHIP II & III)
Rs in Cr
Project Expenditure up to 31-03-2019
Revised Budget for the year
2019-20 (KSHIP II & III)
Expenditure During year
2019-20 (uptoMar,20
Cumulative Expenditure
since inception
KSHIP-II- Rs.2150 cr. 2524.29
398.65*62.61 2586.9
KSHIP-III- Rs.5334 cr. 452.09 145.19 597.28
Total 2976.38 398.65 207.80 3184.18
*Rs.188.66crsurrendered.
Innovative Initiatives under Institutional Development Strategy Action Plan
Apart from improvement of roads, a wide range of reforms have been instituted within the PWD, which aretiedtotheexternalfundingwiththeobjectiveofensuringcapacitybuildingintheDepartmentunder InstitutionalDevelopmentStrategyActionPlan (IDSAP)componentof theProject.This issupported substantially by WB funded KSHIP-II inputs as well as technical assistance from ADB-funded components.
Some of the innovative initiatives introduced through KSHIP are:
1. Revision of Departmental Code,
2. IdentificationofCoreRoadNetwork(CRN)about25,000km
3. CapacityBuildinginRoadSafetyManagement(RSM)andRoadSafetyCell.
4. Safe Corridor Demonstration Program
5. ISO9001:2000andISO14001CertificationforPWDoffices.
6. EstablishmentofPlanningandRoadAssetManagementCentre(PRAMC).
7. Governance&AccountabilityActionPlan(GAAP)andComplainthandlingMechanismand24x7x365PublicResponseCentre
8. StrategicstudyofIT-ICT-MISArchitecture,Facilities&CapacityforPWD
9. Quality Management and Quality Control Capacity enhancement
10. ProjectManagementSoftware(PMS).
11. HRD,E-learningandTraining.
12. Hybrid Annuity Model Contracts.
47
Revised D code for PWD:
ThePublicWorksDepartmentCode (DCode),Volumes I and II, sets out guidelines for officersof the department in respect of administrative and executive functions.The diversified activitiesover the years and the new concepts and innovative approaches have necessitated revision of the DepartmentalCodetoaccommodatethenewdevelopments&inkeepingwiththemanifoldactivitiesof thedepartment.The revisionofDepartmentCode (DCode) isoneof the institutional reformsundertakenthroughtheWorldBankfinancedKarnatakaStateHighwaysImprovementProject-I&II.TherevisedD-CodeisfinalizedinconsultationwithFinanceDepartment,IrrigationDepartment,NationalHighwaysandPublicWorks,Ports&InlandWaterTransportDepartmentSeniorOfficersand issued with the approval of Government. .
Identification of Core Road Network (CRN)
GovernmentofKarnatakahasformulatedtheconceptofaCoreRoadNetwork(CRN)thatencompassesroad links considered important for the economic and social development of the State. The long-term goalofCRNconceptistoimprove40,000km,themostvital20%oftheentireroadnetworkcateringto80%ofthecommercialtraffic.Themedium-termgoalistoimprovea25,000kmofNationalandState Highways.
UnderADBTAgrantforCapacityDevelopmentTechnicalAssistance-1(TA-7324-IND)astudywascarried out to identify the CRN through a set of criteria which include Population centres, transport infrastructure, Industrial parks, development corridors, mining, tourism, agricultural centres and connectivity to taluks and districts.
ThelengthofCoreroadnetworkidentifiedintheStateisasfollows;
Classification Length (km) Category CRN extent
National Highways 4,490.70 NH
24,225.60 km ‘A’Class 9,078.16 SH
‘B’Class 10,656.74SH-9392kmsMDR-2165kms
‘C’Class 50,560.10 MDR -
‘D’Class 147,212.00 VR -
221,997.70
TheproposedCRNhasreceivedtheapprovaloftheGovernmentvideGOdated10-07-2014.
48
Strengthening safety management capacity of PWD:
The major focus of strengthening road safety management capacity of PWD includes advisory support instrengtheningandequippingPWDforeffectiveoperation,maintenanceandprotectionofexistingroads, establishing practices incorporating safety into lifecycle of state roads in a sustainable manner.
Under ADB TA funding program (TASF-Others) a study was undertaken by an internationalconsulting firm with expertise in transport planning, asset management, road safety and trafficmanagement, institutional strengthening of transport sector agencies, and private sector participation. The Consultants have submitted the Final Report.
As part of the recommendations of the Study, the Road Safety Cell has been established under TransportDepartmentvideGovt.Order23-10-2013.TheCellisheadedbyJointCommissionerofTransportandcomprisesofkeystaffvizExecutiveengineer,PWDDept,DeputySuperintendentofPolice,PoliceDept&DeputyDirector,HealthandFamilyWelfareDeptsupportedbyroadsafetyandenforcement specialists.
The Road Safety Cell is coordinating with different stake holding department of the state viz., Transport, Police, PWD, Health, Education, Urban Development, Directorate of MunicipalAdministration,BBMP,RD&PRtoimplementtheroadsafetyinstatewide.
Safe Corridor Demonstration Program (SCDP)
AsapartofRoadSafetyComponentoftheWBfinancedproject,implementationofSafeCorridorDemonstrationProgram(SCDP)hasbeentakenupforSH-20BelgaumtoYeragatti(61.85kms).Thecorridor would serve as demonstration corridor and set as a model road for implementing road safety features on other roads of the State. Under this Program, the following are the activities included:
(a) Improvingtheengineeringconditionsofthecorridors.
(b) Strengtheningtheenforcementalongthecorridorsbyprovidingnecessaryconsultingservicesandequipmentstotrafficpoliceunits.
(c) Enhancingroadsafetyeducation,awarenessfortheroadusers.
(d) Improvingtheemergencymedicalresponsetime.
ISO 9001 and 14001 for PWD offices:
UnderKSHIP1,21officesofPWDhavebeencertifiedtoISO9001-2008.PresentlyGovernmentofKarnatakaisseekingcertificationunderQMSISO9001-2008to60PWP&IWTDepartmentoffices.The Consultancy Services are in advanced stage of progress.
Under theKSHIP-II, theKarnatakaPublicWorksDepartment (KPWD) has obtained ISO14001certificationfor14officesintheState.TheConsultancyserviceiscompletedandthecertificateswereissuedonOctober,2015.
49
Establishment of Planning and Road Asset Management Centre (PRAMC).
The PRAMC is envisaged to be a core planning center for road sector operations of PWD. The Planning and Road Asset Management Centre was established at the PWD Secretariat, by merging the erstwhile IDSCellandITCell.TheUnitWasestablishedvideGONo:PWD:11EAP2011Dated:23-08-2012having51sanctionedpostsheadedbyChiefEngineer.
The PRAMC will take lead responsibility within PWD for roads planning, development and managementaswellasfor‘corporate’PWDwideoperationsandmanagementinthefieldsofIT-ICT-MIS,QualityandTraining/HRD.TheconsultantsM/sEgisInternationalS.A.,France have been mobilized inDec,2012 to lead theprocessof implementationandoperationalisationofPRAMCunderADBfundingoveraperiodofthreeyearsataconsultancycostofRs.25.33crore.TheserviceshavecommencedinFeb,2013andcontinueduptoMarch2019.
Presently,RoaddatacollectionequipmentshavebeenprocuredanddatacollectionforCRNroadsis on going for preparation of Annual works Program and budget for maintenance works through KarnatakaRoadAssetManagementSystem(KRAMS)andHDM4software.
Governance and Accountability Action Plan (GAAP):
Under WB funded project, KSHIP has taken several initiatives as part of GAAP, to improve its governance structure and ability to implement the project effectively and transparently especially in the areas of Disclosure and Complaint Handling System. The GAAP is designed to improve procedures and capacity for better governance and create a forum for public participation during the implementationoftheproject.Aspartofthisexercise,KSHIPhasundertakensuomotodisclosureof theprojectdocuments inKSHIPwebsiteofwww.kship.inas requiredunderRTIActandhasestablished a Complaint Handling Cell to handle and oversee all the complaints.
Strategic study of IT-ICT-MIS Architecture, Facilities & Capacity for PWD:
OverallobjectiveoftheconsultancyservicesistohelptheKPWDtodevelopandbeginimplementinga comprehensive and viable medium-to-longer term IT-ICT-MIS Strategy, inclusive of phased roll-out plan(s) covering all design, development and commissioning / implementation stages undertheproposedStrategy.Theconsultantsareexpectedtoidentifyinitiativesandinvestmentswhich-buildingontheachievementsandbenefitsofthestate-wideinitiationofe-governancearecompatiblewithcurrentGOKpolicyontheroleofITinGOKagenciesandfacilitateanIT-ICTorientedwork-culture within KPWD. The consultancy services is awarded to M/s Wipro Ltd. The Consultant has submitted the As-Is Report, Strategy Report, RFP and Change Management Plan. The Govt has issuedaGOdated22-09-2017forPRAMCtocontinuethefurtherimplementationoftheITICTMISservices to PWD.
50
Quality Management and Quality Control Capacity enhancement:
TheoverallobjectiveisachievingeffectiveandsustainableKPWP&IWTDcapacityforperformanceoftheQualityprocessesrequiredtoensureconformanceofworksandresultingassestswithapplicablerequirements.This shall include advisingon and facilitatingQM/QCplanning, assisting in stafftraining, on the job guidance and support, providing supervision, monitoring and review of selected QC activities, and establishing/ updating policy and technical documentation and user manuals for theKPWP&IWTD'svariousQM/QCrequirements.
The consultancy services has been procured and is in progress.
Along with this process, action was initiated for procurement of Quality Assurance and Quality Control equipments(549nos.)forthevariousQualitycontrolDivisionsandsubdivisionsofKPWDatanestimatedcostofRs.12crore.Theequipmentshavebeenprocuredandinstallationissubstantiallycompleted.
Project Management Software (PMS):
In the World Bank Project Agreement Document, it is agreed to have an web based project activity monitoring and reporting system on pilot basis in PWD Department. The software has been procured under permanent ownership basis and can be used for the future projects of KSHIP, KRDCL and PWD.
The ProjectManagement Software (PMS) enables project stakeholders to view andmonitor theprojectprogressonlineatanytimeduringexecutionoftheprojectthroughDashboardintermsoftime,money,quality,constraint,compliance,projectvisualsandgeneratetherespectivereports.Theclient is able to monitor the progress, mile stone wise, area wise, activity wise with details about financialprogressandqualityparameterscontributingtobettermanagementoftheproject.
HRD, E-learning and Training:
KPWP&IWTDrecognizestheneedforitspersonneltoconstantlyincreasetheirskillstostayahead.AspartoftheLoanAgreementwithWorldBank,ithasbeenagreedforEnhancingtheCapabilityoftheKPWP&IWTDpersonnelbyprovidingHighImpactTrainingProgrammes.Aspartofthis,aproposaltosetuptheElectronicLearning(E–Learning)andHigh-ImpacttrainingprogrammesforKPWD&IWTDpersonnelhasbeeninadvancedstage.PRAMCisleadingthisinitiativeandsuitabletraining modules are being worked out.
51
53
KSHIP II WORLD BANK PROJECT ROADS
WAP1: Malavalli to Pavagada
WAP2: Mudhol to Nippani
WAP1: Malavalli to Pavagada
WAP2: Mudhol to Nippani
54
WEP-1: Hoskote to Chintamani
WEP-2B: Hangal to Tadasa
WEP-4: Tinthini to Devadurga
WEP-2A: Haveri to Hangal
WEP-3: Dharwad to Saundatti
WEAP-3A: Shimoga – Shikaripura-Anandapuram
55
AEP-1: Up gradation of Road from Magadi - Koratagere
AEP-5: Padubidri (Km.0+000) to Karkala (Km.27+800)
AEP-8: Upgradation of Road from Mudgal to Gangavathi
AEP-2: Pavagada (Km.0+000) to AP Border (Km.23+210)
AEP 7: Up gradation of Road from Shelavadi to Mundargi
AEP-9 B: Ramdurga to Badami
KSHIP II ASIAN DEVELOPMENT BANK PROJECT ROADS
56
AEP-9 C: Badami Bypas junction to Pattadakallu
ROB-3: with approaches On Gadag bypass
AEP-3A: Gubbi to Beeragondanahalli near Yediyur
CHAPTER- 6
PLANNING AND ROAD ASSET MANGEMENT CENTER (PRAMC)
6.1 Overview of PRAMC:
A joint mission ofADB andWorld Bank in June 2010 held extensive discussions withPWDandagreeduponanInstitutionalDevelopmentandStrategyActionPlan(IDSAP)asthe basic framework to be complied with one of the principal features of the IDSAP is the establishmentofaPlanningandRoadAssetManagementCentre(PRAMC)inPWDthatwillbe responsible for all planning and programming functions related to road sector development and maintenance of road assets.
ThePlanningandRoadAssetManagementCentre(PRAMC)isestablishedatPWDleveltofunction as ‘Sector Apex Body’ for Road Sector Policy Development, Planning, Programming, RoadSafetyEngineering,InformationTechnologySupportandTrainingSupportacrosswholeofPWD,PlanningandAssetManagementmattersanddefiningtherevisedroleofKarnatakaStateHighways,TrafficandTransportAuthority(KSHTTA) as the nodal agency is one of theactionsrequiredfortheloanAppraisalasperthedraftAidMemoireoftheWorldBankpreparationmission(October10-22,2010).
Morespecifically,thefollowingaretheprinciplefunctionsofthePRAMC:
■ To work as a nodal unit for the Planning, Budgeting and Programming of Roads in Karnataka under the jurisdiction of PWD.
■ Improve planning and decision-making processes of the PWD.
■ Make efficient and effective use of Information Technology, and ensure integration of IT systems across PWD
■ Improve the Human resource capacity by training and capacity development in the Department through training.
■ Implementation of the Pavement Management System
■ To constantly update and maintain Road Information System, Progress Monitoring SystemandOtherInformationSystem
■ And any other task delegated from time to time.
The main task of the PRAMC is the preparation of the Annual Works Programme for the Core RoadNetwork(CRN).ThePRAMChassubmittedtheAnnualworksprogramfortheyear2016-17,2017-18,2018-19and2019-20basedonthedatacollectedfromRCDCV,FWDandBIVandprocessingthedatathroughKRAMSandHDM-4.
58
M/s SATRA Infrastructure Management Services Pvt. Ltd., has been selected as the Consultants to provide consultancy services to support the PRAMC in processing the data through KRAMS andHDM-4.M/sSATRAInfrastructureManagementServicesPvt.Ltd.,havemobilizedtheirteamofexpertsandcommencedtheconsultancywork.
Sub Units of PRAMC
I. Policy Planning Unit
II. Programming Unit
III. Road Safety Unit
IV. InformationTechnologyUnit
V. TrainingUnit.
The procurement of the equipments and Software required for the operationalization iscompleted and handed over to the consultants for the data collection. A brief description of the equipmentsprocuredisexplainedinthefollowingparas.
1. The Road Condition Data Collection Vehicle (RCDCV):-
TheRCDCVknownas“ROMDAS”(RoadMeasurementandDataAcquisitionSystem) isdeployed by the department to collect theRoad condition in a scientificmanner, to assistthe planning process to provide an increased level of service to the road users. The laser technologybasedequipmentwillbeusedtocollecttheroadconditionanddistresssuchasInternationalRoughnessIndex(IRI),Rutting,Ravelling,Potholingandotherparameterstoassist in the planning process. The collection of the data for the entire Core Road Network and establish a Road Asset Management System to undertake a systematic process of maintaining and upgrading RoadAssets, by adopting the best Engineering practices, sound businessprinciplesandtoolstofacilitatedecisionmakingtoachievethepublic’sexpectations.
59
2. Falling Weight Deflectometer (FWD):-
FallingWeightDeflectometer (FWD) isanon-destructive testing (NDT)andnon-intrusivedevice. FWD generates a load pulse by dropping a weight and is a device designed to simulate deflectionofapavementsurfacecausedsimulates traffic loading.This typedofequipmentis one of its kinds in India. The equipment will be used to evaluate pavement structuralcapacity, layer condition assessment for designing the overlays and rehabilitation designs for improvementoftheroadsbasedontherelevantIRCCodes.TheFallingWeightDeflectometeris the world standard dynamic plate bearing test for the non-destructive testing of the structural capacityofflexiblepavement.
3. Ground Penetration Radar (GPR):-
GroundPenetratingRadar(GPR)isaGeophysicalInstrumentthatusesradarpulsestoimagethesub-surfaceanddetectsthereflectedsignalsfromsubsurfacestructureswithoutmodifyingthephysicalproperties.GroundPenetratingRadar isaquick,non-destructiveandeffectiveway to determine pavement layer thickness. GPR can evaluate base and sub-base layers with data collection densities not obtainable by traditional labour-intensive methods, such as coring. Itsmainadvantageisthatitprovidescontinuousprofileoftheroadstructure.UsingtheGPRthe underground utilities can also be detected.
60
ThedatacollectionfortheCRNRoadsusingtheseequipmentswillbeutilizedinthepreparationoftheAnnualWorksProgram(AWP)throughtheKarnatakaRoadAssetManagementSystem(KRAMS)andHDM-4, software. TheAnnualWorksProgramme for theyear2019-20 issubmitted to the Government and the respective zones for considering to propose works in the budgetfor2020-21.
Road Safety Unit:
The Karnataka state is witnessing an increase in the fatalities due to the Road accidents over the years. The Accident statistics in the state of Karnataka in the previous years is as shown below.
Sl. No
Year Accidents Deaths Injuries
1 2010 46,250 9,590 61,7742 2011 44,731 8,971 59,5913 2012 44,448 9,448 58,6594 2013 44,020 10,046 56,7815 2014 43,713 10,452 56,8316 2015 44,011 10,856 56,9717 2016 44,403 11,133 54,5568 2017 42,542 10,609 52,9619 2018 41,707 10,093 51,56210 2019 40,658 10,958 50,447
TheHon’bleSupremeCourthasconstitutedacommitteei.e.“SupremeCourtCommitteeonRoadSafety(SCCRS)”tooverseetheRoadSafetyrelatedaspectsinthecountryvideG.O.dated30-5-2014.ThisCommitteewillmonitortheRoadSafetyactivitiesacrossthecountry.The Committee on Road Safety has directed the State Government to take up measures to improve accident prone locations in the State and also directed that, a time bound programme maybepreparedtorectifyalltheblackspotsidentified.TheCommitteehasbeenconstantlydirecting the State to prepare Annual Calendar/Protocol for treating black spots.
As per the directions of the Supreme Court Committee on Road Safety the Government ofKarnataka has formulated “KarnatakaRoadSafetyPolicy” videOrder no. SARIE/103/SAEPA/2015dated21/09/2015,whichwillactasaguidetotheconcernedstakeholdersandtothepublicwiththe(a)Vision to provide safe road network for all road users, with priority topedestriansandcyclists,toachievezeroroadaccidentsinthelongrunand(b)Mission to reduceaccidentsby25%andfatalitiesby30%by2020.
61
As per the directions and recommendations of SCCRS, the Government of Karnataka framed aStandardOperatingProcedure(SOP)andhasdesignedaprotocolforidentificationofblackspot,preparationoftimeboundActionPlanforimplementingtherectificationmeasure,VideG.O. No. PWD:42:EAP:2017, Bengaluru, dt:4-4-2017.As per the protocol issued by theGovernment, PRAMC shall collect the data of blackspots from Road Safety Cell and shall scrutinize all the data, assign unique codes to the black spots and shall initiate long-termremedial measures for mitigating the blackspots.
The Government of Karnataka has constituted Road Safety Authority under ‘The Karnataka State Road Safety Authority Act, 2017’ vide Notification No. SAMVYASHAE:35:SHASANA:2017,Bengaluru,dt:7-12-2017fortheimplementationofRoadSafetyProgrammesand the establishment of road Safety fund in the State of Karnataka and for matters connected therewith and incidental thereto.
Further, as per the directions of SCCRS, in order to control the road accidents and fatalities occurring on State Highways and major District Roads of the State and to mitigate the accident Blackspots,Govt. ofKarnataka videG.O.No. PWD:190:EAP:2018,BengaluruDt:12-10-2018, has directed ‘Planning and RoadAssetManagement Centre (PRAMC)’ to work as‘PermanentRoadSafetyCell’underPWD.AsperthisG.O,theRoadSafetycellshallfunctionunderthechairmanshipoftheEngineer-in-Chief,PRAMC.
Road Safety Activities under PRAMC:
RoadSafetyCellhasgiventhelistof942blackspotsinKarnatakastate,outofwhich216black spots belong to Public Works Department.
NumberofBlackspotsRectified - 38
NumberofBlackspotsinprogress - 54
NumberofBlackspotsforwhich - 48 tenders are being processed
Numberofblackspotsyettoberectified - 76
The PWP&IWTD, Govt. of Karnataka has created a separate Head of Account for therectification of blackspotsi.e., “3054-03-337-0-07-200” for “State Highway- RoadsafetyMaintenanceExpenditure” and“3054-04-337-1-13-200” for “MajorDistrictRoads -RoadsafetyMaintenance Expenditure”.Also, a separate Head ofAccount for the Road Safetyworks andBarricading forTankbunds is 5054-05-334-4-02-154 in the year 2019-20.TheRoadSafetyworksforrectificationofblackspotsareidentifiedbasedontheblackspotdatacollected by the Police Department and the Karnataka State Road Safety Authority.
62
During theyear2019-20, theGovernmenthas allocated agrant ofRs.325.00Croresunderwhich208RoadSafetyWorkshavebeentakenupbyRoadSafetyUnitofPRAMCwhichhasbeenexclusivelycreatedfortakinguptheRoadSafetyactivitiesinascientificmanner.
Table6.1presentsfundsprovidedforSH,MDRroadsunder3054headandRoadsafetyworksandBarricadingforTankBundsunder5054headduring2019-20,
Table - 6.1
Financial Progress of SH, MDR road sand Tank Bund sunder Road Safety Programme during 2019-20
Sl. No
Head of AccountScheme Name
Grant Allocated (in lakhs)
Expenditure (in lakhs)
1 3054-03-337-0-07-200 SH 15000.00 11249.99
2 3054-04-337-1-13-200 MDR 12500.00 9364.00
3 5054-05-334-4-02-154 Tank Bund 5000.00 0.00
Total 32500.00 20613.99
63
CHAPTER- 7
STATE HIGHWAY DEVELOPMENT PROJECT (SHDP)Overview of State Highway Development Project
7.1 Scheme:
TheStateGovernmenthasapprovedaschemetoimprovetheexisting10500kmlengthofStateRoad.ThisisaMajorInitiativeofGovernmentofKarnataka(GoK)forimprovementsofRoadnetworkwhollyfinancedbytheStateGovernmenttobecompletedintwoyears.Formonitoring of the Project, a Project Implementation unit has been created in state Government OrderNo:PWD45EAP2011Bangaloredated:04.11.2011.
The project Implementation unit-State Highway Development Project in the Karnataka Public Works,Ports&InlandWaterTransportDepartmenthasenvisagedaprogramtocompletethescheme within the stipulated period.
7.2 Highlights:
1. TheEmpower committeeunder the chairmanshipof the chiefSecretarywill lookafter the selection of roads, Administrative approval and Finalization of tenders.
2. TheStateHighwayDevelopmentworksareimplementedonProjectmode.
3. FormonitoringoftheProjectaProjectImplementationunithasbeencreatedinstateGovernmentOrderNo:PWD45EAP2011Bangaloredated:04.11.2011.
4. Improvement/ Renewalworks for Roads connectingDistrict to District, Taluk toTaluk on Priority is being taken up
5. ForpropermonitoringoftheProject
(i) ProjectManagementConsultantsareengaged.
(ii) TechnicalCommitteeunderthechairmanshipofSecretary,PWDisformed.
(iii) Tender Approving Authority under the chairmanship of Additional ChiefSecretary,Publicwork,Ports&InlandWaterTransportDepartmentandProjectSteering committee is formed.
7.3 Details of the Scheme:
1. Approval has been accorded to take up 7254 km length of road at a cost ofRs.2797.00crore(Improvementsof4132.64kmatacostofRs.2192.66croreandrenewalsof3121.76kmatacostofRs.604.61crore)by theEmpowercommitteeinthemeetingheldon16.11.2011&workshavebeenimplementedintwophases (Phase1&Phase2).
64
2. Furtherinthestatecabinetmeetingheldon28-12-2015approvalhasbeenaccordedtotakeuproadlengthof4315.00KmunderPhase3atacostofRs.3500Crorein127Packages(2795KmStateHighwayatacostofRs2710Crore&1520KmMDR'satacostofRs.790.00Crore).
3. SHDPPhasew4Workshavebeenapproved fora lengthof 3692Km(1460KmSH&2232KmMDR)atacostofRs.4500CrorevideGovernmentordernoPWDEAP(p1)Bangalore,Dated:16-02-2019.
Phase-I
1. Theworksaretakenupin66Packages.AdministrativeApprovalhasbeenaccordedin State Government order No.PWD 45 EAP 2012, Bangalore, Dt: 09.05.2012andNo.PWD121EAP2012Dt:19-11-2012.Alengthof3567kmisplannedtobedevelopedatacostofRs.1439.00croreunderthese66Packages(Improvementsto2110kmandRenewalsinalengthof1457km).
2. Allthepackagesareentrustedontenderbasisand100%oftheworksarecompleted.
3. Totally3403.66kmofroadlengthhasbeenimprovedatacostof1684.09crore
Phase-II
1. Theworksaretakenupin70Packages.AdministrativeApprovalhasbeenaccordedinStateGovernmentorderNo.PWD107EAP2012,Bangalore,Dt:19.05.2013Alengthof3745isplannedtobedevelopedatacostofRs.1498.90croreunderthese70Packages(Improvementsworksto2188kmandRenewalsworksto1557km).
2. Tendersforallpackageshavebeenapprovedand100%oftheworksarecompleted.
3. Totally3136.06kmofroadlengthhasbeenimprovedatacostof1859.92crore
Phase-III
1. Fortheyear2015-16alengthof4315.00KmatacostofRs.3500of127Packages(2795KmStateHighwayatacostofRs2710Crore&1520KmMDR'satacostofRs.790.00Crore)hasbeenAdministrativelySanctionedvideGovtOrderPWD183EAP/2014Dated:30-12-2015.Outofall127Packages123Packagesarecompleted,remaining04PackagesareunderProgress.
2. Remaining44.38KmofRoadLengthwillbeCompletedbyJanuary2020.
Phase-IV
SHDPPhasew4Workshavebeenapprovedforalengthof3692Km(1460KmSH&2232KmMDR)atacostofRs.4500CrorevideGovernmentordernoPWDEAP(p1)Bangalore,Dated:16-02-2019.
DuringtheYear2019-20alengthof867.97KmisCompletedandtheremainingWorksareUnder Progress.
65
Table: 7.1
SHDP Physical & Financial Achievements
Year
Physical Progress (in Kms) Financial Progress (in Crores)Ph-I Ph-II Ph-III Ph-IV Total Ph-I Ph-II Ph-III Ph-IV Total
2012-13upto31-03-2013
1438 0 0.00 0.00 1438.00 519.56 0 0.00 0.00 519.56
2013-14upto31-03-2014
1391 805 0.00 0.00 2196.00 770.58 329.42 0.00 0.00 1100.00
2014-15upto31-03-2015
425.85 1526.02 0.00 0.00 1951.87 219 799.34 0.00 0.00 1018.34
2015-16upto31-03-2016
145.77 788.31 0.00 0.00 934.08 156.97 693.03 0.00 0.00 850.00
2016-17upto31-03-2017
3.05 16.93 1975.36 0.00 1995.34 7.23 26.91 1193.79 0.00 1227.93
2017-18upto31-03-2018
0.00 0.00 1394.45 0.00 1394.45 0.58 3.66 1725.76 0.00 1730.00
2018-19upto31.03.2019
0.00 0.00 297.11 0.00 297.11 9.07 3.62 687.3 0.00 699.99
2019-20upto31.03.2020
0.00 0.00 108.32 867.97 976.29 0.00 4.57 213.23 282.20 500.00
TOTAL:- 3403.7 3136.3 3775.2 867.97 11183 1683 1860.6 3820.1 282.20 7645.8
7.4 Project Management System Software (PMS)
For comprehensive monitoring of the Project Monitoring System, software has been developed and installed in the department. The software is developed on dotnet frame work and installed in the Project Monitoring Server. In this Project Management System, Monitoring, Quality control and Contract administration are the main Modules and through these modules, the Project activities, daily activities and photographs, Quality control tests can be uploaded through mobile application. The Project Monitoring System being adopted has won National Awardforimplementationofe-Governanceintitiativesfortheyear2013-14bytheDepartmentofAdministrativeReforms&PublicGrievances,GovernmentofIndia.
Achievements:
1. TheGovernmentofIndiahasconferredGOLD National Award under e-Governance to the State Highway Development Project for "Cat-VII-Innovative use of Mobile Technology in e-Governance" on 30-01-2015 in Gandhinagar, Gujarat by the Hon’bleChiefMinister,GovtofGujarat.
2. India’sBestGovernanceProjectforMinimumGovernment,MaximumGovernancehas conferred to the State Highway Development Project for SKOTCH ORDER OF MERIT AWARD.
66
CHAPTER- 8
INSTITUTIONAL DEVELOPMENT IN PWP&IWTD
8.1 Background:
InstitutionalDevelopment inPWP&IWTDwasgivenamajor impetuswith theoncomingof theKarnatakaStateHighways ImprovementProject (KSHIP); as apre-cursor towhichan InstitutionalDevelopmentStrategyStudywasundertaken in2000-01.TheGovernmenton15-03-2001approvedtherecommendationsoftheStudy.TheDepartmenthassincethenbeen undergoing major Institutional Development. The Institutional Strengthening of the Departmentconsistsoffollowing6components:
■ RegulatoryContext
■ Organization&Management
■ Financial Mechanisms
■ Core Processes
■ Information Systems
■ Human Resources
8.2 Road Safety:
KPWP&IWTDmandateduseof“ManualforSafetyinRoadDesignson15-03-2004.TwoTrafficCellswerecreatedon24-10-2002intheOfficesoftheChiefEngineers,C&B(South&Northzones)withawiderangeofdutiespertainingtotraffic&roadsafety.BlackspotsonPWP&IWTDroadswere improvedaspartofKSHIP roadsafetycomponent.ThiswasthefirstsuchspecificblackspotimprovementworkinPWP&IWTD.Furthersuchworksareenvisaged. A road safety Unit is established in PRAMC which is looking after the Road Safety issues in the state.
8.3 Information Technology:
AnInformationTechnologyCellwasestablishedinPWP&IWTDwhichisnowbroughtunderthe PRAMC. The GIS based RIS is continuing to be updated with the latest information. PWP&IWTDwascomputerizeduptotheDivisionlevel.Manynewapplicationshavebeeninitialized such as Project / Progress Monitoring System, Karnataka Road Information System to have a database of the history of the roads in the State.
8.4 E-Procurement
All theworkscostingmorethanRs.5.00lakharebeingundertakenthroughe-procurementprocessaspernotificationNo.DPAR2e-proc2009,dated:09.10.2012andinaccordancewith
67
the Karnataka Transparency in Public Procurement Act and Rules. This being a complete onlineprocess,alltheprocesseslikereceiptoftender,preparationofworks,approvalrequiredaspernecessity,receiptofEarnestMoneyDepositetc.,shallbedonethroughtheonline.
8.5 Uploading the progress and achievement report of the department in the website of the department
In the website of the department, all information about the department, important documents, government orders and progress reports have been uploaded after computerization. Moreover, organizational set-up details of the department, plans, road network, right to information act, tenders, appointment, communication details, information of allotted residential houses of the PublicWorksDepartmentcanbeseeninwebsite(www.kpwd.co.in).
8.6 Web based progress monitoring system
Awebbasedprogressmonitoringsystemisadopted in thedepartment. All theofficersofPWD are given log-in to the system. Details of works taken up by the department are uploaded inthesystem.Thephysicalprogressandfinancialprogressareuploadedregularlyandthesystemisefficientlybeingusedasamonitoringtool.
8.7 Road Condition Survey
Since2001,theRoadConditionSurveyisbeingconductedannuallybyusingthesystemofROMDAS(RoadMeasurementandDataAcquisitionSystem).Throughthissurvey,kilometerwise IRI value of the roads is collected, so that the information of surface roughness, real condition and visual inspection of the roads is being adopted in the Road information system.
8.8 Road Information System(RIS)
Road Information System is developed on the basis of Geographical Information System. Road Information System provides information on roads communication and condition of the roads. The details of length of the roads, width and surface etc., of the roads, cause way drainagesandbridgesdetailsareavailable.Thedetailsoftheroadsupgradedandthefinancialdetails on development of roads under various schemes during the past four years are being updated.
8.9 Toll Policy
Karnataka Toll rules are implemented in the state and approval habe been accorded to collect the toll feeon19StateHighways covering a lengthof1530KmsdevelopedbyKRDCL/KSHIPvideG.O.No.PWD118EAP2016dated31.03.2017.
68
8.10 Road user’s survey & opinion
ForthefirsttimedetailedsurveyonRoaduser’sopinionwasconductedduringtheyear2002andlikewisesecondtimewasconductedduringJanuary2001&thirdtimeduringOctober2007andopinionoftheusershasbeenstudied.
8.11 Vehicles Traffic Census
Since1956modelTrafficVehiclesurveyoftwodaysisbeingconductedeveryyearandfullfledgedTrafficVehiclecensusofsevendaysisbeingconductedonceineveryfiveyear.Basedon thisVehicleTrafficSurvey/Census, the road improvementworkswillbeundertakenonprioritybasis. AsevendaysTrafficCensuswasconductedduring2014-15andintheyear2019-20.VehicleTrafficSurveywillbeconductedeveryyearbetweenthecensusyear.Closecircuit cameras were installed and used in few count posts as a pilot project.
8.12 No splitting up of Tender works
Government Circular issued prohibiting the splitting of one work into piece works vide PWD 243EAP2011,dated14.03.2011andNo.PWDIFA2013dated:16.01.2013andincaseofmore works to be taken in different chainages in the same road, instructions were issued to call for the tender in package.
8.13 Road Upgradation proposal approving committee
CommitteeheadedbytheSecretary,PublicWorksDepartmentalongwiththeChiefEngineersandRepresentativesfromFinanceDepartmentaspertheG.O.No.PWD374CRM2007,dated:26.05.2009wasformedtoimplementthesystematicappraisalofupgradationofRuralRoadsand Major District Roads and make decisions of upgradations.
8.14 Public works Vigilance Force:
Work Monitoring Cell headed by Executive Engineer at Secretariat was established foreffective utilization of funds provided to the department and to avoid misappropriations. This cellhasbeenmergedwithnewlycreatedVigilanceCell. VigilanceCell isnowheadedbyExecutiveEngineerandrequiredpostshavebeencreatedandtiisdirectlyfunctioningunderGovernmentforverificationofcomplaintsatGovernment.
8.15 Department Code (D-code)
TherevisionofDepartmentCode(DCode)isoneoftheinstitutionalreformsundertakenasdesired by the world bank in its country procurement report. The D-Code has been revised keeping in line with the latest development in technology and procurement procedure. The revisedcodehascomeintoforcew.e.f16.10.2014.
69
8.16 Revision of Department Accounts Code (A-Code)
Since the Department Code has been revised, there is a necessity to revise ‘A-Code’incorporatingtheprovisionsasperrevisedD-Codeandinviewoflatestdelegationoffinancialpower, e-procurement and e-tender. This task has been entrusted to Karnataka Institute of Public Auditors.
8.17 Training Activities
Duringtheyear2019-20,485EngineersandOfficers/staffoftheDepartmentaretrainedinvarious disciplines at reputed institutions.
8.18 Ease of doing Business
Underthe“MakeinIndia”programmesponsored“EaseofdoingBusiness”,theservicesforpermission for Road Cutting on State Highways and Major District Roads and permission in Right of Way are made online.
8.19 Sakala
AsperthecommitmentofthedepartmentintheCitizenCharter,34publicservicesareincludeduder Sakala.
i. TheprovisionmadetogiveclearancetotheRoadcuttingpermissionwithin7daysforroads coming under Public Works Department.
ii. The provision made to give clearance to the Buildings Construction permission and advertisementboardpermissionalongNH,SH&MDRroadscomingunderPublicWorksDepartment.
iii. Issue of Building condition/fitness certificate after receipt of application in completemanner–Timelimitfordisposalbythedesignatedofficer–20workingdays.
iv. PrivateBuildingrentfixationafterreceiptofapplicationincompletemanner–Timelimitdisposalbythedesignatedofficer–15workingdays.
v. Government / Private building valuation after receipt of application in complete manner –Timelimitfordisposalbythedesignatedofficer–15workingdays.
Action is being taken to make provision for uploading Sakala application online in the Department website.
8.20 Major Stake Holders of PWP&IWTD roads in Karnataka
Truck operators, Bus operators and other Transport vehicle operators are the Stake holders. Cement, Bitumen andSteelmanufacturers,BuildingsofallPublicOffices,Forestdepartmentfor providing wood, Quarey owners, manufacturers of other construction materials, manufacturersofbridgebearingsandconstructionequipmentmanufacturersandlabourworkforce.
70
CHAPTER- 9
DEPARTMENT OF ARCHITECTURE
9.1 INTRODUCTION:
TheDepartmentofArchitectureisfunctioningasanindependentDepartmentsince30.10.1986.The main objective of the Department is to furnish Architectural Design Drawings for buildings of various Government Departments through out the State of Karnataka. Architectural Design Drawings are prepared based on the requirements furnished by the userDepartments, sitecondition and other prescribed standards and norms.
TheDepartmentalsofurnishesArchitecturalDrawingstoQuasi-GovernmentOrganisations,Autonomous Bodies, Boards, Development Authorities, like Bangalore Development Authority,Corporations,Municipalitiesetc.,onrequestaftercollectingArchitectsFeeasperGovernment order.
Whenever a request forArchitectural design is received from the user department or anEngineeringDepartment,theconcernedteamofArchitectsmakesathoroughstudyofalltheaspects of building design. The approach to any project is highly professional and creative in nature.All requests, whether they are new proposals / alterations and additions to theexistingbuilding/ongoingworks,arealldealtwithequalimportance,givingutmostprioritytobudgetedworks.ThisofficeiscommittedinissuingthenecessaryArchitecturaldrawingsin time, based on the stage of the project. For e.g. schematic drawings for Administrative sanctionordetaileddrawingsfortechnicalsanctionorworkingdrawingsforexecution.TheDepartment undertakes periodical inspections of building projects which are under constructionatvariousplacesinordertosolvetheproblemsencounteredbythesiteEngineersatthetimeofexecutionandtoseethattheworksareexecutedinaccordancewiththedrawingsfurnished by this Department.
In addition to Architectural Design Drawings, the Department also furnishes detailed working drawings,joinerydetails,InteriorsandserviceslikeElectrical,plumbingandSanitaryetc.,whichareessentialforexecutingthebuildingprojects.
ListofProjectscostingmorethanRs.OnecroreforwhichArchitecturaldrawingshavebeenprepared and furnished during the year under report is enclosed.
71
9.2 ADMINISTRATION:
CentralofficeoftheDepartmentofArchitectureisfunctioningatBangalore.SmtK.N.SavithrihasworkedasChiefArchitectfrom01.11.2016to31.05.2019.From01.06.2019to21.09.2019Sri.K.Mohan was under additional charge of the post of Chief Architect and transferred on 21.09.2019.Thenfrom21.09.201931.03.2020SmtB.Lakhmiwasunderadditionalchargeof the post of Chief Architect. Presently Sri.Hemanthkumar is under additional charge of the post of Chief Architect and under his guidance Deputy Chief Architects, Deputy Architects, Senior Assistant Architects and other Technical staff have prepared Architectural drawings. ChiefArchitectandotherOfficersoftheDepartmenthaveundertakensitevisitstomostoftheprojects during construction at various stages.
This Department has a Computer Wing and Computers are being used for preparing Architectural Design Drawings and also for Administration purpose.
9.3 FINANCIAL:
No Architects fee is collected for designing Government buildings. However, Architects fee asperGovernmentordercollectedincaseofQuasi-GovernmentOrganisations,Corporations,andZ.P.Works,etc.,
9.4 PROGRAMME/PROGRESS:
ThemainaimofthisDepartmentistoprovideveryefficient,economicalanduser-friendlydesignsbasedontherequirementsoftheUserDepartments.
There is need for reviewing Cadre and Recruitment Rules of this Department and necessary steps have already been initiated in this regard.
During the year under report, the Department has prepared and furnished about 704Architectural Design Drawings to various Government building projects estimated around Rs. 1039 .00 Crores.
SUMMARY/ CONCLUSION:
With better coordination from user Departments and the Public Works Department, this Department can function more efficiently and provide better designs in terms of usage,economy and aesthetics and necessary working drawings and detailed drawings for services etc., can also is given in time.
72
CHAPTER - 10
BUILDINGS
10.1 PublicWorks, Ports& InlandWaterTransportDepartment is responsible for constructionand maintenance of government buildings. While it has its own budget for construction and maintenance of buildings. It also undertakes construction on behalf of other Departments/local bodies under the Deposit Contribution Works.
Broadly,buildingsunderPWP&IWTDfallundertwocategoriesviz.,Nonresidentialbuildingsandresidentialbuildings.Thefirstcategorycoversofficebuildings,commercialcomplexes,colleges,hospitals,libraries,etc.Residentialbuildingsincludequartersandhostels.
Whileminorworksareundertakenunderthebudgetheads2059and2216,majorassetcreationworksaretakenupunderthebudgetheads4059and4216capitaloutlay.Inaddition,thereare building programmes under the budget heads of other government Departments, for which budget provision is made under the respective budget heads.
PWP&IWTDundertakes twokinds of repairs formaintenance of buildings, viz., ordinaryrepairsandspecialrepairs.Ordinaryrepairsarecarriedoutannuallyandincludeactivitieslikewhite washing, colour washing, repairs of patches, replacement of small broken parts, painting ofdoors,etc.Specialrepairsarelessfrequentandincluderepairstothedamagedportionsofthebuilding,floors,doorsandwindowsandreplacementofwatersupplyandsanitaryfittings.
MajorbuildingsunderthepurviewofPublicWorksPorts&InlandWaterTransportDepartmentinNorth,NorthEast&SouthZonesarelistedinAnnexuresII,III&IV.
10.2 Budget: 2019-20
Fortheyear2019-20,totalbudgetprovisionforbothcategoriesofbuildings(residentialandinstitutional / commercial) was Rs.770.30 crore. Details of budget provision are given in Table10.1.
74
Table 10.1
Financial Allocation of Building Works under PWP&IWTD Budget for the Year 2019-20
(Rs.inlakh)
Head of Account Head of Development Target Achievement
1 2 3 4
2059-80-053-4-00-200Repair/Maintenanceofland&Buildings of different departments
26730.43 24787.56
2059-80-800-0-06-051 Sand Mining-Administration 500.00 452.25
2059-80-053-1-11-200WorksofVidhanaSoudha,VikasaSoudha,M.Sbuilding,VVtower&Suvarna Soudha buildings
2000.00 1496.06
2059-80-053-1-09-200Works of Legislative Assembly building
250.00 55.93
2059-80-053-1-10-200Works of Legislative Council building
25.00 13.17
2059 Sub Total 29505.43 26804.97
4059-80-051-0-29-386Construction of Departmental Buildings
12200.00 11517.31
4059-80-051-0-32-386 Construction of Court Buildings 14777.47 13666.88
4059 Sub Total 26977.47 25184.19
2216-01-700-3-01-200Maintenance of Residential Buildings
13693.53 11159.60
2216-01-700-4-00-221 Furnishing-Material&Supplies 203.69 61.98
2216 Sub Total 13897.22 11221.58
4216-01-700-2-01-386Construction of Residential Buildings
5350.00 5261.19
4216-01-700-2-24-386Construction of Quarters for JudicialOfficers
1299.89 963.94
4216 Sub Total 6649.89 6225.13
TOTAL - BUILDINGS 77030.01 69435.87
75
Table 10.2Details of Residential and Non-Residential Buildings for the year 2019-20Sl. No. Zone Divisions No. of Buildings
1
South
No1Buldings 3002 No2Buildings 2313 Bangalore 4504 Ramanagara Regular 575 Ramanagara Special 916 Kolar 2467 Chikkaballapur 798 Tumkur 2149 Madhgugiri 13510 Mysore 6011 Hunsur 16912 Mandya 14313 CR Nagar 14714 Hassan 34615 Chikkamagalur 26216 Mangalore 55317 Udupi 21818 Kodagu 410 South Zone Total 411119
North
Dharwad 34420 Gadag 17521 Haveri 28222 Karwar 35723 Sirsi 20624 Shimoga 19625 Shimoga Spl 23426 Davanagere 18427 Chitradurga 20028 Belgaum 55429 Chikkodi 21130 Bijapur 36131 Bagalkote 454 North Zone Total 375832
North East
Bellary 30233 Hadagali 12434 Raichur 24535 Koppal 18936 Gulbarga 49637 Sedam 10638 Yadgir 14839 Bidar 302 North East Zone Total 1912 State Total 9781
The above statement has number of buildings havingCapital cost of aboveRs.1.00 lakh (majorbuildingsandaboveRs.20000andbelowRs.1.00lakh(minorbuildings).
76
Sl.
No.
Div
isio
nsR
esid
entia
l Bui
ldin
gs( Q
uart
ers)
Non
Res
iden
tial B
uild
ings
( G
ovt O
ffice
)
No
of
Bui
ldin
gsC
apita
l cos
t (R
s.in
lakh
s)Pl
inth
Are
a
(in 1
000S
qm)
No
of
Bui
ldin
gsC
apita
l cos
t
(Rs.i
n la
khs)
Plin
th A
rea
(in
100
0Sqm
)1
23
45
67
8
1No1Buldings
7091707.89
23.30
230
79823.51
245.49
2No2Buildings
3949326.32
69.97
192
197853.49
313.99
3B
anga
lore
319
4502.06
62.92
131
13329.36
44.13
4R
aman
agar
a R
egul
ar14
693.02
28.57
439952.15
34.76
5R
aman
agar
a Sp
ecia
l59
524.5
20.29
321893.45
26.57
6K
olar
124
819.31
13.61
122
7816.14
47.31
7C
hikk
abal
lapu
r49
421.08
16.20
305474.39
25.29
8Tu
mku
r87
815.1
10.78
127
5149.32
18.19
9M
adhg
ugiri
70718.02
10.91
653682.95
30.88
10M
ysor
e18
193.42
5.31
425111.61
8.46
11H
unsu
r110
428.52
3.17
593909.80
24.02
12M
andy
a41
299.48
13.35
102
7007.74
114.01
13C
R N
agar
48822.45
22.77
991141.21
16.73
14H
assa
n83
3345.94
24.20
263
29205.64
223.89
15C
hikk
amag
alur
149
1548.94
30.97
113
2766.39
75.95
16M
anga
lore
347
2074.82
71.40
206
12755.53
215.12
17U
dupi
125
1600.55
20.80
934136.76
69.52
18K
odag
u337
333.21
15.44
732742.01
53.02
So
uth
Zon
e To
tal
2089
1601
74.6
346
3.96
2022
3937
51.4
515
87.3
3
77
Sl.
No.
Div
isio
nsR
esid
entia
l Bui
ldin
gs( Q
uart
ers)
Non
Res
iden
tial B
uild
ings
( G
ovt O
ffice
)
No
of
Bui
ldin
gsC
apita
l cos
t (R
s.in
lakh
s)Pl
inth
Are
a
(in 1
000S
qm)
No
of
Bui
ldin
gsC
apita
l cos
t
(Rs.i
n la
khs)
Plin
th A
rea
(in
100
0Sqm
)1
23
45
67
819
Dha
rwad
167
2989.97
192.41
177
21037.24
309.23
20G
adag
81971.96
38.15
943494.08
62.29
21H
aver
i118
2434.85
57.31
164
10399.33
114.87
22K
arw
ar229
1608.67
68.11
128
2647.10
130.66
23Si
rsi
103
1093.07
48.01
103
3231.24
101.97
24Sh
imog
a61
2496.25
30.77
135
9504.42
90.97
25Sh
imog
a Sp
l107
2475.57
36.79
127
9823.16
114.72
26D
avan
ager
e90
1412.02
34.58
944300.11
63.84
27C
hitra
durg
a77
1859.18
29.24
123
8730.37
87.68
28B
elga
um241
1600.25
114.04
313
28642.31
252.70
29C
hikk
odi
80478.99
16.38
131
7771.19
49.77
30B
ijapu
r119
1041.48
72.49
242
4551.82
158.81
31B
agal
kote
215
1933.92
65.33
239
10042.34
162.26
N
orth
Zon
e To
tal
1688
2239
6.18
803.
6120
7012
4174
.71
1699
.77
32B
ella
ry238
6335.12
27503.06
642113.75
21043.55
33H
adag
ali
665718.23
18354.09
581586.85
246417.07
34R
aich
ur143
337.98
9576.86
102
1579.18
32784.66
35K
oppa
l151
39.16
19584.81
3816.95
16907.66
36G
ulba
rga
251
1025.91
155.91
245
4029.09
167.79
37Se
dam
641921.98
125474.00
42971.63
44982.00
38Ya
dgir
60975.43
63811.72
882837.41
88036.21
39B
idar
1100.00
0.70
3380.00
1.37
N
orth
Eas
t Zon
e To
tal
974
1645
3.81
2644
61.1
564
013
514.
8645
0340
.31
78
Sl.
No
Div
isio
ns
Cir
cuit
Hou
seTr
avel
ers B
unga
low
No
No
of
Roo
ms
Cap
ital c
ost
(Rs.
In
lakh
)
Plin
th
Are
a
(in
Sqm
)N
oN
o of
R
oom
s
Cap
ital c
ost
(Rs.
In
lakh
)
Plin
th
Are
a
(in
Sqm
)1
23
45
67
89
10
1No1Buldings
00
0.00
0.00
00
0.00
0.00
2No2Buildings
00
0.00
0.00
00
0.00
0.00
3B
anga
lore
00
0.00
0.00
110
490.00
1500.00
4R
aman
agar
a R
egul
ar0
00.00
0.00
414
13.11
1301.94
5R
aman
agar
a Sp
ecia
l0
00.00
0.00
12
0.24
138.05
6K
olar
12
3.73
200.00
410
16.35
876.46
7C
hikk
abal
lapu
r0
00.00
0.00
416
38.22
1341.38
8Tu
mku
r1
14.50
235.36
310
11.58
498.42
9M
adhg
ugiri
00
0.00
0.00
26
4.00
163.18
10M
ysor
e0
00.00
0.00
28
1.21
1131.21
11H
unsu
r1
215.00
380.00
210
2.68
972.31
12M
andy
a0
00.00
0.00
430
36.48
2838.10
13C
R N
agar
00
0.00
0.00
29
8.18
1031.97
14H
assa
n2
60.33
184.08
845
573.71
4717.09
15C
hikk
amag
alur
00
0.00
0.00
617
75.56
5586.95
16M
anga
lore
00
0.00
0.00
326
315.50
3619.21
17U
dupi
18
400.00
1639.00
15
3.10
755.22
18K
odag
u0
00.00
0.00
36
17.77
615.73
So
uth
Zon
e To
tal
619
423.
5626
38.4
450
224
1607
.69
2708
7.22
79
Sl.
No
Div
isio
ns
Cir
cuit
Hou
seTr
avel
ers B
unga
low
No
No
of
Roo
ms
Cap
ital c
ost
(Rs.
In
lakh
)
Plin
th
Are
a
(in
Sqm
)N
oN
o of
R
oom
s
Cap
ital c
ost
(Rs.
In
lakh
)
Plin
th
Are
a
(in
Sqm
)1
23
45
67
89
1019
Dha
rwad
630
417.15
8041.49
513
52.78
882.73
20G
adag
39
280.00
1220.80
937
497.40
1964.61
21H
aver
i4
16241.83
2347.74
14
50.00
235.00
22K
arw
ar5
19286.50
13396.12
212
6.71
740.00
23Si
rsi
955
667.16
3059.09
832
60.46
1344.46
24Sh
imog
a0
00.00
0.00
841
599.58
5862.11
25Sh
imog
a Sp
l1
47.49
722.62
522
109.63
1447.03
26D
avan
ager
e1
14180.00
755.00
318
181.85
1375.28
27C
hitra
durg
a2
16202.71
1357.00
411
39.95
860.39
28B
elga
um3
20257.52
3022.64
711
41.58
907.59
29C
hikk
odi
313
494.60
2240.00
1357
169.33
4077.00
30B
ijapu
r2
684.00
720.00
1442
468.57
5947.00
31B
agal
kote
13
56.45
3100.00
2779
614.59
9620.92
N
orth
Zon
e To
tal
4020
531
75.4
139
982.
5010
637
928
92.4
335
264.
1232
Bel
lary
230
1701.00
4715.00
825
120.300
13387.900
33H
adag
ali
325
680.00
5858.00
--
--
34R
aich
ur4
29729.99
3216.26
1666
0.300
1164.340
35K
oppa
l5
20810.00
4010.00
825
115.000
9000.000
36G
ulba
rga
310
1.42
3697.00
919
21.590
1866.420
37Se
dam
14
200.00
950.00
35
523.160
1792.000
38Ya
dgir
212
300.00
2612.40
15
23.280
5788.530
39B
idar
00
0.00
0.00
00
0.000
0.000
N
orth
Eas
t Zon
e To
tal
2013
044
22.4
125
058.
6645
145
803.
6332
999.
19
80
Sl.
No
Div
isio
nsC
ircu
it B
unga
low
Gue
st h
ouse
No
No
of
Roo
ms
Cap
ital c
ost
(Rs.
In la
kh)
Plin
th A
rea
(in S
qm)
No
No
of
Roo
ms
Cap
ital c
ost
(Rs.
In la
kh)
Plin
th A
rea
(in S
qm)
12
34
56
78
910
1No1Buldings
00
0.00
0.00
00
0.00
0.00
2No2Buildings
00
0.00
0.00
2128
1810.52
6179.41
3B
anga
lore
731
73.70
2498.87
214
230.00
1148.00
4R
aman
agar
a R
egul
ar0
00.00
0.00
00
0.00
0.00
5R
aman
agar
a Sp
ecia
l3
1026.71
533.45
00
0.00
0.00
6K
olar
310
31.14
1388.42
49
184.16
1769.53
7C
hikk
abal
lapu
r4
30478.73
2757.31
12
5.90
126.00
8Tu
mku
r7
2623.82
2583.93
11
0.58
195.00
9M
adhg
ugiri
728
150.42
2768.42
00
0.00
0.00
10M
ysor
e2
910.51
802.33
418
557.00
2504.65
11H
unsu
r4
12110.21
12138.15
13
24.00
255.97
12M
andy
a5
33165.67
3913.10
517
432.29
2497.54
13C
R N
agar
310
17.04
2630.42
26
50.00
8608.00
14H
assa
n5
1610.86
1940.47
329
18911.72
2786.99
15C
hikk
amag
alur
1640
256.06
6537.99
00
0.00
0.00
16M
anga
lore
942
593.09
3353.06
00
0.00
0.00
17U
dupi
424
675.54
5389.30
00
0.00
0.00
18K
odag
u6
2247.32
1703.76
27
4.59
1683.86
So
uth
Zon
e To
tal
8534
326
70.8
250
938.
9827
234
2221
0.76
2775
4.95
81
Sl.
No
Div
isio
nsC
ircu
it B
unga
low
Gue
st h
ouse
No
No
of
Roo
ms
Cap
ital c
ost
(Rs.
In la
kh)
Plin
th A
rea
(in S
qm)
No
No
of
Roo
ms
Cap
ital c
ost
(Rs.
In la
kh)
Plin
th A
rea
(in S
qm)
12
34
56
78
910
19D
harw
ad7
2196.07
2714.51
23
481.46
780.00
20G
adag
00
0.00
0.00
00
0.00
0.00
21H
aver
i30
89435.10
8299.21
38
56.08
968.12
22K
arw
ar9
27304.82
2503.37
00
0.00
0.00
23Si
rsi
1240
48.30
1605.21
00
0.00
0.00
24Sh
imog
a2
8125.82
1159.38
19
76.06
509.00
25Sh
imog
a Sp
l2
6105.65
720.00
18
500.00
2422.00
26D
avan
ager
e7
26336.60
2568.61
12
35.16
294.14
27C
hitra
durg
a13
41436.18
4835.28
210
27.15
592.04
28B
elga
um17
45256.98
4172.44
00
0.00
0.00
29C
hikk
odi
1353
233.86
6429.16
14
25.62
405.30
30B
ijapu
r6
15102.75
1007.74
00
0.00
0.00
31B
agal
kote
2156
589.51
5895.00
26
140.00
388.04
N
orth
Zon
e To
tal
139
427
3071
.64
4190
9.91
1350
1341
.53
6358
.64
32B
ella
ry-
--
--
--
-33
Had
agal
i13
48387.18
11188.27
16
150.00
380.00
34R
aich
ur5
23133.50
5737.47
14
9.00
0.00
35K
oppa
l-
--
--
--
-36
Gul
barg
a2
12700.00
855.30
--
--
37Se
dam
123
81.54
12236.00
48
48854.00
320.00
38Ya
dgir
24
125.00
853.24
00
0.00
0.00
39B
idar
28
155.00
1044.76
00
0.00
0.00
N
orth
Eas
t Zon
e To
tal
2511
815
82.2
231
915.
046
1849
013.
0070
0.00
82
CHAPTER- 11
PORTS & INLAND WATER TRANSPORT
Introduction Sea ports are important gateways for trading in commodities between countries. The ports
form a major infrastructure in the logistic chain of activities in economic transport of goods. It is an acknowledged fact that, there is a big gap between available capacity of ports in India and the huge demand for port services.
In India,marine transport has the highestmodal share of export-import cargo. Sea routesprovideefficientandcost effectivemodesof transportingbulkquantitiesofgoods.AsperMinistryofShippingestimates,trafficatseaportsislikelytogrowthreetimesby2020-21from the present level.
Karnatakahasamaritimecoastlineof167nauticalmiles(309.59kilometres)andhasoneMajorportatNewMangalorePortand12minorportsi.e.,Karwar,Belekeri,Tadri,PavinaKurve,Honnavar,Manki,Bhatkal,Kundapur,Hangarkatta,Malpe,PadubidriandOldMangalore.
Major Regulatory functions:-
With a view to achieve the various objectives, the Department discharges the following regulatory functions:-
1) RegulationofNavigationattheports. 2) LandingandShippingofgoodsattheports. 3) MaintainingandhiringofmarineFloatingcraftsandcargohandling,equipmentsuch
as Cranes, Tugs, Water Barges, Weigh Bridge etc., 4) DevelopmentandmaintenanceofminorPorts. 5) DredgingatthePortsandchannelsforsafeNavigation; 6) Survey,InspectionandLicensingofHarbourCrafts; 7) Examination and issue of Certificate of competency to Engine,Drivers,Masters,
Sarongs under Karnataka Harbour Craft Rules. 8) Inspection and issue of Certificate of fitness to crafts deployed in Ferries and
Waterways. 9) OperationofFerriesthroughcontractsystem. 10)ConductingHydrographicsurveysofthePorts&Waterways. 11)Conductingenquiryaboutcasualties/wrecks,jettisoning 12)Registration,SurveyandInspectionofsailingvessels. 13)Constructionofjetties,landingramps,ApproachRoadsforFerryServices. 14)ExecutionofCoastalProtectionWorksandfisheryharbour/fishlandingcentresand
Inland Fisheries Development works.
83
Administration:
The Department functions under the administrative control of the Public Works, Ports and Inland Water Transport Department at the Government level. The Director of Ports and Inland WaterTransportwithHead-quartersatKarwaristheHeadoftheDepartmentwhoisassistedin the administration as indicated below.
ThePortOfficers (MasterMariners (F.G.)are functioningwithHeadquartersat importantports in the state i.e., Karwar, Honnavar, Kundapur and Mangalore who are directly responsible for management and operation of the ports in their respective jurisdiction. Licensing of harbourcrafts,conductingexaminationforissueofcertificateofcompetencyasMasterandSerang’s,Inspection/PreliminaryInvestigationintoshippingCasualties,Jettisoningetc.,Portconservator, Deputy Port Conservators and Assistant Port Conservators are stationed at other lesser important ports who work under the direct administration and technical control of the Portofficers.
Table 11.1
Cadre Strength of Ports & Inland Water Transport Department
GroupNo. of Posts sanctioned
No. of Posts Filled
No. of Posts Vacant
Group - A 16 8 8Group–B 40 12 28Group–C 285 75 210Group–D 225 66 159
Total 566 161 405
ThePortEngineeristheTechnicalAssistanttotheDirectorofPorts&InlandWaterTransportandlooksaftertheexecutionofmaintenanceofPortworks,Buildingsetc.,andsupervisesthedredging works in Uttara Kananda District and State Inland Water Transport works assisted by Asst.ExecutiveEngineer,AssistantEngineer&JuniorEngineers.
TheExecutiveEngineerofPortDivisionwithHead-quarters atKarwarand theExecutiveEngineer of Ports & Fisheries Division, with head-quarters at Udupi is working in thedepartment.TheyareassistedbyAssistantExecutiveEngineers,AssistantEngineers/JuniorEngineers.TheExecutiveEngineer,Ports&FisheriesDivision,Udupi is lookingafter thedevelopmental port works, dredging works and maintenance work of Port structures, Fisheries worksandAntiSeaErosionworksofDakshinaKannadaandUdupiDistricts.TheExecutiveEngineer, Ports Division, Karwar look after the Port development works, fisheries worksandAntiSeaErosionworksofUttaraKannadaDistrict.OneMarineEngineer(FirstClassEngineer) with head quarters at Karwar has been working in the department. He is also
84
responsible for operation of the Departmental Mechanized harbour crafts and inspection of mechanizedharbourcraftconductingexaminationfor issueofcertificateofcompetencyasEngineer/EngineDriver.
IMPORTS & EXPORTS:
Karnataka exports a wide variety of goods both agricultural and industrial covering silk,sandalwood oil, handicrafts, readymade garments, coffee, iron ore, sophisticated machine tools, electronic products, computer hardware and software, inter alias. In the last two decades the Statehasemergedasamajorplayerintheexportofengineeringgoods,readymadegarments,leather goods, chemicals, minerals and ores.
Major Commodities in Transaction at Karwar Port
EXPORTS IMPORTS
¾ IronOres,ManganeseOre,Bauxite,Sugar,Alumina, Food grains, Maize, Granite, Horticulture and Agriculture products,
¾ Liquid cargoes like Molasses, phosphoricacid marine products
¾ Coal, Cement, Sugar, Food Grains, Fertilizers, Industrial salt, Rock Phosphate, Raw Sugar
¾ Liquid cargoes like H.S.D, Furnace Oil,Kerosene, Palm Oil, Molasses and otherChemicals.
STATEMENT SHOWING THE CARGO HANDLED DURING 2019-20
(CargoInM.T.&RevenueinRs.lakhs)
Name of Port Import Export Total Revenue earnedKarwar Port 820323 40303 860626 1671.93Belekeri Port - - - 7.74Tadadi Port - - - 3.27Honnavar Port - - - 16.11
Bhatkal Port - - - 0.48
Kundapur Port - - - 31.85
Malpe Port - - - 39.59
Hangarkatta Port - - - 3.20
Padubidri Port - - - -
OldMangalorePort 550 73840 74390 276.79
Total 820873 114143 935016 2050.96
PORT DEVELOPMENT THROUGH PRIVATE INVESTMENT:-
Forfasterdevelopmentofportsanditsefficientandcosteffectiveoperations,thedevelopmentof ports through private investment is envisaged. The development of port based industries and other infrastructural facilities will be integrated with port development.
85
PORT DEVELOPMENT PROJECT PROPOSALS UNDER SAGARMALA PROJECT
¾The Government of Karnataka has taken initiation for Second stage development of Karwar Port under State Government funds and Government of India, Coastal berth scheme.
¾Two projects have been sanctioned for the development of Karwar Port - Construction ofCoastalBerthof250mtrlengthatKarwarPortatanapprovedestimatedcostofRs.61.00CrandExtensionofexistingSouthernbreakwaterby145mandconstructionofnewNorthbreakwaterof1160Mtrs.atKarwarPortatanapprovedestimatedcostofRs.215.00Cr.
¾Two projects have been sanctioned for the development of Old Mangalore Port- Construction of 350Mtr. long coastal cargo berth atOldMangaluru Port at anapprovedestimatedcostofRs.65.00CrandCapitalDredgingatOldPortMangalore(BengreSide)atanapprovedestimatedcostofRs.29.00Cr.
¾The State Government has accorded approval for construction of Northern and extensionofSouthernbreakwateratanestimatedcostofRs.215.00Crores.TheworkwascommencedinthemonthofJanuary2020.However,dueto thestayorderofHon’bleHighCourtofKarnataka,BangaluruvideW.P.No.1332/2020(GM-PIL)filed by Baithkol Bandaru Nirashritara Meenugarara Sahakara Sangha Niyamita, Baithkol, this work has been stopped at present. For the construction of coastal berthatanestimatedcostofRs.61.00Crores,theletterofacceptanceisissuedtothecontractoron21.03.2020.
¾Under Coastal berth Centrally Sponsored Scheme (CSS), for the Construction ofcoastalberthatMangalorePortatanestimatedcostofRs.65.00CroresapprovalofFinancialBidofEmjayConstructions,BangaloreamountingtoRs.5995.88Lakhs(10.95%above)isawaitedandfordeepeningthechannel&berthupto7Mtr.atanestimatedcostofRs.29.00Crores,EIA&CRZclearanceareobtainedandthedetailstender process is as under :
Inthe1st call of tender, the technical bids of two bidders - Yojaka India Pvt. Ltd. and Rock and ReefDredgingPvt.Ltd.,MumbaiwasrejectedbyTechnicalBidEvaluationCommitteeon12-03-2020atDharwad.
Subsequently,2ndcalloftenderwasinvitedon17-03-2020.Butnobidderhadparticipatedinthis tender.
Assuch,3rdcalloftenderwasinvitedandthetechnicalbidwasopenedon05.06.2020.Twobidders–YojakaPvt.Ltd.,MangaloreandRock&Reef,Mumbai-haveparticipatedinthetender.Confirmationofthebiddocumentsisunderprogress.
86
PORT DEVELOPMENT PROJECT PROPOSALS UNDER PPP PROJECT
¾MinistryofShipping(MoS),GovernmentofIndiahasprepared“TechnoEconomicFeasibilityReport”(TEFR)fordevelopmentofBelekeriPortneartoKenivillageasaSatelliteporttoNewMangalorePortTrust(NMPT)with10MTPAcapacityatanestimatedcostofRs.1720.00Cr.GovernmentofKarnatakahasgivenitsconcurrencetoTEFRpreparedbyMinistryofShippingthroughAECOM.
¾The Government has sanctioned 847560 Sqm port land on lease basis to M/sHonnavarPort PrivateLimited (HPPL),Hyderabad atHonnavar port to handle 5MTPAcargo.TheDPRhasbeenpreparedandEIAclearancehasbeenobtainedbythe developer. Designs are approved by the department and the jetty work is under progress.Constructionofbreakwaters&dredgingworksaretobetakenup.
¾M/S.JSWhassubmittedaSuo-Motoproposalfordevelopinganall-weather,multi-cargo, Deepwater green field port at Pavinakurve village, near Honnavar, Uttar-KannadaunderSwissChallengeroutewith14MPTAcapacityatanestimatedcostofRs.1767.00Cr.ThebiddocumentissubmittedtotheGovernmentforapproval.
CREATION OF PORT FACILITIES :-
In view of the fact that ships of large sizes are used in transportation for economies of scale intheinternationaltrade,Portwouldbedevelopedwiththerequireddrafts,berthingfacilitiesandefficientmechanicalhandlingfacilities,soastoreducewaitingperiodofshipsandsavinginthecargohandlingexpenses.Inordertoexpeditecreationofportfacilities,itisproposedtoadopt the following strategies.
Major aim of Port development in Karnataka is to promote regional development. Port based industrial corridors would be encouraged along the coastline to facilitate import of raw material andexportoffinishedgoods.AsmorenumberofMegaprojectsarecomingupintheState,theIndustrial development shall be synchronized with the port development and the infrastructure development.
Development of Support Infrastructure:-
The investment in theport sectorwoulddemandan equal investment in the infrastructurefacilities like roads and railways for faster and efficient handling of the cargomovement.Along the coastline National Highway and Konkan Railway broad gauge line are available. The Hassan-Mangalore broad gauge line would connect the ports in the Southern coast to the adjacent hinterland and similarly the proposed railway linkage from Hubli to Karwar / Ankola would connect all the ports on the Northern coast to the rest of the state. The State Government wouldendeavourtoprovidetherequiredroadnetworkandrailwaylinkagetothehinterland.
87
Maritime Related Industries:-
Maritime related industries would be given priority to be located along Karnataka Coast in the fieldofshipbuilding,shiprepairing,dredging,eco-friendlyshipbreakingandotherflotillaunits like tugs, barges, launches and support crafts. The above manufacturing facilities as well as the traditional boat building activities would be allowed in Karnataka Maritime Waterfront on lease basis to such units. The incentives and concessions to such units would be governed by the industrial incentive package announced by the Government of Karnataka.
Coastal Shipping :-
Private entrepreneurs will be permitted to develop, operate and maintain terminal facilities along the Karnataka Coast. These terminals will be used to transport passenger and cargo to import centers on the Western Coast like Bombay, Goa, Trivandrum, Kanyakumari etc., these facilities will be promote tourism.
By linking places of historical, religious and tourist interests.
By attracting Amusement Parks, Beach Resorts and Water Sports on Karnataka Coast.
PORT FACILITIES OF POWER PROJECTS :-
Thebargemountedpowerprojectswouldbeprovidedwithrequiredportfacilitiesatidentifiedlocations.Similarly,ThermalPowerplantswouldbeprovidedwithexclusiveportfacilitiesforimporting different kinds of power fuels at Harbours
INLAND WATER TRANSPORT ACTIVITIES :-
In Karnataka State, the Inland Water Transport wing has been created under the Department ofPorts in theyear1972on the recommendationsofGokhaleCommitteeandBhagavathiCommittee to look after the administration, maintenance, control and regulation of the Ferries and Waterways by providing Mechanized Boats like LCTs/ Launches, FRP Boats and Steel Boats.
Total 334 ferries are operating in the state, out of which 17 Ferries are operated by the Department and 42 Ferries operated by public auction under the Technical control of the department, remaining 275FerriesareunderthecontrolofZilla/Taluk/GramPanchayat.ThepersonnelworkinginthedepartmentarewelltrainedinthefieldonNavigationandNauticalTechnology. The above Ferry services are mainly provided to cater shore to shore transportation of Men and materials of the remotest rural areas, which are not connected either with road or rail transportation. They are service oriented facilities to the rural commuters for their daily requirements.
88
Detailsofpassengersanddifferentvehiclestransportedduring2019-20throughdepartmentalrun ferries are as follows and revenue earned is Rs. 1.89 Cr.
Table 11.2
Sl. No. Traffic Details 1. Passengers 15,99,887Nos.
2. Cargo(inQntl) 10,124Kg
3. Two wheelers 1,10,580Nos.
4. Animals 162Nos.
5. Bus 12,520Nos.
6. Lorry 610Nos.
7. Jeep,VanandCar 94,240Nos.
ANTI SEA EROSION WORKS :-
The coastline of Karnataka State stretching from Majali in the North to Ullal in the South, passesthroughthreedistrictsi.e.,UttaraKannada,UdupiandDakshinaKannada.Outofthe309.59Kms.longcoastlineofState,about120Kms.longcoastlineissubjectedtoSeaErosionduringmonsooneveryyear.Asmanyas14rivers-Kali,Belekeri,Gangavali,Aghanashini,Sharavathi,Venkatapura, Kollur, Sitanadi, Udyavara, Gurupur, Netravathi etc., drain theircatchments into the Arabian sea and as such, the rivers banks of these rivers in the tidal reaches are subjected to river bank erosion. It is very essential to protect the public property like roads, buildings etc. by construction of long term sea wall and emergent protection works during monsoon wherever severe erosion is taking place.
During theyear2019-20anamountofRs.976.27 lakhshasbeenspentunder theheadofAccount4711and975Mtrs.longRoublemoundseawallhasbeenconstructed.
SUSTAINABLE COASTAL PROTECTION AND MANAGEMENT INVESTMENT PROGRAMME (ADB Assistance)
ULLAL SHORELINE PROTECTION SUB PROJECT
To protect the severe erosion areas of state coast line Government has accorded approval for Rs.911.00Cr.with theassistanceof“AsianDevelopmentBank” (ADB)underSustainableCoastalProtection&ManagementProgramme.
Undertranche-I,thecoastalprotectionworkistakenupatanestimatedcostofRs.223.32croresandatenderpriceofRs.210.57croresatUllalinDakshinaKannadaDistrict.Constructionof8inshoreberms,2offshorereefsandconstructionof975mlengthofbreakwaterworksarecompletedandthetotalexpenditureisRs.246.11Crores.
89
90
Undertranche-II,coastalprotectionworksaretakenupat7placesviz;Mukkacheri,SomeshwarainD.Kannada,ErmalThenka,Udyavara,Kodikanyana,MaravantheandKodibengreinUdupidistrictsatanestimatedamountofRs.585.48croresandatatenderpriceofRs.491.85crores.Theworks areunderprogress and theup todate expenditure isRs.281.76Crores. Theseworks consist of construction of rock groynes, beach nourishment, san redistribution, rock revetment,geotextile revetment,offshore reefsandcommunityawarenessand trainingsonmaintenance of plantations and nurseries.
91
Tabl
e –
11.3
PHY
SIC
AL
AN
D F
INA
CIA
L PR
OG
RE
SS F
OR
TH
E Y
EA
R 2
019-
20 O
F PO
RT
& IW
T D
EPT
. DE
VE
LO
PME
NT
WO
RK
S
(Rs.inlakhs)
Hea
d of
Acc
ount
Sc
hem
e N
ame
Phys
ical
Pro
gres
sFi
nanc
ial P
rogr
ess
Perc
enta
geA
chie
vem
ent
to th
e Ta
rget
Targ
etA
chie
vem
ent
Targ
et(G
rant
201
9-20
)A
chie
vem
ent
(Exp
endi
ture
)
12
34
56
7
5051
Cap
ital O
utla
y on
Por
ts &
Lig
ht H
ouse
s -02
Min
or P
orts
5051-02-201-0-01-
132
Prel
imin
ary
Expenses
- -
BE1.00
RE0.00
0.00
0%
5051-02-201-0-03-
147
LandAqusition&
Bui
ldin
gs4Nos.ofw
orks
4Nos.ofw
orks
BE31.00
RE31.00
17.16
55.35%
5051-02-201-0-04-
059
Con
stru
ctio
ns o
f w
harf
s, je
tties
and
ot
her f
acili
ties
6Nos.ofw
orks
6Nos.ofw
orks
BE250.00
RE452.73
331.23
73.16%
5051-02-201-0-05-
180
Machinery&
Equipm
ents
- -
BE980.00
RE827.26
806.17
97.45%
5051-02-201-0-06-
059
Dredging&
Nav
igat
ion
- -
BE1.00
RE0.00
0.00
0%
5051-02-201-0-09-
051
OtherExpenditure
16Nos.ofw
orks
14Nos.ofw
orks
BE200.00
RE150.00
86.09
57.39%
5051-02-211-0-01-
059
Saga
rmal
a-
-BE3500.00
RE2000.00
67.94
3.39%
Hea
d of
Acc
ount
Sc
hem
e N
ame
Phys
ical
Pro
gres
sFi
nanc
ial P
rogr
ess
Perc
enta
geA
chie
vem
ent
to th
e Ta
rget
Targ
etA
chie
vem
ent
Targ
et(G
rant
201
9-20
)A
chie
vem
ent
(Exp
endi
ture
)
12
34
56
7
Inla
nd W
ater
Tra
nspo
rt
5051-80-052-
0-01-059
Machinery&
Equipm
ents
0Nos.ofw
orks
0Nos.ofw
orks
BE150.00
RE0.00
0.00
0%
5051-80-800-
0-01-059
App
urte
nant
Civ
il w
orks
3Nos.ofw
orks
2Nos.ofw
orks
BE247.00
RE21.00
20.97
99.86%
Sust
aina
ble
Coa
stal
Pro
tect
ion
& M
anag
emen
t Pro
gram
(EA
P)
5051-80-800-
0-80-132
Sust
aina
ble
Coa
stal
Pro
tect
ion
&M
anagem
ent
Program(E
AP)
35Groynes,15I
groynes,9Tgroynes,
4.10Kmlengthof
seaw
all&
plantingof
saplingsfor1.50Km
leng
th
35Groynes,15
Igroynes,9T
groynes,4.10Km
leng
th o
f sea
wal
l &plantingof
saplingsfor1.44
Km
leng
th
BE23200.00
RE19700.00
16276.13
82.62%
4711
Cap
ital O
utla
y on
Flo
od C
ontr
ol P
roje
cts.
-02
Ant
i Sea
Ero
sion
Wor
ks. 1
03 C
ivil
Wor
ks
4711-02-103-
2-00-139
Maj
or w
orks
Constructionof900
mtrs
leng
th se
awal
l
Con
stru
ctio
n of
975mtrslength
seaw
all c
ompl
eted
BE980.00
RE2940.00
976.27
33.21%
92
93
Udyavara sub-project, Udupi Dist: Groynes and Beach Nourishment
Maravanthe sub-project, Udupi Dist: Groynes and sand re-distribution
SCPMIP, ADB Assisted Works
95
Sea Wall at Kasarkod Tonka in Honnavar Taluk of U.K. Dist
Tug services for Berthing & Unberthing at Karwar Port
CHAPTER - 12
QUALITY ASSURANCE ZONE
12.1 Overview of Quality Assurance Zone:
TheQualityAssuranceZoneunderPublicWorks,Ports&InlandWaterTransportDepartmenthas been formed videG.ONo: 396.¸ÉøÀJ.2014, Bangalore dated: 04.08.2014.TheQualityAssuranceZoneisheadedbytheChiefEngineerwiththefollowingstaffpattern.
¾4QualityAssurance Circles headed by the cadre of Superintending Engineers atBangalore,Mysore,Dharwad&Kalburgi
¾8 Quality Assurance Divisions headed by the cadre of Executive Engineers atBangalore,Shimoga,Mysore,Hassan,Dharwad,Belgaum,Kalburgi&Bellary.
¾18 QualityAssurance Sub-Divisions headed by the cadre ofAssistant ExecutiveEngineersatBangalore,Ramnagara,Kolar,Chitradurga,Shimoga,Mysore,Madkeri,Chamarajanagara, Hassan, Mangalore, Dharwad, Karwar, Belgavi, Vijaypur,Kalburgi,Yadgir,Bellary&Raichur.
AtPresent1DivisionatShimogaand3Sub-DivisionsatMadkeri,Yadgir&Vijaypurareyettobe opened.
12.2 Functions of Quality Assurance Zone:
The primary duty of Quality Assurance Zone is to ensure quality as per agreed tenderspecification in theworks takenupbyPWP& IWTD.TheSub-DivisionalLevelOfficersaresupposedtoconductperiodicalspot inspectionof theworks toascertain thequality. Inaddition periodical tests on construction materials will be conducted in the laboratories, based on the materials supplied by the construction divisions.
TheQualityAssuranceZonewillalsocheckwhethernecessaryfieldlaboratoriesasmandatedin the tender documents are established by the contractors at the work site. Also necessary technicalguidancelikemixdesignforroadconstructionwillbedeliveredaspertherequirementof constructional divisions.
TheQualityAssuranceZonewilltakeupthequalitytestsoftheworkscarriedoutbyKRDCL,KSHIP&SHDPasperdirectionsoftheGovernmentonrandombasis.ItismandatoryfortheconstructiondivisionalEngineers toobtainquality test reports from the respectiveQualityAssuranceUnitsbeforesubmittingthefinalbilloftheworks.
97
Inordertoensurepropermonitoringandqualityinworksasperspecifications,actionhasbeentaken to address the concerned seeking creation of a separate module under PMS for Quality AssuranceZonetotheexistingPMSmodulecreatedforCommunicationandBuildingszones.ThisfacilitywillalsoenabletheofficersworkinginQualityAssuranceZonetoreceiveon-line,therequestfromconstructiondivisionsseekingconductingqualitycontroltestonvariouscomponents of the work and to upload the test results immediately.
The circle wise details of Quality Assurance tests conducted and Inspections conducted by QualityAssuranceZoneduring2019-20isasunder:-
Sl No Quality Assurance CircleNumber of Tests
conductedNo of Inspection
conducted1. Bengaluru 34519 1519
2. Mysuru 38013 1621
3. Dharwad 34806 1368
4. Kalburgi 12525 1075
Total 119863 5583
98
Annexure-1Progress of NABARD works (Year Ending 2020)
Scheme
Physical Progress Financial Progress (Rs. in Lakh)
No. of Works Road Length in Km Estimated Cost
ExpenditureUpto 3/2020 CumulativeSanctioned Completed Sanctioned Completed
1 2 3 4 5 6 7
Roads
RIDF II 119 119 1693.00 1693.00 7838.00 7173.00
RIDF III 315 315 2985.00 2985.00 12906.00 12908.00
RIDF IV 257 257 2330.00 2330.00 9571.00 11225.00
RIDF V 315 315 2706.00 2663.00 16735.00 16926.00
RIDF VI 355 355 2863.00 2844.00 21745.00 20652.00
RIDF VII 129 129 1006.00 943.00 8526.00 7561.00
RIDF VIII 45 45 316.00 315.00 2911.00 2719.00
RIDF IX 215 215 1550.00 1527.00 14856.00 14938.00
RIDF X 381 381 2401.00 2343.00 23266.00 22253.00
RIDF XI 439 439 2067.00 1979.00 23624.00 24102.00
RIDF XII 520 520 2165.00 2082.00 28730.00 29968.00
RIDF XIII 539 539 1985.00 1933.00 32611.00 32965.00
RIDF XIV 336 336 1206.00 1180.00 26486.00 24036.00
RIDF XV 257 257 914.00 892.00 19221.00 16889.00
RIDF XVI 265 265 832.00 802.00 18876.00 16962.00
RIDF XVII 333 333 1070.00 975.00 25589.00 27410.00
RIDF XVIII 264 264 730.00 734.00 21275.00 19039.00
RIDF XIX 227 227 530.00 525.00 20864.00 18849.00
RIDF XX 113 113 270.00 270.00 15340.00 14522.00
RIDF XXI 148 147 333.00 318.00 19165.00 17551.00
RIDF XXII 118 116 235.00 216.00 13725.00 11993.00
RIDF XXIII 169 159 323.88 283.81 18731.00 16615.00
RIDF XXIV 196 147 281.00 214.00 19829.00 14110.00
Total 6055 5993 30791.88 30046.81 422420.00 401366.00
100
Progress of NABARD worksBridges
RIDF II 124 123 0 0 5481 5561
RIDF III 58 58 0 0 2739.00 2795.00
RIDF IV 41 41 0 0 1903.00 2153.00
RIDF V 34 34 0 0 1783.00 1821.00
RIDF VI 76 76 0 0 2826.00 2757.00
RIDF VII 46 46 0 0 2230.00 2220.00
RIDF VIII 12 12 0 0 889.00 838.00
RIDF IX 23 23 0 0 1121.00 1125.00
RIDF X 48 48 0 0 2282.00 2348.00
RIDF XI 42 42 0 0 1901.00 1918.00
RIDF XII 41 41 0 0 1928.00 2217.00
RIDF XIII 2 2 0 0 97.00 89.00
RIDF XIV 16 16 0 0 880.00 740.00
RIDF XV 27 27 0 0 1400.00 1270.00
RIDF XVI 180 180 0 0 13386.00 13029.00
RIDF XVII 28 28 0 0 2464.00 2407.00
RIDF XVIII 89 89 0 0 10645.00 10799.00
RIDF XIX 92 92 0 0 6987.00 6551.00
RIDF XX 146 146 0 0 15453.00 14471.00
RIDF XXI 69 69 0 0 6758.00 6140.00
RIDF XXII 58 51 0 0 5766.00 4943.00
RIDF XXIII 65 48 0 0 5563.00 4048.00
RIDF XXIV 64 20 0 0 5566.00 2598.00
Total 1381 1312 0 0 100048.00 92838.00Grand total 7436 7305 30791.88 30046.81 522468.00 494204.00
101
Annexure – IIMAJOR GOVERNMENT BUILDINGS MAINTAINED BY PWP&IWTD.
CHIEF ENGINEER, C & B (NORTH)
Name of the Division Name of the Building
Dharwad CourtComplex,Hubli
GadagCourtComplex,Gadag
JMFCCourt,Ron
HaveriDistrict Court, Haveri
Court Building, Haveri
Sirsi CourtCompelx,Sirsi
ShimogaCourt Building, Shikaripura.
CourtcomplexatSoraba
Shimoga SpecialCourtcomplex,Shimoga.
CourtComplex,Bhadravathi.
ChitradurgaDistrict court at Chitradurga
J.M.F.C.CourtatHiriyur
DavangereCourtcomplexatDavangere
J.M.F.C.atHarappanahalli
BelgaumSuvarna Soudha, Belgaum
NewCourtComplex,Belgaum
ChikkodiCourtcompelx,Athani
CourtComplex,Athani
Vijaypur NewCourtComplex,Vijaypur
BagalkotMunsiff&JMFCCourtatJamkhandi
Courtcomplex,Mudhol
102
Annexure – IIIMAJOR GOVERNMENT BUILDINGS MAINTAINED BY PWP&IWTD
CHIEF ENGINEER, C & B (NORTH EAST)
Name of the Division Name of the Building
Bellary JMFCCount&CentralJail,Bellary
Hadagali Staff Quartes, Hagribomanahalli
Raichur courtComplex,Raichur
Koppal
Courtcomplex,Koppal
Courtcomplex,Gangavathi
Courtcomplex,Kushtagi
Courtcomplex,Yelburga.
PWDDivision,SubDivision&CircuitHouse, Inspection Bungalow
Kalburgi CourtCompelx,Kalburgi
Yadgir JMFCCount,sHAPUR
Bidar CivilCourtComplex,Bidar
103
Annexure – IVMAJOR GOVERNMENT BUILDINGS MAINTAINED BY PWP&IWTD
CHIEF ENGINEER, C & B (SOUTH)
Name of the Division Name of the Building
No.1, Buildings Division, Banglaore
Rajbhavan, Bangalore
VidhanaSoudha
VikasaSoudha,Bangalore
M.SBuildingcomplex
VisveswaraiahTower
L.Hcomplex
KPSCOldandNewBuildings
Karnataka Bhavan I, II, III New Delhi
No.2, Buildings Division, Bangalore
CityCivilComplex,Dr.AmbedkarVeedhi,Bangalore
Ravindra Kalakshetra
Mayo Hall, M.G.Road, Bangalore
JayanagaraGeneralHospital,Bangalore
Minto Hospital and Bangalore Medical College, Bangalore
High Court Building, Bangalore
K.G.I.D., Bangalore
E.S.I.Hospital,Rajajinagar,Bangalore
E.S.I.Hospital,Indiranagar,Bangalore
Ramanagara JMFCCourtBuilding,Ramanagara
Kolar Magistrate court at Kolar
ChickballapurCourtComplexBuilding,Chickballapur.
JMFCCourtcomplex,Gauribidnur.
104
Name of the Division Name of the Building
Tumkur
District Court at Tumkur
JMFCatSiraTaluk,TumkurDist.
JMFCatKunigal
Mysore Chamundi guest house, Mysore
HunsurCourt Building, HD Kote
JMFCCourt,KRnagara
MandyaDistrictCourtcomplex,Mandya.
Court Building, K.R pet.
ChamarajanagarDistrict Court Building, Chamarajnagar
PWDguesthouse(10rooms)atM.Mhills
HassanOfficeoftheSuperintendingEngineer,PWD,Hassan
JMFCcourt,Holenarsipura
Chikmagalur DistrictCourt,AnnexeBuilding,Chikmagalur.
MangaloreDistrictcourtcomplexannexe,Mangalore
DistrictNewCourtComplexatPuttur
UdupiDistrictcourtcomplexatUdupi
ConstructionofCourtComplexatKundapur
KodaguCourt Building, Madkeri
Sudarshan Guest House
105
Annexure - VLIST OF ARCHITECTURAL DRAWINGS OF BUILDINGS COSTING
MORE THAN ONE CRORE
106
Sl. No. Name of the project Plinth Area
(Sq.Mt)Approximate cost
( Rs. in Lakh) 1 2 3 4
1 ProposedGovernmentEngineeringCollegeatArasikere, Hassan District 29025 5224.50
2ProposedGovernmentEngineeringCollegeatMosalehosahalli, Holenarasipura Taluk, Hassan District
28915 5204.70
3 ProposedGroup'A'officersquarters(2ndPhase)atVasanthnagar,Bengaluru 21230 3821.40
4 ProposedDistrictOfficeComplexatDharwad 13070 2352.605 ProposedOfficeComplexatRamanagara 11890 2140.20
6 ProposedHon'bleChiefMinister'sHomeOffice"Krishna" at Kumara Krupa Road, Bengaluru 11020 1983.60
7 ProposedCourtComplexatChitradurga 10800 1944.00
8 ProposedCourtComplexatBannur,PutturTaluk,Dakshina Kannada District 10565 1901.70
9 ProposedP.W.DStaffquarters,3rdInfantryLineatMysuru 10480 1886.40
10 ProposedWorkshopforGovernmentEngineeringCollege at Arasikere, Hassan District 10090 1816.20
11ProposedConstructionofGroup'A'OfficersquartersbydemolishingtheexistingqtrsNo-D-134toD-190atJeevanbhimanagarBengaluru
9975 1795.50
12 ProposedDistrictOfficeComplexatVijayapura 9300 1674.00
13 ProposedCourtComplexatKanakapuraTaluk,Ramangara District 8722 1569.96
14Proposed Government Polytechnic in the premises of GovernmentEngineeringCollegeatMosalehosalli,Hassan
8000 1440.00
15 ProposedMiniVidhanaSoudhaatHosadurgaTalukChitradurga District 7910 1423.80
16 Proposed Hostel and Guest House for NCC at Hosahalli, Yelhanka, Bengaluru. 7380 1328.40
17 ProposedGirlsHostelforArasikereEngineeringCollege, Hassan District 6660 1198.80
18 ProposedBoysHostelforArasikereEngineeringCollege, Hassan District 6625 1192.50
19 Proposed New SIRD Hostel at ANSIRD Campus at Mysuru. 6600 1188.00
20 ProposedCourtComplexatDevanahalliTaluk(12courthalls) 6300 1134.00
(LIST UP TO 31.03.2020)
107
Sl. No. Name of the project Plinth Area
(Sq.Mt)Approximate cost
( Rs. in Lakh) 1 2 3 4
21 ProposedBoysHostelforGovernmentEngineeringCollege at Arasikere, Hassan District 6175 1111.50
22 ProposedGirlsHostelforGovernmentEngineeringCollege at Arasikere, Hassan District 6175 1111.50
23 Proposed Dr.B.R.Ambedkar Spoorthi Soudha at Vikasasoudhapremises,Bengaluru 6152 1107.36
24 Proposed750CapacityRangamandiraforKannadaandCultureBengaluru.(TypeDesign) 5500 990.00
25 ProposedMiniVidhanaSoudhaatKGF,KolarDistrict. 5165 929.70
26 Proposed Court Building at Bhalki Taluk, Bidar District 5118 921.24
27 ProposedMiniVidhanaSoudhaatSindagi,VijayapuraDistrict 5075 913.50
28 ProposedOfficeComplexatHolenarsipuratalukHassan District 4860 874.80
29 ProposedCourtComplexatManviTaluk,RaichurDistrict 4831 869.58
30 Proposed Additions to New Court Building at Ramangara 4750 855.00
31 Proposed Court Building at Channarayaptna, Hassan District(6CourtHalls) 4712 848.16
32 ProposedMiniVidhanaSoudhaatAlnavara,Taluk,Dharwad District. 4680 842.40
33 ProposedJudicialStaffQuartersatMalavagoppaVillage,Shivamogga 4587 825.66
34 ProposedAnnexeto'Krishna'Hon'bleChiefMinister'sHomeOfficeatKumaraKrupaRoad,Bengaluru 4442 799.56
35 Proposed Court Building at Channarayaptna, Hassan District 4400 792.00
36 Proposed Womens Polytechnic College at Holenarasipura, Taluk Hassan district 4395 791.10
37 ProposedCourtComplex&BarAssocoationatMudalagi Taluk, Belagavi District. 4390 790.20
38ProposedGovernmentOfficeComplexinthepremisesofOldTahlsildarOfficeatShiiggaonTaluk,HaveriDistrict.
4340 781.20
39 Proposed First Grade College for IDSG at Chikkamagaluru 4110 739.80
40 ProposedCourtBuilding(6courthalls)atChannarayapatna, Hassan District 4050 729.00
41 ProposedTalukPanchayatOfficeatHolenarasipura,Hassan District. 3905 702.90
42 ProposedMiniVidhanaSoudhaatSagar,ShivamoggaDistrict 3900 702.00
108
Sl. No. Name of the project Plinth Area
(Sq.Mt)Approximate cost
( Rs. in Lakh) 1 2 3 443 ProposedAnnexeCourtBuildingatHassan 3870 696.6044 ProposedMiniVidhanaSoudhaatBelagavi 3850 693.00
45ProposedAdditionsandAlterationstoNGOBhavanandStateGovernmentEmployeesHomeatCubbonPark, Bengaluru
3780 680.40
46 ProposedKalyanaMantapasiteno.1&2forBanashankari temple at Bengaluru 3625 652.50
47 Proposed PG Block for IDSG First Grade College at Chikkamagaluru 3525 634.50
48 ProposedCourtBuildingatJewargi,KalaburagiDistrict 3508 631.44
49 ProposedCourtComplexatSullia,DakshinaKannadaDistrict 3508 631.44
50 Proposed Boys Hostel for Polytechnic at Mosalehosalli, Hassan 3465 623.70
51 Proposed First Grade college at Kadur, Chikkamagaluru Distrist 3375 607.50
52 ProposedQuartersforJudicialOfficers(TypeDesign) 3305 594.90
53 Proposed Dasoha Bhavana for Sri Nimishamba Temple at Sri Rangapatna, Mandya District 3150 567.00
54 Proposed First Grade College at Madikeri 3115 560.70
55 Proposed'C'&'D'typequartersinthepremisesofJudicialAcademy,CresentRoad,Bengaluru 3060 550.80
56 Proposed Government Polytechnic at Bankapura, Haveri District 2968 534.24
57 ProposedMiniVidhanaSoudhaatKunigal,TumakuruDistrict 2700 486.00
58 ProposedResidentialquartersforGroup-C(TypeDesign) 2555 459.90
59 Proposed500CapacityRangamandiraforKannadaandCultureBengaluru.(TypeDesign) 2550 459.00
60 ProposedITIBuilding(9Trades)-Typedesign 2510 451.80
61 ProposedQuartersforJudicialOfficersatGadagTaluk. 2505 450.90
62 Proposed Government Girls College at Channapatna, Ramangara District. 2445 440.10
63 ProposedOfficeBuildinginthepremisesofCEOOffice,Bengaluru. 2438 438.84
64 ProposedMiniVidhanaSoudhaatThikotaTaluk,VijayapuraDistrict 2430 437.40
65 Proposed Government Science College at Hassan 2400 432.00
66 ProposedMiniVidhanaSoudhaatBabaleshwaraTaluk,VijayapuraDistrict 2364 425.52
109
Sl. No. Name of the project Plinth Area
(Sq.Mt)Approximate cost
( Rs. in Lakh) 1 2 3 4
67ProposedResidentialStaffQuartersforGroup'C'&'D'Staff at Sametadaka Kadaba,Puttur Taluk, Dakshina Kannada District
2346 422.28
68Proposed Additional Classrooms and workshops for Government Polytechnic College at K.R.Pete Taluk, Mandya District.
2304 414.72
69 ProposedJudicialQuartersatKalburagi 2280 410.40
70 ProposedCommercialcomplexnearChamrajanagarTemple 2235 402.30
71 Proposed Government First Grade College for women at Ramanagara 2160 388.80
72 Proposed Government P.U College for Women at Ramangara. 2142 385.56
73 Proposed Bar Association Building at Chikkamagaluru 2085 375.3074 Proposed Pravasi Mandira at Tumakuru 2080 374.40
75Proposed Government Higher Primary School at Gowda Thathana Gadda,at Srivnivasapura Taluk, Kolar District
2070 372.60
76 Proposed Workshop for Government Polyetechnic at Mosalehosalli, Hassan 2060 370.80
77 ProposedResidentialquartersforGroup-D(TypeDesign) 2032 365.76
78 ProposedWomen'sFirstGradeCollegeatHassan 1990 358.20
79 Design for District Bar Association Building at Raichur 1989 358.02
80 Proposed Post Metric Girls Hostel at Mulabagilu Taluk, Kolar District. 1928 347.04
81 ProposedIBatHanagal,MolakalmuruTqChitradurga District 1925 346.50
82 Proposed Government Home Science College at Hassan 1922 345.96
83 Proposed'C'&'D'staffquartersandPABlockatJaladharshiniGuestHousepremisesMysuru. 1872 336.96
84 Proposed Law Chambers in the premises of Court Building at Gokak, Belagavi District 1850 333.00
85 ProposedJMFCbuildingatHagaribommanahalli,Ballary District 1832 329.76
86 ProposedValmikiBhavanatBagepalli,Chikkaballapura District. 1825 328.50
87 Proposed500CapacityRangamadira(TypeDesign) 1815 326.70
88 ProposedAdditionstotheexistingFirstGradeCollegeat Tarikere, Chikkamagaluru District 1810 325.80
110
Sl. No. Name of the project Plinth Area
(Sq.Mt)Approximate cost
( Rs. in Lakh) 1 2 3 4
89 Proposed Government Boys College at Channapatna, Ramangara District. 1800 324.00
90 Proposed PWD , IWTD , Sub Division at Raichur 1795 323.1091 ProposedITIBuilding(5Trades)-Typedesign 1750 315.00
92 ProposedResidentialQuartersforGroup'A'Officersat Hassan 1735 312.30
93 Proposed Library and Auditorium for First Grade College at Sringeri Taluk,Chikkamgalur District. 1720 309.60
94ProposedResidentialQuartersforGroupB,C&DStaff in the premises of IB at Puttur Taluk, Dakshina Kannada District.
1648 296.64
95 ProposedValmikiBhavanatGulaganjiKoppa,Dharawad 1630 293.40
96 ProposedCourtcomplexatGajendragadTaluk,Belagavi District 1616 290.88
97 Proposed Dormitory block for Girls at Government Women'sPolytechnicRamangara 1614 290.52
98Proposed Additional Classrooms and Labs for Government Polytechnic College at Turuvekere, Tumakruru District
1611 289.98
99 Proposed Lawyers Chambers in the premises of Court complexatBailhongalTaluk,BelagaviDistrict 1575 283.50
100Proposed improvements to Sri Mallikarjuna Swami temple at Mudukuthore, T.Narasipura taluk, Mysuru District.
1450 261.00
101ProposedCourtComplexinexistingKHBShoppingcumOfficeComplexatYelhankaNew-town,Bengaluru
1446 260.28
102 Proposed Circuit House at Sandur, Ballari District 1425 256.50
103 ProposedSecondFlooroverexistingoldDistrictCourtComplexatTumakuru. 1400 252.00
104 Proposed Post Metric Girls Hostel at Malur, Kolar District. 1389 250.02
105ProposedSub-DivisionOfficeandGroup-'B'.StaffQuarters for Water Supply and Sewage Board, Koppal, Raichur.
1246 224.28
106 Proposed Bar Association Building in the court premises at Arkalgud Taluk, Hassan District 1238 222.84
107 ProposedStaffQuartersforGroup'C'&'D'-Type Design 1190 214.20
108 ProposedValmikiBhavanatVijayapura 1182 212.76
109 Proposed Samudaya Bhavana at Nandini Layout Bengaluru 1180 212.40
Sl. No. Name of the project Plinth Area
(Sq.Mt)Approximate cost
( Rs. in Lakh) 1 2 3 4110 Proposed ITI College at Adur ,Haveri Taluk /District 1175 211.50
111 ProposedVVIPGuestHouseatMuguru,T.NarasipuraTaluk, Mysuru District. 1175 211.50
112 Proposed Samudaya Bhavana at Nandini Layout, Bengaluru 1150 207.00
113 ProposedAdditionstoexistingTherigeBhavanaat Bengaluru 1140 205.20
114ProposedResidentialStaffQuartersforGroup'A'&'B'StaffatHosamataKadaba,PutturTaluk,DakshinaKannada District
1126 202.68
115 Proposed Dr. B.R. Ambedkar Bhavan at Davangere 1120 201.60116 ProposedVVIP,GuestHouseatChitradurga 1116 200.88117 ProposedITIBuilding(2Trades)-Typedesign 1070 192.60118 ProposedI.T.I.Building(2Trades)atBilikere,Mysuru 1070 192.60
119 ProposedITIBuildingatMotebennur(2trades)Byadagi taluk, Haveri District. 1070 192.60
120 ProposedOfficeoftheJointDirector,DivisionOffice,City and Town Planning at Bengaluru 1061 190.98
121 Proposed Guest House at Chikkamagaluru 1060 190.80
122 Proposed Bar Association Building at Arakalagudu Taluk, Hassan District. 1055 189.90
123 Proposed Auditorium for Government First Grade College at Devanahalli, Bengaluru North District. 1042 187.56
124 Proposed Inspection Bungalow at Srirangapatna, Mandya District. 1025 184.50
125 Proposed Bar Association and Law Chambers Building at Khanapura Taluk, Belagavi District 966 173.88
126 Proposed Bar Association building in the court premises at Nanjanagudu, Mysuru District 948 170.64
127 Proposed Pravasi Mandira at Devarayanadurga, Tumakuru 914 164.52
128 Proposed Bar Association Building at Koratagere, Tumakuru District 910 163.80
129 ProposedBarAssociationBuilding(TypeDesign) 910 163.80
130 Proposed Bar Association Building at Mudabidre, Dakshina Kannada District. 910 163.80
131 Proposed Bar Association at Koppa, Chikkamgalur District. 900 162.00
132 ProposedIBatChikkaballapura(Revisedsecondfloor) 870 156.60
133 Proposed Inspection Bungalow at Channapatna, Ramanagara District. 870 156.60
111
Sl. No. Name of the project Plinth Area
(Sq.Mt)Approximate cost
( Rs. in Lakh) 1 2 3 4
134 Proposed Bar Assocation at Honnali Taluk, Davanagere District 850 153.00
135 Proposed Circuit House at Yaragere Grama, Raichur District 850 153.00
136 Proposed Circuit House at Mudhol, Bagalkot District. 850 153.00
137 Proposed Bar Association in the court premises of Kollegala town, Chamarajanagar District 842 151.56
138 Proposed Additional classrooms for PU College at Kakkaragola, Davanagere District 834 150.12
139 ProposedV.I.PGuestHouseatKarwar,Uttara Kannada district 830 149.40
140 ProposedVIPGuestHouseatSakaleshpura,Hassan District. 822 147.96
141 Proposed Bar Association at Manvi, Raichur District 820 147.60
142 Proposed Bar Association at Gajendragad Taluk, Belagavi District 820 147.60
143 Proposed Library and Additionals Classrooms for Government Polytechnic College at Chitradurga 816 146.88
144 Proposed Additional Classrooms to Government Degree College at Channapatna, Ramanagara District. 810 145.80
145 Proposed Bar Association in the premises of Court ComplexatDevadurgaTaluk,RaichurDistrict 805 144.90
146 ProposedExciseofficeatRanebenurTaluk,Haveri District 796 143.28
147 ProposedLocalAuditCircleOfficeatKolar 795 143.10
148Proposed'B'TypeQuartersforGovernmentWomen'sResidential First Grade College at Haradanahalli, Holenarasipura Taluk, Hassan District.
791 142.38
149 ProposedDistrictStatisticsOfficeatMandya 784 141.12
150 ProposedGuestHouseforEngineeringCollegeat Arasikere, Hassan District 750 135.00
151 Proposed IB at Kadaba, Puttur Taluk, Dakshina Kannada District. 744 133.92
152 Proposed Administrative Block for Minor Irrigation at Mysuru 744 133.92
153 ProposedElectionMaterialStorageWarehouseatVijayapura 735 132.30
154 Proposed Pravasi Mandira at Kollur, Udupi District 730 131.40
155ProposedAdditional6Classroomsand2Toiletsfor B.P. Pre-University College at Therakanambi, Gundlupettaluk(UnderRIDF-24)
720 129.60
156 ProposedLokayuktaOfficeatRamangara 685 123.30
112
Sl. No. Name of the project Plinth Area
(Sq.Mt)Approximate cost
( Rs. in Lakh) 1 2 3 4
157 Proposed Bar Association in the premises of Court building at Hosadurga, Chitradurga District 685 123.30
158 Proposed Law Chambers in the premises of Court BuildingatMuddebihal,Vijayapura 674 121.32
159 Proposed Prayer Hall at Bilagi taluk, Bagalkot District 665 119.70
160 ProposedOfficeBuildingforJointDirectorofAgriculture(DistrictLevel)-TypeDesign 640 115.20
161Proposed New Class rooms and Laboratories for Government Womens First Grade College at Tarikere Taluk, Chikkamgaluru District
630 113.40
162 ProposedSub-RegistrarOfficeatPeriyapatnaTaluk,Mysuru District 615 110.70
163 ProposedJudicialQuartersatAdhyapakNagar,Hubbali, Dharwad District 612 110.16
164 ProposedJudicialOfficersQuartersatBhadravathiTaluk, Shivamogga District. 612 110.16
165 DesignforSenior/Junior/Fasttrack/CivilJudgequarters(Northfacing)TypeDesign 612 110.16
166 ProposedJudicialofficersQuartersatNavalgundTaluk, Dharwad District. 612 110.16
167 Proposed Court Building at Shikaripura Taluk, Shivamogga District 612 110.16
168 Proposed Bar Association at Shiggoan Taluk,Haveri district. 600 108.00
169 ProposedJudicialQuartersatSurapura 570 102.60
170 ProposedAdditionalsLabsforexistingGovernmentPolytechnic College at Turuvekere, Tumakruru District 570 102.60
171 ProposedJudicialQuartersatSullia,DakshinaKannada District 570 102.60
172 ProposedExciseOfficeatByadagiTaluk,Haveri District 560 100.80
113
Appendix - 1District wise details of Road length in Karnataka
(As on 31-03-2020) (in Km)
Sl.No Name of the DistrictNational
HighwaysState
Highways
Major District Roads
Total
1 2 3 4 5 61 Bangalore Urban 85.10 158.90 692.64 936.642 Bangalore Rural 242.10 209.65 670.90 1122.653 Ramanagara 123.79 387.65 1434.52 1945.964 Kolar 177.41 305.52 1222.47 1705.405 Chikkaballapur 187.40 263.00 998.18 1448.586 Tumkur 421.37 683.38 3789.75 4894.507 Mysore 354.61 548.61 2551.81 3455.038 Mandya 214.09 427.66 2729.40 3371.159 Chamarajanagar 199.75 314.26 977.25 1491.2610 Hassan 337.65 909.81 3131.35 4378.8111 Chikkamagalur 283.18 535.71 1632.82 2451.7112 Dakshina Kannada 305.36 453.34 775.37 1534.0713 Udupi 252.49 260.31 791.88 1304.6814 Kodagu 95.61 476.31 855.50 1427.42 South Zone Total 3279.91 5934.11 22253.84 31467.8615 Dharwad 196.20 484.41 1404.23 2084.8416 Haveri 132.22 550.01 1848.27 2530.5017 Gadag 110.55 683.42 1179.34 1973.3118 Uttara Kannada 425.50 1173.91 2029.46 3628.8719 Shimogga 430.84 838.21 2003.74 3272.7920 Chitradurga 392.83 437.15 2088.81 2918.7921 Davanagere 111.46 513.74 1285.55 1910.7522 Belgavi 322.85 2351.79 3045.97 5720.6123 Vijayapur 340.13 708.50 2397.39 3446.0224 Bagalkote 203.39 814.36 1586.20 2603.95 North Zone Total 2665.97 8555.50 18868.96 30090.4325 Bellary 268.30 1148.47 2115.84 3532.6126 Raichur 166.12 850.52 1506.45 2523.0927 Koppal 260.07 667.00 1442.93 2370.0028 Kalburgi 320.42 1385.05 1234.30 2939.7729 Yadgir 166.80 423.97 1217.52 1808.2930 Bidar 330.78 505.26 880.08 1716.12 North East Zone Total 1512.49 4980.27 8397.12 14889.88 NH Yet to be allocated 130.30 0.00 0.00 130.30 State Total 7588.67 19469.88 49519.92 76578.47
115
Appendix – 2State Highways, District wise: Surface Feature and Carriageway Width
(As on 31-03-2020) (in Km)
116
Sl. No.
Name of the District
Total Length
Type of SurfaceCarriageway Width wise
road length
C.C. B.T. W.B.M.Un-
SurfacedS.L I.L D.L F.L
1 2 3 4 5 6 7 8 9 10 111 Bangalore Urban 158.90 0.50 158.40 0.00 0.00 3.50 14.10 90.61 50.692 Bangalore Rural 209.65 0.62 209.03 0.00 0.00 0.00 38.08 143.17 28.403 Ramanagara 387.65 0.00 387.65 0.00 0.00 29.10 193.72 161.43 3.404 Kolar 305.52 1.00 303.52 1.00 0.00 6.00 146.03 130.06 23.435 Chikkaballapur 263.00 0.00 263.00 0.00 0.00 41.06 64.54 148.80 8.606 Tumkur 683.38 8.76 674.62 0.00 0.00 89.52 229.35 363.01 1.507 Mysore 548.61 1.43 545.98 1.20 0.00 97.97 123.77 305.30 21.578 Mandya 427.66 1.15 425.39 1.12 0.00 2.02 212.41 207.77 5.469 Chamarajanagar 314.26 0.34 313.92 0.00 0.00 70.23 192.66 49.72 1.6510 Hassan 909.81 38.46 871.35 0.00 0.00 42.41 512.46 335.19 19.7511 Chikkamagalur 535.71 6.85 528.86 0.00 0.00 29.00 327.11 172.00 7.6012 Dakshina Kannada 453.34 2.80 450.54 0.00 0.00 7.80 277.34 164.40 3.8013 Udupi 260.31 3.32 256.99 0.00 0.00 0.00 182.18 69.37 8.7614 Kodagu 476.31 5.17 471.14 0.00 0.00 47.35 348.78 78.68 1.50 South Zone Total 5934.11 70.40 5860.39 3.32 0.00 465.96 2862.53 2419.51 186.1115 Dharwad 484.41 5.51 463.48 0.00 15.42 87.05 278.63 117.43 1.3016 Haveri 550.01 2.51 547.50 0.00 0.00 26.11 335.73 151.37 36.8017 Gadag 683.42 4.76 676.16 0.00 2.50 148.14 403.32 118.54 13.4218 Uttara Kannada 1173.91 6.80 1147.71 15.20 4.20 414.99 718.10 40.82 0.0019 Shimogga 838.21 12.51 823.50 2.20 0.00 87.04 538.88 184.81 27.4820 Chitradurga 437.15 0.93 436.22 0.00 0.00 4.45 274.66 155.89 2.1521 Davanagere 513.74 34.64 479.10 0.00 0.00 7.70 187.80 279.02 39.2222 Belgavi 2351.79 7.94 2343.05 0.80 0.00 501.30 1158.09 658.81 33.5923 Vijayapur 708.50 2.58 705.92 0.00 0.00 53.31 374.76 268.45 11.9824 Bagalkote 814.36 3.75 810.61 0.00 0.00 143.64 288.44 368.75 13.53 North Zone Total 8555.50 81.93 8433.25 18.20 22.12 1473.73 4558.41 2343.89 179.4725 Bellary 1148.47 70.90 1077.57 0.00 0.00 195.81 700.69 211.49 40.4826 Raichur 850.52 0.00 850.52 0.00 0.00 158.65 401.42 283.61 6.8427 Koppal 667.00 2.10 664.90 0.00 0.00 83.69 434.54 145.74 3.0328 Kalburgi 1385.05 9.30 1375.75 0.00 0.00 514.62 579.13 283.59 7.7129 Yadgir 423.97 0.00 423.97 0.00 0.00 16.64 307.59 99.74 0.0030 Bidar 505.26 0.00 505.26 0.00 0.00 132.60 238.97 84.07 49.62
North East Zone Total
4980.27 82.30 4897.97 0.00 0.00 1102.01 2662.34 1108.24 107.68
State Total 19469.88 234.63 19191.61 21.52 22.12 3041.70 10083.28 5871.64 473.26
Appendix – 3Major District Roads, District wise: Surface Feature and Carriageway Width
(As on 31-03-2020) (in Km)
117
Sl. No.
Name of the District
Total Length
Type of SurfaceCarriageway Width wise
road length
C.C. B.T. W.B.M.Un-
SurfacedS.L I.L D.L F.L
1 2 3 4 5 6 7 8 9 10 111 Bangalore Urban 692.64 10.67 681.97 0.00 0.00 196.88 283.17 195.98 16.612 Bangalore Rural 670.90 2.31 668.59 0.00 0.00 295.95 341.65 24.00 9.303 Ramanagara 1434.52 18.06 1370.01 18.10 28.35 877.62 501.70 38.40 16.804 Kolar 1222.47 7.98 1203.79 0.00 10.70 751.33 419.78 30.54 20.825 Chikkaballapur 998.18 3.50 975.85 0.00 18.83 504.17 432.37 47.86 13.786 Tumkur 3789.75 67.29 3560.97 104.74 56.75 2759.59 903.41 115.87 10.887 Mysore 2551.81 11.10 2431.55 109.16 0.00 1831.63 594.76 106.52 18.908 Mandya 2729.40 7.44 2605.08 116.88 0.00 1774.46 879.04 67.55 8.359 Chamarajanagar 977.25 0.00 904.95 72.30 0.00 636.44 340.81 0.00 0.0010 Hassan 3131.35 154.63 2851.49 40.59 84.64 2569.10 495.51 60.96 5.7811 Chikkamagalur 1632.82 19.40 1559.32 54.10 0.00 1318.52 297.59 14.91 1.8012 Dakshina Kannada 775.37 23.90 751.47 0.00 0.00 217.12 529.17 21.13 7.9513 Udupi 791.88 41.17 750.71 0.00 0.00 272.41 472.12 40.25 7.1014 Kodagu 855.50 7.43 812.67 0.00 35.40 599.60 255.40 0.50 0.00 South Zone Total 22253.84 374.88 21128.42 515.87 234.67 14604.82 6746.48 764.47 138.0715 Dharwad 1404.23 45.08 1193.59 42.09 123.47 1140.32 242.86 13.35 7.7016 Haveri 1848.27 37.67 1786.49 20.39 3.72 1351.74 457.89 34.73 3.9117 Gadag 1179.34 22.36 1129.76 2.00 25.22 972.41 188.22 14.09 4.6218 Uttara Kannada 2029.46 43.39 1798.83 21.60 165.64 1876.49 150.97 1.25 0.7519 Shimogga 2003.74 13.02 1975.62 10.29 4.81 1628.53 361.01 3.90 10.3020 Chitradurga 2088.81 16.74 2022.28 10.20 39.59 1555.19 481.16 52.46 0.0021 Davanagere 1285.55 71.98 1180.67 21.30 11.60 922.49 337.64 19.22 6.2022 Belgavi 3045.97 4.62 3035.70 5.40 0.25 2184.04 760.85 84.40 16.6823 Vijayapur 2397.39 8.76 2304.93 75.20 8.50 1745.35 594.99 57.05 0.0024 Bagalkote 1586.20 15.75 1535.49 2.81 32.15 997.05 530.31 58.74 0.10 North Zone Total 18868.96 279.37 17963.36 211.28 414.95 14373.61 4105.90 339.19 50.2625 Bellary 2115.84 82.50 1980.09 51.40 1.85 1399.44 626.76 77.81 11.8326 Raichur 1506.45 6.69 1491.76 8.00 0.00 1175.84 315.19 12.83 2.6027 Koppal 1442.93 9.95 1405.38 27.60 0.00 957.96 467.18 16.04 1.7528 Kalburgi 1234.30 24.58 1188.52 21.20 0.00 1045.38 163.52 21.40 4.0029 Yadgir 1217.52 6.19 1193.33 18.00 0.00 1078.08 133.44 6.00 0.0030 Bidar 880.08 16.99 856.19 6.90 0.00 490.61 374.70 8.97 5.80
North East Zone Total
8397.12 146.90 8115.27 133.10 1.85 6147.31 2080.79 143.05 25.98
State Total 49519.92 801.15 47207.05 860.25 651.47 35125.74 12933.17 1246.71 214.31
App
endi
x - 4
Len
gth
& la
ne w
idth
of N
atio
nal H
ighw
ays i
n K
arna
taka
as o
n 31
-03-
2020
118
Sl
No
NH
No
(Old
)
NH
N
o (N
ew)
Nom
encl
atur
eTo
tal
Len
gth
(in K
m)
Sing
le
Lan
e
Inte
r m
edia
te
Lan
e
Two
Lan
eFo
ur
Lan
eSi
x L
ane
14
48
The h
ighw
ay st
artin
g fro
m it
s jun
ctio
n with
Rao
Tul
a Ram
MarginDelhi(km.14.300ofoldNHNo.8)connecting
Baw
alintheStateofH
aryana,Kotputli,nearJaipur,
KIs
hang
arh,
Bhi
lwar
a, C
hitta
urga
rh, U
daip
ur in
the S
tate
ofRajasthan,A
hmedabad,Vadodara,Ankleshwarinthe
Stat
e of G
ujar
at, M
umba
i, Th
ane,
Pun
e, S
atar
a, K
olha
pur
in t
he S
tate
of
Mah
aras
htra
, B
elga
um,
Chi
tradu
rga,
BangaluruintheStateofKarnataka,K
rishnagiri,Vellor
andterminatingatitsjunctionwithNH-16nearChennai
in th
e St
ate
of T
amiln
adu.
589.000
0.00
0.00
29.48
357.00
202.52
24A
748
Thehighwaystartingfrom
itsjunctionwithNH-48near
Bel
gaum
, Anm
od in
the
Stat
e of
Kar
nata
ka, P
anda
and
terminatingatitsjunctionwithNH-66nearPanajiinthe
Stat
e of
Goa
.
84.120
0.00
0.00
84.12
0.00
0.00
37
44Th
e H
ighw
ay s
tarti
ng f
rom
Dev
anah
alli
conn
ectin
g B
anga
luru
in th
e St
ate
of K
arna
taka
, Hos
ur, K
rishn
agiri
, D
hram
apur
i,143.000
0.00
0.00
0.00
143.00
0.00
119
Sl
No
NH
No
(Old
)
NH
N
o (N
ew)
Nom
encl
atur
eTo
tal
Len
gth
(in K
m)
Sing
le
Lan
e
Inte
r m
edia
te
Lan
e
Two
Lan
eFo
ur
Lan
eSi
x L
ane
49
65
Thehighwaystartingfrom
itsjunctionwithNH-48near
Pune
con
nect
ing
Inda
pur,
Sola
pur,
Um
arga
in th
e St
ate
of M
ahar
asht
ra H
omna
bad
in t
he S
tate
of
Kar
nata
ka
Hyderabad{(excludingfromM
iyapur[km
524/00]to
Assem
bly[km543/00]onPune-HyderabadS
ection
andfrom
Assem
bly0/00to
LBNagar[Km14/00]on
Hyderabad-Vijayw
adaS
ection)},Vijayawada,Vuyyuru,
PamarruandterminatingatitsjunctionwithNH-216at
Mac
hllip
atna
m in
the
Stat
e of
And
hra
Prad
esh.
74.200
0.00
0.00
0.00
74.20
0.00
563,218
&13
52
Thehighwaystartingfrom
itsjunctionwithNH-7near
Sang
rur
in t
he S
tate
of
Punj
ab c
onne
ctin
g N
arw
ana,
HisarintheStateofHaryana,F
atehpur,Jaipur,T
onk,
Kot
a, A
kler
a in
the
Stat
e of
Raj
asth
an, R
ajga
rh, B
iora
, D
ewas
, Ind
ore,
Sen
dhw
a in
the S
tate
of M
adhy
a Pra
desh
, Dhule,A
urangabad,Beed,Osm
anabad,S
olapurin
the
Stat
e of
Mah
aras
htra
, B
ijapu
r, H
ubli
and
term
inat
ing
atitsjunctionwithNH-66nearAnkolaintheStateof
Kar
nata
ka.
402.070
0.00
0.00
320.724
81.346
0.00
617
66Th
e H
ighw
ay S
tarti
ng fr
om P
anaj
i-Mar
gaoi
n th
e st
ate
of
Goa
, Kar
war
a-H
onna
var-U
dupi
-Man
galo
re in
the
stat
e of
KA
to K
asar
agod
in K
L.300.100
0.00
0.00
300.10
0.00
0.00
Sl
No
NH
No
(Old
)
NH
N
o (N
ew)
Nom
encl
atur
eTo
tal
Len
gth
(in K
m)
Sing
le
Lan
e
Inte
r m
edia
te
Lan
e
Two
Lan
eFo
ur
Lan
eSi
x L
ane
748
75
ThehighwaystartingfromitsjunctionwithN
H-73
near
Ban
tval
, Has
san,
Ban
galu
ru, K
olar
in th
e St
ate
of
KarnatakaVenkatagirikotaintheStateofAndhraP
radesh
Pern
ampe
t, G
udiy
atta
m, K
atpa
di a
nd te
rmin
atin
g at
its
junctionwithNH-48nearVelloreintheStateofTam
ilna
du.
397.424
0.000
0.000
49.300
348.124
0.000
850
50
The h
ighw
ay st
artin
g fr
om it
s jun
ctio
n w
ith n
ew N
H N
o.
161atNandedinth
eStateofM
aharashtraconnecting
Udgir,B
idar,Hom
nabad,G
ulbarga,Jevargi,Bijapur,
HospetandterminatingatitsjunctionwithNH-48near
Laks
hmis
agar
a in
the
Stat
e of
Kar
nata
ka.
650.400
0.000
0.800
308.000
341.600
0.000
963
67ThehighwaystartingfromR
amnagaraonNH-748
conn
ectin
g D
harw
ad H
UB
LI a
nd g
adag
, kop
pal,
hosp
et,
bella
ry te
rmin
atin
g at
goo
ty.
394.878
0.00
16.93
70.65
307.30
0.00
1067
181
The
high
way
st
artin
g fr
om
its
junc
tion
with
N
H-
81nearCoimbatoreconnecting
Mettuppalaiyam,
Udagamandalam(Ooty),G
udalurintheStateofTam
ilNaduandterminatingatitsjunctionwithNH-766near
Gun
dulp
et in
the
Stat
e of
Kar
nata
ka.
26.100
0.00
11.84
14.26
0.00
0.00
11150
150
The
highwaystarting
from
Gulberga
onNH-50
Con
nect
ing
Wad
i-Yad
gir-
in th
e st
ate
of K
arna
taka
and
terminatingonN
H-167-inthestateofAP.
118.470
0.00
0.80
109.20
8.47
0.00
120
Sl
No
NH
No
(Old
)
NH
N
o (N
ew)
Nom
encl
atur
eTo
tal
Len
gth
(in K
m)
Sing
le
Lan
e
Inte
r m
edia
te
Lan
e
Two
Lan
eFo
ur
Lan
eSi
x L
ane
12150A
150A
ThehighwaystartingfromitsjunctionwithNH-50at
JevargiconnectingSiriguppa,B
ellary,H
iriyur,Huliyur,
Chi
kkan
ayak
anah
alli,
N
agam
anga
la
Srira
ngap
atna
-M
ysor
e-N
anja
ngud
and
term
inat
ing
at it
s ju
nctio
n w
ith
NH-948atC
hamarajanagarintheStateofKarnataka.
684.770
0.000
150.000
501.210
31.180
2.380
13150E
150E
The
highwayStarting
from
junction
NH-50
near
gulb
arga
con
nect
ing
chow
dapu
r, A
fzal
pur i
n th
e st
ate
of
KA
, du
dhan
i akk
alko
te a
nd te
rmin
atin
g at
its
junc
tion
withNH-52
72.920
0.000
0.000
63.920
9.000
0.000
14167
167
Thehighwaystarting
from
Haggari
onNH-67
in
Kar
nata
ka c
onne
ctin
g A
lur,
adon
i, M
antra
laya
m in
the
stat
e of
And
ra P
rade
sh c
onne
ctin
g R
aich
ur in
Kar
nata
ka
connectingMahbubnagarandterminatingonNH-44in
the
stat
e of
AP
71.400
0.000
0.000
59.280
12.120
0.000
15169A
169A
ThehighwaystartingfromitsjunctionwithN
H-169
near
Thi
rthah
alli
conn
ectin
g A
gum
be,
Heb
bari
and
terminatingatUdupiHarbour(Malpe)intheStateof
Kar
nata
ka
90.000
0.000
50.900
28.400
10.700
0.000
16173
173
ThehighwaystartingfromitsjunctionwithN
H-73
near
M
udig
ere
conn
ectin
g C
hikk
amag
alur
u,
Kad
ur,
Tam
atad
ahal
li, H
osad
urga
and
term
inat
ing
at it
s jun
ctio
n withnew
NHN
o.369nearHolalkereintheStateof
Kar
nata
ka.
153.000
0.000
87.800
62.100
3.100
0.000
121
Sl
No
NH
No
(Old
)
NH
N
o (N
ew)
Nom
encl
atur
eTo
tal
Len
gth
(in K
m)
Sing
le
Lan
e
Inte
r m
edia
te
Lan
e
Two
Lan
eFo
ur
Lan
eSi
x L
ane
17206&
234
69
The
highwayStarting
from
junction
NH-50
near
gulb
arga
con
nect
ing
chow
dapu
r, A
fzal
pur i
n th
e st
ate
of
KA
, du
dhan
i akk
alko
te a
nd te
rmin
atin
g at
its
junc
tion
withNH-52
562.349
0.000
58.245
467.379
36.725
0.000
18207
648
ThehighwaystartingfromitsjunctionwithN
H-48
near
Nel
aman
gla,
Dod
abal
lapu
r, D
even
halli
on
NH
-44,SarajpurintheStateofK
arnataka,Bagalurand
terminatingatitsjunctionwithNH-48nearHosurinthe
Stat
e of
Tam
il N
adu.
122.380
0.000
0.000
122.380
0.000
0.000
19209
948
The
highwaystarting
from
NH-48
junction
near
Kan
akap
ura-
Mal
aval
li-K
olle
gala
-Cha
mar
ajan
agar
a-TerminatingItsJu
nctionWithNh-544AtC
oimbatore.
198.004
0.000
29.450
145.239
23.315
0.000
20212
766
The
Hig
hway
St
artin
g fr
om
Gun
dlup
ete
Mys
ore
terminatingatitsjunctionwithNH-948nearK
ollegalin
the
stat
e of
KA
150.240
0.000
0.000
121.380
28.860
0.000
21766E
766E
The
high
way
star
ting
from
Kum
ta-H
aver
i-Sirs
i128.890
20.000
75.890
33.000
0.000
0.000
22234&
206
73
Thehighwaystartingfrom
itsjunctionwithNH-66near
Man
galu
ru c
onne
ctin
g B
antv
al, B
elta
ngad
i, M
udig
ere,
B
elur
, Ban
avar
, Ars
iker
e an
d te
rmin
atin
g at
its
junc
tion
withNH-48nearTum
kurintheStateofKarnataka
313.555
0.000
103.750
180.255
29.550
0.000
23275
275
Thehighwaystartingfrom
itsjunctonwithNH-75near
Ban
twal
a con
nect
ing
puttu
r-sul
ya-m
adik
eri-p
iriya
patn
a-m
ysur
u-sr
irang
apat
na-M
andy
a-C
hanp
atna
-ram
anag
ara-
andterminatingatirtsjunctionwithnew
NH-75on
beng
alur
u
348.337
0.000
0.000
188.100
160.237
0.000
122
Sl
No
NH
No
(Old
)
NH
N
o (N
ew)
Nom
encl
atur
eTo
tal
Len
gth
(in K
m)
Sing
le
Lan
e
Inte
r m
edia
te
Lan
e
Two
Lan
eFo
ur
Lan
eSi
x L
ane
24367
367
Thehighwaystartingfrom
itsjunctionwithNH-67near
Bha
napu
r con
nect
ing
Kuk
unur
, Yel
burg
a, G
ajen
drag
ad,
Bad
ami,
Gul
edag
uda,
B
agal
kote
, B
agal
kot
and
terminatingatitsjunctionwithnew
NHN
o.52near
Gad
dank
eri i
n th
e St
ate
of K
arna
taka
.
157.800
37.570
50.340
67.270
2.620
0.000
25766C
766C
ThehighwaystartingfromitsjunctionwithN
H66
nearByndur(Baindur)connectingKollur,Hosanagara,
Ana
ndap
ur,
Ana
ntha
pura
, Sh
ikar
pur,
Mas
ur
and
terminatingatitsjunctionwithNH48nearRanibennur
in th
e St
ate
of K
arna
taka
.
203.430
14.970
130.100
57.360
1.000
0.000
26275K
275K
ThehighwaystartingfromitsjunctionwithN
H-275
nearHinkalvillageconnectingNH-275/N
H-150Anear
Colum
biaA
siaH
ospital,NH-766/N
H-150AnearA
PMC
Ban
dipa
lya
and
term
inat
ing
at i
ts o
rigin
atin
g ju
nctio
n withNH-275nearHinkalV
illagearroundMysorecity
inthestateofKarnataka.(MysoreRingRoad)
41.535
0.000
0.000
0.000
0.000
41.535
27948A
948A
ThehighwaystartingfromjunctionofN
H-648and
NH-48
neardobaspet(manne),
Nijagal,
Kengal,
Gud
emar
anah
alli,
Har
thi,
Mel
ahal
li, H
ulik
ereg
unnu
r, R
ayas
andr
a,B
anav
asi,T
hoka
sand
ra i
n th
e st
ate
of K
A
conn
ectin
g A
cche
ttipa
lli
4.265
0.000
4.265
0.000
0.000
0.000
123
Sl
No
NH
No
(Old
)
NH
N
o (N
ew)
Nom
encl
atur
eTo
tal
Len
gth
(in K
m)
Sing
le
Lan
e
Inte
r m
edia
te
Lan
e
Two
Lan
eFo
ur
Lan
eSi
x L
ane
28548B
548B
TheHighw
aystartingfromitsjunctionwithNH-548C
near
Man
tha
conn
ectin
g D
eogo
an F
ata,
Sel
u, P
atha
ri,
Sonpeth,P
araliVaijnath,A
mbajogai,
Renapurphata,
Latur(NH-361),Ausa,Omarga,Yenegur,M
urum
,Alur,
Akk
alko
t, N
agas
ur in
the s
tate
of M
ahar
asht
ra co
nnec
ting
Bijapur(Vijayapura),Tikota,Athani,Kagwad,Chikhodi,
Sankeshw
arandterminatingatitsjunctionwithNH-48
near
Got
ur in
the
stat
e of
Kar
nata
ka.
271.000
0.000
176.000
95.000
0.000
0.000
29373
373
ThehighwaystartingfromitsjunctionwithN
H-73
near
bel
uru
conn
ectin
g H
assa
n ,
Hol
enar
asip
ura
and
terminatingitsjunctionwithNH-275nearBilikerein
the
stat
e of
Kar
nata
ka
126.730
0.000
0.000
126.730
0.000
0.000
30369E
369E
Thehighwaystartingfrom
itsjunctionwithNH-69near
Saga
r C
onne
ctin
g co
nnec
ting
Huv
inah
alli,
Hol
ebag
lu,K
alasavalli,SighanandoorandterminatingatitsJunction
withNH-766CnearM
arakutukainthestateofKA
67.200
28.500
38.700
0.000
0.000
0.000
31160
160
The
Hig
hway
St
artin
g fr
om T
asgo
n, M
iraj c
onne
ctin
g ChikkodiandterminatingitsjunctionwithNH-48inthe
stat
e of
KA
60.000
0.000
2.000
58.000
0.000
0.000
3213
169
Thehighwaystarting
from
NH-69
nearshivmoga
conn
ectin
g t
hirth
ahal
li ko
ppa
Kar
kal
and
term
inat
ing
itsjunctionwithNH-66nearmangalore.
213.800
16.800
114.500
82.500
0.000
0.000
3313
369
ThehighwaystartingfromitsjunctionwithN
H-69
near
Bha
drav
ati c
onne
ctin
g C
hann
agiri
, Hol
alke
re a
nd
terminatingatitsjunctionwithNH-48nearChitradurga
in th
e St
ate
of K
arna
taka
.
105.300
0.400
8.000
89.850
7.050
0.000
124
Sl
No
NH
No
(Old
)
NH
N
o (N
ew)
Nom
encl
atur
eTo
tal
Len
gth
(in K
m)
Sing
le
Lan
e
Inte
r m
edia
te
Lan
e
Two
Lan
eFo
ur
Lan
eSi
x L
ane
34516A
516A
The
Hig
hway
Sta
rting
from
pan
dhar
pur i
,Man
galw
edha
inM
HandterminatingitsjunctionwithNH-52NEA
R
Bija
pur i
n th
e st
ate
o f K
A12.000
0.000
12.000
0.000
0.000
0.000
35752K
752K
TheHighw
ayStartingfromitsjunctionwithNH-752I
nearJinturinth
estateofM
aharashtraandconnecting
toB
ori,Zari,P
arbhani,Gangakhed,Isad,Kingaon,
Dha
nora
, Wad
val,
Nag
nath
, Gha
rani
, Nal
egoa
n, L
atur
, N
itur,
Nila
nga,
Sirs
hi,
Aur
ad S
haja
ni i
n th
e st
ate
of
MaharashtraandterminatingatitsjunctionwithNH-50
near
Bha
lki i
n th
e st
ate
of K
arna
taka
.
48.200
0.000
0.000
45.150
3.050
0.000
36161A
161A
TheHighw
aystartingfromitsjunctionwithNH-548C
Ako
t, Pa
tsul
, Bho
d, A
kola
, Bar
shi T
akli,
She
lu b
azaa
r, M
angr
ulpi
r, M
anor
a, D
igra
s, A
rni,
Dha
noda
, M
ahur
, Sa
rkha
ni,
Kin
vat,
Isla
pur,
Him
ayat
naga
r, B
hoka
r, Mudkhed,Nanded,Osm
anpur,Kautha,Mukhed,Barhali,
Muk
raba
d, L
akhm
apur
, Sa
war
mal
, N
anga
rga,
Waz
zar
in th
e st
ate
of M
ahar
asht
ra c
onne
ctin
g A
urad
, Tul
japu
r, M
usta
pur,
Mar
khal
, N
awad
geri
and
term
inat
ing
at i
ts
junc
tion
with
Bid
ar R
ing
Roa
d in
the
stat
e of
Kar
nata
ka.
46.700
3.300
43.400
0.000
0.000
0.000
37544D
D544D
D
Thehighwaystartingfrom
itsjunctionwithNHNo.44
near
Ana
natp
ur c
onne
ctin
g, R
ayad
urg
in t
he S
tate
of
And
hra
Prad
esh
and
term
inat
ing
at it
s jun
ctio
n w
ith N
H-
150A
nearM
olkalmuruinthestateofKarnataka.
11.000
0.000
5.900
5.100
0.000
0.000
125
Sl
No
NH
No
(Old
)
NH
N
o (N
ew)
Nom
encl
atur
eTo
tal
Len
gth
(in K
m)
Sing
le
Lan
e
Inte
r m
edia
te
Lan
e
Two
Lan
eFo
ur
Lan
eSi
x L
ane
38544E
544E
The
high
way
st
artin
g fr
om
its
junc
tion
with
N
H
No.44nearKodikondacheckpost
connecting
Lepa
kshi
,Hin
dupu
r,Mad
akas
ira,
Rol
la,,A
GA
LI i
n A
P andterminatingitsjunctionwithNH-48nraeSirainKA
16.600
0.000
14.000
0.000
2.600
0.000
39548H
548H
Thehighwaystartingfrom
itsjunctionwithNH-48near
Sank
eshw
ar in
the s
tate
of K
arna
taka
, Gad
hing
laj,
Aja
ra,
Am
boli,
Mad
khol
, Saw
antw
adi,
Insu
li an
d te
rmin
atin
g atitsjunctionwithNH-66nearBandainthestateof
Mah
arsh
tra.
3.300
0.000
0.000
3.300
0.000
0.000
40748A
A748A
A
ThehighwaystartingfromitsjunctionwithN
H-748
near
Mac
hhe
Con
nect
ing
Pira
nvad
i, N
avag
e, K
inay
e,
Kusam
alli,Jamboti,Kalmani,Kankumbi,inthestateof
KarnatakaPoriem,M
atneeandterminatingatSanquelim
(nearS
hriD
attarayaM
andir)intheStateofGoa.
49.840
0.000
33.530
16.310
0.000
0.000
41367A
367A
Thehighwaystartingfrom
itsjunctionwithNH-67near
KoppalandterminatingatitsjunctionwithNHNo.50
near
Met
gal i
n th
e St
ate
of K
arna
taka
.25.100
0.000
25.100
0.000
0.000
0.000
42166E
166E
TheHighw
aystartingfrom
Khanapur-N
agaj-JAT
inthe
sateofM
HandtermintatingatitsJunctionwithNH-52
near
bija
pur i
n th
e st
ate
of K
A25.000
0.000
0.000
25.000
0.000
0.000
43163B
163B
The
high
way
star
ting
from
BID
AR
-Niz
amap
et20.000
0.000
20.000
0.000
0.000
0.000
44766EE
766EE
Thehighwaystartingfrom
itsjunctionwithNH-66near
Hat
tiker
i and
term
inat
ing
at B
elek
eri P
ort i
n th
e St
ate
of
Kar
nata
ka.
4.265
0.000
4.265
0.000
0.000
0.000
To
tal
7588
.672
121.
540
1268
.505
3930
.045
2022
.147
246.
435
126
App
endi
x - 5
Div
isio
n w
ise
leng
th o
f Nat
iona
l Hig
hway
s in
Kar
nata
ka a
s on
31.0
3.20
20
Sl.
No.
NH
N
o.
New
N
H
No.
Nom
encl
atur
e
Bengalore DivisionTumkur Division
Chitrdurga DivisionHassan Division
Manga lore Division
Hubli DivisionKarwar DivisionBijapur DivisionKalburgi DivisionPPP Cell ShivmogaPPP Cell
CPB
NHAI
KRDCL
Yet to Be allocated
Total Length in Km
12
34
56
78
910
1112
1314
1516
1718
19
14
(MKB)NH-48
The
high
way
st
artin
g fr
om
its
junc
tion
with
Rao
Tul
a R
am M
arg
inD
elhi(km
.14.300ofoldNH
No.8)connectingBaw
alinthe
Stat
e of
Har
yana
, K
otpu
tli,
near
Jaipur,
KIshangarh,Bhilwara,
Chi
ttaur
garh
, U
daip
ur
in
the
Stat
e of
Raj
asth
an,
Ahm
edab
ad,
Vadodara,
Ankleshwarinthe
Stat
e of
Guj
arat
, Mum
bai,
Than
e,
Pune
, Sa
tara
, K
olha
pur
in
the
Stat
e of
Mah
aras
htra
, B
elga
um,
Chi
tradu
rga,
B
anga
luru
in
th
e St
ate
of K
arna
taka
, K
rishn
agiri
, Vellor
and
terminating
atits
junctionwithNH-16nearChennai
in th
e St
ate
of T
amiln
adu.
0.00
0.00
0.00
0.00
0.00
29.48
0.00
0.00
0.00
0.00
0.00
559.52
0.00
0.00
589.00
24A
NH
-748
The
high
way
st
artin
g fr
om
itsjunction
withNH-48
near
Bel
gaum
, Anm
od i
n th
e St
ate
of
Kar
nata
ka, P
anda
and
term
inat
ing
atitsjunctionwithN
H-66near
Pana
ji in
the
Stat
e of
Goa
.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
84.12
0.00
0.00
84.12
127
Sl.
No.
NH
N
o.
New
N
H
No.
Nom
encl
atur
e
Bengalore DivisionTumkur Division
Chitrdurga DivisionHassan Division
Manga lore Division
Hubli DivisionKarwar DivisionBijapur DivisionKalburgi DivisionPPP Cell ShivmogaPPP Cell
CPB
NHAI
KRDCL
Yet to Be allocated
Total Length in Km
37
NH-44
The
Hig
hjw
ay
star
ting
from
D
evan
ahal
li co
nnec
ting B
anga
luru
in
the
Stat
e of
Kar
nata
ka, H
osur
, K
rishn
agiri
, Dhr
amap
uri,
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
143.00
0.00
0.00
143.00
49
NH-65
The
high
way
st
artin
g fr
om
itsjunction
withNH-48
near
Pune
co
nnec
ting
Inda
pur,
Sola
pur,
Um
arga
in
the
Stat
e of
M
ahar
asht
ra
Hom
naba
d in
th
e St
ate
of
Kar
nata
ka
Hyd
erab
ad
{(excluding
from
Miyapur
[km5
24/00]toAssem
bly
[km
543/00]
on
Pune-Hyderabad
Sectionandfrom
Assem
bly0/00
toLB
Nagar[Km14/00]on
Hyderabad-V
ijayw
adaSection)},
Vijayawada,Vuyyuru,Pamarru
and
term
inat
ing
at
its
junc
tion
withNH-216atM
achllipatnamin
the
Stat
e of
And
hra
Prad
esh.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
74.20
0.00
0.00
74.20
513
NH
-169
The
high
way
sta
rting
fro
m N
H-
69nearshivmoga
connecting
thirt
haha
lli
kopp
a K
arka
l an
d te
rmin
atin
g its
junc
tion
with
NH
-66nearm
angalore.
0.00
0.00
59.90
0.00
153.90
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
213.80
128
Sl.
No.
NH
N
o.
New
N
H
No.
Nom
encl
atur
e
Bengalore DivisionTumkur Division
Chitrdurga DivisionHassan Division
Manga lore Division
Hubli DivisionKarwar DivisionBijapur DivisionKalburgi DivisionPPP Cell ShivmogaPPP Cell
CPB
NHAI
KRDCL
Yet to Be allocated
Total Length in Km
613
NH
-369
The
high
way
sta
rting
fro
m
its
junctionw
ithNH-69nearBhadravati
conn
ectin
g Ch
anna
giri,
H
olal
kere
an
d te
rmin
atin
g at
its
junc
tion
with
NH-48nearChitradurgaintheS
tate
of K
arna
taka
.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
105.30
0.00
0.00
0.00
0.00
105.30
717
NH-66
The
Hig
hway
St
artin
g fr
om
Pana
ji-M
arga
oin
the
stat
e of
G
oa,
Kar
war
a-H
onna
var-U
dupi
-M
anga
lore
in
the
stat
e of
KA
to
Kas
arag
od in
KL.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
300.10
0.00
0.00
300.10
848
NH-75
The
high
way
st
artin
g fr
om
its
junctionwithNH-73nearBantval,
Has
san,
Ban
galu
ru,
Kol
ar i
n th
e StateofK
arnatakaVenkatagirikota
in t
he S
tate
of
And
hra
Prad
esh
Pern
ampe
t, G
udiy
atta
m,
Kat
padi
an
d te
rmin
atin
g at
its
ju
nctio
n withN
H-48nearVelloreinthe
Stat
e of
Tam
il na
du.
0.00
0.00
0.00
0.00
26.00
0.00
0.00
0.00
0.00
0.00
0.00
371.42
0.00
0.00
397.42
950
NH-50
The
high
way
st
artin
g fr
om
its j
unct
ion
with
new
NH
No.
161atN
andedintheS
tateof
Mah
aras
htra
co
nnec
ting
Udg
ir,
Bid
ar,
Hom
naba
d,
Gul
barg
a,
Jevargi,
Bijapur,
Hospet
and
term
inat
ing
at i
ts j
unct
ion
with
NH-48nearLakshmisagarainthe
Stat
e of
Kar
nata
ka.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
101.40
0.00
0.00
549.00
0.00
0.00
650.40
129
Sl.
No.
NH
N
o.
New
N
H
No.
Nom
encl
atur
e
Bengalore DivisionTumkur Division
Chitrdurga DivisionHassan Division
Manga lore Division
Hubli DivisionKarwar DivisionBijapur DivisionKalburgi DivisionPPP Cell ShivmogaPPP Cell
CPB
NHAI
KRDCL
Yet to Be allocated
Total Length in Km
1063
NH-67
The
high
way
st
artin
g fr
om
Ram
nagaraonNH-748connect-
ing
Dha
rwad
HU
BLI
and
gad
ag,
kopp
al, h
ospe
t, be
llary
term
inat
ing
at g
ooty
.
87.88
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
307.00
0.00
0.00
394.88
1163,218
&13
NH-52
The
high
way
st
artin
g fr
om
itsjunction
withNH-7near
Sang
rur
in t
he S
tate
of
Punj
ab
conn
ectin
g N
arw
ana,
H
isar
in
th
e St
ate
of H
arya
na,
Fate
hpur
, Jaipur,Tonk,Kota,Aklera
in
the
Stat
e of
Raj
asth
an,
Raj
garh
, B
iora
, D
ewas
, In
dore
, Se
ndhw
a in
the
Sta
te o
f M
adhy
a Pr
ades
h,
Dhu
le,
Aur
anga
bad,
B
eed,
Osm
anabad,S
olapurintheState
of
Mah
aras
htra
, B
ijapu
r, H
ubli
and
term
inat
ing
at
its
junc
tion
withN
H-66nearA
nkolainthe
Stat
e of
Kar
nata
ka.
0.00
0.00
0.00
0.00
0.00
171.00106.00
51.60
0.00
0.00
0.00
73.47
0.00
0.00
402.07
1267
NH
-181
The
high
way
st
artin
g fr
om
its
junctionw
ithNH-81n
earC
oimba-
tore
con
nect
ing
Met
tupp
alai
yam
, Udagamandalam(Ooty),G
udalur
in t
he S
tate
of
Tam
il N
adu
and
term
inat
ing
at i
ts j
unct
ion
with
NH-766nearGundulpetinthe
Stat
e of
Kar
nata
ka.
26.10
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
26.10
130
Sl.
No.
NH
N
o.
New
N
H
No.
Nom
encl
atur
e
Bengalore DivisionTumkur Division
Chitrdurga DivisionHassan Division
Manga lore Division
Hubli DivisionKarwar DivisionBijapur DivisionKalburgi DivisionPPP Cell ShivmogaPPP Cell
CPB
NHAI
KRDCL
Yet to Be allocated
Total Length in Km
13150
NH
-150
The
high
way
st
artin
g fr
om
GulbergaonN
H-50Connecting
Wad
i-Yad
gir-
in
the
stat
e of
K
arna
taka
an
d te
rmin
atin
g on
NH-167-inthestateofAP.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
118.47
0.00
0.00
0.00
0.00
0.00
118.47
14150A
NH
-150A
The
high
way
st
artin
g fr
om
itsjunction
withNH-50
at
Jevargi
connecting
Siriguppa,
Bel
lary
, H
iriyu
r, H
uliy
ur,
Chi
kkan
ayak
anah
alli,
N
agam
an
-gal
a Sr
irang
apat
na
- M
ysor
e -
Nan
jang
ud
and
term
inat
ing
atitsjunctionwithN
H-948at
Cha
mar
ajan
agar
in
the
Stat
e of
K
arna
taka
.
77.57158.67
94.88
0.00
0.00
0.00
0.00
110.15
39.30
0.00
0.00
204.20
0.00
0.00
684.77
15150E
NH
-150E
The
high
way
St
artin
g fr
om
junction
NH-50
neargulbarga
conn
ectin
g ch
owda
pur,
Afz
alpu
r in
th
e st
ate
of
KA
,
dudh
ani
akka
lkot
e an
d te
rmin
atin
g at
its
junctionwithNH-52
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
72.92
0.00
0.00
0.00
0.00
0.00
72.92
16167
167
The h
ighw
ay st
artin
g fro
m H
agga
ri onNH-67inK
arnatakaconnecting
Alu
r, ad
oni,
Man
trala
yam
in
the
stat
e of
And
ra P
rade
sh c
onne
ctin
g R
aich
ur i
n K
arna
taka
con
nect
ing
Mah
bubn
agar
and
term
inat
ing
on
NH-44inthestateofAP
0.00
0.00
71.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
71.40
131
Sl.
No.
NH
N
o.
New
N
H
No.
Nom
encl
atur
e
Bengalore DivisionTumkur Division
Chitrdurga DivisionHassan Division
Manga lore Division
Hubli DivisionKarwar DivisionBijapur DivisionKalburgi DivisionPPP Cell ShivmogaPPP Cell
CPB
NHAI
KRDCL
Yet to Be allocated
Total Length in Km
17169A
NH
-169A
The
high
way
st
artin
g fr
om
its
junction
with
NH-169
near
Thirt
haha
lli c
onne
ctin
g A
gum
be,
Heb
bari
and
term
inat
ing
at U
dupi
Harbour(Malpe)intheStateof
Kar
nata
ka
0.00
0.00
0.00
0.00
90.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
90.00
18173
NH
-173
The
high
way
st
artin
g fr
om
its
junction
with
NH-73
near
M
udig
ere
conn
ectin
g C
hikk
amag
alur
u,
Kad
ur,
Tam
atad
ahal
li,
Hos
adur
ga
and
term
inat
ing
at i
ts j
unct
ion
with
newNHNo.369nearHolalkere
in th
e St
ate
of K
arna
taka
.
0.00
0.00
78.8572.10
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
153.00
19206&
234
NH-69
The
high
way
st
artin
g fr
om
star
ting
from
jun
ctio
n w
ith N
H-
66nearhonnavara
connecting
shim
oga,
ban
avar
a, h
uliy
ar s
ira
mad
hugi
ri ch
inta
man
i m
ulba
gal
in th
e st
ate
of K
A
21.95100.91
94.4048.65
0.00
0.00
70.90
0.00
0.00
0.00
139.35
86.20
0.00
0.00
562.35
20206&
234
NH-73
The
high
way
st
artin
g fr
om
itsjunction
withNH-66
near
Man
galu
ru
conn
ectin
g B
antv
al,
Bel
tang
adi,
Mud
iger
e,
Bel
ur,
Ban
avar
, Ars
iker
e an
d te
rmin
atin
g atitsjunctionwithN
H-48near
Tum
kur i
n th
e St
ate
of K
arna
taka
0.00
12.30
0.00
108.36
66.40
0.00
0.00
0.00
0.00
0.00
0.00
126.50
0.00
0.00
313.56
132
Sl.
No.
NH
N
o.
New
N
H
No.
Nom
encl
atur
e
Bengalore DivisionTumkur Division
Chitrdurga DivisionHassan Division
Manga lore Division
Hubli DivisionKarwar DivisionBijapur DivisionKalburgi DivisionPPP Cell ShivmogaPPP Cell
CPB
NHAI
KRDCL
Yet to Be allocated
Total Length in Km
21207
NH
-648
The
high
way
st
artin
g fr
om
itsjunction
withNH-48
near
Nel
aman
gla,
D
odab
alla
pur,
DevenhallionNH-44,S
arajpur
in th
e St
ate
of K
arna
taka
, Bag
alur
an
d te
rmin
atin
g at
its
ju
nctio
n withN
H-48nearH
osurinthe
Stat
e of
Tam
il N
adu.
0.00
41.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
81.38
0.00
0.00
122.38
22209
NH
-948
The
high
way
st
artin
g from
NH-48
junction
near
kana
kapu
ra-M
alav
alli-
Kol
lega
la
-Cha
mar
ajan
agar
a-Te
rmin
atin
g ItsJunction
WithNH-544At
Coi
mba
tore
.
63.78
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
134.23
0.00
0.00
198.00
23212
NH
-766
The
H
ighw
ay
Star
ting
from
G
undl
upet
e M
ysor
e te
rmin
atin
g atitsjunctionwithNH-948near
Kol
lega
l in
the
stat
e of
KA
19.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
131.24
0.00
0.00
150.24
24275
NH
-275
The
high
way
st
artin
g fr
om
itsjuncton
withNH-75
near
Ban
twal
a co
nnec
ting
puttu
r-su
lya-
mad
iker
i-pi
riya
patn
a-m
ysur
u-sr
iran
gapa
tna-
Man
dya-
Cha
npat
na-r
aman
agar
a-
and
term
inat
ing
at i
rts j
unct
ion
with
newNH-75onbengaluru
80.69
0.00
0.00
0.00
132.31
0.00
0.00
0.00
0.00
0.00
0.00
135.34
0.00
0.00
348.34
133
Sl.
No.
NH
N
o.
New
N
H
No.
Nom
encl
atur
e
Bengalore DivisionTumkur Division
Chitrdurga DivisionHassan Division
Manga lore Division
Hubli DivisionKarwar DivisionBijapur DivisionKalburgi DivisionPPP Cell ShivmogaPPP Cell
CPB
NHAI
KRDCL
Yet to Be allocated
Total Length in Km
25367
NH
-367
The
high
way
st
artin
g fr
om
itsjunction
withNH-67
near
Bha
napu
r co
nnec
ting
Kuk
unur
, Ye
lbur
ga,
Gaj
endr
agad
, B
adam
i, G
uled
agud
a, B
agal
kote
, Bag
alko
t an
d te
rmin
atin
g at
its j
unct
ion
with
newNHNo.52nearGaddankeri
in th
e St
ate
of K
arna
taka
.
0.00
0.00
0.00
0.00
0.00
104.00
0.00
53.80
0.00
0.00
0.00
0.00
0.00
0.00
157.80
26766C
NH
-766C
The
high
way
st
artin
g fr
om
itsjunction
withNH66near
Byndur
(Baindur)
connecting
Kol
lur,
Hos
anag
ara,
Ana
ndap
ur,
Ana
ntha
pura
, Sh
ikar
pur,
Mas
ur
and
term
inat
ing
at
its
junc
tion
withN
H48nearRanibennurin
the
Stat
e of
Kar
nata
ka.
0.00
0.00
126.50
0.00
38.7038.23
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
203.43
27275K
NH
-275K
The
high
way
st
artin
g fr
om
its
junction
with
NH-275
near
Hin
kal
villa
ge
conn
ectin
g N
H-
275/N
H-150A
nearColum
bia
Asia
Hospital,
NH-766/
NH-
150A
nearAPM
CBandipalya
and
term
inat
ing
at i
ts o
rigin
atin
g junctionwithNH-275nearH
inkal
VillagearroundMysorecityinthe
stateofKarnataka.(MysoreRing
Road)
41.54
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
41.54
134
Sl.
No.
NH
N
o.
New
N
H
No.
Nom
encl
atur
e
Bengalore DivisionTumkur Division
Chitrdurga DivisionHassan Division
Manga lore Division
Hubli DivisionKarwar DivisionBijapur DivisionKalburgi DivisionPPP Cell ShivmogaPPP Cell
CPB
NHAI
KRDCL
Yet to Be allocated
Total Length in Km
28948A
NH
-948A
The
high
way
st
artin
g fr
om
junctionofN
H-648andN
H-48
neardobaspet(manne),
Nijagal
,Ken
gal,G
udem
aran
ahal
li,H
art
hi,
Mel
ahal
li,
Hul
iker
egun
nur,
Ray
asan
dra,
B
anav
asi,
Thok
asan
dra
in t
he s
tate
of
KA
co
nnec
ting
Acc
hetti
palli
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.27
0.00
0.00
4.27
29548B
NH
-548B
The
Hig
hway
sta
rting
fro
m i
ts
junction
withNH-548Cnear
Man
tha
conn
ectin
g D
eogo
an
Fata
, Se
lu,
Path
ari,
Sonp
eth,
Parali
Vaijnath,
Ambajogai,
Renapurphata,Latur(NH-361),
Ausa,Omarga,Y
enegur,M
urum
,A
lur,
Akk
alko
t, N
agas
ur i
n th
e st
ate
of M
ahar
asht
ra c
onne
ctin
g Bijapur
(Vijayapura),
Tikota,
Ath
ani,
Kag
wad
, C
hikh
odi,
Sank
eshw
ar a
nd te
rmin
atin
g at
its
junctionwithN
H-48nearG
otur
in th
e st
ate
of K
arna
taka
.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
271.00
0.00
0.00
0.00
0.00
0.00
0.00
271.00
30373
NH
-373
The
high
way
st
artin
g fr
om
itsjunction
withNH-73
near
belu
ru
conn
ectin
g H
assa
n ,
Hol
enar
asip
ura
and
term
inat
ing
itsjunction
withNH-275near
Bili
kere
in th
e st
ate
of K
arna
taka
0.00
0.00
0.00
126.73
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
126.73
135
Sl.
No.
NH
N
o.
New
N
H
No.
Nom
encl
atur
e
Bengalore DivisionTumkur Division
Chitrdurga DivisionHassan Division
Manga lore Division
Hubli DivisionKarwar DivisionBijapur DivisionKalburgi DivisionPPP Cell ShivmogaPPP Cell
CPB
NHAI
KRDCL
Yet to Be allocated
Total Length in Km
31369E
NH
-369E
The
high
way
st
artin
g fr
om
its
junctionwithN
H-69nearSagar
Con
nect
ing
conn
ectin
g H
uvin
aha
lli,H
oleb
aglu
,Kal
asav
alli
,Si
ghan
ando
or
and
term
inat
ing
at
itsJunctionwithN
H-766Cnear
Mar
akut
uka
in th
e st
ate
of K
A
0.00
0.00
67.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
67.20
32516A
NH
-516A
The
Hig
hway
St
artin
g fr
om
pand
harp
ur
i,Man
galw
edha
in
M
H a
nd t
erm
inat
ing
its j
unct
ion
withNH-52NEA
RBijapurinthe
stat
e o
f KA
0.00
0.00
0.00
0.00
0.00
0.00
0.00
12.00
0.00
0.00
0.00
0.00
0.00
0.00
12.00
33166E
NH
-166E
The
Hig
hway
st
artin
g fr
om
Khanapur-N
agaj-JAT
inthesate
of M
H a
nd t
erm
inta
ting
at i
ts
JunctionwithNH-52nearbijapur
in th
e st
ate
of K
A
0.00
0.00
0.00
0.00
0.00
0.00
0.00
25.00
0.00
0.00
0.00
0.00
0.00
0.00
25.00
34544E
NH
-544E
The
high
way
st
artin
g fr
om
its
junctionwithN
HN
o.44near
Kod
ikon
da c
heck
post
con
nect
ing
Lepa
kshi
, Hin
dupu
r, M
adak
asira
, R
olla
, A
GA
LI
in
AP
an
d te
rmin
atin
g its
junc
tion
with
NH
-48nraeSirainKA
0.00
16.60
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
16.60
35160
NH
-160
The
Hig
hway
Star
ting
from
Ta
sgon
, M
iraj
conn
ectin
g C
hik-
kodi
and
ter
min
atin
g its
jun
ctio
n withNH-48inthestateofKA
0.00
0.00
0.00
0.00
0.00
0.00
0.00
60.00
0.00
0.00
0.00
0.00
0.00
0.00
60.00
136
Sl.
No.
NH
N
o.
New
N
H
No.
Nom
encl
atur
e
Bengalore DivisionTumkur Division
Chitrdurga DivisionHassan Division
Manga lore Division
Hubli DivisionKarwar DivisionBijapur DivisionKalburgi DivisionPPP Cell ShivmogaPPP Cell
CPB
NHAI
KRDCL
Yet to Be allocated
Total Length in Km
36752K
NH
-752K
The
Hig
hway
Sta
rting
fro
m i
ts
junctionwithNH-752InearJintur
in t
he s
tate
of
Mah
aras
htra
and
connectingtoBori,Zari,Parbhani,
Gan
gakh
ed,
Isad
, K
inga
on,
Dha
nora
, W
adva
l, N
agna
th,
Gha
rani
, N
aleg
oan,
Lat
ur,
Nitu
r, N
ilang
a,
Sirs
hi,
Aur
ad
Shaj
ani
in t
he s
tate
of
Mah
aras
htra
and
te
rmin
atin
g at
its
jun
ctio
n w
ith
NH-50nearBhalkiinthestateof
Kar
nata
ka.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
48.20
0.00
0.00
0.00
0.00
0.00
48.20
37161A
NH
-161A
The
Hig
hway
sta
rting
fro
m i
ts
junction
withNH-548CAkot,
Pats
ul,
Bho
d,
Ako
la,
Bar
shi
Takl
i, Sh
elu
baza
ar,
Man
grul
pir,
Man
ora,
Dig
ras,
Arn
i, D
hano
da,
Mah
ur, S
arkh
ani,
Kin
vat,
Isla
pur,
Him
ayat
naga
r, B
hoka
r, M
udkh
ed,
Nanded,
Osm
anpur,
Kautha,
Muk
hed,
B
arha
li,
Muk
raba
d,
Lakh
map
ur, S
awar
mal
, Nan
garg
a,
Waz
zar i
n th
e sta
te o
f Mah
aras
htra
co
nnec
ting
Aur
ad,
Tulja
pur,
Mus
tapu
r, M
arkh
al,
Naw
adge
ri an
d te
rmin
atin
g at
its
ju
nctio
n w
ith B
idar
Rin
g R
oad
in th
e st
ate
of K
arna
taka
.
0.00
0.00
0.00
0.00
46.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
46.70
137
Sl.
No.
NH
N
o.
New
N
H
No.
Nom
encl
atur
e
Bengalore DivisionTumkur Division
Chitrdurga DivisionHassan Division
Manga lore Division
Hubli DivisionKarwar DivisionBijapur DivisionKalburgi DivisionPPP Cell ShivmogaPPP Cell
CPB
NHAI
KRDCL
Yet to Be allocated
Total Length in Km
38544
DD
NH
-544
DD
The
high
way
st
artin
g fr
om
its
junctionwithN
HN
o.44near
Ana
natp
ur c
onne
ctin
g, R
ayad
urg
in th
e Sta
te o
f And
hra P
rade
sh an
d te
rmin
atin
g at
its
jun
ctio
n w
ith
NH-150AnearM
olkalmuruinthe
stat
e of
Kar
nata
ka.
0.00
0.00
11.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
11.00
39548H
NH
-548H
The
high
way
st
artin
g fr
om
itsjunction
withNH-48
near
Sank
eshw
ar
in
the
stat
e of
K
arna
taka
, G
adhi
ngla
j, A
jara
, A
mbo
li,
Mad
khol
, Sa
wan
twad
i, In
suli
and
term
inat
ing
at
its
junctionwithNH-66nearBanda
in th
e st
ate
of M
ahar
shtra
.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.30
3.30
40748A
AN
H-
748
AA
The
high
way
st
artin
g fr
om
its
junction
with
NH-748
near
Mac
hhe
Con
nect
ing
Pira
nvad
i, N
avag
e,
Kin
aye,
K
usam
alli,
Jamboti,K
almani,Kankumbi,in
the
stat
e of
Kar
nata
ka P
orie
m,
Mat
nee
and
term
inat
ing
at
Sanquelim
(nearS
hriDattaraya
Mandir)intheStateofGoa.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
49.84
49.84
41367A
NH
-367A
The
high
way
st
artin
g fr
om
its
junctionwithNH-67nearKoppal
and
term
inat
ing
at
its
junc
tion
withNHNo.50nearMetgalinthe
Stat
e of
Kar
nata
ka.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
25.10
0.00
0.00
25.10
138
Sl.
No.
NH
N
o.
New
N
H
No.
Nom
encl
atur
e
Bengalore DivisionTumkur Division
Chitrdurga DivisionHassan Division
Manga lore Division
Hubli DivisionKarwar DivisionBijapur DivisionKalburgi DivisionPPP Cell ShivmogaPPP Cell
CPB
NHAI
KRDCL
Yet to Be allocated
Total Length in Km
42766E
NH
-766E
The h
ighw
ay st
artin
g fr
om K
umta
-H
aver
i-Sirs
i0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
56.00
0.00
72.89128.89
43163B
NH
-163B
The
high
way
st
artin
g fr
om
BID
AR
-Niz
amap
et0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
20.00
0.00
0.00
0.00
0.00
0.00
20.00
44766EE
NH
-766
EE
The
high
way
st
artin
g fr
om
its
junctionw
ithNH-66n
earH
attikeri
and
term
inat
ing
at B
elek
eri P
ort i
n th
e St
ate
of K
arna
taka
.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.27
4.27
To
tal
418.
5032
9.48
604.
1335
5.83
554.
0134
2.71
176.
9058
3.55
400.
2910
5.30
139.
3534
46.2
90.
0013
0.30
7588
.67
139
Appendix – 6State Highways Nomenclature and length as on 31-03-2020
140
Sl. No. SH-No. Nomenclature of State Highways Length
(in Km)1 2 3 4
1 SH-01
Highway connecting Padubedri with Chickalaguda via Karkala, Agumbe, Thirthahalli, Anandapura, Hangal, Thadasa, Kalghatagi, Dharwad,Uppinabetegeri,Belawadi,Bailahongala,Vannuru,Hoskoti,Ankalagi, Basapura, Hidkal Dam and Hosur.
394
2 SH-02 HighwayconnectingEkkumbiwithMolakalmuruviaHaveri,Mylara,Harapanahalli and Kudulgi. 223
3 SH-03Highway connecting Hunasanahalli with Chikkahalli via Kanakapura, Ramanagara, Magadi, Solur, Sompura, Koratagere, Madugiri and Pavagada
252
4 SH-04 Highway connecting Kamalanagar with Gunalli via Halburga and Bidar 14
5 SH-05 Highway connecting Bangarapet with Bagepalli via Kolar and Chintamani 107
6 SH-06Highway connecting Karwar with Ilkal via Kaiga, Yellapura, Mundugodu, Bankapura, Savanur, Gadag, Gajendragada and Hanumasagara.
384
7 SH-07 Highway connecting Srirangapatna with Arasikere via Pandavapura, K.R Pet and Chennarayapatna. 108
8 SH-08
Highway connecting Hirisave with Chattalli via Sravanabelagula, Chennarayapatna, Holenarasipura, Arakalagudu, Sanivarasanthe, Chengadahalli,Vanaguru,Kundali,Santhalli,Thaltarshettahalli,Thakere, Beligere, Kumburu and Suntekoppa.
170
9 SH-09 Highway connecting Yelahanka with Gowribidanur via Kudumalakunte and Doddaballapura. 69
10 SH-10 Highway connecting Sarasamba with Ribbonapalli via Aland, Gulbarga and Sedam. 136
11 SH-11 Highway connecting Hulasur with Mahagao via Balakunda, Basavakalyana and Mudubi. 64
12 SH-12 Highway connecting Bijapur with Sankeshwar via Aland, Gulbarga 170
12 SH-14Highway connecting Ramdurg with Manvi via Badami, Pattadakal, Hulgund, Neeralakeri, Mudagal, Maski, Basapura, Pothanal and Chikalaparvi
221
13 SH-15Highway connecting Wanamarapalli with Raichur via Aurad, Santhapur, Bidar, Chincholi, Sedam, Yadagir, Hathiguduru and Devdurg.
297
14 SH-16 Highway connecting Sindagi with Kodangal via Sahapur, Kanapur, Yadagiri and Gurmitkal. 144
141
Sl. No. SH-No. Nomenclature of State Highways Length
(in Km)1 2 3 415 SH-18 Highway connecting Mudhol with Nippani via Chikkodi. 108
16 SH-20 Highway connecting Raichur with Bachi via Lingasugur, Hungund, Bagalkote, Lokapur, Yeraghatti and Belgaum. 330
17 SH-21 Highway connecting Hallebidu with Anechukur via Hassan, Arakalgudu and Periyapatna. 123
18 SH-22 Highway connecting Gulbarga with Hosur via Afzalpur. 45
20 SH-23 Highway connecting Kalmal with Shiggaon via Manvi, Sindhanur, Gangavathi,Ginigera,Koppal,Mundaragi,LaxmeshwarandGudigere. 296
21 SH-24 Highway connecting Tarikere with Dharmapura via Hosadurga, V.VPuraandHiriyur. 137
22 SH-25 Highway connecting Hospet with Shimoga via Mariammanahalli, Harapanahalli, Harihara and Honnali. 184
23 SH-26 Highway connecting Halageri with Hulikal via Honnali, Ayanur, Arasalu and Hosanagar. 120
24 SH-27HighwayconnectingVirajpetwithByndoorviaMadikeri,Somawarpet,Shakaleshpura,Mudigere,Vastare,Jayapura,Sringeri,Begar and Agumbe.
344
25 SH-28 Highway connecting Supa with Annigeri via Haliyala, Dharwad and Hebsur. 115
26 SH-29 Highway connecting Mudgal with Kudithini via Thavaregere, Gangavathi and Kampli. 98
27 SH-30 Highway connecting Sindhanur with Hemmadaga via Kushtagi, Ron, Saundatti, Belawadi, Bekawadi and Khanapur. 292
28 SH-31 HighwayconnectingJathwithJambotiviaAnanthapura,Athani,Gurlapura, Gokak, Nesargi, Bailahongal and Khanapura. 245
29 SH-32 Highway connecting Umarga with Sulepet via Alandh, Mahagaon and Chincholi. 118
30 SH-33 Highway connecting Koratagere with Bavali via Tumkur, Kunigal, Maddur, Malavalli, Mysore and H.D.Kote. 257
31 SH-34
Highway connecting Aurad with Sadashivagad via Balki, Basavakalyana,Alandh,Afzalpur,Indi,Bijapur,Jamakhandi,Mudhol,Lokapur,Ramdurg,Saundatti,Dharwad,Ramanagara,Supa(Joida)and Anasi.
671
32 SH-35 Highway connecting Sidlaghatta with Anekal via Hoskote and Kadagodi. 77
33 SH-36 Highway connecting Koppal with Kyadhiguppa via Bevur and Kushtagi. 68
34 SH-37 Highway connecting Subramanya with Udupi via Dharmsthala, Belthangadi and Karkala. 129
35 SH-38 Highway connecting Kollegal with Hasanurghat. 53
142
Sl. No. SH-No. Nomenclature of State Highways Length
(in Km)1 2 3 436 SH-39 Highway connecting Bangalore with Hesarghatta. 9
37 SH-40 Highway connecting Mylara with Thoranagallu via Hadagali, Hagaribommanahalli and Kudlagi. 157
38 SH-41 HighwayconnectingShiradonwithLingasugurviaZalki,Indi,Devarahipparagi, Hovinahipparagi, Muddebihal and Narayanapura. 196
39 SH-42 HighwayconnectingAnkolawithJoladharasiinKoppal,MunirabadhTown limits. 30
40 SH-43 Highway connecting Tikota with Kanamadagi. 24
41 SH-44Highway connecting Sankeshwar with Sangam via Hukeri, Ghataprabha, Arabhavi, Lokapura, Kerakalamatti, Agasanakoppa, Guledhagudda, Kamathagi and Gulur.
192
42 SH-45 Highway connecting Arabhavi with Challakere via Gokak, Naragund, Shalavadi,Sirahatti,Mandaragi,Hadagali,Itagi,UjjaniandJagalur. 252
43 SH-46 Highway connecting Mundgodu with Anasi via Kalaghatagi, Haliyala and Dandeli. 136
44 SH-47Highway connecting Mandya with Hadagali via Melukote, Shravanabelagula, Tiptur, Huliyar, Hosadurga, Holalkere, Anagodu and Harapanahalli.
347
45 SH-48Hihgway connecting Kumta with Kadamadagi via Siddapura, Soraba, Shikaripura, Honnali, Basavapatna, Chitradurga, Challakere and Pavagada.
357
46 SH-49 Highway connecting Sandur with Siraguppa via Hosapet and Kampli. 107
47 SH-50 HighwayconnectingBhatkalwithSorabaviaJog,Mavinagundi,Siddapura and Chandragutti. 132
48 SH-51 Highway connecting Basavakalyan with Raichur via Gulbarga, Shahabad, Ravur and Yadhgiri. 69
49 SH-52 Highway connecting Thirthahalli with Kundapur via Nagara, Balabere, Hosanagadi and Konibasur. 86
50 SH-53 Highway connecting Kagawad with Kaladhagi via Shedabal, Kudachi, Theradal,JamakhandiandKatharaki. 128
51 SH-54HighwayconnectingJambootiwithRabakaviviaPeeranawadi,Belgam, Budhihal, Akkathangerhal, Kolavi, Mamadhapur, Davaleshwar and Mahalingapura.
138
52 SH-55 Highway connecting Yeraghatti with Babaleshwar via Yadawad, Mudhol, Manthor and Chickkagalagali. 108
53 SH-56 Highway connecting Bedi with Belavanki via Kittur, Gobbaragumpi, Alagawadi, Navalgund and Shelawadi. 105
143
Sl. No. SH-No. Nomenclature of State Highways Length
(in Km)1 2 3 4
54 SH-57
Highway connecting Bagalakote with Beligeriranganabetta via Badami, Ron, Huyalgola, Gadag, Sirahatti, Guttal, Ranibennur, Masur, Sikaripura, Shimoga, Lakkavalli, Tharikere, Chikamagalur, Belur, Hassan, Holenarasipura, K.R Nagar, Belikere, Nanjangud and Yalandur.
536
55 SH-59 Highway connecting Kustagi with Pattadhakal. 5156 SH-60 Highway connecting Hungund with Surpur via Thalikote and Kembavi 105
57 SH-61Highway connecting Managuli with Bichal via Huvinahipparagi, Basavanabagewadi, Devapura, Devdurga, Siriwara, Neermanvi, Bailmerchad and Rajolibanda.
211
58 SH-62 Highway connecting Haveri with Sagara via Lingapura, Chikerur, Hirekerur and Siralakoppa 107
59 SH-63 Highway connecting Raravi with Belur via Siraguppa, Desanur, Gorebal, Karatagi, Kanakagiri, Yelaburga, Sankallur, Sudi and Rajur. 136
60 SH-64 Highway connecting Kalladka with Kannagad via Bhantwal 22
61 SH-65Highway connecting Malpe with Molakalmur via Udupi, Hebri, Agumbe, Begar, Koppa, Narasimharajapura, Sulageri, Bhadravathi, Chennagiri,Shanthisagar,Davanagere,Jagalur,MusturandB.G.Kere
285
62 SH-66 Highway connecting Gangamula with Kotigehara via Malleshwara, Kalasa and Magundi. 91
63 SH-67Highway connecting Mangalore with Athradi via Bajpe, Kattil, Belmane,KapuandSirava.(includingHospetMangaloreRoadinMangaloreCityandOldN.H48inMangaloreCityLimits)
62
64 SH-68 Highway connecting Tumkur with Honnavar in Badravathi and Shimoga Town Limits. 9
65 SH-69 Highway connecting Kumta with Thadas via Sirsi and Mundagodu. 8266 SH-70 Highway connecting Belthangadi with Mulki via Mudabedri. 58
67 SH-71HighwayconnectingTipturwithHassanviaDudda(additionallengthof8KmfromDairyCircletoDevarayapatna(NH-48inHassantownlimits)
57
68 SH-71E HighwayconnectingDairyCirclewithBusthenahalli(NH-48inHassantownlimits) 2
69 SH-72 HighwayconnectingNippaniwithKothalagiviaNanadhi,Examba,Ugar, Mangasuli, Athani and Inapura 133
70 SH-73
HighwayconnectingMangasuliwithLaxmeshwarviaUgar,Kudachi,Raibag, Kabbur, Belladabagewadi, Ghataprabha, Gudichinamalki, Paschapur, Akkathengarahal, Nesargi, Desanur, Suthaghatti, Matthikoppa, Sampagaon, Neginahal, Nayanagar, Belawadi, Budaraghatti, Thadakoda, Mammighatti, Dharwad, Hubli and Kundagol.(includingOldNH4betweenDharwadandHubli)
266
144
Sl. No. SH-No. Nomenclature of State Highways Length
(in Km)1 2 3 4
71 SH-74 Highway connecting Nelamangala with Chikballapur via Doddaballapur 63
72 SH-75 Highway connecting Balki with Chincholi via Humnabad, Kabirwadi, Chitaguppa and Inapur 83
73 SH-76 Highway connecting Birur Sammasagi via Ajjampura, Sivani, Channagiri, Santhebennur, Davangere, Harihara, Koda and Thilavalli 207
74 SH-77 Highway connecting Sirsi with Hosnagar via Soraba, Masur, Bettamallppa and Anandhapura 99
75 SH-78Highway connecting Shettihalli with Ichalakaranji via Dhaddi, Hatharagi,Hukkeri,Chikodi,Examba,SadalgaHighwayconnectingBorangaon
84
76 SH-79Highway connecting Srirangapatna with Malemahadeshwarabetta via Sosale, T. Narsipura, Madapura, Kollegal, Ramapura, Kowdalli, Hanur and Palar
152
77 SH-80 Highway connecting Nanjangud with Biligiriranganabetta via Chamarajanagar and Kyathadevara Gudi 45
78 SH-81 Highway connecting Yelandur with Gundlupet via Honganur, Chamarajanagar and Terakanambi 45
79 SH-82 Highway connecting Hoskote with Gownipalli via Chintamani 62
80 SH-83 Highway connecting Manuli with Kotamachagi via Kadakola, Gudachi, Salahalli, Konnur, Sirola, Holealur, Ron and Abbigere 61
81 SH-84 Highway connecting Sira with Nanjangud via Gubbi, Kallur, Yadayur, Amruthur, Mandya, Kirugaval, Hosavatti and T. Narsipura 228
82 SH-84A HighwayconnectingNH-212withSH-84viaVarunaHoskoteSuthur 1783 SH-84B HighwayconnectingKupparavallionSH-84withSuthur 4
84 SH-85
HighwayconnectingBangalorewithJalsoorviaMagadi,Huliyurdurga, Kowdle, Nagamangala,KR Pet, Saligrama, Ramanathapura,Somwarpet,VanagurandSubramanya(SaligramaBypasslength-2.50Km)
323
85 SH-86Highway connecting Ramanathapura with Terakanambi via Bachhehalli, Kattemalalavadi, Hunsur, HD Kote, Saragur, Begur and Madapatna
153
86 SH-87 Highway connecting Bangalore with Anekal via Bannurghatta 31
87 SH-89 Highway connecting Madakeri with Kutta via Siddapura, Ghattathala, Chennyanakote, Athur and Gonikoppa 85
88 SH-90 HighwayconnectingHunsurwithTalakaveriviaVirajpet,Napoklu,Nalkanadu and Bhagamandala 117
89 SH-91 Highway connecting Konanur with Makutta via Ramanathapura, Kushalanagar,SiddapuraandVirajpet 85
90 SH-92 Highway connecting Kanakapura with Sangam 30
145
Sl. No. SH-No. Nomenclature of State Highways Length
(in Km)1 2 3 4
91 SH-93 Highway connecting Khanapura with Talaguppa via Haliyal, Yellapura, Sirsi and Siddapura 193
92 SH-94Highway connecting Bagepalli with Halagur via Gudibande, Thondebhavi, Mavathur, Kolala, Uradigere, Kyathasandra, Neralapura, Kudur, Magadi, Ramanagar and Channapatna
233
93 SH-95 HighwayconnectingHoskotewithVenkatagirikoteviaMalur,Tekal,Bangarpet and Budhigere 111
94 SH-96 HighwayconnectingDevanahalliwithKempapuraviaVijayapura,Vemgal,Kolar,GhattakamadanahalliandKGF 96
95 SH-97 Highway connecting Sankeshwar with Sadalga via Kowthalli, Nippani and Badakihal 48
96 SH-98 Highway connecting Bhatnagoor with Boragaonwadi via Barawada, Mangura and Karagad 43
97 SH-99 Highway connecting Kothapalli with Masti via Gownipalli, Rajepalli, Srinivasapura, Kolar and Tekal 99
98 SH-100 Highway connecting Subramanya with Manjeshwar via Puttur, Parladaka and Ukkada 89
99 SH-101 Highway connecting Surathkal with Kabaka via Bajpe, Gurupura, Bhantwal,PanemangaloreandVittal 64
100 SH-102HighwayconnectingHuliyarKeralapuraviaJayachamarajapura,Arasikere,Haranahalli,Shanthigrama,HariharapuraandJakkanahalliof Holenarsipura
126
101 SH-103 HighwayconnectingGokakwithSaundattiviaSH-31toMuragodu,Karimani, Sogalkshetra, Manuli, Malaprabha and Goravanakolla 80
102 SH-104Highway connecting Bangalore with Nandi via Kadugondahalli, Nagavara, Thanisandra, Bellahalli, Kannur, Bagalur, Arisinakunte, Devanahalli , Malligenahalli and Karahalli
50
103 SH-104A
HighwayconnectingNH-4inDevanahalliTaluktoSH-104nearGollarahalli via Budigere. 14
104 SH-106 Highway connecting Horanadu with Balur Handpost via Kalasa 42
105 SH-107 HighwayconnectingJannapurawithVanagurviaHuradiHanabalAnemahal Skaleshpura Byakarahalli Heththur 56
106 SH-108 Highway connecting Holenarsipura with K.R. Nagar via Hallimysore Saligrama Chunchanakatte Kesthur Koppalu Gate Srirampura Hebbalu 42
107 SH-109HighwayconnectingYaraneJunctionwithHolenarsipuraviaBikanahalli Channiganahalli Ankapura Karle Hanumanahalli Paduvalahippe
33
108 SH-110 HighwayconnectingBelurwithKodlipetviaBichoduVateholeKamathikodigi Byrapura Kundur K.Hosakote Mgalu 69
146
Sl. No. SH-No. Nomenclature of State Highways Length
(in Km)1 2 3 4
109 SH-111 Highway connecting Doddagangavadi Gate with Chowdanakuppe via DoddagangavadiVirupasandraTavarekereBandigowdanapalya 25
110 SH-112 Highway connecting Belur with Somvarpet 79
111 SH-112A
HighwayconnectingSH-8withSH-57viaCRPatnaNarsipuraKodlipet 22
112 SH-113 HighwayconnectingUppinangadionNH-48withSH-37(BisleyGhatRoad-MDR)viaBajaththurAlankaruBalyaKadaba 33
113 SH-114 HighwayconnectingGundyaonNH-48withKalkundaonSH-37viaShiribagilu Kombharu Bilinele 16
114 SH-115 Highway connecting Kudligere with Kammaraghattta 36
115 SH-116 HighwayconnectingTumkurHonnavarroad(SH-68)withBirurSammasagiroad(SH-76)viaBhadravathiShivaniroad 34
116 SH-117 Highway connecting Ilavala with K.R Nagar via Hoskote, Sagarakatte, Molepette, Lalam Devnahalli 21
117 SH-118 Highway connecting Guruvayanakere via Upinahangadi 20
118 SH-119 Highway connecting Ilavala, Sagarakatte, K.R. Nagar with Narayanapura Kegere via B.B Road 7
119 SH-120 Highway connecting Hampapura, Saligrama road 17
120 SH-121 Highway connecting B.T road with Kodihalli via Kyatnahalli, Hardanahalli, Shigaranahalli, Hariharapura, Duda Kunchevu road 17
121 SH-122 Highway connecting Maharastra Border with Murki, Aurad, Handarki (SH-15)viaBidar,Chincholi,Sedem 184
122 SH-123 HighwayconnectingAndraPradeshborderwithJamaji,Hulsur(ConnectingSH-11)viaSandpur,Sangama 69
123 SH-124HighwayconnectingBarkedwithBilagi(ConnectingSH-55)viaKachari, Padsavalgi, Afzalpur, Gatarga, Devarnavadaga, Sindagi, Byakodu, Tilagola, Talikote, Minajage, Davalgi, Rodgi, Basavna
278
Bagevadi, Telgi, Kolar, Bilagi
124 SH-125HighwayConnectingFirozabadcross(NH-218)withKamalapuraState Highway connecting via Shabad, Bankur, Peta Shirur, Mudbala, Kudli, Rumanagada, Chengata
92
125 SH-126Highway Connecting Andra Pradesh border with Putpak, Bosaga SH via Guru vitkal, Handarki, Satnur, Chitapura, Tengli, Hebbal, Arankal, Varnal,Mudbe
159
126 SH-127
HighwayConnectingSH10withMudhol,YalagerauptoAndraPradesh border via Madana, Itkala, Gunjanur, Anpur, Madavara, Saidapur,Mangal,Sangvara,Joladadgi,Gugal,Herekudlagi,Savantgera, Gabbur, Siravara, Atanur, Machanur, Kuradi, Aroli, Matavari, Uprala, Gunjali, Malapura
169
147
Sl. No. SH-No. Nomenclature of State Highways Length
(in Km)1 2 3 4
127 SH-128
HighwayConnectingSH-61withDevdurga,Amarapura,Bagvathi,Hirekondakal, Ayanur, Belllary, via Mundargi, Galgi, Chincharki, Budani, Hirehanagi, Hire Kondakal, Adavi Amareshwara, Hosur, Valabellary,Ibrahampur,Kundroli,Kuruvali,Raravi,Darur,Talur,Ropanagudi, Chilagurki
202
128 SH-129
Highway Connecting Chickhosur, Mudgal, Mundargi, via Banigal, Ramatnal, Mudanur, Kustagi, Sankapur, Kansagar, Tumbargude, Yalaburgi, Sungada, Kukanur, Banapur, Halgera, Hire Sindagi, Katarki, Mantur, Keslapura, Hosruru
173
129 SH-130
Highway Connecting Yalburga, Kanakagiri, Gangavati, Munerabad viaVajrabande,Hirevenkalkunte,Talkere,Gundala,Basrehal,Gonal, Honnaval, Hosakere, Hosalii, Hanumanahalli, Singapura (ConnetingNH-13)
106
130 SH-131
Highway Connecting Hampi, Kamalapura, Hagarebomnahalli via Papnayakanahalli,Joga,Tolur,Lingadahalli,Rajapura,Bilgatte,ChickJoganahalli,MBAaikanahalli,Banavikal,Kottur,Dopadahalli,Benalkal
178
131 SH-132 Highway Connecting Kampli, Kuru godu, Kudtenni, Bellary, Moka, Alur 95
132 SH-133HighwayConnectingSoreban,Chitargi,Kodalsangama(ConnectingSH-60)viaKarlekoppa,Gomanakoppa,CholaChaugadda,Hirenasbi,Katapura, Ihole, Amungad, Chitargi, Dhanur
106
133 SH-134Highway Connecting Badami, Godaji, Gokak falls via Karur, Batkurki, Chandargi, Hirekoppa, K.S Bagachikoppa, Malikere, Munikere, Kaujalagi, Gokak
121
134 SH-135 Highway Connecting Banashankari, Mahakota, Almatti Dam via Nandikeshwara, Guledagudda, Shirur, Benekatte, Bhagvathi, Rampura 47
135 SH-136
State Highway Connecting Gajendragad, Sorab via Dindur, Nagendragad, Mushagere, Honegannur, Holemannur, Malvada, Belavneke, Lingadal, Hombala, Hulakotte, Kuntakotte, Anthur, Bemtur, Nelaguda, Mulagunda, Basapura, Shirahatti, Kadakole, Muradi, Bagewadi, Bidaralli, Ballehosur, Kittur, Horiti, Kanvalli, Mottebennur, Byadgi, Hamsabavi, Chickerur, Yalageri, Thogarsi, Udri
264
136 SH-137Highway Connecting Navalgunda, Banavasi, Mugavalli via Annegeri, Bandivadi, Kundagol, Hachinal, Kobihal, Hulgur, Karadgi, Savnur, Bankapur, Masanakatte, Koprasikoppa, Bhadrapura, Mulagi, Basi
138
137 SH-138 Highway Connecting Nagaragali, Kattekol via Nandiga Parishchad, MK Hubli, Tigadi, Inchala, Murugodu 111
138 SH-139 Highway Connecting Yargatti, Mudhol via Kattekol, Turnur, Budne 74
139 SH-140 HighwayConnectingAlanvar,BetigereviaHindasagere,Jodgere,Kuluvalli, Kittur, Sangoli, Hulki, Akkasagara 88
Sl. No. SH-No. Nomenclature of State Highways Length
(in Km)1 2 3 4
140 SH-141 Highway Connecting Maharastra border with Rakasakoppa, Sutugatte (NH-4)viaBelagundi,Kalaholu,Solaga,Hindalga,Handiganur 46
141 SH-142 Highway Connecting Kumta, Kurlekoppa via Aminahalli, Nilakunda, Kol, Sirsi 56
142 SH-143 HighwayConnectingGokarna,Vadi,DevnalliviaSanikatta,Heluru,Chinagara 79
143 SH-144 Highway Connecting Honavar, Munase via Salikod, Dodmane, Vandana 58
144 SH-145 Highway Connecting Songemane, Unchalli falls via Gidamavanakatte, Kansur, Ballekoppa 72
145 SH-146 Highway Connecting Ulavi, Diga to Goa border via Kumbaravada, Kiruvati 60
146 SH-147 HighwayConnectingChennarayapatnawithNugehalliroad(linkroadNH-48joiningtoSH-47) 17
147 SH-148Highway Connecting Kuppali, Kavishaila, Gadikalu, Katehaklu, Hedduru, Mahrshi, Bejavalli, Ayanur, Sudur, Chordi, Gama, Chinchinkoppa, Malenahalli via Hirekerur joining road.
145
148 SH-149Highway Connecting Shapura to Shivrampura to AP border SH via Vadi,Shabad,Gulbarga,Hebal,Kalagi,Mangalgi,NidagundaviaKonchavaram
192
149 SH-150 Highway Connecting Davangere, Holalu SH via Kanchikere-Bendekere 72
150 SH-151 Highway Connecting Itagi-Kanchikere SH via Kenchamanahalli-Maidur-Chegatikere-Nazirnagar-Arasikere 45
151 SH-152 HighwayConnectingNH-206Kadur-Maravanje-BelgurviaSrirampura joining SH 52
152 SH-153 HighwayConnectingNH-206Kadur-Hirenallur-Ajjampura-yaraganahalliviaNH-13joiningHollalkerenearbypassingSH 63
153 SH-154 HighwayConnectingMadras-Cannanoreroad(Paschimavahini-Ilavala) 18
154 SH-155 HighwayConnectingPattancross(SH-10)-NarayanapuraDam(SH-41) 163
155 SH-156 HighwayconnectingNH218nearKattisangavitoSH-16nearYanakanchi via Yangunti, Naribole, Gonwar, Ijeri, Yedrami, Kadakola. 95
156 SH-157 HighwayconnectingSirwalinShahpurTaluktoSH-16nearChamanalviaMaradagi,Varchanahalli,Chikkamudabal,Lakhanpur. 55
157 SH-158 HighwayconnectingNH-234inMadhugiriTaluktoAPBorderviaGondihalli, Chikka Malur and Kodigenahalli. 31
158 SH-159HighwayconnectingNH-4inSiraTaluktoAPBorderinMadhugiriTaluk near Muddenahalli via Kurihalli, Rantavalalu, Hosakere and Dodda Yalkur.
69
148
Sl. No. SH-No. Nomenclature of State Highways Length
(in Km)1 2 3 4
159 SH-160HighwayconnectingSH-3inKoratagereTaluktoAPBorderinMadhugiriTaluknearItakadibbanahalli(IDHalli)viaKodagadala(NH-234),ByalyaandPuravara.
42
160 SH-161 NH-50HosurCrosstoYalagurCrossAalamattiMuddebihalroadconnecting By-pass road 31
161 SH-162 HighwayconnectingSH-124nearMadanahipparagainMuddebihalTaluktoSH-10nearLadachincholiviaBhusnoor. 30
162 " - " Highway connecting Channapatna, Nelamangala 18163 " - " Highway connecting Channapatna, Nidasale 3164 " - " Highway connecting Kestur, Byrapattana 2165 " - " Highway connecting Mandya, Guthalu, Muttathi 52166 " - " HighwayconnectingNH-209andIggalur 11167 " - " Highway connecting Sathanur, Muttathi, Mandya 7168 " - " HighwayconnectingBangalore-Mangalore(ReturnedfromNHAI) 11
149
Appendix – 7Taluk wise road length of NH, SH & MDR as on 31-03-2020 (in Km)
150
Sl. No. Name of the TalukNational Highway
State Highway
Major District Roads
Total
1 2 3 4 5 61 Bangalore North 4.50 28.50 115.77 148.772 Bangalore South 46.17 36.20 245.90 328.273 BangaloreEast 0.00 5.20 106.30 111.504 Yelahanka 0.00 21.20 120.60 141.805 Anekal 34.43 67.80 104.07 730.34 Bangalore Urban District 85.10 158.90 692.64 936.646 Doddaballapur 31.48 66.45 198.50 296.437 Devanahalli 61.00 51.55 107.30 219.858 Hosekote 88.30 55.75 172.35 316.409 Nelamangala 61.32 35.90 192.75 1769.32 Bangalore Rural District 242.10 209.65 670.90 1122.6510 Ramanagara 28.07 63.40 500.60 592.0711 Channapatna 22.16 131.32 269.72 423.2012 Kanakapura 48.16 78.40 502.85 629.4113 Magadi 25.40 114.53 161.35 2767.33 Ramanagara District 123.79 387.65 1434.52 1945.9614 Kolar 74.05 91.32 251.69 417.0615 KGF 0.00 45.96 93.83 139.7916 Malur 7.82 65.55 94.43 167.8017 Bangarapet 0.00 31.09 106.80 137.8918 Mulbagil 70.54 0.00 354.02 2808.5019 Srinivasapura 25.00 71.60 321.70 418.30 Kolar District 177.41 305.52 1222.47 1705.4020 Chikkaballapur 87.17 17.15 202.20 306.5221 Gudibande 10.30 18.73 37.40 66.4322 Siddlaghatta 20.00 58.09 220.10 298.1923 Gouribidanur 23.70 88.60 221.30 333.6024 Chintamani 34.00 58.10 120.70 3128.4425 Bagepalli 12.23 22.33 196.48 231.04
151
Sl. No. Name of the TalukNational Highway
State Highway
Major District Roads
Total
1 2 3 4 5 6 Chikkaballapur District 187.40 263.00 998.18 1448.5826 Tumkur 54.81 92.00 368.50 515.3127 Gubbi 33.38 64.25 501.75 599.3828 Kunigal 28.30 112.06 461.75 602.1129 Turavekere 33.00 10.46 422.95 466.4130 Tiptur 47.46 45.10 276.15 368.7131 Madhugiri 37.80 151.70 380.50 570.0032 Chikkanayakanahalli 95.75 27.46 289.00 412.2133 Koratagere 6.20 69.87 242.35 318.4234 Sira 84.67 30.25 636.20 5532.1735 Pavagada 0.00 80.23 210.60 290.83 Tumkur District 421.37 683.38 3789.75 4894.5036 Mysore 114.22 56.40 457.84 628.4637 T.Narsipura 25.00 74.72 233.09 332.8138 Nanjunagud 40.80 93.45 335.26 469.5139 Krishnarajanagar 29.80 111.58 300.99 442.3740 Hunsur 49.10 43.25 527.37 619.7241 Periyapatna 54.29 45.39 338.11 7678.2042 H.D.Kote 41.40 107.32 198.55 347.2743 Saragur 0.00 16.50 160.60 177.10 Mysore District 354.61 548.61 2551.81 3455.0344 Mandya 26.52 63.64 458.78 548.9445 Maddur 14.85 73.46 501.71 590.0246 Malavalli 54.57 87.13 302.94 444.6447 Nagamangala 73.38 46.20 350.78 470.3648 K.R.Pet 0.00 87.13 550.24 6033.3649 Srirangapatna 19.79 31.90 221.74 273.4350 Pandavapura 24.98 38.20 343.21 406.39 Mandya District 214.09 427.66 2729.40 3371.1551 Chamarajanagar 79.97 71.09 287.07 438.1352 Kollegala 36.84 19.31 93.18 4489.1053 Hanur 0.00 130.19 301.52 431.7154 Gundlupet 64.34 53.07 246.30 363.7155 Yalandur 18.60 40.60 49.18 108.38
152
Sl. No. Name of the TalukNational Highway
State Highway
Major District Roads
Total
1 2 3 4 5 6 Chamarajanagar District 199.75 314.26 977.25 1491.2656 Hassan 56.33 117.65 547.56 721.5457 Arkalgud 0.00 113.69 246.53 360.2258 Alur 0.00 47.80 106.90 154.7059 Belur 58.17 75.84 310.10 444.1160 Sakeleshpura 64.14 188.79 370.93 4075.6361 Channarayapatna 44.20 143.76 670.93 858.8962 Arasikere 79.90 97.90 571.55 749.3563 Holenarsipura 34.91 124.38 306.85 466.14 Hassan District 337.65 909.81 3131.35 4378.8164 Chikamagalur 44.78 78.89 331.97 455.6465 Kadur 77.90 56.00 365.95 499.8566 Mudigere 57.60 160.00 274.70 492.3067 Tarikere 39.60 56.18 150.00 7900.9868 Narasimharajapura 0.00 39.52 163.80 203.3269 Koppa 28.00 43.07 165.00 236.0770 Ajjampura 0.00 74.50 112.50 187.0071 Shringeri 35.30 27.55 68.90 131.75 Chikkamagalur District 283.18 535.71 1632.82 2451.7172 Mangalore 75.62 62.90 279.88 3209.8573 Bhantwal 59.86 91.70 131.92 283.4874 Puttur 47.23 26.20 64.20 137.6375 Sulya 35.30 49.46 86.52 171.2876 Belthangadi 45.20 96.70 104.85 592.3977 Mudubidri 18.00 15.60 61.00 94.6078 Kadaba 24.15 110.78 47.00 181.93 Dakshina Kannada District 305.36 453.34 775.37 1534.0779 Udupi 74.97 4.20 109.50 188.6780 Kundapur 42.88 32.00 99.75 174.6381 Karkala 59.20 88.85 120.28 268.3382 Brahmavara 10.00 0.00 79.20 89.2083 Kapu 16.09 42.16 156.80 215.0584 Byandoor 49.35 71.60 192.05 313.0085 Hebri 0.00 21.50 34.30 55.80
153
Sl. No. Name of the TalukNational Highway
State Highway
Major District Roads
Total
1 2 3 4 5 6 Udupi District 252.49 260.31 791.88 1304.6886 Madakeri 47.90 91.30 263.50 402.7087 Somvarapet 47.71 228.50 251.30 527.5188 Virajpet 0.00 156.51 340.70 497.21 Kodagu District 95.61 476.31 855.50 1427.42 South Zone Total 3279.91 5934.11 22253.84 31467.8689 Dharwad 19.60 165.21 310.58 495.3990 Hubli 92.42 33.06 294.03 419.5191 Kalghatgi 33.00 58.28 214.11 305.3992 Kundhagola 6.80 71.90 170.89 249.5993 Navalgund 44.38 74.27 216.39 335.0494 Annigeri 0.00 39.67 88.03 127.7095 Alnavara 0.00 28.60 41.45 70.0596 Hubali Nagara 0.00 13.42 68.75 82.17 Dharwad District 196.20 484.41 1404.23 2084.8497 Haveri 19.47 113.06 280.46 412.9998 Hangal 0.00 114.48 321.40 435.8899 Shigaon 31.00 99.49 176.50 306.99100 Hirekarur 0.00 58.67 175.60 234.27101 Ranibennur 65.45 66.10 298.21 429.76102 Byadagi 13.30 46.60 188.32 248.22103 Savanur 3.00 34.69 236.01 273.70104 Rattihalli 0.00 16.92 171.77 188.69
Haveri District 132.22 550.01 1848.27 2530.50105 Gadag 46.65 159.73 269.90 476.28106 Mundargi 0.00 97.60 236.48 334.08107 Rona 37.00 164.23 205.97 407.20108 Nargund 26.90 40.93 120.41 188.24109 Sirahatti 0.00 89.12 101.90 191.02110 Gajendragada 0.00 65.69 80.48 146.17111 Lakshimiswara 0.00 66.12 164.20 230.32 Gadag District 110.55 683.42 1179.34 1973.31112 Karwar 30.95 103.98 134.71 269.64113 Ankola 74.22 37.67 146.08 257.97
154
Sl. No. Name of the TalukNational Highway
State Highway
Major District Roads
Total
1 2 3 4 5 6114 Kumta 79.65 42.08 223.85 345.58115 Honnavara 76.42 32.15 153.01 261.58116 Bhatkal 24.64 27.10 157.85 209.59117 Supa 31.30 222.70 138.20 392.20118 Sirsi 33.32 195.92 263.10 492.34119 Yallapura 49.00 91.09 169.95 310.04120 Haliyala 0.00 80.51 108.26 188.77121 Siddapura 26.00 223.33 338.20 587.53122 Mundugodu 0.00 90.32 152.90 243.22123 Dandeli 0.00 27.06 43.35 70.41
Uttara Kannada District 425.50 1173.91 2029.46 3628.87124 Shimoga 104.95 124.85 131.94 361.74125 Bhadravati 30.72 97.25 206.40 334.37126 Sagara 133.57 98.39 425.80 657.76127 Hosanagara 72.90 100.68 250.88 424.46128 Thirthahalli 53.50 109.60 380.30 543.40129 Soraba 0.00 148.84 342.73 491.57130 Shikaripura 35.20 158.60 265.69 459.49
Shimogga District 430.84 838.21 2003.74 3272.79131 Chitradurga 83.18 36.91 448.60 568.69132 Challakere 49.00 100.32 518.97 668.29133 Hiriyur 118.55 54.75 427.03 600.33134 Molkalmur 60.00 58.55 116.85 235.40135 Holalkere 46.45 76.06 364.00 486.51136 Hosadurga 35.65 110.56 213.36 359.57
Chitradurga District 392.83 437.15 2088.81 2918.79137 Davanagere 0.00 127.71 214.45 342.16138 Harihara 7.00 44.55 148.20 199.75139 Channagiri 85.80 150.04 247.60 483.44140 Honnali 0.00 71.85 209.25 281.10141 Jagalur 18.66 76.10 297.70 392.46142 Nyamathi 0.00 43.49 168.35 211.84
155
Sl. No. Name of the TalukNational Highway
State Highway
Major District Roads
Total
1 2 3 4 5 6 Davanagere District 111.46 513.74 1285.55 1910.75143 Belgaum 62.21 141.13 296.98 500.32144 Bailahongala 23.76 221.77 148.92 394.45145 Khanapura 34.50 222.32 176.78 433.60146 Savadatti 0.00 347.83 299.82 647.65147 Ramadurg 0.00 261.14 238.62 499.76148 Kittur 0.00 71.56 153.85 225.41149 Gokak 0.00 199.58 185.68 385.26150 Chikkodi 57.12 182.04 239.92 479.08151 Athani 87.00 143.66 414.38 645.04152 Hukkeri 58.26 145.44 299.35 503.05153 Rayabag 0.00 103.45 287.81 391.26154 Nippani 0.00 94.42 134.50 228.92155 Mudalagi 0.00 115.94 91.71 207.65156 Kagavada 0.00 101.51 77.65 179.16
Belgavi District 322.85 2351.79 3045.97 5720.61157 Vijaypur 128.17 18.08 223.51 369.76158 Basavanabagewadi 22.99 96.03 185.20 304.22159 Indi 57.26 90.71 350.40 498.37160 Muddebihal 0.00 87.01 218.38 305.39161 Sindgi 41.97 144.66 467.51 654.14162 Babaleshwara 8.05 64.68 238.85 311.58163 Nidagundi 23.45 16.80 53.57 93.82164 Trikoota 16.15 56.10 179.00 251.25165 Devarahipparagi 11.13 5.77 25.75 42.65166 Talikote 0.00 84.26 139.08 223.34167 Chadachana 0.00 23.25 222.89 246.14168 Koldhara 30.96 21.15 93.25 145.36
Vijayapur District 340.13 708.50 2397.39 3446.02169 Bagalkote 45.80 70.92 231.30 348.02170 Jamakhandi 0.00 55.48 255.99 311.47171 Bilagi 23.80 46.12 215.50 285.42172 Badami 70.50 166.70 164.45 401.65173 Hungund 39.29 146.03 75.10 260.42
Sl. No. Name of the TalukNational Highway
State Highway
Major District Roads
Total
1 2 3 4 5 6174 Mudhol 0.00 163.53 340.29 503.82175 Guledagudda 24.00 58.98 34.50 117.48176 Rabakavi-Banahatti 0.00 40.16 118.29 158.45177 Ilakal 0.00 66.44 150.78 217.22
Bagalkote District 203.39 814.36 1586.20 2603.95 North Zone 2665.97 8555.50 18868.96 30090.43178 Bellary 89.55 107.19 217.79 414.53179 Hospet 61.00 59.94 118.51 239.45180 Siraguppa 35.03 115.30 144.25 294.58181 Sandur 10.77 124.60 263.65 399.02182 Hadagali 0.00 146.83 248.79 395.62183 Kudligi 51.10 109.65 250.85 411.60184 Hagaribommanahalli 0.00 95.80 228.10 323.90185 Kurukodu 20.85 48.56 133.80 203.21186 Kootturu 0.00 76.85 92.10 168.95187 Kampli 0.00 46.83 104.20 151.03188 Harapanahalli 0.00 216.92 313.80 530.72
Bellary District 268.30 1148.47 2115.84 3532.61189 Raichur 56.50 78.90 339.19 474.59190 Lingusugur 38.20 138.74 264.45 441.39191 Manvi 0.00 133.20 105.97 239.17192 Devadurga 0.00 164.14 236.90 401.04193 Sindhanur 33.92 100.00 211.70 345.62194 Maski 37.50 112.04 229.94 379.48195 Siravara 0.00 123.50 118.30 241.80
Raichur District 166.12 850.52 1506.45 2523.09196 Koppal 162.07 142.84 322.78 627.69197 Gangavathi 0.00 63.94 153.50 217.44198 Yalaburga 78.00 145.00 209.95 432.95199 Kustagi 20.00 190.28 253.26 463.54200 Kukanoor 0.00 0.00 240.14 240.14201 Kanakagiri 0.00 92.16 154.70 246.86202 Karatagi 0.00 32.78 108.60 141.38
156
Sl. No. Name of the TalukNational Highway
State Highway
Major District Roads
Total
1 2 3 4 5 6 Koppal District 260.07 667.00 1442.93 2370.00203 Kalburgi 94.40 81.70 125.59 301.69204 Chitapura 39.00 132.25 148.28 319.53205 Aland 0.00 250.50 95.55 346.05206 Afzalpur 77.22 110.70 135.53 323.45207 Chincholi 0.00 176.28 38.32 214.60208 Jevargi 81.20 98.30 188.12 367.62209 Sedam 0.00 154.70 246.10 400.80210 Kalagi 0.00 138.46 19.00 157.46211 Kamalapura 28.60 81.23 36.00 145.83212 Yadrami 0.00 127.05 85.30 212.35213 Shahabad 0.00 33.88 116.51 150.39
Kalburgi District 320.42 1385.05 1234.30 2939.77214 Yadigiri 66.00 62.22 269.17 397.39215 Shahpur 62.50 75.66 217.59 355.75216 Shorapur 38.30 90.00 230.10 358.40217 Hunasagi 0.00 77.80 182.31 260.11218 Vadageeri 0.00 38.03 151.90 189.93219 Gurumitakal 0.00 80.26 166.45 246.71
Yadgir District 166.80 423.97 1217.52 1808.29220 Bidar 54.88 90.69 260.49 406.06221 Humanabad 69.00 19.10 69.40 157.50222 Aurad 82.70 97.10 122.30 302.10223 Basavakalyana 39.80 158.43 105.89 304.12224 Bhalki 66.40 53.63 115.60 235.63225 Chitaguppa 18.00 43.22 115.00 176.22226 Hulasoor 0.00 18.54 9.60 28.14227 Kamalanagar 0.00 24.55 81.80 106.35
Bidar District 330.78 505.26 880.08 1716.12 North East Zone 1512.49 4980.27 8397.12 14889.88 NH Yet to be allocated 130.30 0.00 0.00 130.30 State Total 7588.67 19469.88 49519.92 76578.47
157
Sl. No.
Name of Port Import Export TotalRevenue earned
1 Karwar Port 820323 40303 860626 1671.93
2 Belekeri Port - - - 7.74
3 Tadadi Port - - - 3.27
4 Honnavar Port - - - 16.11
5 Bhatkal Port - - - 0.48
6 Kundapur Port - - - 31.85
7 Malpe Port - - - 39.59
8 Hangarkatta Port - - - 3.2
9 Padubidri Port - - - -
10 OldMangalorePort 550 73840 74390 276.79
Total 820873 114143 935016 2050.96
Appendix – 8STATEMENT SHOWING THE CARGO HANDLED DURING 2019-20
(In M.T.)
158
Appendix – 9Constituency wise road length SH & MDR as on 31-03-2020 (In km)
159
Sl. No. District Name of the Taluk Sl.
No.Name of the Constituency
State Highway
Major District Roads
Total
1 2 3 4 5 6 7 8
1 Bangalore Urban
Bangalore North, Yelahanka 1 Yelahanka 32.20 193.70 225.90Bangalore North 2 Bytarayanapura 17.50 22.27 39.77Bangalore North, Bangalore South 3 Yeshwanthpura 36.20 243.00 279.20
Bangalore North 4 Dasarahalli 0.00 6.20 6.20Bangalore South, Anekal 5 Bangalore South 31.00 55.23 86.23BangaloreEast 6 Mahadevpura 5.20 106.30 111.50Anekal 7 Anekal 36.80 65.94 102.74
Bangalore Urban District 158.90 692.64 851.54
2 Bangalore Rural
Hosakote 8 Hosakote 55.75 172.35 228.10Devanahalli, Doddaballapura 9 Devanahalli 72.50 151.05 223.55Nelamangala, Magadi 10 Nelamangala 35.90 192.75 228.65Doddaballapura 11 Doddaballapura 45.50 154.75 200.25Bangalore Rural District 209.65 670.90 880.55
3 Ramnagara
Ramanagara, Kanakapura 12 Ramanagara 12.60 422.40 435.00Kanakapura 13 Kanakapura 78.40 314.45 392.85Channapatna 14 Channapatna 131.32 269.72 401.04Magadi, Ramanagara 15 Magadi 147.53 361.25 508.78Magadi Nelamangala 17.80 66.70 84.50
Ramanagara District 387.65 1434.52 1822.17
4 Kolar
Kolar 16 Kolar 57.42 125.20 182.62Bangarpet 17 K.G.F 45.96 93.83 139.79Kolar, Bangarpet 18 Bangarpet 44.59 119.89 164.48Mulabagal 19 Mulabagal 0.00 354.02 354.02Kolar, Srinivasapura 20 Srinivasapura 92.00 435.10 527.10Malur 21 Malur 65.55 94.43 159.98
Kolar District 305.52 1222.47 1527.99
5 Chikballapur
Chickaballapur, Gowribidanur 22 Chickaballapur 29.05 227.45 256.50
Sidlaghatta, Chintamani 23 Sidlaghatta 58.09 237.30 295.39Chintamani 24 Chintamani 58.10 103.50 161.60Gowribidanur 25 Gowribidanur 76.70 196.05 272.75Bagepalli, Gudibande 26 Bagepalli 41.06 233.88 274.94
Chickaballapur District 263.00 998.18 1261.18
160
Sl. No. District Name of the Taluk Sl.
No.Name of the Constituency
State Highway
Major District Roads
Total
1 2 3 4 5 6 7 8
6 Tumkur
Tumkur 27 Tumkur Rural 92.00 317.60 409.60Gubbi 28 Gubbi 48.25 369.10 417.35Kunigal 29 Kunigal 112.06 461.75 573.81Turuvekere, Gubbi 30 Turuvekere 26.46 555.60 582.06Tiptur 31 Tiptur 45.10 276.15 321.25Chikkanayakanahalli, Sira 32 Chikkanayakanahalli 35.21 394.70 429.91Sira 33 Sira 22.50 530.50 553.00Koratagere, Tumkur, Madhugiri 34 Koratagere 77.87 348.65 426.52
Madhugiri 35 Madhugiri 143.70 325.10 468.80Pavagada 36 Pavagada 80.23 210.60 290.83
Tumkur District 683.38 3789.75 4473.13
7 Mysore
Mysore 37 Chamundeshwari 37.57 338.13 375.70Mysore, T.Narasipura, Nanjangud 38 Varuna 78.38 291.46 369.84
T.Narasipura 39 T.Narasipura 67.42 210.04 277.46Nanjangud 40 Nanjangud 41.20 186.56 227.76Hunsur 41 Hunsur 43.25 527.37 570.62K.R.Nagar 42 K.R.Nagar 111.58 300.99 412.57Periyapatna 43 Periyapatna 45.39 338.11 383.50H.D.Kote 44 H.D.Kote 123.82 359.15 482.97
Mysore District 548.61 2551.81 3100.42
8 Chama-rajanagar
Chamarajanagar 45 Chamarajanagar 46.53 172.10 218.63Gundulpet, Chamarajanagar 46 Gundulpet 53.07 297.96 351.03Kollegal, Yelandur, Chamarajanagar 47 Kollegal 74.16 134.87 209.03
Kollegal 48 Hanur 140.50 372.32 512.82Chamarajanagar District 314.26 977.25 1291.51
9 Mandya
Mandya 49 Mandya 32.41 231.40 263.81Maddur 50 Maddur 63.17 376.64 439.81Malavalli 51 Malavalli 87.13 302.94 390.07Nagamangala, Maddur 52 Nagamangala 56.49 475.85 532.34K.R.Pet 53 K.R.Pet 87.13 550.24 637.37Srirangapatna, Mandya 54 Srirangapatna 44.84 341.24 386.08Pandavpura, Mandya 55 Melukote 56.49 451.09 507.58
Mandya District 427.66 2729.40 3157.06
161
Sl. No. District Name of the Taluk Sl.
No.Name of the Constituency
State Highway
Major District Roads
Total
1 2 3 4 5 6 7 8
10 Hassan
Hassan 56 Hassan 43.07 202.87 245.94Channarayapatna, 57 Shravanabelagola 109.81 471.68 581.49Holenarasipur, Hassan, Channarayapatna 58 Holenarasipur 160.43 655.30 815.73
Belur, Arasikere 59 Belur 75.84 416.10 491.94Arasikere 60 Arasikere 97.90 465.55 563.45Arakalgud, Holenarasipura 61 Arakalgud 150.72 388.73 539.45Alur, Sakaleshpura, Hassan 62 Sakaleshpura 272.04 531.12 803.16
Hassan District 909.81 3131.35 4041.16
11 Chikmagalur
Chikmagalur 63 Chikmagalur 35.43 307.10 342.53Tarikere 64 Tarikere 120.38 223.50 343.88Mudigere 65 Mudigere 189.21 394.77 583.98Sringere, Koppa, N.R.Pura 66 Sringere 124.39 432.90 557.29Kadur 67 Kadur 66.30 274.55 340.85
Chikmagalur District 535.71 1632.82 2168.53
12 Dakshina Kannada
Mangalore 68 Mangalore North 6.50 92.90 99.40Mangalore 69 Mulki-Moodabidre 72.00 176.02 248.02Mangalore, Bantwal 70 Mangalore 0.00 96.36 96.36Bantwal 71 Bantwal 52.97 98.52 151.49Puttur, Bantwal 72 Puttur 64.93 73.20 138.13Sullia, Puttur 73 Sullia 160.24 133.52 293.76Belthangady 74 Belthangady 96.70 104.85 201.55
Dakshina Kannada District 453.34 775.37 1228.71
13 Udupi
Udupi 75 Udupi 4.20 109.50 113.70Udupi 76 Kapu 42.16 156.80 198.96Kundapura 77 Kundapura 32.00 178.95 210.95Kundapura 78 Byndoor 71.60 192.05 263.65Karkala 79 Karkala 110.35 154.58 264.93Udupi District 260.31 791.88 1052.19
14 KodaguMadikeri, Somwarpet 80 Madikeri 263.30 335.10 598.40Virajpet 81 Virajpet 213.01 520.40 733.41
Kodagu District 476.31 855.50 1331.81 South Zone Total 5934.11 22253.84 28187.95
162
Sl. No. District Name of the Taluk Sl.
No.Name of the Constituency
State Highway
Major District Roads
Total
1 2 3 4 5 6 7 8
15 Dharwad
Dharwad 82 Dharwad Rural 97.22 197.47 294.69
Hubli 83 Hubli-Dharwad East
4.27 23.55 27.82
Hubli 84 Hubli -Dharwad West
32.26 72.01 104.27
Hubli 85 Hubli Central 7.60 28.11 35.71Kalghatagi, Dharwad 86 Kalghatagi 124.16 339.47 463.63Kundgol, Hubli 87 Kundgol 80.80 296.56 377.36Navalagund, Hubli 88 Navalagund 138.10 447.06 585.16
Dharwad District 484.41 1404.23 1888.64
16 Gadag
Gadag 89 Gadag 159.73 269.90 429.63Ron, Gadag, Mundargi 90 Ron 290.65 409.50 700.15Shirahatti, Mundargi 91 Shirahatti 188.66 338.03 526.69Naragund, Gadag, Ron 92 Naragund 44.38 161.91 206.29
Gadag District 683.42 1179.34 1862.76
17 Haveri
Haveri, Savanur 93 Haveri 103.54 319.07 422.61Hangal 94 Hangal 114.48 321.40 435.88Hirekerur 95 Hirekerur 75.59 347.37 422.96Ranebennur 96 Ranebennur 49.62 222.41 272.03Byadagi, Haveri, Ranebennur 97 Byadagi 80.62 356.59 437.21
Shiggaon, Savanur 98 Shiggaon 126.16 281.43 407.59Haveri District 550.01 1848.27 2398.28
18 Uttara Kannada
Karwar, Ankola 99 Karwar 141.65 280.79 422.44Kumta, Honnavar 100 Kumta 64.43 295.73 360.16Bhatkal 101 Bhatkal 36.90 238.98 275.88Sirsi, Siddapur 102 Sirsi 348.12 531.00 879.12Yellapur, Mundagod, Sirsi 103 Yellapur 252.54 393.15 645.69Haliyal,Joida 104 Haliyal 330.27 289.81 620.08
Uttara Kannada District 1173.91 2029.46 3203.37
19 Shimoga
Thirthahalli, Shimoga, Hosanagar 105 Thirthahalli 165.93 525.86 691.79
Sagara, Hosanagar, Sorab 106 Sagara 153.87 455.20 609.07Shikaripura 107 Shikaripura 158.60 265.69 424.29Soraba 108 Soraba 148.84 435.35 584.19Shimoga 109 Shimoga 14.40 22.45 36.85Shimoga, Bhadravathi 110 Shimoga Rural 129.32 181.19 310.51Bhadravathi 111 Bhadravathi 67.25 118.00 185.25
Shimoga District 838.21 2003.74 2841.95
163
Sl. No. District Name of the Taluk Sl.
No.Name of the Constituency
State Highway
Major District Roads
Total
1 2 3 4 5 6 7 8
20 Chitradurga
Chitradurga 112 Chitradurga 36.91 178.40 215.31
Challakere 113 Challakere 61.12 362.05 423.17
Hiriyuru 114 Hiriyuru 54.75 427.03 481.78
Holalkere 115 Holalkere 76.06 543.65 619.71
Hosadurga 116 Hosadurga 110.56 213.36 323.92
Molkalmur, Challakere 117 Molkalmur 97.75 364.32 462.07
Chitradurga District 437.15 2088.81 2525.96
21 Davangere
Davanagere 118 Davanagere North 32.16 32.65 64.81
Davanagere 119 Davanagere South 19.25 52.10 71.35
Davanagere, Channagiri 120 Mayakonda 103.47 192.50 295.97
Jagalur,Harapanahalli 121 Jagalur 76.10 297.70 373.80
Channagiri 122 Channagiri 122.87 184.80 307.67
Harihara 123 Harihara 44.55 148.20 192.75
Honnali 124 Honnali 115.34 377.60 492.94
Davanagere District 513.74 1285.55 1799.29
22 Belgavi
Belagavi, Hukkeri 126 Yamakanmaradi 88.23 172.33 260.56
Belagavi 127 Belagavi North 20.32 9.06 29.38
Belagavi 128 Belagavi South 12.33 22.60 34.93
Belagavi 129 Belagavi Rural 70.21 196.84 267.05
Khanapur 130 Khanapur 222.32 176.78 399.10
Baihongal, Savadatti 131 Baihongal 199.31 188.57 387.88
Baihongal 132 Kittur 202.45 214.02 416.47
Ramdurg 133 Ramdurg 261.14 238.62 499.76
Saudatti 134 Saudatti 239.40 200.00 439.40
Chikkodi 135 Chikkodi Sadalaga 130.97 130.58 261.55
Chikkodi 136 Nippani 94.42 134.50 228.92
Raibag, Chikkodi 137 Raibag 102.33 267.09 369.42
Raibag 138 Kudachi 52.19 130.06 182.25
Hukkeri 139 Hukkeri 95.48 195.50 290.98
Gokak 140 Gokak 147.70 128.60 276.30
Gokak 141 Arabhavi 167.82 148.79 316.61
Athani 142 Athani 119.66 260.25 379.91
Athani 143 Kagawad 125.51 231.78 357.29
Belgaum District 2351.79 3045.97 5397.76
Sl. No. District Name of the Taluk Sl.
No.Name of the Constituency
State Highway
Major District Roads
Total
1 2 3 4 5 6 7 8
23 Bagalkote
Bagalkote, Hunagund 144 Bagalkote 76.71 197.57 274.28Badami 145 Badami 177.70 150.64 328.34Hunagund 146 Hunagund 182.13 201.98 384.11Bilagi, Bagalkote, Badami 147 Bilagi 118.65 321.44 440.09Mudhol 148 Mudhol 141.57 296.29 437.86Jamakhandi 149 Jamakhandi 55.48 255.99 311.47Mudhol,Jamakhandi 150 Terdal 62.12 162.29 224.41
Bagalkote District 814.36 1586.20 2400.56
24 Vijayapura
Muddebihal 151 Muddebihal 128.87 269.45 398.32B.Bagewadi, Sindagi, Muddebihal 152 D.Hipparagi 140.71 347.17 487.88
B.Bagewadi 153 B.Bagewadi 85.70 260.00 345.70Vijayapura 154 Babaleshwar 108.46 393.85 502.31Vijayapura 155 Vijayapura 8.43 24.00 32.43Vijayapura,Indi 156 Nagathan 45.22 446.40 491.62Indi 157 Indi 83.88 319.40 403.28Sindagi, Indi 158 Sindagi 107.23 337.12 444.35
Bijapur District 708.50 2397.39 3105.89 North Zone Total 8555.50 18868.96 27424.46
25 Ballari
Ballari 159 Ballari Urban 13.30 15.22 28.52Ballari 160 Ballari Rural 73.30 202.67 275.97Ballari, Hospet 161 Kampli 101.03 222.20 323.23Sandur, Ballari 162 Sandur 139.55 279.35 418.90Hospet 163 Vijayanagara 53.94 77.46 131.40Hagaribommanahalli, Hospet, Kudligi 164 Hagaribommanahalli 156.63 244.16 400.79
Siruguppa 165 Siruguppa 115.30 144.25 259.55Hadagali, H.B.Halli 166 Hadagali 155.19 306.78 461.97Kudligi 167 Kudligi 121.67 314.05 435.72Harapanahalli 168 Harapanahalli 185.32 253.20 438.52Harapanahalli - Jagaluru 31.60 60.60 92.20
Bellari District 1146.83 2119.94 3266.77
26 Raichur
Raichur, Manvi 169 Raichur Rural 104.17 253.33 357.50Raichur 170 Raichur 15.60 97.16 112.76Manvi 171 Manvi 216.45 203.67 420.12Devadurga 172 Devadurga 164.14 236.90 401.04Lingasugur 173 Lingasugur 138.74 264.45 403.19Sindhanoor 174 Sindhanoor 99.40 193.28 292.68Maski, Sindhanur, Lingasugur 175 Maski 112.02 257.66 369.68
Raichur District 850.52 1506.45 2356.97
164
Sl. No. District Name of the Taluk Sl.
No.Name of the Constituency
State Highway
Major District Roads
Total
1 2 3 4 5 6 7 8
27 Koppal
Gangavathi, Koppal 176 Gangavathi 48.40 133.80 182.20Gangavathi 177 Kanakagiri 138.76 291.10 429.86Koppal 178 Koppal 144.56 316.28 460.84Kushtagi 179 Kushtagi 190.28 253.26 443.54Yelburgra 180 Yelburgra 145.00 450.09 595.09
Koppal District 667.00 1444.53 2111.53
28 Kalburgi
Kalburgi 181 Kalburgi Rural 167.88 162.99 330.87Kalburgi 182 Kalburgi South 28.50 17.00 45.50Kalburgi 183 Kalburgi North 3.60 0.00 3.60Afzalapur 184 Afzalapur 120.70 143.03 263.73Aland 185 Aland 227.00 73.75 300.75Jewargi,Chittapur 186 Jewargi 225.35 273.42 498.77Sedam, Chincholi 187 Sedam 206.40 236.37 442.77Sedam, Chincholi 188 Chincholi 212.03 127.35 339.38Chittapur,Jewargi 189 Chittapur 193.59 200.39 393.98
Kalburgi District 1385.05 1234.30 2619.35
29 Yadgir
Yadgir, Shahapur 190 Yadgir 132.90 378.32 511.22Yadgir 191 Gurmitkal 85.77 263.35 349.12Shorapur 192 Shorapur 103.00 282.77 385.77Shahapur, Shorapur 193 Shahapur 102.30 293.08 395.38
Yadgir District 423.97 1217.52 1641.49
30 Bidar
B.Kalyan 194 B.Kalyan 176.97 115.49 292.46Aurad 195 Aurad 121.65 204.10 325.75Bidar, Humnabad 196 Bidar south 85.55 220.79 306.34Bidar 197 Bidar 33.67 112.20 145.87Bhalki 198 Bhalki 53.63 115.60 169.23Humanabad, B.Kalyan 199 Humanabad 33.79 111.90 145.69
Bidar District 505.26 880.08 1385.34 North East Zone Total 4978.63 8402.82 13381.45
State Total 19468.24 49525.62 68993.86
165