Goose Creek Water Treatment Plant Water Treatment Assessment and Financial Evaluation September 20, 2011 City of Fairfax Utilities Department 1
62

Goose Creek Water Treatment Plant Water Treatment ...

Dec 22, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Goose Creek Water Treatment Plant Water Treatment ...

Goose Creek Water Treatment Plant Water Treatment

Assessment and Financial Evaluation

September 20, 2011

City of Fairfax Utilities Department

1

Page 2: Goose Creek Water Treatment Plant Water Treatment ...

City Council Goal No. 2 (2010-2012)

“Develop cost scenarios for future water treatment alternatives to enable the City Council to determine the most efficient and effective long term water treatment options.”

Adopted October 10, 2010

2

Page 3: Goose Creek Water Treatment Plant Water Treatment ...

AGENDA A. Purpose of Work Session B. Introductions C. Assessments & Capital Needs

1. Intake, Safe Yield and Dams Assessment 2. Treatment Assessment and Upgrade Program 3. Transmission Main Assessment 4. Market Analysis of Land Assets 5. Risk Considerations

D. Financial Analysis of Alternatives E. Review by City’s Financial Advisor

3

Page 4: Goose Creek Water Treatment Plant Water Treatment ...

A. Purpose of Work Session 1. Summary Assessments & Cost Scenarios using: Capital Cost Estimates Comparison of Projected User Rates

2. Select 2 Alternatives for further detailed evaluation: Stay in Water Treatment Purchase from Fairfax Water Both: Full Service Area

w/ Redundancy

4

Page 5: Goose Creek Water Treatment Plant Water Treatment ...

B. Introductions

Dick Dyne – Design-Build Manager (CH2M HILL) Mike Matichich – Financial Analysis (CH2M HILL) Mark Notheis – Project Engineer (CH2M HILL) Jimmie Jenkins – Consulting (CH2M HILL) Aaron Keno – Water Source & Dams

(Gannett Fleming) Lauren Sufleta – Transmission Main (City) (WRA) Bob Woodruff – Land Use Valuation

(William H. Gordon & Assoc.) David Rose – Financial Review (Davenport)

5

Page 6: Goose Creek Water Treatment Plant Water Treatment ...

C. Assessments & Capital Needs

6

Page 7: Goose Creek Water Treatment Plant Water Treatment ...
Page 8: Goose Creek Water Treatment Plant Water Treatment ...

Accuracy Increases

Ord

er o

f Mag

nitu

de

Pla

nnin

g E

stim

ate

Pla

ns &

Spe

cific

atio

ns

PLUS +

MINUS -

The “envelope” of accuracy in estimating construction costs

Actual Bid(s)

8

Page 9: Goose Creek Water Treatment Plant Water Treatment ...

C.1 – Intake, Safe Yield and Dams Assessment

• The Intake is on Goose Creek – Intake baskets; manually cleaned – Single 24-inch pipeline to wet well

• Goose Creek is subject to siltation – Reservoir was 200 million gallons (MG) in 1980

and was restored to 200 MG again in 1997 – Current reservoir is approximately 120 MG

9

Page 10: Goose Creek Water Treatment Plant Water Treatment ...

Safe Yield

• The Safe Yield of Goose Creek and Beaverdam Creek Reservoir is 9.9 million gallons per day (mgd) – Recent hydrological and safe yield study by

Gannett Fleming – Adequate capacity for City Service Area for the 20

year period – Subject to water conservation and manual refill

operations

10

Page 11: Goose Creek Water Treatment Plant Water Treatment ...

Goose Creek Dam

• The concrete Dam at Goose Creek is in good condition.

• Limited dredging is planned. • Rehabilitation is expected to be composed of

new drain valve; seepage monitoring; and other minor changes.

Capital Costs are estimated to be $1.25 M

11

Page 12: Goose Creek Water Treatment Plant Water Treatment ...

12

Page 13: Goose Creek Water Treatment Plant Water Treatment ...

Beaverdam Creek Dam • The earthen Dam at Beaverdam Creek is

homogeneous and in good condition. • New legislation (Code of VA; 10.1-605) (2010)

requires a new or expanded spillway and outlet system.

• Monitoring systems will be provided this year.

• Capital Costs are estimated to be $11.6 M

13

Page 14: Goose Creek Water Treatment Plant Water Treatment ...

14

Major Improvements Required: - Outlet Capacity - Channel Capacity & Stability

Page 15: Goose Creek Water Treatment Plant Water Treatment ...

Weathered Rock

Page 16: Goose Creek Water Treatment Plant Water Treatment ...
Page 17: Goose Creek Water Treatment Plant Water Treatment ...
Page 18: Goose Creek Water Treatment Plant Water Treatment ...

18

Spillway, $8.6

Embankment, $2.5

Dredging, $1.0

Other, $0.8

Improvements to Dams $ 12.9 M

Page 19: Goose Creek Water Treatment Plant Water Treatment ...

C.2 - Treatment Assessment and Upgrade Program

• Source is Goose Creek with a side-storage reservoir (Beaverdam Creek) for low stream flow periods.

• Treatment includes 9 different chemicals, sedimentation, filtration and disinfection.

• Single Transmission Main to City is 22 miles

19

Page 20: Goose Creek Water Treatment Plant Water Treatment ...

20

Page 21: Goose Creek Water Treatment Plant Water Treatment ...

Raw Water Pump Station is constructed on the shore of Goose Creek with one intake approximately

120-feet off-shore.

21

Page 22: Goose Creek Water Treatment Plant Water Treatment ...

Original plant commissioned in 1961. The major upgrade and expansion was in 1981.

22

Page 23: Goose Creek Water Treatment Plant Water Treatment ...

Plant is limited to the conventional process that meets current SDWA requirements.

23

Page 24: Goose Creek Water Treatment Plant Water Treatment ...

Most of the chemicals used for treatment will be consolidated in a new Chemical Feed Building.

24

Page 25: Goose Creek Water Treatment Plant Water Treatment ...

25

Raw Water P.S., $4.1

Chemical Building, $6.1

Generators, $1.3

New Flocculator,

$1.0

Other, $4.3

Treatment Plant $ 16.8 M

The Planning Estimate: for 22 scope items

Page 26: Goose Creek Water Treatment Plant Water Treatment ...

C.3 - Transmission Main Assessment

• P-Wave – 12,000 LF of Electromagnetic Investigation – Pipe condition (structural, i.e., wire)

• Three (3) broken wire sections identified: 1. 50-inch 2. 25-inch 3. 10-inch

26

Page 27: Goose Creek Water Treatment Plant Water Treatment ...

• Smartball – 66,500 LF of Ultrasonic Sound Investigation – Two (2) leaks detected

• An air valve to be replaced • Other not easily identified

27

Transmission Main is in good condition

Capital Costs are estimated to be $0.325 M

Page 28: Goose Creek Water Treatment Plant Water Treatment ...

28

Dams, $12.9

Treatment, $16.8

Transmission, $0.3

Treatment Program $ 30.0 M

Page 29: Goose Creek Water Treatment Plant Water Treatment ...

C.4 - Market Analysis of Land Assets

• Plant and Reservoirs are on the edge of the Loudoun County Transition Policy Area (TPA)

• Land is zoned as Industrial and low density Residential

• Land has limited frontage • Land is inefficient; subject to flood plain and

deep setbacks

29

Page 30: Goose Creek Water Treatment Plant Water Treatment ...

DULLES AIRPORT

TOWN OF LEESBURG

GOOSE CREEK TREATMENT

PLANT

BEAVERDAM RESERVIOR

Page 31: Goose Creek Water Treatment Plant Water Treatment ...

SUBURBAN POLICY AREA

Page 32: Goose Creek Water Treatment Plant Water Treatment ...

TRANSITION POLICY AREA

Page 33: Goose Creek Water Treatment Plant Water Treatment ...
Page 34: Goose Creek Water Treatment Plant Water Treatment ...

TR-10 ZONE

PD-GI ZONE

PD-IP ZONE

Page 35: Goose Creek Water Treatment Plant Water Treatment ...

MAJOR FLOODPLAIN

Page 36: Goose Creek Water Treatment Plant Water Treatment ...

MAJOR FLOODPLAIN 300’

SETBACK 100’

SETBACK

Page 37: Goose Creek Water Treatment Plant Water Treatment ...

300’ SETBACK

MAJOR FLOODPLAIN

100’ SETBACK QUARRY

NOTIFICATION OVERLAY DISTRICT

Page 38: Goose Creek Water Treatment Plant Water Treatment ...
Page 39: Goose Creek Water Treatment Plant Water Treatment ...

TR-10 ZONE

Page 40: Goose Creek Water Treatment Plant Water Treatment ...

R-1 ZONE

TR-10 ZONE

Page 41: Goose Creek Water Treatment Plant Water Treatment ...

300’ SETBACK

MAJOR FLOODPLAIN

Page 42: Goose Creek Water Treatment Plant Water Treatment ...

Maximum Theoretical Density under Perfect Conditions (By-Right)

42

Zoning

Net Area Dwelling

Units

Area (FAR= 0.4) X

1,000

TR-10 144.2 14

R-1 88.1 88

PD-IP 19.3 336

PD-GI 84.2 1,467

Page 43: Goose Creek Water Treatment Plant Water Treatment ...

C.5 – Risk Considerations

• Reliability – Power Failure – The 2-Year Drought – Lack of Redundant Conveyance – Limited Fairfax Water Emergency Agreement

• Cost Uncertainty – Employment – Energy

• Compliance with SDWA

43

Page 44: Goose Creek Water Treatment Plant Water Treatment ...

All manageable except:

44

Lack of Redundant Conveyance

Page 45: Goose Creek Water Treatment Plant Water Treatment ...

Introduce Option 1B = 1A with Redundancy

New Submersible Raw Water P.S. (Add-in) $ 1.18 M Pump-back Improvement at Beaverdam Creek

$ 1.30 M

Raw Water Force Main $ 0.78 M Emergency Connection $ 1.00 M Transmission Main in County $ 11.22 M TOTAL – Redundancy Program $ 15.5 M

45

Page 46: Goose Creek Water Treatment Plant Water Treatment ...

D - Financial Analysis of Alternatives

Options were developed through a participatory process that included: – Loudoun Water – Fairfax Water – Falls Church – Consultants for each Discipline – City Management

46

Page 47: Goose Creek Water Treatment Plant Water Treatment ...

Five Options Were Developed & Evaluated

• Option 1A: City Stays in the Water Treatment Business • Option 2A: City Purchases Capacity from Fairfax Water (In-

City only) • Option 2B: City Purchases Capacity from Fairfax Water (Full

Service Area) • Option 2C: City Purchases Capacity from Fairfax Water (Full

Service Area less County Residential) and later: • Option 1B: City Stays in the Water Treatment Business with

Redundancy

47

Page 48: Goose Creek Water Treatment Plant Water Treatment ...

Order of Magnitude Valuation of City Assets

• $ 10 M for 620 Acres at Reservoir • Unknown Market Conditions at Plant • $ 5 M for Transmission Main to Loudoun • Up to $ 15 M for Transmission/Distribution

and partial storage at University Tank • Conclusion: Assets are not of high values

48

Page 49: Goose Creek Water Treatment Plant Water Treatment ...

49

Factor Options - Treatment Only 1A 1B 2A 2B 2C

Max. Day 10.0 MGD

10.0 MGD

7.0 MGD

10.0 MGD

8.5 MGD

Capital Costs $ 30.0 M $ 45.5 M $ 31.5 M $ 45.0 M $ 38.25M

Potential Sales N/A N/A $ 30.0 M $ 15.0 M $ 22.0 M

Bond $ 30.0 M $ 45.5 M $ 1.5 M $ 30.0 M $ 16.25M Median

User Rate $6.77 $7.47 $7.31 $6.70 $6.94

Table excludes Inflation for User Rate Median User Rate demonstrates impact to customer

City still borrows money for Line Maintenance

Page 50: Goose Creek Water Treatment Plant Water Treatment ...

Financial Model Assumptions

• 20 year solution • 30 year borrowing at 6.0 % • Best available estimates in today’s dollars • All Capital Costs are bonded • Purchase Price for Fairfax Water supply = $4.5M per MGD • Treatment Costs for Fairfax Water = $1.20 per 1,000 gallons purchased • Loss of Loudoun Water by 2018

50

Page 51: Goose Creek Water Treatment Plant Water Treatment ...

51

Page 52: Goose Creek Water Treatment Plant Water Treatment ...

Factors Used to Illustrate Inflation

52

Component Standard Factor Labor ECI 3.0 % Fixed Costs CPI-Urban 2.5 % Variable Costs CPI-Urban 2.5 % Capital Expenses ENR - 10 3.7 % Future Debt Service 6.0 % Wholesale Water Price 4.0 % Increase in Consumption 0.0 % Availability Fee Revenue Zero

Page 53: Goose Creek Water Treatment Plant Water Treatment ...

53

$4.00

$6.00

$8.00

$10.00

$12.00

$14.00

$16.00 R

etai

l Rat

e ($

per

Kga

l)

Alternative Comparison ($ per Kgal) Inflationary

Alternative 1A - City Stays in Water Treatment Business

Alternative 2A - City Purchases Capacity from FW (In-City only)

Alternative 2B - City Purchases Capacity from FW (Full Service Area)

Alternative 2C - City Purchases Capacity from FW (Full Service Area less County Residential) Alternative 1B - Ciy Stays in Water Treatment Business with Higher Reliability

Page 54: Goose Creek Water Treatment Plant Water Treatment ...

E - Peer Review of Financial Analysis

• Davenport & Company LLC, in our capacity as Financial Advisor to the City of Fairfax, has attended meetings, provided input on Key Assumptions, and reviewed the five options prepared by the City’s other Key Utility Advisors.

• Davenport’s goal was to provide insight on key assumptions in order to further refine the relative Cost / Benefit Analysis of the options.

Page 55: Goose Creek Water Treatment Plant Water Treatment ...

Initial Observations

• Capital Related – Retaining ownership of the entire system (i.e. Option #1B)

will require the City to make considerable capital investments over the next several fiscal years (i.e. $34 million between fiscal years 2012 and 2013 alone and $48.5 million total by fiscal year 2016).

– That said, under all other options, the City will still need to make a substantial capital investment by fiscal year 2016.

Page 56: Goose Creek Water Treatment Plant Water Treatment ...

Projected 5 Year Capital Requirements • Given the uncertain nature of the revenues from sale of

assets in Options #2A, 2B, and 2C there is risk that the amount of capital the City will need to fund with new borrowing could be greater.

$0 $10 $20 $30 $40 $50 $60

2C

2B

2A

1B

1A

Millions

Projected 5 Year Capital Requirements

Capital Requirements net of Estimated Asset Sales

Estimated Asset Sales to Offset Capital

Page 57: Goose Creek Water Treatment Plant Water Treatment ...

Projected 20 Year Capital Requirements

• After fiscal year 2016 all of the options require approximately the same capital per year. As such, total projected capital needs over a 20 year period are within the same order of magnitude for each option.

$0 $20 $40 $60 $80 $100

2C

2B

2A

1B

1A

Millions

Projected 20 Year Capital Requirements

Capital Requirements net of Estimated Asset Sales

Estimated Asset Sales to Offset Capital

Page 58: Goose Creek Water Treatment Plant Water Treatment ...

Debt Structuring

• For purposes of initial modeling all options assume that new debt is repaid at a 6% interest rate with 30 years of level annual debt service.

• Thus, under all scenarios, there is the ability to incorporate strategic debt structuring to lessen the budgetary impact of new debt as well as the ability to obtain a lower interest rate (based on current market conditions).

Page 59: Goose Creek Water Treatment Plant Water Treatment ...

Summary Observations • When viewed on a projected user rate basis, Option #1B (i.e. retain

City ownership) is approximately 10% to 12% more costly than options 2B and 2C (i.e. the lowest cost of the “sell the system” options) after the loss of Loudoun Water as a wholesale customer is fully incorporated (i.e. 2018).

• That said, the water rate per 1,000 gallons for Option #1B is higher than Options #2B and 2C by approximately 75¢ per 1,000 gallons. – For a customer that uses 5,000 gallons per month this equates to a bill

that is approximately $3.75 higher per month with Option #1B than with the Options #2B or 2C.

Page 60: Goose Creek Water Treatment Plant Water Treatment ...

Summary Observations (cont.)

• After 20 years (i.e. 2031), the City still retains ownership/control over substantial assets under Option #1B.

• Assumptions as to the disposition of City assets are uncertain (i.e. sale of the reservoir, sale of land to other entities). As such, the relative cost/benefit could be more (or less) favorable toward Option #1B.

Page 61: Goose Creek Water Treatment Plant Water Treatment ...

Summary Observations (cont.)

• The City will retain the greatest amount of control with Option

#1B.

• With that control also comes a greater concentration of risk as it relates to primary ownership of the reservoir, dam, transmission main, etc. and potential equipment failure risk, regulatory risk, etc.

Page 62: Goose Creek Water Treatment Plant Water Treatment ...

Questions ? Course of Action ?

62